Upload
mohammad-mustafa-akbari
View
222
Download
0
Embed Size (px)
Citation preview
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
1/15
Deepwater Horizon Source Control
June 30, 2010
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
2/15
DOE/DOI
External Science
Advisors
On-Site DOI +
DOE Labs Team
Reach Back
to Labs
BP + Contractors
+ Industry
Design
Key
Decisions
Independent Analysis
Information Flow
Integrated Design Reviews
Development of Joint Action
Plans Decision Engagement
Analysis
Operations
Federal & BP Working Relationship
Path Forward via
Unified Command
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
3/15
Strategy and Forward Plan
Run a Safe Operation
Long Term Relief Wells
Short Term Containment
Option to Shut-in Well; Test Integrity
Leverage Industry and Government Expertise
Multiple Parallel Options
No Stone Unturned to Minimize Pollution
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
4/15
Containment: Early JulyCapacity 40 53 mbd
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
5/15
Containment: Offshore Operations
Toisa Pisces
Loch Rannoch
Helix Producer
Subsea Manifold
Air Can in Moonpool
Suction Piles
14 Diameter
90 Long
Suction Piles
14 Diameter
90 Long
New Manifold
49 x 25 x 11
45 Tons
New Manifold
49 x 25 x 11
45 Tons
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
6/15
Containment: Simultaneous Operations
40+ Vessels
1500+ People
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
7/15
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
8/15
Containment: Mid July OnwardsCapacity 60 80 mbd
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
9/15
Advantages of Further Enhancements
Reduce Hurricane Impact
Demobe/Mobe 4 days vs. 10 days
Increase System Capacity & Redundancy
Opportunity to Shut-in Well
Aid Well Kill & Cementing
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
10/15
LMRP Cap
Collecting from Enterprise
Sits over the LMRP Flange
Must be replaced to move to Long Term Containment
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
11/15
Execution Process
Helix Producer full rate and stable
Q4000 full rate and stable
Remove LMRP Cap containment
Install sealing cap assembly
Well integrity test
If shut- in unsuccessful
Implement Mid July Containment
Kill well via relief well
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
12/15
Sealing Cap
Sealing Connection
Necessary for Long Term Containment
Replaces LMRP Cap
Shut-in Option
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
13/15
Relief Wells
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
14/15
Overall Well Path
8/2/2019 6.0 Item 25 Deepwater Horizon Containment - 30 JUN
15/15
Drill Alongside Macondo Well - Prepare for Entry
ElectromagneticField