Special Audits Office
Report No. 2017-07
Subsidy Audit
Davao del Norte Electric Cooperative, Inc.
(DANECO)
Republic of the Philippines COMMISSION ON AUDIT
SPECIAL SERVICES SECTOR
SPECIAL AUDITS OFFICE Commonwealth Avenue, Quezon City Philippines
Tel. No.: (+632) 931-7455 I Telefax No.: (+632) 931-9235
December II , 20 I7
ENGR. BENEDICTO D. ONGKING OIC - General Manager Davao del Norte Electric Cooperative, Inc. (DANECO) KM I 00, Poblacion, Montevista Compostela Valley Province
Sir:
We are pleased to transmit the report on the special audit on the utilization of funds released by the National Electrification Administration (NEA) either as loan or subsidy/grant to DANECO covering the period January I , 20I2 to December 3I, 20I5. The audit was conducted from February 22, 20I7 to April28, 20 I7 in compliance with COA Office Order No. 20 16-I 079 dated December 28, 2016 and Travel Order No. 2017-01 dated February 14, 2017.
The audit was conducted to determine whether the subsidy and loan funds were effectively and efficiently utilized according to their purpose and in compliance with relevant laws, rules and regulations with a view of ensuring that the projects were effectively and efficiently implemented.
The draft report containing the results of the audit was forwarded to that Office on August 29, 20 I7 for comment/justification. The Management comments/justifications were received by this Office on October I8, 2017. The comments submitted were evaluated and incorporated in the report, where appropriate.
We look forward to the implementation of the audit recommendations contained in the report and we would appreciate being informed of the actions taken thereon within 60 days from receipt hereof.
We acknowledge the cooperation and assistance extended to the Audit Team by the officials and employees of that Office.
Very truly yours,
By Authority ofthe Chairman:
f~t~ PEARL L RAMOS
Director III Officer-In-Charge
Table of Contents
Title Page
No.
Part I Executive Summary 1
Introduction 2
Audit Objectives 3
Identification and Selection of Key Audit Area 3
Audit Criteria 3
Audit Scope and Methodology 4
Audit Conclusions 6
Management Comments 6
Team’s Rejoinder 7
Recommendations 7
Part II About DANECO 10
About DANECO 11
Coverage Area 12
Organizational Structure 13
Board Composition 14
Personnel Complement 14
Government Financial Assistance 15
Reported Accomplishments 15
Part III Audit Observations and Recommendations 17
Chapter 1 Proper Selection and Prioritization of SEP Projects 18
Introduction 19
Observations and Recommendations 19
Chapter 2 Compliance with Relevant Laws, Rules and Regulations 25
Introduction 26
Observations and Recommendations 26
Chapter 3 Effective Implementation of SEP/BLEP Projects 48
Introduction 49
Observations and Recommendations 51
Chapter 4 DANECO LOAN (The Modular Gensets Program) 66
Introduction 67
Observations and Recommendations 69
Part IV Annexes 80
A List of unenergized sitios/puroks identified by DANECO 81
B List of energized sitios/puroks not in the priority list of
DANECO/NEA 103
C List of energized sitios/puroks with costs exceeding the P1
million threshold 107
D Breakdown of unsupported transactions/unsubmitted
supporting documents 109
E Breakdown of transactions which were used as liquidation
twice in the AOF 126
F Breakdown of unliquidated subsidy for SEP Projects 129
G Breakdown of items not part of Housewiring materials 132
Table of Contents
Title Page
No.
H Detailed computation of materials used in the new projects
charged to Calamity Loan/Grant 135
I Breakdown of potential and actual/energized household
beneficiaries 136
1
Part I
Executive Summary
EXECUTIVE SUMMARY
2
The audit of Davao del Norte Electric Cooperative, Inc. (DANECO) was
conducted in compliance with COA Office Order No. 2016-1079 dated
December 28, 2016 and Travel Order No. 2017-01 dated February 14, 2017
in response to the letter request dated October 11, 2016 of the Speaker of the
House of Representatives, Honorable Pantaleon D. Alvarez, addressed to the
Chairperson of this Commission, Michael G. Aguinaldo, to conduct an audit
of Electric Cooperatives (ECs) starting with DANECO-National
Electrification Administration (DANECO-NEA) and DANECO-Cooperative
Development Authority (CDA).
The request for special audit as decided during the meeting held with the
Office of the House Speaker, NEA and CDA was to determine whether the
subsidy, grants and loans received by DANECO from NEA were utilized in
accordance to their purpose and in conformity with the pertinent governing
laws, rules and regulations. There were no funds received by DANECO from
CDA as it is only a regulatory agency of the cooperative operations of
DANECO.
The audit was also conducted pursuant to Section 2(1)(d) of Article IX-D of
the 1987 Constitution, that the Commission on Audit shall have the power,
authority, and duty to examine, audit and settle all accounts pertaining to the
revenue and receipts of, and expenditures or uses of funds and property,
owned or held in trust by, or pertaining to, the Government, or any of its
subdivisions, agencies, or instrumentalities, including government-owned or
controlled corporations with original charters, and on a post-audit basis such
non-governmental entities receiving subsidy or equity, directly or indirectly,
from or through the Government, which are required by law or the granting
institution to submit to such audit as a condition of subsidy or equity. It is
also provided under Section 16 of Presidential Decree (PD) No. 1445,
otherwise known as the State Audit Code of the Philippines that it is the
function of the Special Audits Office (formerly known as the Performance
Audit Office) to conduct, consistently with the exercise by the Commission
of its visitorial power, variable scope audit of non-governmental firms
subsidized by the government or government authority or those required to
pay levies or government share, those funded by donation through the
government, and those for which the government has put up a counterpart
fund, provided that such audits shall be limited to the funds or subsidies
coming from the government.
INTRODUCTION
EXECUTIVE SUMMARY
3
The audit aimed at determining whether:
1. The subsidy and loan funds were effectively and efficiently utilized in
accordance to their purpose, and in compliance with relevant laws, rules and
regulations;
2. The projects under Sitio Electrification Program (SEP), Barangay Line
Enhancement Program (BLEP), restoration/rehabilitation of the distribution
lines damaged by typhoon Pablo and Mindanao Modular Generator Sets
(Gensets) Program funded by the subsidies and loans were effectively and
efficiently implemented in compliance with the provisions of Republic Act
(RA) No. 9184 and its Revised Implementing Rules and Regulations (RIRR);
and
3. The monitoring mechanism of DANECO over the implementation of projects
through its contractors/suppliers was effectively executed.
The audit focused on the following areas:
Management and utilization of the subsidy and loan funds received;
Selection and prioritization of projects implemented;
Reasonableness of the costs of materials and labor of the projects
implemented;
Propriety and validity of transactions;
Compliance with the relevant laws, rules and regulations; and
Monitoring mechanism of DANECO over the performance of its contractors.
The audit used the following evaluation criteria:
Proper management and utilization of the subsidy/loan received;
Well-defined selection and prioritization in implementing projects;
Effective implementation of projects;
Reasonableness of the price of materials, labor and contract cost of the
projects implemented;
Propriety, validity and conformity of transactions with RA 9184 and other
relevant laws, rules and regulations; and
Effective and sound monitoring systems.
IDENTIFICATION AND SELECTION OF KEY AUDIT AREA
AUDIT CRITERIA
AUDIT OBJECTIVES
EXECUTIVE SUMMARY
4
Scope
The audit covered the utilization of subsidies and loans extended by NEA to
DANECO from January 1, 2012 to December 31, 2015, amounting to
P572.84 million, broken down as follows:
Table 1: Subsidies and loans covered by the special audit
Year Subsidy Loan Total
2012 P 2,733,771 P 0 P 2,733,771
2013 40,683,073 130,165,000 170,848,073
2014 222,394,713 43,934,341 266,329,054
2015 93,538,026 39,394,120 132,932,146
Total P 359,349,583 P 213,493,461 P 572,843,044
The subsidies and loans were intended for the following programs/projects:
Table 2: Subsidies and loans for implementation of programs/projects
Year Amount
(in million) Purpose
Subsidy P359.350
2012 - 2015 230.133 For the construction of distribution lines of 255 Sitios under SEP
2012 - 2014 10.167 For the enhancement of distribution lines of 3 Barangays under BLEP
2014 119.050 Calamity grant for the rehabilitation of damaged distribution lines caused by typhoon Pablo
Loans 213.493
2013 130.165 Calamity loan for the rehabilitation of damaged distribution lines caused by typhoon Pablo
2014 24.237 Working Capital Loan – Power Accounts
2014 - 2015 59.091 Procurement of 3 megawatts Modular Generator Sets (Gensets)
Total P572.843
AUDIT SCOPE AND METHODOLOGY
EXECUTIVE SUMMARY
5
Methodology
To achieve the audit objectives, the team adopted the following audit
procedures/methodologies, among others:
Attended briefing/orientation on the operations of DANECO;
Obtained and reviewed Board Resolutions, NEA Memoranda and relevant
policies/guidelines relative to the granting and utilization of subsidy and
loan funds;
Reviewed and analyzed financial reports/accounts, liquidation documents,
schedule of projects implemented, list of project beneficiaries and other
pertinent documents;
Vouched and analyzed transactions to determine the propriety and validity
of procurement including award of contracts;
Reviewed and evaluated the reasonableness of price of the procured
materials, labor and contract costs of projects undertaken/implemented;
Interviewed key DANECO officers and employees;
Conducted ocular inspection/validation of selected projects implemented;
Administered survey/questionnaires to selected beneficiaries to assess the
impact of the program/project; and
Confirmed from various sectors the authenticity of documents submitted by
DANECO; extent of damage caused by typhoon Pablo in the Province of
Compostela Valley; and gathered information on the existence of
sitios/puroks of the Province of Compostela Valley, Tagum City, and
IGACOS area:
Table 3: Summary of issues confirmed/information gathered with/from various sectors
Sector Issues Confirmed/Information Gathered
Contractors/Suppliers Authenticity of the transactions, issuance of Official Receipts (ORs) and/or Sales Invoices (SIs), including all information stated therein.
Business Permits and Licensing Office (BPLO)
Issuance of business permit/license to operate to selected contractors/suppliers and information on their declared gross sales/revenues for CYs 2012 to 2015.
Provincial Disaster Risk Reduction Management Council (PDRRMC)
Copies of pictures/videos showing the extent of damage of typhoon Pablo to the electrical distribution lines and facilities of DANECO in the Province of Compostela Valley, and certified true copy of pertinent reports thereon.
Philippine Contractors Accreditation Board (PCAB)
Issuance of accreditation/license for CYs 2012 to 2015 to selected contractors.
EXECUTIVE SUMMARY
6
The audit concluded that the subsidies/grants/loans received by DANECO
from NEA amounting to P548.61 million were not effectively and efficiently
utilized; the implementation of a number of projects under SEP and the
restoration/rehabilitation of distribution lines damaged by typhoon Pablo
were not properly implemented and were not compliant with the relevant
laws, rules and regulations. Thus, it is evident that the monitoring mechanism
of DANECO in the performance of its contractors was not effective due to
incurrence of delays and incidence of missing items in the projects
implemented. Likewise, the purpose of acquiring the Gensets, purportedly to
immediately address the growing power requirement in the Island Garden
City of Samal (IGACOS) area was not attained as the same were installed at
Montevista, Compostela Valley, which had sufficient power supply. The
Gensets remained idle as of inspection date due to the failure of DANECO to
secure the necessary government permits/licenses to operate. Details of these
observations were thoroughly discussed in Part III of this Report.
The Audit Highlights containing the results of audit were forwarded to Engr.
Benedicto D. Ongking, OIC – General Manager of DANECO on August 30,
2017 for comments/justifications to be submitted on or before September 15,
2017. Such deadline was, however, extended upon request and thereby
moved to October 13, 2017. The comments/justifications which were
submitted on October 18, 2017 were evaluated and incorporated in the report,
where appropriate.
Generally, DANECO claimed that in the selection, prioritization and
implementation of SEP projects, DANECO, being an implementing arm of
NEA, just followed and implemented what has been given by NEA as
priority sitios/puroks to be implemented each year. Likewise, in the
acquisition of the three units Modular Gensets, it was AMRECO who
conducted the bidding and was reviewed by NEA. The former DANECO
Management recommended the return of the Gensets to NEA, however, the
present Management passed a resolution to transfer the Gensets to IGACOS,
where the Gensets were to be originally installed.
MANAGEMENT COMMENTS
AUDIT CONCLUSIONS
EXECUTIVE SUMMARY
7
After thorough examination/evaluation of the Management’s comments and
justifications, the Audit Team maintains its findings and observations that
relevant laws, rules and regulations in the selection, prioritization and
implementation of SEP projects were violated, and that project deficiencies
were noted in the implementation of projects, as discussed in the Report.
In view of the noted deficiencies, it is recommended that DANECO should:
Comply strictly with the criteria on selection and prioritization of
SEP projects and give priority to sitios/puroks that are specifically
identified in the target list, so as not to deprive the beneficiaries of
the targeted sitios/puroks the benefits that may be derived from the
Program. In addition, observe the P1 million threshold project cost
per sitio/purok to accommodate all the sitios/puroks to be energized
by the Program. (Observation Nos. 1 and 2).
Submit all pertinent documents to NEA to support the disbursements
against the subsidies and loans received from NEA to ensure reliable
reporting and provide a means of audit/review on validity of the
underlying transactions. Likewise, stop the practice of supporting
disbursements on AOF with documents already reported in other
AOF, and consider filing appropriate actions against the personnel
who committed these lapses. Any excess amount should be returned
to NEA. (Observation No. 3).
Refrain from utilizing the funds as overhead expenses in excess of
what NEA, has allowed; and immediately return the excess overhead
cost amounting to P24.68 million to NEA that could be used to fund
more electrification projects. (Observation No. 4).
Apply strictly the 15 percent advance payment limitation to
infrastructure projects pursuant to the RIRR of RA 9184.
(Observation No. 5).
Engage and award contracts only to legitimate and eligible
contractors/suppliers who are competent and capable of undertaking
projects within the timeline/schedules. (Observation No. 6).
RECOMMENDATIONS
TEAM’S REJOINDER
EXECUTIVE SUMMARY
8
Liquidate immediately the utilization of subsidies/grants received
from NEA to ensure reliability of reporting and recording of actual
project cost. Thus, any excess amount should be returned to NEA.
(Observation No. 7).
Utilize strictly subsidy and loan funds received according to their
intended purposes; and return to NEA the amount used to purchase
items not eligible for charging against subsidy funds and the costs of
newly implemented project not allowable to be funded from calamity
grant/loan. (Observation No. 8).
Intensify and encourage prospective program beneficiaries to have
their household energized, and if possible, assist the potential
beneficiaries in securing permits from their respective LGUs to
maximize the enjoyment of the benefits from the program.
(Observation No. 9).
Compel the contractors to install items that were found missing
during inspection to ensure effectiveness in the delivery of electricity
to every household beneficiaries especially during peak hours; return
immediately to NEA the corresponding costs of missing items if not
needed for the projects; and enhance its monitoring mechanism to
ensure that contractors/suppliers’ performance conform with the
agreed upon plans and specifications/staking sheets and project
timelines/schedules. (Observation No. 10).
Comply to the SEP objectives of energizing far flung and thinly
settled areas which is very costly to electrify to enable the people to
have access to government funded projects with reasonable electric
rates; and stop using the subsidy funds in implementing energization
projects in highly urbanized areas, such as relocation
sites/subdivisions, town/city proper, along the highway, and areas
with existing energization projects. (Observation No. 11).
Enhance its monitoring mechanism to ensure that
contractors/suppliers’ performance conform with the agreed upon
plans and specifications and implement projects as scheduled.
(Observation No. 12).
Conduct in-depth investigation and if warranted, penalize the persons
responsible in approving and awarding the contract for the
acquisition of the Gensets. (Observation No. 13).
EXECUTIVE SUMMARY
9
Avail the option to return the Gensets to NEA as soon as possible to
save DANECO from paying interest expenses as well as maintenance
costs that can be incurred in bringing the Gensets to its good running
condition. (Observation No. 14).
Comply strictly with the provisions of RA 9184 and its RIRR
specifically on the limitation on the advance payment and for similar
transactions in the future. (Observation No. 15).
Explore all possible options to collect from the contractor the
remaining balance of P8.60 million out of the P9.85 million
maximum liquidated damages equivalent to 15 percent of the
contract price, or could be made through deduction from the
Contractor’s Performance Bond. (Observation No. 16).
Conduct further evaluation if still beneficial for DANECO to push
through with the transfer of the Gensets to IGACOS and secure the
necessary government permits/licenses to operate, as it was the
intention of the loan secured from NEA. Otherwise, exercise the
option to return the Gensets immediately to NEA to prevent
depleting DANECO’s financial resources and save it from paying
interest and maintenance expenses considering the idle condition of
the Gensets (Observation No. 17).
10
Part II
About DANECO
ABOUT DANECO
11
The Davao del Norte Electric Cooperative, Inc. (DANECO) is a non-stock
and non-profit electric cooperative, organized on September 24, 1971 to
provide affordable, dependable and round-the-clock electricity not only in the
urban areas but also in far-flung barangays and remote areas on an area
coverage basis. The Cooperative has been under the supervision of NEA
since it was founded pursuant to Presidential Decree (PD) No. 269, as
amended, in relation to Republic Act (RA) No. 6038.
In October 2011, an administrative complaint was filed by the member-
consumers before the Administrative Committee of NEA against the majority
of then DANECO Board of Directors (BOD) for grave offenses of abuse of
authority and grave misconduct, among others, on which the NEA-Board of
Administrators (NEA-BOA) ruled that the accused were guilty and imposed
the penalty of removing them from the DANECO BOD.
In May 2012, the suspended BOD allegedly initiated a referendum with the
member-consumers of DANECO franchise areas in Davao del Norte and
Compostela Valley provinces, to vote for where the member-consumers want
DANECO to be registered with, in line with the Electric Power Industry
Reform Act (EPIRA) in 2001. The EPIRA gives electric cooperatives (ECs)
the option to be registered with either NEA, Cooperative Development
Authority (CDA) or with the Securities and Exchange Commission (SEC) as
a stock corporation. The referendum was held despite the pronouncement of
NEA to defer or suspend the conduct of any referendum while most of its
BOD were suspended.
Reportedly, of the 51,000 member-consumers who allegedly participated in
the referendum, at least 49,000 voted for the registration with the CDA, while
1,700 wanted to remain with NEA, and the others to register with SEC.
However, the result of the said referendum was allegedly not honored by the
member-consumers who wanted to remain with NEA. This incident resulted
in the division of the operations and management of DANECO, thus, the
creation of two factions, DANECO-NEA and DANECO-CDA, with each
having its own sets of BOD and officers. This condition triggered a series of
legal battles of who is legitimate between the two offices. Recently, the
Supreme Court (SC) ruled that DANECO-NEA is the legitimate and
authorized juridical entity to manage the affairs of the electric cooperative.
But despite such decision by the SC, DANECO-CDA reportedly continued
its operation.
ABOUT DANECO
ABOUT DANECO
12
DANECO’s service area covers part of Davao del Norte Province and the
whole of Compostela Valley Province, consisting of two cities and 16
municipalities, with nearly 177,000 member-customers as of December 2015,
as follows:
Table 4: DANECO’s Service/Coverage Area and Member-Customers
City/Municipality Number of Member-Customers as of
2012 2015 Increase
Davao del Norte Province 79,224 88,906 9,682
1. Asuncion 6,003 6,518 515
2. Kapalong 6,953 7,391 438
3. New Corella 5,088 5,874 786
4. San Isidro 2,243 2,456 213
5. Tagum City 48,282 53,022 4,740
6. Talaingod 692 743 51
7. Island Garden City of Samal (IGACOS) 9,963 12,902 2,939
Compostela Valley Province 80,377 88,086 7,709
8. Compostela 11,088 12,204 1,116
9. Laak 5,201 5,714 513
10. Mabini 3,762 4,128 366
11. Maco 8,752 9,425 673
12. Maragusan 5,886 6,626 740
13. Mawab 5,030 5,531 501
14. Monkayo 10,514 11,530 1,016
15. Montevista 5,101 5,699 598
16. Nabunturan 12,669 13,982 1,313
17. New Bataan 5,400 6,168 768
18. Pantukan 6,974 7,079 105
Total 159,601 176,992 17,391
The increase in the number of member-customers between 2012 and 2015
may be partly attributed to the beneficiaries of SEP and/or BLEP projects,
which were implemented by DANECO during the said period.
COVERAGE AREA
ABOUT DANECO
13
The organizational framework of DANECO is presented below:
Table 5: Organizational Chart of DANECO
Operations and Maintenance Department
Member-Customers
Board of Directors
DGM Finance and Administration
Technical Services
Department
DGM Technical and Institutional
Consumers Account
Department
Administrative
Department
CORPLAN Department
General Manager
Institutional Services
Department
Internal Audit
Finance Services
Department
MSEAC Members
Physician, Legal Counsel, Dentist, Security Agency, External Audit
ORGANIZATIONAL STRUCTURE
ABOUT DANECO
14
The DANECO’s Board of Directors (BOD) as of December 31, 2015 is
composed of only two officers, as shown below:
Table 6: DANECO’s Board Composition
Name Position/Designation Nationality
Fr. Tomas P. Avila, Jr. BOD President Filipino
David B. Lagunzad Vice-President Filipino
Under the present set-up, the BOD officers are appointees of NEA, pending
the election of the members of the BOD, and serve the cooperative in an
interim basis, which is renewable annually.
DANECO’s regular personnel of 249 assigned in the Province of Compostela
Valley, Tagum City, and Island Garden City of Samal (IGACOS) as of
December 31, 2015 is presented below:
Table 7: Personnel Complement of DANECO
Office/Department No. of Personnel
Comval Tagum IGACOS Total
Office of the General Manager 2 8 - 10
Corplan Office 2 5 - 7
Internal Audit Office 4 3 - 7
Finance Services Department 22 21 - 43
Consumers Account Department 18 24 - 42
Administrative Department 6 6 - 12
Technical Services and Operation Maintenance Dep’t. 38 47 9 94
Institutional Services Department 8 7 - 15
Maragusan Sub-Office 8 - - 8
Diwalwal Operation 11 - - 11
Total 119 121 9 249
BOARD COMPOSITION
PERSONNEL COMPLEMENT
ABOUT DANECO
15
Section 2 of PD No. 269 declares the policy of the State to promote,
encourage and assist all public service entities engaged in the supply of
electric service, particularly ECs, which are willing to pursue diligently the
objective of total electrification of the country on an area coverage basis.
Accordingly, because of the non-profit nature, cooperative character and
heavy financial burdens that these cooperatives must sustain to become
effectively established and operationally viable, ECs shall be given every
tenable support and assistance by the National Government, its
instrumentalities and agencies to the fullest extent of which they are capable.
In line with this policy, DANECO received P572.84 million from NEA as
financial assistance in the form of subsidy and loan from January 1, 2012 to
December 31, 2015. Details are shown in Table 2 of this Report.
The government, thru NEA, intensified the rural electrification program
through the implementation of programs/projects such as SEP, which is the
extension of distribution lines to far-flung and thinly-settled areas that are
more costly to electrify, and BLEP, which is the tapping of electricity from
the national grid to off-grid sourced barangays.
Based on the year 2011 baseline target, as of December 31, 2015, DANECO
reported that it completed and energized 250 sitios/puroks, which is
equivalent to 23.79 percent of the 1,051 targeted sitios (Annex A) and 87.10
percent of the 287 funded sitios, as tabulated below:
Table 8: SEP targets and accomplishments as of December 31, 2015
Region
Baseline Target in
2011
Funded by NEA
Accomplishment Accomplishment as Percentage (%) of
(No. of Sitio/Purok) Target Funded
Davao del Norte Province
Asuncion 29 12 12 41.38 100.00
IGACOS 101 19 12 11.88 63.16
Kapalong 14 3 3 21.43 100.00
New Corella 55 14 12 21.82 85.71
Tagum City 0 25 18 72.00
Talaingod 59 10 8 13.56 80.00
REPORTED ACCOMPLISHMENTS
GOVERNMENT FINANCIAL ASSISTANCE
ABOUT DANECO
16
Table 8: SEP targets and accomplishments as of December 31, 2015
Region
Baseline Target in
2011
Funded by NEA
Accomplishment Accomplishment as Percentage (%) of
(No. of Sitio/Purok) Target Funded
San Isidro 49 9 8 16.33 88.89
Compostela Valley Province
Compostela 42 20 18 42.86 90.00
Laak 41 9 *15 36.59 166.67
Mabini 47 12 16 34.04 133.33
Maco 62 10 7 11.29 70.00
Maragusan 143 23 19 13.29 82.61
Mawab 54 10 9 16.67 90.00
Monkayo 108 31 27 25.00 87.10
Montevista 81 16 13 16.05 81.25
Nabunturan 117 34 26 22.22 76.47
New Bataan 47 17 15 31.91 88.24
Pantukan 2 13 12 600.00 92.31
Sub-Total Total 1,051 287 250 23.79 87.10
**Carmen 33 0 0 0 0
**Sto. Tomas 10 0 0 0 0
Total 1,094
Note: * - includes 13 passby sitios.
** - Transferred to the franchise area of Davao Light Power Co. (DLPC).
On the other hand, the rehabilitation/restoration works on the distribution
lines damaged by typhoon Pablo in December 2012 funded by both Calamity
Loan and Grant were reported as 100 percent restored/completed. The three
units modular Gensets that were procured out of the loan granted to
DANECO and installed and commissioned at DANECO General
Headquarters in Montevista, Compostela Valley, were reported to be
technically ready but not yet in commercial operation. The Gensets are
discussed in detail in Chapter 4 of this Report.
17
Part III
Audit Observations and Recommendations
18
Chapter I
Proper Selection and Prioritization
of SEP Projects
PROPER SELECTION AND PRIORITIZATION OF SEP PROJECTS
19
Proper selection and prioritization of SEP projects to be implemented plays an
important role in the success and attainment of the ultimate objective of the program
given the limited resources. Thus, it is very important for DANECO, as an
implementing arm of NEA, to carefully select and prioritize SEP projects that will
have an immediate impact to the potential project beneficiary, taking into
consideration, pertinent existing rules and regulations including policies and
guidelines issued by NEA.
The criteria/guidelines in the selection and prioritization of SEP projects to be
implemented are setforth in the Special Provisions of the General Appropriations
Act (GAA) for CYs 2012 to 2014, SEP Executive Summary prepared by NEA, and
NEA Memorandum No. 2011-021 issued for this purpose.
However, audit disclosed that the laid down guidelines/criteria were not religiously
complied with in the implementation of SEP projects in CYs 2012 to 2015,
depriving the intended beneficiaries of the maximum benefits that could have been
derived from its implementation. Some of the sitios/puroks that were energized by
DANECO using government subsidy funds were not included in the NEA’s list of
priority sitios/puroks for energization. Moreover, the cost of energizing 109
sitios/puroks exceeded the construction cost threshold of approximately P1.0
million per sitio/purok.
1. One hundred forty-nine (149) out of the 255 or 58.43 percent of sitios/puroks
energized by DANECO in CYs 2012 to 2015 using government subsidy funds
of P141.86 million were not included in the priority list for energization of
NEA, contrary to the prescribed guidelines of prioritization to the detriment
of the prioritized sitios/puroks as they are deprived of the benefits that could
have been derived from the Program.
In 2011, NEA conducted a “sitio summit”, which was participated in by
different ECs nationwide in order to determine the unenergized sitios/puroks
that will be given priority for SEP implementation. As a result, a total of
32,441 sitios/puroks were identified to be unenergized and posted by NEA in
its database as the official list of priority sitios/puroks for energization for the
remainder of 2011 until June 2016. Out of NEA’s targeted sitios for
energization, 1,094 sitios/puroks (Annex A) were located in DANECO’s
service area.
AUDIT OBSERVATIONS
INTRODUCTION
PROPER SELECTION AND PRIORITIZATION OF SEP PROJECTS
20
The prioritization of sitios/puroks to be energized should be based on the
following criteria/guidelines:
General Appropriations Act (GAA) CYs 2012 to 2014
The Special Provisions of the GAA for CYs 2012 to 2014 provides that
NEA shall prioritize sitios or barangays:
(i) Where the absolute number of indigents and the incidence of poverty
are high, as identified in the latest official poverty statistics of the
National Statistics and Coordination Board (NSCB); and
(ii) With high capability of being energized.
SEP Executive Summary
The SEP Executive Summary prescribes the guidelines/criteria in the
selection and prioritization of SEP projects, which include:
(i) Tapping point – the proximity of the sitio to the last connected electric
pole;
(ii) Right-of-Way (ROW) – all legal implications and consumer-related
concerns are assumed to have been dealt with;
(iii) Peace and Order – there should exist a generally-known conducive
atmosphere for peace and order;
(iv) Construction cost – the approximate construction cost is P1 million
per sitio; and
(v) EC relationship with NEA and other pertinent agencies.
NEA Memorandum No. 2011-021 dated November 3, 2011 states that
only those sitios identified in the NEA Database at the end of August
2011 shall be eligible and shall have priority in the subsidy allocation.
Examination of pertinent documents revealed that 149 out of 255 sitios/puroks
or 58.43 percent of the electrification projects of DANECO implemented in
CYs 2012 to 2015 using government subsidy funds of P141.86 million were
not included in the NEA’s list of priority sitios/puroks for energization,
contrary to its guidelines on prioritization for energization. This deprived the
prioritized sitios/puroks of the benefits that could have been derived from the
program as they have been left out in the implementation of the project.
PROPER SELECTION AND PRIORITIZATION OF SEP PROJECTS
21
The sitios/puroks energized by DANECO that were not included in the list of
priority sitio/purok for energization by NEA are summarized below, while the
details are presented in Annex B:
Table 9: Sitios/purok energized by NEA that were not in the priority list for energization
Project Location
No. of sitio
Fund Source Approved Amount
Asuncion 8 2013 and 2014 SEP P4,813,159.11
Compostela 9 2011 Batch 1; 2012 Batch 2; 2014 and 2015 SEP 8,607,970.73
IGACOS 8 2013; 2014 and 2015 SEP 5,521,999.88
Kapalong 2 2013 SEP 977,737.60
Laak 3 2015 SEP 3,284,237.49
Mabini 11 2011 Batch 1; 2013 and 2015 SEP 16,174,328.06
Maco 6 2013 Additional; 2013 and 2015 SEP 5,454,338.34
Maragusan 10 2013 Additional; 2013 and 2014 SEP 6,410,008.52
Mawab 1 2015 SEP 934,195.77
Monkayo 10 2013 Additional; 2013 and 2014 SEP 9,719,783.91
Montevista 7 2011 Batch 1; 2013 Additional; 2013 and 2014 SEP 5,842,974.91
Nabunturan 12 2011 Batch 1; 2013; 2014 and 2015 SEP 9,174,178.28
New Bataan 2 2011 Batch 1 and 2014 SEP 2,421,992.08
New Corella 3 2013 SEP 1,779,754.91
Pantukan 26 2011 DAP-OVLP/LGSF; 2011 Batch 1; 2013 Addt’l.; 2013; 2014 & 2015 SEP
27,981,679.55
San Isidro 1 2013 SEP 677,590.99
Tagum City 25 2014 and 2015 SEP 27,884,540.61
Talaingod 5 2013 SEP 4,195,983.68
Total 149 P141,856,454.42
DANECO as an implementing arm of National Electrification Administration of
SEP projects just followed and implemented what has been given by NEA as
priority projects to be implemented in each calendar year.
As per guidelines, DANECO shall submit to NEA a duly signed request for the
release of construction fund (RRCF) together with the supporting documents for
evaluation and approval of project cost by NEA. The requested sitios for
energization should come from the targeted unenergized sitios earlier identified and
submitted by DANECO to NEA for its database. Granting that DANECO’s claims
MANAGEMENT’S COMMENTS
TEAM’S REJOINDER
PROPER SELECTION AND PRIORITIZATION OF SEP PROJECTS
22
is correct and that they only followed what NEA has been given, this procedure is
not in accordance with the prescribed guidelines and making the identified list of
unenergized sitios/puroks questionable.
2. The energization of 109 sitios/puroks cost the government a total of P205.32
million subsidy or an average of P1.88 million per sitio/purok contrary to
SEP Executive Summary, which provides the construction cost threshold at
approximately P1.0 million per sitio/purok. The excess costs ranged from
P0.05 million to as high as P12.14 million per sitio/purok or an aggregate
amount of P96.32 million, which could have been used by DANECO to fund
the energization of additional priority sitios/puroks which are included in the
database of NEA and within its service area.
As discussed in the SEP Executive Summary prepared by NEA, the
approximate construction cost of energizing a sitio/purok is P1.0 million in
order to cover as many unenergized sitio/purok for energization. As the
implementation of SEP projects intensified, NEA noticed that the construction
cost of the implemented projects exceeded the P1.0 million threshold per
sitio/purok and considered exorbitant. Thus, it issued Memorandum No. 2014-
007 dated February 18, 2014, addressed to all the EC General Managers
(GMs), to conduct the SEP/BLEP Masterlist Summit dubbed as “Once and for
all.” One of the objectives of the summit was to decide if construction cost is
exorbitant and enforced the acceptable maximum cost estimates of P1 million
per sitio/purok and P5 million per barangay.
Review of the project documents disclosed that energization of 109 out of 255
sitios/puroks energized in CYs 2012 to 2015 cost the government a total of
P205.32 million subsidy or an average of P1.88 million per sitio/purok which
is not in accordance with the SEP Executive Summary, which provides the
construction cost threshold at P1.0 million per sitio/purok. The excess costs per
sitio/purok ranged from P0.05 million to as high as P12.14 million or an
aggregate of P96.32 million, which could have been used by DANECO to fund
the energization of additional priority sitios/puroks which are included in the
database of NEA and within its service area.
The SEP projects with approved cost exceeding the P1.0 million construction
cost threshold are summarized below while details are presented in Annex C:
Table 10: Projects that exceeded the P1.0 million construction cost threshold
Project Location Fund Source No. of
Sitio
Approved Amount
Threshold Excess Amount
Nabunturan, Mabini, Pantukan and Laak
2011 Batch 1 7 P13,868,648.06 P7,000,000 P6,868,648.06
New Bataan and Compostela 2012 Batch 2 3 4,364,475.29 3,000,000 1,364,475.29
PROPER SELECTION AND PRIORITIZATION OF SEP PROJECTS
23
Table 10: Projects that exceeded the P1.0 million construction cost threshold
Project Location Fund Source No. of
Sitio
Approved Amount
Threshold Excess Amount
New Corella, San Isidro, Talaingod, Monkayo and Nabunturan
2013 SEP 11 15,496,584.55 11,000,000 4,496,584.55
Monkayo, Montevista, Maragusan, Maco, Mawab, Pantukan and Nabunturan
2013 Addt’l. 14 32,792,815.10 14,000,000 18,792,815.10
Pantukan, Montevista, Nabunturan, IGACOS, New Bataan, Monkayo, Compostela, Maragusan, Tagum City, New Corella and San Isidro
2014 SEP 27 51,649,110.61 27,000,000 24,649,110.61
Laak, Kapalong, San Isidro, IGACOS, Nabunturan, Mawab, Maco, Monkayo, Montevista, Compostela, Maragusan, New Corella, Tagum City, Mabini and Talaingod
2015 SEP 47 87,148,655.29 47,000,000 40,148,655.29
Total 109 P205,320,288.90 P109,000,000 P96,320,288.90
DANECO commented that just like in the explanations under observation No. 1,
DANECO as an implementing arm of NEA only implemented what has been
advised to construct. DANECO during its submission of Budget Request to NEA
which is subject to the approval by NEA, shows all the details of the construction
cost; despite having projects that are above the allowable threshold, still NEA
approved the said projects.
As discussed earlier, the procedure in implementing SEP projects is that the list of
projects to be implemented originated from DANECO’s submitted RRCF. Based on
the guidelines, the maximum allowable construction cost is P1 million per
sitio/purok. DANECO should follow the guidelines and prioritize sitios/puroks
whose cost are within the threshold.
It is recommended that DANECO comply strictly with the criteria on selection and
prioritization of SEP projects and give priority to sitios/puroks that are specifically
MANAGEMENT’S COMMENTS
TEAM’S REJOINDER
RECOMMENDATION
PROPER SELECTION AND PRIORITIZATION OF SEP PROJECTS
24
identified in the target list, so as not to deprive the beneficiaries of the targeted
sitios/puroks the benefits that may be derived from the Program. In addition,
observe the P1 million threshold project cost per sitio/purok to accommodate all the
sitios/puroks to be energized by the Program.
25
Chapter 2
Compliance with Relevant Laws, Rules and
Regulations
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
26
PD 1445 declares the policy of the State that all resources of the government
shall be managed, expended or utilized in accordance with laws and
regulations, and safeguarded against loss and wastage through illegal or
improper disposition, with a view to ensuring efficiency, economy and
effectiveness in the operations of the government.
As previously discussed, NEA released subsidy and loan funds to DANECO
to fund the implementation of the electrification programs of the government
through SEP/BLEP projects, and restore the electricity lines damaged by
typhoon Pablo. Item 4.1 of COA Circular No. 2007-001 dated October 25,
2007 provides that government organization funds such as subsidy funds
granted by NEA to a non-government organization such as DANECO, retain
their character as public funds, and therefore their utilization is covered by
relevant laws, government rules and regulations and utilization of loan
proceeds is governed by NEA policies and guidelines in addition to the loan
agreement.
Audit disclosed that during CYs 2012 to 2015, relevant laws, rules and
regulations were not complied with in the utilization of the subsidy and loan
funds. Certain reported transcations charged to subsidies and loans were
unsupported, contrary to Section 4(6) of PD 1445 and NEA Memorandum
No. 2013-023 dated October 10, 2013; certain provisions of the Revised IRR
of RA 9184 and MOA were not complied with; and subsidy and loan funds
were used for purposes which are not chargeable against the said funds.
These cast doubt on the propriety and validity of the transactions and the
reliability of the Accounting of Funds (AOFs) prepared by DANECO as
discussed below.
3. Transactions amounting to P170.27 million reported in the AOFs were
not supported or supporting documents not submitted which precluded
the Audit Team from assessing the propriety and validity of the
transactions. Moreover, the reported charges or liquidation exceeded
the amount of funds received while transactions amounting to P2.74
million were charged or liquidated twice against the funds received by
DANECO, resulting in overstatement of reported disbursements and
cost of the project by the same amount. All these cast doubt on the
propriety and validity of the transactions and reliability of the AOF
submitted by
AUDIT OBSERVATIONS
INTRODUCTION
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
27
NEA Memorandum No. 2013-023 dated October 10, 2013 requires the
submission of the original documents to support the AOF and liquidation
of subsidy funds released to the electric cooperatives. In addition, Section
4(6) of PD 1445 provides that all claims against government funds be
supported with complete documentation. This is one of the fundamental
principles that govern the utilization of government funds.
During the period January 1, 2012 to December 31, 2015, DANECO
received from NEA subsidies and loans amounting to P359.35 million
and P213.49 million, respectively, or a total of P572.84 million for the
implementation of SEP/BLEP projects and rehabilitation of damaged
distribution lines caused by typhoon Pablo.
It may be recalled that on December 4, 2012, typhoon Pablo devastated
almost the entire Province of Compostela Valley, leaving heavy damages
to majority of DANECO’s main distribution lines and facilities. For the
immediate rehabilitation/restoration of the damaged distribution lines,
DANECO availed of a Calamity Loan facility from NEA, which the
latter, upon its evaluation of the reported damages, approved a total
assistance of P260.0 million but released only a total of P251.65 million
as of December 31, 2015 broken down into P130.17 million Calamity
Loan and P121.48 million Calamity Grant.
To account for the utilization of funds received, DANECO prepared an
AOF on a per project basis indicating all expenses charged against the
subsidies and loans, including transfer of funds from DANECO’s bank
account solely for subsidy funds received from NEA to its general fund
account.
Examination of the submitted AOFs disclosed that out of the P497.61
million funds received (net of service charges), DANECO reported
charges of P499.39 million against the funds received, P170.27 million of
which were not documented or the supporting documents were not
submitted to the Audit Team in violation of Section 4(6) of PD 1445 and
the previously mentioned NEA Memorandum. DANECO was not able to
present the documents for audit despite repeated request for their
submission which precluded the Audit Team from assessing the propriety
and validity of the said transactions.
The summary of unsupported transactions are tabulated on the next page
and the detailed breakdown is presented in Annex D:
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
28
Table 11: Summary of Unsupported Transactions and Excess Reported Charges Against the Funds Received
Fund Source No. of Sitio/
Purok or Brgy.
Net Amount Received
(As of 12/31/15) (1)
Accounting of Funds
(As of 8/31/17) (2)
Unsupported Transactions
(3)
Charges in Excess of the
Amount Received
(4) = (2 - 1)
Subsidy/Grant
2011 OVLP/LGSF 1 P869,565 P900,000 P602,263 P30,435
2012 BLEP 3 10,166,626 10,522,458 1,516,684 355,832
2012 SEP Batch 2 8 5,922,807 6,130,105 130,130 207,298
2012 SEP Batch 2 5 4,920,788 5,093,015 110,780 172,227
2013 SEP Batch 1 22 8,401,684 8,569,718 706,056 168,034
2013 SEP Batch 1 20 15,070,078 15,371,479 729,399 301,401
2013 SEP Batch 1 2 6,181,510 6,305,140 2,016,544 123,630
2013 SEP Batch 2 9 4,153,650 4,236,723 91,785 83,073
2013 SEP Additional 23 12,951,294 12,475,767 3,683,117 -475,527
2013 SEP Additional 6 2,205,234 2,249,339 406,953 44,105
2013 SEP Additional 2 2,790,298 2,225,744 12,600 -564,554
2013 SEP Additional 5 17,652,822 18,005,878 708,907 353,056
2013 SEP Additional 12 9,946,795 9,503,515 1,469,621 -443,280
2014 SEP 55 61,906,845 63,144,981 2,684,846 1,238,136
2015 SEP 3 6,415,074 6,516,629 1,620,847 101,555
2015 SEP 14 14,770,843 15,066,259 5,453,639 295,416
2015 SEP 18 15,996,803 16,316,739 4,575,622 319,936
2015 SEP (ComVal) 25 28,246,896 24,410,944 4,532,830 -3,835,952
2015 SEP (Tagum) 25 19,827,546 19,855,766 2,917,951 28,220
Calamity Grant 0 119,050,400 118,753,990 26,309,519 -296,410
Sub-Total Subsidy 258 367,447,558 365,554,189 60,280,093 -1,793,369
Calamity Loan
2/13/2013 1st release 4,700,000 4,699,500 2,299,500 -500
4/16/2013 2nd release 62,732,500 62,315,505 53,172,881 -416,995
7/24/2013 3rd release 62,732,500 66,726,250 54,520,950 3,993,749
Sub-Total Loan 130,165,000 133,741,255 109,993,331 3,576,254
Total 258 P497,612,558 P499,395,444 P170,273,424 P1,782,886
Of the P170.27 million unsupported transactions, P36.46 million
represent unpaid transactions of DANECO or payables to its
suppliers/contractors (Annex D).
Examination of the submitted AOFs, further revealed that the charges or
liquidation reported in most AOFs exceeded the amount of funds
received. The difference is partly due to inclusion of certain
payables/unpaid contracts in the AOFs. Moreover, disbursements
amounting to P2.74 million were charged or liquidated twice against the
funds received by DANECO. It was noted that a Check Voucher (CV)
was repeatedly reported as disbursement in one AOF and others were
used to support the disbursement in two different AOFs. The double take-
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
29
up of charges in the DANECO’s AOFs resulted in the overstatement of
the reported disbursements/utilization, as well as, the cost of the project.
The disbursements that were taken up twice within the same AOF or in
two different AOFs are summarized below while detailed breakdown is
presented in Annex E:
Table 12: Transactions which were used as liquidation twice in the AOF
Fund Source Amount Remarks
Calamity Loan - 3rd release (2nd 62M)
P1,791,013.07 The same amount was also charged in the AOF of Calamity Loan 2nd release (1st 62 Million) and 2012 BLEP.
2012 BLEP – 3 Brgys. 1,350.00 The same amount was also charged in the AOF of 2013 SEP Additional – 2 Sitios.
2012 SEP Batch 2 – 8 Sitios
1,234.75 The same amount was also charged in the AOF of 2012 SEP Batch 2 – 5 Sitios.
2013 SEP Batch 2 – 9 Sitios
2,124.00
2013 SEP – 2 Sitios 3,521.67 The same amount was also charged in the AOF of 2013 SEP Additional – 5 Sitios and 23 Sitios.
2013 SEP Batch 1 – 20 Sitios
232,116.41 The same amount was also charged in various AOFs.
2013 SEP Batch 1 – 22 Sitios
357,362.46
2013 SEP Additional – 12 Sitios
17,141.52 The same amount was also charged in the AOF of 2013 SEP - 22 Sitios.
2013 SEP Additional – 2 Sitios
5,000.00 The same amount was also charged in the AOF of 2012 SEP Batch 2 – 5 Sitios.
2013 SEP Additional – 23 Sitios
182,456.95 The same amount was also charged in various AOFs.
2013 SEP Additional – 5 Sitios
148,070.79 The same amount was also charged in various AOFs.
2014 SEP - 55 Sitios 560.70 The same amount repeatedly charged in the 2013 SEP – 2 Sitios.
Total P2,741,952.32
Such circumstances raised doubt on the propriety and validity of the
transactions as well as reliability of the AOFs.
DANECO commented that before the conduct of the special audit, DANECO
had already submitted the original documents such as Check Vouchers,
Material Charge Tickets (MCTs), Material Credit Tickets (MCrTs) and other
pertinent documents to NEA from CYs 2012 to 2015 as partial liquidation to
NEA. Most of the original records that were left during the conduct of special
audit were those not yet submitted to NEA which precluded the accounting
MANAGEMENT’S COMMENTS
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
30
section from giving to the auditors all the necessary documents needed during
the course of the audit.
For those transactions amounting to P2,817,023.20 that were charged or
liquidated twice, as per initial findings that we conducted, DANECO
admitted that those transactions were indeed twice posted but were already
corrected those AOFs submitted to NEA. Of the identified eight SEP
projects, only two projects, the 2013 SEP Additional–23 sitios/puroks and
2015 SEP–25 sitios/puroks of Tagum remain unliquidated.
Before the audit fieldwork, the Audit Team initially gathered and vouched
from NEA all the liquidation documents sumitted by DANECO. During
fieldwork, the Audit Team requested from DANECO the SEP documents for
validation/examination and were later on returned to DANECO after
examination/validation. For those not presented for audit, the Audit Team
cannot assessed the validity and authenticity of the pertinent transactions.
The Audit Team appreciates the actions taken by DANECO for correcting the
AOFs/Liquidation Reports that contained transactions that were posted twice.
The Audit Team recommended that DANECO submit all pertinent
documents to support the disbursements against the subsidies and loans
received from NEA to ensure reliable reporting and provide a means of
audit/review on validity of the underlying transactions. Likewise, stop the
practice of supporting disbursements on AOF with documents already
reported in other AOF, and consider filing appropriate actions against the
personnel who committed these lapses. Any excess amount should be
returned to NEA.
4. Overhead expenses charged by DANECO to SEP/BLEP and
rehabilitation projects implemented during CYs 2012 to 2015 exceeded
the 5.0 percent contingency cost set by NEA by as much as P24.68
million, thus increasing the total project costs and reducing the amount
to be returned/refunded to NEA.
TEAM’S REJOINDER
RECOMMENDATION
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
31
The implementation of SEP/BLEP and rehabilitation projects requires the
ECs, such as DANECO, to submit budget request together with
supporting documents to NEA-Accelerated Total Electrification Office
(ATEO) for review and approval of project cost.
Based on the ATEO Unnumbered Memoranda of various dates in the
approval of the project cost, the approved project cost per sitio or
barangay is composed of the following cost items;
Material cost;
Labor cost;
Freight and handling cost, if applicable;
Contingency which is 5% of materials, labor and freight and handling
costs; and
Service charge
Based on the releases of funds by NEA to DANECO, it was noted that the
amount received by DANECO is net of service charge/income. To
account for the utilization of funds received, DANECO prepared an AOF
on a per project basis indicating all expenses charged against the funds
received.
Examination of the submitted AOFs revealed that disbursements
amounting to P36.04 million classified as overhead expenses were
charged or liquidated against the funds received by DANECO. However,
it was noted that there were no expenses/charges pertaining to
contingency. In a query with DANECO Management as to the type of
expenses that maybe charged against contingency, the Audit Team was
informed that in the AOF which was patterned after the format given by
NEA, all expenses not related to project materials and labor are charged to
overhead expenses and that all expenses related to contingency are part of
overhead expenses.
Based on the foregoing information, the overhead expenses should be
limited to 5.0 percent of the project cost or equivalent to contingency cost
allocated by NEA. Examination of AOFs, however, revealed that the
actual disbursements pertaining to overhead expenses charged against the
funds received exceeded the 5.0 percent limit by P24.68 million, as
tabulated below:
Table 13: Overhead expenses charged against the funds received exceeded the 5% contingency limit
Fund Source Project NEA Approved
Amount
Contingency Limit
(a)
Overhead Expenses per
AOF (b)
Excess (c) = a - b
2012 Batch 1 BLEP – 3 Brgys. P11,691,620.13 P444,561.60 P578,700.40 P134,138.80
2012 Batch 2 SEP – 5 Sitios 5,658,905.86 212,265.25 232,361.37 20,361.37
2013 GAA SEP – 20 Sitios 16,339,571.81 644,697.45 2,340,463.30 1,695,765.85
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
32
Table 13: Overhead expenses charged against the funds received exceeded the 5% contingency limit
Fund Source Project NEA Approved
Amount
Contingency Limit
(a)
Overhead Expenses per
AOF (b)
Excess (c) = a - b
2013 GAA SEP – 22 Sitios 9,521,908.63 364,559.48 1,818,929.19 1,454,369.71
2013 GAA SEP – 9 Sitios 4,707,470.21 175,591.25 443,280.45 267,689.20
2011-OVLP SEP – 1 Sitio 900,000.00 37,472.27 607,075.50 569,603.23
2013 Additional SEP – 23 Sitios 14,678,132.75 551,600.18 1,684,484.80 1,132,884.62
2013 Additional SEP – 12 Sitios 11,273,094.18 474,832.84 1,067,020.75 592,187.91
2014 GAA SEP – 55 Sitios 70,161,090.50 2,669,448.12 12,524,482.02 9,855,033.90
Calamity Grant Rehabilitation 121,480,000.00 5,784,761.90 14,745,198.39 8,960,436.49
Total P266,411,794.07 P11,359,790.34 P36,041,996.17 P24,682,471.08
Charging contingency/overhead expenses in excess of the limit increased
the total cost of the projects and correspondingly reduced the amount of
subsidy to be returned/refunded by DANECO to NEA.
NEA’s evaluated project cost that will detail the project cost of every
sitio/purok approved for implementation will show the following detail of the
total project cost.
1. Materials
2. Labor
3. Freight and handling - 5% of materials
4. Contingency - 5% of materials
5. Engineering and Administrative Overhead (EAO) 2% of MLF
The AOF template issued by NEA which most electric cooperatives follow,
does not provide any column for contingency and freight and handling. The
reason why the overhead expense exceeds the 5 percent allowable cap is due
to the inclusion in the overhead expense of the contingency, freight and
handling cost.
Moreover, as per liquidation submitted to NEA of those SEP/BLEP/Calamity
funds that were mentioned, the total liquidation that we submitted has just
been equal to the project cost except for 2013 SEP Additional 23
sitios/puroks and 12 sitios/puroks where DANECO has balances subject for
return amounting to P720,149.55 and P629,917.25 respectively.
MANAGEMENT’S COMMENTS
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
33
Team’s Rejoinder
It is true that the project cost approved by NEA composed of these items, but
the 2.0 percent EAO was retained by NEA as their service charge/income.
Thus, the fund released to DANECO and subjected for liquidation is net of
service charge.
The Audit Team disagrees the claim of DANECO that freight and handling
cost are included in the overhead expense. The project, when implemented
thru contracts, freight and handling costs were already part of the contracted
amount. As there was no clear cut policy on what type of expenses
chargeable to contingency during CYs 2012 to 2014, this must be returned
intact to NEA unless there is a sudden increase of the cost of materials during
project implementation.
Considering that these projects were not fully liquidated within the
agreed/prescribed time under the MOA despite having been long completed,
the funds were susceptible to additional overhead costs that can be charged
by the cooperative to these projects while they were not fully liquidated or
the projects were not yet closed-out.
The Audit Team recommended that DANECO:
Refrain from utilizing the funds as overhead expenses in excess of what
NEA, has allowed; and
Immediately return the excess overhead cost amounting to P24.68 million to
NEA that could be used to fund more electrification projects.
5. In seven instances, DANECO made advance payments to its contractor
in amounts equivalent to 40 percent of the total contract price in
violation of the 2012 Revised Implementing Rules and Regulations
RIRR) of RA 9184 setting the limit of advance payment to 15 percent of
the total contract cost. The 25 percent excess payment of P4,014,653
represents unnecessary disbursement of government funds at the time
when no accomplishments have been reported yet.
Item 3 of the MOA entered into by and between NEA and DANECO
provides that procurement of equipment and materials and/or engagement
of a contractor for the project/s shall be guided by RA 9184 and its RIRR
and relevant NEA policies, rules and regulations. Under Item 4, Annex E
RECOMMENDATIONS
TEAM’S REJOINDER
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
34
of the RIRR of RA 9184, the advance payment that can be made to the
contractor, is an amount not exceeding 15 percent of the total contract
price.
Examination of liquidation reports and the AOFs provided by DANECO
revealed that in seven instances, DANECO made advance payments to its
contractors in amounts equivalent to 40 percent of the total contract price,
contrary to the limitation under the RIRR of RA 9184. These are
presented below:
Table 14: Advance payments exceeding 15 percent of the total contract price
Check Voucher Contract Price
Should be (15%)
Excess (25%) No. Date Payee Amount Particulars
1311-00270 11/22/13 Square 4 Engineering Services
P1,542,547 Payment of 40% Mobilization for line construction at Doña Josefa, Laak (W.O# 13-5130-09)
P3,856,369 P578,455 P964,092
1310-00229 10/16/13 948,000 Payment of 40% Mobilization for single phase line construction at Sitio Angelo, Sto. Niño, Talaingod, DDN (WO#19-3430-03)
2,370,000 355,500 592,500
1310-00220 10/16/13 MEDCO Technical Services
1,651,480 Payment of 40% Mobilization for single phase line construction at Brgy. Ampawid, Laak (WO#13-5130-07)
4,128,700 619,305 1,032,175
1401-00070 1/13/14 1,042,600 Payment of 40% Mobilization for single phase line construction at Datu Davao, Laak as per Work Order no. 13-5130-08
2,606,500 390,975 651,625
1312-00074 12/4/13 Sarona Enterprises
581,334 Payment of 40% Mobilization for single phase line
1,453,336 218,000 363,334
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
35
Table 14: Advance payments exceeding 15 percent of the total contract price
Check Voucher Contract Price
Should be (15%)
Excess (25%) No. Date Payee Amount Particulars
construction at Sitio Daligdigon, Dagohoy, Talaingod, DDN
1311-00311 11/28/13 241,234 Payment of 40% Mobilization for single phase line construction at P-11, Doña Andrea, Asuncion, DDN
603,086 90,463 150,771
1305-00091 5/6/13 JOHNBOYDMITZ Electrical Services
416,105 Payment of 40% Mobilization for single phase line construction at P-5A Katipunan, New Bataan Province (WO#0134-30-1)
1,040,262 156,039 260,066
Total P6,423,300 P16,058,253 P2,408,737 P4,014,563
Such advance payments of 25 percent in excess of the authorized 15
percent of contract price represent unnecessary disbursements of
government funds at the time when no accomplishments have been
reported yet by the contractor.
There were instances that the contractors due to the difficulty and remoteness
of the area that they constructed, this is one of the considerations they asked
from DANECO that the mobilization will increase to 40 percent. The basis for
the said 40 percent mobilization payment was the approved MOA between
DANECO and contractors. Other constructions were already 15 percent
mobilization.
MANAGEMENT’S COMMENTS
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
36
It is very clear in the MOA entered into by and between NEA and DANECO
that in the procurement of materials and equipment and in the engagement of
contractors, DANECO should be guided by the provisions of RIRR of RA
9184, which limits an advance payment to 15 percent of the contract price.
Contractors, when competent, may implement the project even without an
advance payment or mobilization fee.
The Audit Team recommended that DANECO apply strictly the 15 percent
advance payment limitation to infrastructure projects pursuant to the RIRR of
RA 9184.
6. DANECO transacted business with 16 contractors/suppliers in the total
transaction amount of P130.06 million, who either had no business
permit to operate; or had no PCAB license at the time of their
transaction with the Cooperative; or declared considerably lower gross
sales with their respective Business Permit and Licensing Office
(BPLO) compared to their transactions with DANECO alone. Moreover,
a number of contractors/suppliers did not reply to the Audit Team’s
request for confirmation of DANECO’s reported transactions with
them. These conditions raise doubt on the validity and propriety of the
reported transactions amounting to P130.06 million.
Item 3 of the MOA between NEA and DANECO provides that the
procurement of equipment and materials and/or engagement of
contractors for the project(s) shall be guided by the provisions of RA 9184
and its RIRR and relevant NEA policies, rules and regulations.
Specifically, under Section 23.1.a.ii. of the RIRR of RA 9184, the basic
legal and technical documents required for a contractor/supplier to be
considered legitimate include the following, among others:
Mayor’s permit issued by the city or municipality where the principal
place of business of the contractor/supplier is located; and
Philippine Contractors Accreditation Board (PCAB) license and
registration for the type and cost of contract to be bid, in the case of
procurement of infrastructure projects.
TEAM’S REJOINDER
RECOMMENDATION
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
37
Records disclose that during CYs 2012 to 2015, DANECO engaged the
services of various contractors/suppliers for the implementation of
SEP/BLEP projects.
To validate the legitimacy and eligibility of selected
contractors/suppliers, the Audit Team sent confirmation letters to the
concerned BPLO requesting information on the issuance of business
permits/licenses to these contractors/suppliers during CYs 2012 to 2015
and their declared gross sales. Information as to accreditation of these
contractors by the PCAB was also requested.
Results of confirmation show that DANECO transacted business with 16
contractors/suppliers who either had no business permit/license to
operate; or had no PCAB license at the time of their transaction with the
Cooperative; or declared considerably lower gross sales compared to the
reported transactions with DANECO alone. These manifest that the
cooperative transacted with illegitimate contractors/suppliers which raise
doubt on the propriety and validity of the reported transactions
amounting to P130.06 million. Details of these contractors/suppliers
including other information follow:
Table 15: Suppliers without business permit or PCAB license/accreditation or with declared gross sales lower than reported sales with DANECO
Name of Supplier/ Contractor
Total Amount of Transaction
Remarks
4G Architechtural Design and Engineering Services 220 Blk. B-11 Lot 6 Phase I, SIR New Matina, Bucana, Davao City
P11,715,145 The BPLO, Davao City informed the Team that this contractor/supplier reported gross receipts/revenue during 2012 to 2015 amounting to P0.195 million, P0.199 million, P0.250 million and P0.535 million, respectively or a total of P1.170 million only when the transactions with DANECO alone during CYs 2012 to 2015 amounted to P0.056 million, P3.012 million, P2.428 million and P6.220 million, respectively or a total of P11.716 million. In addition, confirmation with PCAB reveals that the contractor has no PCAB license/ accreditation.
Arise and Build Engineering Services 2408 Ernand St., Binuangan, Maco, Compostela Valley
1,550,217 The BPLO, Maco, Compostela Valley informed the Team that this contractor/supplier has no available records on their file during CYs 2012, 2014 and 2015. However, reported gross receipts/revenue during 2013 amounted to P0.245 million only when the transactions with DANECO alone during CYs 2012 to 2014 amounted to P0.551 million, P0.714 million and P0.285 million, respectively or a total of P1.550 million. In addition, confirmation with PCAB reveals that the contractor has no PCAB license/ accreditation.
Caraga Filchin Corporation Brgy. Lasang, Davao City
10,664,003 The BPLO, Davao City informed the Team that this contractor/supplier reported gross receipts/revenue of only P2.523 million, P4.454 million and P5.924 million during CYs 2012, 2013 and 2014, respectively or a total of P12.901 million, when the transactions with various electric cooperatives including DANECO during the same period amounted to P11.520 million, P17.488 million and P76.605 million, respectively.
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
38
Table 15: Suppliers without business permit or PCAB license/accreditation or with declared gross sales lower than reported sales with DANECO
Name of Supplier/ Contractor
Total Amount of Transaction
Remarks
Gilberto Sarona Sr. Purok 3 Sitio Cogon Bato, Toril, Davao City
5,205,913 The BPLO, Davao City informed the Team that this contractor did not report gross receipts/revenue during CYs 2012 to 2014 due to financial constraints when the transactions with DANECO alone during CYs 2013 to 2014 amounted to P3.813 million and P1.393 million, respectively or a total of P5.206 million. In addition, BPLO informed that the contractor’s line of business reflected in business permit is for quarry yard; concessionaire and retailer of earthfill. Moreover, confirmation with PCAB reveals that the contractor has no PCAB license/ accreditation.
Greenworld Construction Supplies and Allied Services Prk. Mauswagon, Cuambog, Mabini, Compostela Valley
1,330,834 The BPLO, Mabini, Compostela Valley informed the Team that this contractor reported gross receipts/revenue of only P0.467 million, P0.303 million and P0.383 million during CYs 2013, 2014 and 2015, respectively or a total of P1.153 million when the transactions with DANECO alone during CYs 2013 to 2015 amounted to P0.111 million, P0.686 million and P0.534 million, respectively or a total of P1.331 million. In addition, confirmation from PCAB reveals that the contractor is not an accredited contractor.
JOHNBOYDMITZ Electrical Services Purok 3, Poblacion, Montevista, Compostela Valley
7,776,530 The BPLO, Montevista, Compostela Valley informed the Team that this contractor/supplier reported gross receipts/revenue of only P0.055 million, P0.100 million, P0.150 million and P0.165 million during CYs 2012, 2013, 2014 and 2015, respectively, or a total of P0.470 million only when the transactions with DANECO alone during the same period amounted to P0.956 million, P4.827 million, P1.453 million and P0.540 million, respectively, or a total of P7.776 million. In addition, confirmation from PCAB reveals that the contractor is not an accredited contractor.
J.R. and D Electrical Services Prk 2 St. Jude District, Poblacion, Maco, Compostela Valley
1,494,564 The BPLO, Maco informed the Team that this contractor/supplier has no business permit/license to operate during CYs 2012 to 2015 but DANECO’s reported transactions with the establishment amounted to P1.293 million and P0.202 million during CYs 2013 and 2014, respectively or a total of P1.495 million. In addition, confirmation from PCAB reveals that the contractor is not an accredited contractor.
LR Engineering Supply and Services Cuambog, Mabini, Compostela Valley
14,910,534 The BPLO, Mabini, Compostela Valley informed the Team that this contractor reported gross receipts/revenue of only P0.323 million and P0.300 million during CYs 2014 and 2015, respectively, or a total of P0.623 million only when the transactions with DANECO during the same period amounted to P3.926 million and P10.984 million, respectively, or a total of P14.910 million. In addition, confirmation from PCAB reveals that the contractor was newly accredited on July 26, 2016.
Medco Technical Services and Electrical Supply Corp. No. 24 Doña Pilar Compound Filinvest Rd. 1, Batasan Hills, Quezon City
23,711,745 The BPLO, Quezon City informed the Team that this contractor/supplier retired its business operation in July 2014 and has no records on file on the reported gross receipts/revenue during CYs 2012 to 2014 when the reported transactions of DANECO alone with the establishment during CYs 2012 to 2015 amounted to P0.509 million, P5.553 million, P7.169 million and P10.481 million respectively, or a total of P23.712 million. In addition, confirmation from PCAB reveals that the contractor is not an accredited contractor.
Melgar Electrical Construction Services Compostela, Compostela Valley
363,393 The BPLO, Munipality of Compostela informed the Team that this contractor has no records on their file. The reported transactions of DANECO with the establishment amounted to P0.178 million and P0.185 million during CYs 2013 and 2014, respectively or a total of P0.363 million.
Multi-Current Electrical Trading Services Purok 4, Southern
4,797,744 The BPLO, Panabo City informed the Team that this contractor/supplier reported gross receipts/revenue of only P0.263 million, P0.447 million and P5.417 million during CYs 2013 to 2015, respectively, or a total of P6.128 million when the reported
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
39
Table 15: Suppliers without business permit or PCAB license/accreditation or with declared gross sales lower than reported sales with DANECO
Name of Supplier/ Contractor
Total Amount of Transaction
Remarks
Davao, Panabo City, Davao del Norte
transactions of DANECO alone with the establishment during the same period amounted to P0.650 million, P0.917 million and P3.231 million respectively, or a total of P4.798 million. In addition, confirmation from PCAB reveals that the contractor is not an accredited contractor.
Novecio Electrical Services Purok 4 Aurora, Compostela, Compostela Valley
468,968 The BPLO, Compostela, Compostela Valley informed the Team that this contractor has no records on their file. The reported transactions of DANECO with the establishment during CY 2013 amounted to P0.469 million.
Square 4 Engineering and Construction Services B13 L21, Guno St., Country Homes, Mankilam, Tagum City
18,557,714 The BPLO, Tagum City informed the Team that this contractor/supplier reported gross receipts/revenue of only P0.495 million, P0.499 million and P0.967 million during CYs 2013, 2014 and 2015, respectively, or a total of P1.961 million when the transactions with DANECO alone during the same period amounted to P4.433 million, P6.360 million and P7.765 million, respectively or a total of P18.558 million. In addition, confirmation from PCAB reveals that the contractor is not an accredited contractor.
Tulio Construction Services and Supplies Masara, Maco, Compostela Valley
3,036,397 The BPLO, Maco informed the Team that this contractor/supplier has no record on their file during CY 2012 and reported annual gross receipts/revenue of only P0.572 million during CYs 2013, 2014 and 2015 or a total of P1.716 million when the reported transactions of DANECO alone with the establishment during CYs 2012, 2013, 2014 and 2015 amounted to P1.980 million, P0.723 million, P0.266 million and P0.067 million, respectively or a total of P3.036 million. In addition, confirmation from PCAB reveals that the contractor’s accreditation had expired on June 30, 2010.
V-Phase Electrical Services and Supply B17 L14, Garciaville Subd., Tagum City
2,651,702 The BPLO, Tagum City informed the Team that this contractor/supplier submitted an affidavit of “no operation” during 2012 and reported gross receipts/revenue of only P0.100 million and P0.250 million during CYs 2013 and 2014, respectively or a total of P0.350 million when the transactions with DANECO alone during CYs 2012, 2013 and 2014 amounted to P0.476 million, P1.600 million and P0.575 million, respectively or a total of P2.652 million. In addition, confirmation from PCAB reveals that the contractor is not an accredited contractor.
WABE Electrical Services and Supply Purok 1, New Dauis, Nabunturan, Compostela Valley
21,825,003 The BPLO, Nabunturan City informed the Team that this contractor/supplier reported gross receipts/revenue of only P0.030 million, P0.650 million and P0.993 million during CYs 2013, 2014 and 2015, respectively, or a total of P1.673 million when the reported transactions of DANECO alone with the establishment during the same period amounted to P1.452 million, P10.888 million and P9.484 million, respectively or a total of P21.825 million.
Total P130,060,406
Further, the Audit Team sent letters to 17 selected establishments
engaged by DANECO requesting confirmation of its reported
transactions with them. To date, five contractors/suppliers have replied in
the affirmative while four confirmation letters were returned to sender
(RTS) by the Philippine Postal Corporation for reasons either the
supplier/contractor is unknown or unclaimed by the supplier/contractor.
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
40
Every year all contractors of line constructions were subjected to yearly
renewal of their respective accreditation to DANECO for them to participate
in every SEP project bidding of the same year. The following are the
requirements that they submit:
a. Business permits
b. DTI
c. BIR TIN number
d. Proof of VAT payment for 6 months
e. Audited Financial Statement
As to the issue that our contractors have no business permit is not true
considering that the above-mentioned requirements were all submitted to
Bids and Awards Committee (BAC) to renew their respective accreditation
before they can participate in any bidding. With regards to PCAB license
issue it is indeed correct that most of our contractors have no PCAB license
issue. If we strictly follow this licensing requirements none of our line
contractors in the franchise area have PCAB license. Moreover, we have also
timeline given by NEA to finish the said projects hence we proceed with our
line contractors despite their non compliance with PCAB license. These
contractors had been in DANECO for several years already and their track
records have been consistent with us.
The Audit Team sent confirmation letters to the concerned BPLO of the
LGUs where the addresses of suppliers were indicated in the Official
Receipts, or any documents supporting transactions primarily to validate the
legal existence and competence of the supplier. Out of the 16
suppliers/contractors enumerated in Table 15, the following were not issued
business permits to operate during the audit period as confirmed by their
respective BPLO units:
a. Arise and Build Engineering Services
b. J.R. and D Electrical Services
c. Melgar Electrical Construction Services
d. Novecio Electrical Services
e. Tulio Construction Services and Supplies (CY 2012)
TEAM’S REJOINDER
MANAGEMENT’S COMMENTS
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
41
Other constractors enumerated in Table 15 declared/reported to their
respective BPLO gross income/revenue way below than their transactions
with DANECO alone.
Generally, PCAB license/accredited contractor has proven to be competent.
Thus, can accomplished projects within the timelines/schedules with
minimum monitoring and supervision by DANECO.
The Audit Team recommended that DANECO engage and award contracts
only to legitimate and eligible contractors/suppliers who are competent and
capable of undertaking projects within the timeline/schedules.
7. Subsidies of P122.41 million for SEP projects have not been liquidated
by DANECO to NEA notwithstanding that the related projects have
been reportedly completed and energized between February 2014 and
June 2015, some of which were not yet subjected to final inspection
and acceptance by NEA. This casts doubt on the reliability of the
records of both NEA and DANECO on the status of these projects.
Moreover, this precluded DANECO and NEA from establishing the
actual costs of the projects already completed and determining the
excess subsidies received, if any, for return/refund by the former to the
latter.
Item 4.a of the MOA between NEA and DANECO provides that “a final
report on the project(s) to include Accounting of Funds, Status Report of
NEA subsidy fund releases and Certificate of Final Inspection and
Acceptance must be submitted by the recipient EC to NEA within three
(3) months from completion of the project, which shall be the basis for
liquidation. Also, the recipient EC shall conduct close-out of project
within three (3) months after NEA’s final inspection and acceptance to
facilitate the take-up of completed projects in the EC books”.
Examination of project documents revealed that a number of SEP
projects implemented in CYs 2012 and 2013 were reportedly completed
by DANECO between February 2014 and June 2015 but the NEA
subsidy remain unliquidated and not closed-out in the EC books contrary
to the requirements under the MOA. The projects that were reported
energized but corresponding subsidy not yet liquidated follow:
RECOMMENDATION
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
42
Table 16: Reported Energized projects but corresponding NEA subsidy not yet liquidated
Fund Source No. of
Sitio/Brgy.
NEA Subsidy Released Reported Completed/
Energized as of Amount As Percentage of NEA
Approved Amount
2013 SEP 9 P4,236,723.19 90 February 2014
22 8,569,717.76 90 February 2014
2013 SEP Additional
23 13,210,319.47 90 February 2015
6 2,249,339.01 70 December 2014
3 2,846,104.01 90 September 2014
5 18,005,878.41 90 February 2015
12 10,145,730.76 90 June 2015
2014 SEP 55 63,144,981.45 90 December 2014
Total 135 P122,408,794.06
The details of the projects are shown in Annex F. Some of these projects,
mostly from 2013 SEP Additional and 2014 SEP, were not yet subjected
to NEA final inspection and acceptance. As such, NEA has not yet
validated the actual status of the projects. The delayed liquidation of the
NEA subsidies received by DANECO even when the related projects
have already been reported completed/energized and their non-inspection
and acceptance by NEA cast doubt on the reliability of the records of
both NEA and DANECO on the status of projects funded by the
subsidies. Moreover, it precluded DANECO and NEA from establishing
the actual cost of the projects and determining the excess of the subsidies
received, if any, for return/refund by the former to the latter.
As may be noted in Table 16, the amounts of subsidy released by NEA
for the projects already reported completed were only 90 percent of the
amount approved except for one which is 70 percent. As the projects
were already reported completed with only 90 percent of the approved
amount already released, it can be deduced that the amounts of subsidy
approved for the projects by NEA are in effect excessive.
As of audit date DANECO has an outstanding unliquidated SEP project of
P122.41 million. We would like to inform the Commission that as of
September 5, 2017, of those mentioned unliquidated projects, only two
projects have not yet been fully liquidated which the SEP 2013 sitios/puroks
and 2013 Additional 2 sitios/puroks which have a balance for return. As of
September 5, 2017 the unliquidated balance is P8,128,290.69.
MANAGEMENT’S COMMENTS
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
43
We appreciate the actions made by DANECO in liquidating fully some of the
SEP projects earlier noted by the Audit Team to be unliquidated. However,
the Audit Team maintains its observations that these projects were not
liquidated on time.
The Audit Team recommended that DANECO should liquidate immediately
the utilization of subsidies/grants received from NEA to ensure reliability of
reporting and recording of actual project cost. Thus, any excess amount
should be returned to NEA.
8. Subsidy funds amounting to P4.18 million were used to procure kilo-
watt-hour (kwh) meters and meter bases, which are not among the
items qualified to be subsidized as housewiring materials, thus reducing
the funds available for qualified energization expenditures that could
have benefitted additional number of intended beneficiaries of the
Program had funds been properly utilized. Moreover, construction
materials costing P1.34 million sourced out of the Calamity
Loan/Grant were used for the construction of totally new project which
do not qualify as rehabilitation/restoration projects, therefore, should
not have been funded out of the Calamity Loan/Grant.
Subsidy funds were granted to DANECO for the implementation of
SEP/BLEP projects of the government and calamity loan/grant for the
immediate restoration/rehabilitation of distribution lines in areas affected
by typhoon Pablo.
The release of these funds and utilization thereof are subject to the
following rules and regulations:
Subsidy
a) Item 2 of the Memorandum of Agreement (MOA) between NEA and
DANECO provides that the recipient EC shall use the funds solely and
exclusively for the project(s), and in no case be diverted or used for
purposes unrelated to said projects such as but not limited to money market
placements, and other form of investments not related to the project,
payments for amortization of loans and/or credit accommodations obtained
RECOMMENDATION
TEAM’S REJOINDER
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
44
by the recipient from creditors, payment of power bills, salaries, wages,
honoraria and other similar benefits of recipient’s regular personnel; and
b) Item III.B.7 of the NEA Memorandum No. 2013-008 dated February 27,
2013 states that housewiring materials amounting to P2,500 per connection
shall also be provided with subsidy for a maximum of 60 consumers per
sitio/purok or the actual number, whichever is lower. The composition of the
housewiring materials are the following:
Table 17: Composition of housewiring materials
Particular Quantity Cost
Safety switch (30 amperes) 1 set Not indicated
PDX wire #8 5 meters
PDX wire #12 10 meters
PDX wire #14 10 meters
Convenience outlet (2 gang) 1 set
Receptacle 2 pieces
Tumbler switch 2 pieces
Staple wire 30 pieces
Electrical tape (big) 1 piece
Junction box 2 pieces
CFL Bulb (15 w) 2 pieces
Sub-Total materials P 1,900
Labor cost 600
Grand Total P 2,500
Calamity Loan/Grant
a) Schedule 1 of the Contract of Loan states the purpose of calamity loan is to
cover the cost of rehabilitation of damaged distribution lines and restoration
of power in the coverage area caused by typhoon Pablo;
b) Item 2 of the MOA (Calamity Grant) between NEA and DANECO provides
that the recipient EC shall use the funds solely and exclusively for the
project(s) adverted to in Schedule A, which is, for the repair and
rehabilitation of distribution lines damaged by typhoon Pablo.
Examination of the AOFs and supporting liquidation documents for CYs
2012 to 2015 subsidies disclosed that P4.18 million were used by
DANECO to procure kwh meters and meter bases, which are not among
the housewiring materials covered by the P2,500 subsidy per household
connection, as shown in Table 17. These materials should have been
funded by DANECO out of its reinvestment funds as part of its
responsibilities pursuant to Article 8 of the Magna Carta for Residential
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
45
Electricity Consumers, which prescribes the use of DANECO’s
reinvestment funds to procure such items for its customers.
The payments for kwh meters and meter bases is summarized below
while detailed breakdown is presented in Annex G:
Table 18: Transactions on payments of kwh meters and meter bases
Fund Source No. of Sitio Name of Supplier/Payee Particulars Amount
2013 SEP Additional 5 Sitios
EDMI Philippines, Inc. Electronic KWH meters
P218,225
12 Sitios 366,444
2014 SEP 55 Sitios 2,987,244
Sub-Total P3,571,913
2013 SEP Additional 5 Sitios Kupler Industries, Inc.
Meter base
30,800
12 Sitios CEPALCO Energy Services Corp. (CESCO)
80,620
2014 SEP 55 Sitios 496,770
Sub-Total P608,190
Total P4,180,103
The use of subsidy funds to purchase kwh meters and meter bases, which
are not qualified to be subsidized as housewiring materials reduced the
funds for qualified energization expenditures.
Further, inspection of selected rehabilitation/restoration works of the
damaged distribution lines undertaken by DANECO out of the Calamity
Loan/Grant revealed that P1.34 million cost of various electrical
materials were used for the construction of new backbone lines from
Poblacion, Montevista to Compostela Valley Provincial Hospital
(CVPH). This was not rehabilitation/restoration project, but new project,
therefore, not qualified to be funded out of the Calamity Loan/Grant. The
detailed cost of materials used for this new project is presented in
Annex H.
The following inspected rehabilitation projects were found in order,
however, some projects were rerouted from their original
direction/alignment:
Table 19: Other rehabilitation/restoration projects inspected by the Team
Project Name Location
1. Rehab/re-erected single phase/IUB line Purok 4A Sta. Monica, Nuevo Iloco, Mawab
2. Rehab/re-aligned single phase/IUB line Sitio Mahayag, Nuevo Iloco, Mawab
3. Rehab/re-aligned three phase line Barangay Andili to Barangay Nueva Visayas, Mawab
4. Rehab/re-aligned three phase line Barangay Andili, Mawab to Barangay Limbo, Maco
5. Rehab/re-erected/re-aligned single phase/IUB/OS Barangay Limbo to Barangay Calacab, Maco
6. *Rehab/re-routed/re-aligned single phase line Barangay Panibasan to Barangay Elizalde, Maco
7. Rehab of single phase line Barangay Bawani to Barangay Saosao, Mawab
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
46
Table 19: Other rehabilitation/restoration projects inspected by the Team
Project Name Location
8. Rehab of single phase line Purok 6, Antiquera, Nabunturan
9. Rehab of single phase line Barangay Matilo to Barangay Ogao, Nabunturan
10. *Rerouting of 69 kva line Montevista to Compostela
11. Rehab of three phase line Barangay Poblacion to Colupogon, Compostela
12. Rehab of three phase line Montevista to Colupogon , Barangay Marapat, Compostela
13. Rehab of three phase line Barangay Poblacion to Barangay Cabidianan, Nabunturan
14. Rehab of three phase line Barangay Cabidianan to Barangay Mainit, Nabunturan
15. Rehab of three phase (Backbone line) Montevista to Monkayo
16. Rehab of three phase line Liboton to Barangay Pasian, Monkayo
17. Rehab of single phase line Purok 3 to 5, Barangay Marapat, Compostela
18. Rehab of single phase line Mapaca to Barangay Macopa, Monkayo
19. *Double circuit line (Feeder 1 and 2) San Jose to Liboton, Poblacion, Monkayo
Note: * Re-routed projects
Under the house wiring evaluation issued by NEA to all electric cooperatives
as a basis for computation of the house wiring allocation per household will
total to P4,503.40. Of the total allocation it includes Electronic KWH meters
and meter base.
Secondly, with regard to the two projects that were charged to calamity fund
but were considered as new projects, the following are the rationale for the
construction of the said lines:
1. The construction of new backbone line of Poblacion Montevista to
Compostela Valley Provincial Hospital (CVPH) during typhoon Pablo was
due to the urgency because during that time the LGU and the provincial
government requested DANECO to fast track and prioritize the
reconstruction of the original line because during that time the CVPH has no
electricity. If DANECO will repair/reconstruct the original line it will take
time and the cost to repair is substantial because the extent of damage. So to
address the needs of the hospital and the request of the government agency it
was decided by the task force to construct and re route a new line instead of
repairing the original line.
2. For the case of San Jose to Liboton Line of Poblacion Monkayo, the
location of the original line is not ideal to repair considering that the original
line is located adjacent in a river at the same time we have problem in a
right of way so DANECO decided to re route the line instead of repairing
the old lines.
MANAGEMENT’S COMMENTS
COMPLIANCE WITH RELEVANT LAWS, RULES AND REGULATIONS
47
The Audit Team requested from NEA guidelines in granting house wiring to
the intended household beneficiary. NEA in its reply as provided under NEA
Memorandum No. 2013-008 dated February 27, 2013, the subsidy was
P2,500 per household beneficiary. Thus, the Audit Team cannot just simply
rely to the Annex 3 submitted by DANECO without evidence of approval by
NEA.
DANECO also claimed that constructing a new backbone line dedicated to
CVPH would entail shorter time than to repair/reconstruct the original line,
however, the Audit Team disagree to their allegation as during ocular
inspection conducted by the Audit Team with the representatives from
DANECO, it was found out that there were few poles from the original line
that were replaced due to typhoon damaged. Moreover, the project of
constructing new backbone was totally new, it was then not in accordance
with the purpose intended.
With regard to San Jose-Liboton Line of Poblacion Monkayo, the Audit
Team reconsiders its earlier observation, thus, DANECO’s
justification/comment is well-taken.
It is recommended that DANECO:
Utilize strictly subsidy and loan funds received according to their
intended purposes; and
Return to NEA the amount used to purchase items not eligible for
charging against subsidy funds and the costs of newly implemented
project not allowable to be funded from calamity grant/loan.
RECOMMENDATIONS
TEAM’S REJOINDER
48
Chapter 3
Effective Implementation of SEP/BLEP
Projects
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
49
As embodied in PD No. 269, electrification of the entire country, being one
of the primary concerns of the government in order to bring about the desired
changes and reforms, can be achieved through rationalizing the distribution
of electricity. This implies the adoption of measures necessary to obtain the
maximum benefit at the minimum expenses.
In line with this policy, the government, thru NEA, intensified the rural
electrification program through the implementation of programs/projects such
as SEP, which is the extension of distribution lines to far-flung and thinly-
settled areas that are more costly to electrify, and BLEP, which is the tapping
of electricity from the national grid to off-grid sourced barangays.
In 2011, NEA targeted 32,441 unenergized sitios for electrification to be
funded under SEP projects for implementation from CYs 2011 to June 2016
(President Aquino’s administration). Out of NEA’s targeted sitios, DANECO
accounted for 1,094 unenergized sitios, of which 43 sitios were later
transferred to the service area of Davao Light and Power Corporation
(DLPC). The list of DANECO’s targeted sitios is in Annex A.
During the period January 1, 2012 to December 31, 2015, DANECO received
from NEA P359.35 million subsidies for the implementation of SEP/BLEP,
covering 258 sitios/puroks/barangays and rehabilitation of damaged
distribution lines caused by typhoon Pablo. The subsidies received by
DANECO are broken down, as follows:
Table 20: Breakdown of subsidies received from NEA in 2012 to 2015
Fund Source No. of Brgy/ Sitio/Purok
Net Amount Received
SEP BLEP Others Total
2011 OVLP/LGSF 1 P920,290 P920,290
2012 BLEP 3 P10,166,626 10,166,626
2012 SEP Batch 2 13 10,843,595 10,843,595
2013 SEP Batch 1 44 29,653,272 29,653,272
2013 SEP Batch 2 9 4,153,650 4,153,650
2013 SEP Additional 48 45,546,443 45,546,443
2014 SEP 55 61,906,845 61,906,845
2015 SEP 85 77,108,463 77,108,463
Calamity Grant 0 P119,050,400 119,050,400
Total 258 P230,132,558 P10,166,626 P119,050,400 P359,349,584
As of December 31, 2015, DANECO reported projects in 250 sitios as
completed and/or energized, which is equivalent to 23.79 percent of the
INTRODUCTION
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
50
targeted sitios of 1,051 and 87.10 percent of the funded sitios of 287, as
tabulated below:
Table 21: SEP targets and accomplishments as of December 31, 2015 in terms of number of Sitios
Region Target
Funded by NEA
Yearly Accomplishment Accomplishment as Percentage (%) of 2011 2012 2013 2014 2015 Total
(No. of Sitio) Target Funded
Davao del Norte Province
Asuncion 29 12 0 0 6 4 2 12 41.38 100.00
IGACOS 101 19 0 0 2 2 8 12 11.88 63.16
Kapalong 14 3 0 0 1 1 1 3 21.43 100.00
New Corella 55 14 0 0 2 3 7 12 21.82 85.71
Tagum City 0 25 0 0 0 0 18 18 72.00
Talaingod 59 10 0 0 2 6 0 8 13.60 80.00
San Isidro 49 9 0 0 0 3 5 8 16.33 88.89
Compostela Valley Province
Compostela 42 20 0 1 8 4 5 18 42.86 90.00
Laak 41 9 0 1 0 *13 1 *15 36.59 167.67
Mabini 47 12 2 9 4 0 1 16 34.04 133.33
Maco 62 10 0 0 3 3 1 7 11.29 70.00
Maragusan 143 23 0 2 1 10 6 19 13.29 82.61
Mawab 54 10 2 1 0 5 1 9 16.67 90.00
Monkayo 108 31 1 0 0 9 17 27 25.00 87.10
Montevista 81 16 1 1 2 5 4 13 16.05 81.25
Nabunturan 117 34 1 1 7 8 9 26 22.22 76.47
New Bataan 47 17 0 0 5 3 7 15 31.91 88.23
Pantukan 2 13 0 2 2 0 8 12 600.00 92.31
Sub-Total 1,051 287 7 18 45 79 101 250 23.79 87.10
**Carmen 33 0
**Sto. Tomas 10 0
Total 1,094 287
Note: * - Recorded accomplishment included 13 Passby sitios.
** - Transferred to the franchise area of Davao Light and Power Co. (DLPC).
The accomplishments in terms of the number of sitios energized as
percentage of sitios funded may be considered high, being 87.10 percent.
However, in terms of the number of household beneficiaries as percentage of
the target households, the accomplishment was only 46.07 percent as of
August 9, 2017 as shown in succeeding Table.
As to the other observations on project implementation, in summary, the
audit disclosed a total deficiency of P1.37 million in the implementation of
SEP projects due to deviation from the plans and specifications and as-built
staking sheets, and items that were not found by the Audit Team during
inspection/validation on March 6 to 17, 2017. In addition, 13 SEP projects
were implemented in areas that are considered not appropriate for
government subsidy. Moreover, 61 SEP projects incurred significant delay in
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
51
their implementation, thus depriving the intended beneficiaries of the benefits
that may be derived from the Program in a timely manner and indicates that
monitoring by DANECO of the performance of its contractors in delivering
the project, as scheduled needs to be intensified.
9. The electrification program may be considered not effectively
implemented by DANECO in 2012 to 2015 in terms of attaining its
target household beneficiaries as only 4,319 of the 9,374 targeted
households or 46.07 percent were actually energized as of August 9,
2017 despite substantial subsidy funds received.
The effectiveness and success of the electrification program can be
measured not only in terms of the number of projects implemented but
also in the actual number of beneficiaries who benefited from the
program.
As discussed earlier, DANECO received a total of P230.13 million SEP
subsidy funds during the period January 2012 to December 2015 for the
energization of 255 sitios/puroks with an estimated 9,374 identified
potential household beneficiaries.
Review of the summary of new household connections by DANECO for
the SEP projects implemented from January 2012 to December 2015
showed that as of August 9, 2017 only 4,319 households were energized
or only 46.07 percent of the targeted household beneficiaries of 9,374,
despite the substantial subsidy releases for these sitios/puroks.
A summary of identified potential and actual household beneficiaries is
presented below with details in Annex I:
Table 22: Comparison of the identified potential household beneficiaries and the actual number of household beneficiaries as of August 2017
Franchise Area No. of Sitios
No. of Household
Identified as Potential
With Installation
Without Installation
Davao del Norte and Compostela Valley Provinces *251 **7,825 4,058 3,767
Tagum City 25 904 142 762
IGACOS 19 645 119 526
Total 295 9,374 4,319 5,055
Percentage 100% 46.07% 53.93%
Note : * - Included 3 Barangays and 13 Passby Sitios in Laak ** - Included housewiring projects for 13 Passby Sitios in Pantukan
AUDIT OBSERVATIONS
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
52
The table above shows low accomplishments in energization of sitios on
a per household basis. This may be partly attributed to financial
constraints of the potential/targeted beneficiaries in meeting the
requirements prior to energization, such as real property tax (RPT)
arrearage with the concerned local government unit (LGU), meter
deposit, notarial fee, and other miscellaneous expenses that ranged from
P1,000 to P1,500 per household. Survey results with 35 out of the 155
selected beneficiaries disclosed payments of between P200.00 to
P11,000.00, which include the mentioned costs prior to energization. As
the program was implemented mostly in far-flung areas with high
incidence of poverty, difficulties in paying these costs may have
contributed to the reasons why not all of those potential household
beneficiaries end up unenergized under the Program.
The reported household beneficiary of barely 46 percent of the initially
identified potential beneficiary could be considered an indication of an
ineffective implementation of the Program as the potential program
beneficiaries were not maximized despite substantial funds received for
the purpose.
During interview of program beneficiaries, two had informed the Audit
Team that their sitios were energized only after a year because of
consumer-related concerns like neighbors who did not want their trees
removed to make way for the energization project, which should have
been dealt with by DANECO at the beginning of the project and not
during implementation. It was also gathered that delay in the energization
by 3 to 9 months was due to unavailability of the materials of DANECO,
resulting in delayed enjoyment of benefits by the intended beneficiaries.
First, we would like to comment on the 3,547 energized beneficiaries
mentioned in the audit findings. Based on the initial documents, we submitted
the total energized beneficiaries as of March 2017 for ComVal area 3,286 and
for Tagum area 1,315 or a total of 4,601 beneficiaries. Likewise, we would
like to interpose an objection with regard to the comments made that the
delay of energization were the result of unavailable materials for house
wiring which is incorrect. The main reason for the delay of energization is the
failure of some beneficiaries to submit the requirements within the prescribed
period given by DANECO as mentioned in the audit findings.
MANAGEMENT’S COMMENTS
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
53
The Audit Team conducted re-validation on the number of energized
household beneficiaries using the latest report furnished by DANECO to
NEA as of August 9, 2017. The said report provides that the total energized
household beneficiaries for SEP projects implemented from January 1, 2012
to December 31, 2015 were 4,319 or 46.07 percent of the 9,374 targeted
beneficiaries, which the Audit Team considered a relatively low turnout.
With regard to unavailability of house wiring materials being the reason for
the delay in energization in some household benificiaries, it was the result of
the interviews/questionnaires administered by the Audit Team to selected
beneficiaries and as mentioned by one of the Official in the DANECO-
Tagum Branch.
The Audit Team recommended that DANECO intensify and encourage
prospective program beneficiaries to have their household energized, and if
possible, assist the potential beneficiaries in securing permits from their
respective LGUs to maximize the enjoyment of the benefits from the
program.
10. Twenty-one SEP projects costing P23.82 million out of the 91 inspected
projects implemented by DANECO during CYs 2012 to 2015 were
found deficient by P1.37 million due to deviation from the plans and
specifications/as-built staking sheets, and items that were not found by
the Audit Team during inspection. These deficiencies indicate the need
for DANECO to intensify its monitoring of project implementation and
performance of its contractors. Moreover, the items found missing
during inspection are tantamount to waste of government funds.
Item IV of NEA Memorandum No. 2013-008 dated February 27, 2013
instructed the ECs, including DANECO, to closely monitor their
contractor’s performance to ensure completion of projects, as scheduled
and in accordance with the standard specification.
Accomplishment Report of DANECO as of December 31, 2015 disclosed
that it completed and/or energized 250 SEP and three BLEP projects. Of
these completed projects, the Audit Team inspected 91 projects from
March 6 to 17, 2017 to determine their (a) existence and physical
TEAM’S REJOINDER
RECOMMENDATION
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
54
condition; (b) compliance with the plans and specifications/as-built
staking sheets; (c) implementation in areas that are appropriate for SEP
and BLEP projects; and, (d) qualification as SEP project.
Results of inspection show that 21 out of the 91 projects were deficient
by P1.37 million due to non-compliance with the plans and specifications
and as-built staking sheets, and absence of the items during the Team’s
inspection.
The projects with deficiencies follow:
Table 23: Projects inspected with deficiencies
Sitio Barangay City/Municipality Approved Amount
Amount of Deficiencies
Remarks/Explaination for the deficiency
1. Zone 5, VGHOI, Villarica, Babak District, IGACOS Fund Source: 2013 SEP
P378,366 P82,054 The cost of one unit 25 kva transformer and one unit cutout fuse and arrester combination not found/presented during inspection.
2. Purok Gumamela, Bincungan, Tagum City Fund Source: 2014 SEP
527,706 75,671 The cost of one unit 25 kva transformer, one unit cutout fuse and arrester combination and 1 pc. 35 ft. steel pole not found/ presented during inspection.
3. Purok Talaba, Bincungan, Tagum City Fund Source: 2015 SEP
1,560,748 12,717 The cost of 1 piece 35 ft. steel pole not found/presented during inspection.
4. *Purok 1A, Madaum, Tagum City Fund Source: 2014 SEP
538,634 62,954 The cost of one unit 25 kva transformer and one unit cutout fuse and arrester combination not found/presented during inspection.
5. Purok 1 to 5, Saosao, Mawab Fund Source: 2015 SEP
2,037,823 62,000 The cost of one unit 25 kva transformer not found/presented during inspection.
6. Purok 6, Magsaysay, Nabunturan Fund Source: 2015 SEP
939,333 54,800 The cost of one unit 25 kva transformer not found/presented during inspection.
7. Purok 7, Magsaysay, Nabunturan Fund Source: 2011 SEP
1,070,997 84,345 The cost of one unit cutout fuse and arrester combination and one unit 25 kva transformer not found/presented during inspection.
8. Purok 14, Magsaysay, Nabunturan Fund Source: 2015 SEP
1,528,317 54,800 The cost of one unit 25 kva transformer not found/presented during inspection.
9. Purok 9, Magsaysay, Nabunturan Fund Source: 2015 SEP
1,045,217 62,000 The cost of one unit 25 kva transformer not found/presented during inspection.
10. Purok 3, Olaycon, Monkayo Fund Source: 2014 SEP
853,795 62,954 The cost of one unit 25 kva transformer and one unit cutout fuse and arrester combination not found/presented during inspection.
11. Purok 13, GK Berjaya, Poblacion, Monkayo Fund Source: 2014 SEP
1,207,936 58,280 The cost of one unit 25 kva transformer not found/presented during inspection.
12. Purok 7, Amowawon, Poblacion, Monkayo Fund Source: 2014 SEP
2,232,478 70,970 The cost of one unit 25 kva transformer and two units cutout fuse and arrester combination not found/presented during inspection.
13. Purok 2A, 3 and 3A, Katipunan, New Bataan Fund Source: 2012 SEP
1,526,831 77,380 The cost of one unit 25 kva transformer not found/presented during inspection.
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
55
Table 23: Projects inspected with deficiencies
Sitio Barangay City/Municipality Approved Amount
Amount of Deficiencies
Remarks/Explaination for the deficiency
14. Purok Manga, Bincungan, Tagum City Fund Source: 2014 SEP
449,689 58,280 The cost of one unit 25 kva transformer not found/presented during inspection.
15. *Purok Kahayag, Visayan Village, Tagum City Fund Source: 2014 SEP
747,282 58,280 The cost of one unit 25 kva transformer not found/presented during inspection.
16. Purok 4, New Sibonga, Nabunturan Fund Source: 2013 Additional
1,622,732 58,280 The cost of one unit 25 kva transformer not found/presented during inspection.
17. Purok 1A, Basak, Nabunturan Fund Source: 2015 SEP
1,182,747 62,000 The cost of one unit 25 kva transformer not found/presented during inspection.
18. Purok 16, Camanlangan, New Bataan Fund Source: 2014 SEP
1,506,692 58,280 The cost of one unit 25 kva transformer not found/presented during inspection.
19. Purok 17, Panag, New Bataan Fund Source: 2015 SEP
765,606 62,000 The cost of one unit 25 kva transformer not found/presented during inspection.
20. Purok 6, Babag, Monkayo Fund Source: 2013 SEP
785,416 12,793 The cost of one pc. 35 ft. steel pole not found/presented during inspection.
21. *Purok 6A, Babag, Monkayo Fund Source: 2014 SEP
1,311,402 174,840 The cost of three units 25 kva transformer not found/presented during inspection.
Total P23,819,747 P1,365,678
Note: * - Full project cost was disallowed as this project was implemented in area not appropriate for government subsidy.
The non-installation of the missing materials adversely affected the
delivery of intended benefits to the beneficiaries or effectiveness of the
project. It also indicates that DANECO has not performed its function of
monitoring the contractors’ performance. Moreover, the items found
missing during inspection are tantamount to waste of government funds,
if not installed by the contractors. The missing items would render the
current/electricity to fluctuate, erratic or unstable especially during peak
hours.
Of the 21 areas identified projects that were implemented and inspected, five
of those areas are from Tagum area and remaining 16 areas were from
Comval. As we mentioned during the course of the audit, one of the reasons
why most of those transformers were not installed in the designated area as of
audit date is because most of our SEP transformers especially from far flung
barangays were stolen. These transformers were just kept in the warehouse
ready for installation.
MANAGEMENT’S COMMENTS
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
56
Team’s Rejoinder
Based on the physical inventory of SEP materials submitted by DANECO to
the Audit Team during the audit, only 10 units of 25 kva transformers were
on stock.
The Audit Team recommended that DANECO:
Compel the contractors to install items that were found missing during
inspection to ensure effectiveness in the delivery of electricity to every
household beneficiaries especially during peak hours;
Return immediately to NEA the corresponding costs of missing items if not
needed for the projects; and
Enhance its monitoring mechanism to ensure that contractors/ suppliers’
performance conform with the agreed upon plans and specifications/staking
sheets and project timelines/schedules.
11. Eight SEP projects costing P5.91 million were implemented either in
resettlement/relocation sites, or subdivisions, or town/city proper or
along the highway which is not in accordance with the objective of the
program under PD No. 269, hence, are not appropriate to be funded by
government subsidy. Moreover, five of the 91 inspected projects costing
P4.55 million were implemented in areas with existing distribution
lines, which are not qualified as SEP projects.
As provided under PD No. 269, the intention of SEP is to
energize/electrify far flung areas of the countryside that are considered
thinly settled areas and very costly to electrify.
In view of this, NEA issued Memorandum No. 2014-007 dated February
18, 2014 addressed to all the EC General Managers (GMs), to conduct
SEP/BLEP Masterlist Summit dubbed as “Once and for all.” One of the
objectives of the summit is to cleanse the masterlist of otherwise not-seen
previously, “haciendas, schools, villages, resettlements, private lands and
other areas not deemed appropriate for government subsidies.”
However, despite the efforts of NEA in cleansing the list of unenergized
sitios, the implemented projects of DANECO during CYs 2014 and 2015
still included eight projects or 8.79 percent of the 91 inspected projects
that are located either in resettlement/relocation sites, or subdivisions, or
TEAM’S REJOINDER
RECOMMENDATIONS
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
57
town/city proper, or along the highway contrary to the provisions of PD
No. 269. Likewise, five of the inspected projects are not qualified as SEP
projects because these were mere replacement or upgrade of existing
distribution lines which should have been part of the maintenance activity
of DANECO, thus, should have been funded using its own investment
funds, instead of government funds. The total cost of these projects not
qualified for government subsidy is P10.46 million.
Details of these projects are shown below:
Table 24: Projects implemented in sitios/puroks that are not deemed appropriate for government subsidy
Project Name/Location
Amount Granted
Fund Source
Pictures Taken/Remarks
1. Prk. 6A/Caritas Shelter Village, Babag, Monkayo
P1,311,402 2014 SEP
The project was implemented in a relocation site.
2. Prk. 3A, Babag,
Monkayo
857,858 2014 SEP
The project was implemented in a relocation site/Caritas Shelter.
3. Purok 11, Relocation Site, Magading, Nabunturan
947,289 2015 GAA
The project was implemented in a relocation site with existing distribution lines.
4. Purok 1, Andili, Mawab
934,196 2015 GAA
The project was implemented in the town proper which can be considered a highly urbanized sitio/purok.
5. Purok Cogon, Visayan Village, Tagum City
291,107 2014 GAA
The project was implemented in a highly urbanized sitio/purok.
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
58
Table 24: Projects implemented in sitios/puroks that are not deemed appropriate for government subsidy
Project Name/Location
Amount Granted
Fund Source
Pictures Taken/Remarks
6. Purok 2,
Magsaysay,
Nabunturan
462,288 2015 GAA
The project was implemented along the highway.
7. Purok 2b,
Libuton
Poblacion,
Monkayo
566,913 2015 GAA
The project was implemented along the highway and can be considered a highly urbanized sitio/purok.
8. Purok 1A, Madaum, Tagum City
538,634 2014 GAA
The project was implemented in a highly urbanized sitio/purok and with existing distribution line.
9. Purok 14, Poblacion, Nabunturan
1,510,305 2015 SEP
The project was implemented in highly urbanized sitio/purok with existing distribution lines.
10. Purok Timog, Visayan Village, Tagum City
920,730 2015 SEP
The project was implemented in existing distribution lines where the households are energized. There was no reported new project beneficiary at the time of inspection. The project was implemented in a highly urbanized sitio/purok.
11. Purok Kahayag, Visayan Village, Tagum City
747,282 2014 SEP
The project was implemented in existing distribution lines where the households are energized. There was no reported new project beneficiary at the time of inspection.
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
59
Table 24: Projects implemented in sitios/puroks that are not deemed appropriate for government subsidy
Project Name/Location
Amount Granted
Fund Source
Pictures Taken/Remarks
12. Purok Macopa, Visayan Village, Tagum City
629,845 2015 SEP
The project was implemented in existing distribution lines where the households are energized. There was no reported new project beneficiary at the time of inspection.
13. Purok Lanzones, Visayan Village, Tagum City
745,243 2015 SEP
The project was implemented in an existing distribution lines where the households are energized. There was no reported new project beneficiary at the time of inspection.
Total P10,463,092
These resettlement/relocation sites or subdivisions or town/city or along the
highway SEP projects are all approved by NEA. DANECO as an
implementing arm of NEA in its electrification projects only implemented
what has been approved by NEA.
The primary responsibility in the selection and prioritization of sitio to be
energized lies with DANECO. These areas were already prohibited as per
NEA regulations. The NEA Inspectorate Team may also be faulted for
allowing these projects to be implemented.
MANAGEMENT’S COMMENTS
TEAM’S REJOINDER
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
60
The Audit Team recommended that DANECO:
Comply to the SEP objectives of energizing far flung and thinly settled areas
which is very costly to electrify to enable the people to have access to
government funded projects with reasonable electric rates; and
Stop using the subsidy funds in implementing energization projects in
highly urbanized areas, such as relocation sites/subdivisions, town/city
proper, along the highway, and areas with existing energization projects.
12. Sixty-one SEP projects costing P96.32 million were implemented and
completed by DANECO only after 190 to 527 days which was beyond
the requirement under its MOA with NEA which is within six months
or 180 days after receipt of the subsidy funds from NEA. Moreover,
completion of 38 SEP projects costing P29.50 million which were
implemented by DANECO through contracts with private contractors
for 5 to 32 days were delayed by 3 to 167 days. The delayed
implementation and completion of these projects deprived the
beneficiaries of the immediate use of the electrification program and
called for strengthening of DANECO’s monitoring of the contractors’
performance in completing the projects, as scheduled.
Item 3 of MOA between DANECO and NEA provides that DANECO
should implement and complete the projects within six months or 180
days after receipt of subsidy funds by the former from the latter or at a
later date agreed upon between the two parties. In addition, Item IV of
NEA Memorandum No. 2013-008 instructed the ECs, including
DANECO, to strictly follow their submitted/approved completion
timelines. In order to ensure completion of projects within the timelines,
close monitoring of the contractor’s performance should be done.
Analysis of the documents gathered and the results of inspection revealed
that implemention of 61 projects were completed by DANECO only after
190 to 527 days from the time the subsidy funds were received from
NEA, which was beyond the 180 days requirement under the MOA.
Records of NEA also show that as of audit date, DANECO has not
submitted a report indicating the reason/s for the delay in the
implementation of these projects.
The SEP projects that incurred substantial delay in its implementation are
tabulated on the next page:
RECOMMENDATIONS
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
61
Table 25: Projects with delayed implementation and completion
Project Location NEA Approved
Amount
Date Completion
(Days) No. of Days Delay Subsidy
Received Project
Completed Actual
Per MOA
2012 BLEP - 3 BRGYS.
1. Brgy. Ampawid, Laak P4,557,886.30 5/27/2013 1/21/2014 240 180 60
2. Brgy. Datu Davao, Laak 2,876,248.78 5/27/2013 2/1/2014 251 180 71
3. Brgy. Dona Josefa, Laak 4,257,485.04 5/27/2013 2/28/2014 278 180 98
2012 SEP - BATCH 2 - 5 SITIOS PAMANA PROJECTS
4. P-1A, Katipunan, New Bataan 975,371.98 11/8/2012 8/6/2013 272 180 92
5. P-2A, P-3A Katipunan, New Bataan
1,526,830.67 11/8/2012 8/6/2013 272 180 92
6. P-3A, Katipunan, New Bataan 893,182.65 11/8/2012 8/6/2013 272 180 92
7. P-4A, Katipunan, New Bataan 1,011,358.24 11/8/2012 8/6/2013 272 180 92
8. P-5A, Katipunan, New Bataan 1,252,162.32 11/8/2012 8/2/2013 268 180 88
2013 SEP - BATCH 1 - 2 SITIOS
9. So. Angelo, Sto. Nino, Talaingod 2,626,825.13 7/15/2013 2/28/2014 229 180 49
2013 SEP - BATCH 1 - 20 SITIOS
10. P10 to P8, Sta. Cruz, Kipalili, San Isidro
1,743,401.20 7/15/2013 1/31/2014 201 180 21
11. P2A, Pamacaun, Asuncion 589,136.71 7/15/2013 1/21/2014 191 180 11
12. P3 to P5, New Bantayan, Asuncion
775,253.62 7/15/2013 1/20/2014 190 180 10
13. P6, New Bohol, New Corella 1,129,975.05 7/15/2013 1/21/2014 191 180 11
14. P-6A & 6B, Capungagan, Kapalong
760,258.92 7/15/2013 1/21/2014 191 180 11
15. P-Anaman, New Cortes, New Corella
649,779.86 7/15/2013 1/29/2014 199 180 19
16. P-Mamaon, Pinamuno, San Isidro 1,943,371.24 7/15/2013 2/28/2014 229 180 49
17. P-Starlight, Camoning, Asuncion 935,414.04 7/15/2013 2/6/2014 207 180 27
18. So. Anda, Mesaoy, New Corella 677,590.99 7/15/2013 1/28/2014 198 180 18
19. So. Daligdigan, Dagohoy, Talaingod
1,569,158.55 7/15/2013 2/28/2014 229 180 49
2011 OVLP/LGSF
20. So. Maligaya, Tagugpo, Pantukan 900,000.00 5/27/2013 12/21/2013 209 180 29
SEP 2013 Additional - 23 sitios
21. Prk. 6, Magas, Tubo-tubo, Monkayo
646,975.00 3/18/2014 2/11/2015 331 180 151
22. Prk 10, Upper Ulip, Monkayo 621,821.42 3/18/2014 10/22/2014 219 180 39
23. Prk 6, Mayaon, Montevista 1,156,719.82 3/18/2014 8/26/2015 527 180 347
24. Prk 4, Batinao, New Bataan 695,871.33 3/18/2014 10/23/2014 220 180 40
SEP 2013 Additional - 6 sitios
25. P-4 to P-5, Sitio Pawcon, New Cebulan, Montevista
418,676.83 4/3/2014 12/2/2014 244 180 64
26. P-7 to P-4, Sitio Pawcon, New Cebulan, Montevista
723,289.82 4/3/2014 11/11/2014 223 180 43
SEP 2013 Additional - 5 sitios
27. So Sarog (Area 1,2,3), Napnapan, Pantukan
13,144,502.81 3/20/2014 2/2/2015 320 180 140
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
62
Table 25: Projects with delayed implementation and completion
Project Location NEA Approved
Amount
Date Completion
(Days) No. of Days Delay Subsidy
Received Project
Completed Actual
Per MOA
SEP 2013 Additional - 12 sitios
28. P-5, Sanghay, Golden Valley, Mabini
652,416.21 6/27/2014 2/15/2015 234 180 54
29. P-3, Matilo, Nabunturan 706,341.64 6/27/2014 6/25/2015 364 180 184
30. P-5, Matilo, Nabunturan 639,628.38 6/27/2014 4/8/2015 286 180 106
31. P-4, Cabacungan, Nabunturan 528,160.39 6/27/2014 1/29/2015 217 180 37
32. P-3, Bongabong, Pantukan 981,454.28 6/27/2014 2/10/2015 229 180 49
33. P-9, Tambongon, Pantukan 426,980.62 6/27/2014 4/25/2015 303 180 123
2014 GAA - 55 sitios
34. Prk 8, Pinakan, Tagdanua, Pantukan
503,381.73 11/14/2014 6/9/2015 208 180 28
35. Prk 7, Malanlangon, Tagdanua, Pantukan
483,463.87 11/14/2014 6/27/2015 226 180 46
36. Prk Tapis to Prk Maitum, Tambongon, Pantukan
1,873,252.41 11/14/2014 6/24/2015 223 180 43
37. Poblacion Laak to Barubo, Montevista, Compostela Valley
2,905,150.46 11/14/2014 7/25/2015 254 180 74
38. Prk 2A, Cabidianan, Nabunturan 1,011,931.59 11/14/2014 6/30/2015 229 180 49
39. Prk 5, Cabinuangan, New Bataan 1,144,889.72 11/14/2014 10/6/2015 327 180 147
40. Prk 12, Andap, New Bataan 2,084,547.36 11/14/2014 6/20/2015 219 180 39
41. Prk 6, Olaycon, Monkayo 601,005.12 11/14/2014 6/30/2015 229 180 49
42. Prk 7, Amowawon (Extension), Poblacion, Monkayo
2,232,477.52 11/14/2014 10/21/2015 342 180 162
43. Prk 13 (GK Berjaya) Extension, Poblacion, Monkayo
1,207,936.40 11/14/2014 9/25/2015 316 180 136
44. Prk 7, Salvacion, Monkayo 1,556,252.14 11/14/2014 10/1/2015 322 180 142
45. Prk 8, Salvacion, Monkayo 1,151,463.94 11/14/2014 10/1/2015 322 180 142
46. Prk Paco, San Jose, Monkayo 2,171,710.58 11/14/2014 8/31/2015 291 180 111
47. Prk 6A, (Pabahay), Babag, Monkayo
1,311,402.45 11/14/2014 8/15/2015 275 180 95
48. Prk 6 to Prk 11 to Prk 12 (Cabangkalan), Casson, Monkayo
3,387,461.59 11/14/2014 7/25/2015 254 180 74
49. Prk 13, Casoon, Monkayo 722,714.79 11/14/2014 7/31/2015 260 180 80
50. Kabangkalan to Prk 14 to Kapatagan to Prk 18 New Kapatagan, Casoon, Monkayo
4,800,604.42 11/14/2014 9/4/2015 295 180 115
51. Prk 1 (Sanchez), Maparat, Compostela
1,177,981.68 11/14/2014 6/30/2015 229 180 49
52. Prk Narra, Mapawa, Maragusan 1,355,895.73 11/14/2014 8/9/2015 269 180 89
53. Prk Kauswagan , Mapawa, Maragusan
858,389.82 11/14/2014 7/31/2015 260 180 80
54. Prk Mahayag, Mapawa, Maragusan
967,767.70 11/14/2014 7/24/2015 253 180 73
55. Prk. Lubi, Mauswagon, Maragusan
806,933.95 11/14/2014 7/21/2015 250 180 70
56. Prk 1 to Prk 4 to Prk 6, Lebanon, Montevista
2,610,054.77 11/14/2014 6/10/2015 209 180 29
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
63
Table 25: Projects with delayed implementation and completion
Project Location NEA Approved
Amount
Date Completion
(Days) No. of Days Delay Subsidy
Received Project
Completed Actual
Per MOA
57. Prk 1B, New Bantayan, Asuncion 595,396.03 11/14/2014 7/30/2015 259 180 79
58. Prk Lansones, Pandapan, Tagum 954,927.62 11/14/2014 6/25/2015 224 180 44
59. Prk Kahayag, Visayan Village, Tagum
747,282.34 11/14/2014 6/4/2015 203 180 23
60. Prk 3, RTU, Relocation Site, Tagum
2,311,661.74 11/14/2014 6/26/2015 225 180 45
61. So Saraban, Pinamuno, San Isidro
1,793,272.58 11/14/2014 10/21/2015 342 180 162
Total P96,322,739.89
Examination of the project implementation schedules/timelines indicated
in the contract between DANECO and its contractors further revealed
that the implementation of 38 SEP projects with contract time of 5 to 32
days were delayed by 3 to 167 days as tabulated below:
Table 26: Projects with delayed implementation and completion per contract
Project Location NEA Approved
Amount
Implementation Date Completion (Days) No. of Days Delay Started Completed Actual
Per Contract
1. Prk 5, Tamia, Compostela P1,007,400.29 5/20/2013 9/2/2013 106 30 76
2. P-11, Dona Andrea, Asuncion 650,401.95 1/9/2014 2/4/2014 27 12 15
3. P2, Sagyen, Asuncion 531,208.98 9/3/2013 12/2/2013 91 6 85
4. P3, Camansi, New Sambog, New Corella
662,506.98 9/3/2013 11/6/2013 65 12 53
5. P3, Sagayen, Asuncion 426,423.85 9/3/2013 12/2/2013 91 6 85
6. P5, Buclad, Asuncion 503,512.64 1/9/2014 2/4/2014 27 6 21
7. P7, Sta. Cruz, New Corella 1,063,963.48 9/3/2013 11/30/2013 89 16 73
8. P8, Buclad, Asuncion 722,859.32 1/9/2014 2/4/2014 27 12 15
9. P-Starlight, Camoning, Asuncion
935,414.04 1/9/2014 2/4/2014 27 12 15
10. So. Daligdigon, Dagohoy, Talaingod
1,569,158.55 9/17/2013 2/28/2014 165 30 135
11. P2, New Leyte, Maco 262,897.21 11/5/2013 11/12/2013 8 5 3
12. P3, Basak, Nabunturan 192,293.82 10/14/2013 11/4/2013 22 5 17
13. P3, Lumanggang, New Leyte, Maco
409,241.74 10/26/2013 11/14/2013 20 6 14
14. P4, New Leyte, Maco 379,438.62 11/5/2013 11/14/2013 10 6 4
15. P7, Basak, Nabunturan 241,623.44 10/14/2013 10/31/2013 18 6 12
16. P-5, New Visayas, Montevista 347,938.69 10/18/2013 11/25/2013 39 7 32
17. P-7, Concepcion, Montevista 799,092.31 10/14/2013 11/15/2013 33 18 15
18. P-7, Pasian, Monkayo 1,315,958.69 10/23/2013 2/17/2014 118 18 100
19. P-Santol Riverside, Talian, Maragusan
664,878.94 10/22/2013 2/18/2014 120 13 107
20. P-Vanda, Bagong Silang, 519,365.38 10/21/2013 2/1/2014 104 13 91
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
64
Table 26: Projects with delayed implementation and completion per contract
Project Location NEA Approved
Amount
Implementation Date Completion (Days) No. of Days Delay Started Completed Actual
Per Contract
Maragusan
21. So. Maligaya, Tagugpo, Pantukan
900,000.00 10/16/2013 12/21/2013 67 13 54
22. Prk 2, So. Kahayag, Prosperedad, Montevista
1,092,574.78 5/21/2014 6/24/2014 35 20 15
23. Prk 5, Mayaon, Montevista 123,736.19 5/25/2014 6/7/2014 14 8 6
24. Prk 6, Mayaon, Montevista 1,156,719.82 8/4/2015 8/26/2015 23 18 5
25. Purok Rizal (Brgy. Site), Coronobe, Maragusan
315,670.99 5/13/2014 5/22/2014 10 5 5
26. Prk Ipil-Ipil, Tupas, Maragusan 1,504,243.36 5/14/2014 6/10/2014 28 20 8
27. Prk Acacia, Lahi, Maragusan 893,832.92 5/14/2014 8/22/2014 101 8 93
28. Prk Tugas, Saranga, Maragusan
410,683.11 5/13/2014 5/22/2014 10 6 4
29. Prk Gumamela, Bagong Silang, Maragusan
365,187.14 5/14/2014 7/18/2014 66 6 60
30. Prk Sampaguita (Blk-1), Bagong Silang, Maragusan
203,844.85 5/13/2014 5/27/2014 15 8 7
31. P-4 to P-5, Sitio Pawcon, New Cebulan, Montevista
418,676.83 6/9/2014 12/2/2014 177 10 167
32. P-17, Salvacion, Ngan, Compostela
401,796.05 6/13/2014 7/31/2014 49 10 39
33. P-Aguila, Mapawa, Maragusan 586,400.06 6/10/2014 6/23/2014 14 10 4
34. P-7 to P-4, Sitio Pawcon, New Cebulan, Montevista
723,289.82 6/9/2014 11/11/2014 156 10 146
35. Prk 1, Malinawon, Mawab 3,505,205.21 7/17/2014 8/30/2014 45 32 13
36. Prk 5, Cogonon, New Bataan 1,607,919.90 1/27/2015 2/11/2015 16 13 3
37. Prk 5, Cabinuangan, New Bataan
1,144,889.72 6/2/2015 10/6/2015 127 11 116
38. Prk Pag-Asa, Mauswagon, Maragusan
940,668.62 2/4/2015 2/23/2015 20 11 9
Total P29,500,918.29
Delay in the implementation and completion of projects deprived the
intended beneficiaries of the immediate benefits that may be derived
from the project. It is also indicative of DANECO’s weak monitoring of
contractor’s performance that would have ensured completion of projects
according to the agreed timelines.
DANECO as an implementing arm of NEA certainly would like that these
projects at the very least will be able to finish as targeted in the MOA but
circumtances which are beyond our control hinders the project to be finished
on time.
MANAGEMENT’S COMMENTS
EFFECTIVE IMPLEMENTATION OF SEP/BLEP PROJECTS
65
The major reasons why most of these SEP projects either by Administration
which are constructed by DANECO personnel or through private contractors
are the following:
a. Peace and Order situation
b. Right of Way problem
c. Scarcity of materials especially bare wires
d. Weather condition e. Road accessibility
It may be true that the enumerated reasons caused the delay in the
implementation of projects except for the Right of Way (ROW) problem. As
per regulations, ROW problem shall be dealt with before it is requested for
funding from NEA.
Also, the reason for the delay of project implementation is the engagement by
DANECO of incompetent contractors, who have no business permit/license
to operate and PCAB license/accreditation.
The Audit Team recommended that DANECO enhance its monitoring
mechanism to ensure that contractors/suppliers’ performance conform with
the agreed upon plans and specifications and implement projects as
scheduled.
TEAM’S REJOINDER
RECOMMENDATION
66
Chapter 4
DANECO LOAN (The Mindanao Modular Generator Sets Program)
DANECO LOANS (The Modular Gensets Program)
67
Under Section 4, Chapter 2 of PD No. 269, NEA is specifically authorized,
empowered and directed to make loans to public service entities, with
preference to cooperatives, for the construction or acquisition, operation and
maintenance of generation, transmission and distribution facilities and all
related properties, equipment, machinery, fixtures, and materials for the
purpose of supplying area coverage service, and thereafter to make loans for
the restoration, improvement or enlargement of such facilities. In line with
this, NEA extends loans to all ECs nationwide that are encountering financial
difficulty and want to avail of this facility.
Records of DANECO show that during CYs 2012 to 2015, the Cooperative
availed loans from NEA amounting to P213.49 million, broken down as
follows:
Table 27: Loans availed by DANECO from NEA and their repayment status
Year Amount
Released Purpose
Repayment Status
2013 P130.165 Calamity loan for the rehabilitation of damaged lines caused by typhoon Pablo
No payment
2014 - 2015 59.091 Procurement of Modular Generator Sets
2014 24.237 Working Capital loan – Power Account Fully paid
Total P213.493
These loans covered by agreements/contracts between NEA and DANECO,
have specific purposes and their utilization is governed by the provisions of
the agreement/contract. The deficiencies on the utilization of the calamity
loan for the rehabilitation of damaged lines caused by typhoon Pablo are
discussed in Chapter 2. This chapter focuses mainly on the utilization of loan
for the procurement of modular generator sets.
The Mindanao Modular Generator Sets (Gensets) Program
As reported, Mindanao has been experiencing rotating brown-outs in the past
years. In order to provide an immediate short-term solution to the
intermediate electricity needs of Mindanao until baseload power generation
plants come on stream by 2015, the Department of Energy (DOE) proposed
the use of modular gensets. On July 12, 2013, Executive Order No. 137
S.2013 was signed to establish the Mindanao Modular Generator Sets
(Gensets) Program, funded by the P4.5 billion sourced from the DOE-Special
Account in the General Fund (SAGF)-151, specifically from the Gas-
Malampaya Revenue released to NEA, to provide the needed additional
power supply to electricity end-users in Mindanao. Subsequently, on
INTRODUCTION
DANECO LOANS (The Modular Gensets Program)
68
November 6, 2013, the NEA Board of Administrators, under Board
Resolution No. 153 Series of 2013, approved the Loan Facility for the
Modular Generator Sets Program for Mindanao ECs to establish a loan
facility that will meet the Program’s objective of providing immediate relief
or alternative measure to supply the needed power in each of the franchise
areas of ECs in Mindanao.
The Gensets Program was open to all the ECs in Mindanao. In order to avail
of the Program, they have to execute a Loan Agreement with NEA.
The Gensets Program is an inter-agency program among the DOE, NEA and
the Association of Mindanao Rural Electric Cooperatives, Inc. (AMRECO).
The roles and responsibilities of each agency as enumerated in the TOR of
the project follow:
Table 28: Roles and Responsibilities of DOE, NEA and AMRECO
Agency Role and Responsibility
DOE The DOE shall:
Monitor the project and the performance of the obligations of the AMRECO; and
Provide assistance in the filing of the appropriate petition before the ERC for the approval of the rates for the modular Gensets.
NEA The NEA shall:
Provide technical assistance in the evaluation of the proposals;
Timely release the funds for payment of the recommended bidder subject to availability of funds and upon clearance of the DOE;
Provide assistance in the documentation and drafting of the appropriate petition before the ERC for the approval of rates for the modular Gensets; and
Provide advance of funds for the procurement of modular Gensets subject to reimbursement from the National Government upon issuance of the executive order releasing funds for the program. For the rental of modular Genset, NEA shall use its existing financing facilities for the program.
AMRECO AMRECO shall:
Adopt the TOR duly cleared and approved by the DOE and NEA;
Gather pertinent data to facilitate the implementation process including the conduct of bidding; and
With the assistance of the DOE and NEA, file the applicable petition for rate petition with the ERC for and on behalf of participating ECs.
Reportedly in 2013, DANECO was experiencing insufficient power supply in
its franchise area in the Island Garden City of Samal (IGACOS), Davao del
Norte Province. Because of this, the DANECO Board of Directors (BOD), in
its Resolution No. 252, series of 2013 dated August 20, 2013, unanimously
approved the acquisition of three units of 1 mega watt (MW) Gensets,
through the AMRECO, purportedly to address the growing electric power
requirement in the IGACOS area.
DANECO LOANS (The Modular Gensets Program)
69
The bidding for the acquisition of the Gensets was conducted and
administered by AMRECO and the contract was awarded to Marix K.K
Victory Power Partnership. The contract entered into by and between
DANECO and Marix K.K.-Victory Power Partnership was signed on April 4,
2014.
Audit disclosed that the award of contract to the winning bidder is considered
questionable. Moreover, the implementation of the project was not compliant
with certain provisions of RA 9184 and its RIRR and the contract. In
addition, the purpose for availing the loan as well as the objective of the
program/project were not attained as discussed in the following audit
observations.
13. The award of contract for the supply, delivery, installation, testing, and
commissioning of three units of 1 MW each Gensets to the winning
bidder is considered questionable. The declared winning bidder was the
second lowest calculated responsive bidder, offered a longer
implementation period of the project compared to the lowest bidder and
submitted insufficient bidding documents just like the lowest calculated
bidder who was disqualified.
In the contract of loan executed by and between the NEA and DANECO,
for the purchase of modular Gensets to address the power shortage in the
Island of Mindanao, Section 2, Article III thereof states that “Bidding and
construction administration shall be in accordance with NEA
Construction Administration Procedures and other pertinent laws, rules
and regulations”. Correspondingly, the NEA Construction
Administration Procedures, specifically the Procurement Guidelines and
Simplified Bidding Procedures for Electric Cooperatives encourage the
observance of appropriate procurement procedures, including transparent
and competitive bidding to conform with RA 9184.
Likewise, Item 3.1 of the AMRECO Terms of Reference (TOR) for the
engagement of services on acquisition of modular Gensets provides that
in the conduct of bidding, “AMRECO shall observe and or adopt the
pertinent rules and regulations to govern the bidding process for and in
behalf of the Electric Cooperatives; subject to the latter’s procurement
policy and existing procurement procedure of AMRECO.” The same
TOR also provides that “in the formulation of the bidding procedures, the
same shall be guided by the guidelines of the DOE, Energy Regulatory
Commission (ERC) and NEA in the conduct of bidding consistent with
Republic Act No. 9184.”
AUDIT OBSERVATIONS
DANECO LOANS (The Modular Gensets Program)
70
Based on the Executive Report of the AMRECO Bids and Awards
Committee (ABAC) on the result of the bidding process, there were three
bidders who submitted their bid proposals and qualified for the supply,
delivery, installation, testing, and commissioning of three units of 1 MW
Gensets for DANECO, to wit:
Table 29: Bidders and their proposals
Name of Bidder Bid Price per MW
(PhP) Total Bid Price
(PhP)
Lin Man Power Technology, Inc. P15,800,000 P47,400,000
Marix K.K. – Victory Power Partnership 21,886,556 65,659,668
SC Megaworld Construction and Development Corporation 27,727,281 83,181,843
As tabulated above, the lowest calculated bid was the bid proposal of Lin
Man Power Technology, Inc. with a total bid price of P47.40 million or
72.19 percent of the bid of the second lowest bidder and declared
winning bidder, Marix K.K.-Victory Power Partnership, whose bid is
P65.66 million or P18.26 million higher than Lin Man Power
Technology, Inc. However, ABAC rejected the bid proposal of Lin Man
Power Technology, Inc. and recommended the award of contract to
Marix K.K-Victory Power Partnership supposedly due to insufficiency of
documents that prevented an intelligent evaluation and comparison with
the other bidders’ proposals.
The Team’s evaluation disclosed that Lin Man’s bid proposal was
advantageous to DANECO considering the bid price, project
implementation period and proof of technical capacity as presented
below:
Table 30: Comparison of bid proposal of Lin Man Power Technology, Inc. and Marix K.K.-Victory Power Partnership
Particulars Lin Man Power Technology, Inc.
(LMPTI) Marix K.K.-Victory Power Partnership
(MKKVPP)
Total Bid Price PhP47,400,000 PhP65,656,867
Genset Capacity, 1 MW Complied Complied
Project implementation plan
Sixty (60) days or two months project implementation from unit manufacturing to commissioning plus 2 months training of DANECO personnel or a total of 4 months.
One hundred fifty (150) days or 5 months installation and commissioning and additional 2 months for on-site O & M training of EC personnel or a total of 7 months.
Proof of technical capacity
Presented 3 projects that are similar to the bid requirement, two are considered built-in type and one is containerized with capacity of 1,250 kVA.
No documents in the proposal that specify the on-going and completed projects related to supply and installation of generator sets or any other electrical works implemented.
DANECO LOANS (The Modular Gensets Program)
71
Based on the comparison on Table 30, DANECO could have saved
P18.26 million in the acquisition of the Gensets had it awarded the
contract in favor of Lin Man Power Technology, Inc. for being the lowest
bidder aside from the fact that its bid proposal contained a shorter period
of implementation of four months as compared to seven months of Marix
K.K-Victory Power Partnership.
Given the substantial difference between the bid price and
implementation period of the lowest bidder (LMPTI) and the second
lowest bidder (MKKVPP), ABAC could have reconsidered its reason for
rejecting the bid proposal of Lin Man Power Technology, Inc. and could
have applied Section 32.1 of the 2012 Revised IRR of RA 9184, which
states that “…the BAC, through its Secretariat, may ask in writing the
bidder for a clarification of its bid. All responses to requests for
clarification shall be in writing.” Moreover, it could have conducted a
post-qualification activity on Lin Man Power Technology’s declared
ongoing and completed similar projects to further establish the needed
brand and specifications to be supplied by Lin Man Power to enable
ABAC to have an intelligent evaluation and comparison with the other
qualified bidder’s proposals.
The Audit Team also observed that the decision of ABAC to
disqualify/reject the bid proposal of Lin Man Power Technology, Inc. for
insufficiency of documents was not applied to Marix K.K.-Victory Power
Partnership whose bid documents did not include the statement of all its
ongoing and completed government and private contracts, including
contracts awarded but not yet started, which is required under Class A –
Technical Documents, pursuant to Section 23.1 of the 2012 RIRR of RA
9184.
ABAC’s recommendation to award the contract to Marix K.K-Victory
was concurred and approved by the DANECO BOD in its Resolution No.
26, series 2014 dated January 22, 2014.
In April 2017, the Audit Team sent a letter to AMRECO requesting
certified copy of the pertinent bidding documents such as newspaper
clippings on the publications of the Invitation to Bid, Instruction to
Bidders, bid offer/tender of the participating bidders, Abstract of Bids,
Notices of Award and to Proceed, among others. However, the letter was
returned to this Office on May 2, 2017 as AMRECO moved from its
former address at CM Recto, Lapasan Highway, Cagayan de Oro City.
On July 27, 2017, the Audit Team re-sent its letter to AMRECO at its
new address at Gaerlan St., Cagayan de Oro City. On September 25,
2017, the Audit Team received the documents requested from AMRECO.
DANECO LOANS (The Modular Gensets Program)
72
It was ABAC that conducted the bidding process in compliance with the
DOE Department Circular No. OC 2013-08-0019, IRR for the Mindanao
Modular Generator Program, Section 7, Item 6. The result of the ABAC
bidding was reviewed by NEA and evaluated that the bidding process is in
order. Last January 22, 2014, the Board passed Resolution No. 26, series
2014, “A resolution to concur with the approval of NEA on the
recommendation of ABAC to award the supply of three (3) units modular
generator sets with a capacity of 1 megawatt per unit” to the winning bidder.
The conduct of bidding was delegated to AMRECO, but DANECO, being the
debtor/borrower, has the final say on whether to concur or refuse the award of
the contract. It was DANECO who issued Notice to Proceed and signed
contract agreements with the supplier, as well as in the contract of loan with
NEA.
The Audit Team maintains that had the award of contract been made to the
lowest bidder, DANECO could have saved at least P18.26 million.
It is recommended that DANECO conduct in-depth investigation and if
warranted, penalize the persons responsible in approving and awarding the
contract.
14. The purpose for availing loan out of the Gensets Program, that is,
providing immediate relief or alternative measure to supply the needed
power in IGACOS, as well as the program objective were not attained.
The Gensets have not yet been commercially operated as of inspection
date on March 10, 2017 since the required government clearances and
permits have not been obtained by DANECO. Moreover, the Gensets
were installed in DANECO General Headquarters in Compostela
Valley instead of IGACOS and installation was completed only after 26
months compared to the 7-month requirement under the contract.
MANAGEMENT’S COMMENTS
TEAM’S REJOINDER
RECOMMENDATION
DANECO LOANS (The Modular Gensets Program)
73
As discussed earlier, the intended purpose of DANECO in acquiring the
Gensets is to address the growing electric power requirement in its Samal
Island franchise area. Thus, in Annex A of the TOR pertaining to the
acquisition of said Gensets, as well as in the bidding documents, the
indicated delivery site/location of the subject Gensets is in Samal Island
or IGACOS.
The Gensets were however, delivered, installed and commissioned at the
DANECO General Headquarters, Montevista, Compostela Valley;
reportedly completed on August 23, 2016 per Certificate of Completion;
and, finally accepted by DANECO on August 24, 2016 per issued
Certificate of Acceptance or 26 months from receipt of the Notice to
Proceed (NTP), which was way beyond the 7-month period requirement
under the contract. Moreover, the Gensets were delivered and installed in
Compostela Valley, which had a stable and sufficient power capacity,
thus, the purpose of purchasing the Gensets was not served and the
benefits did not redound to the intended beneficiaries, the residents of
IGACOS.
The Audit Team inquired from the DANECO Management on March 22,
2017 about the change in the Gensets’ delivery site/location, as well as
the problems encountered in securing the required government permits
and clearances. In its reply to the Team’s query, dated May 25, 2017,
DANECO informed that the location/delivery site was transferred to
Montevista, Compostela Valley allegedly pursuant to Board Resolution
No. 26, series of 2014.
Under Item No. 11 of the Contract between DANECO and Marix K.K.-
Victory Power Partnership, the buyer (DANECO) shall be responsible in
securing all the required Local government clearances and permits to
operate the Gensets in its coverage area. The seller (Marix K.K.), on the
other hand, shall cooperate and provide assistance, when needed, in the
course of securing the required clearances and permits upon the request
of the buyer. However, as of inspection date on March 10, 2017, the
clearances and permits have not been obtained by DANECO and the
units have not yet been operated commercially.
The costs of these Gensets will eventually be recovered from the
consuming public through the rates being charged to them without
corresponding benefit.
DANECO LOANS (The Modular Gensets Program)
74
The Board passed Resolution #70 series 2014, “A resolution to install the
three modular gensets in Montevista, Compostela Valley” during 7th regular
meeting of the Board of Directors held on April 7, 2014 at DANECO Bibbu
Office, Tagum City.
Reasons of the delay of the project with Board Resolution for extension 60
days.
Delayed released of the 30 percent down payment.
Delay in the manufacturing of the generator due to specification issues.
Problem encountered on the document with the Bureau of Customs.
The DANECO Board Resolution changing the location of the Gensets from
IGACOS to Montevista was made after the bidding was conducted but before
the issuance of the Notice to Proceed to the winning bidder. The change was
not in conformance with the purpose intended. The very reason in acquiring
the Gensets was to provide immediate power reliability in IGACOS area.
Considering that the change in location was done before the awarding of
contract and the delayed project implementation, the DANECO Board should
have passed a resolution cancelling the procurement of the Gensets as these
are not necessary in Montevista, having a more stable and sufficient power
supply.
As the purpose in acquiring the Gensets Program was not attained, it is highly
recommended that DANECO avail its option to return the Gensets to NEA as
soon as possible to save DANECO from paying interest expenses as well as
maintenance costs that can be incurred in bringing the Gensets to its good
running condition.
TEAM’S REJOINDER
RECOMMENDATION
MANAGEMENT’S COMMENTS
DANECO LOANS (The Modular Gensets Program)
75
15. The provision of the contract between DANECO and Marix K.K.-
Victory Power Partnership that required downpayment of 30 percent of
the contract price is contrary to Item 4, Annex E of the 2012 RIRR of
RA 9184, which limits the advance payment to an amount not
exceeding 15 percent of the total contract price.
Item 4.1 of the Contract entered into by and between DANECO and
Marix K.K-Victory Power Partnership for the supply, delivery,
installation, testing and commissioning of the Gensets on April 4, 2014
provides that DANECO shall pay the contractor down payment of 30
percent of the total contract amount upon signing of the contract, and
posting of the required Performance Bond. This provision is not in
accordance with Item 4, Annex E of the RIRR of RA 9184, which limits
the advance payment to an amount not exceeding 15 percent of the total
contract price. Nevertheless, NEA released to DANECO the
downpayment for the Gensets on August 28, 2014 under Check No.
360204 in the amount of P19,697,060, which is equivalent to 30 percent
of the contract amount. Such amount was paid by DANECO to the
contractor under Journal Voucher No. 1412-00195 dated December 29,
2014.
The downpayment of 30 percent is in accordance with the approved TOR set
by the ABAC. It was also included in the provision of the contract between
DANECO and Marix KK.
The 30 percent downpayment is not in accordance with the provision of RA
9184 and its RIRR.
It is recommended that DANECO comply strictly with the provisions of RA
9184 and its RIRR on the limitation with regard to advance payment and in
similar transactions in the future.
RECOMMENDATION
MANAGEMENT’S COMMENTS
TEAM’S REJOINDER
DANECO LOANS (The Modular Gensets Program)
76
16. The installation and commissioning of the Gensets were completed and
accepted only after 26 months in violation of the 7-month period
provided in the contractual agreement between DANECO and Marix
K.K. Victory Power Partnership. Despite substantial delay on the part
of the supplier, DANECO paid 90 percent of the contract amount
without exercising its right under the contract to collect the maximum
liquidated damages of P9.85 million, which is equivalent to 15 percent
of the contract price.
The contractual agreement between DANECO and Marix K.K. Victory
Power Partnership and the TOR provides that the Gensets Program
should be implemented within five months from the issuance of the
Notice to Proceed (NTP) on June 27, 2014 or until November 25, 2014
plus two months on-site Operation and Maintenance training of EC
personnel. The Project was completed and accepted only on August 24,
2016, meaning the actual implementation took 26 months. However,
despite substantial delay on the part of the supplier, DANECO imposed
penalty of only P1.25 million instead of the maximum penalty of P9.85
million, as computed below:
Implementation period: (reckoning from the date of Notice to Proceed to the date
of Completion)
Inclusive Date - June 27, 2014 to August 23, 2016 = 687 days
No. of Days per Contract - 150 days + 60 days O&M = 210 days
No. of Days Delayed = 477 days
Approved Extension = 60 days
Total No. of Days Delayed = 417 days
======== Penalty = 1/10 of 1% of Contract Amount multiplied by the number of days
delay
= 1/10 of 1% x P65,656,867 x 417 days
= P27,378,913.54
Maximum penalty allowed in the Contract is equivalent to 15% of the Contract
Amount
= 15% x P65,656,867
= P9,848,530
Records show that the computed penalty was not fully deducted by
DANECO from the payments to the contractor as shown on the next
page:
DANECO LOANS (The Modular Gensets Program)
77
Table 31: Payments of Gensets to Marix K.K.-Victory Power Partnership
Check Voucher Particulars
No. Date Amount
1412-00195 12/29/2014 P19,697.060.10 30% Down payment
1602-00116 02/29/2016 39,394,120.20 60% Progress billing
Total P59,091,180.30
As the payment made to supplier/contractor was 90 percent of the total
contract price, the balance, which is only 10 percent or P6,565,686.71 is
not sufficient to settle the 15 percent maximum penalty/liquidated
damages of P9,848,530.
A report was submitted by the TWG on Acceptance to the Management for
the penalty of the delay of 36 days penalty amount of P2,363,647.32
considering the approved extension of the supplier. However, there was a
counter proposal computation submitted by the supplier.
The issue on the penalty was brought to NEA for discussion and settlement.
Board Resolution No. 299 series 2016 passed by the Board for the final
penalty computation for the delay of the project.
It is very clear in Item 17 of Annex A of the TOR that the delivery schedule
is not later than 150 days upon receipt of Notice of Award and not upon
receipt of Down Payment, in reference to the DANECO comment above. In
addition, the delay in the down payment was fault committed by NEA. As per
regulations, NEA has an obligation to pay directly to the proponent/supplier
from the proceeds of the loan.
The Audit Team computed the maximum penalty of 15 percent of the
contract amount using the date of the Notice to Proceed, which is later date,
as the reckoning date in the computation of penalty.
TEAM’S REJOINDER
MANAGEMENT’S COMMENTS
DANECO LOANS (The Modular Gensets Program)
78
It is recommended that DANECO explore all possible options to collect from
the contractor the remaining balance of P8.60 million of the P9.85 million
maximum liquidated damages equivalent to 15 percent of the contract price,
or could be made through deduction from the Contractor’s Performance
Bond.
17. DANECO has not yet exercised its option, as of audit date, to return the
Gensets to NEA when these have not yet been operated commercially
and circumstances indicate that these were no longer needed.
Continuous maintenance of the Gensets means additional costs to the
Cooperative in terms of interests and maintenance expenses without
corresponding benefits that will be charged to and recovered from the
consumers.
The Terms and Conditions of the Loan Facility for the Modular Gensets’
(LFMGensets) promulgated by NEA under its unnumbered
Memorandum dated July 9, 2014 states that ECs have the option to return
the units to NEA when these are no longer necessary. Despite the idle
condition of the Gensets, the Cooperative has not yet exercised such
option as of audit date. Meanwhile, DANECO is incurring additional
expenses of maintaining the Gensets when it conducts test runs every
now and then to keep them in operating condition, and interest on the
loan availed for these units, which shall be paid by DANECO when it
becomes due. These expenses will be charged to the customers of
DANECO, who are the consuming public.
The costs of the Gensets including the maintenance expenses are
considered by DANECO as components of the rate base, thus, have an
impact on its current tariff/rate being charged to its customers.
The TWG submitted recommendation to the Management for the return of
the Gensets to NEA. However, Task Force Duterte-Northern Davao Power
(TFD-NDP) function as the new composition of the board passed a resolution
#125 series 2017 “A resolution to transfer the three units Gensets from
Montevista, Compostela Valley to the Island Garden City of Samal” during
10th regular meeting held on July 29, 2017 at Be-ing Suites, Lanang, Davao
RECOMMENDATION
MANAGEMENT’S COMMENTS
DANECO LOANS (The Modular Gensets Program)
79
City. It was supported by NEA through its reply letter dated September 11,
2017.
The Audit Team appreciates the actions of the TWG in recommending the
return of the Gensets to NEA.
The resolution of TFD-NDP to transfer the Gensets to IGACOS is within the
intended purpose of acquiring the Gensets, however, it requires additional
costs (dismantling, hauling, reinstallation, etc.) to be incurred by DANECO,
eventually, additional burden to all DANECO customers.
It is highly recommended that DANECO conduct further evaluation if still
beneficial for DANECO to push through the transfer of the Gensets to
IGACOS and secure the necessary government permits/licenses to operate, as
it was the intention of the loan secured from NEA. Otherwise, exercise the
option to return the Gensets immediately to NEA to prevent depleting
DANECO’s financial resources and save it from paying interest and
maintenance expenses considering the idle condition of the Gensets.
TEAM’S REJOINDER
RECOMMENDATION
80
Part IV
Annexes
Annexes
81
Annex A: List of unenergized sitio/puroks identified by DANECO during the “Sitio
Summit” in 2011. Item Name of Sitio/Purok Barangay City/Municipality District Status
1 P - 1 Ngan Compostela 1st Energized
2 P - 2A Mangayon Compostela 1st Energized
3 P - 2B Mangayon Compostela 1st Energized
4 P - 5A Mangayon Compostela 1st Energized
5 P - 5B Mangayon Compostela 1st Energized
6 P - 10 Osmena Compostela 1st Energized
7 P - 5 Poblacion Compostela 1st Energized
8 P - 8 Poblacion Compostela 1st Energized
9 P - 13 Poblacion Compostela 1st Energized
10 P - 11 San Miguel Compostela 1st Energized
11 P - 14 San Miguel Compostela 1st Energized
12 P - 9 Siocon Compostela 1st Energized
13 P - 5 Tamia Compostela 1st Energized
14 P-Lusvimin Katipunan Maragusan 1st Energized
15 P- Ka•e ll Magcagong Maragusan 1st Energized
16 IP - Angelo New Cebu Magcagong Maragusan 1st Energized
17 P - Sa in Magcagong Maragusan 1st Energized
18 P - Calantas Magcagong Maragusan 1st Energized
19 Prk Ba ras Magcagong Maragusan 1st Energized
20 Sampaguita Tigbao Maragusan 1st Energized
21 P5 Mahayahay Baylo Monkayo 1st Energized
22 P-7 Bliss Baylo Monkayo 1st Energized
23 P-3 to P-2 Macopa Monkayo 1st Energized
24 Lagab Mamunga Monkayo 1st Energized
25 Magas Mamunga Monkayo 1st Energized
26 Kambilawa Olaycon Monkayo 1st Energized
27 P - 1 Poblacion Monkayo 1st Energized
28 P - 2 Poblacion Monkayo 1st Energized
29 P - 3 Poblacion Monkayo 1st Energized
30 P - 4 Poblacion Monkayo 1st Energized
31 P - 5A Poblacion Monkayo 1st Energized
32 P - 6 Poblacion Monkayo 1st Energized
33 P -7 Poblacion Monkayo 1st Energized
34 P - 7A Poblacion Monkayo 1st Energized
35 P - 8 Poblacion Monkayo 1st Energized
36 P - 9 Poblacion Monkayo 1st Energized
37 P - 10 Poblacion Monkayo 1st Energized
38 P - 10A Poblacion Monkayo 1st Energized
39 P -11 Poblacion Monkayo 1st Energized
40 P - 13 Poblacion Monkayo 1st Energized
41 P15 Amakan Poblacion Monkayo 1st Energized
42 P - 2 Salvacion Monkayo 1st Energized
43 P -4 Maligaya San Jose Monkayo 1st Energized
44 P-5 Bosquit San Jose Monkayo 1st Energized
45 P3 Mahayahay San Jose Monkayo 1st Energized
46 P - 9 Tubo-tubo (New Del Mc Monkayo 1st Energized
47 P - 3 Bankerohan Norte Montevista 1st Energized
48 Bandihasan Bankerohan Norte Montevista 1st Energized
Annexes
82
Item Name of Sitio/Purok Barangay City/Municipality District Status
49 P-2 Brgy. Site Bankerohan Sur Montevista 1st Energized
50 P - 17 Cabinuangan (Pob.) New Bataan 1st Energized
51 P - 18 Cabinuangan (Pob.) New Bataan 1st Energized
52 P - 17 Camanlangan New Bataan 1st Energized
53 P - 18 Camanlangan New Bataan 2nd Energized
54 P - 10 Kahayag New Bataan 1st Energized
55 P - 1A Katipunan New Bataan 1st Energized
56 P - 3 Katipunan New Bataan 1st Energized
57 P - 3A Katipunan New Bataan 1st Energized
58 P - 5A Katipunan New Bataan 1st Energized
59 Aslom Mayaon Montevista 1st Energized
60 Magtaya Mayaon Montevista 1st Energized
61 Magtaya Mayaon Montevista 1st Double Entry
62 P - 3A (Mapaso) New Bataan 1st Energized
63 Prk 12 Cadunan Mabini 2nd Energized
64 P - 5 Bawani Mawab 2nd Energized
65 Tabontabon Bawani Mawab 2nd Energized
66 Mahayag 8-A Nuevo !loco Mawab 2nd Energized
67 San Isidro 9-B Nuevo (loco Mawab 2nd Energized
68 San Isidro 9-C Nuevo Iloco Mawab 2nd Energized
69 P - 7 Magsaysay Nabunturan 2nd Energized
70 Kahayag Magsaysay Nabunturan 2nd Energized
71 Reserva Mainit Nabunturan 2nd Energized
72 P - 4 Ogao Nabunturan 2nd Energized
73 P - 6 Pangutosan Nabunturan 2nd Energized
74 Siringan Kingking (Pob.) Pantukan 2nd Energized
75 Puyo Santa Emilia Laak (Sn. Vicente) 2nd Energized
76 P - Vanda Bagong Silang Maragusan 1st Energized
77 Lumanggang (Prk 3) New Leyte Maco 2nd Energized
78 P - 6 Basak Nabunturan 2nd Energized
79 Prk Starlight Camoning Asuncion 1st Energized
80 P - 6 Manat Nabunturan 2nd Energized
81 P - 9 Manat Nabunturan 2nd Energized
82 Prk 5 Buclad Asuncion 1st Energized
83 Prk 5 New Bantayan Asuncion 1st Energized
84 Purok 7 Santa Cruz New Corella 1st Energized
85 Prk Mamaon Pinamuno San Isidro 2nd Energized
86 Prk 10 Igangon San Isidro 2nd Energized
87 Prk 8 Kipalili San Isidro 2nd Energized
88 Prk 6 Cogon Babak 2nd Energized
89 Prk 7 Cogon Babak 2nd Energized
90 Prk 6 Marnbago-B Babak 2nd Energized
91 P - 3 Aurora Compostela 1st Unenergized
92 P - 17 Ngan Compostela 1st Unenergized
93 Prk Aguila Mapawa Maragusan 1st Unenergized
94 P - 5 Bagongon Compostela 1st Unenergized
95 P - 2 Bankerohan Sur Montevista 1st Unenergized
96 P - 6 New Sibonga Nabunturan 2nd Unenergized
97 P - 4 Aurora Compostela 1st Unenergized
98 P - 6 Bagongon Compostela 1st Unenergized
Annexes
83
Item Name of Sitio/Purok Barangay City/Municipality District Status
99 P - 11 Gabi Compostela 1st Unenergized
100 P - 12 Gabi Compostela 1st Unenergized
101 P- 13 Gabi Compostela 1st Unenergized
102 P - 1 Lagab Compostela 1st Unenergized
103 P - 2 Lagab Compostela 1st Unenergized
104 P- 1C Mapaca Compostela 1st Unenergized
105 P - 2 Mapaca Compostela 1st Unenergized
106 P - 4 Mapaca Compostela 1st Unenergized
107 P - 5 Mapaca Compostela 1st Unenergized
108 P - 5 Maparat Compostela 1st Unenergized
109 P - 7 Maparat Compostela 1st Unenergized
110 P-Valencia 1-2 New Alegria Compostela 1st Energized
111 Madredijos New Alegria Compostela 1st Energized
112 Albur New Alegria Compostela -Is' Energized
113 Typlon - 1 New Alegria Compostela 1st Energized
114 Typlon - 2 New Alegria Compostela 1st Energized
115 P - 15 Ngan Compostela 1st Unenergized
116 P - 16 Ngan Compostela 1st Unenergized
117 P - 18 Ngan Cornpostela 1st Unenergized
118 P - 19 Ngan Compostela 1st Unenergized
119 P - 12 San MigUnenergizedl Compostela 1st Unenergized
120 P - 13 San MigUnenergizedl Compostela 1st Unenergized
121 P - 12 Siocon Compostela 1st Energized
122 P-9 Mamaraw Tamia Compostela 1st Energized
123 P - Asusina Bagong Silang Maragusan 1st Energized
124 S - Cahayagan Bagong Silang Maragusan 1st Unenergized
125 S - Tandik Bagong Silang Maragusan 1st Unenergized
126 P - Manga Cambagang Maragusan 1st Unenergized
127 P - Sunkist Cambagang Maragusan 1st Unenergized
128 P - Marang Cambagang Maragusan 1st Energized
129 P - Caimito Cambagang Maragusan 1st Energized
130 P - Lanzones Cambagang Maragusan 1st Energized
131 P - Nangka Cambagang Maragusan 1st Energized
132 P - Durian Cambagang Maragusan 1st Energized
133 P - Santol Cambagang Maragusan 1st Energized
134 P - Bayabas Cambagang Maragusan 1st Energized
135 Del Pilar Coronobe Maragusan 1st Unenergized
136 Jacinto to Upper Mandayan Coronobe Maragusan 1st Unenergized
137 P- Mauswagon Katipunan Maragusan 1st Energized
138 P-Magtinabo Katipunan Maragusan 1st Energized
139 P-Riverside Katipunan Maragusan 1st Unenergized
140 P - Tandik Katipunan Maragusan 1st Energized
141 P- Malipayon Katipunan Maragusan 1st Energized
142 P-Managhiusa Katipunan Maragusan 1st Energized
143 P-Madaugon Katipunan Maragusan 1st Unenergized
144 P-Sampaguita Lahi Maragusan 1st Energized
145 P-Macopa Lahi Maragusan 1st Unenergized
146 P-Dol-dol Lahi Maragusan 1st Energized
147 P-Mahayahay Lahi Maragusan 1st Unenergized
148 P-Acacia Lahi Maragusan 1st Unenergized
Annexes
84
Item Name of Sitio/Purok Barangay City/Municipality District Status
149 P-Lanzones Lahi Maragusan 1st Unenergized
150 P-Orchids Lahi Maragusan 1st Unenergized
151 P - Tubog Magcagong Maragusan 1st Energized
152 P - Lemonsito Magcagong Maragusan 1st Unenergized
153 P - Manga Magcagong Maragusan 1st No Households
154 P - Penarasan Mahayahay Maragusan 1st Energized
155 P - Durian Mahayahay Maragusan 1st Unenergized
156 P- Adet Taraga Mahayahay Maragusan 1st Unenergized
157 P-Magbayabas Mahayahay Maragusan 1st Unenergized
158 P - Kalantas Mahayahay Maragusan 1st Unenergized
159 P - Rambutan Mahayahay Maragusan 1st No Households
160 P - Dango Mapawa Maragusan 1st Unenergized
161 P - Candelaria Mapawa Maragusan 1st Energized
162 P-Mahayahay Mapawa Maragusan 1st Unenergized
163 Prk Lansones Mapawa Maragusan 1st No Households
164 P - Almasiga Maragusan (Pob.) Maragusan 1st Unenergized
165 P - Aguacan A Maragusan (Pob.) Maragusan 1st Unenergized
166 P - Aguacan B Maragusan (Pob.) Maragusan 1st Unenergized
167 P - Narra Maragusan (Pob.) Maragusan 1st Energized
168 P - Acacia Maragusan (Pob.) Maragusan 1st Energized
169 P - Nangca Maragusan (Pob.) Maragusan 1st Energized
170 P - Atis Maragusan (Pob.) Maragusan 1st Unenergized
171 P - Manga Maragusan (Pob.) Maragusan 1st Unenergized
172 P - Sampaloc Maragusan (Pob.) Maragusan 1st Energized
173 P-Rambutan A Maragusan (Pob.) Maragusan 1st Energized
174 P-Rambutan B Maragusan (Pob.) Maragusan 1st Energized
175 Riverside Maragusan (Pob.) Maragusan 1st Energized
176 Pinetree - 1 Maragusan (Pob.) Maragusan 1st Energized
177 Pinetree - 2 Maragusan (Pob.) Maragusan 1st Energized
178 Magtalisay Maragusan (Pob.) Maragusan 1st Unenergized
179 Sambag Maragusan (Pob.) Maragusan 1st Energized
180 Ilang-ilang Maragusan (Pob.) Maragusan 1st Energized
181 Yakal Maragusan (Pob.) Maragusan 1st Energized
182 Bulahan Maragusan (Pob.) Maragusan 1st Energized
183 Apitong Maragusan (Pob.) Maragusan 1st Energized
184 Falcata Maragusan (Pob.) Maragusan 1st Energized
185 Lawaan - A Maragusan (Pob.) Maragusan 1st Energized
186 Lawaan - B Maragusan (Pob.) Maragusan 1st Energized
187 Wakatan Maragusan (Pob.) Maragusan 1st Energized
188 Santol Maragusan (Pob.) Maragusan 1st Energized
189 Kutugsao Maragusan (Pob.) Maragusan 1st Energized
190 Buyo Maragusan (Pob.) Maragusan 1st Energized
191 Molave Maragusan (Pob.) Maragusan 1st Unenergized
192 Orchids Maragusan (Pob.) Maragusan 1st Unenergized
193 Fortune Maragusan (Pob.) Maragusan 1st Unenergized
708 Finetree Maragusan (Pob.) Maragusan 1st Unenergized
195 Mandarin Maragusan (Pob.) Maragusan 1st Energized
196 Durian Maragusan (Pob.) Maragusan 1st Energized
197 P - Saging Maragusan (Pob.) Maragusan 1st Energized
198 P - Bagras Maragusan (Pob.) Maragusan 1st Energized
Annexes
85
Item Name of Sitio/Purok Barangay City/Municipality District Status
199 P - Calantas Maragusan (Pob.) Maragusan 1st Energized
200 P - Aguila Maragusan (Pob.) Maragusan 1st Unenergized
201 P - Lansones Maragusan (Pob.) Maragusan 1st Energized
202 Maglabog Mauswagon Maragusan 1st Energized
203 P - Pag-asa Mauswagon Maragusan 1st Energized
204 P - Malinawon Mauswagon Maragusan 1st Energized
205 P - Lobe Mauswagon Maragusan 1st Unenergized
206 P - Aquino New Albay Maragusan 1st Unenergized
207 P - Quirino New Albay Maragusan 1st Unenergized
208 P - Rizal New Albay Maragusan 1st Unenergized
209 P - Highlands New Albay Maragusan 1st Unenergized
210 P - Sto. Nino New Albay Maragusan 1st Unenergized
211 P - Mabini New Albay Maragusan 1st Unenergized
212 P - Roxas New Albay Maragusan 1st Unenergized
213 P-Tandang Sora New Albay Maragusan 1st Unenergized
214 P - Laurel New Albay Maragusan 1st Energized
215 P - Calantas New Katipunan Maragusan 1st Energized
216 P - Duranta New Katipunan Maragusan 1st Unenergized
217 P - Guijo New Katipunan Maragusan 1st Unenergized
218 P - 1 New Man-ay Maragusan 1st Energized
219 P - 2 New Man-ay Maragusan 1st Energized
220 P - 3 New Man-ay Maragusan 1st Energized
221 P - 4 New Man-ay Maragusan 1st Energized
222 P - 5 New Man-ay Maragusan 1st Unenergized
223 P - 6 New Man-ay Maragusan 1st Unenergized
224 P - 7 New Man-ay Maragusan 1st Unenergized
225 P - Lunas New Panay Maragusan 1st Unenergized
226 P - Humabon New Panay Maragusan 1st Unenergized
227 P - 2 Paloc Maragusan 1st Energized
228 P - 3 Paloc Maragusan 1st Unenergized
229 P - 4 Paloc Maragusan 1st Energized
230 P-5 Mambusao Paloc Maragusan 1st Unenergized
231 P-5 Riverside Paloc Maragusan 1st Unenergized
232 P - 8 Paloc Maragusan 1st Unenergized
233 P - Caimito Pamintaran Maragusan 1st Unenergized
234 P -1 Parasanon Maragusan 1st Energized
235 P - 2 Parasanon Maragusan 1st Unenergized
236 P - 3 Parasanon Maragusan 1st Unenergized
237 P - 4 Parasanon Maragusan 1st Energized
238 P - 5 Parasanon Maragusan 1st Energized
239 P - 6 Parasanon Maragusan 1st Energized
240 Manga Talian Maragusan 1st Energized
241 Lanzones Talian Maragusan 1st Unenergized
242 Caimito Talian Maragusan 1st Energized
243 Marang Talian Maragusan 1st Unenergized
244 Mahayahay Tandik Maragusan 1st No Households
245 Tinago Tandik Maragusan 1st No Households
246 Panaghiusa Tandik Maragusan 1st Unenergized
247 Everlasting Tigbao Maragusan 1st Energized
248 Dalia Tigbao Maragusan 1st Unenergized
Annexes
86
Item Name of Sitio/Purok Barangay City/Municipality District Status
249 Durian Tupaz Maragusan 1st Unenergized
250 Ipil-ipil Tupaz Maragusan 1st Unenergized
251 Dita Tupaz Maragusan 1st Energized
252 Molave Tupaz Maragusan 1st Unenergized
253 Manga Tupaz Maragusan 1st Energized
254 Falcata Tupaz Maragusan 1st Unenergized
255 Camelle Tupaz Maragusan 1st Unenergized
256 Angelo Tupaz Maragusan 1st Unenergized
257 Prk 4 Awao Monkayo 1st Unenergized
258 P 6 Awao Monkayo 1st Unenergized
259 Prk 7 Awao Monkayo 1st Unenergized
260 Prk 9 Awao Monkayo 1st Unenergized
261 Prk 13 Awao Monkayo 1st Unenergized
262 Prk 15 Awao Monkayo 1st Unenergized
263 Prk 17 Awao Monkayo 1st Unenergized
264 Mabuhay Awao Monkayo 1st Energized
265 Pilar 6. 7 Babag Monkayo 1st Unenergized
266 Aunan 10 Babag Monkayo 1st Unenergized
267 Bagkitan 1 Babag Monkayo 1st Unenergized
268 Magmon 11, 12 Babag Monkayo 1st Unenergized
269 Prk Malinawon Banlag Monkayo 1st Unenergized
270 P6 Lower Buay Baylo Monkayo 1st Unenergized
271 P1A, Mayao Baylo Monkayo 1st Unenergized
272 P - 9 Casoon Monkayo 1st Unenergized
273 P - 10 Casoon Monkayo 1st Unenergized
274 P - 11 Casoon Monkayo 1st Unenergized
275 P - 12 Casoon Monkayo 1st Unenergized
276 P -13 Casoon Monkayo 1st Unenergized
277 P - 14 Casoon Monkayo 1st Unenergized
278 P -16 Casoon Monkayo 1st Unenergized
279 Anagase Casoon Monkayo 1st Energized
280 Kabangkalan Casoon Monkayo 1st Unenergized
281 P- 7 Palo Haguimitan Monkayo 1st Unenergized
282 P 9 Kasub Haguimitan Monkayo 1st Unenergized
283 P -I Inambatan Monkayo 1st Unenergized
284 Arno-awon Inambatan Monkayo 1st Unenergized
285 P-1A Macopa Monkayo 1st Unenergized
286 P-1B Macopa Monkayo 1st Unenergized
287 P-4A Macopa Monkayo 1st Unenergized
288 P - 5 Macopa Monkayo 1st Unenergized
289 P-4 Catian Naboc Monkayo 1st Unenergized
290 P-5 Catian Naboc Monkayo 1st Unenergized
291 P - 6 Naboc Monkayo 1st Unenergized
292 P - 7 Naboc Monkayo 1st Unenergized
293 P - 8 Naboc Monkayo 1st Unenergized
294 Bigaan Olaycon Monkayo 1st Unenergized
295 P - 2 Olaycon Monkayo 1st Unenergized
296 P - 9 Pasian (Santa Filomenc Monkayo 1st Unenergized
297 P - 10 Pasian (Santa Filomenc Monkayo 1st Unenergized
298 P - 12 Pasian (Santa Filomenc Monkayo 1st Unenergized
Annexes
87
Item Name of Sitio/Purok Barangay City/Municipality District Status
299 P - 13 Pasian (Santa Filomeni Monkayo 1st Unenergized
300 P -2A Poblacion Monkayo 1st Unenergized
301 P -2B Poblacion Monkayo 1st Unenergized
302 P -2C Poblacion Monkayo 1st Unenergized
303 P -3A Poblacion Monkayo 1st Unenergized
304 P -3B Poblacion Monkayo 1st Unenergized
305 P -4A Poblacion Monkayo 1st Unenergized
306 P -8A Poblacion Monkayo 1st Unenergized
307 P - 1 Rizal Monkayo 1st Unenergized
308 P -1A Rizal Monkayo 1st Unenergized
309 P -3 Rizal Monkayo 1st Unenergized
310 P -6 Rizal Monkayo 1st Unenergized
311 P - 1A Salvacion Monkayo 1st Energized
312 P - 4 - 5 Salvacion Monkayo 1st Unenergized
313 P -7 Salvacion Monkayo 1st Unenergized
314 P - 8 Salvacion Monkayo 1st Unenergized
315 P - 9 Salvacion Monkayo 1st Unenergized
316 P - 10 Salvacion Monkayo 1st Unenergized
317 P4 Sta. Monica San Isidro Monkayo 1st Unenergized
318 P-15 Maot San Jose Monkayo 1st Unenergized
319 P - 8 Tubo-tubo (New Del Mc Monkayo 1st Unenergized
320 P - 10 Tubo-tubo (New Del Mc Monkayo 1st Unenergized
321 P - 11 Tubo-tubo (New Del Mc Monkayo 1st Unenergized
322 P-7 Tinago Tubo-tubo (New Del M Monkayo 1st Unenergized
323 P - 6 Magas Tubo-tubo (New Del Mc Monkayo 1st Unenergized
324 P - Palmera Union Monkayo 1st Unenergized
325 P - Senorita Union Monkayo 1st Unenergized
326 P - Lumbia Union Monkayo 1st Unenergized
327 P - Santan Union Monkayo 1st Unenergized
328 P - 2 Upper Ulip Monkayo 1st Unenergized
329 P - 3 Upper Ulip Monkayo 1st Unenergized
330 P - 4 Upper Ulip Monkayo 1st Unenergized
331 P - 5 Upper Ulip Monkayo 1st Unenergized
332 P - 7 Upper Ulip Monkayo 1st Unenergized
333 P - 9 Upper Ulip Monkayo 1st Unenergized
334 P - 10 Upper Ulip Monkayo 1st Unenergized
335 P -11 Upper Ulip Monkayo 1st Unenergized
336 P - 12 Upper Ulip Monkayo 1st Unenergized
337 P - 13 Upper Ulip Monkayo 1st Unenergized
338 Km 6, Casoon (Kabangkalan) Monkayo 1st Unenergized
339 P - 3 Banagbanag Montevista 1st Unenergized
340 P -7 Banagbanag Montevista 3rd Unenergized
341 P-1, P-5, P-7 Bankerohan Norte Montevista 1st Unenergized
342 P 1 Camansi Montevista 1st Unenergized
343 P -2 Camansi Montevista 1st Unenergized
344 P - 3 Camansi Montevista 1st Unenergized
345 P - 4 Camansi Montevista 1st Unenergized
346 P 5 Camansi Montevista 1st Unenergized
347 P - 6 Camansi Montevista 1st Unenergized
348 P - 7 Camansi Montevista 1st Unenergized
Annexes
88
Item Name of Sitio/Purok Barangay City/Municipality District Status
349 P 1 Camantangan Montevista 1st Unenergized
350 P 2 Camantangan Montevista 1st Unenergized
351 P - 3 Camantangan Montevista 1st Unenergized
352 P 5 Camantangan Montevista 1st Unenergized
353 P 6 Camantangan Montevista 1st Unenergized
354 P 2 Canidkid Montevista 1st Unenergized
355 P 3 Concepcion Montevista 1st Unenergized
356 P 6 Concepcion Montevista 1st Unenergized
357 P I Dauman Montevista 1st Unenergized
358 P - 2 Daman Montevista 1st Unenergized
359 P - 3 Dauman Montevista 1st Unenergized
360 P - 4 Dauman Montevista 1st Unenergized
361 P 5 Dauman Montevista 1st Unenergized
362 P 1 Lebanon Montevista 1st Unenergized
363 P 4 Lebanon Montevista 1st Unenergized
364 P 6 Lebanon Montevista 1st Unenergized
365 P 2 Linoan Montevista 1st Unenergized
366 P 3 Linoan Montevista 1st Unenergized
367 P - 4 Linoan Montevista 1st Unenergized
368 P 5 Linoan Montevista 1st Unenergized
369 P 6 Linoan Montevista 1st Unenergized
370 P 7 Linoan Montevista 1st Unenergized
371 P - 5 Mayaon Montevista 1st Unenergized
372 P 6 Mayaon Montevista 1st Unenergized
373 P - 7 Mayaon Montevista . 1st Unenergized
374 P 8 Mayaon Montevista 1st Unenergized
375 P - 9 Mayaon Montevista 1st Unenergized
376 P - 10 Mayaon Montevista 1st Unenergized
377 P -• 12 Mayaon Montevista 1st Unenergized
378 P 13 Mayaon Montevista 1st Unenergized
379 P5 S. Agustin New Calape Montevista 1st Unenergized
380 P - 6 New Calape Montevista 1st Unenergized
381 P 3 New Dalag Montevista 1st Unenergized
382 P 4 New Dalag Montevista 1st Unenergized
383 P 5 New Dalag Montevista 1st Unenergized
384 P - 6 New Dalag Montevista 1st Unenergized
385 P 3A New Visayas Montevista 1st Unenergized
386 P 4 New Visayas Montevista 1st Energized
387 P - 6 New Visayas Montevista 1st Unenergized
388 P 7 New Visayas Montevista 1st Unenergized
389 P-2 Kahayag Prosperidad Montevista 1st Unenergized
390 P 3 Prosperidad Montevista 1st Unenergized
391 P - 6 Camag Prosperidad Montevista 1st Unenergized
392 P - 7 Village Prosperidad Montevista 1st Unenergized
393 P - 1B San Jose (Pob.) Montevista 1st Unenergized
394 P - 2B San Jose (Pub.) Montevista 1st Unenergized
395 P 3 San Jose (Pob.) Montevista 1st Unenergized
396 P - 4 San Jose (Pob.) Montevista 1st Unenergized
397 P - 4A San Jose (Pob.) Montevista 1st Unenergized
398 P 4B San Jose (Pob.) Montevista 1st Unenergized
Annexes
89
Item Name of Sitio/Purok Barangay City/Municipality District Status
399 P - 7 San Jose (Pob.) Montevista 1st Unenergized
400 P - 8 San Jose (Pob.) Montevista 1st Unenergized
401 P-6 Mabanda San Vicente Montevista 1st Unenergized
402 P-7 Bagtoc San Vicente Montevista 1st Unenergized
403 P - 8 San Vicente Montevista 1st Unenergized
404 P - 9 San Vicente Montevista 1st Unenergized
405 P-1 Tearbav V. Tapia Montevista 1st Unenergized
406 P-2 Mahayag Tapia Montevista 1st Unenergized
407 P - 3 Tapia Montevista 1st Unenergized
408 P - 4 (Inner) Tapia Montevista 1st Unenergized
409 P - 5 (Inner) Tapia Montevista 1st Unenergized
410 P - 6 Upper Tapia Montevista 1st Unenergized
411 P - 7 Tapia Montevista 1st Unenergized
412 P -3 Bandihasan Montevista 1st Energized
413 P - 1 Andap New Bataan 1st Energized
414 P - 7 Andap New Bataan 1st Energized
415 P - 8 Andap New Bataan 1,. Unenergized
416 P - 9 Andap New Bataan 1st Energized
417 P - 13 Andap New Bataan 1st Energized
418 P - 14 Andap New Bataan 1st Energized
419 P - 1B Bantacan New Bataan 1st Unenergized
420 P - 5E Bantacan New Bataan 1st Unenergized
421 P - 5F Bantacan New Bataan 1st Unenergized
422 P - 2 Batinao New Bataan 1st Unenergized
423 P - 3 Batinao New Bataan 1st Unenergized
424 P - 4 Batinao New Bataan 1st Unenergized
425 P - 5 Batinao New Bataan 1st Unenergized
426 P - 6 Batinao New Bataan 1st Unenergized
427 P - 7 Batinao New Bataan 1st Unenergized
428 P - 8 Batinao New Bataan 1st Unenergized
429 Inupawan Batinao New Bataan 1st Energized
430 P - 5 Cabinuangan (Pob.) New Bataan 1st Unenergized
431 P - 10 Cabinuangan (Pob.) New Bataan 1st Energized
432 P - 15 Cabinuangan (Pob.) New Bataan 1st Energized
433 P - 15 Camanlangan New Bataan 1st Unenergized
434 P - 16 Camanlangan New Bataan 1st Unenergized
435 P - 20 Camanlangan New Bataan 3rd Unenergized
436 P - 2 Cogonon New Bataan 1st Unenergized
437 P - 3 Cogonon New Bataan 1st Unenergized
438 P - 4 Cogonon New Bataan 1st Unenergized
439 P - 5 Cogonon New Bataan 1st Unenergized
440 P - 6 Cogonon New Bataan 1st Unenergized
441 P - 2B Katipunan New Bataan 1st Unenergized
442 P - 4B Katipunan New Bataan 1st Unenergized
443 P - 1 Magangit New Bataan 1st Unenergized
444 P - 4 Magsaysay New Bataan 1st Unenergized
445 P - 17 Panag New Bataan 1st Unenergized
446 P - 1A San Roque New Bataan 1st Unenergized
447 P - 3A San Roque New Bataan 1st Unenergized
448 P - 3B San Roque New Bataan 1st Unenergized
Annexes
90
Item Name of Sitio/Purok Barangay City/Municipality District Status
449 P - 3C San Roque New Bataan 1st Unenergized
450 Prk 2 Anitapan Mabini 2nd Energized
451 Prk 3 Anitapan Mabini 2nd Energized
452 Prk 5 Anitapan Mabini 2nd Energized
453 Prk 6 Anitapan Mabini 2nd Energized
454 Prk 7 Anitapan Mabini 2nd Energized
455 Prk 8 Anitapan Mabini 2nd Energized
456 Prk Silica Cabuyuan Mabini 2nd Unenergized
457 Prk Maglangit Cabuyuan Mabini 2nd Unenergized
458 Prk Pagsilaan Cabuyuan Mabini 2nd Unenergized
459 Prk 7 Cadunan Mabini 2nd Unenergized
460 Prk 8 Cadunan Mabini 2nd Unenergized
461 Prk 9 Cadunan Mabini 2nd Unenergized
462 Prk 1 - Pagkakaisa Cuarnbog (Pob.) Mabini 2nd Unenergized
463 Prk 2 - Pag-asa Cuambog (Pob.) Mabini 2nd Unenergized
464 Prk 1 Del Pilar Mabini 2nd Unenergized
465 Prk 3 Del Pilar Mabini 2nd Unenergized
466 Prk 4 Del Pilar Mabini 2nd Unenergized
467 Prk 5 Del Pilar Mabini 2nd Unenergized
468 Prk 6 Del Pilar Mabini 2nd Unenergized
469 Prk 7 Del Pilar Mabini 2nd Unenergized
470 Prk 8 Del Pilar Mabini 2nd Unenergized
471 Prk 9 Del Pilar Mabini 2nd Unenergized
472 Prk 1 Golden Valley (Maraut) Mabini 2nd Unenergized
473 Prk 3 Golden Valley (Maraut) Mabini 2nd Unenergized
474 Prk 4 Golden Valley (Maraut) Mabini 2nd Unenergized
475 Prk 5 Golden Valley (Maraut) Mabini 2nd Unenergized
476 Prk 4 Libodon Mabini 2nd Unenergized
477 Prk 5 Libodon Mabini 2nd Unenergized
478 Prk 6 Libodon Mabini 2nd Unenergized
479 Prk 1 Pangibiran Mabini 2nd Unenergized
480 Prk 6 Pangibiran Mabini 2nd Unenergized
481 Prk 7 Pangibiran Mabini 2nd Unenergized
482 Prk 8 Pangibiran Mabini 2nd Unenergized
483 Prk Madre de Cacao Pindasan Mabini 2nd Unenergized
484 Prk Acacia Pindasan Mabini 2nd Unenergized
485 Prk Mahogany Pindasan Mabini 2nd Unenergized
486 Prk Marang Pindasan Mabini 2nd Unenergized
487 Prk 2 San Antonio2 Mabini 2nd Unenergized
488 Prk 4 San Antonio2 Mabini 2nd Unenergized
489 Prk 7 San Antonio2 Mabini 2nd Unenergized
490 Prk 6 Tagnanan (Mampising) Mabini 2nd Unenergized
491 Prk 7 Tagnanan (Mampising) Mabini 2nd Unenergized
492 Prk 8 Tagnanan (Mampising) Mabini 2nd Unenergized
493 Prk 10 Tagnanan (Mampising) Mabini 2nd Unenergized
494 Baca Ph 2 Cuambog Mabini 2nd Unenergized
495 P-Pag-asa to Pagkakaisa NB Mabini 2nd Unenergized
496 Bagsak ( Prk 3) Anibongan Maco 2nd Unenergized
497 Batangbatangon (Prk 5) Anibongan Maco 2nd Unenergized
498 Prk 1 Anislagan Maco 2nd Unenergized
Annexes
91
Item Name of Sitio/Purok Barangay City/Municipality District Status
499 Prk 4 Anislagan Maco 2nd Unenergized
500 Prk 2 Calabcab Maco 2nd Unenergized
501 Upper Bao (Prk 4) Concepcion Maco 2nd Unenergized
502 Granada (Prk 5) Concepcion Maco 2nd Unenergized
503 Maduaw (Prk 6) Concepcion Maco 2nd Unenergized
504 San RogUnenergized (Prk Dumlan Maco 2nd Unenergized
505 Prk 5 Elizalde (Somil) Maco 2nd Unenergized
506 Upper Pislongan (Prk 3) Gubatan Maco 2nd Unenergized
507 Prk 7 Gubatan Maco 2nd Unenergized
508 Napo (Prk 6) Kinuban Maco 2nd Unenergized
509 Andapon (Prk 7) Kinuban Maco 2nd Unenergized
510 Prk Mahayahay Langgam Maco 2nd Unenergized
511 Prk 5 Lapu-lapu Maco 2nd Unenergized
512 Singanan (Prk 6) Libay-libay Maco 2nd Unenergized
513 Portion of Prk 2 Lumatab Maco 2nd Unenergized
514 Prk Sampaguita Mainit Maco 2nd Unenergized
515 Prk Durian Mainit Maco 2nd Unenergized
516 Prk Pagbaba-ayaw Mainit Maco 2nd Energized
517 Prk Bombe! Mainit Maco 2nd Unenergized
518 Sameco Mainit Maco 2nd Energized
519 Prk 1 Manipongol Maco 2nd Unenergized
520 Prk 4 Manipongol Maco 2nd Unenergized
521 Prk 5 Manipongol Maco 2nd Unenergized
522 San Martin (Prk 3) Mapaang Maco 2nd Unenergized
523 Portion of Zone 88 Masara Maco 2nd Unenergized
524 Prk 5 New Asturias Maco 2nd Unenergized
525 Prk 6 New Asturias Maco 2nd Unenergized
526 Prk 7 New Asturias Maco 2nd Unenergized
527 Prk Madonna New Barili Maco 2nd Unenergized
528 Prk San Isidro New Barili Maco 2nd Unenergized
529 Prk San Vicente New Barili Maco 2nd Unenergized
530 Prk Kanarobe New Barili Maco 2nd Energized
531 Prk De Oro New Barili Maco 2nd Unenergized
532 Bunlang (Prk 4) New Leyte Maco 2nd Energized
533 Bunlang (Prk 8) New Leyte Maco 2nd Energized
534 North Davao (Prk 4) New Leyte Maco 2nd Unenergized
535 Tinago (Prk 7) New Leyte Maco 2nd Unenergized
536 Mansanitas (Prk 3) New Visayas Maco 2nd Unenergized
537 Simin-simin (Prk 5) New Visayas Maco 2nd Unenergized
538 Cabaywa (Prk 6) New Visayas Maco 2nd Unenergized
539 Prk 6 Panangan Maco 2nd Unenergized
540 Tagmani Prk 9 Panibasan Maco 2nd Unenergized
541 Tagmani Prk 10) Panibasan Maco 2nd Unenergized
542 Prk 5 Panoraon Maco 2nd Unenergized
543 Prk 6 Panoraon Maco 2nd Unenergized
544 Prk 7 Panoraon Maco 2nd Unenergized
545 Lantawan (Prk 3) Sangab Maco 2nd Unenergized
546 Camansi (Prk 4) Sangab Maco 2nd Unenergized
547 Prk 4 Tagbaros Maco 2nd Unenergized
548 Prk 5 Tagbaros Maco 2nd Unenergized
Annexes
92
Item Name of Sitio/Purok Barangay City/Municipality District Status
549 Prk 6 Tagbaros Maco 2nd Unenergized
550 Prk 8 Tagbaros Maco 2nd Unenergized
551 Prk 1 Taglawig Maco 2nd Unenergized
552 Prk 4 Taglawig Maco 2nd Unenergized
553 Prk 1A Teresa Maco 2nd Unenergized
554 Lim-aw (Prk 2) Teresa Maco 2nd Unenergized
555 Mahayahay (Prk 5) Teresa Maco 2nd Unenergized
556 Biocadan (Prk 7-A) Teresa Maco 2nd Energized
557 P-10 Cristo Rey Andili Mawab 2nd Energized
558 P - 1 Sawani Mawab 2nd Unenergized
559 P - 2 Bawani Mawab 2nd Unenergized
560 P - 3 Bawani Mawab 2nd Unenergized
561 P - 4 Bawani Mawab 2nd Unenergized
562 P - 1 Concepcion Mawab 2nd Unenergized
563 P - 2 Concepcion Mawab 2nd Unenergized
564 P - 4 Libertad Malinawon Mawab 2nd Unenergized
565 P-5 Tan-awan Malinawon Mawab 2nd Unenergized
566 P - 1 Malinawon Mawab 2nd Unenergized
567 Mahayag 8-B Nuevo Hoc° Mawab 2nd Unenergized
568 P - 1 Poblacion Mawab 2nd Energized
569 P - 1A Poblacion Mawab 2nd Unenergized
570 P - 3 Poblacion Mawab 2nd Energized
571 P - 4 Poblacion Mawab 2nd Energized
572 P - 5 Poblacion Mawab 2nd Energized
573 P - 6 Poblacion Mawab 2nd Energized
574 P - 7 Poblacion Mawab 2nd Energized
575 P - 8 Poblacion Mawab 2nd Energized
576 P-9 Dalisay Poblacion Mawab 2nd Unenergized
577 P-10 Marsman Poblacion Mawab 2nd Unenergized
578 P - 10A Poblacion Mawab 2nd Unenergized
579 P - 11 Dryer Poblacion Mawab 2nd Unenergized
580 P- 11A Poblacion Mawab 2nd Unenergized
581 P - 12 Poblacion Mawab 2nd Energized
582 P - 13 Poblacion Mawab 2nd Energized
583 P-14 L-Guisok Poblacion Mawab 2nd Unenergized
584 P-15 Tabon2X Poblacion Mawab 2nd Unenergized
585 P - 15 New Panay Poblacion Mawab 2nd Unenergized
586 P - 16 Poblacion Mawab 2nd Energized
587 P - 17 Poblacion Mawab 2nd Energized
588 P - 19 Poblacion Mawab 2nd Energized
589 P-20 San Jose Poblacion Mawab 2nd Unenergized
590 P - 5 Salvacion Mawab 2nd Unenergized
591 P - 6 Salvacion Mawab 2nd Unenergized
592 P - 7A Salvacion Mawab 2nd Unenergized
593 P - 7B Salvacion Mawab 2nd Unenergized
594 P-5 Cagong Saosao Mawab 2nd Unenergized
595 P - 1 Sawangan Mawab 2nd Energized
596 P - 2 Sawangan Mawab 2nd Energized
597 P - 3 Sawangan Mawab 2nd Energized
598 P -- 4 Sawangan Mawab 2nd Unenergized
Annexes
93
Item Name of Sitio/Purok Barangay City/Municipality District Status
599 P - 5 Sawangan Mawab 2nd Unenergized
600 P - 6 Sawangan Mawab 2nd Unenergized
601 P - 7A Sawangan Mawab 2nd Unenergized
602 P - 7B Sawangan Mawab 2nd Unenergized
603 Mahayahay Tuboran Mawab 2nd Unenergized
604 San Vicente Tuboran Mawab 2nd Unenergized
605 Sugod Tuboran Mawab 2nd Unenergized
606 P - I Anislagan Nabunturan 2nd Unenergized
607 P - II Anislagan Nabunturan 2nd Unenergized
608 P - III Anislagan Nabunturan 2nd Unenergized
609 P -11/ Anislagan Nabunturan 2nd Unenergized
610 P - 2 Antiquera Nabunturan 2nd Unenergized
611 P - 4 Antiquera Nabunturan 2nd Unenergized
612 P - 6 Antiquera Nabunturan 2nd Energized
613 P - 1 Basak Nabunturan 2nd Unenergized
614 P - 2 Basak Nabunturan 2nd Unenergized
615 P - 4 Basak Nabunturan 2nd Unenergized
616 P - 5 Basak Nabunturan 2nd Unenergized
617 P-1 to Buclad Bayabas Nabunturan 2nd Unenergized
618 Pb. to P-2 Bayabas Nabunturan 2nd Unenergized
619 P5 Handuromog - Fatima Bayabas Nabunturan 2nd Unenergized
620 P6 San MigUnenergizedl - Pe Bayabas Nabunturan 2nd Unenergized
621 P6 San MigUnenergizedl - Br Bayabas Nabunturan 2nd Unenergized
622 P-7 Crossing - P. Indig Res Bayabas Nabunturan 2nd Unenergized
623 P - 4 - Guzon Res. Bayabas Nabunturan 2nd Unenergized
624 P-8 Nocnocan Bukal3 Nabunturan 2nd Unenergized
625 P - 7 Golden Valley Bukal3 Nabunturan 2nd Unenergized
626 P -9 Golden Valley Bukal3 Nabunturan 2nd Unenergized
627 P - 11 Bolanonan Bukal3 Nabunturan 2nd Unenergized
628 P - 1 Cabacungan Nabunturan 2nd Unenergized
629 P - 2 Cabacungan Nabunturan 2nd Unenergized
630 P .. 3 Cabacungan Nabunturan 2nd Unenergized
631 P - 4 Cabacungan Nabunturan 2nd Unenergized
632 P - 5 Cabacungan Nabunturan 2nd Unenergized
633 Purok 6 to Crossing Cabacungan Nabunturan 2nd Unenergized
634 Purok 7 to Crossing Cabacungan Nabunturan 2nd Unenergized
635 P 1 Cabidianan Nabunturan 2nd Unenergized
636 P - 2 Cabidianan Nabunturan 2nd Unenergized
637 P - 2A Cabidianan Nabunturan 2nd Unenergized
638 P - 2B Cabidianan Nabunturan 2nd Unenergized
639 P - 1A Katipunan Nabunturan 2nd Unenergized
640 P - 1B Katipunan Nabunturan 2nd Unenergized
641 P - 2 Katipunan Nabunturan 2nd Unenergized
642 P - 3 Katipunan Nabunturan 2nd Unenergized
643 P - 4 Katipunan Nabunturan 2nd Unenergized
644 P - 5 Katipunan Nabunturan 2nd Unenergized
645 P - 6 Katipunan Nabunturan 2nd Unenergized
646 P - 7 Katipunan Nabunturan 2nd Unenergized
647 P - 1 Libasan Nabunturan 2nd Unenergized
648 P - 2 Libasan Nabunturan 2nd Unenergized
Annexes
94
Item Name of Sitio/Purok Barangay City/Municipality District Status
649 P - 3 Libasan Nabunturan 2nd Unenergized
650 P - 4 Libasan Nabunturan 2nd Unenergized
651 P - 5 Libasan Nabunturan 2nd Unenergized
652 P - 2 Linda Nabunturan 2nd Unenergized
653 P - 3 Linda Nabunturan 2nd Unenergized
654 P - 5 Linda Nabunturan 2nd Unenergized
655 P - 6 Linda Nabunturan 2nd Unenergized
656 P - 1 Magading Nabunturan 2nd Unenergized
657 P - 4 Magading Nabunturan 2nd Unenergized
658 P - 6 Magading Nabunturan 2nd Unenergized
659 P - 8 Magading Nabunturan 2nd Unenergized
660 P - 9 Magading Nabunturan 2nd Unenergized
661 New Visayas Magading Nabunturan 2nd Unenergized
662 P - 8 Magsaysay Nabunturan 2nd Unenergized
663 P - 9 Magsaysay Nabunturan 2nd Unenergized
664 P - 10 Magsaysay Nabunturan 2nd Unenergized
665 P - 11 Mainit Nabunturan 2nd Unenergized
666 P - 12 Mainit Nabunturan 2nd Unenergized
667 P - 17 Mainit Nabunturan 2nd Unenergized
668 P - 1 Manat Nabunturan 2nd Unenergized
669 P - 2 Manat Nabunturan 2nd Unenergized
670 P - 3 Manat Nabunturan 2nd Unenergized
671 P - 4 Manat Nabunturan 2nd Unenergized
672 P - 5 Manat Nabunturan 2nd Unenergized
673 P - 7 Manat Nabunturan 2nd Unenergized
674 P - 8 Manat Nabunturan 2nd Unenergized
675 P - 3 Matilo Nabunturan 2nd Unenergized
676 P - 5 Matilo Nabunturan 2nd Unenergized
677 P 7 Matilo Nabunturan 2nd Unenergized
678 P - 5 Mipangi Nabunturan 2nd Unenergized
679 P-6 Tagaytay Mipangi Nabunturan 2nd Unenergized
680 P g Mipangi Nabunturan 2nd Unenergized
681 P-10 Darnpinas Mipangi Nabunturan 2nd Unenergized
682 P - 1 New Dauis Nabunturan 2nd Unenergized
683 P 2 New Dauis Nabunturan 2nd Unenergized
684 P - 3 New Dauis Nabunturan 2nd Energized
685 P - 4 New Dauis Nabunturan 2nd Energized
686 P - 5 New Dauis Nabunturan 2nd Unenergized
687 P - 1 New Sibonga Nabunturan 2nd Unenergized
688 P - 2 Tagnaga New Sibonga Nabunturan 2nd I Unenergized
689 P 3 New Sibonga Nabunturan 2nd Unenergized
690 P-4 Haguimitan New Sibonga Nabunturan 2nd Unenergized
691 P 5 New Sibonga Nabunturan 2nd Unenergized
692 P - 6 Lower Tagmaylan New Sibonga Nabunturan 2nd Unenergized
693 P 7 New Sibonga Nabunturan 2nd Unenergized
694 P 8 New Sibonga Nabunturan 2nd Unenergized
695 Upper Tagmaylan New Sibonga Nabunturan 2nd Unenergized
696 P 3 Pangutosan Nabunturan 2nd Unenergized
697 P 2 San Isidro Nabunturan 2nd Unenergized
698 P 3 San Isidro Nabunturan 2nd Unenergized
Annexes
95
Item Name of Sitio/Purok Barangay City/Municipality District Status
699 P - 4 San Isidro Nabunturan 2nd Unenergized
700 P - 5 San Isidro Nabunturan 2nd Unenergized
701 P 1 San Roque Nabunturan 2nd Unenergized
702 P - 1 a San Roque Nabunturan 2nd Unenergized
703 P - 2 San Roque Nabunturan 2nd Unenergized
704 P - 3 San Roque Nabunturan 2nd Unenergized
705 P - 4 San Roque Nabunturan 2nd Unenergized
706 P - 2 San Vicente Nabunturan 2nd Unenergized
707 P-5, P 2-7 to P - 1 Santa Maria Nabunturan 2nd Unenergized
708 P 3 Santo Nilio (Kao) Nabunturan 2nd Unenergized
709 P - 7 Santo Niho (Kao) Nabunturan 2nd Unenergized
710 P - 8 Santo Nino (Kao) Nabunturan 2nd Unenergized
711 P 3 Sasa Nabunturan 2nd Unenergized
712 P - 4 Tagnocon Nabunturan 2nd Unenergized
713 P - 5 Tagnocon Nabunturan 2nd Unenergized
714 Hacienda Kingking (Pob.) Pantukan 2nd Unenergized
715 Prk 9 Aguinaldo Laak (Sn. Vicente) 2nd Unenergized
716 Greenhills Bagong Silang Laak (Sn. Vicente) 2nd Unenergized
717 La Union Bagong Silang Laak (Sn. Vicente) 2nd Unenergized
718 Nagas Banbanon Laak (Sn. Vicente) 2nd Unenergized
719 Malinawon Banbanon Laak (Sn. Vicente) 2nd Unenergized
720 Kapatagan Belmonte Laak (Sn. Vicente) 2nd Unenergized
721 Upper San RoqUnenergized Binasbas Laak (Sn. Vicente) 2nd Unenergized
722 Tuburan Bullucan Laak (Sn. Vicente) 2nd Unenergized
723 Prk Magtaguktok Cebulida Laak (Sn. Vicente) 2nd Unenergized
724 Prk Magsumpad Cebulida Laak (Sn. Vicente) 2nd Unenergized
725 Prk Gundingon Cebulida Laak (Sn. Vicente) 2nd Unenergized
726 Logom Concepcion Laak (Sn. Vicente) 2nd Unenergized
727 Maharlika Imelda Laak (Sn. Vicente) 2nd Unenergized
728 Prk 5 Imelda Laak (Sn. Vicente) 2nd Unenergized
729 Tabon Inacayan Laak (Sn. Vicente) 2nd Unenergized
730 Prk Baungon Inacayan Laak (Sn. Vicente) 2nd Unenergized
731 Prk Tambis Inacayan Laak (Sn. Vicente) 2nd Unenergized
732 Abon-Abon Kaligutan Laak (Sn, Vicente) 2nd Unenergized
733 Prk 6 Kaligutan Laak (Sn. Vicente) 2nd Unenergized
734 Udang - Udang Kapatagan Laak (Sn. Vicente) 2nd Unenergized
735 Taduk Kapatagan Laak (Sn. Vicente) 2nd Unenergized
736 Cebuli Kapatagan Laak (Sn. Vicente) 2nd Unenergized
737 Dalimdim Kapatagan Laak (Sn. Vicente) 2nd Unenergized
738 Magaad Kidawa Laak (Sn. Vicente) 2nd Unenergized
73g Kinabalian Kidawa Laak (Sn. Vicente) 2nd Unenergized
740 Tinublag Kilagding Laak (Sn. Vicente) 2nd Unenergized
741 New Cebuli Kilagding Laak (Sn. Vicente) 2nd Unenergized
742 Dadago Kilagding Laak (Sn. Vicente) 2nd Unenergized
743 Binagyo Kilagding Laak (Sn. Vicente) 2nd Unenergized
744 Old Laak Laac (Pob.) Laak (Sn. Vicente) 2nd Unenergized
745 Baubo Laac (Pob.) Laak (Sn. Vicente) 2nd Unenergized
746 Mikagkas Langtud Laak (Sn. Vicente) 2nd Unenergized
747 Patong Langtud Laak (Sn. Vicente) 2nd Unenergized
748 San Isidro Mangloy Laak (Sn. Vicente) 2nd Unenergized
Annexes
96
Item Name of Sitio/Purok Barangay City/Municipality District Status
749 Prk Durian Mangloy Laak (Sn. Vicente) 2nd Unenergized
750 Pinanupuan Naga Laak (Sn. Vicente) 2nd Unenergized
751 Lower Dalimdim Naga Laak (Sn. Vicente) 2nd Unenergized
752 Prk 8 Naga Laak (Sn. Vicente) 2nd Unenergized
753 Naga Sisimon Laak (Sn. Vicente) 2nd Energized
754 Galingan Sisimon Laak (Sn. Vicente) 2nd Unenergized
755 Prk 4 Buclad Asuncion 1st Unenergized
756 Lower Cabaywa Cabaywa Asuncion 1st Unenergized
757 Pututan Cabaywa Asuncion 1st Energized
758 Lower Camansa Camansa Asuncion 1st Unenergized
759 New Talisay (Prk 10) Cambanogoy (Pob.) Asuncion 1st Unenergized
760 New Talisay (Prk 11) Cambanogoy (Pob.) Asuncion 1st Unenergized
761 Mahayahay Prk 17 Cambanogoy (Pob.) Asuncion 1st Unenergized
762 Mahayahay Prk 18 Cambanogoy (Pob.) Asuncion 1st Unenergized
763 Pasil (Prk 13) Cambanogoy (Pob.) Asuncion 1st Unenergized
764 Pasil (Prk 16) Cambanogoy (Pob.) Asuncion 1st Unenergized
765 !log (Prk 3) Cambanogoy (Pob.) Asuncion 1st Energized
766 Hog (Prk 9) Cambanogoy (Pob.) Asuncion 1st Unenergized
767 Prk 19 Cambanogoy (Pob.) Asuncion 1st Unenergized
768 Prk 22 Cambanogoy (Pob.) Asuncion 1st Unenergized
769 Prk Madasigon Camoning Asuncion 1st Unenergized
770 Prk Pag-asa Camoning Asuncion 1st Unenergized
771 Prk Mahayahay Camoning Asuncion 1st Unenergized
772 Prk Mabuhay Canatan Asuncion 1st Unenergized
773 Lower Dalimdim ( Prk 5) Napungas Asuncion 1st Unenergized
774 Prk Kawayanan New Bantayan Asuncion 1st Unenergized
775 Prk Butay New Santiago Asuncion 1st Unenergized
776 P-1 Sabangan Asuncion 1st Unenergized
777 P-6 Sabangan Asuncion 1st Unenergized
778 Prk 2 Santa Filomena Asuncion 1st Unenergized
779 Prk 6 Santa Filomena Asuncion 1st Energized
780 Capasanan Sonlon Asuncion 1st Unenergized
781 Wegi - Wegi Florida Kapalong 1st Unenergized
782 Tagulayan Gabuyan Kapalong 1st Unenergized
783 Dugayan Gupitan Kapalong 1st Subject for Solar
784 Langan Gupitan Kapalong 1st Subject for Solar
785 Patil Gupitan Kapalong 1st Subject for Solar
786 Prk 6 Luna Kapalong 1st Unenergized
787 Prk 7 Luna Kapalong 1st Unenergized
788 Tagumpay Mabantao Kapalong 1st Unenergized
789 P-10 Mamacao Kapalong 1st Unenergized
790 Magtalisay Maniki (Poblacion) Kapalong 1st Unenergized
791 Prk 4 Semong (Sampao) Kapalong 1st Unenergized
792 Prk 5 Sernong (Sampao) Kapalong 1st Unenergized
793 Prk 7 Sernong (Sampao) Kapalong 1st Unenergized
794 Bunawang nb Kapalong 1st Unenergized
795 Prk 7 Carcor New Corella 1st Unenergized
796 Prk 8 Carcor New Corella 1st Unenergized
797 Prk 2 Del Monte New Corella 1st Unenergized
798 Prk 4 Del Monte New Corella 1st Unenergized
Annexes
97
Item Name of Sitio/Purok Barangay City/Municipality District Status
799 Prk 5 Del Monte New Corella 1st Unenergized
800 Prk 1 Del Pilar New Corella 1st Unenergized
801 Prk 3 Del Pilar New Corella 1st Unenergized
802 Prk 8 Del Pilar New Corella 1st Unenergized
803 Prk 16 Del Pilar New Corella 1st Unenergized
804 Kauswagan Limba .an New Corella 1st Unenergized
805 Panayugan Limba-an New Corella 1st Unenergized
806 Prk 6A Limba-an New Corella 1st Unenergized
807 Prk 23 Mesaoy New Corella 1st Unenergized
808 Prk 20 Mesaoy New Corella 1st Unenergized
809 Prk 19 Mesaoy New Corella 1st Energized
810 Prk 3 Mesaoy New Corella 1st Unenergized
811 Prk 3A Mesaoy New Corella 1st Unenergized
812 Prk 1 New Cortez New Corella 1st Unenergized
813 Prk 2 New Cortez New Corella 1st Unenergized
814 Prk 3 New Cortez New Corella 1st Unenergized
815 Prk 4 New Cortez New Corella 1st Unenergized
816 Prk 2 New Sambog New Corella 1st Unenergized
817 Prk 3 New Sambog New Corella 1st Unenergized
818 Prk 1 Patrocenio New Corella 1st Energized
gi 9 Prk 2 Patrocenio New Corella 1st Energized
820 Prk 3 Patrocenio New Corella 1st Unenergized
821 Prk 4 Patrocenio New Corella 1st Energized
822 Prk 5 Patrocenio New Corella 1st Unenergized
823 Prk 9B Poblacion New Corella 1st Unenergized
824 Prk 9A Poblacion New Corella 1st Unenergized
825 Prk 6A Poblacion New Corella 1st Unenergized
826 Prk 4 Poblacion New Corella 1st Unenergized
827 Prk 5 Poblacion New Corolla 1st Unenergized
828 Prk 6 Poblacion New Corella 1st Unenergized
829 Prk 3 San Jose New Corella 1st Energized
830 Prk 4 San Jose New Corolla 1st Unenergized
831 Prk 3 San Roque New Corella 1st Unenergized
832 Prk 5 San Roque New Corella 1st Unenergized
833 Prk 8 San Roque New Corella 1st Unenergized
834 Prk 1 Santa Cruz New Corella 1st Unenergized
835 Prk 2 Santa Cruz New Corella 1st Unenergized
836 Prk 3 Santa Cruz New Corella 1st Unenergized
837 Prk 4 Santa Cruz New Corella 1st Unenergized
838 Prk 10 Santa Cruz New Corella 1st Unenergized
839 Kanatan Santa Cruz New Corella 1st Unenergized
840 Prk 3 Santa Fe New Corella 1st Unenergized
841 Prk 4 Santa Fe New Corella 1st Unenergized
842 Prk 5 Santa Fe New Corolla 1st Unenergized
843 Prk 6 Santa Fe New Corella 1st Unenergized
844 Prk 2 Santo Nino New Corella 1st Unenergized
845 Prk 3 Santo Nino New Corella 1st Unenergized
846 Prk 10 Suawon New Corella 1st Unenergized
847 Tubod Suawon New Corella 1st Unenergized
848 Mahayahay Suawon New Corella 1st Unenergized
Annexes
98
Item Name of Sitio/Purok Barangay City/Municipality District Status
849 Prk 4 Palma Gil Talaingod 1st Unenergized
850 Prk 5 Palma Gil Talaingod 1st Unenergized
851 Prk 5A Palma Gil Talaingod 1st Unenergized
852 Daligdigan (Prk 6) Palma Gil Talaingod 1st Unenergized
853 Daligdigan (Prk 7) Palma Gil Talaingod 1st Unenergized
854 Daligdigan (Prk 8) Palma Gil Talaingod 1st Unenergized
855 Igona (Prk 9) Palma Gil Talaingod 1st Unenergized
856 Lumabag (Prk 10) Palma Gil Talaingod 1st Unenergized
857 Lumabag (Prk 11) Palma Gil Talaingod 1st Unenergized
858 Lumabag (Prk 12) Palma Gil Talaingod 1st Unenergized
859 Prk 13 Palma Gil Talaingod 1st Unenergized
860 Prk 14 Palrna Gil Talaingod 1st Unenergized
861 Prk 15 Palma Gil Talaingod 1st Unenergized
862 Prk 16 Palma Gil Talaingod 1st Unenergized
863 Prk 17 Palma Gil Talaingod 1st Unenergized
864 Prk 18 Palma Gil Talaingod 1st Unenergized
865 Prk 19 Palma Gil Talaingod 1st Unenergized
866 Prk 20 Palma Gil Talaingod 1st Unenergized
867 Prk 21 Palma Gil Talaingod 1st Unenergized
868 Prk 22 Palma Gil Talaingod 1st Unenergized
869 Prk 23 Palma Gil Talaingod 1st Unenergized
870 Prk 24 Palma Gil Talaingod 1st Unenergized
871 Prk 25 Palma Gil Talaingod 1st Unenergized
872 Prk 26 Palma Gil Talaingod 1st Unenergized
873 Prk 27 Palma Gil Talaingod 1st Unenergized
874 Prk 28 Palma Gil Talaingod 1st Unenergized
875 Prk 29 Palma Gil Talaingod 1st Unenergized
876 Prk 30 Palma Gil Talaingod 1st Unenergized
877 Prk 31 Palma Gil Talaingod 1st Unenergized
878 Prk 32 Palma Gil Talaingod 1st Unenergized
879 Prk 33 Palma Gil Talaingod 1st Unenergized
880 Prk 34 Palrna Gil Talaingod 1st Unenergized
881 Prk 22 Santo Nino Talaingod 1st Unenergized
882 Prk 23 Santo Nilio Talaingod 1st Unenergized
883 Prk 24 Santo Nino Talaingod 1st Unenergized
884 Prk 25 Santo Nino Talaingod 1st Unenergized
885 Prk 26 Santo Nino Talaingod 1st Unenergized
886 Prk 27 Santo Nif10 Talaingod 1st Unenergized
887 Prk 28 Santo Nino Talaingod 1st Unenergized
888 Prk 29 Santo Nino Talaingod 1st Unenergized
889 Prk 30 Santo Nino Talaingod 1st Unenergized
890 Prk 2A Santo Nino Talaingod 1st Unenergized
891 Prk 4 Santo Nino Talaingod 1st Unenergized
892 Prk 5 Santo Nino Talaingod 1st Unenergized
893 Prk 6A Santo Nino Talaingod 1st Unenergized
894 Prk 13 Santo Nino Talaingod 1st Unenergized
895 Prk 14 Santo Nino Talaingod 1st Unenergized
896 Cuyas (Prk 15) Santo Nino Talaingod 1st Unenergized
897 Prk 16 Santo Nino Talaingod 1st Unenergized
898 Prk 17 Santo Nino Talaingod 1st Unenergized
Annexes
99
Item Name of Sitio/Purok Barangay City/Municipality District Status
899 Prk 18 Santo Nino Talaingod 1st Unenergized
900 Hindangan (Prk 19) Santo Nino Talaingod 1st Unenergized
901 Prk 20 Santo Nino Talaingod 1st Unenergized
902 Cabadiangan (Prk 21) Santo Nino Talaingod 1st Unenergized
903 Salawao (Prk 9A) Santo Nino Talaingod 1st Unenergized
904 Nasa (Prk 9B) Santo Nino Talaingod 1st Unenergized
905 Lower Mesolong (Prk 10) Santo Nino Talaingod 1st Unenergized
906 Upper Mesolong (Prk 11) Santo Nino Talaingod 1st Unenergized
907 Naseko Prk 12 Santo Nino Talaingod 1st Unenergized
908 Prk 10 Dacudao San Isidro 2nd Unenergized
909 Prk Mabuhay C Dacudao San Isidro 2nd Unenergized
910 Prk Mamalian Datu Balong San Isidro 2nd Unenergized
911 Prk Binuhi Datu Balong San Isidro 2nd Unenergized
912 Prk 5 Libuton San Isidro 2nd Unenergized
913 Prk Casilac Linao San Isidro 2nd Unenergized
914 Prk 6 Linao San Isidro 2nd Unenergized
915 Prk 2 Linao San Isidro 2nd Unenergized
916 Prk Bombil Monte Dujali San Isidro 2nd Unenergized
917 Prk Anagdong Monte Dujali San Isidro 2nd Unenergized
918 Prk Danao Monte Dujali San Isidro 2nd Unenergized
919 Prk Lutangan Monte Dujali San Isidro 2nd Unenergized
920 Prk Lawaan Monte Dujali San Isidro 2nd Unenergized
921 Prk New Mangga Pinamuno San Isidro 2nd Energized
922 Prk Saraban Pinamuno San Isidro 2nd Unenergized
923 Prk Curvada Pinamuno San Isidro 2nd Unenergized
924 Prk Capasoon Pinamuno San Isidro 2nd Unenergized
925 Prk 5 San Miguel San Isidro 2nd Unenergized
926 Prk 5A San Miguel San Isidro 2nd Unenergized
927 Prk 6A San Miguel San Isidro 2nd Unenergized
928 Prk 3 San Miguel San Isidro 2nd Unenergized
929 Prk 7 San Miguel San Isidro 2nd Unenergized
930 Prk 1 Igangon San Isidro 2nd Unenergized
931 Prk 2 Igangon San Isidro 2nd Unenergized
932 Prk 3 Igangon San Isidro 2nd Unenergized
933 Prk 4 Igangon San Isidro 2nd Unenergized
934 Prk 5 Igangon San Isidro 2nd Unenergized
935 Prk 6 Igangon San Isidro 2nd Unenergized
936 Prk 9A Igangon San Isidro 2nd Unenergized
937 Prk 1A Igangon San Isidro 2nd Unenergized
938 Prk 11 Kipalili San Isidro 2nd Unenergized
939 Prk 12 Kipalili San Isidro 2nd Unenergized
940 Prk 13 Kipalili San Isidro 2nd Unenergized
941 Prk 5 Kipalili San Isidro 2nd Unenergized
942 Prk Palmera Mamanganl San Isidro 2nd Unenergized
943 Prk Bombil Mamanganl San Isidro 2nd Unenergized
944 Prk Sampaguita Mamanganl San Isidro 2nd Unenergized
945 Prk Waling - Waling Mamanganl San Isidro 2nd Unenergized
946 Prk Marigold Mamanganl San Isidro 2nd Unenergized
947 Prk Camia Mamanganl San Isidro 2nd Unenergized
948 Prk Calachuchi Mamanganl San Isidro 2nd Unenergized
Annexes
100
Item Name of Sitio/Purok Barangay City/Municipality District Status
949 Prk Daisy Mamanganl San Isidro 2nd Unenergized
950 Prk Cacao-C Sawata San Isidro 2nd Unenergized
951 Prk Mahayahay Sawata San Isidro 2nd Unenergized
952 Prk Cebuly-D Sawata San Isidro 2nd Unenergized
953 Agman Sawata San Isidro 2nd Unenergized
954 Prk 1 Camudmud Babak 2nd Unenergized
955 Prk 7 Camudmud Babak 2nd Unenergized
956 Prk 2 Cogon Babak 2nd Energized
957 Prk 3 Kinawitnon Babak 2nd Unenergized
958 Prk 4 Kinawitnon Babak 2nd Unenergized
959 Prk 5 Kinawitnon Babak 2nd Unenergized
960 Prk 1 Libuak Babak 2nd Unenergized
961 Prk 2 Mambago-B Babak 2nd Unenergized
962 Prk 3 Marnbago-B Babak 2nd Unenergized
963 Prk 7 Miranda (Pob.) Babak 2nd Unenergized
964 Prk 5 San Agustin Babak 2nd Unenergized
965 Prk 6 San Agustin Babak 2nd Unenergized
966 Prk 7 San Agustin Babak 2nd Unenergized
967 Prk 3 San Antonio Babak 2nd Unenergized
968 Prk 4 San Antonio Babak 2nd Unenergized
969 Prk 6 San Antonio Babak 2nd Unenergized
970 Prk 7 San Antonio Babak 2nd Unenergized
971 Prk 2 San Isidro Babak 2nd Unenergized
972 Prk 3 San Isidro Babak 2nd Unenergized
973 Prk 6 San Isidro Babak 2nd Unenergized
974 Prk 2 Santo Nino Babak 2nd Unenergized
975 Prk 3 Santo Nino Babak 2nd Unenergized
976 Prk 5 Santo Nino Babak 2nd Unenergized
977 Prk 2 Tagpopongan Babak 2nd Unenergized
978 Prk 1 Tambo Babak 2nd Unenergized
979 Prk 6 Tambo Babak 2nd Unenergized
980 Prk 7 Tambo Babak 2nd Unenergized
981 Prk 7 Torii Babak 2nd Unenergized
982 Prk 5 Adecor Kaputian 2nd Unenergized
983 Prk 1 Anonang Kaputian 2nd Unenergized
984 Prk 4 Anonang Kaputian 2nd Unenergized
985 Prk 5 Anonang Kaputian 2nd Unenergized
986 Prk 6 Anonang Kaputian 2nd Unenergized
987 Prk Kahayag Bandera Kaputian 2nd Energized
988 Prk Tadtad Bandera Kaputian 2nd Energized
989 Prk Manan-aw Bandera Kaputian 2nd Energized
990 Prk Trinidad Bandera Kaputian 2nd Unenergized
991 Dadatan I Dadatan Kaputian 2nd Unenergized
992 Dadatan II Dadatan Kaputian 2nd Unenergized
993 Prk 4 Kanaan Kaputian 2nd Unenergized
994 Prk 5 Kanaan Kaputian 2nd Unenergized
995 Prk 6 Kanaan Kaputian 2nd Unenergized
996 Prk Milagro Libertad Kaputian 2nd Unenergized
997 Prk Tucanga Libertad Kaputian 2nd Energized
998 Prk 2 Linosutan Kaputian 2nd Unenergized
Annexes
101
Item Name of Sitio/Purok Barangay City/Municipality District Status
999 Prk 1 Pangubatan (Talicod I) Kaputian 2nd Unenergized
1,000 Prk 7 Pangubatan (Talicod I) Kaputian 2nd Unenergized
1,001 Prk 1 Poblacion (Kaputian) Kaputian 2nd Unenergized
1,002 Prk 18 Poblacion (Kaputian) Kaputian 2nd Energized
1,003 Upper Lidao Poblacion (Kaputian) Kaputian 2nd Unenergized
1,004 Sagrande Poblacion (Kaputian) Kaputian 2nd Unenergized
1,005 Prk Nabunturan San Isidro (Kaputian) Kaputian 2nd Energized
1,006 Prk Makawan San Isidro (Kaputian) Kaputian 2nd Unenergized
1,007 Prk Kauswagan San Isidro (Kaputian) Kaputian 2nd Unenergized
1,008 Prklpit - pit San Remigio Kaputian 2nd Unenergized
1,009 Prk Maligaya Santa Cruz Talicod Kaputian 2nd Unenergized
1,010 Prk Waling - Waling Santa Cruz Talicod Kaputian 2nd Unenergized
1,011 Prk Shooting star Santa Cruz Talicod Kaputian 2nd Unenergized
1,012 Prk Sampaguita Santa Cruz Talicod Kaputian 2nd Unenergized
1.013 Prk 5 Zion Kaputian 2nd Unenergized
1,014 Prk 7 Zion Kaputian 2nd Unenergized
1,015 Prk Mangga Tagbaobo Kaputian 2nd Unenergized
1,016 Prk 7 Aumbay Samal 2nd Unenergized
1,017 Prk 1 Aumbay Samal 2nd Unenergized
1,018 Prk 1A Aumbay Samal 2nd Unenergized
1,019 Prk 5 Aumbay Samal 2nd Unenergized
1,020 Prk 6 Aumbay Samal 2nd Unenergized
1,021 Pik 5 Aundanao Samal 2nd Unenergized
1,022 Prk 6 Aundanao Samal 2nd Unenergized
1,023 Prk 7 Aundanao Sam! 2nd Unenergized
1,024 Prk 4 Catagman Samal 2nd Unenergized
1,025 Prk 5 Catagman Samal 2nd Energized
1,026 Prk 2 Cawag Samal 2nd Unenergized
1,027 Prk 3 Cawag Samar 2nd Unenergized
1,028 Prk 6 Cawag Samal 2nd Unenergized
1,029 Prk 4 Del Monte Samal 2nd Unenergized
1,030 Prk 5 Del Monte Sarnal 2nd Unenergized
1,031 Prk 6 Del Monte Samal 2nd Unenergized
1,032 Prk 5 Guilon Samal 2nd Unenergized
1,033 Prk 6 Guilon Samal 2nd Unenergized
1,034 Prk 7 Guilon Samal 2nd Unenergized
1,035 Prk 5 Licup Samal 2nd Unenergized
1,036 Prk 7 Licup Sarnal 2nd Unenergized
1,037 Prk 4 Limao Samal 2nd Unenergized
1,038 Prk 7 San Jose (San Lapuz) Samal 2nd Unenergized
1,039 Prk 2 Tagbay Samal 2nd Unenergized
1,040 Prk 3 Tagbay Samal 2nd Unenergized
1,041 Prk 4 Tagbay Samal 2nd Unenergized
1,042 Prk 5A Tagbay Samal 2nd Unenergized
1,043 Prk 6 Tagbay Samal 2nd Unenergized
1,044 Prk 7 Tagbay Samal 2nd Unenergized
1,045 Prk 1 Tagbitan-ag Samal 2nd Unenergized
1,046 Prk 2 Tagbitan-ag Samal 2nd Unenergized
1,047 Prk 4 Tagbitan-ag Samal 2nd Unenergized
1,048 Prk 5 Tagbitan-ag Samal 2nd Unenergized
Annexes
102
Item Name of Sitio/Purok Barangay City/Municipality District Status
1,049 Prk 7 Tagbitan-ag Samal 2nd Unenergized
1,050 Prk 8 Tagbitan-ag Samal 2nd Unenergized
1,051 Prk 4 Tagdaliao Samal 2nd Unenergized
1,052 Prk 3 Anibongan Carmen DLPC Coverage
1,053 Prk 4 Anibongan Carmen DLPC Coverage
1,054 Prk 6 Anibongan Carmen DLPC Coverage
1,055 Prk 7 Anibongan Carmen DLPC Coverage
1.056 Prk 8 Anibongan Carmen DLPC Coverage
1,057 Prk 3 Asuncion Carmen DLPC Coverage
1,058 Prk 4 Asuncion Carmen DLPC Coverage
1,059 Prk 1 Guadalupe Carmen DLPC Coverage
1,060 Prk 4 Guadalupe Carmen DLPC Coverage
1,061 Prk 5 Guadalupe Carmen DLPC Coverage
1,062 Prk 2 San Isidro Carmen DLPC Coverage
1,063 Prk 3 San Isidro Carmen DLPC Coverage
1,064 Prk 4 San Isidro Carmen DLPC Coverage
1,065 Prk 5 San Isidro Carmen DLPC Coverage
1,066 Cabangcalan Sto. Nino Carmen DLPC Coverage
1,067 Prk Kawayan Taba Carmen DLPC Coverage
1,068 Prk Camia Taba Carmen DLPC Coverage
1,069 Prk Mangga Taba Carmen DLPC Coverage
1,070 Prk 2 Tubod Carmen DLPC Coverage
1,071 Prk 2A Tubod Carmen DLPC Coverage
1,072 Prk 3A Tubod Carmen DLPC Coverage
1,073 Prk 3C Tubod Carmen DLPC Coverage
1,074 Prk 4 Tubod Carmen DLPC Coverage
1,075 Prk 5A Tubod Carmen DLPC Coverage
1,076 Prk 5B Tubod Carmen DLPC Coverage
1,077 Prk 5C Tubod Carmen DLPC Coverage
1,078 Prk 2A Tuganay Carmen DLPC Coverage
1,079 Prk 2B Tuganay Carmen DLPC Coverage
1,080 Prk 3 Tuganay Carmen DLPC Coverage
1,081 Prk 4 Tuganay Carmen DLPC Coverage
1,082 Prk 6 Tuganay Carmen DLPC Coverage
1.083 Prk 7A Tuganay Carmen DLPC Coverage
1,084 Prk 8 Tuganay Carmen DLPC Coverage
1,085 Prk 7 New Katipunan Sto. Tomas DLPC Coverage
1,086 Prk 9 New Katipunan Sto. Tomas DLPC Coverage
1,087 Prk 3 Pantaron Sto. Tomas DLPC Coverage
1,088 Prk 7 Pantaron Sto. Tomas DLPC Coverage
1,089 Prk 10 Pantaron Sto. Tomas DLPC Coverage
1,090 Prk 7 San Jose Sto. Tomas DLPC Coverage
1,091 Prk 9 San Jose Sto. Tomas DLPC Coverage
1,092 Prk 1 San MigUnenergizedl Sto. Tomas DLPC Coverage
1,093 Prk 2 San MigUnenergizedl Sto. Tomas DLPC Coverage
1,094 Prk 7 San MigUnenergizedl Ste. Tomas DLPC Coverage
Annexes
103
Annex B: List of energized sitio/puroks not in the priority list of DANECO/NEA.
Item No.
Name of Project/Location Fund Source NEA Approved
Amount
Per NEA Report
Completed Energized
1 Prk. 8, Buclad, Asuncion 2013 SEP 722,859.32 9/30/2013 10/4/2013
2 Prk. 11, Doña Andrea, Asuncion 2013 SEP 650,401.95 1/6/2014 2/26/2014
3 Prk. 7, Doña Andrea, Asuncion 2013 SEP 407,560.94 9/14/2013 9/14/2013
4 Prk. 6 & 7, New Bantayan, Asuncion 2013 SEP 890,171.33 11/12/2013 2/26/2014
5 Prk. 2A, Pamacuan, Asuncion 2013 SEP 589,136.71 1/21/2014 2/27/2014
6 Prk. 2, Sagayen, Asuncion 2013 SEP 531,208.98 9/8/2013 9/13/2013
7 Prk. 3, Sagayen, Asuncion 2013 SEP 426,423.85 9/8/2013 9/13/2013
8 Purok 1B, New Bantayan, Asuncion 2014 SEP 595,396.03 11/17/2014 7/30/2015
8 Sub-Total 4,813,159.11
1 Purok 8B, Gabi, Compostela 2012 Batch 2 715,343.10 8/6/2013 10/9/2013
2 Purok 6 (Relocation Site), Poblacion, Compostela 2012 Batch 2 1,585,482.30 8/2/2013 10/8/2013
3 Purok 7 to Purok 3, Tamia, Compostela 2012 Batch 2 241,435.08 7/25/2013 10/9/2013
4 Purok 1 (Javillana), Marapat, Compostela 2014 SEP 1,261,985.07 11/17/2014 4/9/2015
5 Purok 1 (Sanchez), Marapat, Compostela 2014 SEP 1,177,981.68 11/17/2014 6/30/2015
6 P-3 & P-7, Aurora, Compostela 2015 SEP 1,083,336.50
7 Purok 26 (Quary), Ngan, Compostela 2015 SEP 1,161,847.97
8 P-3 Relocation, San Miguel, Compostela 2015 SEP 926,143.86
9 Prk. 5, Bagongon, Compostela 2011 Batch 1 454,415.17
9 Sub-Total 8,607,970.73
1 So. Proper (going to Pump House), Kanaan/Kaputian, IGACOS 2013 SEP 419,395.23
2 P-6 Esperat Area, San Vicente Mambago/Penapalta, IGACOS 2013 SEP 639,592.59 12/11/2013 2/5/2014
3 VGHOI, Villarica/Babak, IGACOS 2013 SEP 378,366.07 11/19/2013 12/19/2013
4 Purok 4B, Penaplata, IGACOS 2014 SEP 1,398,109.91 12/16/2014 -
5 Purok Calachuchi, Kanaan, IGACOS 2015 SEP 622,011.75
6 Purok Rose-A, Kanaan, IGACOS 2015 SEP 361,124.26
7 Purok Rose-B, Kanaan, IGACOS 2015 SEP 609,837.54
8 Purok 6A, Penaplata, IGACOS 2015 SEP 1,093,562.53
8 Sub-Total 5,521,999.88
1 Prk. 6A-6B Mabuhay, Capungagan, Kapalong 2013 SEP 760,258.92 1/21/2014 2/27/2014
2 Prk. 2A, Gabuyan, Kapalong 2013 SEP 217,478.68 9/26/2013 9/26/2013
2 Sub-Total 977,737.60
1 Purok 5-Lintahon, Ceboleda, Laak 2015 SEP 492,464.95
2 Purok 10, Mabuhay, Laak 2015 SEP 890,204.40
3 Purok 9, Mabuhay, Laak 2015 SEP 1,901,568.14
3 Sub-Total 3,284,237.49
1 Manasa-Thru Cut, Anitapan, Mabini 2011 Batch 1 1,974,258.06 12/20/2012 8/16/2013
2 So. Mambatang, Anitapan, Mabini 2011 Batch 1 1,769,944.88 1/17/2012 8/16/2013
3 So. Mangurian-Singapore, Anitapan, Mabini 2011 Batch 1 2,663,264.96 5/3/2012 8/16/2013
4 So. Mascareg, Anitapan, Mabini 2011 Batch 1 3,513,003.99 7/8/2012 8/16/2013
5 So. Saranganan Kingking Pantukan / So. Kapok Proper, Cadunan, Mabini
2011 Batch 1 957,282.25
6 Purok Tuburan, Mascaraeg, Mabini 2013 SEP 460,770.76 12/8/2013 2/22/2014
7 Purok Kindaraan, Mascaraeg, Mabini 2013 SEP 253,395.76 11/5/2013 1/28/2014
8 Sitio Ninja-1, Mascaraeg, Mabini 2013 SEP 785,670.35 12/8/2013 2/22/2014
Annexes
104
Item No.
Name of Project/Location Fund Source NEA Approved
Amount
Per NEA Report
Completed Energized
9 Sitio Ninja-2, Mascaraeg, Mabini 2013 SEP 12/8/2013 2/22/2014
10 Cabuyuan To Mampalusog, Upper Cabuyuan, Mabini 2015 SEP 1,632,955.40
11 Purok Mampalusong, Upper Cabuyuan, Mabini 2015 SEP 2,136,781.65
11 Sub-Total 16,174,328.06
1 P. Rancho, Mapaang Maco, Maco 2013 Additional 9/17/2014 10/8/2014
2 Purok-2, New Leyte, Maco 2013 SEP 262,897.21 11/16/2013 2/25/2014
3 Purok-3 Lumangang, New Leyte, Maco 2013 SEP 409,241.74 11/14/2013 2/25/2014
4 Purok 2A, Elizalde, Maco 2015 SEP 1,414,033.24
5 Purok 6, Amacan, New Leyte, Maco 2015 SEP 2,691,142.08
6 Purok A, Sinalikway, New Leyte, Maco 2015 SEP 677,024.07
6 Sub-Total 5,454,338.34
1 Prk. Gumamela, Bagong Silang, Maragusan 2013 Additional 365,187.14 7/18/2014 12/16/2014
2 Prk. Sampauita, Bagong Silang, Maragusan 2013 Additional 203,844.85 5/27/2014 12/16/2014
3 Prk. Rizal, Coronobe, Maragusan 2013 Additional 315,670.99 5/22/2014 12/17/2014
4 Prk. Atis, Saranga, Maragusan 2013 Additional 851,187.49 5/21/2014 12/19/2014
5 Prk. Tugas, Saranga, Maragusan 2013 Additional 410,683.11 5/22/2014 12/19/2014
6 Prk. Santol Riverside, Talian, Maragusan 2013 SEP 664,878.94 2/18/2014 2/26/2014
7 Purok Kauswagan, Mapawa, Maragusan 2014 SEP 858,389.82 11/17/2014 7/31/2015
8 Purok Mahayag, Mapawa, Maragusan 2014 SEP 967,767.70 11/17/2014 7/24/2015
9 Purok Narra, Mapawa, Maragusan 2014 SEP 1,355,895.73 11/17/2014 8/9/2015
10 Purok Atis, Mauswagon, Maragusan 2014 SEP 416,502.75 11/17/2014 1/27/2015
10 Sub-Total 6,410,008.52
1 Purok 1, Andili, Mawab 2015 SEP 934,195.77
1 Sub-Total 934,195.77
1 Prk. Moda Liboton, Poblacion, Monkayo 2013 Additional 401,979.10 5/28/2014 -
2 P2, Tubo-tubo, Monkayo 2013 Additional 732,783.44 7/15/2014 -
3 Prk. 5 Bulman, Naboc, Monkayo 2013 SEP 467,895.52
4 Prk. 7, Pasian, Monkayo 2013 SEP 1,315,958.69 2/17/2014 2/19/2014
5 Purok 6A, Caritas Shelter Village, Babag, Monkayo 2014 SEP 1,311,402.45 11/17/2014 8/15/2015
6 Purok3A, Via Caritas Et Vita Comm, Babag, Monkayo 2014 SEP 857,857.95 11/17/2014 1/8/2015
7 Purok 3A, Gabanan Baylo, Monkayo 2014 SEP 1,005,396.49 11/17/2014 3/13/2015
8 Purok 3, Olaycon, Monkayo 2014 SEP 853,794.57 11/17/2014 1/14/2015
9 Purok 6, Olaycon, Monkayo 2014 SEP 601,005.12 11/17/2014 6/30/2015
10 Purok Paco, San Jose, Monkayo 2014 SEP 2,171,710.58 11/17/2014 8/31/2015
10 Sub-Total 9,719,783.91
1 Prk. 7, New Cebulan, Montevista 2011 Batch 1 500,784.04
2 P6, Banag-banag, Montevista 2013 Additional 148,042.76 5/21/2014 -
3 Prk. 4 to Prk. 5 So. Pawcon, New Cebulan, Montevista 2013 Additional 418,676.83 12/2/2014 -
4 Prk. 7 to Prk. 4 So. Pawcon, New Cebulan, Montevista 2013 Additional 723,289.82 11/11/2014 -
5 Prk. 7, Concepcion, Montevista 2013 SEP 799,092.31 11/15/2013 2/11/2014
6 Prk. 5, New Visayas, Montevista 2013 SEP 347,938.69 11/5/2013 11/5/2013
7 Poblacion Laak to Barubo, Montevista, Montevista 2014 SEP 2,905,150.46 11/17/2014 7/25/2015
7 Sub-Total 5,842,974.91
1 Prk. 7, Mainit, Nabunturan 2011 Batch 1 97,342.46 4/1/2012 4/1/2012
2 Purok-3, Basak, Nabunturan 2013 SEP 192,293.82 11/4/2013 2/19/2014
Annexes
105
Item No.
Name of Project/Location Fund Source NEA Approved
Amount
Per NEA Report
Completed Energized
3 Purok-7, Basak, Nabunturan 2013 SEP 241,623.44 10/31/2013 2/10/2014
4 Purok-3, Magsaysay, Nabunturan 2013 SEP 1,452,737.46 10/19/2013 1/25/2014
5 Purok-1 to Purok-7, Pangutusan, Nabunturan 2013 SEP 578,507.64 2/1/2014 2/1/2014
6 Purok-17 Bantilan Subd., Poblacion, Nabunturan 2013 SEP 126,031.79 1/28/2014 1/28/2014
7 Purok 11, Magading, Nabunturan 2015 SEP 947,289.48
8 Purok 14, Magsaysay, Nabunturan 2015 SEP 1,510,305.03
9 Purok 2, Magsaysay, Nabunturan 2015 SEP 462,288.17
10 Purok 6, Magsaysay, Nabunturan 2015 SEP 939,332.64
11 Purok 3, Ogao, Nabunturan 2015 SEP 1,116,121.32
12 Purok 14, Poblacion, Nabunturan 2015 SEP 1,510,305.03
12 Sub-Total 9,174,178.28
1 Prk. 3, Fatima, New Bataan 2011 Batch 1 337,444.72
2 Purok 12, Andap, New Bataan 2014 SEP 2,084,547.36 11/17/2014 6/20/2015
2 Sub-Total 2,421,992.08
1 *Anda, Messaoy, New Corella 2013 SEP 1/28/2014 2/12/2014
2 Prk. 6, New Bohol, New Corella 2013 SEP 1,129,975.05 1/21/2014 2/25/2014
3 Prk. Anaman, New Cortes, New Corella 2013 SEP 649,779.86 1/29/2014 2/18/2014
3 Sub-Total 1,779,754.91
1 So. Maligaya, Tagugpo, Pantukan 2011 DAP-OVLP/LGSF
900,000.00 12/21/2013 2/23/2014
2 Prk. 5 Tabon-tabon Bawani Mawab/Mendoza Relocation, Kingking, Pantukan
2011 Batch 1 584,003.63 1/30/2012 1/30/2012
3 Prk. Hacienda, Napnapan, Pantukan 2011 Batch 1 1,279,465.45 12/22/2011 1/30/2012
4 Prk. 3 Concepcion Mawab/ So. Looban, Poblacion (Kingking), Pantukan
2011 Batch 1 666,420.01 1/30/2012 1/30/2012
5 Prk. 9, Tambongon, Pantukan 2013 Additional 426,980.62 4/25/2015 -
6 Prk. 3, Bongabong, Pantukan 2013 Additional 981,454.28 2/10/2015 -
7 So. Sarog (Area 1 2 3), Napnapan, Pantukan 2013 Additional 13,144,502.81 2/2/2015 4/1/2015
8 Purok-1 to Purok-3, Araibo, Pantukan 2013 SEP 124,643.83 11/15/2013 2/19/2014
9 So. Diat Palo, Napnapan to So. Panganason, Kingking, Pantukan
2014 SEP 3,100,651.51 11/17/2014 2/2/2015
10 Sitio Boringot to Sitio Palo, Napnapan, Pantukan 2014 SEP 2,195,500.42 11/17/2014 2/2/2015
11 Purok 7, Malanlangon, Tagdanua, Pantukan 2014 SEP 483,463.87 11/17/2014 6/27/2015
12 Purok 8, Pinakan, Tagdanua, Pantukan 2014 SEP 503,381.73 11/17/2014 6/9/2015
13 Purok Tapis to Purok Maitom, Tambongon, Pantukan 2014 SEP 1,873,252.41 11/17/2014 6/24/2015
14 Benguet Purok Tagapara, Napnapan, Pantukan 2015 SEP 41,341.25 2/2/2015 4/1/2015
15 Purok 29, Sitio Pulang Lupa, Napnapan, Pantukan 2015 SEP 137,804.20 2/2/2015 4/1/2015
16 Purok Campo Uno, Napnapan, Pantukan 2015 SEP 101,056.42 2/2/2015 4/1/2015
17 Purok Kinagdan, Napnapan, Pantukan 2015 SEP 110,243.35 2/2/2015 4/1/2015
18 Purok Lawan, Napnapan, Pantukan 2015 SEP 275,608.39 2/2/2015 4/1/2015
19 Purok Manga, Napnapan, Pantukan 2015 SEP 82,682.53 2/2/2015 4/1/2015
20 Purok Minyapis, Napnapan, Pantukan 2015 SEP 183,738.92 2/2/2015 4/1/2015
21 Purok Nangka, Napnapan, Pantukan 2015 SEP 275,608.39 2/2/2015 4/1/2015
22 Sitio Lantawan, Napnapan, Pantukan 2015 SEP 137,804.20 2/2/2015 4/1/2015
23 Sitio Liniputan, Napnapan, Pantukan 2015 SEP 68,902.10 2/2/2015 4/1/2015
24 Sitio Makitang Dagat, Napnapan, Pantukan 2015 SEP 68,902.10 2/2/2015 4/1/2015
Annexes
106
Item No.
Name of Project/Location Fund Source NEA Approved
Amount
Per NEA Report
Completed Energized
25 Sitio Mamacao, Napnapan, Pantukan 2015 SEP 142,397.67 2/2/2015 4/1/2015
26 Sitio Sabong, Napnapan, Pantukan 2015 SEP 91,869.46 2/2/2015 4/1/2015
26 Sub-Total 27,981,679.55
1 *Siabok, Pinamuno, San Isidro 2013 SEP 677,590.99 1/28/2014 2/12/2014
1 Sub-Total 677,590.99
1 Purok Daisy, Bingcungan, Tagum City 2014 SEP 143,271.34 11/17/2014 1/6/2015
2 Purok Diamante, Bingcungan, Tagum City 2014 SEP 923,080.08 11/17/2014 5/16/2015
3 Purok Gumamela, Bingcungan, Tagum City 2014 SEP 527,705.60 11/17/2014 1/6/2015
4 Purok Manga, Bingcungan, Tagum City 2014 SEP 449,689.33 11/17/2014 1/6/2015
5 Purok 1A, Madaum, Tagum City 2014 SEP 538,633.90 11/17/2014 1/10/2015
6 Purok Lansones, Pandapan, Tagum City 2014 SEP 954,927.62 11/17/2014 6/25/2015
7 Purok Manga, Pandapan, Tagum City 2014 SEP 310,302.38 11/17/2014 1/13/2015
8 Purok 3, RTU, Relocation Site, Tagum City 2014 SEP 2,311,661.74 11/17/2014 6/26/2015
9 Purok Cogon, Visayan Village, Tagum City 2014 SEP 291,107.16 11/17/2014 1/6/2015
10 Purok Kahayag, Visayan Village, Tagum City 2014 SEP 747,282.34 11/17/2014 6/4/2015
11 Purok Rose, Bincungan, Tagum City 2015 SEP 899,351.10
12 Purok Talaba, Bincungan, Tagum City 2015 SEP 1,560,748.21
13 Purok 3A Dagohoy, Canocotan, Tagum City 2015 SEP 545,838.93
14 Purok Narra, Cuambogan, Tagum City 2015 SEP 974,774.44
15 Purok 1A Gapas, Madaum, Tagum City 2015 SEP 852,872.03
16 Purok 28-A, Mandaum, Tagum City 2015 SEP 3,765,598.44
17 Purok 28-B, Mandaum, Tagum City 2015 SEP 3,139,202.70
18 Purok 28-C, Mandaum, Tagum City 2015 SEP 2,442,878.68
19 Purok Sta. Cruz, Pagsabangan, Tagum City 2015 SEP 1,160,121.59
20 Purok Lemon/Riverside, Pandapan, Tagum City 2015 SEP 780,559.23
21 Purok Nangka, Pandapan, Tagum City 2015 SEP 705,059.02
22 Purok Santol, Pandapan, Tagum City 2015 SEP 1,564,056.57
23 Purok Lanzones, Visayan Village, Tagum City 2015 SEP 745,243.45
24 Purok Macopa, Visayan Village, Tagum City 2015 SEP 629,844.56
25 Purok Timog, Visayan Village, Tagum City 2015 SEP 920,730.17
25 Sub-Total 27,884,540.61
1 Daligdigan, Dagohoy, Talaingod 2013 SEP
1,569,158.55
2/28/2014 2/28/2014
2 Puork 6A, Dagohoy, Talaingod 2013 SEP 2/28/2014 2/28/2014
3 Purok 3, Dagohoy, Talaingod 2013 SEP 2/28/2014 2/28/2014
4 Purok 3, Sto. Niño, Talaingod 2013 SEP 2,626,825.13
12/13/2013 2/28/2014
5 So. Angelo, Sto. Niño, Talaingod 2013 SEP 12/13/2013 2/28/2014
5 Sub-Total 4,195,983.68
149 Total P141,856,454.42
Note: * - Approved amount shared with another sitio/purok.
Annexes
107
Annex C: List of energized sitio/puroks with costs exceeding the P1 million per sitio/
purok threshold. Item Name of Project/Location Fund Source Approved Amount Excess Amount
1 Prk. 7 Kahayag, Magsaysay, Nabunturan 2011 Batch 1 P1,070,997.25 P70,997.25
2 So. Mangurian-Singapore, Anitapan, Mabini 2011 Batch 1 2,663,264.96 1,663,264.96
3 So. Mascareg, Anitapan, Mabini 2011 Batch 1 3,513,003.99 2,513,003.99
4 So. Mambatang, Anitapan, Mabini 2011 Batch 1 1,769,944.88 769,944.88
5 Manasa-Thru Cut, Anitapan, Mabini 2011 Batch 1 1,974,258.06 974,258.06
6 Prk. Hacienda, Napnapan, Pantukan 2011 Batch 1 1,279,465.45 279,465.45
7 So. Puyo, Sta. Emilia, Laak 2011 Batch 1 1,597,713.47 597,713.47
7 Sub-Total 2011 Batch 1 13,868,648.06 6,868,648.06
1 Prk. 5A, Katipunan, New Bataan 2012 Batch 2 1,252,162.32 252,162.32
2 Prk. 2A 3 & 3A, Katipunan, New Bataan 2012 Batch 2 1,526,830.67 526,830.67
3 Purok 6 (Relocation Site), Poblacion, Compostela 2012 Batch 2 1,585,482.30 585,482.30
3 Sub-Total 2012 Batch 2 4,364,475.29 1,364,475.29
1 Prk. 6, New Bohol, New Corella 2013 SEP 1,129,975.05 129,975.05
2 Prk. 7, Sta. Cruz, New Corella 2013 SEP 1,063,963.48 63,963.48
3 Mama-on, Pinamuno, San Isidro 2013 SEP 1,943,371.24 943,371.24
4 Prk. 10 to 8 / Sta. Cruz, Kapalili, Sawata 2013 SEP 1,743,401.20 743,401.20
5 So. Mesolong, Sto. Niño, Talaingod 2013 SEP
4,220,352.30 1,220,352.30 6 Purok Salawao, Sto. Niño, Talaingod 2013 SEP
7 Indangan, Sto. Niño, Talaingod 2013 SEP
8 So. Angelo, Sto. Niño, Talaingod 2013 SEP 2,626,825.13 626,825.13
9 Purok 3, Sto. Niño, Talaingod 2013 SEP
10 Prk. 7, Pasian, Monkayo 2013 SEP 1,315,958.69 315,958.69
11 Purok-3, Magsaysay, Nabunturan 2013 SEP 1,452,737.46 452,737.46
11 Sub-Total 2013 SEP 15,496,586.55 4,496,584.55
1 P4, Awao, Monkayo 2013 Additional 1,724,040.81 724,040.81
2 P2 Kahayag, Prosperidad, Montevista 2013 Additional 1,092,574.78 92,574.78
3 P6, Mayaon, Montevista 2013 Additional 1,156,719.82 156,719.82
4 Prk. Ipil ipil, Tupas, Maragusan 2013 Additional 1,504,243.36 504,243.36
5 So. Maduaw, Concepcion Maco, Compostela Valley 2013 Additional
3,162,337.79 162,337.79 6 P. Rancho, Mapaang Maco, Compostela Valley 2013 Additional
7 Purok 5, Granada Compound, Concepcion, Maco 2013 Additional
8 Prk. 1, Malinawon, Mawab 2013 Additional 3,505,205.21 2,505,205.21
9 Prk. 4, Sawangan, Mawab 2013 Additional 1,586,784.20 586,784.20
10 So. Sarog (Area 1 2 3), Napnapan, Pantukan 2013 Additional 13,144,502.81 12,144,502.81
11 Prk. 2, San Roque, Nabunturan 2013 Additional 1,079,878.53 79,878.53
12 Prk. 5 to Prk. 1, Sta. Maria, Nabunturan 2013 Additional 1,158,379.43 158,379.43
13 Prk. 8, New Sibonga, Nabunturan 2013 Additional 2,055,416.31 1,055,416.31
14 Prk. 4, New Sibonga, Nabunturan 2013 Additional 1,622,732.05 622,732.05
14 Sub-Total 2013 Additional 32,792,815.10 18,792,815.10
1 Sitio Boringot to Sitio Palo, Napnapan, Pantukan 2014 SEP 2,195,500.42 1,195,500.42
2 Sitio Diat Palo, Napnapan to Sitio Panganason, Kingking, Pantukan 2014 SEP 3,100,651.51 2,100,651.51
3 Purok Tapis to Purok Maitom, Tambongon, Pantukan 2014 SEP 1,873,252.41 873,252.41
4 Poblacion Laak to Barubo, Montevista, Compostela Valley 2014 SEP 2,905,150.46 1,905,150.46
5 Purok 2, Basak, Nabunturan 2014 SEP 1,363,110.67 363,110.67
6 Purok 4B, Penaplata, IGACOS 2014 SEP 1,398,109.91 398,109.91
7 Purok 5, Cogonon, New Bataan 2014 SEP 1,607,919.90 607,919.90
8 Purok 5, Cabinuangan, New Bataan 2014 SEP 1,144,889.72 144,889.72
9 Purok 12, Andap, New Bataan 2014 SEP 2,084,547.36 1,084,547.36
Annexes
108
Item Name of Project/Location Fund Source Approved Amount Excess Amount
10 Purok 7, Poblacion, Monkayo 2014 SEP 2,232,477.52 1,232,477.52
11 Purok 13, Poblacion, Monkayo 2014 SEP 1,207,936.40 207,936.40
12 Purok 7, Salvacion, Monkayo 2014 SEP 1,556,252.14 556,252.14
13 Purok 8, Salvacion, Monkayo 2014 SEP 1,151,463.94 151,463.94
14 Purok Paco, San Jose, Monkayo 2014 SEP 2,171,710.58 1,171,710.58
15 Purok 6A, Caritas Shelter Village, Babag, Monkayo 2014 SEP 1,311,402.45 311,402.45
16 Purok 6 to Purok 11 to Purok 12, Casson, Monkayo 2014 SEP 3,387,461.59 2,387,461.59
17 Kabangkalan to Purok 14 to Kapatagan to Purok 18 New Kapatagan, Casoon, Monkayo
2014 SEP 4,800,604.42 3,800,604.42
18 Purok 1 (Sanchez), Marapat, Compostela 2014 SEP 1,177,981.68 177,981.68
19 Purok 1 (Javillana), Marapat, Compostela 2014 SEP 1,261,985.07 261,985.07
20 Purok Narra, Mapawa, Maragusan 2014 SEP 1,355,895.73 355,895.73
21 Purok 1 to Purok 4 to Purok 6, Lebanon, Montevista 2014 SEP 2,610,054.77 1,610,054.77
22 Purok 3, RTU, Relocation Site, Tagum City 2014 SEP 2,311,661.74 1,311,661.74
23 Purok 2, Del Monte, Corella 2014 SEP 1,210,437.11 210,437.11
24 Purok 3, Patrocenio, New Corella 2014 SEP 1,786,559.19 786,559.19
25 Sitio Saraban, Pinamuno, San Isidro 2014 SEP 1,793,272.58 793,272.58
26 Purok 5, Patrocenio, New Corella 2014 SEP 1,142,129.49 142,129.49
27 Purok 16, Camanlangan, New Bataan 2014 SEP 1,506,691.85 506,691.85
27 Sub-Total 2014 SEP 51,649,110.61 24,649,110.61
1 Sitio Mikaglas, Langtud, Laak 2015 SEP 1,702,736.19 702,736.19
2 Sitio Patong, Langtud, Laak 2015 SEP 1,618,335.77 618,335.77
3 P-Tagumpay, Luan, Mabantao, Kapalong 2015 SEP 1,219,290.14 219,290.14
4 Purok 6, San Miguel, San Isidro 2015 SEP 1,222,866.08 222,866.08
5 Purok 1- Bagacay, Tagbinatag, IGACOS 2015 SEP 1,478,562.87 478,562.87
6 P-4 Tagalaya-B, Tagbinatag, IGACOS 2015 SEP 1,794,730.85 794,730.85
7 Purok 5, Sto. Niño, IGACOS 2015 SEP 1,201,775.20 201,775.20
8 P-1 To P-4, Igangon, San Isidro 2015 SEP 1,726,581.19 726,581.19
9 Purok 3, Ogao, Nabunturan 2015 SEP 1,116,121.32 116,121.32
10 Purok 1A, Basak, Nabunturan 2015 SEP 1,182,746.70 182,746.70
11 P-5, Sitio Tagaytay, Mipangi, Nabunturan 2015 SEP 3,554,898.88 2,554,898.88
12 P-1 & P-5, Saosao, Mawab 2015 SEP 2,037,822.91 1,037,822.91
13 Purok 2A, Elizalde, Maco 2015 SEP 1,414,033.24 414,033.24
14 Purok 8, Naboc, Moncayo 2015 SEP 1,315,455.72 315,455.72
15 Sitio San Agustin, New Calape, Montevista 2015 SEP 1,594,578.86 594,578.86
16 Sitio Mabanda, San Vicente, Montevista 2015 SEP 3,343,176.98 2,343,176.98
17 Sitio Bagtok, San Vicente, Montevista 2015 SEP 2,121,564.60 1,121,564.60
18 P-3 & P-7, Aurora, Compostela 2015 SEP 1,083,336.50 83,336.50
19 Purok 26 (Quary), Ngan, Compostela 2015 SEP 1,161,847.97 161,847.97
20 P-Caimeto, Pamintaran, Maragusan 2015 SEP 1,148,071.23 148,071.23
21 P-Highlander, New Albay, Maragusan 2015 SEP 1,282,126.68 282,126.68
22 New Matalom (Purok 5), Sta. Fe, New Corella 2015 SEP 3,405,477.40 2,405,477.40
23 Laceda (Purok 6), Sta. Fe, New Corella 2015 SEP 1,877,850.44 877,850.44
24 Purok 14, Poblacion, Nabunturan 2015 SEP 1,510,305.03 510,305.03
25 Purok 28-A, Mandaum, Tagum City 2015 SEP 3,765,598.44 2,765,598.44
26 Purok 28-B, Mandaum, Tagum City 2015 SEP 3,139,202.70 2,139,202.70
27 Purok 28-C, Mandaum, Tagum City 2015 SEP 2,442,878.68 1,442,878.68
28 Purok-8 Magtagoktok, Ceboleda, Laak 2015 SEP 1,911,079.75 911,079.75
29 Purok Sta. Cruz, Pagsabangan, Tagum City 2015 SEP 1,160,121.59 160,121.59
30 Purok Santol, Pandapan, Tagum City 2015 SEP 1,564,056.57 564,056.57
31 Purok Talaba, Bincungan, Tagum City 2015 SEP 1,560,748.21 560,748.21
Annexes
109
Item Name of Project/Location Fund Source Approved Amount Excess Amount
32 P-10 Panayugan, Limbaan, New Corella 2015 SEP 1,434,616.40 434,616.40
33 Purok 20, Mesaoy, New Corella 2015 SEP 2,246,972.46 1,246,972.46
34 Purok 6A, Penaplata, IGACOS 2015 SEP 1,093,562.53 93,562.53
35 Purok 5, Guilon, IGACOS 2015 SEP 1,124,391.22 124,391.22
36 Purok 6, Guilon, IGACOS 2015 SEP 1,768,489.85 768,489.85
37 Purok 9, New Panay Dampinas, Mipangi, Nabunturan 2015 SEP 1,854,020.77 854,020.77
38 Purok 10, Dampinas, Mipangi, Nabunturan 2015 SEP 1,050,514.10 50,514.10
39 Purok 14, Magsaysay, Nabunturan 2015 SEP 1,528,316.60 528,316.60
40 Purok 6, Amacan, New Leyte, Maco 2015 SEP 2,691,142.08 1,691,142.08
41 Purok 9, Mabuhay, Laak 2015 SEP 1,901,568.14 901,568.14
42 Purok 7, Upper San Roque, Binasbas, Laak 2015 SEP 1,089,925.18 89,925.18
43 Purok 6, Upper San Roque, Binasbas, Laak 2015 SEP 2,090,242.79 1,090,242.79
44 Cabuyuan To Mampalusog, Upper Cabuyuan, Mabini 2015 SEP 2,136,781.65 1,136,781.65
45 Purok Mampalusong, Upper Cabuyuan, Mabini 2015 SEP 1,632,955.40 632,955.40
46 Sitio Angelo, Sto. Niño, Talaingod 2015 SEP 6,847,177.43 4,847,177.43
47 Sitio Mesolong, Sto. Niño, Talaingod 2015 SEP
47 Sub-Total 2015 SEP 87,148,655.29 40,148,655.29
109 Total P205,320,288.90 P96,320,288.90
Annex D: Detailed breakdown of unsupported transactions/unsubmitted supporting
documents. Fund Source Project CV No. Date Particulars Amount Remarks
2011 OVLP/ LGSF
1 Sitio 1405-00321 5/21/2014 CARAGA FILCHIN CORPORATION - DAVAO BRANCH
P602,262.75 Amount chargeable cannot be determined
2011 OVLP/LGSF Total 602,262.75
2012 Batch 1 3 Barangays
1409-00067 9/1/2014 PERFORMANCE BOND 10%
659,486.64 CV only
1410-00563 10/31/2014 ADDITIONAL LABOR AND MATERIALS
270,002.33 No supporting documents
1410-00564 10/31/2014 4,737.41
1310-00350 10/23/2013 FUEL AND OIL
16,401.00
1311-00272 11/21/2013 1,590.00
1311-00275 11/21/2013 37,335.00
1412-00182 12/13/2013 23,112.00
1401-00257 1/20/2014 20,405.00
1402-00267 2/14/2014 39,342.00
1403-00363 3/24/2014 26,341.00
1405-00083 5/5/2014 30,125.00
1405-00084 5/5/2014 2,700.00
1405-00268 5/16/2014 14,850.00
1405-00273 5/16/2014 24,375.00
1406-00238 6/11/2014 28,639.00
1407-00352 7/17/2014 27,595.00
1407-00382 7/17/2014 1,350.00
1408-00210 8/12/2014 34,128.00
1408-00254 8/13/2014 882.40
1408-00422 8/27/2014 515.98
1409-00301 9/16/2014 22,819.00
Annexes
110
Fund Source Project CV No. Date Particulars Amount Remarks
1405-00301 5/20/2014 TRAVEL EXPENSES 700.00
1405-00321 5/21/2014 FUND TRANSFER 94,385.00
1408-00387 - MATERIALS FOR HOUSEWIRING
4,200.00
1406-00020 5/15/2014 OTHER EXPENSES (VEHICLE SPAREPARTS)
14,660.00
1406-00065 6/2/2014 61,360.00
1409-00052 6/2/2014 21,120.00
1410-00085 10/4/2014 33,526.79
2012 Batch 1 Total - 3 brgys. 1,516,683.55
2012 Batch 2
8 Sitios
1510-00544 10/26/2015 FINAL BILLING, PERFORMANCE BOND & RETENTION
16,448.06 No supporting documents
1310-00044 10/4/2013 TRANSPORTATION
3,300.50
1401-00162 1/16/2014 1,201.67
1402-00304 2/17/2014 17,862.28
1404-00122 4/7/2014 1,865.00
1401-00201 4/10/2014 2,785.50
1405-00168 5/9/2014 1,861.23
1405-00380 5/29/2014 945.00
1410-00160 10/8/2014 1,970.25
1410-00397 10/8/2014 431.50
1405-00321 5/21/2014 81,459.57
2012 Batch 2 Total - 8 sitios 130,130.56
2012 Batch 2 5 Sitios 1406-00009 6/2/2014 FUEL AND OIL 1,664.25 No supporting documents 1405-00321 5/21/2014 75,097.06
1312-00232 12/13/2014 OFFICE SUPPLIES 14,288.50
1405-00265 5/15/2014 19,730.00
2012 Batch 2 Total - 5 sitios 110,779.81
2013 GAA 22 Sitios 1311-00089 11/8/2015 TRANSPORTATION 217.84 No supporting documents 1311-00320 10/22/2015 MEAL ALLOWANCE 1,000.00
1405-00321 5/21/2016 FUND TRANSFER 699,668.94
1404-00122 4/7/2014 TRANSPORTATION 2,088.75
1405-00379 5/29/2014 1,890.00
1503-00284 3/18/2015 573.47
1508-00325 8/19/2015 617.00
2013 GAA Total - 22 sitios 706,056.00
2013 GAA
20 Sitios
1409-00117 9/11/2014 HOUSEWIRING MATERIALS
80,030.00 No supporting documents 1508-00422 8/27/2015 ELECTRONIC
METERS 53,060.70
1312-00111 12/5/2013 LABOR 10,326.22
1312-00111 12/5/2013 LABOR 10,326.20
1503-00081 3/6/2015 PERFORMANCE BOND AND RETENTION 10%
172,420.37
1312-00111 12/5/2013 LABOR 10,326.20
1312-00111 12/5/2013 LABOR 10,326.20
1312-00111 12/5/2013 LABOR 10,326.20
1312-00111 12/5/2013 LABOR 10,326.20
1508-00423 8/27/2015 HOUSEWIRING MATERIALS
83,936.81
1508-00425 8/27/2015 ELECTRONIC 53,060.70
Annexes
111
Fund Source Project CV No. Date Particulars Amount Remarks
METERS
1310-00348 10/23/2013 FUEL AND OIL 896.92
1405-00321 5/21/2014 Fund transfer 121,947.71 Fund Transfer, Summary of witholding tax
1301-00160 1/20/2013 ELECTRICAL MATERIALS
100,888.54 No supporting documents
1406-00351 6/23/2014 HOUSEWIRING INSTALLATION
1,200.00
2013 GAA Total - 20 sitios 729,398.97
2013 GAA
2 Sitios
1312-00075 12/4/2013 40% PAYMENT 1,529,172.27 No supporting documents
1402-00250 2/14/2014 10% PAYMENT 382,293.07
1310-00146 10/10/2013 FUEL AND OIL 287.75
1407-00069 7/2/2014 2,024.90
1408-00248 8/13/2014 283.25
1408-00251 8/13/2014 511.35
1408-00253 8/13/2014 1,607.60
1408-00484 8/29/2014 455.20
1409-00118 9/1/2014 120.37
1409-00230 9/12/2014 1,318.80
1410-00227 10/10/2014 836.39
1405-00321 5/21/2014 Fund transfer 78,633.69
1406-00125 6/9/2014 HOUSEWIRING INSTALLATION
600.00
1406-00349 6/9/2014 10,500.00
1406-00388 8/22/2014 6,900.00
1406-00266 10/11/2014 1,000.00
2013 GAA Total - 2 sitios 2,016,544.64
2013 Additional
9 Sitios 1312-00156 12/12/2013 70% PAYMENT 91,785.41 CV only
2013 Additional Total - 9 sitios 91,785.41
2013 Additional
23 Sitios
MCT14-1404-218 4/23/2014 Line construction materials
116,578.00 No supporting documents
MCT14-1407-107 7/17/2014 102,525.00
MCT14-1407-123 7/22/2014 37,586.72
MCT14-1407-127 7/22/2014 27,200.00
MCT14-1407-137 7/25/2014 2,073.10
MCT14-1411-070 11/5/2014 2,070.00
MCrt5-1412-009 12/29/2014 Returned line materials (3,444.64)
MCrt5-1412-007 12/29/2014 (6,120.00)
1405-00447 5/30/2014 Labor 105,160.31
1502-00171 2/11/2015 25,583.55
1410-00399 10/18/2014 transportation 1,955.20
1407-00269 7/15/2016 fund transfer 2,201.00
MCT14-1404-250 4/25/2014 Line construction materials
137,774.00
MCT14-1406-249 6/27/2014 38,375.89
MCT14-1406-250 6/27/2014 44,766.87
MCT14-1406-251 6/27/2014 102,000.00
MCT14-1407-083 7/8/2014 3,585.86
MCT14-1411-067 11/5/2014 6,280.00
MCrT5-1412-004 12/29/2014 Returned line materials (3,258.90)
MCrT5-1412-006 12/29/2014 (10,877.10)
1405-00447 5/30/2014 Labor 105,160.28
Annexes
112
Fund Source Project CV No. Date Particulars Amount Remarks
1502-00171 2/11/2015 25,583.56
MCT14-1407-084 7/8/2014 Line construction materials
61,976.95
MCT14-1407-085 7/9/2014 57,800.00
MCT14-1407-093 7/14/2014 998.00
MCT14-1501-254 1/22/2015 2,132.66
MCrT5-1412-008 12/29/2014 Returned line materials (10,200.00)
1411-00241 11/21/2014 transportation
626.25
1411-00276 11/24/2016 986.55
1411-00276 11/24/2016 5,388.75
MCT14-1404-247 4/25/2014 Line construction materials
137,774.00
MCT14-1407-124 7/22/2014 74,800.00
MCT14-1410-057 10/17/2014 10,093.50
MCT5-1502-061 2/10/2015 1,066.69
MCrT5-1412-011 12/29/2014 Returned line materials
(37,400.00)
MCrT5-1412-013 12/29/2014 (20,400.00)
MCrT5-1502-001 2/6/2015 (91,800.00)
1405-00447 5/30/2014 Labor
105,160.28
1502-00171 2/11/2015 25,583.56
MCT14-1404-171 4/14/2014 Line construction materials
105,980.00
MCT14-1404-206 4/22/2014 95,382.00
MCT14-1404-241 4/24/2014 105,980.00
MCT14-1404-242 4/24/2014 105,980.00
MCT14-1407-143 7/28/2014 650,412.91
MCT14-1408-035 8/13/2014 13,882.80
MCrT5-1412-012 12/29/2014 Returned line materials
(115,344.46)
MCrT5-1412-010 12/29/2014 (746.00)
1405-00447 5/30/2014 Labor
210,320.56
1502-00171 2/11/2015 51,167.12
1407-00379 7/17/2015 meal allowance 2,305.00
MCT14-1404-280 4/28/2014 Line construction materials
148,372.00
MCT14-1406-156 6/23/2014 155,221.79
MCT14-1406-157 6/23/2014 4,237.46
MCT14-1406-226 6/25/2014 17,000.00
MCrT5-1412-003 12/29/2014 Returned line materials
(17,000.00)
MCrT5-1412-005 12/29/2014 (7,219.63)
1405-00447 5/30/2014 Labor
105,160.28
1502-00171 2/11/2015 25,583.56
MCT14-1404-281 4/28/2014 Line construction materials
21,196.00
MCT14-1406-091 6/10/2014 81,498.85
MCT14-1404-239 4/24/2014 40,712.00
MCrT5-1412-002 12/29/2014 Returned line materials (7,336.25)
1405-00447 5/30/2014 Labor
105,160.28
1502-00171 2/11/2015 25,583.56
1510-00393 10/3/2015 transportation
2,057.00
1508-00322 8/19/2015 864.10
1508-00324 8/19/2015 1,059.40
MCT14-1404-249 4/25/2014 Line construction materials
127,176.00
MCrT5-1411-003 11/5/2014 Returned line materials (94,800.00)
1405-00447 5/30/2014 Labor
105,160.28
1502-00171 2/11/2015 25,583.56
Annexes
113
Fund Source Project CV No. Date Particulars Amount Remarks
1507-00452 7/20/2015 transportation
543.15
1506-00236 6/9/2015 286.61
1506-00237 6/9/2015 291.30
1506-00238 6/9/2015 1,095.30
1410-00421 10/21/2014 mobilization 15% 147,000.00 NO OR
1501-00463 1/31/2015 transportation
733.00 No supporting documents
1410-00566 10/31/2015 4,218.75
1410-00451 10/27/2014 transportation
669.24
1408-00487 8/10/2014 219.20
1408-00487 8/29/2014 235.20
1408-00457 1/28/2015 meal allowance 6,420.00
1410-00399 10/18/2014 transportation 1,955.20
1511-00481 11/20/2015 meal allowance 3,100.00
1411-00241 11/21/2014 transportation
626.25
1411-00276 11/24/2014 986.55
1411-00277 11/24/2014 5,388.75
1503-00083 3/6/2015 full payment 3,353.30
1411-00341 11/24/2014 transportation 5,013.20
1411-00342 11/24/2014 485.90
1411-00343 11/24/2014 transportation 1,000.00
2013 Additional Sub-Total Paid Transactions - 23 sitios 3,461,556.96
2013 Additional
23 Sitios Payables Payables 58,280.00 No supporting documents 52,500.00
58,280.00
52,500.00
2013 Additional Sub-Total Payables - 23 sitios 221,560.00
2013 Additional Total - 23 sitios 3,683,116.96
2013 Additional
6 Sitios Not indicated not indicated for installation of 1 unit Distribution Transformer 15kva
52,500.00 No supporting documents
Not indicated not indicated for installation of 1 unit Distribution Transformer 15kva
52,500.00
Not indicated not indicated for installation of 1 unit Distribution Transformer 15kva
52,500.00
Not indicated not indicated for installation of 1 unit Distribution Transformer 25kva
58,280.00
2013 Additional Sub-Total Paid Transactions - 6 sitios 215,780.00
2013 Additional
6 Sitios Payables Payables 42,892.70 No supporting documents 45,000.00
45,000.00
58,280.00
2013 Additional Sub-Total Payables - 6 sitios 191,172.70
2013 Additional Total - 6 sitios 406,952.70
2013 Additional
2 Sitios 1408-00034 8/14/2014 Labor 12,600.00 No supporting documents
2013 Additional Total - 2 sitios 12,600.00
2013 Additional
5 Sitios
MCT14-1503-151 3/16/2015 various electrical materials
417.20 No supporting documents Not indicated not indicated for installation of 1 unit
distribution transformer 52,200.00
Annexes
114
Fund Source Project CV No. Date Particulars Amount Remarks
25kva
MCT14-1409-077 9/23/2014 various electrical materials
10,959.88
Not indicated not indicated for installation of 1 unit distribution transformer 25kva
52,500.00
1504-00484 4/29/2015 freight and handling of housewiring materials
7,000.00
1406-00380 6/25/2014 fuel and oil
464.80
1406-00382 6/25/2014 333.90
1407-00245 7/10/2014 231.28
1411-00047 11/4/2014 219.40
1411-00280 11/21/2014 424.16
1506-00137 6/4/2015 1,356.43
2013 Additional Sub-Total Paid Transactions - 5 sitios 126,107.05
2013 Additional
5 Sitios Payables Payables 58,280.00 No supporting documents 524,520.00
2013 Additional Sub-Total Payables - 5 sitios 582,800.00
2013 Additional Total - 5 sitios 708,907.05
2013 Additional
12 Sitios
MCT14-1505-509 5/29/2015 nut, Oval Eye 5/8 400.00 No supporting documents
MCT1612-179 12/12/2016 line construction materials
5,495.00
MCT1606-599 6/16/2016 Distribution Transformer 25kva
58,280.00
1411-00083 11/5/2014 progress billing 40% 238,400.00
MCT1612-165 12/6/2016 line construction materials
365.42
1502-00408 2/25/2015 Transportation 831.70
1502-00292 2/18/2015 1,186.50
MCT1606-607 6/16/2016 Distribution Transformer 25kva
58,280.00
1507-00500 7/22/2015 housewiring materials 75,693.00
MCT12-1512-254 12/4/2015 Distribution Transformer 25kva
58,280.00
MCT14-1512-002 12/9/2015 line construction materials
5,650.00
JV1509-00022 9/16/2015 final billing offsetted to his penalty
118,128.28
MCT14-1511-323 11/9/2015 line construction materials
1,133.60
MCT12-1512-253 12/4/2015 Distribution Transformer 25kva
58,280.00
MCT1612-163 12/5/2016 line construction materials
764.00
1503-00084 3/6/2015 mobilizaiton 15% 64,350.00
MCT1612-175 12/7/2016 line construction materials
7,277.35
MCT1612-171 12/6/2016 764.00
JV1604-00037 4/18/2016 final billing (offsetted to his payables)
123,991.23
MCT14-1501-394 1/30/2015 line construction materials
7,952.00
MCT14-1502-074 2/27/2015 294,352.36
MCT14-1506-002 2/5/2015 19,546.60
MCrT5-1508-002 8/4/2015 returned line materials (12,300.00)
MCT14-1504-356 4/24/2015 line construction 4,400.00
Annexes
115
Fund Source Project CV No. Date Particulars Amount Remarks
materials
2013 Additional Sub-Total Paid Transactions - 12 sitios 1,191,501.04
2013 Additional
12 Sitios Payables Payables 45,000.00 No supporting documents 58,280.00
58,280.00
58,280.00
58,280.00
2013 Additional Sub-Total Paid Transactions - 12 sitios 278,120.00
2013 Additional Total - 12 sitios 1,469,621.04
2014 GAA 55 Sitios CV#1510-00561 10/28/2015 LABOR 17,400.00 No supporting documents CV#1602-00474 2/29/2015 MEAL ALLOWANCE 3,000.00
CV#1502-00170 2/4/2015 FUND TRANSFER 769,618.30
CV#1602-00348 2/16/2016 MEAL ALLOWANCE 10,686.05
CV#1608-00344 8/25/2016 HOUSEWIRING MATERIALS
100,924.00
CV#1605-097 5/26/2016 Final billing (offsetted to his payable)
152,121.34
CV#1602-00003 6/1/2016 FUND TRANSFER 52,104.60
CV#1602-00284 2/18/2015 Meals Allowance 1,432.25
MCT12-1511-071 11/4/2015 Distribution Transformer 25kva
58,280.00
CV#1504-00594 7/25/2015 Publication 10,996.72
MCT14-1412-493 12/29/2014 Line construction materials
11,539.75
CV#1507-00488 6/20/2015 TRANSPORTATION 467.25
CV#1608-00328 8/19/2015 1,675.80
CV#1601-00103 1/5/2016 1,440.00
CV#1602-00052 2/4/2016 Housewiring materials 132,090.00
MCT14-1601-333 1/22/2016 Line construction materials
17,149.60
2014 GAA Sub-Total Paid Transactions - 55 sitios 1,340,925.66
2014 GAA 55 Sitios Payables Payables – Payee not indicated
233,120.00 No supporting documents 116,560.00
116,560.00
58,280.00
61,760.00
58,280.00
58,280.00
58,280.00
174,840.00
58,280.00
58,280.00
58,280.00
58,280.00
58,280.00
58,280.00
58,280.00
2014 GAA Sub-Total Payables - 55 sitios 1,343,920.00
2014 GAA Total -55 sitios 2,684,845.66
2015 SEP
3 Sitios
MCT14-1607-099 7/22/2016 Various electrical materials
13,617.00 No supporting documents MCT12-1607-015 7/22/2016 Distribution 54,800.00
Annexes
116
Fund Source Project CV No. Date Particulars Amount Remarks
MCT12-1608-009 8/12/2016 Transformer 25kva
54,800.00
MCT12-1608-005 8/9/2016 54,800.00
MCT12-1608-004 8/8/2016 54,800.00
MCT14-1608-278 8/12/2016 Line construction materials
13,367.00
MCT14-1608-153 8/9/2016 13,087.00
MCT14-1608-146 8/8/2016 9,412.76
CV#1604-00355 4/26/2016 MEAL ALLOWANCE 280.00
MCT14-1609-020 9/2/2016 Line construction materials
11,937.00
MCT12-1609-004 9/2/2016 Distribution Transformer 25kva
54,800.00
MCT12-1611-015 11/22/2016 54,800.00
MCT14-1611-318 11/22/2016 Line construction materials
14,772.64
CV#1610-00408 10/24/2016 Retention 10% 196,428.35
MCT12-1608-013 8/15/2016 Distribution Transformer 25kva
54,800.00
MCT14-1608-304 8/15/2016 Line construction materials
13,887.00
MCT12-1611-012 11/16/2016 Distribution Transformer 25kva
54,800.00
MCT14-1611-221 11/16/2016 Line construction materials
14,697.00
Sub-Total Paid Transactions 739,885.75
2015 SEP 3 Sitios PAYABLES - Distribution of Lines
248,686.12 No supporting documents
632,274.66
Sub-Total Payables 880,960.78
2015 SEP Total - 3 sitios 1,620,846.53
2015 SEP
14 Sitios CV#1605-00526 5/31/2016 Retention 10% 72,200.00 No supporting documents
Sub-Total Paid Transactions 72,200.00
2015 SEP
14 Sitios
Payables PAYABLES - Housewiring
130,595.00 No supporting documents
143,920.00
224,875.00
202,555.00
179,900.00
157,580.00
98,945.00
269,850.00
170,905.00
89,950.00
157,580.00
134,925.00
251,860.00
98,945.00
PAYABLES - Distribution of Lines
187,550.00
292,469.68
302,213.50
241,333.00
249,909.05
253,185.00
93,475.00
Annexes
117
Fund Source Project CV No. Date Particulars Amount Remarks
168,790.00
84,395.00
84,396.00
93,775.00
93,775.00
167,342.00
756,446.02
Sub-Total Payables 5,381,439.25
2015 SEP Total - 14 sitios 5,453,639.25
2015 SEP 18 Sitios CV#1701-00306 1/20/2017 Final Billing,Performance Bond and Retention 10%
188,730.00 No supporting documents
CV#1610-00409 10/27/2016 Labor on housewiring installation
30,000.00
CV1610-00123 10/7/2016 10,800.00
CV1610-00122 10/7/2016 12,000.00
Sub-Total Paid Transactions 241,530.00
2015 SEP
18 Sitios
Payables PAYABLES - Distribution of Lines
386,880.00 No supporting documents
281,210.00
81,682.80
232,831.00
286,823.70
358,941.70
77,380.00
77,380.00
77,380.00
77,380.00
671,602.74
105,500.00
PAYABLES - Housewiring
269,850.00
269,850.00
269,850.00
269,850.00
269,850.00
269,850.00
Sub-Total Payables 4,334,091.94
2015 SEP Total - 18 sitios 4,575,621.94
2015 GAA 25 Sitios - ComVal
MCT1612-173 12/6/2016 Line construction materials
4,380.00 No supporting documents MCT1609-338 9/15/2016 Distribution
Transformer 25kva (2 units)
109,600.00
MCT12-1612-086 12/1/2016 Distribution Transformer 25kva
62,000.00
MCT12-1604-077 3/29/2018 58,280.00
MCT1605-00135 4/27/2016 58,280.00
MCT#1607-257 6/30/2016 58,280.00
MCT#1607-345 7/7/2016 54,800.00
MCT#1607-344 7/7/2016 54,800.00
MCT# 1607-346 7/7/2016 54,800.00
MCT#1607-256 6/30/2016 58,280.00
MCT1609-339 9/15/2016 Distribution Transformer 25kva (2
109,600.00
Annexes
118
Fund Source Project CV No. Date Particulars Amount Remarks
units)
MCT#1607-256 6/30/2016 Distribution Transformer 25kva
52,200.00
CV#1610-00419 10/28/2016 Electronic meters
27,144.00
CV#1610-00419 10/28/2016 60,320.00
CV#1610-00419 10/28/2016 90,480.00
CV#1610-00419 10/28/2016 90,480.00
CV#1610-00419 10/28/2016 79,924.00
CV#1610-00419 10/28/2016 63,336.00
CV#1610-00419 10/28/2016 63,336.00
CV#1610-00419 10/28/2016 88,972.00
CV#1610-00419 10/28/2016 84,448.00
CV#1610-00419 10/28/2016 49,764.00
CV#1610-00419 10/28/2016 90,480.00
CV#1610-00419 10/26/2016 90,480.00
CV#1610-00419 10/28/2016 52,780.00
CV#1610-00419 10/26/2016 60,320.00
CV#1610-00419 10/28/2016 60,320.00
CV#1610-00419 10/28/2016 22,620.00
CV#1610-00419 10/28/2016 90,480.00
CV#1610-00419 10/28/2016 58,812.00
CV#1610-00419 10/28/2016 75,400.00
CV#1610-00419 10/28/2016 45,240.00
CV#1610-00419 10/28/2016 90,480.00
CV#1610-00419 10/28/2016 90,480.00
CV#1610-00419 10/28/2016 45,240.00
CV#1610-00419 10/28/2016 90,480.00
CV#1610-00419 10/28/2016 60,320.00
CV#1612-00291 12/16/2016 Final Billing, Performance Bond and Retention 10%
23,866.68
CV#1612-00292 12/13/2016 175,049.68
CV#1612-00290 12/16/2016 41,871.09
CV#1607-00342 7/27/2016 Housewiring materials
151,386.00
CV#1611-00438 11/29/2016 88,308.50
CV#1608-00347 8/26/2016 100,924.00
CV1611-00438 11/29/2016 151,386.00
MCT#1609-265 9/9/2016 Line construction materials
2,243.80
MCT1609-340 9/16/2016 4,479.00
MCT# 1607-401 7/13/2016 1,973.96
MCT1612-177 12/7/2016 58.50
MCT14-1603-543 3/18/2016 84,650.00
MCT#1611-057 11/3/2016 2,443.70
MCT#1701-171 1/15/2017 1,221.85
MCT#1606-595 6/15/2018 1,059.20
CV#1603-00501 3/31/2016 MEAL ALLOWANCE
12,000.00
CV#1603-00500 3/31/2016 10,000.00
CV#1604-00379 4/28/2016 4,573.00
CV#1605-00067 5/4/2016 5,000.00
CV#1512-00110 12/3/2015 TRANSPORTATION
3,194.50
CV#1602-00350 2/16/2016 307.60
CV#1602-00363 2/16/2016 270.00
Annexes
119
Fund Source Project CV No. Date Particulars Amount Remarks
Sub-Total Paid Transactions 3,323,703.06
2015 GAA 25 Sitios - ComVal
PAYABLES - Distribution of Lines
485,370.00 No supporting documents
155,463.00
99,960.00
172,570.20
295,764.00
Sub-Total Payables 1,209,127.20
2015 GAA Total - 25 sitios 4,532,830.26
2015 GAA 25 Sitios - Tagum MCT12-1606-005 6/13/2016 Distribution Transformer 25kva
54,800.00 No supporting documents
MCT14-1606-060 6/13/2016 Line construction materials
13,887.00
MCT14-1609-240 9/13/2016 55,485.00
MCT14-1610-497 10/26/2016 11,867.00
CV#1604-00355 4/26/2016 MEAL ALLOWANCE 280.00
CV#1606-00186 5/12/2016 TRANSPORTATION 335.90
Sub-Total Paid transactions 136,654.90
2015 GAA
25 Sitios - Tagum
Payables PAYABLES - Distribution of Lines
58,280.00 No supporting documents
112,605.00
58,280.00
54,800.00
58,280.00
58,280.00
58,280.00
58,280.00
216,991.22
58,280.00
116,560.00
65,580.00
116,560.00
58,280.00
58,280.00
58,280.00
116,560.00
58,280.00
PAYABLES - Housewiring
37,000.00
37,000.00
44,400.00
44,400.00
42,920.00
22,000.00
67,800.00
26,640.00
50,320.00
35,200.00
88,800.00
63,600.00
33,440.00
52,800.00
88,800.00
75,600.00
88,800.00
Annexes
120
Fund Source Project CV No. Date Particulars Amount Remarks
48,840.00
68,080.00
50,320.00
71,040.00
42,920.00
56,240.00
50,320.00
53,280.00
2015 GAA Sub-Total Payables 2,781,296.22
2015 GAA Total - 25 sitios 2,917,951.12
Calamity Grant
Rehab 1607-00133 7/13/2016 - 59,659.50 No supporting documents 1611-00075 11/8/2016 - 41,160.00
1404-00351 4/21/2014 payment of ampact tap and ampact wedge for upgrading and correction of line conductor
177,156.00 Bank statement only
1408-00481 8/29/2014 payment of 75 pcs steel pole 35Ft (Full delivery) for rehabilitation of lines damaged by typhoon Pablo
756,534.37
1411-00327 11/21/2014 payment of cross arm steel 3-3/4x4x4-3/4x8 and pin crossarm steel 5/8x13-5/8LS for replenishment of CAPEX Materials used during typhhon Pablo
420,226.18
1411-00329 11/21/2014 payment of clevis, secondary swinging, connector compression YHO-300 & YHO-150, cross arm steel and nut oval eye for Maragusan Separate Feeder - CAPEX project (M.Montejo)
129,607.27
Materials and Labor (no indicated references) 5,327,679.79 No suppporting documents
1406-00286 6/17/2014 Transfer of fund from CDF fund to RCBC General Fund- Savings. (re: Withholding tax on labor of rehabilitation of lines charge to typhoon Pablo for the period covered September 1, 2013 to March 31, 2014
105,814.17 Deposit slip and summary of wihthholding tax only
1410-00499 7/25/2014 - 34,014.00 No suppporting documents
Sub-Total paid transactions 7,051,851.28
Calamity Grant
Payables J.O # 2016-0061 C - UNPAID OBLIGATION
1,562,118.20 No suppporting documents
J.O # 2016-0062 C - 1,150,007.41
J.O # 2016-0063 C - 2,391,563.79
J.O # 2016-0093 C - 860,000.00
J.O # 2016-0094 C - 287,310.00
J.O # 2016-01157 T - 472,855.03
Annexes
121
Fund Source Project CV No. Date Particulars Amount Remarks
J.O # 2016-01158 T - 221,957.42
J.O # 2016-01159 T - 21,243.58
J.O # 2016-01160 T - 194,300.40
J.O # 2016-01161 T - 663,897.89
J.O # 2016-01162 T - 99,507.71
J.O # 2016-01163 T - 150,687.00
J.O # 2016-01164 T - 73,330.05
J.O # 2016-01165 T - 25,479.00
J.O # 2016-01166 T - 187,461.16
J.O # 2016-01167 T - 22,925.75
J.O # 2016-01168 T - 102,281.11
J.O # 2016-01169 T - 74,855.59
J.O # 2016-01170 T - 163,589.68
J.O # 2016-01171 T - 159,578.70
J.O # 2016-01172 T - 223,504.07
J.O # 2016-01173 T - 45,154.06
J.O # 2016-01174 T - 163,892.40
J.O # 2016-01176 T - 362,437.01
Unbilled Labor by Contractors
- 1,441,427.15
Unpaid Labor and Materials
- 8,136,303.44
Sub-Total unpaid transactions 19,257,667.60
Total Calamity Grant 26,309,518.88
Total Unsupported Transactions for SEP Subsidy and Calamity Grant 60,280,093.08
Total Unpaid Transactions/Payables (Part of the total) 36,462,155.69
CALAMITY LOAN
Calamity Loan 4,700,000.00 1303-00294 3/15/2013 CARAGA FILCHIN CORP. - DAVAO BRANCH
2,299,500.00 No supporting documents
Sub-Total Calamity 1st release 2,299,500.00
Calamity Loan
1st 62,732,500
1304-00174 4/16/2013 NTS ELECTRICAL SERVICES
251,347.03 No supporting documents 1304-00199 4/16/2013 JOHNBOYDMITZ
ELECTRICAL SERVICES
39,557.10
1302-00016 2/6/2013 NTS ELECTRICAL SERVICES
58,317.40 Bank statement only 1302-00080 2/12/2013 RENOL
ENGINEERING SERVICES AND CONSTRUCTION SUPPLY
17,372.60
1302-00087 2/13/2013 KILOVOLT,INC 122,746.66
1302-00132 2/14/2013 4G ENGINEERING SERVICES
93,664.91
1302-00164 2/15/2013 SANGREE INDUSTRIAL SALES
17,229.84
1302-00165 2/15/2013 NTS ELECTRICAL SERVICES
55,975.17
1302-00166 2/15/2013 RENOL ENGINEERING SERVICES AND CONSTRUCTION SUPPLY
20,018.03
1302-00167 2/15/2013 26,899.67
1302-00168 2/15/2013 63,136.61
Annexes
122
Fund Source Project CV No. Date Particulars Amount Remarks
1302-00169 2/15/2013 KILOVOLT,INC 63,645.47
1302-00170 2/15/2013 41,408.27
1302-00177 2/15/2013 SANGREE INDUSTRIAL SALES
127,763.72
1302-00178 2/15/2013 2,804.10
1302-00179 2/15/2013 MULTI-CURRENT ELECTRICAL TRADING SERVICES
94,256.13
1302-00181 2/15/2013 JOHNBOYDMITZ ELECTRICAL SERVICES AND SUPPLY
37,000.60
1302-00184 2/15/2013 118,511.55
1302-00185 2/15/2013 45,619.32
1302-00186 2/15/2013 NTS ELECTRICAL SERVICES
20,351.00
1302-00193 2/15/2013 41,520.42
1302-00234 2/28/2013 SANGREE INDUSTRIAL SALES
100,210.72
1304-00052 4/5/2013 NTS ELECTRICAL SERVICES
23,140.45
1304-00056 4/5/2313 ARISE AND BUILD ENGINEERING SERVICES
55,975.42
1304-00057 4/5/2013 4G ENGINEERING SERVICES
154,219.19
1304-00241 4/19/2013 BLACK AND WHITE CONSTRUCTION SUPP,
28,860.80
1304-00366 4/26/2013 4G ENGINEERING SERVICES
44,649.39
1305-00058 5/2/2013 KILOVOLT, INC 32,986.54
1306-00194 6/13/2013 JOHNBOYDMITZ ELECTRICAL SERVICES
92,055.47
Summary of Materials 51,281,637.42 Summary of materials only
Sub-Total Calamity 2nd release 53,172,881.00
Calamity Loan
2nd 62,732,500
1308-00095 8/12/2013 MINDANAO LEADER CABLE SUPPLY, INC.
108,365.47 No supporting documents 1308-00068 8/12/2013 NTS ELECTRICAL
SERVICES 139,125.80
1310-00279 10/17/2013 RENOL ENGINEERING SERVICES
6,844.71
1311-00188 11/14/2013 JOHNBOYDMITZ ELECTRICAL SERVICES
11,201.17
1402-00134 2/6/2014 MULTI - CURRENT ELECTRICAL TRADING SERVICES
70,911.17
1305-00101 5/6/2013 DASURECO 1,173,200.00
1308-00040 8/7/2013 KUPLER INDUSTRIES, INC.
12,766,053.03
1308-00044 8/7/2013 MINDANAO LEADER CABLE SUPPLY, INC.
71,844.16
1308-00045 8/7/2013 E AND CON RESOURCES GROUP, INC.
241,430.95
1308-0094 8/7/2013 Davao Poles Marketing and Construction
486,160.71
Annexes
123
Fund Source Project CV No. Date Particulars Amount Remarks
1308-00097 8/12/2013 TULIO CONSTRUCTION SERVICES AND SUPPLY
130,896.97
1308-00098 8/12/2013 MINDANAO LEADER CAM l SUPPLY, INC.
494,616.25
1308-00099 8/12/2013 CARAGA FILCHIN CORPORATION
742,708.93
1308-00100 8/12/2013 SOCOTECO 1 1,143,000.00
1308-00103 8/12/2013 KUPLER INDUSTRIES, INC
2,231,123.35
1308-00104 8/12/2013 SANGREE TRADING AND ELECTRICAL SUPPLY
113,378.57
1308-00105 8/12/2013 CENTRADE INTEGRATED SALES CORP.
628,220.36
1308-00106 8/12/2013 CARAGA FILCHIN CORPORATION
11,295,276.75
1308-00114 8/12/2013 METER KING INCORPORATED
1,216,086.27
1308-00238 8/22/2015 MEDCO TECHNICAL SERVICES AND ELECTRICAL SUPPLY
4,291,903.21
1308-00239 8/22/2015 MINDANAO LEADER CABLE SUPPI Y, INC
66,707.04
1309-00023 9/5/2015 KUPLER INDUSTRIES, INC.
23,476.50
1309-00024 9/23/2015 MINDANAO LEADER CABLE SUPPLY, INC
68,899.29
1309-00083 9/23/2015 4G ENGINEERING SERVICES
17,441.94
1309-00236 9/23/2015 MINDANAO LEADER CABLE SUPPLY, INC.
33,617.14
1309-00257 9/25/2015 NOVECIO ELECTRICAL SERVICES
11,865.81
1310-00261 10/18/2015 METER KING INCORPORATED
991,071.43
1310-00262 10/18/2015 520,312.50
1310-00263 10/21/2015 520,312.50
1310-00264 10/21/2015 MINDANAO LEADER CABLE SUPPLY, INC.
119,010.92
1310-00265 10/21/2015 KUPLER INDUSTRIES, INC.
1,942,500.00
1310-00329 10/23/2015 SOCOTECO II 1,183,000.00
1310-00330 10/23/2015 KUPLER INDUSTRIES, INC
78,397.71
1310-00331 10/23/2015 JOHNBOYDMITZ ELECTRICAL SERVICES AND SUPPLY
62,874.90
1311-00185 11/15/2015 DAVAO POLES MARKETING AND CONS1RUCTION
2,081,250.59
1311-00369 11/29/2015 CARAGA FILCHIN CORPORATION
1,288,392.86
1311-00365 12/2/2015 MULTI - CURRENT 25,506.54
Annexes
124
Fund Source Project CV No. Date Particulars Amount Remarks
ELECTRICAL TRADING
1403-00318 ? DAVAO POLES MARKETING AND CONSTRUCTION
308,080.50
1403-00319 ? METER KING INCORPORATED
319,620.54
1306-00243 6/18/2013 GILBERT ROLAND M. ESTOQUE
10,500.00
1308-00101 8/12/2013 EDNA F. ANTIA 25,460.00
1308-00102 8/12/2013 BERNIE F. LANDA 3,900.00
1308-00188 3/15/2013 ALEX DUMADAG 8,190.00
1308-00226 3/19/2015 DANECO
5,000.00
1309-00048 9/5/2015 314,942.96
1308-00094 8/12/2013 DAVAO POLES MARKETING AND CONSTRUCTION SERVICES
486,160.71 Bank statement only
1308-00083 8/12/2013 RT TRAJERA CONSTRUCTION AND SUPPLY
57,098.03
1308-00086 8/12/2013 WABE ELECTRICAL SERVICES AND SUPPLY
212,990.30
1308-00087 8/12/2013 ARISE AND BUILD ENGINEERING SERVICES
18,091.50
1308-00088 8/12/2013 SARONA ENTERPRISES
280,091.43
1308-00095 8/12/2013 GREENWORLD CONSTRUCTION SUPPLIES AND ALLIED SERVICES
262,779.46
1308-00171 8/13/2013 BLACK AND WHITE CONSTRUCTION
52,597.11
1308-00172 8/13/2013 JR AND 0 ELECTRICAL SERVICES
34,017.65
1308-00173 8/13/2013 MEDCO TECHNICAL SERVICES AND ELECTRICAL SUPPLY
170,386.09
1308-00174 8/13/2013 106,050.83
1308-00175 8/13/2013 165,873.00
1308-00176 8/13/2013 WABE ELECTRICAL SERVICES AND SUPPLY
93,701.11
1308-00236 8/19/2013 115,438.67
1309-00079 9/11/2013 MULTI - CURRENT ELECTRICAL TRADING SERVICES
175,638.08
1309-00080 9/11/2013 81,933.55
1309-00081 9/11/2013 159,843.02
1309-00221 9/20/2013 MEDCO TECHNICAL SERVICES AND ELECTRICAL SUPPLY
94,610.50
1309-00258 9/25/2013 GREENWORLD CONSTRUCTION SUPPLIES AND ALLIED SERva. ES
117,443.69
1309-00220 9/25/2013 MEDCO TECHNICAL SERVICES AND ELECTRICAL SU PPI
232,634.22
Annexes
125
Fund Source Project CV No. Date Particulars Amount Remarks
1311-00001 11/5/2013 MINDANAO LEADER CABLE SUPPLY, INC.
225,660.46
1311-00161 11/14/2013 58,081.86
1311-00179 11/14/2013 JOHNBOYDMITZ ELECTRICAL SERVICES
8,997.56
1311-00181 11/14/2013 NTS ELECTRICAL SERVICES
102,363.91
1311-00182 11/14/2013 5,634.40
1311-00183 11/14/2013 31,899.46
1311-00269 11/14/2013 4G ENGINEERING SERVICES
72,217.11
1312-00078 12/4/2013 MINDANAO LEADER CABLE SUPPLY, INC.
319,523.21
1312-00079 12/4/2013 MULTI - CURRENT ELECTRICAL TRADING SERVICES
17,994.21
1312-00080 12/4/2013 5,901.91
1312-00082 12/4/2013 26,360.75
1312-00122 12/6/2013 59,610.50
1312-00081 12/6/2013 1,421.96
1312-00284 12/23/2013 GREENWORLD CONSTRUCTION SUPPLIES AND ALLIED SERVICES
268,277.13
1312-00280 12/23/2013 MULTI - CURRENT ELECTRICAL TRADING SERVICES
10,231.72
1312-00283 12/23/2013 SANGREE INDUSTRIAL SALES
72,571.84
1312-00282 12/23/2013 49,440.00
1312-00286 12/23/2013 MINDANAO LEADER CABLE SUPPLY, INC.
64,423.96
1312-00285 12/23/2013 WABE ELECTRICAL SERVICES AND SUPPLY
416,994.92
1312-00411 12/23/2013 IBO CALTEX FILLING 7,813.61
1401-00198 1/17/2014 MINDANAO LEADER CABLE SUPPLY, INC.
170,107.12
1401-00199 1/17/2014 NTS ELECTRICAL SERVICES
65,947.23
1403-00413 3/26/2014 DAVAO CONTRACTORS DEVELOPMENT COOPERATIVE
28,846.61
1403-00414 3/26/2014 KUPLER INDUSTRIES, INC
66,351.85
1403-00415 3/26/2014 30,101.96
1403-00416 3/26/2014 RT TRAJERA CONSTRUCTION AND SUPPLY
56,716.14
1404-00021 4/2/2014 MINDANAO LEADER CABLE SUPPLY, INC.
63,626.79
1404-00022 4/2/2014 84,736.61
1404-00023 4/2/2014 5,363.38
1404-00024 4/2/2014 2,118.42
1404-00025 4/2/2014 CENTRADE INTEGRATED SALES COPRORAT ION
42,368.30
1404-00026 4/2/2014 MEGA POWER CONSTRUCT ION
88,899.11
1404-00216 4/11/2014 GREENWORLD CONSTRUCTION
28,288.59
Annexes
126
Fund Source Project CV No. Date Particulars Amount Remarks
SUPPLIES AND ALLIED SERVICES
1311-00366 11/29/2013 MULTI - CURRENT ELECTRICAL TRADING
103,609.12
1311-00367 11/29/2013 MINDANAO LEADER CABLE SUPPLY, INC.
98,760.25
1311-00368 11/29/2013 METER KING INCORPORATED
495,535.71
1312-00004 12/2/2013 MULTI - CURRENT ELECTRICAL TRADING
29,484.61
1312-00005 12/2/2013 755.32
1312-00006 12/2/2013 32,315.80
1312-00013 12/2/2013 2,983.00
1401-00319 1/29/2013 MINDANAO LEADER CABLE SUPPLY, INC.
74,806.07
1403-00309 3/19/2014 JOHNMAEJEM ELECTRICAL SALES AND SERVICES
32,854.02
1403-00310 3/19/2014 MINDANAO LEADER CABLE SUPPLY, INC.
9,867.75
1403-00311 3/19/2014 30,919.50
1403-00312 3/19/2014 MEGA POWER CONSTRUCTION
9,655.02
1403-00313 3/19/2014 60,356.25
1403-00314 3/19/2014 89,196.43
1403-00315 3/19/2014 KUPLER INDUSTRIES, INC.
407,945.53
1403-00316 3/19/2014 SANGREE TRADING AND ELECTRICAL SUPPLY
49,126.42
1403-00317 3/19/2014 4,840.49
1403-00320 3/19/2014 CENTRADE INTEGRATED SALES CORP.
118,988.04
Sub-Total Calamity 3rd release P54,520,950.37
Total Unsupported transactions charged to Calamity Loan P109,993,331.37
Total Unsupported transactions P170,273,424.45
Payables/Unpaid transactions (Part of the total) P36,462,155.69
Annex E: Detailed breakdown of transactions which were used as liquidation twice in the
AOF Fund
Source Nature of Expenses AOF Reference Check Voucher
Remarks No. Date Amount
Calamity Loan- 3rd release (2nd 62M)
For partial payment of labor on rehabilitation of three phase line construction at Valma, Compostela Comval Province (W.O# 593-0133-13) as per attachement
1306-00273 6/20/2013 P142,392.46 Full amount also charged to Calamity Loan 2nd release (1st 62M)
For full payment of labor on rehabilitation of three phase line construction at Poblacion to Cnetennial, Compostela Comval (W.O# 593-013-4) as per attachment
1306-00274 6/20/2013 30,761.92 Full amount also charged to Calamity Loan 2nd release (1st 62M)
Annexes
127
Fund Source Nature of Expenses
AOF Reference Check Voucher Remarks
No. Date Amount
Full payment of labor on rehabilitation of three phase line construction at Cabadianan to Antiquera, Nabunturan Comval (WO# 593-0135-6).
1306-00275 6/20/2013 39,437.95 Full amount also charged to Calamity Loan 2nd release (1st 62M)
For partial payment of labor on single phase line construction at Tamia to Pilar, Mangayon, Compostela (W.O# 593-0133-19) as per attachment
1306-00305 6/24/2013 68,277.89 Full amount also charged to Calamity Loan 2nd release (1st 62M)
For payment of mobilization (40%) on single phase line construction at Datu Davao, Laak, Comval as per Work Order NO. 13-5130-08
1401-00070 12/23/2013 1,023,982.14 Full amount also charged to 2012 BLEP Datu Davao, Laak
1308-0094 8/7/2013 486,160.71 Appeared twice in the AOF.
Sub-Total 1,791,013.07
2012 BLEP - 3 BRGYS.
FUEL AND OIL CV1407-00382 7/17/2014 1,350.00 Already chargeable to 2013 SEP Additional-2 Sitios
Sub-Total 1,350.00
2012 SEP - BATCH 2 - 8 SITIOS
TRANSPORTATION CV1403-00462 3/28/2014 1,234.75 Already charged to 2012 SEP-5 Sitios
Sub-Total 1,234.75
2013 SEP - 9 Sitios
Transportation CV1403-00463 3/28/2014 2,124.00 Already charged to 2012 SEP-5 Sitios
Sub-Total 2,124.00
2013 SEP - BATCH 1 - 2 SITIOS
FUEL AND OIL CV1406-00380 6/25/2014 3,401.30 Already charged to 2013 SEP Additional-5 Sitios and 2013 SEP Additional-23 Sitios
FUEL AND OIL CV1409-00118 9/1/2014 120.37 Already charged to 2013 SEP-2 Sitios, Sitio Mesolong, Sto. Nino, Talaingod
Sub-Total 3,521.67
2013 SEP – BATCH 1 – 20 SITIOS
ELECTRICAL MATERIALS CV1402-00313 2/21/2014 55,301.79 Already charged to Purok 6 to 7, New Bantayan Already charged to 2013 SEP-2 Sitios
FUEL AND OIL CV1404-00419 4/28/2014 2,327.89
FUEL AND OIL CV1404-00423 4/28/2014 168.15 Already charged to 2012 BLEP-Barangays
FUEL AND OIL CV1406-00172 6/10/2014 337.35 Already charged to 2013 SEP-2 Sitios
FUEL AND OIL CV1408-00159 8/8/2014 1,300.70 Already charged to 2013 SEP-2 Sitios
FUEL AND OIL CV1409-00311 9/16/2014 260.16 Already charged to 2013 SEP-2 Sitios
PERFORMANCE BOND AND RETENTION 10%
CV1503-00081 3/6/2015 172,420.37 Already charged to 2014 SEP-55 Sitios, Purok 12, Andap, New Bataan
Sub-Total 232,116.41
2013 SEP - Batch 1 - 22 Sitios
Transportation CV1401-00100 11/8/2013 5,288.14 Already charged to P-1 to P-7, Pangutusan, Nabunturan
Transportation CV1402-00343 2/20/2014 2,900.76 Already charged to VGHOAI, Villarica, Babak Transportation CV1402-00344 2/20/2014 277.40
Transportation CV1403-00030 3/15/2014 6,999.10 Already charged to 2012 SEP-8 Sitios and 2013 SEP-9 Sitios
Transportation CV1406-00014 6/2/2014 601.56 Already charged to Calamity Grant
Housewiring Materials CV1406-00391 6/25/2014 12,615.50 Already charged to 2013 SEP-22 Sitios, P-2, New Leyte, Maco and to P-9 to P-6, Manat, Nabunturan
Line construction materials CV1410-00099 10/3/2014 41,910.00 Already charged to 2013 SEP-22 Sitios, P-6 Esperat Area, San Vicente, Mambago, IGACOS
Annexes
128
Fund Source Nature of Expenses
AOF Reference Check Voucher Remarks
No. Date Amount
Electrical Materials CV1410-00100 10/3/2014 66,480.00 Already charged to 2013 SEP-22 Sitios, VGHOAI, Villarica, Babak, IGACOS
Electrical Materials CV1410-00109 10/3/2014 66,480.00 Already charged to 2013 SEP-22 Sitios, Sitio Proper going to Pumphouse, Kanaan, Kaputian, IGACOS
Electrical Materials CV1410-00113 10/3/2014 73,020.00 Already charged to 2013 SEP-22 Sitios, P-6 to P-7, Cogon
Electrical Materials CV1410-00114 10/3/2014 28,930.00 Already charged to 2013 SEP-22 Sitios, P-6 Esperat Area
Electrical Materials CV1410-00234 10/10/2014 390.00 Already charged to 2013 SEP-22 Sitios, P7, Cogon, Babak, IGACOS
Electrical Materials CV1410-00236 10/10/2014 6,930.00 Already charged to 2013 SEP-22 Sitios, P-1 to P-7, Pangutusan
Electrical Materials CV1410-00238 10/10/2014 2,570.00 Already charged to 2013 SEP-22 Sitios, P-6 Esperat Area, San Vicente Mambago, Penaplata, IGACOS
Electrical Materials CV1410-00239 10/10/2014 6,930.00 Already charged to 2013 SEP-22 Sitios, VGHOAI, Villarica, Babak, IGACOS
Electrical Materials CV1410-00241 10/10/2014 35,040.00 Already charged to 2013 SEP-22 Sitios, Ninja 1 and 3
Sub-Total 357,362.46
2013 SEP Additional - 12 sitios
TRANSPORTATION CV1411-00044 11/4/2014 1,856.88 Already charged to 2013 SEP-22 Sitios, Purok 2, New Leyte, Maco
PUBLICATION CV1411-00139 11/12/2015 15,284.64 Already charged to 2013 SEP Additional-12 Sitios, Purok 2, San Roque, Nabunturan
Sub-Total 17,141.52
2013 SEP Additional - 2 sitios
Meals CV1310-00363 10/24/2013 5,000.00 Already charged to 2012 SEP Batch 2 - 5 Sitios
Sub-Total 5,000.00
2013 SEP Additional - 23 sitios
TRANSPORTATION CV1405-00310 5/20/2014 3,083.25 Already charged to 2012 SEP-5 Sitios.
Electrical materials CV1406-00006 6/2/2014 100,924.00 Already charged to 2013 SEP Additional, Purok Atis
Transportation CV1406-00344 6/25/2014 125.70 Already charged to 2013 SEP Additional-23 Sitios, Purok Tugas, Saranga
Electrical materials CV1410-00103 10/3/2014 2,881.90 Already charged to 2013 SEP Additional-23 Sitios, P-1 (Brgy. Site), Rizal, Monkayo
Electrical Materials CV1410-00104 10/3/2014 13,997.80 Already charged to 2013 SEP Additional-23 Sitios, Purok 4, Awao, Monkayo
Electrical materials CV1410-00110 10/3/2014 23,635.20 Already charged to 2013 SEP-23 Sitios, Purok 6, Magasm Tubo-tubo, Monkayo
Electrical materials CV1410-00111 10/3/2014 11,817.60 Already charged to 2013 SEP Additional-23 Sitios, Purok 7, Palo, Haguimitan, Monkayo
Transportation CV1410-00158 10/8/2014 5,635.50 Already charged to 2013 SEP Additional-23 Sitios, Purok Gumamela, Bagong Silang, Maragusan and 2013 SEP-9 Sitios
Line construction materials MCT14-1409-070
9/22/2014 20,356.00 Already charged to 2013 SEP Additional-23 Sitios, Purok 2, Upper Ulip, Monkayo
Sub-Total 182,456.95
2013 SEP Additional - 5 sitios
Transportation CV1411-00350 11/24/2014 352.10 Already charged to 2013 SEP Additional-5 Sitios, Purok 6, Sawangan, Mawab
DANECO CV1507-00123 7/2/2015 95,518.69 Already charged to 2013 SEP Additional-
Annexes
129
Fund Source Nature of Expenses
AOF Reference Check Voucher Remarks
No. Date Amount
23 Sitios.
Distribution Transformer 15kva MCT14-1411-367
11/26/2014 52,200.00 Already charged to 2013 SEP Additional-5 Sitios, P-1, Malinawon
Sub-Total 148,070.79
2014 SEP-55 Sitios
Transportation 3/31/2014 560.70 Already charged to 2013 SEP-2 Sitios
Sub-Total 560.70
Total P2,741,952.32
Annex F: Detailed Breakdown of Unliquidated Subsidy for SEP Projects
Item No.
Project Location Fund Source
NEA Approved Amount
Amount Recieved
Project Status
Sitio Barangay City/Municipality Completed Energized
1 Prk. 5 Bulman Naboc Monkayo
2013 SEP
467,895.52 0 Not implemented
2 Prk. 6 Babag Monkayo 785,416.19 706,874.57 1/31/2014 2/18/2014
3 Prk. 7 Pasian Monkayo 1,315,958.69 1,184,362.82 2/17/2014 2/19/2014
4 Prk. 5 New Visayas Montevista 347,938.69 313,144.82 11/5/2013 11/5/2013
5 Prk. 7 Concepcion Montevista 799,092.31 719,183.08 11/15/2013 2/11/2014
6 Prk. 1 Ngan Compostela 122,160.95 109,944.86 1/29/2014 1/29/2014
7 Prk. Vanda Bagong Silang Maragusan 519,365.38 467,428.84 2/1/2014 2/15/2014
8 Prk. Azucena Bagong Silang Maragusan 152,659.06 137,393.15 11/14/2013 1/27/2014
9 P. Santol Riverside
Talian Maragusan 664,878.94 598,391.05 2/18/2014 2/26/2014
9 Sub-Total 5,175,365.73 4,236,723.19
1 Sitio Ninja-1 Mascaraeg Mabini
2013 SEP
785,670.35 707,103.32 12/8/2013 2/22/2014
2 Sitio Ninja-2 Mascaraeg Mabini 12/8/2013 2/22/2014
3 Purok Tuburan Mascaraeg Mabini 460,770.76 414,693.68 12/8/2013 2/22/2014
4 Prk.-1 to Prk.-3 Araibo Pantukan 124,643.83 112,179.45 11/15/2013 2/19/2014
5 Purok-4 New Leyte Maco 379,438.62 341,494.76 11/16/2013 2/25/2014
6 Purok-2 New Leyte Maco 262,897.21 236,607.49 11/16/2013 2/25/2014
7 Purok-3 Lumangang
New Leyte Maco 409,241.74 368,317.57 11/14/2013 2/25/2014
8 Purok-3 Dauis Nabunturan 223,020.89 200,718.80 10/19/2013 1/25/2014
9 Purok-3 Basak Nabunturan 192,293.82 173,064.44 11/4/2013 2/19/2014
10 Prk.-1 to Prk.-7 Pangutusan Nabunturan 578,507.64 520,656.88 2/1/2014 2/1/2014
11 Purok-4 Dauis Nabunturan 559,908.95 503,918.06 10/21/2013 2/11/2014
12 Purok-6 Basak Nabunturan 610,235.02 549,211.52 10/19/2013 11/4/2013
13 Purok-7 Basak Nabunturan 241,623.44 217,461.10 10/31/2013 2/10/2014
14 Prk.-9 to Prk.-6 Manat Nabunturan 325,352.94 292,817.65 11/1/2013 2/21/2014
15 Purok-3 Magsaysay Nabunturan 1,452,737.46 1,307,463.71 10/19/2013 1/25/2014
16 Purok-17 Bantilan Subd.
Poblacion Nabunturan 126,031.79 113,428.61 1/28/2014 1/28/2014
17 Prk. Kindaraan Mascaraeg Mabini 253,395.76 228,056.18 11/5/2013 1/28/2014
18 Prk-6 to Prk-7 Cogon Babak IGACOS 602,118.96 541,907.06 1/21/2014 2/22/2014
19 Prk-6 Esperat Area
San Vicente Mambago
Penapalta IGACOS
639,592.59 575,633.33 12/11/2013 2/5/2014
20 Prk-6 Mambago Babak IGACOS 496,665.55 446,999.00 * *
21 VGHOI Villarica Babak IGACOS 378,366.07 340,529.46 11/19/2013 12/19/2013
22 So Proper (going to Pump
Kanaan Kaputian IGACOS
419,395.23 377,455.71 * *
Annexes
130
Item No.
Project Location Fund Source
NEA Approved Amount
Amount Recieved
Project Status
Sitio Barangay City/Municipality Completed Energized
House)
22 Sub-Total 9,521,908.62 8,569,717.76
1 P1 Pob. Monkayo Monkayo
2013 SEP Additional
319,825.28 0 Not implemented
2 P7 Palo Haguimitan Monkayo 619,543.42 557,589.08 7/23/2014 *
3 P2 Upper Ulip Monkayo 913,745.59 822,371.03 7/4/2014 12/8/2014
4 P1 Brgy. Site Rizal Monkayo 245,212.07 220,690.86 7/15/2014 *
5 P6 Magas Tubo-tubo Monkayo 646,975.00 582,277.50 2/11/2015 4/18/2015
6 P4 Awao Monkayo 1,724,040.81 1,551,636.73 9/6/2014 12/13/2014
7 P2 Tubo-tubo Monkayo 732,783.44 659,505.10 7/15/2014 *
8 Prk. Moda Liboton
Pob. Monkayo 401,979.10 361,781.19 5/28/2014 *
9 P10 Upper Ulip Monkayo 621,821.42 559,639.28 10/23/2014 2/16/2015
10 P2 Kahayag Prosperidad Montevista 1,092,574.78 983,317.30 6/24/2014 11/27/2014
11 P5 Mayaon Montevista 123,736.19 11,362.57 6/7/2014 10/4/2014
12 P6 Mayaon Montevista 1,156,719.82 1,041,047.84 1/6/2015 *
13 P6 Banag-banag Montevista 148,042.76 133,238.48 5/21/2014 *
14 P3A Mapaso New Bataan 570,093.73 513,084.36 6/11/2014 *
15 P4 Batinao New Bataan 695,871.33 626,284.20 10/23/2014 *
16 P5 and 5A Bagongon Compostela 440,343.42 396,309.08 5/19/2014 10/11/2014
17 Prk. Rizal Coronobe Maragusan 315,670.99 284,103.89 5/22/2014 12/17/2014
18 Prk. Ipil ipil Tupas Maragusan 1,504,243.36 1,353,819.02 6/10/2014 12/18/2014
19 Prk. Acacia Lahi Maragusan 893,832.92 804,449.63 8/22/2014 12/18/2014
20 Prk. Tugas Saranga Maragusan 410,683.11 369,614.80 5/22/2014 12/19/2014
21 Prk. Atis Saranga Maragusan 851,187.49 766,068.74 5/21/2014 12/19/2014
22 Prk. Gumamela Bagong Silang Maragusan 365,187.14 328,668.43 7/18/2014 12/16/2014
23 Prk. Sampauita Bagong Silang Maragusan 203,844.85 183,460.37 5/27/2014 12/16/2014
23 Sub-Total 14,997,958.02 13,210,319.47
1 Prk. 7 to Prk. 4 So. Pawcon
New Cebulan Montevista
2013 SEP Additional
723,289.82 506,302.87 11/11/2014 *
2 Prk. 17 Salvacion
Ngan Compostela 401,796.05 281,257.24 8/27/2014 *
3 Prk. Aguila Mapawa Maragusan 586,400.06 410,480.04 6/23/2014 12/17/2014
4 Prk. 4 to Prk. 5 So. Pawcon
New Cebulan Montevista 418,676.83 293,073.78 12/2/2014 *
5 Prk. 5 Batibao New Bataan 328,644.16 230,050.91 8/22/2014 *
6 Prk. 6 Babag Monkayo 754,534.52 528,174.16 * *
6 Sub-Total 3,213,341.44 2,249,339.01
1 So. Maduaw Concepcion Maco
2013 SEP Additional
3,162,337.79 2,846,104.01 5/26/2014 7/14/2014
2 P. Rancho Mapaang Maco 9/17/2014 10/8/2014
3 Prk 5, Granada Compound
oncepcion Maco 9/17/2014 10/8/2014
3 Sub-Total 3,162,337.79 2,846,104.01
1 Prk. 1 Malinawon Mawab
2013 SEP Additional
3,505,205.21 3,154,684.69 8/30/2014 12/23/2014
2 Prk. 4 Sawangan Mawab 1,586,784.20 1,428,105.78 8/30/2014 11/28/2014
3 Prk. 5 Sawangan Mawab 852,021.06 766,818.95 9/17/2014 11/28/2014
4 Prk. 6 Sawangan Mawab 918,018.29 826,216.46 7/30/2014 11/28/2014
5 So. Sarog (Area 1, 2 3)
Napnapan Pantukan 13,144,502.81 11,830,052.53 2/2/2015 4/1/2015
5 Sub-Total 20,006,531.57 18,005,878.41
1 Prk. 5 Sanghay Golden Valley Mabini 2013 SEP Additional
652,416.21 587,174.59 2/21/2015 5/28/2015
2 Prk. 2 San Roque Nabunturan 1,079,878.53 971,890.68 10/23/2014 11/21/2014
Annexes
131
Item No.
Project Location Fund Source
NEA Approved Amount
Amount Recieved
Project Status
Sitio Barangay City/Municipality Completed Energized
3 Prk. 5 to Prk. 1 Sta. Maria Nabunturan 1,158,379.43 1,042,541.49 11/29/2014 *
4 Prk. 2 New Sibonga Nabunturan 836,241.92 752,617.73 11/27/2014 *
5 Prk. 8 New Sibonga Nabunturan 2,055,416.31 1,849,874.68 12/10/2014 *
6 Prk. 4 New Sibonga Nabunturan 1,622,732.05 1,460,458.85 12/17/2014 4/21/2015
7 Prk. 3B New Sibonga Nabunturan 585,404.42 526,863.98 12/21/2014 *
8 Prk. 3 Matilo Nabunturan 706,341.64 635,707.48 6/25/2015 *
9 Prk. 5 Matilo Nabunturan 639,628.38 575,665.54 4/8/2015 *
10 Prk. 4 Cabacungan Nabunturan 528,160.39 475,344.35 1/29/2015 *
11 Prk. 3 Bongabong Pantukan 981,454.28 883,308.85 2/10/2015 *
12 Prk. 9 Tambongon Pantukan 426,980.62 384,282.56 4/25/2015 *
12 Sub-Total 11,273,034.18 10,145,730.76
1 So Boringot to So Palo
Napnapan Pantukan
2014 SEP
2,195,500.42 1,975,950.38 11/17/2014 2/2/2015
2 So Diat Palo, Napnapan to So Panganason
Kingking Pantukan 3,100,651.51 2,790,586.36 11/17/2014 2/2/2015
3 Prk 8, Pinakan Tagdanua Pantukan 503,381.73 453,043.56 11/17/2014 6/9/2015
4 Prk 7, Malanlangon
Tagdanua Pantukan 483,463.87 435,117.48 11/17/2014 6/27/2015
5 Prk Tapis to Prk Maitom
Tambongon Pantukan 1,873,252.41 1,685,927.17 11/17/2014 6/24/2015
6 Pob Laak to Barubo
Montevista Montevista 2,905,150.46 2,614,635.41 11/17/2014 7/25/2015
7 Prk 2 Basak Nabunturan 1,363,110.67 1,226,799.60 11/17/2014 3/2/2015
8 Prk 2A Cabidianan Nabunturan 1,011,931.59 910,738.43 11/17/2014 6/30/2015
9 Prk 4B Penaplata IGACOS 1,398,109.91 1,258,298.92 12/16/2014 *
10 Prk 5 Cogonon New Bataan 1,607,919.90 1447,127.91 11/17/2014 2/11/2015
11 Prk 5 Cabinuangan New Bataan 1,144,889.72 1,030,400.75 11/17/2014 10/6/2015
12 Prk 12 Andap New Bataan 2,084,547.36 1,876,092.62 11/17/2014 6/20/2015
13 Prk 4 Cogonon New Bataan 493,740.19 444,366.17 11/17/2014 3/16/2015
14 Prk 4 Magsaysay New Bataan 807,766.17 726,989.55 11/17/2014 1/11/2015
15 Prk 7 Naboc Monkayo 898,103.15 808,292.84 11/17/2014 2/13/2015
16 Prk 6 Olaycon Monkayo 601,005.12 540,904.61 11/17/2014 6/30/2015
17 Prk 3 Olaycon Monkayo 853,794.57 768,415.11 11/17/2014 1/14/2015
18 Prk 7 Poblacion Monkayo 2,232,477.52 2,009,229.77 11/17/2014 10/2/2015
19 Prk 13 Poblacion Monkayo 1,207,936.40 1,087,142.76 11/17/2014 9/25/2015
20 Prk 7 Salvacion Monkayo 1,556,252.14 1,400,626.93 11/17/2014 10/1/2015
21 Prk 8 Salvacion Monkayo 1,151,463.94 1,036,317.55 11/17/2014 10/1/2015
22 Prk Paco San Jose Monkayo 2,171,710.58 1,954,539.52 11/17/2014 8/31/2015
23 Prk 3A, Via Caritas Et Vita Comm.
Babag Monkayo 857,857.95 772,072.16 11/17/2014 1/8/2015
24 Prk 6A, Caritas Shelter Village
Babag Monkayo 1,311,402.45 1,180,262.21 11/17/2014 8/15/2015
25 Prk 3A, Gabanan
Baylo Monkayo 1,005,396.49 904,856.84 11/17/2014 3/13/2015
26 Prk 6 to Prk 11 to Prk 12
Casson Monkayo 3,387,461.59 3,048,715.43 11/17/2014 7/25/2015
27 Prk 13 Casoon Monkayo 722,714.79 650,443.31 11/17/2014 7/31/2015
28 Kabangkalan to Prk 14 to Kapatagan to Prk 18 New
Casoon Monkayo 4,800,604.42 4,320,543.98 11/17/2014 9/4/2015
Annexes
132
Item No.
Project Location Fund Source
NEA Approved Amount
Amount Recieved
Project Status
Sitio Barangay City/Municipality Completed Energized
Kapatagan
29 Prk. 2, Valencia New Alegria Compostela 360,758.08 324,682.27 11/17/2014 12/21/2014
30 Prk. 1 (Sanchez) Marapat Compostela 1,177,981.68 1,060,183.51 11/17/2014 6/30/2015
31 Prk. 1 (Javillana) Marapat Compostela 1,261,985.07 1,135,786.56 11/17/2014 4/9/2015
32 Prk Narra Mapawa Maragusan 1,355,895.73 1,220,306.16 11/17/2014 8/9/2015
33 Prk. Kauswagan Mapawa Maragusan 858,389.82 772,550.84 11/17/2014 7/31/2015
34 Prk Mahayag Mapawa Maragusan 967,767.70 870,990.93 11/17/2014 7/24/2015
35 Prk Pag-Asa Mauswagon Maragusan 940,668.62 846,601.76 11/17/2014 2/23/2015
36 Prk Lubi Mauswagon Maragusan 806,933.95 726,240.56 11/17/2014 7/21/2015
37 Prk Atis Mauswagon Maragusan 416,502.75 374,852.48 11/17/2014 1/27/2015
38 Prk 1 to Prk 4 to Prk 6
Lebanon Montevista 2,610,054.77 2,349,049.29 11/17/2014 6/10/2015
39 Prk 1B New Bantayan Asuncion 595,396.03 535,856.43 11/17/2014 7/30/2015
40 Prk Daisy Bingcungan Tagum 143,271.34 128,944.21 11/17/2014 1/6/2015
41 Prk Diamante Bingcungan Tagum 923,080.08 830,772.07 11/17/2014 5/16/2015
42 Prk Manga Bingcungan Tagum 449,689.33 404,720.40 11/17/2014 1/6/2015
43 Prk. Gumamela Bingcungan Tagum 527,705.60 474,935.04 11/17/2014 1/6/2015
44 Prk Lansones Pandapan Tagum 954,927.62 859,434.86 11/17/2014 6/25/2015
45 Prk Manga Pandapan Tagum 310,302.38 279,272.14 11/17/2014 1/13/2015
46 Prk 1A Madaum Tagum 538,633.90 484,770.51 11/17/2014 1/10/2015
47 Prk Cogon Visayan Village Tagum 291,107.16 261,996.44 11/17/2014 1/6/2015
48 Prk Kahayag Visayan Village Tagum 747,282.34 672,554.11 11/17/2014 6/4/2015
49 Prk 3, RTU Relocation Site Tagum 2,311,661.74 2,080,495.57 11/17/2014 6/26/2015
50 Prk 2 Del Monte Corella 1,210,437.11 1,089,393.40 11/17/2014 3/17/2015
51 Prk 3 Patrocenio New Corella 1,786,559.19 1,607,903.27 11/17/2014 2/28/2015
52 So New Mangga Pinamuno San Isidro 440,407.57 396,366.81 11/17/2014 1/7/2015
53 So Saraban Pinamuno San Isidro 1,793,272.58 1,613,945.32 11/17/2014 10/21/2015
54 Prk 5 Patrocenio New Corella 1,142,129.49 1,027,916.54 11/17/2014 1/24/2015
55 Prk 16 Camanlangan New Bataan 1,506,691.85 1,356,022.67 11/17/2014 1/31/2015
55 Sub-Total 70,161,090.50 63,144,981.45
135 Total 137,511,567.85 122,408,794.06
Note: * - No project status reported by NEA
Annex G: Detailed breakdown of items (kwh meters and meter bases) not forming part of
housewiring materials.
Fund Source Project Check Voucher
No. Date Payee Nature Amount
SEP 2013 Additional
5 sitios 1501-00428 1/27/2015 EDMI Philippines, Inc. electronic meters
P60,200.00
5 sitios 1501-00429 1/27/2015 60,200.00
5 sitios 1501-00433 1/27/2015 45,150.00
5 sitios 1501-00434 1/27/2015 52,675.00
12 sitios 1507-00233 7/13/2015 52,780.00
12 sitios 1507-00240 7/13/2015 45,240.00
12 sitios 1507-00241 7/13/2015 30,160.00
12 sitios 1507-00242 7/13/2015 52,780.00
12 sitios 1507-00243 7/13/2015 45,240.00
12 sitios 1507-00244 7/13/2015 45,240.00
Annexes
133
Fund Source Project Check Voucher
No. Date Payee Nature Amount
12 sitios 1507-00257 7/13/2015 15,080.00
12 sitios 1507-00263 7/13/2015 60,320.00
12 sitios 1507-00264 7/13/2015 19,604.00
2014 SEP 55 sitios CV#1505-00446 7/13/2015 45,240.00
55 sitios CV#1506-00236 6/9/2015 48,360.00
55 sitios CV#1506-00237 6/9/2015 48,360.00
55 sitios CV#1506-00238 6/9/2015 44,330.00
55 sitios CV#1506-00239 6/9/2015 28,210.00
55 sitios CV#1506-00240 6/9/2015 48,360.00
55 sitios CV#1506-00241 6/9/2015 24,180.00
55 sitios CV#1506-00242 6/9/2015 48,360.00
55 sitios CV#1506-00243 6/9/2015 48,360.00
55 sitios CV#1506-00244 6/9/2015 48,360.00
55 sitios CV#1506-00245 6/9/2015 32,240.00
55 sitios CV#1507-00235 7/13/2015 30,160.00
55 sitios CV#1507-00237 7/13/2015 90,480.00
55 sitios CV#1507-00238 7/13/2015 90,480.00
55 sitios CV#1507-00245 7/13/2015 52,780.00
55 sitios CV#1507-00246 7/13/2015 45,240.00
55 sitios CV#1507-00248 7/13/2015 90,480.00
55 sitios CV#1507-00249 7/13/2015 60,320.00
55 sitios CV#1507-00251 7/13/2015 90,480.00
55 sitios CV#1507-00252 7/13/2015 75,400.00
55 sitios CV#1507-00253 7/13/2015 52,780.00
55 sitios CV#1507-00254 7/13/2015 45,240.00
55 sitios CV#1507-00255 7/13/2015 60,320.00
55 sitios CV#1507-00256 7/13/2015 90,480.00
55 sitios CV#1507-00258 7/13/2015 75,400.00
55 sitios CV#1507-00259 7/13/2015 60,320.00
55 sitios CV#1507-00260 7/13/2015 52,780.00
55 sitios CV#1507-00261 7/13/2015 60,320.00
55 sitios CV#1507-00262 7/13/2015 75,400.00
55 sitios CV#1507-00265 7/13/2015 75,400.00
55 sitios CV#1507-00266 7/13/2015 90,480.00
55 sitios CV#1509-00371 9/21/2015 45,240.00
55 sitios CV#1509-00372 9/21/2015 90,480.00
55 sitios CV#1509-00373 9/21/2015 22,620.00
55 sitios CV#1509-00374 9/21/2015 52,780.00
55 sitios CV#1509-00375 9/21/2015 45,240.00
55 sitios CV#1509-00376 9/21/2015 42,224.00
55 sitios CV#1509-00377 9/21/2015 30,160.00
55 sitios CV#1509-00378 9/21/2015 150,800.00
55 sitios CV#1509-00379 9/21/2015 90,480.00
55 sitios CV#1509-00380 9/21/201 5 37,700.00
55 sitios CV#1509-00381 9/21/2015 22,620.00
55 sitios CV#1509-00382 9/21/2015 30,160.00
55 sitios CV#1509-00383 9/21/2015 22,620.00
55 sitios CV#1509-00384 9/21/2015 45,240.00
55 sitios CV#1509-00385 9/21/2015 45,240.00
Annexes
134
Fund Source Project Check Voucher
No. Date Payee Nature Amount
55 sitios CV#1509-00386 9/21/2015 45,240.00
55 sitios CV#1509-00387 9/21/2015 150,800.00
55 sitios CV#1509-00388 9/21/2015 37,700.00
55 sitios CV#1509-00389 9/21/2015 30,160.00
55 sitios MCT1511-00273 11/24/2015 15,080.00
55 sitios CV#1507-00250 7/13/2015 30,160.00
55 sitios CV#1507-00239 7/13/2015 75,400.00
Sub-Total KWH meters 3,571,913.00
SEP 2013 Additional
5 sitios 1505-00161 5/7/2015 Kupler Industries, Inc. meter base 30,800.00
12 sitios 1505-00178 5/7/2015 CEPALCO ENERGY SERVICES CORPORATION (CESCO)
meter base 10,150.00
12 sitios 1505-00179 5/7/2015 8,700.00
12 sitios 1505-00180 5/7/2015 10,150.00
12 sitios 1505-00181 5/7/2015 10,150.00
12 sitios 1505-00182 5/7/2015 8,700.00
12 sitios 1505-00183 5/7/2015 2,900.00
12 sitios 1505-00184 5/7/2015 8,700.00
12 sitios 1505-00185 5/7/2015 3,770.00
12 sitios 1505-00186 5/7/2015 5,800.00
12 sitios 1505-00187 5/7/2015 11,600.00
2014 SEP 55 sitios CV#1504-00436 4/24/2015 8,120.00
55 sitios CV#1504-00437 4/24/2015 5,800.00
55 sitios CV#1505-00162 5/7/2015 5,800.00
55 sitios CV#1505-00163 5/7/2015 7,250.00
55 sitios CV#1505-00164 5/7/2015 17,400.00
55 sitios CV#1505-00165 5/7/2015 4,350.00
55 sitios CV#1505-00166 5/7/2015 8,700.00
55 sitios CV#1505-00167 5/7/2015 2,900.00
55 sitios CV#1505-00168 5/7/2015 8,700.00
55 sitios CV#1505-00169 5/7/2015 8,700.00
55 sitios CV#1505-00170 5/7/2015 4,350.00
55 sitios CV#1505-00171 5/7/2015 8,700.00
55 sitios CV#1505-00172 5/7/2015 5,800.00
55 sitios CV#1505-00173 5/7/2015 4,350.00
55 sitios CV#1505-00174 5/7/2015 7,250.00
55 sitios CV#1505-00175 5/7/2015 17,400.00
55 sitios CV#1505-00176 5/7/2015 10,150.00
55 sitios CV#1505-00177 5/7/2015 8,700.00
55 sitios CV#1505-00299 5/20/2015 29,000.00
55 sitios CV#1505-00300 5/20/2015 29,000.00
55 sitios CV#1505-00430 5/22/2015 10,150.00
55 sitios CV#1505-00431 5/22/2015 14,500.00
55 sitios CV#1505-00433 5/22/2015 11,600.00
55 sitios CV#1505-00434 5/22/2015 8,700.00
55 sitios CV#1505-00435 5/22/2015 17,400.00
55 sitios CV#1505-00436 5/22/2015 8,700.00
55 sitios CV#1505-00437 5/22/2015 5,800.00
55 sitios CV#1505-00438 5/22/2015 11,600.00
55 sitios CV#1505-00439 5/22/2015 14,500.00
55 sitios CV#1505-00441 5/22/2015 11,600.00
Annexes
135
Fund Source Project Check Voucher
No. Date Payee Nature Amount
55 sitios CV#1505-00442 5/22/2015 17,400.00
55 sitios CV#1505-00443 5/22/2015 17,400.00
55 sitios CV#1505-00444 5/22/2015 17,400.00
55 sitios CV#1505-00445 5/22/2015 17,400.00
55 sitios CV#1505-00446 5/22/2015 8,700.00
55 sitios CV#1505-00447 5/22/2015 14,500.00
55 sitios CV#1505-00448 5/22/2015 11,600.00
55 sitios CV#1505-00449 5/22/2015 17,400.00
55 sitios CV#1505-00450 5/22/2015 14,500.00
55 sitios CV#1505-00451 5/22/2015 10,150.00
55 sitios CV#1505-00456 5/22/2015 17,400.00
55 sitios CV#1512-00247 12/16/2015 5,800.00
55 sitios CV#1512-00248 12/16/2015 10,150.00
Sub-Total Meter Base 608,190.00
Total P4,180,103.00
Annex H: Detailed computation of materials used in the new projects (Construction of 3-
Phase line from Poblacion Montevista to ComVal Provincial Hospital) charged to
Calamity Loan/Grant.
Materials Unit Quantity Unit Cost Total Cost
Steel Pole – 40 ft Pcs 27 P17,395.25 P469,671.75
Steel Pole – 35 ft Pcs 1 12,716.92 12,716.92
Crossarm 3 x 4 x 8 Pcs 41 1,287.17 52,773.97
Angular brace 60 span Pcs 41 650.00 26,650.00
Insulator, Pin type, 6” Pcs 85 130.56 11,097.60
Pole top pin Pcs 27 147.13 3,972.51
Steel Pin 5/8 Pcs 52 92.85 4,828.20
Insulator, suspension polymer Pcs 30 210.09 6,302.70
Clamp, deadend strain Pcs 30 370.00 11,100.00
Pole bond double # 5-6 Pcs 9 0 0
Machine bolt, ½ x 6 Pcs 82 18.01 1,476.82
Double arming bolt, 5/8 x 22 Pcs 27 84.45 2,280.15
Bolt, oval eye, 5/8 x 10 Pcs 18 92.61 1666.98
Bolt, machine, 5/8 x 10 Pcs 77 41.99 3,233.23
Lock nut 5/8 Pcs 122 8.12 990.64
Eye nut 5/8 Pcs 46 73.27 3,370.42
Square washer 21/4 x 21/4 Pcs 238 13.08 3,113.04
Compression connector YHO-400 Pcs 29 117.00 3,393.00
Nut, thimble eye, 5/8 Pcs 1 75.68 75.68
Bolt, thimble eye 5/8 x 10 Pcs 1 85.00 85.00
J-Hook Pcs 12 36.33 435.96
Malleable iron, Guy attachment Pcs 1 108.29 108.29
Anchor rod bonding clamp Pcs 6 39.73 238.38
Rod, anchor 5/8 x 7 Pcs 4 332.39 1,329.56
Annexes
136
Materials Unit Quantity Unit Cost Total Cost
Log, anchor 8 x 4 Pcs 4 727.40 2,909.60
Square washer 4 x 4 Pcs 4 21.45 85.80
Clamp, 3 bolts Pcs 22 145.31 3,196.82
Guy wire, 3/8 7 strand Ft 520 19.65 10,218.00
Anchor shackle Pcs 7 266.45 1,865.15
Guy grip Pcs 2 144.00 288.00
Insulator, spool, 1 3/4 Pcs 6 16.33 97.98
Insulator, spool 3 Pcs 60 31.43 1,885.80
Secondary bracket angle Pcs 2 92.00 184.00
Secondary swinging clevis Pcs 17 68.76 1,168.92
Single upset, Bolt 5/8 x 10 Pcs 23 86.85 1,997.55
Double upset, bolt 5/8 x 10 Pcs 23 87.24 2,006.52
Clamp, Loop deadend Pcs 68 68.33 4,646.44
Hotline clamp #2-4/0 Pcs 6 425.00 2,550.00
Ground rod 5/8 x 10 Pcs 9 385.89 3,473.01
Ground rod clamp Pcs 9 39.73 357.57
Ground wire 3 strand Ft 360 5.57 2,005.20
Bare wire #4/0 Mts 11,060 61.65 681,849.00
IUB Insulated wire #4/0 Mts 2,695 0 0
Total P1,341,696.16
Annex I: Detailed breakdown of potential and actual/energized household beneficiaries.
Item No.
Particulars Fund Source
Approved Amount
No. of HH
Sitio Barangay City/ Municipality As Plan Actual
1 Prk. 8 Buclad Asuncion 2013 Subsidy SEP 722,859.32 30
2 Prk. 11 Doña Andrea Asuncion 2013 Subsidy SEP 650,401.95 30
3 Prk. 7 Doña Andrea Asuncion 2013 Subsidy SEP 407,560.94 30
4 Prk. 6 & 7 New Bantayan Asuncion 2013 Subsidy SEP 890,171.33 30
5 Prk. 2A Pamacuan Asuncion 2013 Subsidy SEP 589,136.71 30
6 Prk. 2 Sagayen Asuncion 2013 Subsidy SEP 531,208.98 30
7 Prk. 3 Sagayen Asuncion 2013 Subsidy SEP 426,423.85 30
8 Prk 1B New Bantayan Asuncion 2014 Subsidy 595,396.03 30
9 Prk 8B Gabi Compostela 2012 Subsidy Batch 2 715,343.10 30 31
10 Prk 6 (Relocation Site) Poblacion Compostela 2012 Subsidy Batch 2 1,585,482.30 30 37
11 Prk 7 to Purok 3 Tamia Compostela 2012 Subsidy Batch 2 241,435.08 10 4
12 Prk 1 (Javillana) Marapat Compostela 2014 Subsidy 1,261,985.07 40 21
13 Prk 1 (Sanchez) Marapat Compostela 2014 Subsidy 1,177,981.68 50 24
14 P-3 & P-7 Aurora Compostela 2015 GAA 1,083,336.50 33 18
15 Prk 26 (Quary) Ngan Compostela 2015 GAA 1,161,847.97 60 48
16 P-3 Relocation San Miguel Compostela 2015 GAA 926,143.86 60 55
17 Prk. 2A Gabuyan Kapalong 2013 Subsidy SEP 217,478.68 30
18 Prk 5-Lintahon Ceboleda Laak 2015 GAA 492,464.95 25
19 Prk 10 Mabuhay Laak 2015 GAA 890,204.40 60
20 Prk 9 Mabuhay Laak 2015 GAA 1,901,568.14 60
21 Prk Tuburan Mascaraeg Mabini 2013 Subsidy SEP 460,770.76 40 31
22 Prk Kindaraan Mascaraeg Mabini 2013 Subsidy SEP 253,395.76 20 16
Annexes
137
Item No.
Particulars Fund Source
Approved Amount
No. of HH
Sitio Barangay City/ Municipality As Plan Actual
23 Sitio Ninja-1 Mascaraeg Mabini 2013 Subsidy SEP 785,670.35 40
1
24 Sitio Ninja-2 Mascaraeg Mabini 2013 Subsidy SEP 10
25 Cabuyuan To Mampalusog Upper Cabuyuan Mabini 2015 GAA 2,136,781.65 60
26 Prk Mampalusong Upper Cabuyuan Mabini 2015 GAA 1,632,955.40 60
27 P. Rancho Mapaang Maco Maco 2013 Additional
3,162,337.79 30
28 Prk 5, Granada Comp. Concepcion Maco 2013 Additional
29 So. Maduaw Concepcion Maco Maco 2013 Additional 30
30 Prk-2 New Leyte Maco 2013 Subsidy SEP 262,897.21 5 5
31 Prk-3 Lumangang New Leyte Maco 2013 Subsidy SEP 409,241.74 50 38
32 Prk 2A Elizalde Maco 2015 GAA 1,414,033.24 53 50
33 Prk 6, Amacan New Leyte Maco 2015 GAA 2,691,142.08 24 32
34 Prk A, Sinalikway New Leyte Maco 2015 GAA 677,024.07 20 2
35 Prk. Gumamela Bagong Silang Maragusan 2013 Additional 365,187.14 20 21
36 Prk. Sampauita Bagong Silang Maragusan 2013 Additional 203,844.85 5 5
37 Prk. Rizal Coronobe Maragusan 2013 Additional 315,670.99 20 18
38 Prk. Atis Sarangan Maragusan 2013 Additional 851,187.49 40 19
39 Prk. Tugas Sarangan Maragusan 2013 Additional 410,683.11 10 15
40 Prk. Santol Riverside Talian Maragusan 2013 Subsidy SEP 664,878.94 30 31
41 Prk Kauswagan Mapawa Maragusan 2014 Subsidy 858,389.82 50 35
42 Prk Mahayag Mapawa Maragusan 2014 Subsidy 967,767.70 60 32
43 Prk Narra Mapawa Maragusan 2014 Subsidy 1,355,895.73 50 36
44 Prk Atis Mauswagon Maragusan 2014 Subsidy 416,502.75 20 26
45 Prk 1 Andili Mawab 2015 GAA 934,195.77 60 10
46 Prk. Moda Liboton Liboton Monkayo 2013 Additional 401,979.10 25 26
47 P2 Tubo-tubo Monkayo 2013 Additional 732,783.44 30 42
48 Prk. 5 Bulman Naboc Monkayo 2013 Subsidy SEP 467,895.52 30
49 Prk. 7 Pasian Monkayo 2013 Subsidy SEP 1,315,958.69 13 13
50 Prk 6A, Caritas Shelter Vill. Babag Monkayo 2014 Subsidy 1,311,402.45 60 83
51 Prk3A, Via Caritas Et Vita Comm.
Babag Monkayo 2014 Subsidy 857,857.95 60 56
52 Prk 3A, Gabanan Baylo Monkayo 2014 Subsidy 1,005,396.49 60 8
53 Prk 3 Olaycon Monkayo 2014 Subsidy 853,794.57 40 40
54 Prk 6 Olaycon Monkayo 2014 Subsidy 601,005.12 50 40
55 Prk Paco San Jose Monkayo 2014 Subsidy 2,171,710.58 50 42
56 Prk. 7 New Cebulan Montevista 2011 Subsidy Batch 1 500,784.04
57 P6 Banag-banag Montevista 2013 Additional 148,042.76 7 7
58 Prk. 4 to Prk. 5 So. Pawcon New Cebulan Montevista 2013 Additional 418,676.83 5 4
59 Prk. 7 to Prk. 4 So. Pawcon New Cebulan Montevista 2013 Additional 723,289.82 17 25
60 Prk. 7 Concepcion Montevista 2013 Subsidy SEP 799,092.31 20 26
61 Prk. 5 New Visayas Montevista 2013 Subsidy SEP 347,938.69 10 10
62 Pob. Laak to Barubo Montevista Montevista 2014 Subsidy 2,905,150.46 60
63 Prk-3 Basak Nabunturan 2013 Subsidy SEP 192,293.82 10 7
64 Prk-7 Basak Nabunturan 2013 Subsidy SEP 241,623.44 15 13
65 Prk-3 Magsaysay Nabunturan 2013 Subsidy SEP 1,452,737.46 27 26
66 Prk-1 to Prk-7 Pangutusan Nabunturan 2013 Subsidy SEP 578,507.64 5 3
67 Prk-17 Bantilan Subd. Poblacion Nabunturan 2013 Subsidy SEP 126,031.79 5 4
68 Prk 11 Magading Nabunturan 2015 GAA 947,289.48 60 54
69 Prk 14 Magsaysay Nabunturan 2015 GAA 1,510,305.03 60 15
70 Prk 2 Magsaysay Nabunturan 2015 GAA 462,288.17 15 3
71 Prk 6 Magsaysay Nabunturan 2015 GAA 939,332.64 60 3
Annexes
138
Item No.
Particulars Fund Source
Approved Amount
No. of HH
Sitio Barangay City/ Municipality As Plan Actual
72 Prk 3 Ogao Nabunturan 2015 GAA 1,116,121.32 18 16
73 Prk 14 Poblacion Nabunturan 2015 GAA 1,528,316.60 60 10
74 Prk 12 Andap New Bataan 2014 Subsidy 2,084,547.36 50 38
75 Anda Messaoy New Corella 2013 Subsidy SEP 677,590.99 30
76 Siabok Pinamuno San Isidro 2013 Subsidy SEP
77 Prk. 6 New Bohol New Corella 2013 Subsidy SEP 1,129,975.05 30
78 Prk. Anaman New Cortes New Corella 2013 Subsidy SEP 649,779.86 30
79 So. Maligaya Tagugpo Pantukan 2011 DAP-OVLP/ 900,000.00 30 31
80 Prk. 9 Tambongon Pantukan 2013 Additional 426,980.62 25
81 Prk. 3 Bongabong Pantukan 2013 Additional 981,454.28 30
82 So. Sarog (Area 1 2 3) Napnapan Pantukan 2013 Additional 13,144,502.81 100
83 Prk-1 to Prk-3 Araibo Pantukan 2013 Subsidy SEP 124,643.83 15 17
84 So. Diat Palo, Napnapan to So. Panganason
Kingking Pantukan 2014 Subsidy 3,100,651.51 60
85 So Boringot to So Palo Napnapan Pantukan 2014 Subsidy 2,195,500.42 60
86 Prk 7, Malanlangon Tagdanua Pantukan 2014 Subsidy 483,463.87 30
87 Prk 8, Pinakan Tagdanua Pantukan 2014 Subsidy 503,381.73 30
88 Prk Tapis to Prk Maitom Tambongon Pantukan 2014 Subsidy 1,873,252.41 35
89 Benguet Prk Tagapara Napnapan Pantukan 2015 GAA 41,341.25 9
90 Prk 29, So Pulang Lupa Napnapan Pantukan 2015 GAA 137,804.20 30
91 Prk Campo Uno Napnapan Pantukan 2015 GAA 101,056.42 22
92 Prk Kinagdan Napnapan Pantukan 2015 GAA 110,243.35 24
93 Prk Lawan Napnapan Pantukan 2015 GAA 275,608.39 60
94 Prk Manga Napnapan Pantukan 2015 GAA 82,682.53 18
95 Prk Minyapis Napnapan Pantukan 2015 GAA 183,738.92 40
96 Prk Nangka Napnapan Pantukan 2015 GAA 275,608.39 60
97 Sitio Lantawan Napnapan Pantukan 2015 GAA 137,804.20 30
98 Sitio Liniputan Napnapan Pantukan 2015 GAA 68,902.10 15
99 Sitio Makitang Dagat Napnapan Pantukan 2015 GAA 68,902.10 15
100 Sitio Mamacao Napnapan Pantukan 2015 GAA 142,397.67 31
101 Sitio Sabong Napnapan Pantukan 2015 GAA 91,869.46 20
102 Daligdigan Dagohoy Talaingod 2013 Subsidy SEP
1,569,158.55 30
103 Prk 6A Dagohoy Talaingod 2013 Subsidy SEP
104 Prk 3 Dagohoy Talaingod 2013 Subsidy SEP
105 Prk 3 Sto. Niño Talaingod 2013 Subsidy SEP 2,626,825.13 30
106 So. Angelo Sto. Niño Talaingod 2013 Subsidy SEP
107 Prk. 6 Babag Monkayo 2013 Additional 754,534.52 25 11
108 Prk. 5 Buclad Asuncion 2013 Subsidy SEP 503,512.64 30
109 Starlight Camoning Asuncion 2013 Subsidy SEP 935,414.04 30
110 Prk. 3-5 New Bantayan Asuncion 2013 Subsidy SEP 775,253.62 30
111 Prk 6-18 Mahayahay Cambanogoy Asuncion 2015 GAA 675,957.24 38
112 Prk 3 Aurora Compostela 2012 Subsidy Batch 2
113 Prk 5A Mangayon Compostela 2012 Subsidy Batch 2 1,941,865.60 60 69
114 Prk 5B Mangayon Compostela 2012 Subsidy Batch 2
115 Prk 14 San Miguel Compostela 2012 Subsidy Batch 2 918,152.25 30 29
116 Prk 5 Tamia Compostela 2012 Subsidy Batch 2 1,007,400.29 14 11
117 Prk 9 Tamia Compostela 2012 Subsidy Batch 2 364,388.82 11 2
118 P5 and 5A Bagongon Compostela 2013 Additional 440,343.42 8 11
119 Prk. 17 Salvacion Ngan Compostela 2013 Additional 401,796.05 25 12
120 Prk. 1 Ngan Compostela 2013 Subsidy SEP 122,160.95 8 7
Annexes
139
Item No.
Particulars Fund Source
Approved Amount
No. of HH
Sitio Barangay City/ Municipality As Plan Actual
121 Prk 2, Valencia New Alegria Compostela 2014 Subsidy 360,758.08 20 5
122 P-Tagumpay, Luan Mabantao Kapalong 2015 GAA 1,219,290.14 50
123 Prk 6, Upper San Roque Binasbas Laak 2015 GAA 2,090,242.79 60
124 Prk 7, Upper San Roque Binasbas Laak 2015 GAA 1,089,925.18 60
125 Prk-8 Magtagoktok Ceboleda Laak 2015 GAA 1,911,079.75 25
126 Sitio Mikaglas Langtud Laak 2015 GAA 1,702,736.19 29
127 Sitio Patong Langtud Laak 2015 GAA 1,618,335.77 32
128 Prk. 5 Sanghay Golden Valley Mabini 2013 Additional 652,416.21 10 14
129 Prk -4 New Leyte Maco 2013 Subsidy SEP 379,438.62 5 50
130 Prk 3A, Lumanggang New Leyte Maco 2015 GAA 887,277.58 22 17
131 Prk. Acacia Lahi Maragusan 2013 Additional 893,832.92 60 58
132 Prk. Aguila Mapawa Maragusan 2013 Additional 586,400.06 30 10
133 Prk. Ipil ipil Tupas Maragusan 2013 Additional 1,504,243.36 29 18
134 Prk. Azucena Bagong Silang Maragusan 2013 Subsidy SEP 152,659.06 15 14
135 Prk. Vanda Bagong Silang Maragusan 2013 Subsidy SEP 519,365.38 20 22
136 Prk Lubi Mauswagon Maragusan 2014 Subsidy 806,933.95 35 18
137 Prk Pag-Asa Mauswagon Maragusan 2014 Subsidy 940,668.62 60 54
138 P-Highlander New Albay Maragusan 2015 GAA 1,282,126.68 15 17
139 P-Tandang Sora New Albay Maragusan 2015 GAA 667,671.12 30 8
140 P-Caimeto Pamintaran Maragusan 2015 GAA 1,148,071.23 40 30
141 Prk Aguacan-A Poblacion Maragusan 2015 GAA 695,179.60 40 25
142 Prk. 1 Malinawon Mawab 2013 Additional 3,505,205.21 40 41
143 Prk. 4 Sawangan Mawab 2013 Additional 1,586,784.20 35 35
144 Prk. 5 Sawangan Mawab 2013 Additional 852,021.06 30 40
145 Prk. 6 Sawangan Mawab 2013 Additional 918,018.29 40 33
146 Prk 4A Bawani Mawab 2015 GAA 535,954.60 20 6
147 Prk 5A Bawani Mawab 2015 GAA 949,573.10 40 16
148 P-1 & P-5 Saosao Mawab 2015 GAA 2,037,822.91 60 26
149 Prk 8 Naboc Moncayo 2015 GAA 1,315,455.72 42 36
150 P4 Awao Monkayo 2013 Additional 1,724,040.81 34 42
151 P7 Palo Haguimitan Monkayo 2013 Additional 619,543.42 10 11
152 P1 Pob. Monkayo Monkayo 2013 Additional 319,825.28 30
153 P1 Brgy. Site Rizal Monkayo 2013 Additional 245,212.07 7 7
154 P6 Magas Tubo-tubo Monkayo 2013 Additional 646,975.00 20 22
155 P10 Upper Ulip Monkayo 2013 Additional 621,821.42 5 5
156 P2 Upper Ulip Monkayo 2013 Additional 913,745.59 15 15
157 Prk. 6 Babag Monkayo 2013 Subsidy SEP 785,416.19 25 12
158 Kabangkalan to Prk 14 to Kapatagan to Prk 18 New Kapatagan
Casoon Monkayo 2014 Subsidy 4,800,604.42 60 188
159 Prk 13 Casoon Monkayo 2014 Subsidy 722,714.79 35 15
160 Prk 6 to Prk 11 to Prk 12 Casson Monkayo 2014 Subsidy 3,387,461.59 60 132
161 Prk 7 Naboc Monkayo 2014 Subsidy 898,103.15 30 27
162 Prk 13 Poblacion Monkayo 2014 Subsidy 1,207,936.40 60 63
163 Prk 7 Poblacion Monkayo 2014 Subsidy 2,232,477.52 40 37
164 Prk 7 Salvacion Monkayo 2014 Subsidy 1,556,252.14 55 55
165 Prk 8 Salvacion Monkayo 2014 Subsidy 1,151,463.94 35 30
166 Prk 9 Awao Monkayo 2015 GAA 522,285.18 30 19
167 Prk 2B Poblacion Monkayo 2015 GAA 566,912.56 50 6
168 P5 Mayaon Montevista 2013 Additional 123,736.19 7 10
Annexes
140
Item No.
Particulars Fund Source
Approved Amount
No. of HH
Sitio Barangay City/ Municipality As Plan Actual
169 P6 Mayaon Montevista 2013 Additional 1,156,719.82 5 13
170 P2 Kahayag Prosperidad Montevista 2013 Additional 1,092,574.78 15 15
171 Prk 1 to Prk 4 to Prk 6 Lebanon Montevista 2014 Subsidy 2,610,054.77 60 60
172 Prk 3 Banag-banag Montevista 2015 GAA 829,262.94 60 62
173 Sitio San Agustin New Calape Montevista 2015 GAA 1,594,578.86 45 40
174 Sitio Bagtok San Vicente Montevista 2015 GAA 2,121,564.60 56 44
175 Sitio Mabanda San Vicente Montevista 2015 GAA 3,343,176.98 59 77
176 Prk. 4 Cabacungan Nabunturan 2013 Additional 528,160.39 13 7
177 Prk. 3 Matilo Nabunturan 2013 Additional 706,341.64 30 14
178 Prk. 5 Matilo Nabunturan 2013 Additional 639,628.38 30 12
179 Prk. 2 New Sibonga Nabunturan 2013 Additional 836,241.92 35 2
180 Prk. 3B New Sibonga Nabunturan 2013 Additional 585,404.42 20 6
181 Prk. 4 New Sibonga Nabunturan 2013 Additional 1,622,732.05 40 39
182 Prk. 8 New Sibonga Nabunturan 2013 Additional 2,055,416.31 35 15
183 Prk. 2 San Roque Nabunturan 2013 Additional 1,079,878.53 30 30
184 Prk. 5 to Prk. 1 Sta. Maria Nabunturan 2013 Additional 1,158,379.43 35 24
185 Prk -6 Basak Nabunturan 2013 Subsidy SEP 610,235.02 20 21
186 Prk -4 Dauis Nabunturan 2013 Subsidy SEP 559,908.95 5 6
187 Prk -3 Dauis Nabunturan 2013 Subsidy SEP 223,020.89 5 15
188 Prk -9 to Prk k-6 Manat Nabunturan 2013 Subsidy SEP 325,352.94 10 7
189 Prk 2 Basak Nabunturan 2014 Subsidy 1,363,110.67 60 20
190 Prk 2A Cabidianan Nabunturan 2014 Subsidy 1,011,931.59 40 16
191 Prk 1A Basak Nabunturan 2015 GAA 1,182,746.70 40 14
192 Prk 9 Magsaysay Nabunturan 2015 GAA 1,045,217.11 60 30
193 P-5, Sitio Tagaytay Mipangi Nabunturan 2015 GAA 3,554,898.88 60 60
194 Prk 10, Dampinas Mipangi Nabunturan 2015 GAA 1,050,514.10 54 15
195 Prk 9, New Panay Dampinas
Mipangi Nabunturan 2015 GAA 1,854,020.77 60 26
196 Prk 2 San Vicente Nabunturan 2015 GAA 1,006,370.43 40 14
197 Prk. 1A Katipunan New Bataan 2012 Subsidy Batch 2 975,371.98 30 20
198 Prk. 2A 3 & 3A Katipunan New Bataan 2012 Subsidy Batch 2 1,526,830.67 30 51
199 Prk. 3A Katipunan New Bataan 2012 Subsidy Batch 2 893,182.65 30 32
200 Prk. 4A Katipunan New Bataan 2012 Subsidy Batch 2 1,011,358.24 30 19
201 Prk. 5A Katipunan New Bataan 2012 Subsidy Batch 2 1,252,162.32 30 21
202 Prk. 5 Batibao New Bataan 2013 Additional 328,644.16 30 17
203 P4 Batinao New Bataan 2013 Additional 695,871.33 21 32
204 P3A Mapaso New Bataan 2013 Additional 570,093.73 5 5
205 Prk 5 Cabinuangan New Bataan 2014 Subsidy 1,144,889.72 30 28
206 Prk 16 Camanlangan New Bataan 2014 Subsidy 1,506,691.85 60 61
207 Prk 4 Cogonon New Bataan 2014 Subsidy 493,740.19 35 35
208 Prk 5 Cogonon New Bataan 2014 Subsidy 1,607,919.90 40 31
209 Prk 4 Magsaysay New Bataan 2014 Subsidy 807,766.17 30 30
210 Prk 17 Panag New Bataan 2015 GAA 765,606.26 35 23
211 Prk. 3 / Camansi New Sambog New Corella 2013 Subsidy SEP 662,506.98 30
212 Prk. 7 Sta. Cruz New Corella 2013 Subsidy SEP 1,063,963.48 30
213 Prk 2 Del Mote New Corella 2014 Subsidy 1,210,437.11 30 30
214 Prk 3 Patrocenio New Corella 2014 Subsidy 1,786,559.19 60 35
215 Prk 5 Patrocenio New Corella 2014 Subsidy 1,142,129.49 60 16
216 Prk 2-7 Carcor New Corella 2015 GAA 767,644.84 60
217 P-10 Panayugan Limbaan New Corella 2015 GAA 1,434,616.40 60
Annexes
141
Item No.
Particulars Fund Source
Approved Amount
No. of HH
Sitio Barangay City/ Municipality As Plan Actual
218 Prk 20 Mesaoy New Corella 2015 GAA 2,246,972.46 60
219 Prk 23, Mesaoy Mesaoy New Corella 2015 GAA 732,096.23 33
220 Laceda (Purok 6) Sta. Fe New Corella 2015 GAA 1,877,850.44 39 26
221 New Matalom (Purok 5) Sta. Fe New Corella 2015 GAA 3,405,477.40 60 68
222 Mama-on Pinamuno San Isidro 2013 Subsidy SEP 1,943,371.24 30
223 Sitio New Mangga Pinamuno San Isidro 2014 Subsidy 440,407.57 20
224 Sitio Saraban Pinamuno San Isidro 2014 Subsidy 1,793,272.58 25
225 P-1 To P-4 Igangon San Isidro 2015 GAA 1,726,581.19 22
226 P-6A To P-6B Igangon San Isidro 2015 GAA 995,065.52 56
227 Prk 13 Kipalili San Isidro 2015 GAA 741,282.33 45
228 Prk 6 San Miguel San Isidro 2015 GAA 1,222,866.08 40
229 Prk. 10 to 8 / Sta. Cruz Kapalili Sawata 2013 Subsidy SEP 1,743,401.20 80
230 Indangan Sto. Niño Talaingod 2013 Subsidy SEP
4,220,352.30 50
231 Prk Salawao Sto. Niño Talaingod 2013 Subsidy SEP
232 So. Mesolong Sto. Niño Talaingod 2013 Subsidy SEP
233 Sitio Angelo Sto. Niño Talaingod 2015 GAA 6,847,177.43
234 Sitio Mesolong Sto. Niño Talaingod 2015 GAA
235 Prk. 6A-6B Mabuhay Capungagan Kapalong 2013 Subsidy SEP 760,258.92 30
236 BLEP Ampawid Laak 2012 Subsidy Batch 1 4,557,886.30 50
237 BLEP Datu Davao Laak 2012 Subsidy Batch 1 2,876,248.78 50
238 BLEP Doña Josefa Laak 2012 Subsidy Batch 1 4,257,485.04 50
239 Prk. 1 (Lube) Ampawid Laak 2011 Subsidy Batch 2 Passby
240 Prk. 2 (Mangga) Ampawid Laak 2011 Subsidy Batch 2 Passby
241 Prk. 3 (Avocado) Ampawid Laak 2011 Subsidy Batch 2 Passby
242 Prk. 5 (Lanzones) Ampawid Laak 2011 Subsidy Batch 2 Passby
243 Prk. 9 Apunan Laak 2011 Subsidy Batch 2 Passby
244 Prk. 9 Datu Davao Laak 2011 Subsidy Batch 2 Passby
245 Prk. 1 Doña Josefa Laak 2011 Subsidy Batch 2 Passby
246 Prk. 2 Rambutan Doña Josefa Laak 2011 Subsidy Batch 2 Passby
247 Prk. 3 Doña Josefa Laak 2011 Subsidy Batch 2 Passby
248 Prk. 4 Doña Josefa Laak 2011 Subsidy Batch 2 Passby
249 Prk. 1 Mabuhay Loreto ADS Laak 2011 Subsidy Batch 2 Passby
250 Prk.3 Malale Laak 2011 Subsidy Batch 2 Passby
251 Prk. 2 Proper Laak 2011 Subsidy Batch 2 Passby
251 261,026,436.81 7,825 4,058
1 Prk Daisy Bingcungan Tagum City 2014 Subsidy 143,271.34 15 14
2 Prk Diamante Bingcungan Tagum City 2014 Subsidy 923,080.08 30 28
3 Prk Gumamela Bingcungan Tagum City 2014 Subsidy 527,705.60 25 12
4 Prk Manga Bingcungan Tagum City 2014 Subsidy 449,689.33 15 10
5 Prk 1A Madaum Tagum City 2014 Subsidy 538,633.90 30
6 Prk Lansones Pandapan Tagum City 2014 Subsidy 954,927.62 20 2
7 Prk Manga Pandapan Tagum City 2014 Subsidy 310,302.38 15 2
8 Prk 3, RTU Relocation Site Tagum City 2014 Subsidy 2,311,661.74 60
9 Prk Cogon Visayan Village Tagum City 2014 Subsidy 291,107.16 10
10 Prk Kahayag Visayan Village Tagum City 2014 Subsidy 747,282.34 20
11 Prk Rose Bincungan Tagum City 2015 GAA 899,351.10 60 31
12 Prk Talaba Bincungan Tagum City 2015 GAA 1,560,748.21 60
13 Prk 3A Dagohoy Canocotan Tagum City 2015 GAA 545,838.93 34
14 Prk Narra Cuambogan Tagum City 2015 GAA 974,774.44 18
Annexes
142
Item No.
Particulars Fund Source
Approved Amount
No. of HH
Sitio Barangay City/ Municipality As Plan Actual
15 Prk 1A Gapas Madaum Tagum City 2015 GAA 852,872.03 40
16 Prk 28-A Mandaum Tagum City 2015 GAA 3,765,598.44 60
17 Prk 28-B Mandaum Tagum City 2015 GAA 3,139,202.70 60
18 Prk 28-C Mandaum Tagum City 2015 GAA 2,442,878.68 60
19 Prk Sta. Cruz Pagsabangan Tagum City 2015 GAA 1,160,121.59 60 41
20 Prk Lemon/Riverside Pandapan Tagum City 2015 GAA 780,559.23 60
21 Prk Nangka Pandapan Tagum City 2015 GAA 705,059.02 30
22 Prk Santol Pandapan Tagum City 2015 GAA 1,564,056.57 38
23 Prk Lanzones Visayan Village Tagum City 2015 GAA 745,243.45 29
24 Prk Macopa Visayan Village Tagum City 2015 GAA 629,844.56 25
25 Prk Timog Visayan Village Tagum City 2015 GAA 920,730.17 30 2
25 27,884,540.61 904 142
1 So Proper (to Pump House) Kanaan/Kaputian IGACOS 2013 Subsidy SEP 419,395.23 30
2 Prk -6 Esperat Area San Vicente Mambago/Penapalta
IGACOS 2013 Subsidy SEP 639,592.59 30 6
3 VGHOI Villarica/Babak IGACOS 2013 Subsidy SEP 378,366.07 30
4 Prk 4B Penaplata IGACOS 2014 Subsidy 1,398,109.91 28 20
5 Prk Calachuchi Kanaan IGACOS 2015 GAA 622,011.75 34
10 6 Prk Rose-A Kanaan IGACOS 2015 GAA 361,124.26 48
7 Prk Rose-B Kanaan IGACOS 2015 GAA 609,837.54 29
8 Prk 6A Penaplata IGACOS 2015 GAA 1,093,562.53 46
9 Prk -6 to Prk -7 Cogon/Babak IGACOS 2013 Subsidy SEP 602,118.96 30 13
10 Prk -6 Mambago/Babak IGACOS 2013 Subsidy SEP 496,665.55 30
11 Prk 5 Guilon IGACOS 2015 GAA 1,124,391.22 34 21
12 Prk 6 Guilon IGACOS 2015 GAA 1,768,489.85 36
13 Prk 5 Sto. Niño IGACOS 2015 GAA 1,201,775.20 30
14 P 8 Tagalaya-C Tagbinatag IGACOS 2015 GAA 588,642.57 35
15 P-2 San Juan Tagbinatag IGACOS 2015 GAA 1,011,652.49 22 12
16 P-4 Tagalaya-B Tagbinatag IGACOS 2015 GAA 1,794,730.85 60
17 P-5 Tagalaya-A Tagbinatag IGACOS 2015 GAA 899,195.00 38 8
18 P-7 Fatima Tagbinatag IGACOS 2015 GAA 539,572.10 20 7
19 Prk 1- Bagacay Tagbinatag IGACOS 2015 GAA 1,478,562.87 35 22
19 17,027,796.54 645 119
295 Total 305,938,773.96 9,374 4,319