11
PERSONAL INFORMATION: Name : Osama Ahmed Mahmoud Ahmed. Address : Ismailia, Egypt. Telephone :( +201002741166) OR (+966543039144). Nationality : Egyptian Birthday : 10/ 04/ 1984. Marital status : married. Militant’s status : Exempt. E-mail : [email protected] Employee ID : 174589 EDUCATION: B.Sc. in Civil Engineering: Institution : Alexandria University , Faculty of Engineering Location : Alexandria – Egypt General Grade : Good ( Cumulative 73.08% ) Graduation Project : Project management Project Grade : Good. Years 9/2001 – 06/2006 : 2001-2006 Preparatory year (2001/2002) : G: Good First year (2002/2003) : V.G: Very Good Second year (2003/2004) : G: Good Third year (2004/2005) : G: Good Fourth year (2005/2006) : V.G: Very Good EMPLOYMENT RECORD: 12/2006 - 1/2009 : Civil engineer at The Arab Contractors (OSMAN AHMED OSMAN& CO.) Utilities Dep. 1/2009 – 9/2014 : Civil engineer at The Arab Contractors (OSMAN AHMED OSMAN& CO.) Marine Constructions Dep. 9/2014-until now : Civil engineer at Saudi Binladin Group (SBG).

osama C.V

Embed Size (px)

Citation preview

Page 1: osama  C.V

PERSONAL INFORMATION:

Name : Osama Ahmed Mahmoud Ahmed. Address : Ismailia, Egypt. Telephone :( +201002741166) OR (+966543039144). Nationality : Egyptian Birthday : 10/ 04/ 1984. Marital status : married. Militant’s status : Exempt. E-mail : [email protected] Employee ID : 174589

EDUCATION:

B.Sc. in Civil Engineering: Institution : Alexandria University , Faculty of Engineering Location : Alexandria – Egypt General Grade : Good ( Cumulative 73.08% ) Graduation Project : Project management Project Grade : Good. Years 9/2001 – 06/2006 : 2001-2006

Preparatory year (2001/2002) : G: Good

First year (2002/2003) : V.G: Very Good Second year (2003/2004) : G: Good Third year (2004/2005) : G: Good Fourth year (2005/2006) : V.G: Very Good

EMPLOYMENT RECORD:

12/2006 - 1/2009 :

Civil engineer at The Arab Contractors (OSMAN AHMED OSMAN& CO.) Utilities Dep.

1/2009 – 9/2014 : Civil engineer at The Arab Contractors (OSMAN AHMED OSMAN& CO.) Marine Constructions Dep.

9/2014-until now : Civil engineer at Saudi Binladin Group (SBG).

Page 2: osama  C.V

QUALIFICATIONS: Operating systems: MS-DOS, UNIX, Windows 95/98/NT/2000/XP/vista/7/8

Other software programs: MS Office (Word, Excel, PowerPoint, Outlook, Access, FrontPage).

Networks, Databases, Internet.

Commercial applications for Civil Engineers:

AutoCAD 2006-2007….2015 Microsoft Project (Project management). Primavera Project Planner (Project management) P6. Analysis program SAP V14.

LANGUAGES:

Arabic: Mother Longuage.

English: (Very Good Reading, Speaking, and Writing).

WORK EXPERIENCES:

Job:‐TechnicalOfficeEngineer&SiteEngineer 1- PROJECT NAME:-

IINNFFRRAA SSTTRRUUCCTTUURREE FFOORR RReellooccaattiioonn OOff ttaannnneerriieess ttoo RRoobbaakkii RReeggiioonn ((ffiirrsstt ssttaaggee)) ((5599mmiilllliioonn LL..EE)) ((ffrroomm 1122//22000066 ttoo 66//22000088))..

. COMPONENTS OF THE PROJECT:-

a) Groundwater Tank (5000 m3) b) Roads Network(150000m2) c) Telephone Cables Network d) Electrical Cables Network.

THE TASKS:-

Preparation of schedules for the project using Primavera 6 Inventory needs of the project Inventory items and preparation extracts of client and subcontractors. Approved Material Submittal from client

2- PROJECT NAME:-

SSUUPPEERR SSTTRRUUCCTTUURREE FFOORR RReellooccaattiioonn OOff ttaannnneerriieess ooff RRoobbaakkii RReeggiioonn ((ffiirrsstt ssttaaggee)) ((117700 mmiilllliioonn ppoouunnddss)))).. ((FFrroomm 44//22000088 ttoo 77//22000099))..

COMPONENTS OF THE PROJECT:-

a) 160 Tanneries and Units Glue. b) Concrete foundations. c) Steel structure

THE TASKS:- Preparation of schedules for the project using Primavera 6

Workshop drawings for the steel windows

Inventory items and preparation extracts of client and subcontractors.

Page 3: osama  C.V

3- PROJECT NAME:-

LLiiffttiinngg ppuummppss ssttaattiioonn ffoorr ssaalliinnee aanndd ggeenneerraall aanndd tthhee jjooiinntt cchhrroommee rreeccoovveerryy ppllaanntt && ssaalliinnee wwaatteerr ttrreeaattmmeenntt ppllaanntt aanndd aannnneexxeedd sseerrvviicceess ooff rroobbaaiikkyy lleeaatthheerr ddiittrriicctt CCiittyy ((112266mmiilllliioonn LL..EE)) ((ffrroomm 66//22000088 uunnttiill nnooww)).

COMPONENTS OF THE PROJECT:-

a) Lifting pump station for general b) Lifting pump station for saline c) homogenization tank d) Thickening tank e) Administration building f) Fence g) Workshop building h) Transformer building i) Generator building

THE TASKS:- Preparation of schedules for the project using Primavera 6

Inventory needs of the project

Terms of business analysis studies for the project

Workshop drawings for the project

Inventory items and preparation extracts of client and subcontractors.

4- PROJECT NAME:- GGEENNEERRAALL EEFFFFLLUUEENNTT TTRREEAATTMMEENNTT,, SSOOLLIIDD WWAASSTTEE,, SSAANNIITTAARRYY;; DDIISSPPOOSSAALL SSYYSSTTEEMM AANNDD AANNNNEEXXEEDD SSEERRVVIICCEE FFOORR LLEEAATTHHEERR CCIITTYY ((113399mmiilllliioonn LL..EE)) ((ffrroomm 44//22000099 ttoo 99//22001144))..

COMPONENTS OF THE PROJECT:-

a) primary settling tank b) sulphide oxidation tank & homogenization tank c) denitrification tank & biological oxidation tank d) Filter press building e) Screening and grit chamber f) Secondary settling tank g) Thickening tank h) Final pond storage i) Electrical cabin, Blowers room j) Administration building k) Workshop building l) Fence and gates

THE TASKS:- Preparation of schedules for the project using Primavera P6

Inventory needs of the project

Terms of business analysis studies for the project

Workshop drawings for the project

Inventory items and preparation extracts of client and subcontractors.

Page 4: osama  C.V

5- PROJECT NAME:-

PPrroojjeecctt ooff CCuussttooddiiaann ooff tthhee HHoollyy MMoossqquuee ffoorr EExxppaannssiioonn ooff PPrroopphheett’’ss MMoossqquuee && PPiiaazzzzaa iinn MMaaddiinnaa aanndd RReellaatteedd EElleemmeenntt.. ((FFrroomm 99//22001144 uunnttiill nnooww))..

COMPONENTS OF THE PROJECT:-

a) Single height prayer cell )24*24( and double height prayer cell ( 72*72 )m

height 48m (two floor under +0.0 level and four floor above +0.0 level b) Deep foundation (piles average length 65m) c) Raft (thickness 1.75m) and pile cap(thickness 2.5m) d) Columns (Diameter 2.85m) e) Beams (1.2*3.6 m)&(1.2*2.4 m)&(1.2*1.2m) f) Solid slab (thickness 0.6&0.3&0.2 m) & precast slab g) Artificial stone &soft beams & skin walls h) Arches cast in situ i) Cladding columns and floor and walls (marble and granite)

THE TASKS:-

Preparation Reinforcement Workshop drawings

Inventory items and preparation extracts of client and subcontractors.

CERTIFICATE AND TRAINING COURSES:

Certificate from Institute for Construction Engineering and Management Technologies: civil engineer level 1.

Certificate from Institute for Construction Engineering and Management

Technologies: civil engineer level 2.

Certificate from Institute for Construction Engineering and Management

Technologies: civil engineer level 3. Certificate from Arab Contractors Computer Center: Mastering Primavera P6.

Certificate from OSHAcademy for Construction Safety and Healthy

Certificate from Institute for Construction Engineering and Management Technologies: in Program Specialist in project Management (Contracts, Planning, Financial Management, Primavera and Soft skills)

Page 5: osama  C.V
Page 6: osama  C.V
Page 7: osama  C.V
Page 8: osama  C.V
Page 9: osama  C.V
Page 10: osama  C.V
Page 11: osama  C.V