Deepwater Horizon Subsea Containment
and Relief Wells
1
8/9/2019 Deepwater Horizon Subsea Containment and Relief Wells PowerPoint
2/9
Source Control Strategy and Forward Plan
Run a Safe Operation
Short Term Containment
Work within UAC structure
Levera e Industr and GovernmentExpertise
Multiple Parallel Options
2
8/9/2019 Deepwater Horizon Subsea Containment and Relief Wells PowerPoint
3/9
Containment: Near Term
3
8/9/2019 Deepwater Horizon Subsea Containment and Relief Wells PowerPoint
4/9
Free Standing Riser Containment Equipment
Helix Producer Air Can in Moonpool
Toisa Pisces
Loch RannochSubsea Manifold
New Manifold
49 x 25 x 11
45 Tons
New Manifold
49 x 25 x 11
45 Tons
Suction Piles
14 Diameter
90 Long
Suction Piles
14 Diameter
90 Long
4
8/9/2019 Deepwater Horizon Subsea Containment and Relief Wells PowerPoint
5/9
Sealing Cap Installation
41
Install 3 RamStack
RemoveLMRP Cap
Install FlangeTransition Total Sealin Ca
3
5
Unbolt & Remove Flangew/ Overshot Tool
Spool on Flex Joint2
8/9/2019 Deepwater Horizon Subsea Containment and Relief Wells PowerPoint
6/9
Containment: Mid July OnwardsCapacity 60 80 mbd
6
8/9/2019 Deepwater Horizon Subsea Containment and Relief Wells PowerPoint
7/9
Relief Wells Schematic
DD-III SE
20002800
DD-II MacondoSW
30200
3636365,000
Casing
Point
28
22
28
22
18
28
22
16
13-5/8
16
13-5/8
18
16
13-5/8
10,000
11-7/8
9-7/8 Target9-7/8
11-7/8
Reservoir
15,000
7
7
20,000
8/9/2019 Deepwater Horizon Subsea Containment and Relief Wells PowerPoint
8/9
Overall Well Path
8
8/9/2019 Deepwater Horizon Subsea Containment and Relief Wells PowerPoint
9/9
Prepare for Intercept
ElectromagneticField
9