Upload
moustafa-helmy
View
144
Download
4
Embed Size (px)
Citation preview
Personal Information
Name : Mustafa Helmi Zaki Sayed
Date of Birth: 23/12/1976
Nationality: Egyptian
Tel: +20 100 660 5312 - +20 128 1333 306
E- Mail: [email protected] &
Language: Arabic (mother language)
English (reading & writing- very good)
Social Status: Married + 2 children
Military Status: Exempted
Educational Attainment • Bachelor’s Degree in Horticulture Cairo university 1998
*Grade: good
• Master’s Degree in Ornamental Plants Cairo university 2003
Thesis presented and discussed was on
1 | P a g e
“The effect of different levels of fertilizers & irrigation on different types
of turf grass”
Profile • Highly motivated with extensive technical and administrative experience in
turf and landscape maintenance. 17 years demonstrated history producing
timely results.
• Have a good adaptability skill, a fast learner and couching skills.
• Have strong understanding and continue to expand in turf culture,
course conditioning, course construction and reconstruction to up to
date proper use of fertilizer as well as keeps up to date on new golf
courses and irrigation equipment.
• Knowledgeable in proper calibration of fertilizer spreaders (walk
behind and ride-on), boom sprayers and back pack sprayers.
• Preparing and opening the Golf courses to host the big tournaments.
• Have an extensive knowledge of golf accessories and golf operation.
Work Experiences:
EMAAR MISR for DEVELOPMENT 1st of January 2013 till present
Position: Golf course and agronomy manager – MARASSI & UPTOWN CAIRO
(UTC)
(Marassi: #18 Holes golf course & Golf Academy). North cost, Sedi Abdulrahman.
(UPTOWN CAIRO: # 18 Holes golf course & Golf clubhouse) Cairo, Mokattam.
• Overseeing the Construction & maintenance for the two 18 holes golf courses.
• The landscape maintenance at the Clubhouse at UTC.
• The landscape maintenance at the Golf Club & Academy, Family Beach and
Beach Clubhouse at MARASSI (NORTH COAST).
2 | P a g e
• Preparing the forecasting budget for the hospitality department for each
course.
• Overseeing the operation at Marassi golf club and academy.
Palm Hills Golf Course (6th of October City) 1st of June 2012 till 31st of December 2012.
Position: Golf Course Superintendent (27 Holes & 9 holes Golf Academy).
Stella Di Mare Resort (Alein Al Sokhna) 1st of December 2007 till 29th of May 2012.
Position: Golf Course superintendent.
Duties & Responsibilities
• Manpower management.
• Grass maintenance and annul renovation programs for greens, tees and fair
ways.
• Maintenance of landscape areas and relocated and redesign landscape areas.
• Irrigation scheduling for all golf course (18 halls) using Rain Bird system.
• Irrigation maintenance scheduling (computerized system).
• Pest control programs (insecticide, fungicide and herbicide).
• Fertilization programs.
• Workshop supervision (machines maintenance scheduling, spar parts requests
and machines dilly work list).
•
During this period: • Participate as Trainer in the training course of LANDSCAPE DESIGN AND
MANAGEMENT at A.U.C. (How to build and maintain the golf courses,
football fields and turf grass area).
• Working as a consultant at AUC (part time), for the soccer fields & all the
grass area including the president villa at AUC. Up till now (ongoing)
3 | P a g e
Palm Hills Golf Course (6 October City) August 2007 till November 2007
Position: Egyptian Golf Course Superintendent.
Duties and Responsibilities
• Turf nursery construction (20 fed) including the irrigation system, planting the
stolons (paspalum sea isle super supreme)
• Turf nursery manager.
• Construction of palm hills golf course.
• Executive engineer & supervision all irrigation, drainage& grassing.
Al-Sulaiteen Agri. & Industrial Complex (SAIC) Doha – Qatar
July 2003 – August 2007
Position: Project Manager
• Construction and maintenance for football pitches (new stadium at
Doha).
• Designing, execution and maintenance of landscaping projects
• Estimate for tenders and prepares quotations.
• Coordinates with engineers, prepares progress report, scheduling of
manpower and landscaping equipments.
• Overall in-charge of activities in all maintenance and construction projects.
Projects handled at Doha:-
PROJECT CLIENT PERIOD
1 Package 1,2,3 Landscape Maintenance Building Engineering
Department (BED)
2 years
2 Construction & Maintenance of 3 Schools Football
fields.
Qatar National Olympic
Committee (QNOC)
1 years
4 | P a g e
3 Beautification at Shahaniya Park.
Ministry of Municipal &
Agriculture Affairs
6 months
4 Beautification of 4 Roundabouts at Ali Bin Talib
Street.
Ministry of Municipal &
Agriculture Affairs
18 months
5 Maintenance of Green Area at Al Cornish. Ministry of Municipal &
Agriculture Affairs
2 years
6 Maintenance the park of Shooting Range at Al
Wassail
Qatar National Olympic
Comity
3 years
7 Construction & Maintenance of the Racing track at
Qatar Equestrian Federation. (Irrigation & grass).
Qatar National Olympic
Comity
15 months
8 Maintaining the landscape area of Khalifa sport
city (Aspire). Including Super club & 5football
fields.
Qatar National Olympic
Comity
3years
9 Maintenance the landscape area around QNOC
Building.
Qatar National Olympic
Comity
3 years
10 Maintenance of 2nd Grade Football clubs (13
football fields)
Qatar National Olympic
Comity
3years
11 Construction & Maintenance of Football field of Al
Nasser Club at Al-Jumailiyah
Qatar National Olympic
Comity
15 months
12 Construction & Maintenance of Football ground of
Al kharssah Club at Al kharssah
Qatar National Olympic
Comity
15 months
5 | P a g e
13 Maintenance the landscaping of Qatar foundation
(education city) including 3 football field.
Qatar Foundation(Q.F) 12 months
14 Maintenance the landscaping of Qatar leadership
academy including1 football field.
Qatar Foundation(Q.F) 12 months
15 Replanting & maintenance all the grass area at al
Doha Cornish
Building Engineering
Department (BED)
13 months
16 Construction & Maintenance of Football Pitches at
Al Khor (Private)
Mr./ Helal quarry 6 months
17 Construction & Maintenance of Green Area at Ras
Abu Fontas station. (QEWC)
Qatar Electric & Water
Corporation (QEWC)
3 years
18 Maintenance of al rayyan park (150,000m2
paspalum turf grass).
Ministry of Municipal
& Agriculture Affairs
1 year
19 Landscaping works of Private Villas.
(Construction & Maintenance)
- Mr. Saleh Al
kholaifi
- Mr. Mahmoud
- Mr.
AbdulKareem.
- Al Duhail
School.
- Mr. Abdulatef Al
Meer
6 | P a g e
During this period:- Gave lectures and trained on:
“HOW TO BUILD & MAINTAIN THE TURF GRASS”.
1) At the Municipality of agricultural to the agricultural & landscape Engineers
and
2) At Oasis & Marriott Hotels to the landscape companies, under authority of the
Ministry of Municipal & Agriculture Affairs.
Dreamland Golf & Tennis Resort August 1998 – July 2003
Position: Asst. Superintendent
• In-charge of maintenance of the Golf course including all necessary works such
As application of fertilizers, herbicide and pesticide operations.
• In-charge of maintaining the soccer fields, the tennis fields and croquet.
Duties and Responsibilities
• Coordinate with the senior superintendent every given task, especially
during major activities.
• Identify insects, diseases, and weed populations and known proper
control methods either cultural or chemical.
• Use irrigation controllers to water turf as needed.
• Thoroughly assist in all safety needs and procedure.
• Understand all irrigation systems, repairs, maintenance and as-built on
site.
• Train, motivate and supervises all staff in a professional attitude.
• Planning and execution of the technical knowledge, regarding proper
fertilizer and pesticide application and cultural program for landscape
and irrigation maintenance.
7 | P a g e
Designing, planting and maintenance of some private projects
- North coast (Dr. Ahmad Bahgat villa, Dr. Hany Assal villa).
- Mena House Golf Course, Egypt - In-charge of all the maintenance operation of
the golf course and the turf grass including all necessary works such as
application of fertilizers, herbicide and pesticide operations. Only for one season
as contractor.
References and Certificates hereafter
8 | P a g e
9 | P a g e
10 | P a g e
11 | P a g e
12 | P a g e
13 | P a g e
14 | P a g e
15 | P a g e
16 | P a g e
17 | P a g e
18 | P a g e
19 | P a g e
20 | P a g e
21 | P a g e
22 | P a g e
23 | P a g e
24 | P a g e
25 | P a g e
The original certificates ready upon request.
26 | P a g e