Upload
craig-sharples
View
25
Download
5
Embed Size (px)
Citation preview
Curriculum Vitae
Craig Sharples Electrical & Instrument Engineering / Design
// Experience
WGPSN (North Sea) May 2013 - Present Position: Instrument Engineer Woodgroup Engineering (North Sea) Feb 2012 - May 2013 Position: Instrument Designer/Engineer Woodgroup Engineering (North Sea) Aug 2007 - Feb 2012 Position: Senior E&I Designer Production Services Network Sep 2006 - Aug 2007 Position: Senior E&I Designer BAE Systems (Submarines) Apr 2006 - Sep 2006 Position: RCM Engineer BAE Systems (Submarines) Feb 2006 - Apr 2006 Position: Electrical Designer (Job title / Salary Scale Change) BAE Systems (Marine) Sep 1995 - Mar 2006 Position: Design Area Owner/ Leading Design Draughtsman (Electrical)
// Education
BTEC HNC in Electrical/Electronic Engineering Sep 1997 - Jun 1998 BTEC ONC in Electrical/Electronic Engineering Sep 1995 - Jun 1997 NVQ Level 2&3 in Material Processing Sep 1995 - Mar 1997 NVQ Level 2 in Engineering Assembly Sep 1995 - Mar 1997 BTEC OND in Mechanical/Electrical Engineering Oct 1991 - Mar 1992 GCSE Grade B (x2) in English Language and English Literature GCSE Grade C (x8) Maths, Physics, Biology, Geography, Art & Design, German, Graphic Design & Integrated Humanities.
// Training - Skills
Oil & Gas Autocad (2005), I-Link, Documentum, Navisworks, Microstation (Sigma3 & 2004), Automanager, Projectwise, Livelink, PDMS.
Marine & Shipbuilding (Nuclear) CADDS 5X, EPD Connect, (Visualiser, Tree Building & Modifying, Working within the 3D Model), Icepic (Cable Routing, Linking & Management), Office (Word, Excel, Power point etc), Database Manager ( Document Control & Storing), Netscape (Standards, Rules & Regulations), First Aid Training, Nuclear Safety, Fire Safety & Awareness, Confined Spaces, COSHH/PPE, DIP (Data Image Processing)
// Personal Details
Name
Craig Sharples
Date of Birth
1st
July 1975
Address
35 Ennerdale Drive
Barrow-in-Furness
Cumbria
LA14 4PN
Phone
+44 74787 46426
// Additional
B.O.S.I.E.T. valid until 16/4/2015
U.K.O.O.A. Medical valid until
24/3/2015 / Vantage & MIST
(Offshore) Card valid and up date
// Social
uk.linkedin.com/in/stonus
CRAIG SHARPLES Phone: +44 74787 46426 Email: [email protected]
Curriculum Vitae
Craig Sharples Electrical & Instrument Engineering / Design
// History
Oil & Gas (Onshore & Offshore) WGPSN (North Sea) St. Fergus Gas Plant Rejuvenation Project
SF7271 – Control Building Vesda Replacement
SF7113 – Phase 1 (Completion) & Phase 2 Unit 2100 Logic Replacement (FSC/DCS/HIPPS/ESD/EDP/Yokagawa)
SF7108 – NGL Main Export Pumps A, B & C. New Control & Safeguarding System (FSC), Migration of Several pump functions from DCS. Migration of U3000 ESD Failsafe and Non Failsafe functions, including Replacement Flow,, Scoop and Position Transmitters.
SF3421 – New Fire & Gas Detection System. Mod 1 & Mod 2. BMS FSC Modifications (Deletions).
Instrument Engineer for the St. Fergus site. Covering various Construction Workpacks, Honeywell Modpacks, Honeywell FSC Graphic generation, FSC/DCS C&E generation, DCS Destruct/Construct Schedules, I/O Schedules. ESD/EDP, HIPPS, Installation of new Honeywell FSC systems replacing existing P&F Logic system cabinets. Replacing existing VESDA system (tying into existing F&G). Replacing Main Export Pump Logic and Control and working on a New F&G System, tying into and running parallel to the existing F&G system. Woodgroup Engineering (North Sea) St. Fergus Gas Plant Rejuvenation Project Combined Design and (later) Engineering for Phase 1 Unit 2600 Logic replacement (SF7113). Work consists of every aspect of design, HIPPS, ESD, EDP, Relay Logic Cabinets, Block Diagrams, Termination Diagrams , Loop Diagrams, GA’s, Cable Routing, Cabinet and Junction Box design, Connection drawings, Material Requisitions. Updating Mimic Panels and Override Panels. Working closely with the Instrument Engineers, Designers and external sub-contract companies, on all aspects of the logic design and replacement. Design and checking on various other small Workpacks. Combined Engineering/Design on VESDA (Very Early Warning Aspirating Smoke Detection) system. Construction Workpack, Equipment Specification, Technical Bid Evaluation, Vendor Quotes and Specification, plus all Design Drawings and Material Requisition. Checking of Design Workpacks, along with working on P&ID’s, and As Building. PSN LTD BP Miller 2030 (DF1) Project
Brae Gas Import
Licence to Operate
LP Operations Work on the DF1 feed included:- Working from P&ID’s, creating Block Diagrams (DCS, ESD, F&G), Destruct & Construct, Cable Schedules, updating I/O Schedules and Cause & Effect Drawings, Modifying Loop Diagrams, Pneumatic & Process Hook-Ups. Creating Cable Routing Layouts, Termination diagrams and raising BOM’s. PSN LTD BP HAG Project
Navaids (permanent/temporary)
Permanent 6.6KV/440V Power & Emergency Power
GA/PA (permanent/temporary)
Removal & Destruct, MIMIC Layout Drawings, Temporary Power Supplies
Replacement 80KVA UPS Modifying Single Line and Mimic Panel drawings. Sizing of cables and cable lengths, updating of cable schedules, transit and block requirements ready for BOM’s. Survey Report - Picking up from previous surveys and completing new Offshore Surveys.
History – Marine & Shipbuilding (Nuclear)
Began work in the Marine and Shipbuilding industry in 1995 as an Engineering Apprentice (Electrical) for GEC Marine (now BAE Systems). Began my apprenticeship identifying the correct diagrams/procedures as required. Worked on Trident class Submarines (Vengance & Vigilant), LPH (Ocean), Penetrator Workshop (Reactor cable harness assemblies) and Combat Systems (Missile guidance cabinets). Completed my apprenticeship one year early (completed my NVQ’s and ONC after two years instead of three), and due to my grades, effort and attitude during my apprenticeship I was entered into the National Outstanding Achievements Award for apprentices for which I came second in the county. At the same time I was accepted into the Technical Department to learn my second trade as an Electrical Designer/Design Draughtsman. Between 1997 and 2006 I was involved mainly with the Astute Class project (Nuclear Powered Hunter Killer Submarines), and also involved with design work on the early Future Carrier Bid (now known as the CVF) and LPD (Bulwark). During my time at BAE Systems I gained a wide range of experience in all aspects of the Technical department. I worked for three years on the 24V DC battery backed emergency system (Marine equivalent of UPS ) calculating volt drops, cable selection, schematic diagrams, cabling diagrams and equipment integration, also ensuring all loads were within the system capabilities by tying into the load analysis database. I have extensive knowledge of the following: System schematic diagrams, equipment integration, cable routing and cable integration, intelligent diagrams, cabling diagrams, connection diagrams, commissioning diagrams, tree building (EPD Connect), 3D modelling including surfaces was a big part of my experience, intelligent cable routing within the 3d models (Nodal Networks etc), GA layouts. Full boat degaussing integration and outputs, including specifying pipes, materials, flanges etc. Setting-up and maintaining the database for full boat internal/external penetrations (Seacon, Disc Seal, Rise, Brattberg) for ordering purposes, and ensured the ‘cut-outs’ in the structure were to the correct specification and position. Electrical Design Area 1 owner – route/integrate/output/arrangement complete/problem solving with integration/management/MOD/human factors etc. Using Devise to give customers and management presentations/visualization of the 3D Model within the Virtual Reality suite. Writing Technical Specifications/Definitions for external penetrations and external moulded splice blocks.
// References
Mr. Garry Holmes Head of Instruments UK Region Woodgroup PSN Ltd John Wood House East Tullos Aberdeen AB12 3AX Tel: +44 1224 851797 Email:[email protected] Web:www.woodgroup-psn.com
Mr. David Young Lead Instrument Designer Woodgroup PSN Ltd GPS Contract Ground Floor Trafalgar House 1, Hareness Road, Aberdeen AB12 3LE Tel: +44 1224 532030 Email: [email protected] Web: www.woodgroup-psn.com
Mr. Grant Lunn Engineering Director PSS Engineering Ltd Process House 341 Great Western Road Aberdeen AB10 6NW Tel: +44 1224 586288 Mob: +44 7810 513834 Email: [email protected] Web: www.pssuk.co.uk
CRAIG SHARPLES Phone: +44 74787 46426 Email: [email protected]