4
DRAWING NUMBER DATE DRAWING TITLE PROJECT DISCRIPTION REVISION THESE DRAWINGS ARE THE EXCLUSIVE PROPERTY OF IHS DESIGN AND MAY NOT BE REPRODUCED OR USED WITHOUT EXPRESSED WRITTEN PERMISSION FROM THE SAME. SITE PLAN CARRIAGE HOUSE DEVELOPMENT 1373 TANEMURA CRESCENT KELOWNA, BC V1P 1R5 LOT 1 PLAN KAP86150 APRIL 26, 2017 DATE 1 4 of IHS DESIGN 1392 MINE HILL DRIVE KELOWNA, BC V1P 1S5 www.ihsdesign.com (250) 212-7938 PROJECT NORTH 24'-7 1/4" [7.500m ] 55'-1 1/2" [16.802m ] 14'-5 1/8" [4.398m ] 29'-1 1/2" [8.878m ] 46'-5 3/8" [14.158m ] 10.701m a = 38.258m r = 112.500m 46.542m 26.226m 61.652m EXISTING DWELLING TANEMURA CRESCENT 16'-3 1/4" [4.960m ] 20'-0 3/8" [6.105m ] GRAVEL DRIVEWAY GRAVEL DRIVEWAY EXISTING 1.2m RETAINING RU1-C ZONE STANDARDS PROPOSED SITE AREA 550.00m2 1970.00m2 EXISTING BUILDING FOOTPRINT AT GRADE 228.71m2 EXISTING BUILDING TOTAL FINISHED FLOOR AREA 199.23m2 PROPOSED CARRIAGE HOUSE FOOTPRINT 89.86m2 PROPOSED CARRIAGE HOUSE FINISHED FLOOR AREA 89.86m2 PROPOSED CARRIAGE COVERED PATIO 11.90m2 PROPOSED DRIVEWAY AREA (CONCRETE) 0.00m2 ACCESSORY BUILDING SITE COVERAGE 14% 5.2% SUITE AREA TO MAIN DWELLING AREA 75% 45.1% SITE COVERAGE 40.0% 16.8% SITE COVERAGE INCLUDING HARD SURFACES 50.0% 16.8% BUILDING HEIGHT OF EXISTING HOUSE 9.5m/2 1/2 STOREYS 6.870m/1 1/2 STOREYS BUILDING HEIGHT OF PROPOSED CARRIAGE HOUSE 4.8m/1 1/2 STOREYS 4.693m/1 STOREY PEAK OF CARRIAGE HOUSE ROOF 4.693m PEAK OF EXISTING DWELLING ROOF 7.921m PARKING STALLS PROVIDED 3 4 PRIVATE OPEN SPACE CARRIAGE HOUSE 30.00m2 60.00m2 SETBACK TO PRINCIPLE BUILDING 3.000m 14.158m REAR (SOUTH) YARD SETBACK 2.000m 8.878m SIDE (EAST) YARD SETBACK 2.000m 16.802m SIDE (WEST) YARD SETBACK 2.000m 4.398m 1 IN 200 YEAR FLOOD CONSTRUCTION LEVEL 343.660m 575.000m ZONING ANALYSIS PROJECT DATA: CIVIC ADDRESS 1373 TANEMURA CRESCENT KELOWNA, BC V1P 1R5 LEGAL ADDRESS LOT 1 PLAN KAP86150 CURRENT ZONING RU-1 - LARGE LOT HOUSING PROPOSED ZONING RU1C LARGE LOT HOUSING WITH CARRIAGE HOUSE FUTURE LAND USE S2RES - SINGLE/TWO FAMILY RESIDENTIAL PROJECT LOCATION

CRESCENT TANEMURA - Kelownaapps.kelowna.ca/CityPage/DevApps/Z17-0046 DVP17-0131... · 2017. 6. 1. · 1373 tanemura crescent kelowna, bc v1p 1r5 lot 1 plan kap86150 april 26, 2017

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • DRAWING NUMBER

    DATE

    DRAWING TITLE

    PROJECT

    DISCRIPTIONREVISION

    THESE DRAWINGS ARE THE EXCLUSIVE PROPERTY OF IHSDESIGN AND MAY NOT BE REPRODUCED OR USED WITHOUT

    EXPRESSED WRITTEN PERMISSION FROM THE SAME.

    SITE PLAN

    CARRIAGE HOUSE DEVELOPMENT

    1373 TANEMURA CRESCENT

    KELOWNA, BC V1P 1R5

    LOT 1 PLAN KAP86150

    APRIL 26, 2017

    DATE

    1

    4of

    IHS DESIGN1392 MINE HILL DRIVE

    KELOWNA, BC V1P 1S5www.ihsdesign.com

    (250) 212-7938

    PROJECT NORTH

    24'-7

    1/4

    "[7

    .500

    m]

    55'-1 1/2"[16.802m]

    14'-5 1/8"[4.398m]

    29'-1

    1/2

    "[8

    .878

    m]

    46'-5

    3/8"

    [14.15

    8m]

    10.701m

    a = 38.258mr = 112.500m

    46.5

    42m

    26.226m

    61.6

    52m

    EXISTING DWELLING

    TANEMURA CRESCENT

    16'-3 1/4"

    [4.960m]

    20'-0

    3/8"

    [6.10

    5m]

    GRAVEL DRIVEWAY

    GRAVEL DRIVEWAY

    EXISTING 1.2m RETAINING

    RU1-C ZONE STANDARDS PROPOSED

    SITE AREA 550.00m2 1970.00m2

    EXISTING BUILDING FOOTPRINT AT GRADE 228.71m2

    EXISTING BUILDING TOTAL FINISHED FLOOR AREA 199.23m2

    PROPOSED CARRIAGE HOUSE FOOTPRINT 89.86m2

    PROPOSED CARRIAGE HOUSE FINISHED FLOOR AREA 89.86m2

    PROPOSED CARRIAGE COVERED PATIO 11.90m2

    PROPOSED DRIVEWAY AREA (CONCRETE) 0.00m2

    ACCESSORY BUILDING SITE COVERAGE 14% 5.2%

    SUITE AREA TO MAIN DWELLING AREA 75% 45.1%

    SITE COVERAGE 40.0% 16.8%

    SITE COVERAGE INCLUDING HARD SURFACES 50.0% 16.8%

    BUILDING HEIGHT OF EXISTING HOUSE 9.5m/2 1/2 STOREYS 6.870m/1 1/2 STOREYS

    BUILDING HEIGHT OF PROPOSED CARRIAGE HOUSE 4.8m/1 1/2 STOREYS 4.693m/1 STOREY

    PEAK OF CARRIAGE HOUSE ROOF 4.693m

    PEAK OF EXISTING DWELLING ROOF 7.921m

    PARKING STALLS PROVIDED 3 4

    PRIVATE OPEN SPACE CARRIAGE HOUSE 30.00m2 60.00m2

    SETBACK TO PRINCIPLE BUILDING 3.000m 14.158m

    REAR (SOUTH) YARD SETBACK 2.000m 8.878m

    SIDE (EAST) YARD SETBACK 2.000m 16.802m

    SIDE (WEST) YARD SETBACK 2.000m 4.398m

    1 IN 200 YEAR FLOOD CONSTRUCTION LEVEL 343.660m 575.000m

    ZONING ANALYSIS

    PROJECT DATA: CIVIC ADDRESS 1373 TANEMURA CRESCENTKELOWNA, BC V1P 1R5

    LEGAL ADDRESS LOT 1 PLAN KAP86150CURRENT ZONING RU-1 - LARGE LOT HOUSINGPROPOSED ZONING RU1C – LARGE LOT HOUSING WITH CARRIAGE HOUSE

    FUTURE LAND USE S2RES - SINGLE/TWO FAMILY RESIDENTIAL

    PROJECT LOCATION

  • DRAWING NUMBER

    DATE

    DRAWING TITLE

    PROJECT

    DISCRIPTIONREVISION

    THESE DRAWINGS ARE THE EXCLUSIVE PROPERTY OF IHSDESIGN AND MAY NOT BE REPRODUCED OR USED WITHOUT

    EXPRESSED WRITTEN PERMISSION FROM THE SAME.

    ELEVATIONS

    CARRIAGE HOUSE DEVELOPMENT

    1373 TANEMURA CRESCENT

    KELOWNA, BC V1P 1R5

    LOT 1 PLAN KAP86150

    APRIL 26, 2017

    DATE

    2

    4of

    IHS DESIGN1392 MINE HILL DRIVE

    KELOWNA, BC V1P 1S5www.ihsdesign.com

    (250) 212-7938

    PROJECT NORTH

    SOUTH ELEVATIONScale: 1/4" = 1'-0"

    2

    TOP OF GARAGE SLAB

    0'-0" [0.000m]

    TOP OF WALLS GARAGE BAY 2

    10'-0 3/4" [3.067m]

    PEAK OF ROOF

    15'-4 3/4" [4.693m]

    TOP OF BASEMENT SLAB

    -10'-4" [-3.150m]

    WEST ELEVATIONScale: 1/4" = 1'-0"3

    TOP OF GARAGE SLAB

    0'-0" [0.000m]

    TOP OF WALLS GARAGE BAY 2

    10'-0 3/4" [3.067m]

    PEAK OF ROOF

    15'-4 3/4" [4.693m]

    TOP OF BASEMENT SLAB

    -10'-4" [-3.150m]

    CULTURED STONE

    EAST ELEVATIONScale: 1/4" = 1'-0"4

    NORTH ELEVATIONScale: 1/4" = 1'-0"

    1

    TOP OF GARAGE SLAB

    0'-0" [0.000m]

    TOP OF WALLS GARAGE BAY 2

    10'-0 3/4" [3.067m]

    PEAK OF ROOF

    15'-4 3/4" [4.693m]

    CEDAR SIDING (STAINED)

    ACRYLIC STUCCO

  • 30'-0"6'-0"

    35'-0

    "

    33'-0

    "5'

    -0"

    35'-6"

    6'-6"

    16'-0" 13'-0" 6'-6"

    10'-0

    "

    BEDROOM 111'6" x 12'4"

    BEDROOM 212'0" x 10'4"

    DINING6'9" x 9'1"

    KITCHEN8'5" x 12'0"

    LIVING15'8" x 14'6"

    BATH

    41'-6"

    15'-0

    1/8

    "10

    '-0"

    10'-0

    "

    14'-6" 14'-6"

    FFA = 968 SQ.FT.BASEMENT FLOORScale: 1/4" = 1'-0"2

    A D3A D3

    DRAWING NUMBER

    DATE

    DRAWING TITLE

    PROJECT

    DISCRIPTIONREVISION

    THESE DRAWINGS ARE THE EXCLUSIVE PROPERTY OF IHSDESIGN AND MAY NOT BE REPRODUCED OR USED WITHOUT

    EXPRESSED WRITTEN PERMISSION FROM THE SAME.

    FLOOR PLANS

    CARRIAGE HOUSE DEVELOPMENT

    1373 TANEMURA CRESCENT

    KELOWNA, BC V1P 1R5

    LOT 1 PLAN KAP86150

    APRIL 26, 2017

    DATE

    3

    4of

    IHS DESIGN1392 MINE HILL DRIVE

    KELOWNA, BC V1P 1S5www.ihsdesign.com

    (250) 212-7938

    PROJECT NORTH

    29'-0"6'-0"

    35'-0

    "

    35'-6"

    6'-6"

    GARAGE BAY 114'0" x 27'0"

    41'-6"

    14'-6" 14'-6"

    GARAGE BAY 214'0" x 29'0"

    35'-0

    "

    2'-0

    "28

    '-0"

    5'-0

    "

    30'-0

    "5'

    -0"

    30'-0" 5'-6"

    DN

    6'-3

    "

    MAIN/GARAGE FLOORScale: 1/4" = 1'-0"1

    A D3A D3

  • TOP OF GARAGE SLAB

    0'-0" [0.000m]

    TOP OF WALLS GARAGE BAY 2

    10'-0 3/4" [3.067m]

    PEAK OF ROOF

    15'-4 3/4" [4.693m]

    TOP OF BASEMENT SLAB

    -10'-4" [-3.150m]

    10'-0

    3/4

    "9'

    -0"

    4'-0"

    4'-0"

    2'-0"

    SECTIONScale: 1/4" = 1'-0"A

    DRAWING NUMBER

    DATE

    DRAWING TITLE

    PROJECT

    DISCRIPTIONREVISION

    THESE DRAWINGS ARE THE EXCLUSIVE PROPERTY OF IHSDESIGN AND MAY NOT BE REPRODUCED OR USED WITHOUT

    EXPRESSED WRITTEN PERMISSION FROM THE SAME.

    SECTION

    CARRIAGE HOUSE DEVELOPMENT

    1373 TANEMURA CRESCENT

    KELOWNA, BC V1P 1R5

    LOT 1 PLAN KAP86150

    APRIL 26, 2017

    DATE

    4

    4of

    IHS DESIGN1392 MINE HILL DRIVE

    KELOWNA, BC V1P 1S5www.ihsdesign.com

    (250) 212-7938

    PROJECT NORTH

    - LAMINATE SHINGLES- BITUMEN SATURATED ROOFING PAPER- 7/16" SHEATHING W/ H-CLIPS- ENGINEERED ROOF TRUSSES @ 24" O.C.- LOOSE FILL INSULATION- 6 MIL POLY VAPOUR & AIR BARRIER- 1/2" CEILING BOARD (TEXTURED)

    1 ROOF SYSTEM

    - HARDIPLANK LAP SIDING/BOARD & BATTEN- BUILDING PAPER- 3/8" SHEATHING- 2X6 STUD WALL - STUDS @ 16" O.C.- BATT TYPE INSULATION- 6 MIL POLY VAPOUR & AIR BARRIER- 1/2" DRYWALL (PAINTED)

    2 EXTERIOR WALL

    - 1/2" DRYWALL (PAINTED)- 2X4 STUD WALL - STUDS @ 16" O.C.- 1/2" DRYWALL (PAINTED)

    - WALLS RUNNING PERPENDICULAR TO FLOOR JOIST LAYOUT ARE TO HAVE A STUD SPACING OF 19.2" O.C. WITH STUDS DIRECTLY ABOVE JOIST

    3 INTERIOR LOADBEARING WALL

    - 1/2" DRYWALL (PAINTED)- 2X4 STUD WALL - STUDS @ 16" O.C.- 1/2" DRYWALL (PAINTED)

    4 INTERIOR NON-LOADBEARING WALL

    - INTERIOR FLOOR COVERINGS- 3/4" T & G PLYWOOD SUBFLOOR- 11 7/8" TJI SILENT FLOOR (SEE APPROVED LAYOUT FOR JOIST SPACING AND PLACEMENT)- 1/2" DRYWALL (TEXTURED) IN FINISHED AREAS ONLY- REFER TO APPROVED FLOOR LAYOUT DIAGRAM

    5 FLOOR SYSTEM

    - 4" CONCRETE SLAB (20 MPA MIN)- 10M BARS @ 16" E.W. IN TILED FLOOR AREAS- 6 MIL POLY LAPPED NOT LESS THAN 12" & ALL JOINTS SEALED TO PREVENT AIR LEAKAGE- RIGID INSULATION- MINIMUM 4" CLEAN GRANULAR MATERIAL

    - PROVIDE ROUGH-IN FOR FUTURE SUBFLOOR DEPRESSURIZATION SYSTEM TO CONTROL SOIL GAS AS PER BCBC 9.13.4.3

    7 BASEMENT CONCRETE SLAB

    - 4" CONCRETE SLAB (32 MPA MIN)- MIN. 2% SLOPE TO FRONT OF GARAGE- 5% MIN AIR ENTRAINMENT- 10M BARS @ 18" E.W.- 6" MIN WELL COMPACTED GRANULAR FILL- UNEXCAVED EARTH

    8 GARAGE CONCRETE SLAB

    6 CONCRETE FOUNDATION - 8" CONCRETE FROST WALL - MIN. 20 MPa 28 DAY CONCRETE STRENGTH- 10M BAR (HORIZ.) @ 18" O.C.- 10M BAR (VERT.) @ 48" O.C. ALTERNATING- 24" X 24" 15M CORNER BARS @ ALL CORNERS- 1 1/2" CLEAR TO REBAR FROM INSIDE OF WALL- 1/2" A307 ANCHOR BOLTS REQ'D @ 4'-0" O.C.- RIGID INSULATION

    - 8" X 16" CONTINUOUS CONCRETE FOOTING- 2 ROWS 15M BAR CONTINUOUS- 2" CLEAR TO REBAR FROM BOTTOM OF FOOTING

    - UNEXCAVATED EARTH- PROVIDE MINIMUM 24" FROST PROTECTION

    TABLE OF ASSEMBLIES NO HRV INSTALLED (BCBC ZONE 5)

    ELEMENT DETAILS TABLE EFFECTIVE RSI

    W1-EXTERIOR FRAMED WALL REQUIRED RSI = 3.08

    Continuous Materials Air film exterior CM-1 0.03

    Continuous Materials OSB sheathing, 9.5mm (3/8") at 0.0098 RSI/mm CM-1 0.09

    Frame-Cavity Stud dimensional lumber - 38 mm x 140 mm (2"x6") with RSI=1.19 m2K/W WA-2

    610 mm (24") on-centre

    RSI 4.23 (R24) nominal cavity fill between studs 2.80

    Continuous Materials Polyethylene vapour retarder 0.00

    Continuous Materials Gypsum board, 12.7 mm (1/2") at 0.0063 RSI/mm CM-1 0.08

    Continuous Materials Air film interior, wall (heat flow horizontal) CM-1 0.12

    Total 3.12

    W2-FOUNDATION WALL REQUIRED RSI = 2.98

    Continuous Materials Concrete Foundation Wall 200 mm (8") at 0.0004 RSI/mm CM-1 0.08

    Continuous Materials 1" Airspace CM-1 0.18

    Frame-Cavity Stud dimensional lumber: 38 mm x 140 mm (2"x6") spruce with RSI=1.19 m2K/W, WB-1

    406 mm (16") on-centre

    RSI 3.52 (R20) nominal cavity fill between studs 2.68

    Continuous Materials Gypsum board, 12.7 mm at 0.0063 RSI/mm CM-1 0.08

    Continuous Materials Air film interior, wall (heat flow horizontal) CM-1 0.12

    Total 3.14

    W4-INTERIOR GARAGE WALL REQUIRED RSI = 3.08

    Continuous Materials Air film exterior CM-1 0.03

    Continuous Materials Gypsum board, 12.7 mm at 0.0063 RSI/mm CM-1 0.08

    Frame-Cavity Stud dimensional lumber - 38 mm x 140 mm (2"x6") with RSI=1.19 m2K/W WA-2

    610 mm (24") on-centre

    RSI 4.23 (R24) nominal cavity fill between studs 2.80

    Continuous Materials Polyethylene vapour retarder 0.00

    Continuous Materials Gypsum board, 12.7 mm at 0.0063 RSI/mm CM-1 0.08

    Continuous Materials Air film interior, wall (heat flow horizontal) CM-1 0.12

    Total 3.11

    C1 - CEILINGS BELOW ATTICS REQUIRED RSI = 8.67

    Continuous Materials Roof sheathing 0.00

    Continuous Materials Vented roof air space CM-1 0.03

    Continuous Materials Glass fibre loose fill insulation for attics - 112 mm to 565 mm (CAN/ULC S702), 358 mm (14") at 0.01875 RSI/mm CM-1 6.71

    Frame-Cavity Roof truss bottom chord dimensional lumber: 38 mm x 89 mm (2"x4") SPF R1-1

    610 mm (24") on-centre

    R12 nominal cavity fill between bottom chords 1.88

    Continuous Materials Polyethylene vapour retarder 0.00

    Continuous Materials Gypsum board, 12.7 mm at 0.0063 RSI/mm CM-1 0.08

    Continuous Materials Air film interior, ceiling (heat flow up) CM-1 0.11

    Total 8.68

    Notes:

    1. Roof sheathing: is to the exterior of the vented roof air space therefore excluded from calculation

    C2 - VAULTED CEILING REQUIRED RSI = 4.67

    Continuous Materials Roof sheathing 0.00

    Continuous Materials Vented roof air space CM-1 0.03

    Frame-Cavity Roof truss bottom chord dimensional lumber - 38 mm x 140 mm (2"x6") with RSI=1.19 m2K/W R1-2

    610 mm (24") on-centre

    RSI 4.93 (R28) nominal cavity fill between bottom chords 3.66

    Continuous Materials Extruded polystyrene (XPS), 25 mm (1") at 0.035 RSI/mm CM-1 0.87

    Continuous Materials Polyethylene vapour retarder 0.00

    Continuous Materials Gypsum board, 12.7 mm at 0.0063 RSI/mm CM-1 0.08

    Continuous Materials Air film interior, ceiling (heat flow up) CM-1 0.11

    Total 4.75

    Notes:

    1. Roof sheathing: is to the exterior of the vented roof air space therefore excluded from calculation

    F1 - FLOOR OVER UNHEATED SPACES REQUIRED RSI = 4.67

    Continuous Materials Air film interior, floor (heat flow down) CM-1 0.16

    Continuous Materials Plywood (generic softwood), 19 mm at 0.0087 RSI/mm CM-1 0.17

    Continuous Materials Polyethylene vapour retarder 0.00

    Frame-Cavity Engineered wood I joists and trusses - 241 mm (9.5") depth with RSI>2.04 m2K/W through web FL-6

    488 mm (19.2") on-centre

    RSI 4.93 (R28) nominal cavity fill between floor joists 4.46

    Continuous Materials Air film exterior CM-1 0.03

    Total 4.82

    S1 - BASEMENT SLAB ABOVE FROST REQUIRED RSI = 1.96

    Continuous Materials Air film interior, floor (heat flow down) CM-1 0.16

    Continuous Materials 102 mm (4") concrete slab at 0.0004 RSI/mm CM-1 0.04

    Continuous Materials Extruded polystyrene (XPS), 50.8 mm (2") at 0.035 RSI/mm CM-1 1.78

    Continuous Materials Polyethylene vapour retarder 0.00

    Total 1.98

    Notes:

    1. Unheated slab

    All vaules from the NRC Tables for Calculating Effective Thermal Resistance of Opaque Assemblies

    D1 - 1373 TANEMURA - SITE - 26APR2017D1 [Elevations/Site Plan]Viewport-14

    D2 - 1373 TANEMURA - ELEVATIONS - 26APR2017D2 [Elevations]Viewport-7Viewport-8Viewport-10Viewport-9

    D3 - 1373 TANEMURA - FLOOR PLANS - 26APR2017D3 [Foundation/Basement]Viewport-11Viewport-13

    D4 - 1373 TANEMURA - SECTION - 26APR2017D4 [Main Floor Plan]Viewport-12