13
Johannes Sidabutar Mobile phone : +62-812-7763-019 Batam, Indonesia August 27, 2022 email:[email protected] CURRICULUM VITAE Name : Johannes Sidabutar Place & Date of Birth : Belawan, March 6 th 1973 Sex : Male Religion : Christian Marital Status : Married, 2 children Nationality : Indonesia Languages : English & Indonesian Passport No : A 0953824 (Valid 10 Augustus 2016) Previous: B 816387 Health , Height / Weight : Fit to work, 168 Cm / 80 Kg Education : Bachelor Degree in CIVIL ENGINEERING CONSTRUCTION Atma Jaya Yogyakarta University (September 1993 – July 1999) Email : [email protected] Mobile Phone : +62-812-7763-019 , +62-813-6432-2280 Specialties : Cost Control Estimating, Quantity Surveyor, Project Control, Welding Inspector, and Field Production Engineer QUALIFICATIONS Seeking full-time or permanent position and long term career position with a progressive company offering good conditions and promotion prospects. More than 15 years experience. In Oil and Gas Fabrication as Quantity Surveyor Project Control,Estimating Manhours, Welding Inspector and Piping Production Engineer more than 11 years. In Civil Construction as Project Executive Engineer and Quantity Surveyor more than 3 years . Familiar in conducting systemized quantity survey with high standard in following Fabrication Oil & Gas Onshore Offshore exploration, modules and LNG Plant construction activities for piping engineering all aspects from materials, processes, man Page 1 of 13

CV Johannes Sidabutar1(2)

Embed Size (px)

Citation preview

Page 1: CV Johannes Sidabutar1(2)

Johannes SidabutarMobile phone : +62-812-7763-019

Batam, Indonesia May 3, 2023 email:[email protected]

CURRICULUM VITAE

Name : Johannes SidabutarPlace & Date of Birth : Belawan, March 6th 1973Sex : MaleReligion : ChristianMarital Status : Married, 2 childrenNationality : IndonesiaLanguages : English & IndonesianPassport No : A 0953824 (Valid 10 Augustus 2016)

Previous: B 816387 Health , Height / Weight : Fit to work, 168 Cm / 80 Kg Education : Bachelor Degree in CIVIL ENGINEERING CONSTRUCTION Atma Jaya Yogyakarta University

(September 1993 – July 1999)Email : [email protected] Mobile Phone : +62-812-7763-019 , +62-813-6432-2280Specialties : Cost Control Estimating, Quantity Surveyor, Project

Control, Welding Inspector, and Field Production Engineer

QUALIFICATIONSSeeking full-time or permanent position and long term career position with a progressive company offering good conditions and promotion prospects.

More than 15 years experience. In Oil and Gas Fabrication as Quantity Surveyor Project Control,Estimating Manhours, Welding Inspector and Piping Production Engineer more than 11 years. In Civil Construction as Project Executive Engineer and Quantity Surveyor more than 3 years .

Familiar in conducting systemized quantity survey with high standard in following Fabrication Oil & Gas Onshore Offshore exploration, modules and LNG Plant construction activities for piping engineering all aspects from materials, processes, man powers, man hours, equipments, fabrication, installation, supervise, facilities and standard completion time.

Own Knowledge by attending Indonesian Government approved training & course over 600 hours for Welding Inspection, welding processes, welding symbols, various DT and NDT examination (UT, RI, MT, PT), Quality Management System, Basic and Various Welding Process, and their adherence requirements to international construction standard & code i.e. AWS D1.1(Structural Code), ASME IX (Welding and Brazing Qualification), ASME VIII (American Boiler and Pressure Vessel), ANSI/ASME B31.3 (Process Piping), API 650 (Tank Vessel), API 1104 (Pipeline and Related Structural).

Capable of maximizing utilization of computer programs, operation, work sheet, network, data base, presentation, documentation, reporting system i.e. daily ,weekly, monthly and summary, etc in conduction effective project controls.

Page 1 of 9

Page 2: CV Johannes Sidabutar1(2)

Johannes SidabutarMobile phone : +62-812-7763-019

Batam, Indonesia May 3, 2023 email:[email protected] Training Course

PERIOD TITLE INSTITUTEAPRIL 14

10 MILLION WORK HOURS WITHOUT LTI APLNG BECHTEL

SEP 05 – SEP 10

SERVICE AWARDS 5 YEARS (26 SEPTEMBER 2005 – 26 SEPTEMBER 2010)

PT McDermott Indonesia, Batam

May-07 - Jan.08

Welding Inspector Course for Structural Code, Pipeline Code, Piping Code and Pressure Vessel Code Requirements, NDT and DT Examination

Ikbal M-Yos Batam, Indonesian Government Oil & Gas (MIGAS) Approved Institute

Sep.07 Valve Selection, Operation and Maintenance Training

Fiqry Jaya Manunggal Jakarta

Jul.07- Aug.07

Standard McDermott Company Training1). Welding Engineering 2). Work pack Engineering3). Electrical and Instrument Engineering4). Construction Engineering.5). Desk Top Change Management System Engineering Training (DTCMS

PT McDermott Indonesia, Batam

Sep -05May-02

Standard Yard Safety Induction PT. McDermott Indonesia, Batam

Professional Work Experience:

Exxon Mobile Cepu Limited 29 December 2014 – PresentEngineering Procurement Construction 1 Central Process Facility Project, CEPU Bojonegoro Site

Brief of Project Description:The Banyu Urip Project is located in East Java, consisting of the Central Processing Facility (CPF) (which includes the Production Processing Facilities [PPF] and supporting Infrastructure Facilities [IF]), export, storage and offloading facilities. The development is expected to produce sour crude and associated gas from multiple wellpads. The crude will be sweetened in a central processing facility and sent via onshore and offshore pipelines to a floating storage and offloading vessel located off the north coast of Java near the city of Tuban. Associated gas and water will be re-injected into the reservoir. Additional fresh water will be injected into the reservoirQuantity SurveyorMain ResponsibilityQuantity Surveyor Site Progress All Fabrication Construction Discipline Civil Concrete Steelwork Buildings Tanks Mechanical Piping Electrical And Instrumentation include Change Order and Back Charge also

Assessments Weekly Progress Report Main contractor to compare with directly check on site

Review verification to discuss, agree and sign Invoicing Monthly Progress Report Change Order and Back Charge main contractor

Page 2 of 9

Page 3: CV Johannes Sidabutar1(2)

Johannes SidabutarMobile phone : +62-812-7763-019

Batam, Indonesia May 3, 2023 email:[email protected]

RekindWorleyParsons is a Joint Operation between PT. Rekayasa Industri and PT. WorleyParsons Indonesia and is currently providing Engineering and Construction Management services for PT. Chevron Pasific Indonesia in Duri, Riau under its Engineering and Construction Management Contract

WorleyParsons Menara Batavia 12A FloorJl KH Mas Mansyur Kav.126 Jakarta, IndonesiaJuly 7 th July 2014 – 26 December 2014 (6 month) Cost Control Estimator EngineerMAIN RESPONSIBILITIES

Review Tender documents including detailed review of the ITT, Basis Estimate, Scope of Work, key Contract Dates, and Commercial price forms as a minimum from Front End Engineering Design (FEED) until Detail Engineering Design (DED)

Initiate all required cost estimates as detailed in the Work Breakdown Structure (WBS) Minimal Level 3 Procedures

Compile the commercial price forms for the Proposal Document intended for submission to the Client.

Estimate labors and pricing Structural, Mechanical, Piping and E&I Purpose based on procedure, type of contract, scope of work, preambles, and technical specs.

Maintain costing As-Built based on contract award, schedule and planning, documents and drawings

Maintains and supports the office estimating system, database, procedure and manuals

Familiar in technical specifications or standards such as ASME, API, ASTM, AISC, ASCE, etc

Perform cost estimating & control Services for Company’s projects both at individual or portfolio level which shall include but not limited to: cost estimating, cost control & forecasting, etc.

Prepare construction cost monitoring report for project executed by Company’s contractors and supervised by Contractor. This include in providing monthly project cost accrual for Company’s contractor and Contractor.

Work closely with Company and Company’s contractors during performance of cost estimating & control services for Company’s projects.

Develop and maintain Contractor’s processes and procedures related with cost estimating & control.

Prepare detailed cost estimate for project execution covering all associated cost components (such as: detail engineering, construction, commissioning, equipment certification, construction management, procurement of goods & services, project overheads, etc.) by using budgetary quotations for major equipment and by referring to historical data and/or appropriate cost benchmarks and/or professional judgment base on Front End Engineering Design (FEED) until Detail Engineering Design (DED).

PT SMOE Indonesia Jl Hang Kesturi VI Lot 5 -1 Kabil Indonusa EstateKabil Batam Island Indonesia Bechtel Australian Pacific LNG Module Yard Project

Page 3 of 9

Page 4: CV Johannes Sidabutar1(2)

Johannes SidabutarMobile phone : +62-812-7763-019

Batam, Indonesia May 3, 2023 email:[email protected] Project Overview

Australia Pacific LNG Project (APLNG Project) is the engineering, procurement and construction for a grassroots two-train LNG liquefaction plant fed by coal seam gas, two LNG storage tanks, and a product loading jetty to be located on Curtis Island in Gladstone harbor. Scheduled for completion in 2015. 

 Client: Origin Energy, ConocoPhillips and Sinopec Corp.  Key Location

 Houston & Shanghai Execution Offices for EPC Site: Curtis Island, Australia Module Yard in Indonesia

 Key Elements of Module Yard Execution Modules will be assembled at S.M.O.E. 22,000MT of steel  127,000 LM of pipe  134 pieces of equipment into 69 modules  Schedule

o 22 month build period  Requires nearly 2,200 craft resources supported by 250 Field Non Manual personnel

July 01 st 2013 – June 30 th 2014 (1Year) Quantity Surveyor Pipe and Steel OSBL MAIN RESPONSIBILITIES:

Monitoring all necessary sites based on cost control deliverables Take control of all quantities and progress reporting Daily Quantity Reporting progress for staged, erect, welded/bolted, support/valves,

punch, test package Pre Completed until Post Completed Submit and sign off Daily Quantity report to work package engineer team to update

into system team works database and coordination with the field engineer for walk down

Review daily quantity reporting and test package from database PMOR (print my own report)

Submit daily progress reporting to Production Management All the daily quantity and progress reporting coordination with Production

ManagementMy reference :Johnson, Waylon Manager Area OSBL, ISBL [email protected] Volkovickas, Gary Lead Piping Superintendent [email protected]

PT Saipem Karimun Yard Indonesia Company ProfileSaipem (43% owned by Eni) is a leader in the provision of engineering, procurement, project management and construction services for the oil & gas industry, with unique capabilities in designing and executing large-scale offshore and onshore projects. Have a strong expertise in operating in deep water and remote areas. Have significant technological competence in gas monetization and heavy oil exploitation

March 5 th 2012 – June 25 th , 2013 (1 Year 4 Month) Quantity Surveyor EngineerProject Control Department1. External Saipem Award ProjectIraQ Crude Oil Export Expansion Project (ICOEEP) Phase 2 (CMMP) EPC WorksCompany South Oil Company (SOC) and Foster Wheeler Energy LTDGorgon Project Barrow Island LNG Plant Loading Platform Jacket Levelling SystemCompany Chevron Australia Pty LtdALwasit Arabiyah and Hasbah Offshore/Onshore Facilities

Page 4 of 9

Page 5: CV Johannes Sidabutar1(2)

Johannes SidabutarMobile phone : +62-812-7763-019

Batam, Indonesia May 3, 2023 email:[email protected] Company Saudi Arabian Oil Company (Aramco)/Aramco Overseas Company B.V2. Internal Saipem ProjectTower Crane 1000T ProjectS45 Barge Biendong ProjectYard Facility Project

MAIN RESPONSIBILITIES:Check on site actual physically progress Structural, Piping Mechanical, Electrical and Instrument from Cutting Prefabrication, Assembly, Painting until Installation. Report with photos and marking drawing, and send weekly progress report to management. Review compare the progress report with Fabrication Database Tools. My reference :Gianmario Pinna Production Planning Manager [email protected] Luca Iacoponi Project Control Manager [email protected]

PT Teguh Cipta Pratama Company profileContractor Owner Montigo Resorts for Civil Construction (Concrete, Roads, Sewage, Villas, Residences, Buildings), Mechanical Electrical, Plumbing Installation and include with the facility for 5 star resort.June 20th 2011- March 03rd 2012 (10 Months)Quantity Surveyor EngineerProject DepartmentMontigo Resorts Nongsa Batam ProjectProject Development will be a 5-star resort

MAIN RESPONSIBILITIES: Reports directly to General Manager and Project Manager Assist Project Coordinator and Project Manager in organizing and executing

contracts in accordance with the specifications and conditions agreed with the customer.

Liason with other departments, customer, and other parties involved in the project in doing daily tasks

KEY ACTIVITIES: Estimate, calculate, prepare, check, review, verification for Proposal, Tender,

Contract, Bill of Quantity (BQ) and quotations as required Material take off for Bill of Quantity (BQ), updating of materials and quality

analyzing on the market, evaluate price or material cost submitted by supplier or contractor

Manage information/records and Coordination with Site Engineer and Site Supervisor for check review progress purposes based on worksite

Check progress onsite with coordination supervisor in charge Coordination with subcontractor for review progress and check payment Weekly and Monthly Bill Of Quantity progress report Submit invoice approval for payment progress base on worksite and subcontractor

to Singapore Head Office

PT Mc Dermott Indonesia Batam Company profile:

Page 5 of 9

Page 6: CV Johannes Sidabutar1(2)

Johannes SidabutarMobile phone : +62-812-7763-019

Batam, Indonesia May 3, 2023 email:[email protected] McDermott is a leading engineering, procurement, construction and installation group of companies focused on executing complex offshore oil and gas projects worldwide. Providing fully integrated EPCI services for upstream field developments, the Company delivers fixed and floating production facilities, pipelines and subsea systems from concept to commissioning. McDermott's customers include national and major energy companies. Operating in more than 20 countries across the Atlantic, Middle East and Asia Pacific, integrated resources include approximately 14,000 employees and a diversified fleet of marine vessels, fabrication facilities and engineering officesMarch 31st 2009 – June 15th 2011 (2 years 4 months)Chevron Platong Gas II Project – PLLQ2 Utility Deck, PLLQ2 Link Bridge, PLCPP2 Link Bridge, PLFT2 Bridge-Jacket-Flare Tower Piping Quantity Surveyor Project Control Department

MAIN RESPONSIBILITIES:

Reports directly to the Lead Quantity Surveyor, and is responsible for the Piping Quantity Survey requirements in Batam on the Platong Gas II Project.

Establish and, if necessary, improve existing processes and systems in Batam to increase efficiency and quality of Quantity Surveying deliverables.

KEY ACTIVITIES:

Ensures activities during assigned project execution are consistently performed in compliance with the established procedures.

Responsible for Piping Quantity Surveying deliverables being prepared correctly as required by the contract and internal requirements.

Progressively re-measure the unit rate scope based on design and fabrication documents.

Conducts site measures as required, and/ors take-offs from drawings leading to the preparation of bill of quantities.

Maintain database of the bills of estimated quantities and comprehensive and accurate files, logs and records.

Review the feasibility of the Contract schedule of unit rates. Estimating “star rates” for work items not included in the Contract schedule

of rates. Interfacing with the Client quantity surveying representatives with regards to

agreements to measured quantities and associated estimated values of work completed.

Maintains a close working relationship with Batam project engineering, the detailing office, the MTO group and other Fabrication departments as required, in order to retrieve and maintain accurate records of the latest updated drawing and MTO data.

Supporting the JRM change management representatives in quantifying scope changes.

Provides variance analysis (including quantity analysis, man hour analysis and re-measurement analysis) and recommends corrective actions for deviations from plan or budget.

Assists in the preparation of the final project close-out report. Attend necessary meetings on site representing Quantity Surveying.

Page 6 of 9

Page 7: CV Johannes Sidabutar1(2)

Johannes SidabutarMobile phone : +62-812-7763-019

Batam, Indonesia May 3, 2023 email:[email protected]

Mentor & guide Quantity Surveying personnel on a daily basis.My reference :Sharon Yee Lead Quantity Surveyor : [email protected] Anthony Nobel Project Control Manager : [email protected] Setiawan Lead Change Coordinator : [email protected] Suparwo Sumanto Deputy Project Control Manager : [email protected]

February 1st 2008 – March 31st 2009 (1 year 2 months)Cost Estimator Piping EngineerEstimating DepartmentJob Description

1. Bidding project base on scope project requirement for common Wellhead Platform, Module, pipe racks, FPSO

2. Bidding references with Piping man hours standard base unit man hour, client and customer Document drawing, and material take off

3. Summary bidding and AFC calculation based on Man hour Fabrication Installation, Dia Inch, Weight Pipe Support, Stress relieve, pressure testing, NDT, and Inspection.

My reference : Hariyanto Abdullah Supervisor Department Estimating : [email protected] Ibnu Subroto Lead Estimating : [email protected]

March 15th, 2007 – January 31st 2008 (11 months)Piping Production Engineer Project CPP North Belut Conoco PhillipsProduction Engineer DepartmentJob Descriptions:1. Issued material as per isometric drawing2. Fabrication and Installation Piping System as per isometric drawing, and Work

package3. Preparing Isometric Drawing and work package for Fabrication and Installation4. Supervision and Coordination support with Supervisor and Superintendent for

monitoring technically Fabrication and Installation5. Estimate for material, manpower and man hours6. Monitor and report the project progress and ensure the yard is supplied with the

correct material and drawing to meet the project schedule requirement7. Preparing, monitoring and review daily, weekly, and monthly Piping Progress

Reporting using PIMS database (Project Information Management System)8. Preparing, monitoring and review manpower, man hours Progress Reporting and

Productivity using FCB Database (Field Construction Budget)My reference :Ahmad Bernie Donowikoro : Fabrication Coordinator : [email protected]

September 26th, 2005 – March 14th, 2007 (1 years 7 months)Quantity Surveyor Piping and Structural 75 Modularized Woodside Australia Liquified Natural Gases Train V ProjectProject Control DepartmentJob Descriptions:1. Material Take Off as per drawing2. Material Take Off ensure with spec and Bill Of Quantity based on spec and contract

agreement3. Monitor and reporting progress comparison with Bill Of Quantity

Page 7 of 9

Page 8: CV Johannes Sidabutar1(2)

Johannes SidabutarMobile phone : +62-812-7763-019

Batam, Indonesia May 3, 2023 email:[email protected] 4. Preparing, monitoring and review Weekly and Monthly Summary Bill Of Quantity

progress reporting5. Submitted Summary Bill Of Quantity progress reporting to management and client for

invoicing6. Summary QS Rule: Re-measure ( take off drawing ) Monitor the progress, Capture the

changes in yard, contract Vs the actual Qty, Develop the unit rate amount, BOQ (bill of quantity)

My Reference : Joel Friedman Cost Control Manager : [email protected] Douglas Barker Project Control Manager : [email protected]

PT Batamec Shipyard Tanjung Uncang Batam April 01st, 2004 – October 30th, 2005 (1 years 7 months)Piping Production Engineer Project new building anchor handling supply vessel (AHSV) 5400 HP TideWater ProjectProduction DepartmentJob Descriptions:1. Issuing correct drawings to contractor2. Issuing material and equipment to contractor as per requirement3. Supervision Fabrication and Installation4. Preparing, monitoring and review for daily, weekly, and monthly progress reporting5. Preparing, monitoring and review for manpower and man hours progress reporting

PT Mcdermott Indonesia Batam May 8th 2002 – March 29th,2004 (1 years 11 months)Assistant Piping Production Engineer Topside and Integration Floating Production Storage and Offloading Unit (FPSO) Belanak Conoco Phillips ProjectProduction Engineer Department Job Description Assistant Piping Production Engineer :1. Assist for Commissioning test piping, hydro testing, retro jetting, blowing pneumatic

with pressure2. Line checker for punch list and reinstatement piping installation3. Preparing, Monitoring and review for daily, weekly and monthly Hydro test progress

reportingMy Reference :Muhammad Thantowi : Fabrication Coordinator: [email protected]

PT Cipta Kasih Mulia Batam Contractor and Developer August 31st 1999 - May 01st 2002 (2 years 10 months)Supervisor Project and Dimensional Controller Structural EngineeringJob Description Dimensional Controller Structural1. Survey Dimensional Controller with equipment Levelling, T1 T2 Theodolite2. Survey and check dimensional as per drawing and based on requirement3. Preparing, monitoring and review for daily, weekly and monthly Dimensional Controller

and project progress reporting My Reference :Tuahman Purba : Director

Specific activities / qualifications: Knowledge material take off as per drawing compare with Bill of material

Page 8 of 9

Page 9: CV Johannes Sidabutar1(2)

Johannes SidabutarMobile phone : +62-812-7763-019

Batam, Indonesia May 3, 2023 email:[email protected]

Knowledge Line List, isometric drawing, piping and instrument drawing (P & ID) and test package drawing

Knowledge to process test piping (commissioning) start from hydro test, retro jetting, blowing, pneumatic air with pressure air and water, and until reinstatement

Knowledge piping coating like pipe fire proofing (PFP), sandblast, insulation, and painting

Able to Fabrication and installation piping Knowledge of NDT welding such UT(Ultrasonic Test), NDT (Non Destructive Test),

MDF (Material Demand Form), Issued Material, welded and fitting Knowledge of Basic Welding and Various Welding. Symbol welding, material

welding and quality management system Knowledge judgment of Welding based on Standard and Code for : AWS D1.1 ,

ASME IX, ASME VIII, ANSI B31.3 , ASME B31.3, API 650, API 1104 . Able to line check piping with references Line List, Isometric Drawing, Piping and

Instrument Diagram (P&ID), and test package drawing Able to line check drawing Structural 2D, and 3D Experience in oil and gas industry or fabrication yard. Understand structural, piping, construction drawing oil and gas industries or

fabrication yard. Knowledge in produces engineering procedures for structure, material, lifting and

load outs of heavy structural component. Monitor and report the project progress and ensure the yard is supplied with the

correct material and drawing to meet the project schedule requirement. Knowledge about fabrication and installation are in accordance with drawing and

specifications. Good Knowledge of technical specification for building and water supply system Good Knowledge how to prepare the cost and bill of quantity Able make daily, weekly, monthly and summary reporting Good Healthy, able to lead and motivate people target oriented, strong

interpersonal. Good communication skill, interpersonal skills and willing to work as a team. Good HSE awareness, familiar with Multinational Company. Computer literate and good communication in English both oral and written

Computer Skills:1. Engineering Software : PIMS ( Project Implemented Management System), MTO

(Material Take Off), MCS (Material Control System), Construct SIM, PDMS, Fabrication Database Tools (FDBTools) and Print My Own Report (PMOR Acces) review. Naviswork and Tekla (modeling 3 Dimension)

2. Windows Operating System : MS Windows XP, MS Windows73. Application Software: MS – Word, MS – Excel, Ms-Access, Power Point, etc

Hobbies : Reading, Computers, Football, Swimming, and Travelling

Availability: One (1) month advance notice

Herewith I certify that all above statements in these Curriculum Vitae is true

Page 9 of 9