1. FOR GENERAL NOTES AND SYMBOLS, SEE PROJECT TRINITY DRG Nos. FOR GENERAL NOTES AND SYMBOLS, SEE PROJECT TRINITY DRG Nos. D-00731-EFAB-TTL-PR-PI-0001 / -0002 / -0003 (PREVIOUSLY 4857-EPE-D702-0000 SHEETS 1 OF 4). 2. NITROGEN MANIFOLD CONNECTION FOR BACKFLUSH CLEANING. REFER TO SEQUENCE NITROGEN MANIFOLD CONNECTION FOR BACKFLUSH CLEANING. REFER TO SEQUENCE DESCRIPTION. 3. DELETED. DELETED. 4. DELETED. DELETED. 5. DELETED. DELETED. 6. DELETED. DELETED. 7. COARSE SCREEN ON NOZZLE TO PREVENT WOODCHIPS ENTERING VENT LINE. COARSE SCREEN ON NOZZLE TO PREVENT WOODCHIPS ENTERING VENT LINE. 8. NOZZLE PROVIDED FOR FUTURE TEMPERATURE MEASUREMENT. NOZZLE PROVIDED FOR FUTURE TEMPERATURE MEASUREMENT. 9. CONNECTIONS PROVIDED FOR SAMPLE VENT TESTING (NB 80), AT 90 TO EACH CONNECTIONS PROVIDED FOR SAMPLE VENT TESTING (NB 80), AT 90° TO EACHOTHER 80MM NB. 10. DELETED. DELETED. 11. RESERVE PLACE FOR SPARE C-0101B. RESERVE PLACE FOR SPARE C-0101B. 12. N INLET & VENT VALVE PART OF XV-0101 AND XV-0102 VALVE PACKAGE SUPPLY. N INLET & VENT VALVE PART OF XV-0101 AND XV-0102 VALVE PACKAGE SUPPLY. 13. DESIGNED FOR EXPLOSION CONTAINMENT. DESIGNED FOR EXPLOSION CONTAINMENT. 14. DELETED. DELETED. 15. DELETED. DELETED. 16. 80 NB NOZZLE FUTURE LEVEL TRANSMITTER. 80 NB NOZZLE FUTURE LEVEL TRANSMITTER. 17. SIGHT GLASS WITH INTEGRATED LIGHT. SIGHT GLASS WITH INTEGRATED LIGHT. 18. XV 01013 PROVIDES ON/OFF FUNCTIONALITY FOR SEQUENCE, XV 01048 IS XV 01013 PROVIDES ON/OFF FUNCTIONALITY FOR SEQUENCE, XV 01048 IS INTERLOCK SHUT OFF VALVE. 19. SPACING TO BE ALLOWED FOR FUTURE INSTALLATION OF A SECONDARY DOME VALVE. SPACING TO BE ALLOWED FOR FUTURE INSTALLATION OF A SECONDARY DOME VALVE. 20. DELUGE WATER SUPPLY TO BE EXTERNAL ONLY VIA DISTRIBUTION RING, SEE INSET DELUGE WATER SUPPLY TO BE EXTERNAL ONLY VIA DISTRIBUTION RING, SEE INSET DETAILS. 21. 'RO' SIZED TO LIMIT N² FLOW WITHIN ACCEPTABLE RANGE TO PREVENT 'RO' SIZED TO LIMIT N² FLOW WITHIN ACCEPTABLE RANGE TO PREVENT ² FLOW WITHIN ACCEPTABLE RANGE TO PREVENT EXCESSIVE IMPACT ON OTHER USERS. 22. DELETED. DELETED. 23. XV-0101 & XV-0102 NITROGEN VENT TO SAFE LOCATION. XV-0101 & XV-0102 NITROGEN VENT TO SAFE LOCATION. 24. DISCHARGE TO SAFE AREA AWAY FROM MANNED AREAS, WALKWAYS, ETC. DISCHARGE TO SAFE AREA AWAY FROM MANNED AREAS, WALKWAYS, ETC. 25. A BARRIER IS TO BE PLACED AROUND THE FIBC, WITH SIGNAGE TO STATE A BARRIER IS TO BE PLACED AROUND THE FIBC, WITH SIGNAGE TO STATE POTENTIAL FOR ODA (OXYGEN DEFICIENT ATMOSPHERE). 26. AN ODA ASSESSMENT IS TO BE CARRIED OUT AT SITE TO DETERMINE. AN ODA ASSESSMENT IS TO BE CARRIED OUT AT SITE TO DETERMINE. WHETHER AN OXYGEN MONITOR IS REQUIRED WHILST DEALING WITH THE FIBC. 27. A DEVIATION OF GREATER THAN 100mbar BETWEEN PT-01007 & PT-01008 A DEVIATION OF GREATER THAN 100mbar BETWEEN PT-01007 & PT-01008 WILL LEAD TO A PROCESS TRIP OF THE LOCK HOPPER SEQUENCE & CLOSURE OF VALVES XV-0101 AND XV-0102. 28. RESTRICTION ORIFICE SIZED @ 6.5mm IN HAZOP ACTION 253, TO RESTRICT RESTRICTION ORIFICE SIZED @ 6.5mm IN HAZOP ACTION 253, TO RESTRICT FLOW OF NITROGEN TO ATMOSPHERE IN THE EVENT OF A SEAL FAILURE ON XV-0101 / XV-0102. 29. SEE VENDOR DRAWING FOR 1 oo 2 SOLENOID DETAIL : SEE VENDOR DRAWING FOR 1 oo 2 SOLENOID DETAIL : XV-0101 & XV-0102 - PANEL SCHEMATIC & LAYOUT