Palace of Westminster - Medium Term Design Review £35M Development In 2013 we were appointed by the Parliamentary Estates Directorate to undertake a Design Review of the Mechanical & Electrical medium term works at the Houses of Parliament, which is a Grade I listed building and a World Heritage Site. It had been some time since the Houses of Parliament had its heating, power and ICT infrastructure updated. This project saw the mechanical and electrical plant equipment updated and refurbished. S I Sealy reviewed the designs of this refurbishment, which included the water systems, steam infrastructure, electrical low voltage infrastructure systems and high voltage substations, ventilation, building management systems as well as the ICT infrastructure. www.sisealy.co.uk

CS Palace of Westminster - SI Sealy · Palace of Westminster - Medium Term Design Review £35M Development In 2013 we were appointed by the Parliamentary Estates Directorate to undertake

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CS Palace of Westminster - SI Sealy · Palace of Westminster - Medium Term Design Review £35M Development In 2013 we were appointed by the Parliamentary Estates Directorate to undertake

Palace of Westminster - Medium Term Design Review£35M Development

In 2013 we were appointed by the Parliamentary Estates Directorate to undertake a Design Review of the Mechanical & Electrical medium term works at the Houses of Parliament, which is a Grade I listed building and a World Heritage Site.

It had been some time since the Houses of Parliament had its heating, power and ICT infrastructure updated. This project saw the mechanical and electrical plant equipment updated and refurbished. S I Sealy reviewed the designs of this refurbishment, which included the water systems, steam infrastructure, electrical low voltage infrastructure systems and high voltage substations, ventilation, building management systems as well as the ICT infrastructure.

www.sisealy.co.uk

Page 2: CS Palace of Westminster - SI Sealy · Palace of Westminster - Medium Term Design Review £35M Development In 2013 we were appointed by the Parliamentary Estates Directorate to undertake

Call David Stafford, Director, on 0161 430 2044 or email [email protected]

Inwood Court, Stuart Road, Bredbury, Stockport SK6 2SR

www.sisealy.co.uk

Low Carbon Consultants CIBSE Accredited Low Carbon

Energy Assessors

Part L Compliance, SBEM, EPC, DEC,

SAP Certification

Level 5 Modelling

Building energy and thermal modelling

Thermal overheating compliance

Daylight modelling

BREEAM LZC Studies

Climate Change Modelling

Building Information Modelling (BIM)

Revit MEP

BIM Services

Mechanical Engineering Boiler and Power Plants

Renewable Energy Technologies

Air Conditioning, refrigeration

and cold stores

Heating and Ventilation

Hot and Cold Water installations

Process systems for gases and liquids

Lifts and Escalators

Laundry and Kitchen installations

Medical Gases

Electrical Engineering Power generation and distribution

Interior Lighting Design

Exterior lighting and floodlighting

Emergency Lighting

General power and process systems

TV, CCTV, Fire alarms, security, public address

Lightning protection

Information Technology and Data Systems

Project Management Formal Contract Administration

Feasibility to commissioning

Full cost control and monitoring

Engineering Asset Management Property Appraisals and Condition Surveys

Property Management and Strategic Planning

Testing Programmes

FS 561237 EMS 568685 OHS 588589

OHSAS18001OccupationalHealth & SafetyManagement

ISO14001EnvironmentalManagement

ISO9001QualityManagement