51
Decision making Under Uncertainty Uncertainty, Probability, and Expected Value Decision Trees Sequential Decisions Risk Aversion Expected utility Expected Utility and Risk Aversion

Decision making Under Uncertainty

Embed Size (px)

DESCRIPTION

Decision making Under Uncertainty. Uncertainty, Probability, and Expected Value Decision Trees Sequential Decisions Risk Aversion Expected utility Expected Utility and Risk Aversion. Uncertainty. - PowerPoint PPT Presentation

Citation preview

Page 1: Decision making Under Uncertainty

Decision making Under Uncertainty

• Uncertainty, Probability, and Expected Value• Decision Trees• Sequential Decisions• Risk Aversion• Expected utility• Expected Utility and Risk Aversion

Page 2: Decision making Under Uncertainty

In business we are forced to make decisions

involving risk—that is, where the consequences of any action we take is

uncertain due to unforeseeable events. Where do we begin?

Page 3: Decision making Under Uncertainty

Analyzing the Problem—Preliminary Steps

• Listing the available alternatives, not only for direct action but also for gathering information on which to base later action;

• Listing the outcomes that can possibly occur (these depend on chance events as well as on the decision maker’s own actions);

• Evaluating the chances that any uncertain outcome will occur; and

• Deciding how well the decision maker likes each outcome.

Page 4: Decision making Under Uncertainty

ExperimentsThese are

processes that generate well-

defined outcomes

ExperimentExperimental

Outcomes

Toss a coin Head, tail

Select a part for inspection

Defective, nondefective

Conduct a sales call Purchase, no purchase

Roll a die 1, 2, 3, 4, 5, 6

Play a football game Win, lose, tie

Page 5: Decision making Under Uncertainty

Probability is a numerical measure of

the likelihood of an event occurring

Probability:

0 1.00.5

The occurrence of the event is just as likely as it is unlikely

Page 6: Decision making Under Uncertainty

When an experiment is repeatable, then a

probability is a long-run frequency. This if

we flip a coin 1,000 times, the frequency of

“heads” will be very close to 0.5

Page 7: Decision making Under Uncertainty

Unfortunately, business experiments are rarely repeatable. We cannot

introduce a new product 1,000 times and measure the

frequency with which it succeeds—can we?

Page 8: Decision making Under Uncertainty

Objective versus Subjective Probabilities

• Repeatable experiments (tossing a die, flipping a coin) generate objective probabilities.

• Non-repeatable experiments necessarily involve assigning hypothetical or subjective probabilities to particular outcomes.

Page 9: Decision making Under Uncertainty

I estimate my odds of becoming a country

music star at two to one.

According to the subjective view, the probability of an outcome represents the decision maker’s degree of belief that the outcome will occur.

Page 10: Decision making Under Uncertainty

(Subjective) Probability Distribution for a New Product Launch

Outcome Sales Revenue ProbabilityComplete success $10,000,000 0.1

Promising 7,000,000 0.3

Mixed response 3,000,000 0.2

Failure 1,000,000 0.4

The following gives the subjective view of a manager concerning the probability distribution for the first year’s outcome of a new product launch.

Page 11: Decision making Under Uncertainty

Computing Expected Value or E(v)

nnvpvpvpvE ...)( 2211

Suppose the decision maker faces a risky prospect than has n possible monetary outcomes, v1, v2, . . . , vn, predicted to occur with probabilities p1, p2, . . . , pn. Then the (monetary) expected value is found by:

million 1.4$)1)($4.0()3)($03(.)7)($3.0()10)($1.0()( vE

E(v) for the new product launch is given by:

Page 12: Decision making Under Uncertainty

The Wildcatters Drilling Problem

120

120Drill

Do not drill

Dry

0.4

Wet

0.6

$0

-$200

$600

Payoffs measured in 1,000s

Page 13: Decision making Under Uncertainty

The Expected Value Criterion

I will select the course of action with the highest

expected value. Note that the expected value of “not drilling”

is equal to zero.

Expected value of the drilling option:

000,120$)000,200)(6.0()000,600)(4.0()( vE

Page 14: Decision making Under Uncertainty

Good Decision, Bad Outcome

OK, the well turned out to be dry. But that does not mean

the decision to drill was a bad one. When confronted with

uncertainty, we must distinguish between bad

decisions and bad outcomes.

Page 15: Decision making Under Uncertainty

Bushier Decision Tree

Our next decision tree will take into account three (3) risks affecting the profits derived from drilling:

1. The cost of drilling—which depends on the depth at which oil is found (or not found);

2. The amount of oil discovered; and

3. The price of oil.

In this case we should apply the expected value criterion in stages.

Page 16: Decision making Under Uncertainty

“Bushier” Drilling Decision (19 outcomes)

Page 17: Decision making Under Uncertainty

Finding Expected Value With Multiple Risks

To find the wildcatter’s expected value from

drilling, we start at the tips of the decision tree and “average backwards.”

Page 18: Decision making Under Uncertainty

Expected Profit Drilling at 3,000 Feet

At node D (drilling at 3,000 feet, 5,000 barrels discovered), expected profit is equal to:

(0.2)(700) + (0.5)(0.3)(150)=$360 thousand

But we might have discovered 8,000 barrels or 16,000 barrels by drilling at 3,000 feet. Thus at node E expected profit is equal to $636 thousand and at node F $1,372 thousand.

Thus the expected profit of drilling at 3,000 feet is calculated by:

(0.15)(360) + (0.55)(636) + (0.3)(1,372) = $815.4 thousand

Page 19: Decision making Under Uncertainty

Expected Value from DrillingNow we just multiply the expected value of each outcome (find oil at 3,000 feet, find oil at 5,000 feet, and not find oil) by its probability and sum together. Thus we have:

(0.13)(815.4) + (0.21)(353.8) + (0.66)(-400) = -$83.7 thousand

Would you drill?

Page 20: Decision making Under Uncertainty

Sequential Decisions

Most important business problems require a sequence of key decisions over time. Building

a new petrochemical facility is obviously a huge decision.

Whether that decision turns out to be “good” or “bad” will partly

depend on future decisions concerning product lines, pricing,

or other variables.

Page 21: Decision making Under Uncertainty

R & D Decision

A pharmaceutical firm must choose between 2 R&D

approaches—biochemical and biogenetic.

Page 22: Decision making Under Uncertainty

An R&D Decision (all figures expressed in present values)

R&D Choice Investment Outcomes

Profit(Minus R&D) Probability

Biochemical $10 millionLarge success

Small Success

$90 million

$50 million

0.7

0.3

Biogenetic $20 million SuccessFailure

$200 million0 million

0.20.8

Let G denote the biogenetic approach and C is the biochemical approach. The expected profit (π) of the 2 approaches is calculated as follows:

million 68$10)50)(3.0()90)(7.0()( CE

million 20$20)20)(2.0()( GE

Page 23: Decision making Under Uncertainty

We would select the biochemical option based

on the expected value criterion. However, our

analysis should not stop here. We might hedge our bets by doing both R&D

programs simultaneously. Depending on the results,

we can decide which method to commercialize

Don’t’ Stop Now!

Page 24: Decision making Under Uncertainty

Simultaneous R&D Investments

Figure 8.3

Note: failure for biochemical means “small success.”

Page 25: Decision making Under Uncertainty

Notes on Figure 8.3

•4 possible outcomes

Probability of “Both programs succeed is equal to the probability that biochemical will succeed (0.7) times the probability that biogenetic will succeed (0.2).

That is: PBS = (0.7)(0.2)= 0.14Note that the probabilities of the 4 outcomes must sum to 1.

•Biogenetic should be selected for commercialization if it is successful (as it is on the upper two branches of the tree) since it has the higher payoff. Thus the payoff would be equal to $200 million minus the $30 million spent for R&D, or $170 million

•“Average backwards” to find the expected value of simultaneous development.

Page 26: Decision making Under Uncertainty

Computing Expected Value in the Simultaneous Case

million 4.72$)20)(24.0()60)(56.0()70)(06.0()170)(14.0()( vE1

1 Note the typographical errors in the equation on p. 321 of Samuelson and Marks, 5th edition.

The expected profit from simultaneous R&D

development exceeds the expected payoff from

pursuing biochemical alone ($72.4 million compared to

$68 million)

Page 27: Decision making Under Uncertainty

Sequential Development

There is another strategy. We can pursue the R&D

methods sequentially. But which approach should we do first?

Page 28: Decision making Under Uncertainty

Sequential R&D: Biochemical First

Figure 8.4

Page 29: Decision making Under Uncertainty

Notes on Figure 8.4

•One would intuitively think that, if biochemical is successful you would go ahead and commercialize it. This turns out not to be the case. You get a higher expected payoff by continuing on to develop biogenetic.

•Where does the $82 come from? If biogenetic success in the 2nd step, you would commercialize it. If it fails, you commercialize biochemical, but now the payoff is $60 million instead of $80 since you spend an additional $20 million to develop biochemical. Thus if biochemical succeeds the expected value is: E(v) = (0.2)(170)+(0.8)(60) = $82 million.

•Note that if biochemical fails, the firm would best option is to pursue biogenetic.

•The firm’s expect profit at the outset is equal to:

E(v) = (0.7)(82) + (0.3)(50) = $72.4 million

Page 30: Decision making Under Uncertainty

Sequential R&D: Biogenetic First

Figure 8.5

Page 31: Decision making Under Uncertainty

Why does the “biogenetic first” strategy have a higher expected profit ($74.4 million compared to $72.4 million for “biochemical first”)?

If biogenetic is successful in the first

stage, we will go ahead and commercialize it—

thereby saving $10 million in R&D for

biochemical

Page 32: Decision making Under Uncertainty

Summary of Pharmaceutical Company’s R&D Options

Page 33: Decision making Under Uncertainty

Risk Aversion

When it comes to risks that are large relative to financial

resources, firms and individuals tend to adopt a

conservative attitude. That is, they are not “risk-neutral”—which is what the expected

value criterion assumes.

Page 34: Decision making Under Uncertainty

A Coin Gamble

You have 2 choices: You can have $60, no questions asked. Or, you

can accept the following gamble: A fair coins is tossed. Heads: you win $400. Tails: You lose $200

dollars. OK, what is your choice?

Question: Which choice has the highest expected value?

For the “gamble” choice:

100$)200)(5.0()400)(5.0()( vE

If you refuse the bet, you are not risk neutral!

Page 35: Decision making Under Uncertainty

The Certainty Equivalent (CE)

The CE is the amount of money for certain that makes the individual

exactly indifferent to the risky prospect.

Example: Suppose that a guaranteed $25 would make you indifferent to the bet with an expected value of $100. Thus your CE = $25. If CE < E(v), then the individual is risk averse.

Page 36: Decision making Under Uncertainty

The CE and the Degree of Risk Aversion

The discount factor for risk is the difference between the expected value of the gamble and the CE. My CE is $75. Thus my discount factor is equal to: $100 - $75 =

$25. If your CE is $25, then your discount factor is $75.

Principle: The higher the discount factor, the higher the degree of risk aversion.

Page 37: Decision making Under Uncertainty

The Demand For Insurance Insurance entails the transfer (for a price) of risk from t risk averse individuals or films to risk neutral insurance companies.

Risk pooling allows insurance companies to be risk neutral. An

insurance company does not know which homes will catch fire. It can predict how many homes out of 10,000 will catch fire, however.

Page 38: Decision making Under Uncertainty

Expected Utility

This is a similar decision making process to expected utility—with one big difference. In contrast to the risk neutral manager, who averages monetary values at

each step, the risk averse manager averages expected

utilities associated with monetary values.

Page 39: Decision making Under Uncertainty

A Risk Averse Wildcatter

Figure 8-7

Page 40: Decision making Under Uncertainty

Expected Utility: How It Works

•The decision maker first attaches a utility value to each possible monetary outcome.

•The worst monetary outcome is assigned a value of zero; the best monetary outcome must have a greater than zero—but that is the only requirement.

•Our wildcatter assigns a value of 0 to the worst outcome (-$200) and a value of 100 to the best outcome ($600). Thus the expected utility of drilling is given by:

.40)0)(6.0()100)(4.0(

)200()6.0()600()4.0()(

UUuE

Page 41: Decision making Under Uncertainty

Expected Utility: How It Works-Continued

Now I must compare the expected utility of drilling with the expected utility of not drilling—that is U(0).

How do I find that?

Principle: To find U(0), compare $0 for certain with a gamble offering $600 thousand (with probability p) and -$200 thousand (with probability 1 – p).

The wildcatter finds his preference for $0 by finding the probability p that leaves him indifferent to the options of $0 and the gamble (drilling).

Page 42: Decision making Under Uncertainty

I find my preference for $0 by finding the probability p that leaves me indifferent to the

options of $0 and the gamble (drilling). Say I have determined it is 0.5.

Then the expected utility of the 50-50 gamble is equal to:

50)0)(5.0()100)(5.0()200()5.0()600()5.0()0( UUU

Should the wildcatter drill?

Expected utility rule: The decision maker should choose the course of action that maximizes his or her expected utility.

Page 43: Decision making Under Uncertainty

A More Complicated Drilling Prospect

Figure 8.8

Now drilling has 4 possible outcome with probabilities listed. Let’s compare expected value and expected utility of drilling:

E

million 120$)120)(30.0()0)(32.0()200)(18.0()600)(2.0()( vE

1.56)25)(30.0()50)(32.0()70)(18.0()100)(2.0(

)120()30.0()0()32.0()200()18.0()600()2.0()(

UUUUUE

Thus expected utility is maximized by drilling

Page 44: Decision making Under Uncertainty

Figure 8.9

Page 45: Decision making Under Uncertainty

Notes on Figure 8-9

•The utility curve gives us the “certainty equivalent” of a bet with a given expected value.

•The CE of a bet with an expected value of $200 thousand is $0. That is, the certainty of obtaining $0 and a bet with an expected value of $200 thousand have the same expected utility (50).

•A concave utility curve means the decision maker is risk averse—that is, there is a discount due to risk equal to E(v) – CE ($200 thousand in the example above).

•A risk-neutral decision maker is guided by expected value—there id no discount for risk so that the utility curve is linear.

•A risk lover has a convex utility curve.

Page 46: Decision making Under Uncertainty

Positive discount for risk

Zero discount for risk

E(v) – CE > 0

E(v) – CE = 0

E(v) – CE < 0

Negative discount for risk

Page 47: Decision making Under Uncertainty

Nonmonetary Examples: An R&D Race

•A firm must decide between two R&D methods—A or B (it cannot do both).

•Methods A and B entail the same cost and have the dame projected profitability—the only source of uncertainty concerns each method’s time until completion.

•Subjective utilities are attached to various completion times—e.g., the utility of a 12 month completion time is 100.

•Management is solely interested in meeting an 18 week deadline.

Page 48: Decision making Under Uncertainty

R&D RaceFigure 8.11

Notice that Method B gives the highest

expected utility even though the expected completion time for

this method is higher.

Method B has a greater chance of beating the 18 week deadline.

Page 49: Decision making Under Uncertainty

A Surgical Decision•A 60-year old woman suffers from cardiovascular disease.

•A heart bypass operation can restore her to near-perfect health, but carries the risk of death—an estimated 4 percent (p = 0.04) for someone with her health history.

•Should she undergo the operation?

•We assume that cost is not a factor—the woman is covered by health insurance.

Page 50: Decision making Under Uncertainty

A Medical DecisionFigure 8-12

• Note that the patient names the probability of success (p) that will leave her indifferent to the two course of action.

•The patient is indifferent between her current health status and a 12 percent chance of death.

Page 51: Decision making Under Uncertainty

Since the probability of success for this operation

(0.96) exceeds the patient’s required degree of safety

(0.88), the operation is a go.

Note also that the expected utility of the surgery exceeds the utility of her current health status. That is, the expected utility of surgery is given by:

96)0)(04.0()100)(96.0(

)Death()04.0(Health) Normal()96.0()(

UUUE

Whereas the utility of the patients current health status is 88.