5
Mohamed Mostafa Alsharif BIM Manager, Coordinator Arch, Stru & MEP BIM Support Solving problems for Revit, Autocad Developer Revit Dynamo Quality Control Engineer E-Mail: [email protected] Mobile: 01148932819 My Channel: https://www.youtube.com/c/MohamedMostafaAlsharif My page: https://www.facebook.com/3dquality My Site: http://bimdesigners.wix.com/3dquality https://eg.linkedin.com/in/mohamedalsharif Experience: 6 years work with standard and all disciplines Personal Data: o Date of birth: 05/08/1991 o Nationality: Egyptian o Home address: 24 ElMadina / Hadayek Elmadi, Cairo, Egypt o Marital status: Married. o Military service: Holds a 9-year postponement of recruitment, for I am a single Education: o Qualification: Bachelor Of Quality Control 2012 Languages skills: o Arabic: Mother tongue. o English: Spoken (Good) & Written (Good). Personal skills: o Good Communication Skills. o Team Work Orientation. o Work under Stress. o Flexible & Dynamic. o Learned How To Learn (By Search In Internet And Other Ways). Computer skills: o Revit Architecture o Revit MEP o Autocad o Dynamo (Visual Programming For Revit) o Lumion o Naviswork o Microsoft office o Microstation . o Just knowledge about Dailux & 3dsmax.

Mohamed Mostafa

Embed Size (px)

Citation preview

Page 1: Mohamed Mostafa

Mohamed Mostafa Alsharif

BIM Manager, Coordinator Arch, Stru & MEP BIM Support

Solving problems for Revit, Autocad

Developer Revit Dynamo

Quality Control Engineer

E-Mail: [email protected]

Mobile: 01148932819 My Channel: https://www.youtube.com/c/MohamedMostafaAlsharif

My page: https://www.facebook.com/3dquality

My Site: http://bimdesigners.wix.com/3dquality

https://eg.linkedin.com/in/mohamedalsharif

Experience: 6 years work with standard and all disciplines

Personal Data:

o Date of birth: 05/08/1991

o Nationality: Egyptian

o Home address: 24 ElMadina / Hadayek Elmadi, Cairo, Egypt

o Marital status: Married.

o Military service: Holds a 9-year postponement of recruitment, for I am a single

Education: o Qualification: Bachelor Of Quality Control 2012

Languages skills: o Arabic: Mother tongue.

o English: Spoken (Good) & Written (Good).

Personal skills:

o Good Communication Skills.

o Team Work Orientation.

o Work under Stress.

o Flexible & Dynamic.

o Learned How To Learn (By Search In Internet And Other Ways).

Computer skills:

o Revit Architecture

o Revit MEP

o Autocad

o Dynamo (Visual Programming For Revit)

o Lumion

o Naviswork

o Microsoft office

o Microstation .

o Just knowledge about Dailux & 3dsmax.

Page 2: Mohamed Mostafa

Companies: 1-Proservice

http://www.proservice.com.eg

ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

2-Evic_europe

http://evic-co.com

ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

3-Dar Engineering “AlfanarCo.”

6 years

To: till now

http://www.alfanar.com/

Job Description:- BIM Coordinator

Explain what i can do:

1. Use The Dynamo To Create A Professional Tools To Enhance The Work

2. Start the project with all departments with the right way

3. Prepare the work flow for all departments with Continuous development

4. Coordination Between All departments And Interference Detection

5. Create Schedules Quantities For All Elements

6. Create All Views, scope box And Sheets

7. Put Materials, Lighting And Landscape For Render

8. Also Can Be Extract To Lumion Program To High Render

9. Identify and document clashes between different department models using Navisworks

10. Develop, lead and assist project team in BIM Environment

11. Implement BIM training modules for key staff and training course

12. Participate in the process of developing BIM standards for projects across the company

13. Develop and maintain Revit content libraries through creation of families

14. Ensure that the implementation of Revit aligns with company CAD-BIM Strategy and links appropriately

with the wider business

15. Review Revit “warnings” to help keep model problems to a minimum

16. Attend project kickoff meetings to help ensure that everyone understands the BIM process

17. Creation and/or maintenance of your company’s Revit project templates

18. Run Clash Detective on the predetermined portions of the assembled files (ex: Piping vs. Stru Steel, HVAC

vs. Stru Steel, etc…)

19. Comply with the requirements of all discipline QA/QC procedures

20. Solve the Revit problems For MEP Departments

21. Teach the Revit For MEP Departments

Projects

Page 3: Mohamed Mostafa

1. King Faisal Medical City

Location : Asir, Abha

Area : 260,000 sq. m

Completion : 2016

2. Cancer Centre, King Fahad Medical City

Location : KFMC, Riyadh

Completion : 2015

3. Neuroscience Centre, King Fahad Medical

City

Location : KFMC, Riyadh

Area : 50,000 sq. m (Approx.)

Completion : 3rd Qtr. of 2013

Cost: : SR 1.1 billion (Est.)

4. Cochlear Implant Unit, King Fahad Medical

City

Location : Riyadh

Area : 8050 sq.m

Completion : 2012

Cost: : SR 154 million

5. Prince Mohamed Medical City

Location : Al-Jouf

Area : 262,000m²

Completion : 2018

6. Veterinary Teaching Hospital, King Faisal

University

Location : Al-Ahsa KFU

Area : 12,000m²

Completion : 2016

Cost: : SR 60 Million

7. DAR Engineering Head Office

Location : Riyadh

Area : 4000 square

8. Specialist Medical Centre Hospital Towers

Location : City of Riyadh

Completion : 2017

Cost : 300 million

Page 4: Mohamed Mostafa

9. Proton Therapy Centre,KingFahad Medical

City

Location : KFMC, Riyadh

Completion : 2015

10. Prince Sattam Hospital in Riyadh, Saudi Arabia(500 beds)

11. Master Planning for various Hospitals

DAR Engineering appointed by the Ministry of

Health to carry out site studies situate pre-

designed typical hospital with its ancillary

buildings. These typical hospitals shall be fitted out

on various sites located all over the Kingdom.

12. OumElBouaghi Hospital-Algeria

13. King Fahd Military Medical Complex -Saudi

Arabia

14. Medical Spine Colleges, Umm

Al Qura University

Location : Holy City of Makkah Completion : 2016 Cost : 464 million

15. Cairo American college Maadi Cairo-Egypt

(Electrical shop drawing)

16. Le MERIDIEN HELIOPOLIS, Salah Salem,

street, Cairo, Egypt (Electrical shop drawing)

17. Aug pharmaceutical factory in Egypt

(Electrical shop drawing)

18. Urban plaza el Azhar-Cairo Egypt

(Electrical shop drawing)

Page 5: Mohamed Mostafa

Electrical High voltage projects 1.

Construction of New Haramain (HHR) 380/110/33/13.8 kV BSP

Electrical Substation

Client: Saudi Electricity Company

Contractor: alfanar

Project Value: 1,087,673,000 SAR

Completion Date: 24-04-2014

2. Yanbu Power & Desalination - Phase III-

Lighting Electrical Substation

Owner : SWCC

Client: EmpresariosAgrupados

3. Construction of Makkah West 380/110/13.8 kV BSP

Electrical Substation

Client : Saudi Electricity Company

Contractor : alfanar

Project Value : 493,747,110 SAR

Completion Date : 27.11.2011

4. Construction of Madinah East 380/110 kV BSP

Electrical Substation

Client : Saudi Electricity Company

Contractor : AL Touki Co.

Project Value : 645,000,000 SAR

Completion Date : 18.4.2012

5. Al-Fardous 380/230/115/13.8kv BSP-

Dammam

6.

Construction Of Umlujj North 380/110/33/13.8kv BSP(design)

7.

Qurayyah ipp-1 380/230kv substation

8. Jeddah 380kv substations & Riyadh 380kv

substations & Construction Of Modon Jeddah

9. Construction of Madinah East 380/110 kV BSP

Electrical Substation