Integral Coach Factory, Chennai.38
MINUTES OF THE
CUSTOMER INTERACTION MEETING HELD AT ICF
ON 21ST AND 22ND OF MAY 2015
Quality Assurance Department
MINUTES OF THE CUSTOMER INTERACTION MEETING HELD AT ICF ON 21ST
AND 22ND
OF MAY 2015
Members Present
ICF
S/Shri.
1 Ashok K Agarwal - GM
2 Pankaj Kumar - CME
3 Bhaskar Narang - COS
4 S.G.Hundekari - CEE
5 Jagdish Prasad - CMM/S
6 S.Srinivas - CDE/Mech
7 Shishir Dutt - CWE/Fur
8 Shashi Bhushan - CWE/Shell
9 K.S.Jain - CME/QA
10 S.Sridhar - CEE/QC&C
11 S.P.Vavre - CDE/Elec.
12 M.Chandra Kumar - Dy.CME/P/Shell
13 P.Balasundar - Dy.CME/Plg.& IE
14 M.E.Srinivasan - Dy.CME/A/Fur.
15 K.N.Babu - Dy.CME/TC
16 R Sundararajan - Dy.CME/Fur-II
17 J Nagesh - Dy.CME/QC
18 D.Neelakantan - Dy.CME/D-I
19 T.Dilipkumar - Dy.CME/D-II
20 A.P.Soni - Dy.CME/Bogie
21 Karuna Kumar u - Dy.CME/Production
22 S.Lakshmanaswamy - Dy.CEE/EMU
23 M.Ramanathan - Dy.CEE/C&D
24 J.Maran - Dy.CEE/Design
25 Mehar kure.V.D. - Dy.CC&M
Zonal Railways S/Shri
1 S K Paswan - CWM/CW/PER/SR
2 Guatam Dutta - CWM/LW/PER/SR
3 P Sivaraman - Dy.CME/CW/PER/SR
4 D Jayaraman - Sr.CDO/BBQ/SR
5 J.S. Hira - CDO/ANVT/NR
6 G.Srinivasa rao - CDO/HYB/SCR
7 Mayanak Pratap Singh - CDO/TVC/SR
8 Sanjoy Kumar Mistry - DME/Proj/SDAH/ER
9 Ramavtar Yadav - PE/C/AII/NWR
10 B.Anjaneyulu - PE/UBLS/SWR
11 Abhay kumar - WM/JUDW/NR
12 Ravinadranath - WM/TPYS/SCR
13 K.Vijaya kumar - ADME(P) CKP/SER
14 Ambarish Kumar Singh - ADME/C&W/DNR/ECR
15 Kundan Kumar - ADME/GHY/NFR
16 Shakeel Rahiman - AWM/ CW/LGDS/SCR
17 Satya prakash - SSE/C&W/ANVT/NR
18 Akhilesh babu - SSE/C&W/ASR/NR
19 V.M.Joseph - SSE/C&W/BDTS/WR
20 S.P.Singh - SSE/C&W/BE/NR
21 P.K.Gowrha - SSE/C&W/BSP/SER
22 Swarupananda Hansda - SSE/C&W/CP/ER
23 Paresh Hazarika - SSE/C&W/DBRG/NFR
24 A.K.Deshmukh - SSE/C&W/Durg/SECR
25 Brij Mohan Kain - SSE/C&W/GWL/NCR
26 Rajneesh Kumar Chaubey - SSE/C&W/MB/NR
27 T.Abdulkarim - SSE/C&W/PGT/SR
28 R.Dhasarathan - SSE/C&W/SBC/SWR
29 K.B.Rabbi - SSE/C&W/TKPR/ER
30 Raveendran P - SSE/C&W/TVC/SR
31 Manoj kumar yadav - SSE/C/AII/NWR
32 C.H.Sambasiva rao - SSE/C/BZA/SCR
33 S.N.Sharma - SSE/C/GHY/NFR
34 B.C.Jayaprasad - SSE/CRS/TPTY/SCR
35 D.Vijay Kumar - SSE/CW/PER/SR
36 V.Selvaraj - SSE/CW/UBLS/SWR
37 Ajay kumar - JE/C&W/AGC/NCR
RITES/RDSO S/Shri 1. Pankaj Agarwal 2. A K Jain 3. P K Srivastava
- - -
GGM/Corp. QA/RITES Ltd. GM/Southern Region/RITES Ltd. Jt. Director/Carriage/RDSO
RDSO Items
1.
Reporting
Railways
SR/Aug'13, SWR/Aug'13, SCR/Jan'14,
SWR/Jan'14, ECoR/Apr‟14
Type of
Coaches/Major
Assy./Specific
Item.
All Types/Seats & Berths – Upholstery Cloth.
Brief Account
of Problem.
Peeling off of rexene. Coating on the
rexene peels off and rexene starts wrinkling
in short span of service.
The rexene cloth at the edges of the side
lower berths (Foldable Bed cum Back Rest)
is getting torn frequently.
Hence foam and proper padding is to be
provided to avoid the above problem.
Decision taken
during the
meeting.
RDSO to conduct anonymous quality audits.
All tests which require one day or more to be
changed as type test. Design to write to RDSO
regarding tests.
2.
Reporting
Railways SR/Aug'13, SWR/Aug'13
Type of
Coaches/Major
Assy./Specific
Item.
All Types/DTPB - Densified Thermal Bonded
Polyester Block (Recron).
Brief Account
of Problem.
DTPB cushions are getting compressed within
first POH - AC Coaches berth cushion loses
their strength and cushioning ability after 8-10
months.
Decision taken
during the
meeting.
Design to write to RDSO repeatedly.
3.
Reporting Railways NR
Type of
Coaches/Major
Assy./Specific Item.
AC/Upholstery Cloth.
Brief Account of
Problem.
Loose skinning (wrinkling) of Upholstery
Cloth (oil cloth)
on berth and seats.
Decision taken
during the meeting.
Other Rlys to check and report in the next
meeting.
4.
Reporting
Railways
SWR/Aug'13, SCR/Aug'13,
SCR/Jan'14, SR/Jan'14
CR/April „14
Type of
Coaches/Major
Assy./Specific
Item.
All Types/Paneling – LP Sheet.
Brief Account of
Problem.
LP Sheet - Crack/breakage.
As the marking of manufacturer‟s
initials are on the back side of the sheet
it is not possible to trace the
manufacturer without disassembling the
panels for initiating warranty claim.
Coaching Depots are complaining that
they do not have sufficient man power
to disassemble the panels and the coach
is forced to run in service until the next
POH.
Decision taken
during the
meeting.
CME - No coach should be despatched
from ICF with LP Sheet crack. QA &
Design to check the back pieces. Design
to identify areas where the screws are
not to be provided.
5.
Reporting
Railways SR/Aug'13, SR/April „14
Type of
Coaches/Major
Assy./Specific
Item.
All Types/Brake Gear Bushes.
Brief Account of
Problem.
Manufacturer initial and year of
manufacture is not traceable and
getting defaced on run in the brake
gear bushes within 9 months. Hence
raising warranty claim is very
difficult. Specific clause/condition to
be stipulated in the RDSO
specification with the marking
should be permanent and clearly
visible up to the condemnation
period of brake gears for raising
necessary warranty claims.
Elongation of brake gear lever pin
holes and Wearing of pin number 3
due to poor performance of HPPA
brake gear bushes.
Decision taken
during the
meeting.
Rlys are requested to write to RDSO,
RB with a copy to ICF & RCF
indicating vendor wise, vintage wise
failure analysis.
CME instructed CDE/Mech to raise
this issue in the CMG meeting and
go for a solution and advised Rlys to
write to RB and RDSO repeatedly.
CME - We should revert back to
nylon bushes.
In the HPPA brake gear bushes supplied by trade, the Drg. No. and date of manufacturing
code are printed as per extant drawings.
During POH/IOH, it is noticed that the name are defaced/smeared away.
Due to the names defacing, it is very difficult identify the date of manufacturing and
hence the warranty claim also
6.
Reporting
Railways CR/Aug'13, SWR/Aug'13, ECoR (CDO/Waltiar)
Type of
Coaches/Major
Assy./Specific
Item.
Conventional coaches/ Hytrel Washer.
Brief Account of
Problem.
Hytrel washers – crack.
AXLE BOX CANTED & GRAZING
o ECoR - In recent years, there is increase
in the cases of canting and grazing of
primary suspension unit with wheel. In
East Coast Railway nearly 40% of cases
of sick marking of coaches during
primary examination is due to above
reason. Further due to canting the
collars of rear cover of the Axle Box
assembly get damage and metal
particles get contaminated in grease.
ICF being manufacturing unit, may
relook into the modification done in
primary suspension like use of hytrel
washers etc. and take measures to
prevent such cases and thus increase the
coach reliability & reduce the down
time.
o SR - Axle box getting canted due to
wearing of hytrel washer. The limit of
radial clearance of bearing in service to
be reduced.
Decision taken
during the
meeting.
It was decided in the CMG meeting that RDSO to
submit a report to RB within 2 months. Rlys (with a
copy to ICF) and ICF/Design to write to RB &
RDSO repeatedly.
7.
Reporting
Railways SR, ER
Type of
Coaches/Major
Assy./Specific
Item.
All Types/Composite material wearing piece
Brief Account of
Problem.
Unusual sound and jerk observed from the
bogies. The side bearer with polymer
bearing piece is having no groove.
Detached and lifted the coach. All side
bearers provided with Non-metallic piece
(Thermoplastic Polyurethane wearing)
causing generation of friction and
abnormal heat. Resulting rubbing marks
on hard ground steel wearing plate.
Composite material wearing pieces found
cracked condition.
Decision taken
during the
meeting.
The item has been introduced as a trial only.
Defective wearing piece
8.
Reporting
Railways
SWR/Aug'13, SCR/Aug'13 CR/Aug'13,
SCR/Jan'14, SWR/Jan'14, SR/Jan'14
Type of
Coaches/Major
Assy./Specific
Item.
AC & Non – AC Sleeper Coaches/PU coated
ladder.
Brief Account
of Problem. PU Peels off and forms sharp edges.
Decision taken
during the
meeting.
ICF to implement the new design SS ladder.
Newly designed SS Ladder
9.
Reporting
Railways SR, SCR
Type of
Coaches/Major
Assy./Specific
Item.
Non-AC/FRP Window
Brief Account of
Problem.
FRP shutter unit guide rails are getting
torn/cracked at louvre shutter catch
engaging location, locking hole in the
FRP frame getting oblong
Damage of rubber liners lead to jamming
of shutter The Shoot Bolt Locking
Mechanism in FRP window shutters can
be provided as a replaceable unit, so that
during POH, the locking mechanism can
be replaced separately without
condemning the entire shutter.
Decision taken
during the
meeting.
Already highlighted to RDSO
Damaged guide rail
Non-replaceable Shoot bolt Arrangement
10.
Reporting
Railways ECoR
Type of
Coaches/Major
Assy./Specific
Item.
Non-AC Coaches/Brake Gear/Alarm
Resetting Wire Rope
Brief Account of
Problem.
In Non-AC coaches, the Alarm resetting
rope is provided at one side of end wall.
In case of chain pulling by passengers, the
en-route Driver and Guard face difficulty
as they have to go through the coach to
reach the other side for resetting.
This causes hardship and also extra
detention time. Provision for resetting of
PEASD on both side of the end wall is
required
Decision taken
during the
meeting.
ICF has revised the Drawing to have both
side resetting arrangement in GS and SLR
Coaches and trial conducted in one coach.
Drawing has been sent for the approval of
RDSO and awaiting feedback.
11.
Reporting
Railways SWR/Feb‟15
Type of
Coaches/Major
Assy./Specific
Item.
All Types/Bogie/Compensating Rings
Brief Account of
Problem.
In newly built coaches - approximately 30
mm packing below the bolster coil springs
is given.
It shows that the free height of the bolster
springs is low.
Decision taken
during the
meeting.
After the introduction of Bio-toilets the
tare weight of the coaches have increased
by 2 Tonnes (0.5 x 4 Nos.) approx..
To maintain the bolster clearance excess
Compensating rings are used.
RDSO to re-design Springs.
Items pertains to ICF
1.
Reporting Railways SR/Aug'13, ECoR/Aprl‟14, SCR/July‟14 ,
SWR/July‟14
Type of Coaches/Major
Assy./Specific Item.
All types/Primary and Secondary
Suspension/Equalizing Stay
Brief Account of
Problem
Corrosion problems are more in Epoxy
painted equalizing stays of ICF design.
The RDSO design, Galvanized, equalizing
stays are corrosion resistant and last for
more than 3 POHs.
The bracket holding the Equalizing stay
and the equalizing stay unit get bend
during service and it becomes virtually
impossible to remove the long pin for
replacing the defective member.
Interchangeability problem of Bush on
Equalizing Stays
Action taken/Drawing
No./Remarks
Procurement of new forged design
equalizing stay to drg.329-0-5-012 and 013
dtd.07/01/2014 (UL No. 08139513550101)
is under progress.
For 2015-16, Procurement advice given
for 800 numbers.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
To be implemented immediately.
2.
Reporting Railways SR/April‟14
Type of Coaches/Major
Assy./Specific Item. SLR Coaches/Shell Items/SLR Luggage Door
Brief Account of
Problem
Dropping of luggage door from its guides:- To
prevent this, a bolt is welded on side pillar.
Action taken/Drawing
No./Remarks
New Stainless Steel Sliding Door with
Rollon Guide has been developed and the
drawing is under issue.
Weight of the SS Door will be 110 Kg as
against MS of 130 Kg.
Stainless Steel doors with Rollon make
guide rails will overcome the dropping of
luggage door and corrosion issues.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under Implementation
3.
Reporting Railways SCR/April‟14
Type of Coaches/Major
Assy./Specific Item.
AC Coaches/Furnishing Items/Emergency
Window
Brief Account of
Problem
Working out of chain from rubber beading
while pulling due to lesser thickness of split
pin
Action taken/Drawing
No./Remarks
Drawing has been altered – Size of the
split pin altered from 2 to 4 mm, Washer
Size altered from Inner Dia.3.4 to Inner
Dia.5.5 to IS 2016/67. Drg. No. ICF/SK
54-275 Alt‟d‟ Aug/2014.
Amendments have been issued in two
existing POs on 17/02/2015 for getting the
balance materials as per the latest drawing
as there is no financial implications.
New PO Nos. 07141141709 &
07141141862 - Delivery due on 30/05,
071401662140 & 071401662227 -
Delivery due on 30/06, have been released.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under implementation
Furnishing Div. has to cut in immediately.
4.
Reporting Railways SR/April‟14
Type of Coaches/Major
Assy./Specific Item. All types/Brake Gear/Brake cylinder
Brief Account of
Problem
Wheel grooving on account of brake
binding.
SR made the BMBC stroke 40mm against
32 mm to reduce brake binding- number of
brake binding cases have come down.
Action taken/Drawing
No./Remarks
Vide Letter No. MC/MTG/CMG/XIV
Dtd.24/02/2015 RDSO has instructed to
provide BMBC having 40 mm piston
stroke for all new GS and SLR Coaches.
106 sets of air brake equipment with
40mm piston stroke Brake Cylinders of
M/s.Stone India is under RITES
Inspection.
New UL has been initiated for Air Brake
Equipment with 40mm piston stroke Brake
Cylinders for GS & SLRD coaches.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under implementation
Furnishing Div. has to cut in immediately.
5.
Reporting Railways SR/Aug‟13, SCR/Aug‟13, CR/Aug‟13, SWR/Aug'13
NCR/April‟14, ER/July‟14
Type of
Coaches/Major
Assy./Specific Item.
All types/Furnishing Items/PVC Flooring
Brief Account of
Problem
PVC Flooring sheets in the toilet and gangway areas
generally get uprooted at skirting places. It should be
properly pasted.
Falling/uprooting of PVC in lavatories - Moulding's
gripping should be strengthened.
Action
taken/Drawing
No./Remarks
As an immediate measure aqua putty sealant to
ICF/MD/SPEC – 114 is issued to seal the PVC ends with
the pan.
An alternate material like Polymerized PVC flooring as per
RDSO Specn. C-9704-1997 has been tried; Drg. No. 283-
4-1-701 dtd.16/09/2014 and 286-4-1-501 dtd.16/09/2014.
Implementation started in coaches with SS Modular toilets.
100% implementation has been planned in all coaches
during 2015-16 itself, Supply and Installation PO No.
061500411143-Delivery due on 15/06/2015.
The Feedback received on the Polymerized Flooring from
SWR is that the Flooring is peeling off and the colour is
also fading.
As such additional properties are being added as special
condition in the existing specification.
Procurement will be made as per revised UL Description.
PDC 30/05/2015.
Implementation
status of the
modification in the
coaches/ Decision
taken during the
meeting.
Under Implementation
6.
Reporting Railways SR/Aug‟13, SCR/Aug‟13, SWR/Aug‟13,
ECoR/Jan‟14
Type of Coaches/Major
Assy./Specific Item. Non-AC Coaches/Furnishing Items/Roof Ceiling
Brief Account of
Problem
Passengers occupying space on the luggage rack
tear NFTC sheets provided below the roof sheet
at the joints and insert wrappers, tea cups and
paper items etc. in GS/SLR Coaches.
These are vulnerable to fire accidents.
NFTC being soft material, easily get damaged by
miscreants.
Further it is very difficult for Depot to repair
these ceiling damages.
Hence roof ceiling of GS/SLR coaches may
please be provided with alternate material of
higher strength and with minimum joints to
prevent such intentional damages by passengers.
Action taken/Drawing
No./Remarks
In Three Coaches (ECR GS 14410, SR GS 14432
and SCR SCN 14240), Roof ceilings have been
provided with 0.8 mm thick Stainless Steel Sheet
against existing NFTC material as a trial
measure; Drg.No.286-4-3-504 dtd.21/07/2014.
Further height of Luggage rack has been lowered
to earlier position of 1368mm (Luggage rack
Drg. GS6-6-1-601 alt 'f‟ 09/05/2014).
The customer feedback received from Southern
Railway is satisfactory; 100% implementation is
planned.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
To be implemented 100%, Furnishing to cut in
within 3 months in GS, SLRD and SCN.
7.
Reporting Railways ECoR/Jan‟14
Type of
Coaches/Major
Assy./Specific Item.
Non-AC Coaches/Furnishing
Items/Lavatory Roof Ceiling
Brief Account of
Problem
In some trains there are frequent cases
of intentional damages of toilet ceiling
of SCN coaches below the water tank.
These damages are caused by
miscreants in en-route.
The material is used for ceiling below
the water tank is NFTC sheet. Design
may replace this material by any other
material of better strength to prevent
damages.
Action taken/Drawing
No./Remarks
Roof ceiling of lavatory has been
changed from NFTC to 0.8 mm thick
Stainless Steel sheet as a trial measure
in three Coaches (ECR GS 14410, SR
GS 14432 and SCR SCN 14240).
The customer feedback received from
Southern Railway is satisfactory; 100%
implementation is planned.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
To be implemented 100%.
Furnishing to cut in within 3 months in
GS, SLRD and SCN.
8.
Reporting Railways SR/Aug‟13, NR/April‟14, SCR/July‟14
Type of Coaches/Major
Assy./Specific Item.
AC Chair Car/Furnishing Items/AC Chair Car -
Seats
Brief Account of
Problem
Different designs of AC Chair Car Chairs cause
maintainability problems like removing the
Chairs completely even for attending minor
defects
Because of different designs of chairs arranging
spares is difficult
As the qualities of chairs are very poor and
frequent damages of Snack table, Reclining
Mechanisms, Arm Rests etc. are noticed.
Due to defacing/deficit of manufacturers name
plate on the Seats it is difficult to find out the
manufacturers of the seats.
Action taken/Drawing
No./Remarks
Design of seats for AC chair car revised with
imported gas spring for reclining mechanism,
wider snack table &.back rest stopper. Detail
drawings indicating dimensions and material
has been made for frame work, back rest, back
rest cover , arm rest cover and foot rest for
standardization and to maintain uniformity
among all suppliers.
UL Description has been revised to new
specification No. ICF/MD/119 Rev.03
Dt.16/04/2014 and Drg. No.140-6-1-011 dtd.
11/02/2014.
Tender for procurement is due for opening on
16/06/2015.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
QA to ensure the quality of Snack Tables
9.
Reporting Railways SWR/Aug'13, SWR/Aug'13, CR/Apr „14, ECoR/Apr „14,
SCR/July‟14, SWR/Feb‟15, SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
All types/Furnishing Items/Painting
Brief Account of
Problem
Exterior paint of the coaches gets faded within a span of one
year.
Also, peeling off, cracks, Improper application and Bubbles
formations, dark patches, etc. are seen
Becomes dull, water base PU paint glossiness requirement is
80% but after one year the glossiness retention is only around
50%.
Fading of Satin Blue Markings on Exterior body in 2012
coaches - Coach Number, Class , capacity markings in Satin
blue not visible.
Action
taken/Drawing
No./Remarks
The Supply and application orders are under progress through
Non-Stock Indent for evaluating the performance of
Commercially Available Branded Paint for Exterior Application
in one LHB ACCW and two Conventional ACCW Coaches to
M/s.Dupont and three Conv. AC Coaches to M/s. Nerolac.
Three Coaches are completed by M/s.Nerolac and further order
for three coaches is released on M/s.Dupont.
Pasting of advertisement and touch up with the alkide paint
over the PU Exterior Paint to be avoided otherwise paint will
peel off.
Implementation
status of the
modification in the
coaches/ Decision
taken during the
meeting.
CME/QA to write to all the railways to use only permitted
cleaning agents for coach washing. CME/QA to connect the
instruction of joint circular of mechanical and commercial
department regarding advertisement in Railway coaches to
DME coaching RB to withdraw the painting, stickers etc.
CDE/Mech to write to open railways regarding permitted
detergents/washing agents.
Paint manufacturers to audit the coaches at User Railways
regarding cleaning agents, performance of paint.
10.
Reporting Railways NR/April‟14
Type of Coaches/Major
Assy./Specific Item.
All types/Furnishing Items/Plumbing- Flush
Valve
Brief Account of
Problem
Prone to theft.
Rlys want Polytetrafluoroethylene (PTFE)
material.
Action taken/Drawing
No./Remarks
As a stop gap arrangement, procurement of
100 Non-AC Coach sets of Plastic material
Flush Valves (CDC Make) is under
progress.
Similarly, 25 Coach sets of Stainless Steel
material Push Type Controlled Discharge
Flush Valve is also under progress through
single tender.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Controlled Discharge Flush Valve to be
implemented immediately.
All toilet fittings must be of branded
fittings
11.
Reporting Railways SWR/Aug‟13, SR/Jan'14, ECoR/April‟14,
SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item.
Conventional coaches/Furnishing
Items/LITTER BIN
Brief Account of
Problem
Dust bin cover securing arrangement in
Non-AC coaches is giving problem during
service.
The link mechanism of the Litter Bins is
frequently getting damaged and not user
friendly.
Stainless steel litter bins may be provided in
place of existing litter bins.
Action taken/Drawing
No./Remarks
Stainless Steel Litter Bin is under
procurement.
Proto-type Stainless Steel Litter Bin of
M/s.Dynamic Air Engg. has been approved.
50 numbers are offered for RITES
Inspection. PDC 30/05/2015.
Subsequently, based on Railway Board‟s
advice, the existing litter bin volume of 29
litres has been increased to 47 + 43 litres by
introducing additional bin and modifying the
existing bin (separate bins for biologically
degradable and recyclable waste). Trial
conducted in Shell No. GS 6020.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under Implementation.
12.
Reporting Railways CR/Aug‟13, ECoR/April‟14
Type of Coaches/Major
Assy./Specific Item.
Pantry Car/Furnishing Items/Gas Cylinder
Securing Brackets.
Brief Account of
Problem
The bracket provided to hold the gas
cylinders in Pantry cars get damaged/
distorted during handling by pantry car
staff.
The present steel brackets may please be
altered by flexible member of sufficient
strength to clamp these cylinders.
Action taken/Drawing
No./Remarks
Chain type securing arrgt. was Introduced
(Drg. No. WCB5-6-4-502, ALT-„d„
dtd.07/2014 ).
But the material received as per latest
drawing from trade was rejected during
load test.
In-house manufactured items as per latest
drawing have been provided in three
Coaches.
Drawing is re-modified with commercial
quality chain (Drg. No. WCB5-6-4-502,
ALT-„e„ dtd.18/05/2014 ).
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Furnishing to cut in immediately.
13.
Reporting Railways ER/July‟14
Type of Coaches/Major
Assy./Specific Item.
Conventional coaches/Vestibule/Rolling
shutter
Brief Account of
Problem
Failure of Rolling shutter due to corrosion.
SS sheet may be used to avoid corrosion.
Action taken/Drawing
No./Remarks
At present no vendor is available to supply
SS Shutters. New vendor is under
development for SS Shutters.
Since the maximum corrosion is on the
bottom piece, Locking plate material has
been changed to SS to AISI 304. Drg. No.
140-25-004 alt.„h‟ Dtd.18/05/2015.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Stainless steel to be introduced.
14.
Reporting Railways ECoR/April‟14
Type of Coaches/Major
Assy./Specific Item.
SLR Coaches/Shell Items/Partition wall
between luggage portion and passenger area.
Brief Account of
Problem
There are frequent cases of damage of
partition wall between luggage portion and
passenger area by miscreants. The metal
plates of partition walls are found cut to
pilfer material by miscreants.
Recently, in Train No.12808 in which the
metal partition wall of 1.6mm sheet of
SLR coach was cut to a total length of
700mm by the miscreants from the Guard
Van end.
It is suggested to provide metal sheet of
higher thickness or corrugated sheet of
2mm thickness to overcome this problem.
Further, the Hylem panel on the other side
to be eliminated so that damage caused to
the side walls can be seen easily.
Action taken/Drawing
No./Remarks
Design (Drg. No. 242-1-0-225 & 242-1-0-
226 dtd.26/09/2014) of SS partition
frame with 2.0 mm thick Stainless Steel
paneling in luggage room side is issued.
Will be implemented from June 2015
onwards in SLR Coaches.
CAI issued to all Railways on
dt.19/05/2015.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under Implementation.
15.
Reporting Railways NCR/April‟14
Type of Coaches/Major
Assy./Specific Item.
GS Coaches/Furnishing Items/Wash Basin out
let pipe.
Brief Account of
Problem
Outside wash basin underneath area should
be covered by LP Sheet to prevent hitting
of wash basin drain pipe with passenger
luggage.
This measure will improve cleaning of that
area also.
Action taken/Drawing
No./Remarks
The present design of the outlet pipe is
standardized for SCN, GS and SCZ
Coaches. The bend of the pipe is designed
for accommodating Dust Bins in SCN
Coaches.
Wash basin outlet pipe material has been
revised with Stainless steel for better
strength and durability.
UL number received and will be
implemented after exhausting the existing
stock.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under Implementation.
16.
Reporting Railways ECoR/April‟14
Type of Coaches/Major
Assy./Specific Item.
AC Coaches/Furnishing Items/Plumbing - GI
Pipe
Brief Account of
Problem
IN ICF AC coaches connection between
centrifugal pump and water tank is with GI
pipe line.
In LHB coaches, the above is with
stainless steel wire mesh protected flexible
pipe, which is easy for maintenance.
Hence the same may be considered for ICF
AC coaches also.
Action taken/Drawing
No./Remarks
Drg. issued on 02/09/2014 – No.268 63
707 alt „l‟.
Out of three items two items are common
with LHB items. One item is new,
procurement under progress through non-
stock indent.
Three POs have been released and the
delivery is due on 29/06/15, 30/10/15,
30/06/2016.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under Implementation
17.
Reporting Railways NR/April‟14
Type of
Coaches/Major
Assy./Specific Item.
All types/Furnishing Items/Dropping of lav.
Doors
Brief Account of
Problem
Dropping of Lav. Doors are noticed due to
:-
weak base channel on which hinges of
doors are screwed.
Weak hinge capacity in terms of size.
Base channel on which hinge and doors
are screwed should be thicker to achieve
more gripping of screw.
Size of door hinge should be increased to
4" from 3" to increase number of
screws/hinges.
Action taken/Drawing
No./Remarks
Lavatory door with door frame has been
introduced in AC coaches (Drg. 469-5-6-
002 alt „b‟ 08/09/2012).
The same design is under implementation
in Non-AC Coaches also (Dr.No.286 56
501 alt „c‟ and 283 56 701 alt „c‟).
Soft copy of the new drawing has been
issued to all the Railways..
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under Implementation
18.
Reporting Railways ECoR/April‟14
Type of
Coaches/Major
Assy./Specific Item.
All types/Shell Items/Main Door Window
Brief Account of
Problem
In Main doors, the window bars are
provided at close frequency.
Hence during washing, brush cannot
reach the glass surface and it is difficult
to clean these glasses.
It is suggested that the Window Bars are
to be provided at a distance same as other
windows of the coaches.
Further the window is at a very lower
level and this prevents passengers to
view from inside. Design may review
elimination of window by glass at upper
level, same as Non-AC LHB coaches.
Action
taken/Drawing
No./Remarks
Drawing No. 140-5-1-002 Alt „v‟
Dt.05/09/2014 has been issued with less
number of window bars.
UL No. 08305114580101 has been
amended vide letter No. MD/G/UL/444
dtd. 05/05/2015.
Will be implemented from the next
procurement cycle.
Soft copy of the new drawing has been
issued to all the Railways.
Implementation
status of the
modification in the
coaches/ Decision
taken during the
meeting.
Under Implementation
19.
Reporting Railways SWR/Aug‟13, SR/Aug‟13, CR/Aug'13,
ER/July‟14, SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. All types/Bogie /Modified Crown pad
Brief Account of
Problem
Bolt and nut of diamond shaped modified
'A' dimension pad (Crown Clearance)
cannot be attended in Pit-lines during rake
maintenance if worked out.
Without taking out wheels in sick line, bolt
& nut cannot be unscrewed from outside
which results in detachment of Coaches.
CW/PER - The Diamond shaped rubber
stopper pads which are received in the
First POH ICF coaches are removed and
reverted back to RDSO design SK-97068
during POH for the following reasons.
Action taken/Drawing
No./Remarks
New Design Crown Pad, Drg.No. T-0-1-
640 has been introduced.
27 Coach sets have been completed out of
100 Coach Sets planned (Coach Nos.
ECoR SLR 15704, SLR 15705, CR SCN
15225, SCR SCN 15218, SECR SCN
158208, SCN 158201, SR SCN 14378,
SECR SCN 15219, ER SCN 09057, SR
SLR 14738, 14739, 15705). Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
To be implemented in all coaches.
20.
Reporting Railways ECR/July‟14, ER/July‟14, SWR/Feb‟15
Type of Coaches/Major
Assy./Specific Item.
AC Coaches/Furnishing Items/Fire
Extinguisher
Brief Account of
Problem
Arrangement to be provided for keeping
Fire Extinguishers at both ends of AC
Coaches.
Fire Extinguisher hanging hook open out -
Fire Extinguisher bracket (Similar to
Guard van equipment lobby) to be
provided in all AC coaches for easy
operation
Action taken/Drawing
No./Remarks
The following drawings have been issued
for all AC Coaches with modified design
for fixing the fire extinguisher outside the
linen room.
WGSCWAC7(268)-.6-4-701 Alt ‟c‟
WGFSCWAC(143)-6-4-703 Alt „f‟
WGFAC12(524)-6-4-201 Alt ‟a‟ - Oct
2014
CAI issued to all Railways on
dt.19/05/2015.
UL description has been changed will be
implemented from 2016-17 onwards.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Since the item is a safety item, Shell/Fur to cut
in immediately.
21.
Reporting Railways SR/Aug‟13
Type of Coaches/Major
Assy./Specific Item.
All types/Brake Gear/Wire ropes for manual
release of distributor valve
Brief Account of
Problem
Wire ropes for manual release of
distributor valve can be provided in
Stainless Steel instead of G.I.
Action taken/Drawing
No./Remarks
Bi-metal corrosion at the soldered joint is
the reason of failure.
New Drg. Nos. 285-35-504, 285-35-804,
268-35-753, 242-35-209 have been issued
for wire rope of Stainless Steel with ferrule
type joint .
Will be implemented from 2015-16,
through next procurement cycle.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under implementation
22.
Reporting Railways SR/July „14
Type of Coaches/Major
Assy./Specific Item.
Sleeper Coaches/Furnishing Items/Foldable
snack table
Brief Account of
Problem
Hinges, Screws, Table Support, Compreg
Side Piece etc. are frequently worked out.
Colour to RDSO shade code for shaded
compreg sheet may be incorporated in the
drawing.
Action taken/Drawing
No./Remarks
Revised drawing No. 204-6-4-601 alt „q‟
dtd.11/2014 has been issued duly taking
care of the above problems, will be
implemented in the next procurement
cycle.
In LHB coaches, the old design of water
bottle holder to be followed.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Almost all the Railways are in the view of
discarding the snack table in SCN
Coaches.
Railways to obtain dispensation from
Board for non-provision of snack tables in
SCN Coaches.
23.
Reporting Railways SR/Aug'13, July‟14, Nov‟14, Feb‟15
Type of Coaches/Major
Assy./Specific Item.
Non-AC Coaches/Furnishing Items/FDB
cover
Brief Account of
Problem
Passengers are inserting waste material
through the gap of the FDB Cover in the
Roof paneling.
ICF has not implemented the modification
of FDB (Fuse Distribution Board ) Cover
as per RDSO latest instruction in GS, SCN
& SLRD Coaches
Action taken/Drawing
No./Remarks
FDB inspection cover redesigned and
implemented (329-4-4-023
Dt.01/03/2013).
As a long term solution centralized FDB at
Doorways has been introduced in GS
Coaches as per RDSO‟s Instruction. –
Implemented in 10 GS Coaches (SR
14415. 14432, 14434, 14436, 14437,
14438, 14439, 14440, 14442 and 14443).
SR to give the feedback on the 10 coaches.
Railway Board‟s approval for 100%
implementation has been obtained.
Procurement action (Enq. No. 06/15/005)
is initiated.
Implementation
status of the
modification in the
coaches/ Decision
taken during the
meeting.
As Railway Board‟s approval for 100%
implementation has been obtained for
centralized FDB, Electrical to cut in
immediately.
24.
Reporting Railways SR/Aug‟13
Type of Coaches/Major
Assy./Specific Item. Pantry Car/Shell Items/Floor Side Moulding
Brief Account of
Problem
Stainless Steel Floor side mouldings may
be provided to arrest corrosion in pantry
cars
Action taken/Drawing
No./Remarks
Drawing (No.140-1-0-040/col II 2004)
has already been modified with stainless
steel (AISI 301)material instead of IRS M-
41, which is same as trough floor.
Trial conducted in few coaches.
100% implementation has been planned
for SLR & WCB from 2015-16 onwards.
Raw material is under procurement stage.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Railways to submit life cycle analysis of Floor
Side Moulding.
25.
Reporting Railways SCR/Aug'13, SWR/Jan'14
Type of Coaches/Major
Assy./Specific Item. Non AC Coaches/Shell Items/Window sill
Brief Account of
Problem
Almost all windows manifest gap at sill
level, between sidewall sheet & window
resulting in rain water seepage.
Putty filling by ICF does not last long and
also not properly filled.
Action taken/Drawing
No./Remarks
Window Sealing Angle Design has been
modified with upward lip. Detail Drg. No.
140-1-4-015, Assembly Drg.No. 287-1-4-
802 Alt „b‟ 08/2014. –This design will not
allow water to enter inside the shell. Thus
filling the gap with putty is eliminated.
This will also control the accumulation of
muck in those areas.
Trial conducted in one coach Shell No.
SCN 5197 – Feedback is awaited from Fur
Div.
UL No.05301472700101 description has
been revised on date 18/12/2014.
Against two existing POs of old design,
issued in 09/2014, 20564 Nos. (571 Coach
Sets) are due for receiving. On exhausting
this stock, the new design will be
implemented.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under implementation.
26.
Reporting Railways SR/July‟14
Type of Coaches/Major
Assy./Specific Item. SLR Coaches/Shell Items/Dog Box
Brief Account of
Problem
Dog box modification in SLR - GOC has
modified the dog box to SR Drg. No. SK
C&W 4154/BG. The features are –
Height of the Dog Box is increased from
1070 mm to 1370 mm.
Front side of the Dog Box is covered with
weld mesh for proper light and ventilation.
Provision of drain pipe.
Vertical Sliding Door modified to
Horizontal Sliding Door for easy
operation.
Action taken/Drawing
No./Remarks
New Design of modular Dog box drawing
(Drg.No.242-64-212 dtd.19/05/2015) has
been released.
Proper ventilation, watering and toileting
facility are incorporated in new design.
UL Description is under modification.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under implementation
27.
Reporting Railways SR/Aug‟13, SCR/Aug‟13, SWR/Aug‟13,
ECoR/April‟14
Type of Coaches/Major
Assy./Specific Item.
Non-AC Coaches/Shell Items/Luggage Rack
Top Wire Mesh
Brief Account of
Problem
Wires of Luggage rack top mesh panel are
coming out from frame.
Possibility of using old model diamond
type wire mesh can be explored.
Action taken/Drawing
No./Remarks
Design revised from square weld mesh to
Diamond (OBLONG) weld mesh.
UL description has been revised on
23/07/2014 (UL No.08301002880101).
Procurement action has been initiated vide
letter No.MS320 dtd. 23/07/2014.
Will be implemented from June 2015
onwards in SLR Coaches, mid 2015-16 in
SCN Coaches and from 2016-17 onwards
in GS Coaches.
Drawing has been issued to all the
Railways.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under implementation
28.
Reporting Railways SWR/July‟14
Type of Coaches/Major
Assy./Specific Item. All types/Plumbing – Lav. Drain Pipe
Brief Account of
Problem Non-standard Drain pipe
Action taken/Drawing
No./Remarks
Design of drain out pipe location modified
vide Drg. No. 140-6-3-084
Dtd.05/02/2014.
Implemented from Jan 2015 in FAC
coaches, will be implemented in other
coaches from May 2015.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Implemented
29.
Reporting Railways CR/Aug‟13, CR/Nov‟14
Type of Coaches/Major
Assy./Specific Item. Pantry Car//LPG Gas Room Pipe Lines
Brief Account of
Problem
LPG gas store room pipe lines at less
height without NRV & gauge
Central Railway modified the location of
the pipe lines
Action taken/Drawing
No./Remarks
In the Customer Interaction Meeting held
at ICF during 22nd and 23rd January 2014,
all the Railways demanded modification of
existing features of Pantry Cars.
A joint committee was formed during the
above meeting with the members from
Railways and ICF
(Dy.CME/Coaching/HQ/CR,
Sr.CDO/BBQ/SR and
Dy.CME/Design/ICF) to review the
features of Pantry Cars.
The recommendations of the committee
are implemented since September 2014.
The above point is not figuring in the
recommendations.
Location of pipe line is at 700 mm from
the floor level as per the drawing to
accommodate the commercial gas cylinder.
However, drawing No.039-64-121 alt‟y‟
dtd. 05/15 with increased height (730 mm)
has been released.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Furnishing to cut in immediately
QA to ensure the same.
30.
Reporting Railways SR/Nov‟14
Type of Coaches/Major
Assy./Specific Item. All types/Plumbing/Gravity Cock
Brief Account of
Problem
More water Leakages are noticed in
Powder coated Grey Alumimium Alloy
(ICF Design) Gravity Cocks compared to
Chrome plated Brass cocks of RCF
Design.
During POH, the Renewal rate of Gravity
cock is 66 % due to breakage, jamming,
Leakage.
JAYSON Brand gravity cocks not
available from the trade supply.
ICF is requested to incorporate test
procedure (Hydraulic pressure test for 2
bars for 2 minutes as in the RCF Design)
for the gravity cocks to eliminate water
dripping / leakage problem in new gravity
cocks.
Action taken/Drawing
No./Remarks
ICF will include hydraulic pressure test in
the drawing.
Possibility of introducing SS Gravity Cock
will be explored.
Procurement of 100 Coach Sets of Spring
loaded Cocks in Non-AC Coaches is under
progress.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Only branded quality pipe fittings and
accessories to be provided in the lavatories.
31.
Reporting Railways SR/Nov‟14
Type of Coaches/Major
Assy./Specific Item. All types/Shell Items/Side Bearer
Brief Account of
Problem
Chamfer for side bearer of body bolster to
ICF Drg No.T-1-1-740 is required for
effective overhead welding of New Side
bearer to the Body Bolster during POH.
In House manufactured side bearers are
manufactured with chamfer and effective
welding could be ensured.
Hence, ICF is requested to review the
drawing to enable the Workshops to
procure to the side bearer with end
chamfering.
Action taken/Drawing
No./Remarks
Drawing modified with a „NOTE‟ for
workshops to procure the side bearer with end
chamfering, Drg. No.T-1-1-740 Alt „f‟.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Implemented.
32.
Reporting Railways SR/April‟14, SR/Nov‟14
Type of Coaches/Major
Assy./Specific Item. Sleeper Coaches/Seat and Berth/Head Rest
Brief Account of
Problem
In AC and Non-AC coaches, top berth
Head rest is fixed with two sided adhesive
tape and it is getting dropped even in the
maiden trip.
Once the Head Rest is fallen down the
adhesive tape is not suitable for
subsequent pasting and removing of
adhesive tape is also very difficult.
RCF and MLR / BPL do not provide Head
Rest in SCN Coaches.
Head Rest provision has been discontinued
in CW/PER from April 2011.
Minutes of ICF interaction meeting held in
APRIL 2014, sl. No. 35, NEW points for
discussion states that “ Rlys are requested
to write to RDSO ”.
Since Headrest is implemented by ICF
vide Sl No. 16 , ICF / CAI No A – 2002
/04 dt.25.09.2002 under injury free feature,
ICF may do away head rest provision in all
coaches in line with RCF
Action taken/Drawing
No./Remarks
All the Railways have requested to do away
the headrest. RDSO to issue the instructions.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
ICF will not provide the headrest in future
coaches.
33.
Reporting Railways SR/Nov‟14
Type of Coaches/Major
Assy./Specific Item.
Non-AC Coaches/Emergency
Window/Emergency window Grill
Brief Account of
Problem
Emergency window Grill - Colour
difference noticed in Non-AC Coaches.
Galvanised finish is given in ICF Drg –
ICF / STD-5-4-005.
Air Craft Blue colour is seen on new ICF
Coaches.
Red Paint to be followed as per RDSO
SK-CSC-1728, alt-5, “ Exterior Marking
for Coaches ” , Detail –N and Note-6.
ICF is requested to alter ICF Drg.No.
ICF/STD-5-4-005 in line with RDSO
Guidelines.
Action taken/Drawing
No./Remarks
Drawing has been revised. Drg.No. 140-54-
005 alt‟n‟ dtd. 05/15.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Implemented.
34.
Reporting Railways SCR/Nov‟14
Type of
Coaches/Major
Assy./Specific Item.
All types/Shell
Items/Main Door
Handle – Operating
Instruction Notice is
required.
Brief Account of
Problem
Main Door Handle
Operating
Direction
Indication Notice
may be provided as
the passengers are
getting confused
while opening or
closing the main
doors both from
outside and inside.
Action
taken/Drawing
No./Remarks
Drawing
(Drg.No.268-64-
702 alt „h‟ 05/15)
has been issued for
immediate
implementation.
Implementation
status of the
modification in the
coaches/ Decision
taken during the
meeting.
Under implementation
35.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. AC 3 Tier/Seat and Berth/Side Berth of ACCN
Brief Account of
Problem
Nearly 80 to 90 mm gap is found between
panel and backrest-cum-side berth in
unfolded condition on both sides.
This results in falling off pillows in the
gap.
Action taken/Drawing
No./Remarks
Drawing (PDC – 15/03/2015) is being
modified to eliminate the gap.
As a stop gap arrangement, the gap is
covered suitably.
Modified drawing is released
(Drg.No.501-61-001 alt ‟h‟ dtd.05/15)
Will be implemented from 2016-17.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under implementation.
36.
Reporting Railways SR/Aug‟13, SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
All types/Shell Items/Partition Pillars
Brief Account of
Problem
Square MS partition pillar in ICF coaches
are getting corroded adjoining the floor
due to water seepage during cleaning
activities.
This square MS partition pillar is getting
damaged during service.
To avoid this, it is suggested to replace MS
partition pillar with SS material.
Action taken/Drawing
No./Remarks Under study.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Since all the other structural materials are
of IRS M-41, presently only Partition
Pillar Material cannot be switched over to
Stainless steel.
Railways to come up with suggestions for
improvement and also to give the
performance feedback on the anticorrosive
paint to RDSO Specn. M&C/PCN 123.
37.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. All types/Furnishing Items/Door Stopper
Brief Account of
Problem
Door stopper provided in newly built
coaches for main doors as well as toilet
causes damages to the mica panels.
The orientation of door stopper and design
are to be modified.
Action taken/Drawing
No./Remarks
Back pieces are already available for
fixing the door stopper – Drg. No.140-1-0-
065 item No.6.
Revised drawing issued by increasing the
back piece size from 60 to 100 mm width
in the door frame - Drg. No.140-5-6-012
alt „r‟.
In in-house manufactured doors the above
modification has been implemented.
PO No. 071418062366 dtd.25/11/‟14
delivery due on 30/07/2015.
Soft copy of the new drawing has been
issued to all the Railways.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
QA to ensure
.
38.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item.
All types/Plumbing/Non-metallic Side Filling Water Pipe
Adaptors
Brief Account of
Problem
Non-metallic Side Filling Water Pipe Adaptors are
prone for damage/theft/pilferage in open line.
The half portion of the water side filling pipe
adaptors are found missing in 90% of coaches.
Action taken/Drawing
No./Remarks It is as per CAMTECH design.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Design and QA to conduct studies at BBQ and BZA
regarding the performance and the failure of the side
filling arrangement.
Single piece swiveling type design to be tried.
39.
Reporting Railways ER/Feb‟15
Type of Coaches/Major
Assy./Specific Item. All Types/Lav. Assy/Western Commode
Brief Account of
Problem
During replacement of Commode it is difficult &
time consuming as the base bolt are getting rusted
and broken.
Extra plate/block may be provided at the bottom of
commode & design may be reviewed for easy
fitment.
SS nut & bolt may be used to prevent corrosion
Action taken/Drawing
No./Remarks
Stainless hardware had been introduced vide drawing
No.140-63-069 alt „nil‟. To be implemented.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
QA to ensure the proper hardware.
40.
Reporting Railways NR/April‟14, ER/Feb‟15
Type of Coaches/Major
Assy./Specific Item. AC Coaches/Window Assy./Window Glasses
Brief Account of
Problem
Problems are faced in the procurement and
fitment of different sizes of Window
glasses & rubber gaskets in different types
of AC Coaches.
In newly received AC Chair Car the size is
1220X762X25.5 whereas the previous
size was 1220X752X25.5
Standardization of window glass size
required.
Action taken/Drawing
No./Remarks
Size has been standardized to 1220X752X25.5
mm (Drg. Nos. 077-5-4-221 alt „k‟ Dt.
10/07/2014 and 251-5-4-203 alt „e‟
Dt.29/05/2008)
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Implemented
41.
Reporting Railways SR/Aug'13, SCR/Jan'14, ER/Feb‟15
Type of Coaches/Major
Assy./Specific Item. All Types/Lav. Assy./Lav. Door
Brief Account of
Problem
Damage of Al. ventilators of Lav. Doors
ER - It is noticed that miscreants
frequently damage the louvers fitted on
lavatory door in non-AC coaches and
privacy of passengers are under threat.
Ventilator may be shifted on side wall of
inside lavatory of Non-AC coaches in lieu
of lavatory door using louver or perforated
sheet.
Action taken/Drawing
No./Remarks
The damages are due to
pilferage/Vandalism. Change over to MS
will lead to corrosion problem.
Sturdy Structured Ventilators of Stainless
Steel Material design has been issued
(Drg.No.140-56-015 alt „h dtd. 06/2014).
PO has been released (No. 071418062366
dtd.25/11/‟14 delivery due on 30/07/2015).
Advice given for in-house manufacturing
also.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Under implementation
42.
Reporting Railways SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
SLR/Guard‟s Cabin/Hand Brake Wheel
Brief Account of
Problem
ICF may provide “ON – OFF” Indication
for Hand brake wheel operation in Guard‟s
cabin of SLRD Coaches to help in case of
emergency.
SLRD 14701, Hand brake “On and Off”
indication is not clearly visible and
incorrect. The Arrow illustrating the hand
brake wheel rotation for applying brake is
not painted
Action taken/Drawing
No./Remarks
“On and Off” rotating direction is available in
the wheel itself.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
QA to check the Hand wheel marking and
Emergency Brake Valve operating direction
(only upward) in the guard van in 25 coaches.
43.
Reporting Railways SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
GS/Plumbing/Chute Fixing
Brief Account of
Problem
Painting instruction for Chute fixing
arrangement for Wash Basin Outlet pipe –
ICF Drg No. GS2-6-3-206, alt h/6.
There is no painting instruction given in
ICF drg No. GS2-6-3-206 and also in the
various component drawings.
ICF is requested to incorporate suitable
painting instruction in the drawing to get
the supplies in painted condition which
will eliminate painting work by
workshops.
Action taken/Drawing
No./Remarks
Painting instruction is added as Note in the
Drawing.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Implemented.
Design to advice all the Railways.
44.
Reporting Railways SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
GS/Plumbing/Chute Fixing Material
Brief Account of
Problem
Relaxation of Copper Bearing steel to
Chute fixing arrangement to GS2-6-3-
206, alt h/6 is required.
Out of the 8 components in chute fixing
arrangement, the material specification
of Item-3 support & item-4 Lug only are
copper bearing steel to IS : 2062 , Cu /
IRS-M-41.
All other 6 items are ordinary mild steel
, i.e., non-copper bearing steel.
Keeping only the 2 items as copper
bearing steel may not serve the purpose.
Hence, the material specification of
Item-3 support & item-4 Lug may be
changed to Non copper bearing steel.
Action taken/Drawing
No./Remarks
Material Specification for the two items
have been revised to IS 2062 – 2011
E250A (without Copper Bearing).
Drg. No. 001-63-071 alt „l‟ dtd.05/15.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Implemented.
Design to advice all the Railways.
45.
Reporting Railways SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
All Types/Bogie/Bogie Levers
Brief Account of
Problem
Relaxation of Copper Bearing steel for
Bogie Levers of AC & Non AC Coaches to
Drg No. T-3-2-802, WTAC4-3-2-402 is
required.
During POH, 5 % of bogie levers – AC
and Non-AC coaches are condemned
mainly due to the bush holes getting
oblong/bent/other damage and there is no
corrosion problem.
After 2009, the material specification of
these levers was changed from IS:2062
mild steel to copper bearing steel ( Cu
grade ).
Since there is no corrosion related
problem, ICF may relax copper bearing
steel to eliminate procurement problem ,
delay in Tender procedures , lab testing
during certification, etc.
Action taken/Drawing
No./Remarks Material of bogie levers has been modified
to IS 2062 without copper bearing.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Implemented.
Design to advice all the Railways.
46.
Reporting Railways SR/Aug‟13, SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
SCN/Furnishing/Racks and Partition Panels
Brief Account of
Problem
Damages are noticed in the Racks and Partition
Panels at Main Doorways of SCN coaches to Drg.
No.286-6-4-501.
RCF & BEML do not provide any Rack at Doorway
and it is maintenance free.
ICF is requested to eliminate the provision of this
Rack in SCN, SCZ & GS Coaches for the following
reasons.
This shelf is not used by the genuine passengers as
this is away from their sight.
Additional rectification work is carried out by
renewal of LP Sheet Partition panel of approx. 50
sq.ft per SCN Coach.
Post 2010 SCN, GS Coaches are provided with SS
Racks and the same are bent/hanging/missing.
Action taken/Drawing
No./Remarks
Shells are going with stainless steel rack as against
plywood vide drawing No.GS-6-4-501.
Racks had been introduced for the purpose of
keeping food trays. However, user Railways are
seeking dispensation.
User Railways may dispense with the racks if not
required.
Future ICF coaches will be without the racks. Drg.
No. (GS6)289-9-0-602 alt „l‟, (SCN8)287-9-0-802
alt‟w‟.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
ICF will not provide Racks in future coaches.
47.
Reporting Railways SR/Aug‟13, SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
All types/Axle Box Assy./Cast Iron Axle Box
Front Covers
Brief Account of
Problem
Non Elimination of Cast Iron Axle Box Front
Covers in lieu of Aluminium to T-0-2-633,alt-
r/5.
One Man Committee Report on Roller
Bearings , released by Railway Board in May
1976 by Sri. K.Raman, CME/SR, para 4.3.7
reads, “the front cover should also be of
Aluminium as it will have a better heat
dissipating capacity and in the event of
working out, the cover will show the distress
which can easily be detected. If the cover is
made out of steel or cast iron, in the event of a
breakdown of the bearing, it may escape early
detection”.
ICF is requested to delete cast iron front
covers in ICF Drg No.T-0-2-633,alt-r/5 and
advise zonal Railways to stop procurement
and fitment
Action taken/Drawing
No./Remarks
Aluminium front cover to 000-02-633 – item
(1) is the main design.
SG Iron and Malleable Cast iron given as a
alternate design only.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Railways can opt as per their requirement.
48.
Reporting Railways SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
All Types/Roller Bearing Assy./Roller Bearing
Brief Account of
Problem
ICF is requested to mark the month and
year of roller bearing assembly, for e.g., [
ICF – 02/15] on the outer race of the roller
bearing.
This information is vital for the Railways
to decide the type of attention i.e. in situ or
strip & fit during POH.
Action taken/Drawing
No./Remarks
Month and year of manufacture markings
are provided on the bearings by the
manufacturers.
The purchase orders are placed to supply
the bearings on month-wise schedule.
As such manufactures marking can be
referred by User Railways to decide the
type of attention.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
ICF to follow the RDSO instruction regarding
marking.
49.
Reporting Railways SR/Feb‟15
Type of
Coaches/Major
Assy./Specific Item.
SCN/Seat and Berth/Middle Berth
Brief Account of
Problem
Hitting of Middle Berth bottom board on
the stopper bush in SCN Coaches.
Approx . 10 Nos. of Middle Berth Bottom
Board found cracked in First POH SCN
Coaches (on both ends of the berth).
Crack is covered by Over patch during
POH.
Elimination of Berth stopper can solve the
problem since no crack is seen if middle
berth stoppers are not there.
Action taken/Drawing
No./Remarks
Already back pieces are available in the
middle berth frame where the stopper
comes in to contact. Drg. No. 201-61-605
Alt „f‟.
However, back piece design has been
modified from Plate to Channel as a
foolproof method.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
Design to monitor the performance of the
modified design.
50.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item.
Non-AC Coaches/Shell Assy./Lower Berth
Seat Brackets
Brief Account of
Problem
Lower berth/seat Brackets of Non AC
Coaches are getting corroded due to water
seepage.
Action taken/Drawing
No./Remarks
Fixing of chair angles have been modified
from welded design to bolted design with
sidewall after paneling.
Drawing is issued.
This will reduce the chances of corrosion.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
To be implemented.
51.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. Non-AC Coaches/Furnishing/Lav. Paneling
Brief Account of
Problem
Joint in Lavatory Panel of Non AC
Coaches may be avoided as it is not
required.
No Joint in Lavatory Panel of AC Coaches
and aesthetic is also good.
Action taken/Drawing
No./Remarks
All SCN and GS Coaches are being
provided with SS Paneling inside the
lavatory without joints.
Proposal has been approved to turnout
these coaches with SS Modular toilets in
future.
At present all AC Coaches are fitted with
SS Modular Toilets.
Implementation status
of the modification in
the coaches/ Decision
taken during the
meeting.
To be implemented in 100% Non-AC
Coaches, cut in to be from first week of June
2015.
52.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. AC Coaches/Vestibule Assy/Flap Door
Brief Account of
Problem
Vestibule flap doors are getting damaged
and missed frequently.
C&W/PER/SR has stopped the provision
of flap doors except in FAC w.e.f. Dec 14
during POH.
Action taken/Drawing
No./Remarks
The item is appearing in the RDSO
Particular Specification RDSO Spec
2011 CG-B-05 AC2T SLEEPER.
If all the Railways demand the removal
of flap doors, the same will be elevated
to RDSO for review.
Implementation status of
the modification in the
coaches/ Decision taken
during the meeting.
ICF will provide as per RDSO directives,
User Railways may take their own decision.
53.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. All Types/Brake Gear/PEAV Isolating Cock
Brief Account of
Problem
PEAV (Passenger Emergency Alarm
Valve) isolating cock is provided in
intricate location in ICF newly built Bio-
toilet coaches.
Operation of isolation cock is possible
only in pit line and not in en-route.
Action taken/Drawing
No./Remarks Design is under review.
Implementation status of
the modification in the
coaches/ Decision taken
during the meeting.
Under Design Modification.
54.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item.
AC Coaches/Furnishing Items/Location of
Fan
Brief Account of
Problem
Fan is infringing with curtains in AC
coaches. Fans in AC coaches are to be
relocated. (SR ACCW 04126)
Action taken/Drawing
No./Remarks Due to space restriction it is technically
not feasible.
Implementation status of
the modification in the
coaches/ Decision taken
during the meeting.
Technically not feasible.
55.
Reporting Railways SWR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. SCZ/Seats
Brief Account of
Problem
In newly built coaches - Seat width is less
and may lead to public complaints
Action taken/Drawing
No./Remarks
These seats are ergonomically designed
cushioned seats with increased knee
space and the structure is of Stainless
steel material to avoid corrosion.
Implementation status of
the modification in the
coaches/ Decision taken
during the meeting.
Railways may forward any passenger
complaints received for further
improvements.
56.
Reporting Railways SWR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. All Types/Furnishing Items/Notice Board
Brief Account of
Problem
Location of emergency windows are
marked on metal plate and provided in
the roof.
These metal plates are infringing the
heads of passengers while climbing the
upper berths.
Instead of metal plate, soft material
(LIKE RUBBER SHEET) may be used.
Action taken/Drawing
No./Remarks
The location of the present indication
board is in centre line with the
emergency window in the bay.
The location is being modified to centre
line of the bay to avoid hitting of
passengers head.
Implementation status of
the modification in the
coaches/ Decision taken
during the meeting.
Under Design Modification
57.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. -
Brief Account of Problem
LHB Drawings for reference during POH.
ICF is requested to issue a list of Drawings comprising POH related items viz.,
amenities, interior fittings, lavatory items, vestibule, bogie , Air brake , CBC, CDTS /
Bio toilet , seats and berths, flooring sheets, ceiling etc., required for maintenance
during IOH and POH.
Action taken/Drawing
No./Remarks
ICF is following RCF drawings and specifications for the manufacture of LHB
Coaches and the alterations are issued by RCF.
Hence, User Railways may obtain necessary drawings and specifications from RCF.
However, on specific request for specific item the same will be provided by ICF.
Implementation status of the
modification in the coaches/
Decision taken during the
meeting.
Railways may approach the Design/ICF for specific drawings.
58.
Reporting Railways SR/Feb‟15
Type of Coaches/Major
Assy./Specific Item. -
Brief Account of Problem
The list of new alteration details of ICF drawings, month wise, was available in ICF
website in 2012 and not available at present.
ICF is requested to restore the list of alteration number and date of the drawings altered
on monthly basis.
Action taken/Drawing
No./Remarks
List updated in the website. Alterations issued during Jan 2015 to April 2015 are available.
Website: 10.53.20.11 – Main Menu –Department - Mechanical - list of drawings issued.
Implementation status of the
modification in the coaches/
Decision taken during the
meeting.
Implemented.