Page 1: C.V Mr. Rabih Makhoul

1 - 14

Profile of

RABIH SAMIR MAKHOUL

Professional Manager with experience in Project Management of Construction Projects

INDEX

1. CAREER SUMMARY 2 – 5

2. DETAILS OF PROFESSIONAL EXPERIENCE 5 - 18

Page 2: C.V Mr. Rabih Makhoul

Page 2 of 18

CAREER SUMMARY:

SPECIALIZATION:

Project Construction Management of Marine Projects.

Managing and communicating a clear vision of the division projects objectives.

Managing time, resources, and sequencing of the work efforts are aligned to produce the desired result

within a given period of time

EXPERIENCE: 16 Years.

POSITIONS HELD:

APERTURE Group Management Contracting Cluster head June 2016 till present Qatar- Doha

HUTA MARINE Works LTD Division Manager June 2012 till to June 2016 KSA-Jeddah

Projects Director February 2010 to June 2012

Project Manager February 2007 to February 2010

Construction Manager May 2005 to February 2007

Site Manager January 2004 to May 2005

Field Engineer August 2003 to January 2004

Davis Langdon (DLL), SARL. Cost Engineer January 2002 to August 2003 Lebanon

Site Engineer January 2001 to January 2002

Lebanese National Army Site Engineer January 1999 to January 2000 Lebanon

REPRESENTATIVE PROJECTS: June 16 - Present Contracting Cluster Head for APERTURE Group Sep 15 - June 16 Dareen Fishing Port Upgrade Works, ARAMCO - Jubail, Saudi Arabia - Division Manager (Contract Value: 37.5 Million SR) May 15 - June 16 Design and Build of King Abdul Aziz Road Project - Mecca, Saudi Arabia -

Page 3: C.V Mr. Rabih Makhoul

Page 3 of 18

Division Manager (Contract Value: 6.6 Billion SR) Feb 15 - June 16 Southern Border infrastructure Project - Sharoura, Saudi Arabia - Division Manager (Contract Value: 161 Million SR) Jun 14 - June 16 Deepening Approach Channel, Turning Basin and Quay Walls for Berth 8 and 9 Project - Yanbu commercial port, Saudi Arabia – Division Manager (Contract Value: 98 Million SR) Jun 14 - June 16 Construction of Quay Walls for Reception Passengers, Ships, Picnic Boats and Yachts - Yanbu commercial port, Saudi Arabia - Division Manager (Contract Value: 103 Million SR) Jun 14 - June 16 Construction of Yanbu Supporting Berths - Yanbu commercial port, Saudi Arabia - Division Manager (Contract Value: 59 Million SR) Apr 14 - June 16 Shuqaiq Steam Power Plant Project - Offshore Civil Works- Gizan, Saudi Arabia - Division Manager (Contract Value: 930 Million SR) Sep 13 - June 16 Jeddah South Thermal Power Plant Project - Offshore Civil works - Jeddah, Saudi Arabia - Division Manager (Contract Value: 1.1 Billion SR) Mar 13 - June 16 Construction of Two Deep Berth- Dammam Port, Saudi Arabia - Division Manager (Contract Value: 190 Million SR) Mar 12 - Feb 15 Zamil New Ship Yard (Phase 1 & Phase 2) - Dammam Port, Saudi Arabia – Projects

Director / Division Manager (Contract Value: 220 Million SR) Mar 11 - Aug 13 Qurayyah Independent Power Plant - Marine Works - Al-Khobar, Saudi Arabia -

Projects Director / Division Manager (Contract Value: 215 Million SR) Mar 11 - Present Durrat Al-Khobar, Saudi Arabia - Projects Director / Division Manager (Contract Value:

400 Million SR) Jan 11 - Present King Abdul Aziz International Airport Development Project Phase 1 - Jeddah, Saudi Arabia - Projects Director / Division Manager (Contract Value: 1 Billion SR) Feb 10 - Jun 13 Qurayyah Combined Cycle Power Plant - Offshore Works- Al-Khobar, Saudi Arabia - Project Directors / Division Manager (Contract Value: 360 Million SR) Jun 09 - Feb 10 Thuwal Town Development, ARAMCO - Marina Facilities - Jeddah, Saudi Arabia - Project Manager (Contract Value: 130 Million SR) Feb 07 - Mar 10 King Abdullah University of Science & technology, ARAMCO - Jeddah, Saudi Arabia - Project Manager (Contract Value: 650 Million SR) May 05 - Feb 07 Rabigh Development Project “Construction of RORO Jetties and sculpture Berth,

ARAMCO and SUMITOMO Joint Venture - Jeddah, Saudi Arabia - Construction Manager ((Contract Value: 170 Million SR)

Jan 04 - May 05 Construction of MSF Seawater Desalination Plant & Fresh Water Tank in Khafji Joint

Operation, ARAMCO and KJO - Khafji, Saudi Arabia - Site Manager (Contract Value: 70 Million SR)

Aug 03 - Jan 04 Procurement & Construction of Berth54 in King Fahd Industrial Port - Jubail, Saudi Arabia - Field Engineer (Contract Value: 96 Million SR) Jan 02 - Aug 03 Restoration and construction works for the Grand Opera building, Solider - Beirut,

Page 4: C.V Mr. Rabih Makhoul

Page 4 of 18

Lebanon - Cost Engineer (Contract Value: 50 Million US Dollar) Jan 01 - Jan 02 Restoration and construction works for Lot 166 and 182, Solider - Beirut, Lebanon - Site Engineer (Contract Value: 20 Million US Dollar) Jan 99 - Jan 00 Lebanese Army Military service - Tripoli, Lebanon - Site Engineer (Contract Value: 1 Million US Dollar)

Experience Highlight

Senior level of management with a high degree of independent decision making and professionalism. The typical

duties are including but not limited to the following:

Advance knowledge of construction, construction management, and design-build construction obtained through

a combination of experience and education.

Directs the overall construction management, organization, and operations of all projects and related

construction activities for the division.

Reviews and approves data submitted by staff for business development proposals. Provides direct input for

proposals, strategic plans, presentations and contract negotiations. Participates in final pricing of proposals by

providing counsel and information pertaining to the CM aspects of the project.

Performs all functions inherent in management and supervisory positions through directing, planning, organizing

and coordinating.

Develops annual operating plan and budget for the Construction Management Division.

Responsible for ensuring coordination with project controls to develop cost estimates, quantity takeoffs and

manpower requirements for proposals, forecasts and change orders on assigned projects.

Interacts and negotiates with top-level managers of Client companies.

Responsible for planning, scheduling, conducting and coordinating the technical and management aspects on

projects.

Develops construction bid documents and negotiate contracts with contractors, subcontractors, and suppliers.

Assigns discipline personnel to projects.

Ensures effective communication and coordination on projects between all disciplines and parties.

Demonstrates an expertise relative to constructability as applied to construction methods and materials, and the

economics involved.

Directs and participates in jobsite visits, Client meetings, and presentations.

Appoints Project Managers to assigned projects. Approves the selection of field Construction Managers for all

projects.

Page 5: C.V Mr. Rabih Makhoul

Page 5 of 18

COMPUTER SKILLS

Sr. Program Level Experience Last Used

1 Microsoft Package (Excel, Word, Power Point, M.S Project)

Excellent 16 Years 1 month

2 AutoCAD 2010 Excellent 16 Years 1 month

3 Primavera Very Good 6 years 8 Years

4 STADD Pro. Very Good 6 Years 8 years

5 Concise Very Good 6 Years 8 years

6 Water CAD Very Good 6 Years 8 years

7 Flow Master Good 3 Years 11 years

8 Culvert Master Good 3 Years 11 years

9 Robot Millennium Good 3 Years 11 years

Professional Membership Member of Lebanese Council of Engineers Member of Saudi Council of Engineers Language English - Excellent (Speaking, reading, writing)

French - Very Good (Speaking, reading, writing)

Arabic - Excellent (Speaking, reading, writing)

Academic Credentials MS. Civil Engineering – Balamand University- 2002 - Lebanon

BSc. Civil Engineering – Balamand University- 1999 –Lebanon

Personal Information Surname: Rabih Samir Makhoul

Nationality: Lebanese

Profession: Civil Engineer

Date of Birth: March 29, 1977

Email: [email protected]

Mobile: 0097466048594 - 0096171600098

ENCLOSURES: Details of Professional Experience (P.5 to 14).

Page 6: C.V Mr. Rabih Makhoul

Page 6 of 18

Professional Experience Division Manager June 2012 till June 2016

Responsibilities and Duties

Perform a key role in project planning, estimation and budgeting, execution, monitoring, controlling

and billing.

Devise the project work plans and co-ordinate with the consultants, contractors and sub-contractors.

Handle project accounting and minimize exposure and risk in the project.

Maintain strict adherence to the budgetary guidelines, quality and safety standards.

Oversee the construction projects from start to finish and ensure that construction activities move

according to predetermined schedule.

Ensure all civil works are supervised and completed properly and on time.

Assist and coordinate the selection of the key staff required to fill both Technical and Administrative

posts and establishing the organization structure of the project with HR.

Coordination with procurement management for the supply and implementation of the material

required of them after the adoption of demand from the Project Manager, in accordance with the

approved work program.

Coordinate with planning department to create manpower histogram, activities schedule, and

program of work.

Assist with senior management to prepare project management plan which shall be used as road

map to execute the project.

Manage day-to-day operational aspects of a project and scope.

Ensure that the client is properly billed and those payments are received in a timely manner for the

project.

Ensure that all contractual and legal matters related to the projects are dealt with properly and

promptly, seeking advice and guidance from Manager of Projects as necessary.

Keep the Manager of Projects informed of problems and progress and seeking his assistance on

problems which cannot be resolved on Project.

Monitor, identify, and analyze all project costs with a view of facilitating the completion of the projects

at minimum cost and within budget limit.

Monitor Material Procurement activities for the project under his control and ensure that all materials

are submitted, approved, ordered and delivered in accordance with project time schedule.

Ensure that the project quality system properly and efficiently satisfies the requirements of the

Contract.

Facilitate team and client meetings effectively.

Hold regular status meetings with project team.

Review deliverables prepared by team before passing to client.

Raise ‘Early Warning’ notices to planning, commercial, senior management in view of any and all

perceived delays to general progress of all works.

Committed to HSE requirements and all applicable legislations and contractual requirements

affecting the HSE activities at project site and administrative offices.

Ensure project documents are complete, current, and stored appropriately.

Manage projects closing out and insure.

Page 7: C.V Mr. Rabih Makhoul

Page 7 of 18

Projects Held

1. Dareen Fishing Port Upgrade Works September 2015 - Present Jubail, Saudi Arabia Contract Value: 37.5 Million SR.

Scope of Work

Construction of Marina Breakwater and reinstatement of the existing one ( length = 500 m)

Procurement and installation of Floating docks ( Total Area = 90 m2)

Demolition of existing coast Guard Tower

2. King Abdul-Aziz Road (KAAR) , May 2015 - Present Makkah, Saudi Arabia Contract Value: 6.6 Billion SR.

The King Abdul Aziz Road Project is a mega-project measuring 3.5Km from the outskirts of Makkah to the Grand

Holy Mosque. The project includes 209 plots along a central pedestrian spine that will alleviate the chaotic pilgrim

activity currently experienced during Hajj.

Scope of Work

King Abdullah Metro Station (290 x 38 m – Total Area = 11,020 m2)

Metro Tunnel ( Total length = 1150 m )

King Abdullah Mosque Car Park (380 x 204 m - Total area = 77,520 m2)

South Tunnel at King Abdullah Mosque (Total Length = 390 m)

North Tunnel at King Abdullah Mosque (Total Length = 390 m)

Car Park No.2 (370 x 40 m - Total area = 14,800 m2)

Car Park No.3 (418 x 40 m - Total area = 16,720 m2)

Al Mansor Road Underpass (Total Length = 430 m)

Second Ring Road Underpass and Buss Terminal Park (Total Length = 190 m)

South Bridge at First Ring Road (Total Length = 59 m)

North Bridge at First Ring Road

First Ring Rod Underpass (Total Length = 157 m)

Pedestrian Underpass (4 Nos.)

Station Underpass (118 x 60 m - Total area = 7,080 m2)

South and North Roads (Total Length = 2,400 m)

Underpass and U-Turn (Total length 930 m).

Access Roads.

Page 8: C.V Mr. Rabih Makhoul

Page 8 of 18

3. Southern Border infrastructure Project February 2015 - Present Sharoura, Saudi Arabia Contract Value: 161 Million SR.

The Border Guard has revealed that work has begun on reinforcing basic security infrastructure on the country’s southern border.

Scope of Work

Construction of 54.4 Km asphalt road including cut and fill, base course installation and asphalt paving.

4. Jeddah South Thermal Power Plant, September 2013 - Present Jeddah, Saudi Arabia Contract Value: 1.1 Billion SR.

Hyundai Heavy Industries Co., Ltd. (HHI), the world’s biggest shipbuilder and a leading industrial plant EPC

contractor, announced that the Company won a USD 3.3 billion order from Saudi Electricity Company (SEC) for

Jeddah steam Power Plant (JSTPP) in Saudi Arabia. HUTA is subcontractor for the Project offshore scope.

Scope of Work

S/W Intake Bridge (250 m length and 35 m width, consists of pre stressed U beam girder and top slab).

Sheet Piling Works (362 m of Anchor sheet pile with 22 m).

Dredging and Reclamation (Dredging of 7,649,109.00 m³).

Intake GRP pipe and Head structures (32 Nos. of 450 tons precast Head structures with the related GRP

pipe installation).

Fuel unloading jetty (Two Nos. of Fuel unloading jetty 40 x 25 m) to accommodate berthing and mooring of

vessels ranging in size from 70,000 to 100,000 DWT.

Breasting and Mooring Dolphins (7 Nos. of mooring dolphin and 8 Nos. of Breasting dolphins)

Jetty Trestle (850 m length of trestle, rested on piles with around 15 m width).

Small Boat Landing (150 m of quay wall for small boat berthing).

5. Shuqaiq Steam Power Plant, April 2014 - Present Shuqaiq Saudi Arabia Contract Value: 930 Million SR.

Hyundai Heavy Industries Co., Ltd. (HHI), the world’s biggest shipbuilder and a leading industrial plant EPC

contractor, announced that the Company won a USD 3.3 billion order from Saudi Electricity Company (SEC) on

August 14 to build the Shuqaiq Steam Power Plant (SSPP) in Saudi Arabia. HUTA is subcontractor for the Project

offshore scope.

Scope of Work

C/W Pump Station(140 m length x 83 m width resting on a 1.5 m thickness raft foundation- The foundation

top level is varies from -11.50 to -12.10 m, the concrete QTY is 58,000 m3)

S/W Intake Bridge (450 m length and 7 m width, consists of post tension I girder and top slab).

Dredging and Reclamation (Dredging of 4,372,000 m³).

Intake GRP pipe and Head structures (32 Nos. of 450 tons precast Head structures with the related GRP

pipe installation).

Fuel unloading jetty (Two Nos. of Fuel unloading jetty 40 x 25 m) to accommodate berthing and mooring of

vessels ranging in size from 70,000 to 100,000 DWT.

Page 9: C.V Mr. Rabih Makhoul

Page 9 of 18

Breasting and Mooring Dolphins (7 Nos. of mooring dolphin and 8 Nos. of Breasting dolphins)

Jetty Trestle (920 m length of trestle, rested on piles with around 15 m width).

Small Boat Landing (150 m of quay wall for small boat berthing).

6. Yanbu Recreational Berth, June 2014 - Present Yanbu, Saudi Arabia Contract Value: 103 Million SR.

Scope of Work

Sheet Piling works

Dredging

Main quay wall

Docking Quay (floating dock)

Access launch ramp

Fuel station quay

Lift station

Utilities works

7. Yanbu Supporting Berth, June 2014 - Present Yanbu, Saudi Arabia Contract Value: 59 Million SR.

Scope of Work

Construction of 200 m of berthing quay wall with 13m draft.

Dredging works of 140,000 m3.

Utilities works.

8. Deepening works for Berth 8 and 9 June 2014 - Present Yanbu, Saudi Arabia Contract Value: 98 Million SR.

Scope of Work

Dredging works.

Quay wall strengthening and reinstatement.

Underwater sheet pile installation

Scour protection

9. ZAMIL New Ship Yard (Phase 1 and Phase 2), March 2012 – February 2015 Dammam Port Saudi Arabia Contract Value: 220 Million SR.

EPC contract has been signed with Zamil Offshore Services Company to build a new shipyard on a large reclaimed

area inside King Abdul-Aziz Port in Dammam.

The new shipyard is designed to accommodate the building and repair of all types of vessels within its ship-lift

capacity; offshore support vessels, harbor service craft, yachts, naval vessels and offshore structures including rigs

and platforms.

The shipyard will be equipped with a modern ship lift capable of handling vessels up to 7500 tons in weight.

Page 10: C.V Mr. Rabih Makhoul

Page 10 of 18

The new layout includes the construction of nine dry berths to enable the yard to build and repair nine vessels

simultaneously as well as providing versatile facilities and workshops for extensive fabrication and outfitting.

The overseas design provider is TRITON from Greece and consultancy provider is HAMZA associates from Egypt.

Scope of Work

Ship lift Construction (Synchro lift area) 105 m x 65 m

Quay Wall Construction (200 tons each block, 705 L. M)

30 m height vertical and raked piles driving (240 Nos.)

Procurement of long lead items (Bollards, Capstan, Fenders, Ladders…)

Dredging Works

Reclamation Works

Shore Protection

Steel Treatment Building Foundations (120 m x 250 m)

Transfer Area Foundation (Railway) including the railing works (155 m x 320 m)

Utilities Trenches (2600 L. M)

Fresh Water Tank

Sewage Pump Station

Utilities Pump Room

Roads including parking and high lighting mast ( 3100 L. M)

Dynamic Soil Improvement. (Area = 300250 m2)

Utilities network (electrical, sewerage, fresh water, cooling water, firefighting, drainage……)

10. Qurayyah Independent Power Plant - Marine Works, March 2011 - August 2013 Dammam, Saudi Arabia Contract Value: 215 Million SR.

Qurayyah IPP project called for building a 4000-megawatt combined-cycle thermal power plant, the world’s

largest to date, in cooperation with Saudi Arabians’ largest developer ACWA power, and SAMSUNG C&T. HUTA

has been participating in the project the initial design stage.

HUTA is a full EPC (engineering, procurement, and construction) contractor responsible for all tasks design to

procurement through actual construction. The overseas design provider is Sargent and Lundy (S&L) from

Chicago and consultancy provider is Fichtner from Germany.

Scope of Work

Dredging of Intake and Outfall Channel (Approximately 600,000m3)

Offshore and Onshore GRP 4.0 m dia. pipe laying using coupling system ( 6.5 k.m)

Construction of Seawater pump station (105 m x 95 m ,depth 12 m below seawater)

Construction of outfall seal pit structure (2 Nos.,29 m x 22 m , depth 6 below seawater level)

Shore protection works

Construction and installation of velocity cap (Seawater Intake head structure)

Navigation aids, Oil boom and permanent buoy installation.

Inland GRP pipe 2.70 m dia. Installation using lamination system.

11. Two Deep Berths. Dammam Port, March 2013 - Present Saudi Arabia Contract Value: 190 Million SR.

HUTA is the EPC Marine contractor for the Two New Berths Project; the marine works mainly comprise

construction of two quay walls to support two new deep water berths (38 and 39) in King Abdul Aziz Port (KAP),

Page 11: C.V Mr. Rabih Makhoul

Page 11 of 18

Dammam, Kingdom of Saudi Arabia. Both of the proposed quay walls are 19.0m high and 300m long and will be

constructed using reinforced concrete blocks between the existing caissons at north and south of the walls.

The engineering services provided by COWI comprise studies, concept design and detailed design, including

geotechnical assessment of the subsurface site conditions.

Scope of Work

Dredging works

Construction of Quay Wall (620 L.M)

12. Durrat Al-Khobar , March 2011 - Present Saudi Arabia Contract Value: 400 Million SR. The Durrat Al-Khobar Site is located in Al-Aziziah area in Al-Khobar and occupies approximately 4,100,000 m2.

The Project will comprise the following components:

Land plots facing the sea

In-Land plots facing green spaces Land for Hotel

Marina

Restaurant Island

Land for public facilities

Play areas and sport areas Open green spaces

Roads and bridges

Utilities

Scope of Work

Bridges

Water Treatment Plant

Sewage Treatment Plant

Irrigation Tank

Deep well

Roads

Utilities network (electrical, sewerage, fresh water …)

Project Director February 2010 till June 2012

Responsibilities and Duties

· Project Planning - Develop a plan for managing each project, including staffing, schedule, job cost breakdown,

work measurement system, invoicing format, and document flow and control.

· Estimating - Ensure that accurate estimates are prepared for each designated project.

· Customer Relationship - Establish a positive and open relationship with the Owner.

· Contract Review - Ensure the contract is reviewed, understood, communicated to the project team and adhered to

throughout the course of the project.

· Project Documentation - Develop and implement a system for timely and accurate project documentation,

including billings, change requests, information requests, schedule, meetings, transmittals,

and work measurement.

Page 12: C.V Mr. Rabih Makhoul

Page 12 of 18

· Constructability Reviews - Interface with Project Engineer and Site Manager, as necessary, to review

constructability of design with the goal of meeting or exceeding projected quality, cost

and schedule commitments.

· Leadership - Manage key project positions including the Project Engineer, Site Manager and Project Administrator,

as required. Establish, organized, and direct the efforts of the project team. Ensure the company's

standardized management procedures and methods are being utilized.

· Quality - Ensure compliance with all quality initiatives and processes.

Projects Held

1. King Abdul Aziz International Airport Development January 11 - Present Project Phase -1 (Package 421 & 422) (KAIA), Contract Value: 1 Billion SR. Jeddah, Saudi Arabia The Master Plan embraces development in three phases to 2035,Phase 1 is now underway, with the following

main features to be achieved by 2014 :

State-of-the-art terminal facility, capacity 30 Million Annum Passengers (MAP), with the capability to operate as

both a domestic and an international hub

Transportation center and railway station ,to accommodate the new high-speed rail service now under

construction, serving Makkah and Madinah

Full program of supporting infrastructure : New ATC Tower ,systems and equipment, taxiways, airside and

landside road network, utilities networks, services and support buildings

First phase of cargo village and Airport City development, driven by private sector investment

Uninterrupted airport operations maintained at all times during construction

Airport Operational and Transfer ( ORAT ) Program, to move all scheduled airlines from existing two terminals to

the new facility

Increased opportunities for involvement of the private sector, to encourage commercial dynamism, quality and

variety in the new airport development.

The oversees design provider is Atkins from UK and consultancy provider is Dar Al-Handasah from Saudi

Arabia.

Scope of Work

Excavation, dewatering and shoring works for the following structures:

Passenger and terminal building

Automated people mover maintenance

Data center 1 (Support facilities – A)

Data center 1 (Fuel tank)

Tunnel on arterial 4

Curbside viaduct

Multi story car parking

Load center (A)

Load center (B)

Load center (C)

Utilities tunnel

Water tank for fire station

Crisis center (Support facilities-A)

First class car parking

Transportation center

Page 13: C.V Mr. Rabih Makhoul

Page 13 of 18

2. Qurayyah Combined Cycle Power Plant - Marine Works, February 2010 - June 2013

Dammam, Saudi Arabia Contract Value: 360 Million SR.

Saudi Electricity Company (SEC) has implemented Qurayyah Combined Cycle Power Plant, approximately 100 km

south of Dammam. The project comprises 15 GE frame 7FA gas turbines, which will be operated in open cycle

configuration in a first phase. In phase two the project will be extended to a combined cycle power plant consisting of

5 blocks, three gas turbines, related heat recovery boilers and 1 steam turbine each. 3,200 MW Qurayyah Combined

Cycle Power Plant being constructed adjacent to the existing Qurayyah l Power Plant to meet the future load

demand and to support the existing generation capability in the Eastern Province of Saudi Arabia. HUTA is the EPC

marine contractor for QCCPP Project. The overseas design provider is Sargent and Lundy (S&L) from Chicago and

consultancy provider is Lahmeyer from Germany.

Scope of Work

Dredging of Inner & Outer Basin in addition to Outfall area (800,000 M3).

Construction of Intake basin with breakwater (205mx300m) with an inlet of 52 Nos. of GRP pipes 2m

diameter.

Precast concrete blocks for intake structure and end weir discharge canal and etc.

Construction of Reinforced concrete lining discharge channel (around 800L.m).

Construction of Rip Rap Revetments for Shoreline protection (Around 1.5Km).

Reinstatement of slope protection.

Construction of Cooling water Pump House with 14 bays approximately 215m x 53m, depth 9 m below

seawater With R.C Walls provided with Reinforcement protected by cathodic protection.

Construction of Weir Box (55mx13m,depth 4 m below Seawater)

Project Manager February 2007 till February 2010

Responsibilities and Duties

Direct and manage project development from beginning to end.

Develop, analyze and forecast project cost reports and determine the status of the jobs in terms of

scheduling and costing.

Develop and update project schedules, communicate these schedules and resource requirements to

Operation Managers and Asset Manager for planning purposes.

Instill a positive working relationship with the client and client engineer.

Conduct project meetings.

Oversee the procurement of material purchases and prepare purchase requisitions.

Procure subcontractors required to execute project. Negotiate scope of work, costs, payment terms

and complete subcontractor agreements.

Develop and submit all project submittals for client approval in bidding of work.

Follow all company Health and Safety Programs, and supports a safe work environment.

Identify and resolve issues conflicts within the project team.

Review drawings and table of quantities to ensure adequacy of the implementation of the entire work

and raise them to the point of the service after review with the projects management and Executive

with the preparation of revised tables.

Consultation with the Project Manager to prepare a program of the operational work of the project

including the number and type of work teams, dates of initial start in the business, determine the

starting point of starting work on the basis of the estimated quantities specified for the project and

the duration of the work available and the possibilities for action by the company and determine the

need for the outside when necessary.

Page 14: C.V Mr. Rabih Makhoul

Page 14 of 18

Managing the employees and workers in the project, determine the fronts of daily work in advance,

follow-up audit of the course of the distribution of work tasks for a Technical Assistant.

Follow-up the Productivities daily of the equipment, personnel and work daily and monthly

comparison between the main business of the work executed by the Department of the

programming, monitoring and implementing agencies are informed of this and the reprogramming of

the project according to the possibilities.

Coordination with the workshops management on the request for equipment or repairing orders.

Preparing the monthly invoices and adoption of a supervision and distribute.

Coordination with various government departments related to the project or that have the services

and require them to take permits or renewal of such permits.

Make sure to follow the proper methods for implementation and the safety of the work done.

Preservation and documentation of documents and correspondence for each project.

Projects Held

Thuwal Town Development, ARAMCO – Marina Facilities June 2009 – February 2010 Jeddah, Saudi Arabia Contract Value: 130 Million SR.

Scope of Work

Development Marinas and service jetty. The work included several major activities from Dredging (Around

1,000,000 M3), concrete shoreline walls (Around 1 Km), Sand Beaches(Around 3Km), Rip Rap

Revetments(Around 2Km), Fisherman and leisure harbor floating docks Marina with all required services and

utilities, Boat hoist, Boat Ramp and the Coast Guard offshore jetty (on piles).

King Abdullah University for Science and February 2007 - February 2010 Technology project (KAUST), Jeddah, Saudi Arabia Contract Value: 650 Million SR.

Scope of Work

Dredging of Channel & Harbor (2,000,000 M3).

Construction of Steel sheet piles shoreline walls (Around 3 Km).

Reinforced concrete bored piles (More than 2000 piles).

Construction of Concrete Shoreline block wall (around 8 Km).

Construction of Revetments and Rip Rap Shoreline protection (Around 4Km).

Reinstatement of slope protection.

Construction of Two Seawater Intake Pump station (50mx30m & 90mx40m, depth 9m below Seawater), One

for the University desalination plant and the other for the academic building water circulation.

Construction of vehicular Bridge No.1 (100mx40m) linking the University to the Island).

Construction of Sea Court Bridge (100mx50m) above Seawater linking the two major Academic Buildings.

Installation of double line, Diameter 1200 mm GRP Pipes linking the desalination plant to the Seawater

intake pump station (Around 4 Km).

Installation of three line offshore HDPE Pipes(Underwater), Diameter 1200mm linking the Pump Station to

the underwater intake Mouths as well as to the discharge Mouth (Around 7 Km).

Construction of several lift Stations.

Construction of South Marina. The work included construction of Shoreline Block Wall, Revetments, Floating

Docks Marina with Relative services and accessories, Boat Hoist and Boat Ramp.

Page 15: C.V Mr. Rabih Makhoul

Page 15 of 18

Construction Manager May 2005 till February 2007

Responsibilities and Duties

Manage and supervise the Subcontractors / Site Engineers.

Ensure that all construction works are undertaken to required designs, specifications, standards and QHSE

requirements.

Determine labor requirements and dispatch workers to construction sites.

Obtain all necessary permits and licenses.

Study job specifications to determine appropriate construction methods.

Take actions to deal with the results of delays, bad weather, or emergencies at construction site.

Monitor site progress including installation of required equipment against accepted programs and 2-4 week

look ahead.

Make recommendation where extra sources or alternative work processes are required to maintain or

increase performance.

Responsible for reporting progress of site works to project manager.

Monitor Project cost and provide project manager with timely identification of deviations from project budget.

Identify problematic design issues and make recommendations for alternative and cost effective re-design

solutions.

Ensure the construction schedule is maintained.

Reports on changes and additions to contractual agreements by main contractors, consultants, clients,

suppliers and subcontractors.

Maintain accurate and detailed records of all site activities

Investigate damages, accidents, or delays at construction sites, to ensure that proper procedures are being

carried out

Projects Held

Rabigh Development Project “Construction of RORO Jetties May 2005 - February 2007 And Sculpture Berth, ARAMCO AND SUMITOMO Joint Venture Contract Value: 120 Million SR. Jeddah, Saudi Arabia

Scope of Work

Pre-cast work

Driving of steel piles

Reinforced concrete bored piles

Dredging

Sheet Piling

Reinstatement of slope protection

Casting of platforms

Page 16: C.V Mr. Rabih Makhoul

Page 16 of 18

Site Manager January 2004 till May 2005

Responsibilities and Duties

Supervise and Observe the Foremen and labor Force, and make sure the works are as per the approved

shop drawings and up to the quality standard, and to the satisfaction of the consultant; and are completed on

the scheduled time with the least amount of cost and minimal wastage of Materials.

Set out, level and survey of the site, and check drawings and quantities and ensure the accuracy of

calculations.

Mark out the site, and make sure designs are applied correctly and liaise with the Construction Manager.

Schedule, plan the physical works and activities and initiate materials ordering on time to keep the works in

progress and avoid delay.

Organize the process so that deadlines are met.

Organize and supervise materials and Labors.

Act as day-to-day manager of the construction site activities, and be the main source of technical advice and

quality control for everyone working on site.

Ensure that all materials used and work performed are as per specifications.

Oversee the selection and requisition of materials and plant.

Manage, monitor and interpret the contract design documents supplied by the Client/Consultant.

Regular liaison with Subcontractors, Supervisors, Planners, Quantity surveyors and the general workforce

involved in the project.

Liaise with the local authority (where appropriate to the project) to ensure compliance with local construction

regulations and by-laws.

Oversee and take some responsibility for Quality Control, Health and Safety matters on site.

Projects Held

Construction of MSF Seawater Desalination Plant January 2004 – May 2005 And Fresh Water Tank in Khafji Joint Operation, ARAMCO, Contract Value: 70 Million SR. Khafji, Saudi Arabia.

Scope of Work

Construction of 4 New Concrete Buildings

Procurement

Pre-cast concrete Retaining Walls and Manholes

In-situ concrete Cable Trenches, Road Pavements & Heavy Equipment Foundations

Demolitions works

Steel erections

Concrete repair

Quantity take off

As-Built drawings.

Page 17: C.V Mr. Rabih Makhoul

Page 17 of 18

Field Engineer August 2003 till January 2004

Projects Held

Procurement & Construction of Berth 54 Contract Value: 96 Million SR. In King Fahd Industrial Port, Jeddah, Saudi Arabia.

Scope of work

Pre-cast concrete

In-site concrete

Driving of steel piles

Steel erection

Concrete repair

Quantities take off

As-Built drawings.

Cost Engineer January 2002 till August 2003

Projects Held

Restoration and constructions works for Grand Opera building- SOLIDERE- Beirut, Lebanon Contract Value: 50 Million US Dollar

Responsibilities and Duties

Quantity Surveying.

Quality & Cost Control

Checking of interim payments/Final Accounts

Site Engineer January 2001 till January 2002

Projects Held

Restoration and constructions works for Lot 166 and 188 - SOLIDERE- Beirut, Lebanon Contract Value: 20 Million US Dollar

Responsibilities and Duties

Revising the B.O.Q

Studying the material specifications &

Selecting the convenient offers and alternative to adopt - Quantity take off

Supervising the site (concrete work, partitions, finishing)

Preparing Shop drawings

Page 18: C.V Mr. Rabih Makhoul

Page 18 of 18

Site Engineer January 2009 till January 2010

Projects Held

Lebanese National Army Contract Value: 1 Million US Dollar

Responsibilities and Duties

Worked as a Site Engineer for various project concerning the Lebanese National Army, the work mainly was

restoration work.