47
CPWG/27 WP/10 22/10/2019 Twenty-Seventh Meeting of the Cross Polar Trans East Air Traffic Management Providers’ Work Group (CPWG/27) (Singapore, 22 – 24 October 2019) Agenda Item 4: Summary of Pertinent Issues from the ANSPs Meeting and other relevant meetings Summary of Discussions Route Development Group – East (Presented by the United States) 1. Introduction 1.1. The Route Development Group (RDGE) works on matters related to ATS route planning and implementation, as well as airspace improvement projects in the Eastern part of the ICAO European Region. 1.2. The RDGE-E meets bi-annually and consists of Armenia, Azerbaijan, Belarus, Bulgaria, Estonia, Finland, Georgia, Hungary, Kazakhstan, Kyrgyzstan, Latvia, Lithuania, Norway, Poland, Republic of Moldova, Romania, Russian Federation, Sweden, Tajikistan, Turkey, Turkmenistan, Ukraine, Uzbekistan, EUROCONTROL, IAC, IBAC and IATA. For specific coordination matters, any other State within the ICAO EUR Region may also be invited to participate at the RDGE. Other relevant stakeholders may also be invited to participate as observers. 1.3 With regard to specific regional coordination matters the following adjacent States will also be invited: Afghanistan, Canada, China, Democratic People’s Republic of Korea, Iran, Iraq, Japan, Mongolia, Pakistan, Syrian Arab Republic and the United States. Note: The Cross Polar Working Group (CPWG) could also be invited to participate on specific issues related to ATS route planning and implementation in the Far East Area of the ICAO EUR Region. Summary This working paper presents information on the thirty-first meeting of the Route Development Group – Eastern Part of the ICAO EUR Region (RDGE/31) was held in the ICAO EUR/NAT Office in Paris, France, from 9 to 13 September 2019

CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

CPWG/27 WP/10 22/10/2019

Twenty-Seventh Meeting of the Cross Polar Trans East Air Traffic Management

Providers’ Work Group (CPWG/27)

(Singapore, 22 – 24 October 2019)

Agenda Item 4: Summary of Pertinent Issues from the ANSPs Meeting and other relevant meetings

Summary of Discussions

Route Development Group – East

(Presented by the United States)

1. Introduction

1.1. The Route Development Group (RDGE) works on matters related to ATS route planning and implementation, as well as airspace improvement projects in the Eastern part of the ICAO European Region.

1.2. The RDGE-E meets bi-annually and consists of Armenia, Azerbaijan, Belarus, Bulgaria, Estonia, Finland, Georgia, Hungary, Kazakhstan, Kyrgyzstan, Latvia, Lithuania, Norway, Poland, Republic of Moldova, Romania, Russian Federation, Sweden, Tajikistan, Turkey, Turkmenistan, Ukraine, Uzbekistan, EUROCONTROL, IAC, IBAC and IATA. For specific coordination matters, any other State within the ICAO EUR Region may also be invited to participate at the RDGE. Other relevant stakeholders may also be invited to participate as observers. 1.3 With regard to specific regional coordination matters the following adjacent States will also be invited: Afghanistan, Canada, China, Democratic People’s Republic of Korea, Iran, Iraq, Japan, Mongolia, Pakistan, Syrian Arab Republic and the United States. Note: The Cross Polar Working Group (CPWG) could also be invited to participate on specific issues related to ATS route planning and implementation in the Far East Area of the ICAO EUR Region.

Summary

This working paper presents information on the thirty-first meeting of the Route Development Group – Eastern Part of the ICAO EUR Region (RDGE/31) was held in the ICAO EUR/NAT Office in Paris, France, from 9 to 13 September 2019

Page 2: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

CPWG/27 WP/10 22/10/2019

1.4 The RDGE has four subgroups:

a) Baltic area and its interface;

b) Black Sea and South Caucasus area and its interface;

c) Middle Asia area and its interface; and

d) Far East area and its interface. These subgroups meet concurrently to discuss previously proposed and new ATS route proposals and agree on actions and deadlines for their execution to enable the States to continue coordination on a bilateral or multilateral basis between the meetings. The actions and deadlines agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides papers at each RDGE meeting on recent activities and one on the latest State ATM ATS Route Catalogue presented at each CPWG meeting to increase communication and coordination between the two groups. 2. Discussion

2.1. Attached are the draft Summary of Discussion for your information.

2.2 The ICAO EURNAT Office would like to note paragraph 5.24 in the report where Jeppesen raised a point that there would be considerable benefits that could be envisaged if the new ATS Route P170 NETRI-SUBEK could be connected to the Fukuoka FIR boundary.

Page 3: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

CPWG/27 WP/10 22/10/2019

2.3 The connection of P170 (SUBEK) to the Fukuoka FIR boundary NIPPI (R220) and OMOTO (R580) would create more options for westbound trans-Pacific flights. The Anchorage ARTCC (ZAN) currently allows operators to plan user-preferred/random routings to these points if the flights can reach FL380 or above by 180E and the connection to the NOPAC routes would be highly interesting for airspace users. It was agreed to present this proposal to the next CPWG meeting and to coordinate with JCAB the implementation possibilities.

3. Action by the Meeting

3.1. The Meeting is invited to:

a. review the route proposal from the RDGE/31 meeting; and

b. provide response to ICAO EURNAT Regional Office.

Page 4: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

D R A F T

SUMMARY OF DISCUSSIONS OF THE

ROUTE DEVELOPMENT GROUP – EASTERN PART OF THE ICAO EUR REGION

THIRTY-FIRST MEETING

(Paris, France, 9 to 13 September 2019)

1. Introduction

1.1 The thirty-first meeting of the Route Development Group – Eastern Part of the ICAO EUR Region (RDGE/31) was held in the ICAO EUR/NAT Office in Paris, France, from 9 to 13 September 2019.

1.2 Mr. Evgeni Tavadze of Georgia presided over the meeting and Mr. Sven Halle, from the ICAO Europe and North Atlantic (EUR/NAT) Office, served as Secretary. He was supported by Mr. Abbas Niknejad, Ms. Isabelle Hofstetter and Ms. Patricia Cuff, from the ICAO Europe and North Atlantic (EUR/NAT) Office. The language support to this meeting and during the working group sessions was provided by several delegates.

1.3 68 participants attended the meeting from 27 States, 2 international organizations and 2 Computer Flight Plan Software Providers (CFSP). The RDGE was attended by delegations from P.R. China, Cyprus, Greece, Iraq, Israel and the United States. The delegation from I. R. Iran registered for the event but eventually could not participate. The list of participants is at Appendix A. The full contacts list is available separately on the RDGE site on the ICAO Secure Portal.

1.4 The opportunity of the meeting was also taken to hold specific side-meetings on contingency matters and airspace improvements in the “Eastern Mediterranean EUR/MID interface area” (which was attended by Cyprus, Greece, Israel, EUROCONTROL and IATA) and on the interface area between Turkey, Iraq and I.R. Iran (which was attended by Turkey, Iraq, Bulgaria, EUROCONTROL and IATA).

1.5 The Summary of Discussions (SoD) from the RDGE/30 meeting, which was sent out for comments on 24 June 2019, was reviewed in detail and updated. The RDGE/31 approved the commented version including all the Appendices in the plenary session. The endorsed version of the RDGE/30 SoD was afterwards posted on the ICAO EUR/NAT RDGE portal.

2. Adoption of the Agenda

2.1 At its opening session, the RDGE adopted the following agenda:

Agenda Item 1: Report on activities since RDGE/30 and follow-up actions;

Under this Agenda Item, the Group will consider issues of interest for its work, inter alia:

a) review and approval of the RDGE/30 Summary of Discussions;

b) report from the Secretariat on significant international aviation developments;

c) report from EUROCONTROL on related activities (e.g. RNDSG);

d) presentation of the Cross Polar Working Group (CPWG) activities;

e) report on current or planned implementations of airspace projects (i.e. Free Route Airspace, major airspace changes);

RDGE/31

Page 5: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

2 RDGE/31 – Summary of Discussions 2

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

f) report from States; highlighting ATS route developments and activities (including the measuring and reporting of environmental benefits from these operational improvements), as well as needs and problems which need to be addressed by the Group.

Agenda Item 2: Report on Actions taken on RDGE Action Plan;

Under this Agenda Item, the Secretariat, States and International Organisations concerned will provide updates on actions taken based on the RDGE Action Plan.

Agenda Item 3: Proposals for improvements of ATS route network in the Eastern Part of the Region;

Under this Agenda Item, the Group will:

a) be presented with evaluations of existing and new proposals from the Subgroups: - Baltic Sea Area and Interface - Black Sea and Caucasus Area and Interface - Middle Asia Area and Interface - Far East Area and Interface

Under this Agenda Item, the RDGE working groups will:

b) review and update existing proposals in RDGE ATS Route Catalogue; and c) incorporate new proposals into the RDGE ATS Route Catalogue.

Agenda Item 4: Any other business.

Under this Agenda Item, the RDGE will discuss AOBs and preparations for the future meetings.

2.2 The list of documentation reviewed by the Meeting is in Appendix B.

3. Report on activities since RDGE/30 and follow-up actions

Report from Secretariat on significant international aviation developments

3.1 For reference purposes, the RDGE was presented with the Terms of Reference, Composition, Structure, Task List and Working Procedures that was approved by the EANPG59 RASG-EUR06 meeting in November 2017.

3.2 The RDGE was informed about recent significant international aviation developments and took note of the amendments to the ICAO Annexes and PANS that had been adopted since the last RDGE as well as the proposed amendments to ICAO Annexes. The meeting also noted the considerable number of circular/individual State Letters and Electronic Bulletins which were issued since the last meeting.

Report from EUROCONTROL on activities from RNDSG

3.3 The RDGE was provided with detailed information concerning the activities of the Route Network Development Subgroup (RNDSG) which, based on an EANPG invitation (EANPG conclusions 35/2 and 36/2), organises and carries out the necessary coordination of planning and implementation activities for improving the ATS route network in the European Civil Aviation Conference (ECAC) area of the ICAO EUR Region. As result of the above invitation and in the execution of the EU Regulation No 677/2011 of 7 July 2011, which amended EU Regulation No 691/2010, Annex I - The European Route Network Design (ERND) Function, Part A-Objective 1(c), the Route Network Development Subgroup (RNDSG) of the Network Operations Team (NETOPS) has developed a number of activities aimed at improving the ECAC ATS route network and airspace structure as well as ensuring regional interconnectivity and interoperability of the European route network within the ICAO EUR Region and with adjacent ICAO Regions.

3.4 The RDGE was informed on activities related to the European Route Network Improvement Plan (ERNIP) Part 2, ARN Version. The objective of the ARN Version as part of the ERNIP is the

Page 6: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

3 RDGE/31 – Summary of Discussions 3

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

enhancement of European ATM capacity, flight efficiency and environmental performance through the development and implementation of an improved ATS route network, Free Route Airspace and TMA system structures supported by corresponding improvements to the airspace structure and the optimal utilisation rules of both in the ECAC area. It was noted that the structure and content of the ARN Version 2020-2024, which contained more than 250 (two hundred fifty) airspace projects for implementation in summer 2020 and over the period autumn 2020 until end of 2024, would be presented for discussion and refinement by RNDSG/98 (September 2019). The content would be further refined by RNDSG/99 (4-6 February 2020) and finally reviewed and approved by RNDSG/100 in spring 2020.

3.5 The status of the Free Route Airspace (FRA) concept implementation within the ECAC area of the ICAO EUR Region was presented. The map below represents the status of all FRA projects (H24 or time limited or level limited or on seasonal basis) that are currently implemented and will be implemented till the end of 2019.

3.6 The following FRA projects are planned for implementation before the end of 2019:

a) SEE FRA - South East Europe Free Route Airspace - Extension of existing cross-border FRA operations (FL175 / FL105 / 9500 FT - FL660) from Night to H24 within Sofia FIR, Bucuresti FIR and Budapest FIR: 07 NOV 2019;

b) FRASC - Free Route Airspace South Caucasus - Merging of existing H24 FIR based FRA operations into cross-border FRA operations (FL195 - FL660) within Yerevan FIR and Tbilisi FIR : 07 NOV 2019; and

c) FRAM Phase 3 - Free Route Airspace Maastricht UAC - Expansion of existing Night and Weekend FRA (FL245 - FL660) to H24 within the AoR of Maastricht UAC: 05 DEC 2019.

3.7 The FRA Design Guidelines document was approved on 27 June 2019 by the Network Management Board (NMB) meeting and Version 1.0 was distributed to the Operational Stakeholders and RDGE members. Whilst guidance on FRA is provided in the ERNIP Part 1 (Airspace Design Methodology), the FRA Design Guidelines document provides additional guidelines related to AIP publication of specific information associated with aerodrome connectivity and assigned vertical limits/flight levels on FRA significant points and airspace organisational aspects in FRA implementation to ensure a harmonized Network approach. The FRA Design Guidelines document, version 1.0, can be found on the ICAO Secure Portal at the RDGE/31 site as an attachment to RDGE/31- IP/06.

Page 7: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

4 RDGE/31 – Summary of Discussions 4

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

3.8 As from 23 May 2019, an Excel table containing the FRA significant points definition in accordance with State AIPs was made available to operational stakeholders. The FRA points Excel file included all AIP published data for FRA significant points in terms of relevance, airports reference, vertical flight level (FL) availability, FLOS and all other available FRA information. It was noted that the FRA points Excel file, maintained and updated by EUROCONTROL, was compatible and usable by EUROCONTROL charting and readily usable for possible future FRA points map presentation and display purposes. The data for each AIRAC cycle is available via the following website https://www.eurocontrol.int/publications/free-route-airspace-fra-points-list.

3.9 The RNDSG work to harmonise the rules for identification of Control Sectors was noted. The aim was to have the same rules for identification of Control Sectors published in AIP as provided to the Network Manager in order to maintain interoperability of different systems, including the Network Manager Operations Systems and data that need to be made available to the Network Manager. The Identification Guidelines was agreed by RNDSG/96 (February 2019) and the amendment of ERNIP Part 1 would be presented for approval at RNDSG/98 (September 2019).

3.10 Regarding the designation of significant points not marked by the site of a radio navigation aid and used for VFR purposes which was finalised at RDGE/29 and presented at RNDSG/97 (April 2019), Action Item RNDSG/97-07 (APR 2019) tasked the RNDSG Secretariat to identify all significant points not marked by the site of a radio navigation aid and used for VFR purposes in airspace classes B, C and D. The relevant summary and possible actions for replacement would be presented at RNDSG/99 (February 2020). RDGE/32 would be informed for the actions requested to be performed by the States concerned.

3.11 The RDGE noted the EUROCONTROL Sub-Regional Group activities and its participation at the ICAO Special Coordination Meeting on the Implementation of ATM Contingency Arrangements (SCM ACA, Muscat, Oman, 16 - 18 July 2019) and the Seventh Meeting of the APANPIRG ATM Sub-Group (ATM/SG/7) and ICAO EUR / MID / APAC Regions - Fourth Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARD/TF/4) (Bangkok, Thailand, 05 - 09 August 2019).

3.12 The RDGE concurred that it was important to continue the coordination of ATS route network development between the ECAC and RDGE member States in order to ensure overall planning coherency, especially at the interface areas. The Chairman thanked EUROCONTROL for the detailed presentation, the continuous support and valuable contributions and stressed again the importance of this coordination during the RNDSG and/or RDGE meetings

Report from the Cross Polar Trans-East Air Traffic Management Providers Working Group (CPWG)

3.13 No update was available from the Cross Polar Working Group (CPWG) which was currently reviewing its tasks in order to re-organise its activities.

3.14 The RDGE noted that all information regarding the CPWG is available at:

http://www.faa.gov/about/office_org/headquarters_offices/ato/service_units/systemops/ato_intl/cross_polar/

3.15 It was noted that the stalling of inter-regional coordination activities was also seen in the Advanced Inter-Regional Air Traffic Services Route Development Task Force (AIRARD/TF) which would not continue to meet in the current format due to the lack of engagement from key trans-regional States and airspace users. IATA highlighted that work was on-going to find a suitable inter-regional platform to address inter-regional coordination of cross-regional traffic flows.

Report from States; highlighting, inter alia, ATS route developments and activities and needs and problems to be addressed by the Group

3.16 During the RDGE/31 a total of 23 State reports were presented, namely by Armenia, Azerbaijan, Belarus, Bulgaria, Estonia, Finland, Georgia, Hungary, I.R. Iran, Iraq, Kazakhstan, Kyrgyzstan, Latvia, Lithuania, Norway, Poland, Republic of Moldova, Romania, Russian Federation, Sweden, Tajikistan,

Page 8: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

5 RDGE/31 – Summary of Discussions 5

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Turkey, Ukraine and Uzbekistan. No State Report was received from Turkmenistan. Kyrgyzstan and I.R. Iran submitted State reports, but were unable to attend the meeting.

3.17 State reports on traffic figures for the time period from April 2019 to August 2019 showed another very volatile picture in traffic figures (between a decrease of 25% (Tajikistan had 70% loss in overflights) and a maximum increase of 11.1%, but with an average traffic decrease of 0.62% for the total traffic figures) when compared with the traffic figures for the same time period in the previous year, mainly due to the closure of the airspace of Pakistan and the events in Syria and the Gulf Region. The traffic figures presented per State are reflected in Appendix C.

3.18 A total of 46 new ATS routes had been implemented since the last meeting and 9 airspace projects were completed. The full details of the ATS route developments and ATS route-related activities are shown in Appendix D.

3.19 The impact on traffic flows due to the closure of the Pakistan airspace, the high workload on adjacent FIRs in view of measures put in place to shift traffic out of congested FIRs in the core area of Europe and the removal of ATS routes in relation to FRA implementation were discussed.

3.20 With respect to the measures implemented in summer 2019 by EUROCONTROL NM to re-route traffic out of the FIRs in the core European area that had capacity shortfalls, several States in the adjacent FIRs that were impacted with extremely high workload reported that nine months advance notice of such measures was insufficient for their internal planning. It was requested that this issue be brought to the attention of the EANPG.

3.21 The meeting discussed the challenges, benefits and technical aspects of the removal of ATS routes in light of FRA implementation, in particular, the impact on airspace users’ flight plans. It was noted that close coordination with airspace users and computer flight plan service providers was necessary in order for flight planning software to be updated to enable continued coherent flight plans. IATA and ICAO were requested to address the flight planning issues related to FRA implementation and removal of ATS routes (such as the CFSP software to be updated so that they do not choose automatically the underlying ATS Route Network but rather plan for FRA) so that the full benefits of FRA could be provided to airspace users (RDGE Action Plan # 31/03 refers). It was noted that this would be raised at the next IATA RCG meeting and brought to the attention of the next ICAO COG/RCOG meeting.

3.22 In the State reports, many ATS route proposals in the RDGE ATS Route Catalogue were highlighted as high priority items for further discussions/studies at the RDGE/31 meeting. The outcome of these discussions is shown in the Subgroup reports in paragraph 5.

3.23 The following reflects additional information reported by States:

Armenia - Armenia/Georgia/EUROCONTROL NM FRASC Coordination Meeting took place on 13-14 May 2019 in Yerevan, Armenia.

- Cross-border FRA operation within the ATS airspaces of Armenia and Georgia (Free Route Airspace in South Caucasus Area) - FRASC is planned on 07 NOV 2019.

Azerbaijan - Thanks to I.R. Iran and Turkey was expressed for cooperation on implementation of N374.

- Letter of Agreement (LoA) between Baku ACC and Tehran ACC was signed on 31 July 2019.

- LoA between Baku ACC (Sector South ACC/Nakhchivan) and Ankara ACC was signed on 5 August 2019.

- Two-way satellite communication between Baku ACC (Sector South ACC/Nakhchivan) and Ankara ACC was established.

- Two-way communication line between Baku ACC (Sector South ACC/Nakhchivan) and Tehran ACC was established.

Belarus - Bi-directional instead of uni-directional flows were implemented on the following route segments: Z494 KOMAP – OKNOD and N743 DELON – KOMAP.

Page 9: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

6 RDGE/31 – Summary of Discussions 6

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

- DFL between middle and upper sectors from FL375 to FL365 was changed in Minsk FIR.

- Horizontal limits of Minsk, Homiel and Mahiliou TMAs were changed. - 38 new 5LNCs were implemented on new SID/STAR of the above mentioned TMAs. - 7 not used 5LNCs were released from national AIP as well as from ICARD database. - All above mentioned improvements were implemented on AIRAC 25 APR 2019. - The equipment installation procedures and step-by-step transition of the personnel to the

new ATC center are being currently under way. - On the basis of a thorough FRA utilization in Minsk FIR analysis, the altitudes and time

periods of FRA utilization are being expanded. Following the coordination procedures, it is planned to provide FRA operations in the altitude range of FL275-FL660 on a 24-hour basis. The planned date of implementation would be provided when available.

- Meeting with State ATM Corporation regarding the new Moscow area airspace structure (Moscow, 29-30 August 2019).

Bulgaria - Implementation of SEE FRA project between Bulgaria, Romania and Hungary WEF 7 NOV 2019;

- Transfer of the operations from LTBA to LTFM WEF April 2019 – Traffic volatility to LTFM;

- Implementation of NM measures for the summer season 2019; - RAD actualization and implementation of new restrictions aiming in the reduction og

the traffic complexity in 24/7 FRA environment; - New interface between BULGARIA and GREECE – new WPT ATFIR; - Traffic volatility due to regulated neighbouring airspaces - high impact of measures put

in place to shift traffic out of congested FIRs in the core area of Europe. Estonia - Unexpected drop in traffic figures was noted.

- Work on re-designation of route designators related to removal of ATS routes in parts of Tallinn FIR to be addressed at the Baltic Subgroup.

Finland - CPDLC EFES, will be changed to EFIN depending on EUROCONTROL and ICAO actions.

- Work on re-designation of route designators due to removal of ATS routes in parts of Helsinki FIR would be coordinated at the Baltic Subgroup.

Georgia - new ACC sectorization project was implemented in Tbilisi FIR on 23 May 2019, where existing CTAs were divided horizontally up to 4 additional sectors with one of the previously chosen DFLs.

- Enhanced Mode S operations were implemented on 23 May 2019 based on the capabilities of the new INDRA system.

- The Abastumani Astrophysical Observation Center which was built in 1932 has been rehabilitated. Trial observations will begin on 16 September 2019. For proper working process, the Observation Center requires a no-Flying Zone over it of at least 5 NM radius. The appropriate NOTAM will be issued by Georgian CAA when the ATS route structure has been reconfigured. Tactical rerouting will be applied by Tbilisi ACC to avoid that area. New proposals would be coordinated at the Black Sea Subgroup.

Hungary - Though, the traffic demand is still increasing in overflight relationship, the number of controlled movements has started to decrease. The main reason behind is the stable staff shortage which was foreseen and announced on the appropriate forums and has led to the continuous and massive flow restriction measures. As a result of which some of the airspace users have chosen to avoid Hungarian airspace. (The sum of accumulated delays in this year for LHCC is 1 144 455 min.)

- The Step 2 of SEEFRA (joining of Slovakia the SEEFRA) is foreseen after summer season in 2020.

- The 4 geographical sectors have been introduced in May this year, but the benefit of it cannot be utilised due to the staff shortage.

- The new Budapest TMA is under construction, which embraces a bunch of new SID/ STAR tracks, new entry/exit and intermediate points. The project aims at making the TMA structure more responsive to the needs of the airspace users as well as the ATC,

Page 10: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

7 RDGE/31 – Summary of Discussions 7

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

with implementation date of 30 January 2020. - The ATCO shortage is still the main issue in Budapest ACC. Recovery of the staff

backbone is planned in 2023. I. R. Iran - Current reduction of longitudinal separation with Pakistan. Iraq - Military operations at the interface between Turkey and Iraq.

- Restriction below FL 320(LTAA NOTAM A4373/19 and A4374/19). Kazakhstan - A working meeting was held between representatives from ATM of Kazakhstan and

ATM China in Urumqi, from 24-25 June 2019. - A new LoA was signed between ACC of Urumqi and Almaty on 25 June 2019. - It is planned to sign LoAs with ACCs of Azerbaijan, Kyrgyzstan, Russian Federation,

Turkmenistan and Uzbekistan with the effective date of 7 November 2019. - The first phase of implementation of performance-based navigation (PBN) was

completed in the airspace structure and the ATS procedures on 7 November 2019 as follows: - transition altitude within all FIR 10 000 feet; - altitude measurement system below the transition level in feet; - horizontal separation minimums on ATS routes and TMA; - measuring distances in nautical miles; - new SID RNAV 1, STAR RNAV 1 and RNP APCH APV Baro for Nur-Sultan aerodrome.

- Work was on-going for the second phase of PBN implementation. - A new aerodrome primary radar and a monopulse secondary radar with S mode and

ADS-B equipment is planned to put on at the Almaty and Petropavlovsk in December 2019.

- New ILS were planned to put on at the Aktau and Taraz in October 2019. - 36th meeting of the “Eurasia” Coordination Council took place from 23 to 26 April

2019 in Dushanbe, Tajikistan. The next meeting of the Coordination Council of “Eurasia” will be held in Almaty, Kazakhstan in September 2019.

Kyrgyzstan - New LoA was signed between Bishkek and Urumqi ATC Centres in August 2019. Latvia - CPDLC Functionality will be implemented by the end of 2019;

- Upper limit of controlled airspace will be raised to FL660 as from 30 of January 2020. Lithuania - New Vilnius ACC/APP premises and installation of a new Indra ATM system iTEC 2.1

for Vilnius ACC completed. Site acceptance tests were successfully performed. Technical connectivity and OLDI tests with all neighboring ATC centres accomplished. Training of operational and technical staff in progress. Shadow and transition periods planned to start in October. Operational date of a new ATM system planned from December 2019.

- Remote TWR project started. Norway - There has been no progress in the long-standing issue of the unallocated airspace (NO-

FIR area) between Murmansk FIR and BODØ/NORWAY FIR and BODØ OFIR since RDGE/30. The Russian Federation and Norway have agreed on coordinates for the FIR border. Once formal letters confirming the agreed FIR border are available, the States will approach ICAO with a request to update the Air Navigation Plan and relevant documents related to alignment of FIR borders. (ref. RDGE Action 26/03).

- No progress in the harmonisation/realignment of the FIR border between NORWAY FIR and BODØ OCEANIC FIR (proposal 91.035 /26.032)

- For many years, there has been a discrepancy between international documents and Norwegian publications relating to the number of FIRs over Norwegian territory and names of such FIRs. In an effort to solve this issue, Norway has informed ICAO of their intention to merge the flight information regions of Bodo, Trondheim, Stavanger and Oslo into one new FIR to be named “FIR Polaris”.

- Work on removal of ATS routes above FL135 is in progress. Poland - Work on removal of ATS routes since implementation on POL FRA in February 2019

is in progress.

Page 11: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

8 RDGE/31 – Summary of Discussions 8

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Republic of Moldova

- ATM system planned to be upgraded during 2019-2020 according to the operational requirements.

- New Automated Weather Observing System - “IMS4 AWOS” was put into operation in April 2019.

- ATM alternate (Contingency centre) was put into operation in June 2019. - Integrated ATC Simulator (Inclusive 3D Tower) was put into operation in July 2019.

Romania - New ROMATSA ATM system was implemented and working well. - SEEFRA H24 will start on 07 November 2019.

Russian Federation

- A meeting has been held with Belaeronavigation State Enterprise to discuss the procedure for the utilization of coordination points in Moscow and Minsk ACC interface as part of the new Moscow area airspace structure (Moscow, 29 – 30 August 2019).

- ACC consolidation is ongoing. Eight consolidated ACCs have been established to date: Moscow, Rostov-on-Don, Samara, Irkutsk, Novosibirsk, Krasnoyarsk, Magadan, Khabarovsk, Yekaterinburg and Tyumen.

- Preparations for the implementation of Yakutsk (December 2019) and Saint Petersburg consolidated ACCs are under way as part of the ACC consolidation programme.

- Preparations to implement the new airspace structure project for Moscow area and adjacent ACCs are under way in accordance with the schedule for the transition to the new Moscow area airspace structure approved by Deputy Minister of Transport of the Russian Federation.

- With the view of implementing the ICAO Global Air Navigation Plan and the Aviation System Block Upgrade (ASBU) programme, the Russian Federation is amending the structure and contents of the Russian AIP in accordance with PANS AIM (Doc 10066) requirements, as well as implementing AIXM 5.1 model for the exchange of aeronautical information to enable a further transition to eAIP and D-NOTAM.

Sweden - NUAC HB (Nordic Unified Air traffic Control), the joint Swedish/Danish en-route ANSP, was liquidated on 1 September 2019.

Tajikistan - A meeting was held between Afghanistan China, Pakistan, Tajikistan, IFALPA and ICAO during the AIRARD/TF/4 meeting (Bangkok, Thailand, 05-09 August 2019) and a number of trans-regional ATS route proposals were discussed and agreed for implementation by Afghanistan, Pakistan and Tajikistan.

Turkey - Due to the capacity shortfalls of some ANSPs at the core area of Europe, measures to reroute / shift the traffic out of these airspaces have created very high workload on neighbouring ANSPs. The 9 months advance notice of such measures is not sufficient for planning of very large capacity changes. - Request that States that anticipate capacity shortfalls in the near future to closely

cooperate with ICAO and Eurocontrol to prevent such unwanted situations. - Request ICAO and Eurocontrol not only to advertise that some measures are

required but also to put pressure or even sanction the ANSPs concerned so that they do whatever is required (airspace design, investment, ATCO recruitment etc.) in advance to address the lack of capacity.

- Opening of third runway at Istanbul Airport (Phase 1b) is planned before 2020 summer season. Airspace/procedure design studies are about to be finalised. A Real Time Simulation has been planned at Eurocontrol Experimental Center from 27 January 2020 and will last 9 weeks. No regulation or capacity reduction is planned for the transition period.

- New Route Segment between UDROS and ABSAX Points, to be coordinated at the Black Sea Subgroup, is required to have better connection for ARR to LT** Airports and to separate traffic flows towards to Yerevan / Tehran FIRs and others via UDROS.

Turkmenistan - No State Report was submitted. Ukraine - In accordance with the ERNIP and EUROCONTROL Transition Plan for a Single CDR

Category, the H24 Single CDR Category is planned to be implemented on 07 NOV 2019 in all FIRs and UIR of Ukraine.

- On 07 NOV 2019, vertical limits of restricted, danger and training areas to appropriate

Page 12: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

9 RDGE/31 – Summary of Discussions 9

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

VFR levels will be implemented in order to harmonise the publication in AIP of Ukraine with ERNIP provisions.

- Following the results of H24 post-implementation monitoring of the Special Procedures for the gradual availability for flight planning and use of four ATS routes over the High Seas in Simferopol FIR, where the responsibility for ATS is delegated to Ukraine by international agreements, no operational consequences were identified.

- Available ATS airspace over the High Seas is in regular use by aircraft operators. Since 27 AUG 2015 till 31 JULY 2019 there were provided air navigation services for 78 744 flights (including 13 180 flights in 2019).

Uzbekistan - NIL

3.24 The RDGE was reminded that State Reports are an important source of information for ATS route and airspace development-related activities, on the implementation of operational improvements and on interface issues which are essential for the RDGE discussions. States were again invited to submit their reports, even in the unfortunate case that they could not directly participate at the RDGE meeting, for the benefit of all RDGE States.

3.25 Only a small number of States reported on the savings in terms of mileage, time, fuel and CO2 emissions from ATS route changes. All States were requested to insert at least an indication of the route length difference together with the number of aircraft affected of this/these new proposals when compared to the initial route length into the State reports, so that this information could be extracted for further analysis.

4. Report on Actions taken on RDGE Action Plan

4.1 The RDGE reviewed progress reports on specific actions in the Action Plan which are elaborated below. The updated RDGE Action Plan based on the RDGE’s review and an update is provided in Appendix E.

ICARD 5LNC Issues

4.2 With the introduction of thousands of new codes into the ICARD EUR/NAT database 2018, it was gradually noted that 5LNC considered homophonous (Similar Pronunciation but Different Spelling) were available for selection in the ICARD EUR/NAT database, such as:

KUWUS – KUVUS ADASA – ADAZA PADCA – PADKA - PADQA INBAC – INBAK ECMAN – EKMAN ABOCA – ABOKA – ABOQA ABOVO – ABOWO

4.3 The category of 5LNC listed above is different from 5LNC that may sound-alike such as:

EXTRA - ARTRA CORBA - COTSA LILTO - LIRTU RESUP - RERUS.

4.4 For 5LNC that may sound-alike, there is currently a 300NM safety distance to be observed.

4.5 The ICAO Secretariat informed the Group that it would be desirable to have some guidance as to how homophonous 5LNC (similar pronunciation but different spelling) could be implemented and which criteria were to be considered. The RDGE proposed the following:

Page 13: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

10 RDGE/31 – Summary of Discussions 10

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Homophonous Code (similar pronunciation but different spelling) shall be separated by a minimum of 1000 NM distance.

4.6 The RDGE noted that the above position would be presented for further discussion at the RNDSG/98 meeting (24-26 September 2019) and the outcomes would be reported to the COG/RCOG meeting (Paris, 23-25 October 2019) for approval and guidance to be provided to ICARD Users (RDGE Action Plan #31/04 refers).

RNDSG Actions related to RDGE Action Plan

4.7 A separate Information Paper (IP/04) was prepared by EUROCONTROL on RDGE Action Plan activities performed by RNDSG since RDGE/30 with the aim to ensure regional interconnectivity and interoperability of the European route network within the ICAO EUR Region and with adjacent ICAO Regions. It covered the following issues:

Rationalise use of route designators including rationalisation process and RDs collocation resolution;

Airspace developments and related updates of ERNIP Database;

Required RDGE SAAM Evaluations;

ERNIP Database;

Removal of 5LNC duplicates and like-sounding 5LNCs;

Harmonization of national Airspace AIP publications;

Sharing the Guidelines on FRA Design document with RDGE members.

4.8 The representative from EUROCONTROL reported that several SAAM evaluations had been provided to the ICAO Contingency Coordination Team (CCT) related to unavailability of the airspace of Pakistan with an updated assessment covering the impact of traffic flows mainly for the European Network and to IATA and ICAO MID Region at the Special Coordination Meeting on the Implementation of ATM Contingency Arrangements (Muscat, Oman, 16 - 18 July 2019) related to the SAAM/NEST impact assessment due to possible closure of the Persian Gulf and the Gulf of Oman areas.

Updates to RDGE Action List

4.9 During the review of the RDGE Action Item List, the following Action Items were reported as completed: RDGE Action 29/02 and RDGE Action 30/04.

4.10 The meeting agreed to include 5 new action items (RDGE 31/01 to 31/05) into the list (Appendix E refers) and a report on the status of these action items is expected for the RDGE/31 meeting as follows:

• 31/01 Initiate High Seas Coordination Procedure for UDROS-ABSAX on behalf of Turkey;

• 31/02 Initiate High Seas Coordination Procedure for GOBLI-DIGAM on behalf of Ukraine;

• 31/03 Address flight planning issues related to FRA implementation and removal of ATS routes in order for CFSP software to be updated so that the full benefits of FRA can be provided to airspace users;

• 31/04 Clarify guidance on minimum distance for proximity check of homophonous 5LNC; and

• 31/05 Provide objectives for proposals proposed by Uzbekistan.

Page 14: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

11 RDGE/31 – Summary of Discussions 11

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

5. Proposals for improvements of ATS route network in the Eastern Part of the Region

Baltic Sea area and its interface Subgroup

5.1 Experts from the following States and international organisations participated in the work of the Baltic Sea Area and its Interface Subgroup: Belarus, Estonia, Finland, Latvia, Lithuania, Moldova, Norway, Russian Federation, Sweden, Ukraine and IATA.

5.2 Mr Tarmo Pihlak from Estonia was the Rapporteur of the Subgroup. Mr Sergei Männik from Estonia provided language assistance.

5.3 In accordance with the agenda, the Baltic Sea Area and its Interface Subgroup considered Working Papers WP/03 and WP/27.

5.4 A total of 43 existing proposals were reviewed and 29 changes were agreed for incorporation into the Baltic ATS Route Catalogue. The following table reflects the outcome of the Subgroup’s deliberations. Only proposals which were updated or changed are reflected below. All other route proposals in the Baltic RDGE ATS Route Catalogue (WP/03) which are not shown remain unchanged.

Proposal number Changes to be made 94.061b / 28.023b 94.004 / 28.017 94.006 / 28.019 94.064 / 29.017 95.027 / 29.019 93.018 / 27.015 94.003 / 28.016

Implemented, can be deleted

19.025 Implemented 28.03.2019, can be deleted 26.033 a. b. c. Implemented, b. implemented as ARZIM GOWDA BABUN 29.018 Implemented, can be deleted 28.005 Updated Description:

To re-align the following existing ATS route segments: a. T561 LEDUN - NUKOL as LEDUN - SL (Solodniki); b. P989 MEGAS - KERIS as MEGAS - OGUMA - SEVIK; c. T635 PIRUS - NASBI as PIRUS – SADER.

To re-designate and re-align the following existing ATS route segments: a. L168 AGAMO – IGROD as N866 AGAMO – ARKAT and L168 BEBDA – IGROD; b. L169 OPOKA - US - PT - ST as M869 OPOKA - SUNUN (extension of RD from

Latvia; release of L169); c. N740 OGUTA - FI - AVGOK as N858 VEKIS – TEGBO (extension of RD from

Belarus; release of N740); d. L159 FORMA - SUGIR as P29 FORMA - BERUN (extension of RD from Ukraine;

release of L159); e. L157 NALEG - IN as M853 NALEG - TUMIT (extension of RD from Ukraine;

release of L157). Implementation date 7 NOV 2019 Delete Remarks.

97.035 / 30.024 Will be implemented 7 NOV 2019 as a. DAHRU PENAL b. HOFTI KIZIR 97.041 / 30.023 Implementation date 30 JAN 2020 96.019 / 30.001 Implementation date 7 NOV 2019 96.021 / 29.030 FIN: add text to c. Some other routes will also remain. 19.026 Implementation date: autumn 2020 96.027 / 29.015 Implementation date spring 2021 76.022 / 16.017 Implementation date spring 2021 80.032 / 19.003 Implementation date spring 2021 87.018 / 23.012 Implementation date spring 2021 69.238b / 12.001b RUS proposed LATLA- UBANO only for ULLI arrivals. Implementation date spring 2020. 01.012c RUS proposes to remove from catalogue 63.051 / 08.006 UKR: implementation date spring 2021

Page 15: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

12 RDGE/31 – Summary of Discussions 12

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal number Changes to be made 63.052 / 08.007 UKR: implementation date spring 2021 06.006a BLR: implementation date spring 2021 23.002 RUS: proposal frozen until spring 2021 81.084 / 15.001 RUS: propose as PEMIL TOGRU AGAMO 28.003 RUS: propose as UHT KOKAT 11.013b Implementation date autumn 2020

Modify 3rd bullet point in Comment to read: G375 GATRI-KUGON-LKN as alternative proposed by RUS.

79.032 / 18.015 Change Finland FIR to Helsinki FIR 79.028 / 18.011 08.016 78.052 / 18.010

RUS: proposal frozen until autumn 2020

06.003 RUS: propose to delete the proposal 79.027 / 18.017 LAT, LTU: proposed to delete as FRA options are available East of ADAXA. 15.002 RUS: Cannot be implemented as proposal is crossing military area. Proposed to delete the

proposal as alternative route ANDAT ALUTI DEGER already exists. 25.005 RUS: SONIB RATLA cannot be implemented. IATA: propose G908 from DIPLU or G713

from BLZ implementation as bi-directional AWY.

Black Sea and South Caucasus area and its interface Subgroup

5.5 Experts from the following States and international organisations attended the Subgroup meeting: Armenia, Azerbaijan, Belarus, Bulgaria, Georgia, Republic of Moldova, Romania, Russian Federation, Turkey, Ukraine, EUROCONTROL, IATA, Jeppesen and Aistech Space.

5.6 Mr Aleksandr Estrov from Azerbaijan was the Rapporteur of the Subgroup and technical support was provided by Mr Evgeni Tavadze from Georgia.

5.7 The work of the Subgroup was based mainly on the following documents: WP/04, WP/10, WP/30, WP/33 and WP/34. The Subgroup reviewed 35 route proposals, 8 proposals were implemented and 8 new proposals were inserted.

5.8 During the specific side-meeting on “Re-opening of KABAN” in the interface between Turkey, Iraq and I.R. Iran (which was attended by Turkey, Iraq, Bulgaria, EUROCONTROL and IATA), EUROCONTROL provided SAAM evaluations on the possible EUR and MID airspace interface improvements with Tehran FIR and with Baghdad FIR / Kuwait FIR / Bahrain FIR.

5.9 The results of Subgroup and side-meeting are reflected in the following table. Only proposals which were updated or changed are reflected below:

Proposal Comments 4 – 71.040d/16.026d Proposed date changed to “autumn 2020” 9 – 87.018/23.012 Proposed date changed to “spring 2021” 27 – 96.028/30.002 Comment from TUR was modified as “The implementation requires sector reconfiguration

which can be done after TUR-IRQ interface is resolved” 26 – 96.029/30.003 Comments to be updated:

• The ATS route over KABAN will be available for flights above FL260 in respect to the currently existing FAA SFAR 77. For the EASA SIB, the Iraqi delegation is in negotiations with EASA to include the new ATS Route in an updated version of the SIB.IRQ: Route network re-organisation proposal of Iraq is as shown in map below. Possible implementation date until end of 2019.

• TUR: further coordination for implementation needed. • TUR: Based on the initial proposal from Iraq, the use of westbound points KABAN will be

as follows: KABAN - ARR LT.. and overflights from 3 Iraqi aerodromes via MAKOL, IBLAL, TUDBU, VADEN, GOLDO, RIKSO, VESAR, REDRA, SOTIV, BANRO, PIROX, TOMBI and VESAR.

Page 16: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

13 RDGE/31 – Summary of Discussions 13

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal Comments

5.10 New proposal by Georgia: Proposal ID : New Proposal BLK.01 Impl. Status: State(s) & Org. Comments:

Description: To change the lower limit of the DISKA - VERCA segment of the M737 route from FL140 to FL055 or 5500 feet. Objective: To optimize the a/c climbing profile for departures from Tbilisi (UGTB) airport.

Planned 07 NOV 2019

Project Group: SG BLACK SEA

Project Category: ATS Routes

AZE

Originator(s): GEO

AZE: The implementation of the FL55 on the route M737 segment DISKA - VERCA planned for 07 NOV 2019.

5.11 In view of requirement of a No-Fly Zone of at least 5 NM radius over the Abastumani Astrophysical Observation Center in Georgia, the following proposals were agreed for inclusion in the Black Sea Catalogue:

Page 17: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

14 RDGE/31 – Summary of Discussions 14

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal ID : New Proposal BLK.02 Impl. Status: State(s) & Org. Comments:

Description: N77: OGEVI – CCCCC (413514N0430032E) – BBBBB (41 38 24N042 28 12E) – IBERI – ALIKA – BANUT Where CCCCC and BBBBB are new waypoints. Flight Level Band: 195 – 660 Objective: Abastumani Astrophysical Observation Center requires no Flying Area over it with at least 5NM radius.

Planned 27 FEB 2020

Project Group: SG BLACK SEA

Project Category: ATS Routes

GEO

Originator(s): GEO

TUR: Need to be coordinated with other stakeholders in Turkey.

Proposal ID : New Proposal BLK.03 Impl. Status: State(s) & Org. Comments:

Description: N644: ROLIN – AAAAA (41 41 16N041 57 34E) – BBBBB (41 38 24N 042 28 12E)– CCCCC (413514N0430032E) – DDDDD (41 34 53N 043 36 18E)– LAGAS – BADIR - ADEKI Where AAAAA, BBBBB, CCCCC and DDDDD are new waypoints Flight Level Band: 195 - 660 Note: ROLIN – AAAAA segment is over the High Seas. Appropriate PfA letter will be sent to ICAO EUR/NAT Office from GCAA. Objective: Abastumani Astrophysical Observation Center requires no Flying Area over it with at least 5NM radius.

Planned 27 FEB 2020

Project Group: SG BLACK SEA

Project Category: ATS Routes

GEO

Originator(s): GEO

TUR: Need to be coordinated with other stakeholders in Turkey.

Page 18: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

15 RDGE/31 – Summary of Discussions 15

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal ID : New Proposal BLK.04 Impl. Status: State(s) & Org. Comments:

Description: M10: SARPI - BBBBB (41 38 24N 042 28 12E)-CCCCC (413514N0430032E) - BARAD Where BBBBB and CCCCC are the new waypoints. Route segment between SARPI–BBBBB is westbound, segment between BBBBB and CCCCC is bi-directional, segment between CCCCC –BARAD is eastbound only. Flight Level Band: 195 – 660 Objective: Abastumani Astrophysical Observation Center requires no Flying Area over it with at least 5NM radius.

Planned 27 FEB 2020

Project Group: SG BLACK SEA

Project Category: ATS Routes

GEO

Originator(s): GEO

TUR: Need to be coordinated with other stakeholders in Turkey.

Proposal ID : New Proposal BLK.05 Impl. Status: State(s) & Org. Comments:

Description: N37: LURIS – BT – BARUS - AAAAA (41 41 16N 041 57 34E) – LU – SARPI Where AAAAA is a new waypoint Flight Level Band: 195 - 660 Objective: Abastumani Astrophysical Observation Center requires no Flying Area over it with at least 5NM radius.

Planned 27 FEB 2020

Project Group: SG BLACK SEA

Project Category: ATS Routes

GEO

Originator(s): GEO

TUR: Need to be coordinated with other stakeholders in Turkey.

Page 19: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

16 RDGE/31 – Summary of Discussions 16

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal ID : New Proposal BLK.06 Impl. Status: State(s) & Org. Comments:

Description: P567: BANUT – BARUS – DDDDD (41 34 53N 043 36 18E) – TAVRO Where DDDDD is a new waypoint Flight Level Band: 195 - 660 Objective: Abastumani Astrophysical Observation Center requires no Flying Area over it with at least 5NM radius.

Planned 27 FEB 2020

Project Group: SG BLACK SEA

Project Category: ATS Routes

GEO

Originator(s): GEO

TUR: Need to be coordinated with other stakeholders in Turkey.

5.12 New proposal by Turkey: Proposal ID : New Proposal BLK.07 Impl. Status: State(s) & Org. Comments:

Description: UDROS-ABSAX Route Segment to be implemented WEF 07 NOV 2019 for traffic towards Yerevan and Tehran FIRs and ARRs to LT** Airports. Objective: New Route Segment between UDROS and ABSAX Points is required to have better connection for ARR to LT** Airports and to separate traffic flows towards to Yerevan / Tehran FIRs and others via UDROS.

Proposed

Project Group: SG BLACK SEA

Project Category: ATS Routes

TUR

Originator(s): TUR

ICAO Secretariat requested to circulate High Seas Coordination Letter as outcome of RDGE/31. RDGE Action Plan #31/01 refers.

Page 20: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

17 RDGE/31 – Summary of Discussions 17

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

5.13 New proposal by Ukraine: Proposal ID : New Proposal BLK.08 Impl. Status: State(s) & Org. Comments:

Description: Establishment of new unidirectional (ODD levels) ATS route from GOBLI to DIGAM FL275 – FL660. Objective: To further improve ATS route network in Kyiv UIR/Odesa FIR.

Planned 23 APR 2020 reserve date 21 MAY 2020

Project Group: SG BLACK SEA

Project Category: ATS Routes

UKR

Originator(s): UKR

Ukraine to coordinate new route designator with EUROCONTROL and ICAO Secretariat requested to circulate High Seas Coordination Letter as outcome of RDGE/31 (RDGE Action Plan #31/02 refers).

Middle Asia area and its interface Subgroup

5.14 Experts from the following States and international organisations participated in the work of the Middle Asia area and its interface Subgroup: Armenia, Azerbaijan, P. R. China, Kazakhstan, Russian Federation, Tajikistan, Uzbekistan, IATA, Jeppesen, Aistech Space and ICAO.

5.15 Mr Sergali Parmanov from Kazakhstan was the Rapporteur of the subgroup, assisted by Ms Patricia Cuff from the ICAO EUR/NAT Office. Language assistance to the subgroup was kindly provided by Mr Maksim Suleymanov from Uzbekistan.

5.16 In accordance with the agenda, the Middle Asia and its Interface Subgroup considered Working Papers: WP/05, WP/07, WP/09 and WP/16.

5.17 The Subgroup noted that 10 proposals had been implemented since the RDGE/30 meeting. 11 out of 62 existing proposals could not be reviewed and updated due to the absence of delegations from Afghanistan, Kyrgyzstan, Pakistan and Turkmenistan. Additionally, 3 new proposals were agreed for inclusion in the Middle Asia ATS Route Catalogue.

5.18 The following table reflects the outcome of the Group’s deliberations. Only proposals which were updated or changed are reflected herebelow. All other route proposals in the Middle Asia RDGE ATS Route Catalogue (WP/05) which are not shown remain unchanged.

Page 21: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

18 RDGE/31 – Summary of Discussions 18

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal # Changes to be made 1. 18.025 Implementation: Proposed end 2020

Comments: Route to be taken into account in PBN implementation and airspace restructurisation package. Target date of implementation end-2020. Route designators to be coordinated with ICAO and adjacent States.

2. 18.024 Description: To implement extension of bidirectional ATS route N993 LANOR – MONEG – GEDNO – AGINU – AGZ (SARIN). Comments: Route to be taken into account in PBN implementation and airspace restructurisation package. To be implemented on 7 NOV 2019.

3. 29.001 Description: To implement bidirectional ATS routes:

a. N993: ANDAT - SONAT – DIKIN - IMANA – LANOR – AGZ; and b. M166: AGZ - SARIN.

4. 95.031 / 28.006

Description: To implement bidirectional ATS routes: a. L88: RASAM – METKA; and b. B476: METKA – BEGLI – NEBIT – DARVA – OGOLI. Comments: • AZE: Ready to implement RASAM – METKA in AIRAC 07 NOV 2019. • TKM: Ready to implement. Currently in final approval phase. May be implemented by end

2019. • UZB: Implemented DARVA-OGOLI on 28 FEB 2019.

5. 23.013 Implementation: Planned 07 NOV 19 6. 02.004 Implementation: Planned Spring 2020

Comments: • KAZ: Route to be taken into account in PBN implementation and airspace restructurisation

package. To be implemented on 7 NOV 2019. • RUS: continuation as conventional route currently and plan to implement as RNAV route L993

in March 2020. 7. 21.011 Implementation: Proposed end 2020

Comments: KAZ: Route to be taken into account in PBN implementation and airspace restructurisation package. Target date of implementation end-2020. Route designators to be coordinated with ICAO and adjacent States. UZB: Ready to implement on same date as KAZ. ICAO to coordinate with TKM on date of implementation.

8. 26.022 Description: To implement bidirectional ATS route M875 AMDAR – TIGTA – BEKAS. Implementation: Proposed end 2020 KAZ: Route to be taken into account in PBN implementation and airspace restructurisation package. Target date of implementation end-2020. Route designators to be coordinated with ICAO and adjacent States. UZB: Ready to implement on same date as KAZ.

9. 26.023 Implementation: Proposed end 2020 Comments: KAZ: Route to be taken into account in PBN implementation and airspace restructurisation package. Target date of implementation end-2020. Route designators to be coordinated with ICAO and adjacent States. UZB: Ready to implement on same date as KAZ.

11. 29.005 Description: To implement bidirectional ATS route B904 NABOX - BUDBO - KHOLM –IRTAJ – JD. Implemented: 07 July 2019

16. 27.009 Description: To implement bi-directional ATS route Peshawar (PS) – SURVI. Comments: At ATMSG/7: Pakistan counter-proposed for this route via SURVI – Peshawar (PS). Pakistan informed the meeting the proposed route between SURVI and PS had been submitted to the relevant authority in Pakistan for approval.

Page 22: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

19 RDGE/31 – Summary of Discussions 19

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal # Changes to be made 17. 29.011 Comments:

• UZB: Further studies required. • TJK: Ready to implement PINAX – MOSOM in 2020.

21. 27.008 Comments: • TJK: A107-L154 RAMAN-PEPEL implemented. • UZB: Ready to implement after implementation of Lahore-RAMAN in PAK. • AFG: Ready to implement RAMAN-DUGIN but waiting for agreement from PAK. • ICAO Bangkok to be contacted.

23. 29.013 To be deleted as same as #21. Proposal 27.008 24. 17.005 Description:

To implement bi-directional ATS route POMIR – waypoint south from POMIR in TJK – XXXXX (new FIR Bdry pt btn CHN/TJK) - DSC (Yarkant). Comments: • TJK: Ready to implement. • CHN: Studies currently being made for FIR border point and progress report will be provided

at RDGE/32. 25. 22.044 Comments:

• KGZ: Ready to implement. • CHN: Ready to coordinate bi-laterally with KGZ in order for further studies to be made.

Progress report will be provided at RDGE/32. • IATA: proposal is beneficial for operators.

26. 28.009 Objective: UZB to provide information. 28. 28.010 Objective: UZB to provide information.

Description: To implement bidirectional ATS route KZO – ADAZA – ODIVA – AGNAN – Mashhad (MSD). Comments: • IRN: Further studies required. Progress report expected at RDGE/32. At present, additional

bdry point with TKM not possible. • TKM: Further studies required. Progress report expected at RDGE/32. ICAO to request update. • UZB: Will implement N990 ODIVA-AGNAN on 07 NOV 19. • KAZ: Will implement N990 ODIVA-ADAZA-KZO on 7 NOV 19.

29. 21.012 Implementation: Proposed MAR 2020 Objective: To further improve ATS route network between Kazakhstan and Russian Federation. Comments • RUS and KAZ to define crossing point on FIR boundary. • RUS: Considering implementing as conditional route (CDR) KST – DITLI in MAR 2020 and

in the new airspace structure, implement in NOV 2020 as a permanent RNAV route. 31. 28.007 Objective: UZB to provide information.

Comments: • KAZ: Further studies required. Progress report expected at RDGE/32. • UZB: Ready to implement on same date as KAZ.

32. 29.002 Comments: • KAZ: Further studies required. Progress report expected at RDGE/32. • UZB: Ready to implement on same date as KAZ.

33. 06.010 Description: To implement bidirectional ATS route ARBOL - NEPLA - AGPIN - GORBO - LAGMO. Implementation: Proposed 2020 Comments: KAZ: Further studies required. Target date of implementation end-2020. Route description may be slightly modified.

34. 29.007 Comments: • TJK: Ready to implement. • KAZ: Further studies required. • KGZ: Ready to implement. • UZB: Further studies required. • Afghanistan commented that waypoint TAPIS is a converging point for two congested routes,

and would review this.

Page 23: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

20 RDGE/31 – Summary of Discussions 20

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal # Changes to be made 35. 28.012 Objective: UZB to provide information.

Comments: KAZ: Further studies required. Progress report expected at RDGE/32. Planned for 2020 implementation.

36. 26.020 Comments: • KAZ: Depends on agreement between UZB and TKM. Further studies required. • UZB: Ready to implement but require coordination with TKM to agree on FIR boundary point. • TKM: Not acceptable at present.

37. 20.001 Comments: • TJK: Environmental issue indicated related to glaciers which are the natural water reserves of

Tajikistan. Further studies required to identify the obstacle clearance for operations. Progress expected at RDGE/32.

• KGZ: Further studies required. Progress expected at RDGE/32. 39. 19.033 Comments:

ICAO to request update. 40. 22.013 Comments:

ICAO to request update. 41. 23.016 Description:

To implement bidirectional ATS route POMIR – NMA – DEMAS. Comments: • KGZ & TJK: Ready to implement. • UZB: Further studies required.

42. 29.014 Comments: • KAZ: Further studies required in order for coordination with UZB on delegated airspace. • TJK: Ready to implement.

43. 26.013 Comments: • KGZ: Implemented VADER-TADOT on AIRAC FEB 2018. • TJK : Ready to implement IBKIT-VADER. • UZB: Not acceptable at present. • TKM: Ready to implement. Alternative route at present NAZAR-NINOP-DERKI-INDUD.

Operators are invited to request DCT NAZAR-DERKI. 45. 29.003 Comments:

TKM: Ready to implement. Currently in final approval phase. May be implemented by end 2019. 46. 26.019 Comments:

• UZB: Ready to implement. • TKM: Not acceptable at present. • IATA: Interesting route for cross-polar operations especially from Gulf area with destination

North America. 48. 29.006 Description:

To implement bidirectional ATS route NAZAR–DERKI-EDOSU–OMANO–PF–ABLAG-NMA Implementation: Planned 2020 Comments: • TJK: G79 OMANO-PF-ABLAG implemented. • TKM: A847/B713 NAZAR-NINOP-DERKI implemented. • UZB: A247/A230 DERKI–EDOSU–OMANO implemented. ABLAG–NMA will be

implemented in 2020 (3 NM longer). 49. 29.010 Comments:

• UZB: Not acceptable at present. • TKM: Not acceptable at present. • TJK: Ready to implement.

51. 28.011 Objective: UZB to provide this information Comments: • UZB: Ready to implement. • KAZ: Further studies required. Progress report expected at RDGE/32. • KGZ: Implemented as L728 (RNAV 5) OGTOL – LARSI – KAMUD on 28 FEB 2019.

Page 24: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

21 RDGE/31 – Summary of Discussions 21

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal # Changes to be made 52. 30.006 Comments:

• Note: This route is an extension of proposal 28.011 in Catalogue TIGTA – GENDI – OGTOL – KAMUD.

• KAZ: Further studies required. Progress report expected at RDGE/32. • RUS: Further studies required. Progress report expected at RDGE/32.

53. 29.008 Description: To implement bidirectional ATS route SKD-RONVU-OMANO-ABLAG–ENOVO-OGODA–KAMUD.

54. 28.014 Comments: • TKM: Further studies required. Progress report expected at RDGE/32. • UZB: Ready to implement.

55. 26.018 Implementation: Planned 2020 Comments: • UZB: Ready to implement ADOBI – KURAB in 2020. • TKM: Implemented DSH - ADOBI on 16 AUG 2018.

56. 26.036 Implementation: Planned 2020 Comments: • L135 implemented in KGZ & TJK. • L138 implemented in KGZ. • IATA requests that adjacent States consider extending RDs for further implementation of PBN

routes. • TJK: ready to implement as L138 in 2020

57. 30.007 Comments: • KAZ: Ready to implement in 2020. Progress report expected at RDGE/32. • KGZ: Further studies required. Progress report expected at RDGE/32.

58. 30.008 Comments: • KAZ: Further studies required. Progress report expected at RDGE/32. • UZB: Ready to implement.

59. 30.009 Comments: • KAZ: Further studies required. Progress report expected at RDGE/32. • KGZ: Ready to implement. • UZB: Ready to implement.

59. 30.010 Comments: IRN: Q19 was established between MESPO-NAGES on AIRAC 28 Feb 2019. Update to be requested.

62. 30.021 Description: To implement bidirectional ATS route B905: EDOSU-DILRO 402450N 0691660E–NULMO 405050N 704070E–DIPAX. Comments: • UZB: Further studies required. Progress to be provided at RDGE/32. • TJK: DILRO – NULMO already implemented.

5.19 The following reflects new proposals which were agreed for inclusion in the Middle Asia RDGE ATS Route Catalogue: Proposal ID : New Proposal MID.01 Impl. Status: State(s) & Org. Comments:

Description: To implement bidirectional ATS route SMK – IBMOB – EVROB – LBA.

Objective: Savings of 3 to 11 NM, To further improve ATS route network between KAZ, UZB, TKM.

Proposed

Project Group: SG MIDASIA

Project Category: ATS Routes

KAZ UZB

Originator(s): UZB

KAZ: Further studies required. Progress to be provided at RDGE/32. UZB: Ready to implement.

Page 25: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

22 RDGE/31 – Summary of Discussions 22

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal ID : New Proposal MID.02 Impl. Status: State(s) & Org. Comments:

Description: To implement bidirectional ATS route Leh (LLH) 340504N 0773438E – Hotan (HTN) 370212N 0795206E – Yarkant (DSC) 381318N 0770418E – NIPIR 370530.12N 0703000E – ALKIB 355939.84N 0695415.84E – ALMOL 353947.16N 0694529.88E – TAPIS 343100.12N 0690900E.

Objective: To improve route network.

Proposed

Project Group: SG MIDASIA

Project Category: ATS Routes

AFG IND CHN TJK

Originator(s): AFG

AFG: Bypass route for Afghanistan – India carriers bypassing Pakistan airspace (if required). TJK: would coordinate with China for opening new exit/entry point at the FIR boundary. At ATMSG/7: China commented this route proposal would not be viable at the time being, however, China would provide its assistance and support for any contingency route when necessary, in the event of abrupt closure of Pakistan airspace.

Page 26: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

23 RDGE/31 – Summary of Discussions 23

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal ID : New Proposal MID.03 Impl. Status: State(s) & Org. Comments:

Description: To implement bidirectional ATS route SUBUT – LESGI - OTBOR in upper airspace above FL245.

Objective: Optimization of the traffic flow east-west and vice versa

Proposed

Project Group: SG MIDASIA

Project Category: ATS Routes

AZE TKM UZB

Originator(s): AZE

UZB: Route will start from OTBOR with existing route network. AZE: Further coordination with TKM required.

Far East area and its interface Subgroup

5.20 Experts from the following States and international organisations participated in the work of the Far East Area and its Interface Sub-Group: P. R. China, Russian Federation, IATA, Jeppesen and ICAO.

5.21 Mr Konstantin Starostin from the Russian Federation chaired the meeting of the Sub-Group, assisted by Mr Sven Halle from ICAO EUR/NAT Office. Language assistance to the Sub-Group was provided by Mr Dmitry Kosolapov from IATA.

5.22 In accordance with the agenda, the Far East Area and its Interface Sub-Group considered Working Paper WP/06. A total of 39 existing proposals in the Far East Area ATS Route Catalogue were reviewed and 1 new route proposals was discussed and included into the ATS Route Catalogue.

5.23 The following table reflects the outcome of the Sub-Group’s discussions and decisions. A huge amount of route proposals in the Far East RDGE ATS Route Catalogue (WP/06) could not be progressed further due to the lack of information from China and/or lack of responses from Japan and South Korea (ROK):

Proposal # Changes to be made 1. - FE0013

- 13.034 Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at RDGE/32.

2. - FE0017 - 15.035

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

3. - FE0031 - 16.005

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

Page 27: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

24 RDGE/31 – Summary of Discussions 24

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal # Changes to be made 4. - FE0035

- 18.030 Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

5. - FE0029 - 18.031

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

6. - FE0041 - 19.018

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

7. - FE0058 - 24.010

Update Comments: Implementation could not be progressed due to the lack of information from China on the results from the AKARA Technical Working Group (TWG) which is addressing the ATS routes and airspace enhancements with China, Japan and Republic of Korea (ROK).

8. - FE0059 - 24.011

Update Comments: Implementation could not be progressed due to the lack of information from China on the results from the AKARA Technical Working Group (TWG) which is addressing the ATS routes and airspace enhancements with China, Japan and Republic of Korea (ROK).

9. - FE0061 - 25.010

Update Comments: Implementation could not be progressed due to the lack of information from China on the results from the AKARA Technical Working Group (TWG) which is addressing the ATS routes and airspace enhancements with China, Japan and Republic of Korea (ROK).

10. - FE0063 - 25.011

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

11. - FE0064 - 25.012

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

12. - FE0065 - 25.013

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

13. - FE0066 - 25.014

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

14. - - 27.012

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

15. - - 27.013

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

16. - 27.014 Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

17. - FE0021 - 13.028

Update Comments: Implementation could not be progressed due to the lack of information from Japan. However the Russian Federation confirmed that no airspace changes will be accepted for the Fukuoka FIR from the Japanese side before the end of 2020.

18. - FE0022 - 13.033

Update Comments: Implementation could not be progressed due to the lack of information from Japan. However the Russian Federation confirmed that no airspace changes will be accepted for the Fukuoka FIR from the Japanese side before the end of 2020.

19. - FE0008 - 15.033

Update Comments: Implementation could not be progressed due to the lack of information from Japan. However the Russian Federation confirmed that no airspace changes will be accepted for the Fukuoka FIR from the Japanese side before the end of 2020.

Page 28: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

25 RDGE/31 – Summary of Discussions 25

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Proposal # Changes to be made 20. - FE0039

- 19.016 Update Comments: Implementation could not be progressed due to the lack of information from Republic of Korea (ROK) on the connecting routes to MESOV for RDGE/31.

21. - FE0051 - 20.012

Update Comments: Implementation could not be progressed due to the lack of information from Republic of Korea (ROK) on the connecting routes to MESOV for RDGE/31.

22. - FE0052 - 20.013

Update Comments: Implementation could not be progressed due to the lack of information from Republic of Korea (ROK) on the connecting routes to MESOV for RDGE/31.

23. - FE0056 - 20.017

Update Comments: Implementation could not be progressed due to the lack of information from Republic of Korea (ROK) for RDGE/31.

24. - FE0034 - 16.027

Update Comments: Implementation could not be progressed due to the lack of information from Republic of Korea (ROK) for RDGE/31.

25. - FE0030 - 18.020

Update Comments: Unfortunately the bilateral meeting between China and the Russian Federation, which was scheduled for Summer 2019 in St Petersburg, did not take place and no new meeting date/venue was agreed so far. If the bilateral meeting would take place before April 2020, then an update could be expected at the RDGE/32.

26. - FE0038 - 19.015

Update Comments: Implementation could not be progressed due to the lack of information from Republic of Korea (ROK) on the connecting routes to MESOV for RDGE/31.

27. - FE0078 - 29.023

Update Comments: Implementation of new RNAV5 ATS Route within the Russian Federation at AIRAC 7 NOV 2019.

28. - FE0079 - 29.024

Update Comments: Implementation of new RNAV5/RNAV10 ATS Routes (R968) within the Russian Federation at AIRAC 7 NOV 2019.

29. - FE0080 - 29.025

Update Comments: Implementation of new RNAV5/RNAV10 ATS Routes (B915) within the Russian Federation at AIRAC 7 NOV 2019.

30. - FE0081 - 29.026

Update Comments: Implementation of new RNAV5/RNAV10 ATS Routes (B237) within the Russian Federation at AIRAC 7 NOV 2019.

31. - FE0082 - 29.027

Update Comments: Implementation of new RNAV10 ATS Route within the Russian Federation at AIRAC 7 NOV 2019.

32. - FE0083 - 29.028

Update Comments: Further coordination between Russian Federation and Kazakhstan needed. An update can be expected at RDGE/32. RUS: Delete this proposal from Far East Catalogue and move to MIDASIA Catalogue.

33. - FE0084 - 29.029

Update Comments: Further coordination between Russian Federation and Kazakhstan needed. An update can be expected at RDGE/32. RUS: Delete this proposal from Far East Catalogue and move to MIDASIA Catalogue.

34. - FE0085 - 30.014

Update Comments: Additional studies required by Russian Federation, the proposal could be included into an ATS Route change package for March/April 2020. An update can be expected at RDGE/32

35. - FE0086 - 30.015

Update Comments: Implementation of new RNAV5 ATS Route (P172) within the Russian Federation at AIRAC 7 NOV 2019

36. - FE0087 - 30.016

Update Comments: Implementation of new RNAV5 ATS Route (P170) within the Russian Federation at AIRAC 7 NOV 2019

37. - FE0088 - 30.017

Update Comments: Implementation of new RNAV5 ATS Route (A841) within the Russian Federation at AIRAC 7 NOV 2019

38. - FE0089 - 30.018

Update Comments: Implementation of new RNAV5 ATS Route (A842) within the Russian Federation at AIRAC 7 NOV 2019

39. - FE0090 - 30.019

Update Comments: Implementation of new RNAV5 ATS Route (B802) within the Russian Federation at AIRAC 7 NOV 2019

5.24 During the presentation of the new ATS routes that will be implemented within the Russian Federation, Jeppesen raised a point on the considerable benefits that could be envisaged if the new ATS Route P170 NETRI - SUBEK could be connected to the Fukuoka FIR boundary:

Page 29: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

26 RDGE/31 – Summary of Discussions 26

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

5.25 The connection of P170 (SUBEK) to the Fukuoka FIR boundary NIPPI (R220) and OMOTO (R580) would create more options for westbound trans-Pacific flights. The Anchorage ARTCC (ZAN) currently allows operators to plan user-preferred/random routings to these points if the flights can reach FL380 or above by 180E and the connection to the NOPAC routes would be highly interesting for airspace users. It was agreed to present this proposal to the next CPWG meeting and to coordinate with JCAB the implementation possibilities:

Page 30: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

27 RDGE/31 – Summary of Discussions 27

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

5.26 The following new proposal was presented from the Russian Federation and the Sub Group agreed to include them into the FE Route Catalogue. The envisaged implementation dates will be around March/April 2020: Proposal ID : New Proposal FE.0091 Impl. Status: State(s) & Org.

Comments:

Description: To establish the new bi-directional RNAV 10 route PEMID – new waypoint XXXXX (683436N 1774141E) – new waypoint XXXXX (683155N 1772658E) – FRENK between FL150-400.

Objective: Request from IATA to further improve ATS route network within Magadan FIR.

Proposed Spring 2020

Project Group: SG FAR EAST

Project Category: ATS Routes

RUS

Originator(s): IATA

RUS: Further studies required.

5.27 The Sub-Group members noted with concerns, that the initially planned bilateral meeting (where the implementation of the SIMLI project was expected to be discussed) between Russian Federation and China did not take place in St Petersburg in summer 2019. The Sub Group stressed again the importance to address these necessary airspace improvements and agree to an implementation date, so that the implementation of the SIMLI dualisation project can be finalised before airspace changes and increased traffic complexity will negatively impact the traffic flows. The latest version of the SIMLI proposal (all ATS Route changes in red are prepared for implementation by the Russian Federation) is as follows:

5.28 As there had been no information on a new date/venue for this bilateral meeting, it cannot be expected that new information would be available for discussions at the RDGE/32 meeting.

5.29 The ICAO Secretariat was invited to update the Far East area and its interface part of the RDGE Catalogue to include the above proposals/changes.

5.30 The representatives from IATA expressed their appreciation for the work of the Sub-group and thanked especially the delegation from the Russian Federation for their continuous enhancement of the ATS-Route infrastructure in this part of the ICAO EUR Region. The Sub-group members thanked the delegation from P.R. China for their participation in the meeting. All Sub-group members expressed their

Page 31: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

28 RDGE/31 – Summary of Discussions 28

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

disappointment in the stagnation of the ATS-Route development process due to the lack of information from China, as well as the lack of responses from Japan and South Korea (ROK).

6. Any other business

6.1 The Chairman, together with the IATA delegation, expressed their appreciation on the high number of States, who participated actively in this RDGE meeting. The excellent level of discussions resulted in a significant amount of ATS route improvements and updates to the RDGE ATS route catalogues in the Baltic Sea, Black Sea, Middle Asia and Far East Subgroups.

Future meetings

6.2 The thirty-second meeting of the Route Development Group – Eastern Part of the ICAO EUR Region (RDGE/32) will take place, at the kind invitation of Georgia, in Tbilisi from 18 to 22 May 2020.

~~~~~~~~~~~~~~

LIST OF APPENDICES

Appendix A—List of Participants Contacts List Appendix B—Meeting Documentation Appendix C—Traffic Figures (2019 compared with 2018) from State Reports Appendix D—Routes Implemented Since RDGE/30 And To Be Implemented [State Reports] Appendix E—RDGE Action Plan (Status 13 SEPTEMBER 2019)

_________________________

Page 32: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

A-1 RDGE/31 – Summary of Discussions – Appendix A A-1

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

APPENDIX A — LIST OF PARTICIPANTS

(Paragraph 1.3 refers)

ARMENIA Sergey DANIELYAN Garush NIKOGHOSYAN

AZERBAIJAN Agabek BALABEKOV Bala MIRZAYEV Aleksandr ESTROV

BELARUS Aliaksandr SHOSTAK Vladimir BABOURTCHIK

BULGARIA Bisser JELEV Rossen YANCHEV

CHINA Peng WU Zhenyu ZHAO

CYPRUS Yiannis THEOPHILOU

ESTONIA Sergei MANNIK Tarmo PIHLAK

FINLAND Teppo ASANTI

GEORGIA Evgeni TAVADZE (Chairman)

GREECE Georgia GLIATI Maria KAPAROUNAKI

HUNGARY Peter TORMASI Arpad LAKATOS

IRAQ Abbas Naser MAJEED Riad CHEHAYEB Dan CUCU

ISRAEL Adam MANOR

KAZAKHSTAN Sergali PARMANOV Anuar SAIFUTDINOV

LATVIA Aleksandrs FJODOROVS

LITHUANIA Nerijus MALECKAS

NORWAY Hans Jacob HOFGAARD

POLAND Grzegorz ZACHARCZUK

REPUBLIC OF MOLDOVA Serghei FEDOSEEV

ROMANIA Adrian STEFAN Daniela BRATESCU

RUSSIAN FEDERATION Alexey ZAVALNIY Svetlana YADROVA Vladimir POLIENKO Andrey KUDRYAVTSEV Sergey PATRUSHIN Emil RAGIMOV Alexander SOBOL Konstantin STAROSTIN Pavel ZUBKOV Anna PLIATS

SWEDEN Pontus BENGTSSON

TAJIKISTAN Bakhtiyor KHUMOROV Firuz MUKHAMADAMINSHOEV

TURKEY Mustafa KILIC Sitki Kagan ERTAS

UKRAINE Oleksandr GNATIUK Anastasia BILKO

UNITED STATES Travis FIEBELKORN

UZBEKISTAN Maksim SULEYMANOV Andrey ZAYTSEV

EUROCONTROL Razvan BUCUROIU Roman KUSHNAROV

IATA Dmitry KOSOLAPOV Jens ALBEK Steve CARTER Victor ERMOLAEV Riku KOHVAKKA Romain LEPROVAUX Andreas TROST Rafal MARCZEWSKI Oleg SHILOV Clim van der WEIJDEN

JEPPESEN Chuck TAYLOR

Aistech Space Aleix DE TORO Peter VINDING

ICAO Silvia GEHRER Elkhan NAHMADOV Sven HALLE (Secretary) Abbas NIKNEJAD Oguzhan HASDENIZ Berk BOZKURT Isabelle HOFSTETTER Patricia CUFF

_________________________

Page 33: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

A-2 RDGE/31 – Summary of Discussions – Appendix A A-2

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

CONTACTS LIST

(Note: full contact details can be found on the RDGE site on the ICAO Secure Portal)

_________________________

Page 34: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

B-1 RDGE/31 – Summary of Discussions – Appendix B B-1

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

APPENDIX B — MEETING DOCUMENTATION

(paragraph 2.2 refers)

WP/IP/ PPT/FL AI Title Presented by

- 1a Draft RDGE/30 SoD Secretariat

WP01 Provisional Agenda Secretariat

WP02 2 RDGE Action Plan Secretariat

WP03 3 RDGE Route Catalogue – Part 1 – Baltic area and its interface Secretariat

WP04 3 RDGE Route Catalogue – Part 2 – Black Sea and South Caucasus area and its interface Secretariat

WP05 3 RDGE Route Catalogue – Part 3 – Middle Asia area and its interface Secretariat

WP06 3 RDGE Route Catalogue – Part 4 – Far East area and its interface Secretariat

WP07 1f State Report Uzbekistan

WP08 1f State Report Armenia

WP09 3 ATS route proposals for inclusion in RDGE Middle Asia ATS Route Catalogue

Secretariat on behalf of Afghanistan and Tajikistan

WP10 1f State Report Georgia

WP11 1f State Report Sweden

WP12 1f State Report Norway

WP13 1f State Report Republic of Moldova

WP14 1f State Report Latvia

WP15 1f State Report Ukraine

WP16 1f State Report Republic of Tajikistan

WP17 1f State Report Russian Federation

WP18 1f State Report Estonia

WP19 1f State Report Finland WP20 Rev1 2 ICARD 5LNC issues Secretariat

WP21 1f State Report Belarus

WP22 1f State Report Lithuania

WP23 1f State Report Romania

WP24 1f State Report Kazakhstan

WP25 1f State Report Azerbaijan

WP26 1f State Report Bulgaria

WP27 3 Baltic Catalogue update: Proposal 28.005 related to re-designation of routes by RUS in follow-up to removal of ATS routes by EST and FIN

Secretariat EUROCONTROL

WP28 1f State Report Iraq

WP29 1f State Report Poland

Page 35: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

B-2 RDGE/31 – Summary of Discussions – Appendix B B-2

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

WP/IP/ PPT/FL AI Title Presented by

WP30 1f State Report Turkey

WP31 1f State Report Kyrgyzstan

WP32 1f State Report Hungary

WP33 1f State Report I.R. Iran

WP34 3 ATS route proposals for inclusion in RDGE Black Sea ATS Route Catalogue Georgia

IP01 - Work Schedule Secretariat

IP02 - Meeting Documentation Secretariat

IP03 1b RDGE Terms of Reference (as approved in November 2017 by EANPG/59) Secretariat

IP04 1c Report on activities of RNDSG EUROCONTROL

IP05 2 Report on RNDSG actions on RDGE action plan EUROCONTROL

IP06 REV 1c FRA Design Guidelines v1.0 EUROCONTROL

PP01 1b ICAO Update Secretariat

PP02 3 EUR and MID airspace interface improvements with Tehran FIR and with Baghdad FIR / Kuwait FIR / Bahrain FIR

EUROCONTROL

_________________________

Page 36: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

C-1 RDGE/31 – Summary of Discussions – Appendix C C-1

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

APPENDIX C — TRAFFIC FIGURES (2019 COMPARED WITH 2018) FROM STATE REPORTS

(paragraph 3.17 refers)

State Period of comparison

International/Domestic Traffic

Arrival/Departures Traffic

Overflight Traffic

Overall Traffic growth

Armenia April 2019 – July 2019 compared to same period in 2018 Arr/Dep Traffic: +7.3% -26.7% -19.4%

Azerbaijan March 2019 – July 2019 compared to same period in 2018 -0.1% -24.8% -15.4%

Belarus April 2019 – August 2019 compared to same period in 2018 - - +1.58%

Bulgaria April 2019 – July 2019 compared to same period in 2018 - - -0.7%

Estonia April 2019 – August 2019 compared to same period in 2018 -3.9% -0.5% -1.2%

Finland January 2019 – July 2019 compared to same period in 2018

International: +3.0% Domestic: -0.6%

Arr/Dep Traffic: +3.0% +0.7% +1.6%

Georgia April 2019 – July 2019 compared to same period in 2018 2% -29% -19%

Hungary April 2019 – August 2019 compared to same period in 2018

International: -3.4% Domestic: +3.4%

Arr/Dep Traffic: +6%

KFOR: +23.4% Total

LHCC+KFOR: -0.2%

+0.02%

I.R. Iran April 2019 – August 2019 compared to same period in 2018

Domestic traffic: -4% International departure &

arrival: -20% -11% -9%

Iraq April 2019 – August 2019 compared to same period in 2018 +59% +41% +50%

Kazakhstan April 2019 – August 2019 compared to same period in 2018 +5.8% -3.9% +1.2%

Kyrgyzstan April 2019 – August 2019 compared to same period in 2018

International: -7.79% Domestic: -2.51% - -4.14%

Latvia April 2019 – August 2019 compared to same period in 2018 Arr/Dep Traffic: +6% +3% +4%

Lithuania April 2019 – August 2019 compared to same period in 2018

Arrivals: +0.57% Departures: +0.25% +0.81% +0.54%

Norway April 2019 – July 2019 compared to same period in 2018 -1.33% -4.54% -1.77%

Poland January 2019 – July 2019 compared to same period in 2018

Arr/Dep Traffic: +4.0%, Domestic: +8.6%. +4.1%, +4.7%

Republic of Moldova

April 2019 – August 2019 compared to same period in 2018 -0.6% +0.1% -0.6%

Romania March 2019 – July 2019 compared to same period in 2018

Domestic: -5.76% International: +3.22% -1.66% -0.77%

Russian Federation

April 2019 – July 2019 (inclusive) compared to same period in 2018

Total: +9.9 % International: +0% Domestic: +20.9

Arr/Dep Traffic: +4.9%

-0.5% +2.2%

Sweden January 2019 – June 2019 compared to same period in 2018

International DEP/ARR SWE -3.4%

DK-SE FAB -1.6% Internal

SWE -9.1% DK-SE FAB -5.0%

SWE +6.6% DK-SE FAB

+5.0%

ESMM +1.44% ESOS -4.22% DK-SE FAB

-0.22%

Page 37: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

C-2 RDGE/31 – Summary of Discussions – Appendix C C-2

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

State Period of comparison

International/Domestic Traffic

Arrival/Departures Traffic

Overflight Traffic

Overall Traffic growth

Tajikistan April 2019 – August 2019 compared to same period in 2018 +5% -70% -25%

Turkey April 2019 – August 2019 compared to same period in 2018 -0.9 -0.5% -0.8%

Turkmenistan NA NA NA NA

Ukraine April 2019 – July 2019 compared to same period in 2018

International Traffic +12.7%

Domestic Traffic +6.2%

+10.5 % +11.1%

Uzbekistan January 2019 – June 2019 compared to same period in 2018 +24% -16% -2%

_________________________

Page 38: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

D-1 RDGE/31 – Summary of Discussions – Appendix D D-1

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

APPENDIX D — ROUTES IMPLEMENTED SINCE RDGE/30 AND TO BE IMPLEMENTED [STATE REPORTS]

(paragraph 3.18 refers)

1. List of routes implemented since RDGE/30 or to be implemented in near future

Designator Route Description Date of implementation DD/MM/YYYY

State(s) concerned

Estimated Mileage Savings when compared to current routing

Estimated Fuel Savings per flight in kg

Estimated Emissions savings per flight CO2 in kg

B904 BUDBO-GULSO-BURTA-KADVI-PAGMA-URGER-KHOLM(AFG)-IRTAJ-OKTAB-JD(TJK)

10/10/2019 (AFG) 12/09/2019 (TJK) Afghanistan/Tajikistan NA NA NA

N374 NAX-NAXSI-MUQAM-TUXAZ 18/07/2019 Azerbaijan NA NA NA T919 PEMAN-TELLI 18/07/2019 Azerbaijan NA NA NA P171 LENOK - DUBIN 25/04/2019 Belarus NA NA NA Y130 KUBIN - PODIL 25/04/2019 Belarus NA NA NA Z736 BABUN – GOWDA - ARZIM 25/04/2019 Belarus NA NA NA L715 GIBUX _ LOVEK April 2019 Iraq NA NA NA M703 GADSI - PASIP April 2019 Iraq NA NA NA L145 DEMAS-TRZ-MIRGA-DZG-BULOG-KST- LANOR 07/11/2019 Kazakhstan NA NA NA L147 RODAM-TOMGO-PABRI-TIROK-GEDSA- AKB 07/11/2019 Kazakhstan NA NA NA L162 URUSU-ERUTA-NIRAN-NKZ- DIDOP - ODIVA 07/11/2019 Kazakhstan NA NA NA L163 BEKAS-SIVKO-RUGUS-ADUMI-NKZ-RILOK-MIKNO-DODUR-RODRO 07/11/2019 Kazakhstan NA NA NA L165 NELTI-KST-GEMBO-GEDSA-RESBA-NKZ-AKALI 07/11/2019 Kazakhstan NA NA NA T531 GUTAN -URL-GERLI-ARKER-MILSO-BOLNA-ODIVA 07/11/2019 Kazakhstan NA NA NA

N161 GASBI-BODSI-DIVNO-IDROS-ARKAM-DZG-AGAKO-MADEV-BURID-GILAK- SARIN 07/11/2019 Kazakhstan NA NA NA

M166 ARISA-URL-SIVKO-AKB-ABIRA-ARK-VAMRI-KRG-GORBO-AGZ-TOLKI- AGUSA-SARIN 07/11/2019 Kazakhstan NA NA NA

L985 AKALI – LATNU – SANUR – ADLIK –RAVNI – LANOR 07/11/2019 Kazakhstan NA NA NA L988 OBATA – ALABA – BEKOR – LAMGI –TUSEP – AST – LAGMO 07/11/2019 Kazakhstan NA NA NA N985 TITUR – BAVAG - LAGMO 07/11/2019 Kazakhstan NA NA NA N126 KST – TUSEP – AGADI – ABREK - TDK – BARUR – RULAD 07/11/2019 Kazakhstan NA NA NA

Page 39: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

D-2 RDGE/31 – Summary of Discussions – Appendix D D-2

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Designator Route Description Date of implementation DD/MM/YYYY

State(s) concerned

Estimated Mileage Savings when compared to current routing

Estimated Fuel Savings per flight in kg

Estimated Emissions savings per flight CO2 in kg

L993 LENTA – TUSEP - KRG 07/11/2019 Kazakhstan NA NA NA L998 LANOR – RUDAL – ASTIK - AGADI 07/11/2019 Kazakhstan NA NA NA M610 AZABI–ANIGA–DIVNO–MILSO–KZO–LIMTO– ARBOL– BERVI–RULAD 07/11/2019 Kazakhstan NA NA NA N170 BEBLU–AST-BANOS–LUKUS–BLH–MAROR–RISAD– ADABA - ATA 07/11/2019 Kazakhstan NA NA NA N993 LANOR–MONEG–GEDNO–AGINU-AGZ 07/11/2019 Kazakhstan NA NA NA M618 AGUNA – LIPSI – GOMIR 07/11/2019 Kazakhstan NA NA NA M199 MULTA – RESDO – AVLAK – NKZ 07/11/2019 Kazakhstan NA NA NA L143 SULET – AGUNA – GENGA – AGNAT–SOMIP - ELSUT 07/11/2019 Kazakhstan NA NA NA

N55 BALUN – TITIL – OGANU – ARKER –BEKOR – GEMBO – ATNON - DAKIN 07/11/2019 Kazakhstan NA NA NA

L192 BABUR – KORAG 07/11/2019 Kazakhstan NA NA NA M741 LANOR – LAMGI – LUGER – GEKSO –RITAL - ASLOK 07/11/2019 Kazakhstan NA NA NA N990 ODIVA – ADAZA – KZO – GORVA – DZG – KUGUN – MIMKA – DAKIN 07/11/2019 Kazakhstan NA NA NA

M996 Realignment M996 as KEMIV – IPNIK – ISVIG 28/05/2019 Norway NA NA NA

L130 BINOM-TAVRU-BADKA. To change from westbound to bi-directional 25/04/2019 Republic of Moldova NA NA NA

A914 Konstantinovsk NDB (KA) – Bagaevskiy NDB (BA) (domestic route converted into an international route) Russian Federation NA NA NA

B912 VADAS – ABRER – Mirny VOR/DME (DEМ) (new route segment) Russian Federation NA NA NA

B927

Salekhard VOR/DME(SH) – TEKRI – REFRI – NOROT – NIREL – NURGI (domestic route segment converted into an international route; and NURGI – BUGOS – BASEB – BETKA – Norilsk (Alykel) VOR/DME (NOR) (new route segment).

Russian Federation NA NA NA

G244 Morozovsk VOR/DME (MOR) – GIMIS – AMEPU (new route segment) Russian Federation NA NA NA

N171 RUMOL – OTRIP – LUMIT Russian Federation NA NA NA T411 LABAR – MORUT – NEBOL Russian Federation NA NA NA

B905 DILRO-NULMO 12/09/2019 Tajikistan NA NA NA

N/UN374 GDR VOR – GEZSO-TUXAZ (FIR BDRY) 18/07/2019 Turkey 20 NM NA NA

M614 Implemented new bidirectional ATS route DIGAM – ETNIL - KESAM (FL135 FL660). 25/04/2019 Ukraine NA NA NA

Page 40: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

D-3 RDGE/31 – Summary of Discussions – Appendix D D-3

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Designator Route Description Date of implementation DD/MM/YYYY

State(s) concerned

Estimated Mileage Savings when compared to current routing

Estimated Fuel Savings per flight in kg

Estimated Emissions savings per flight CO2 in kg

M435 Changed from westbound to bidirectional the existing ATS route segment RASIL - ETNIL 25/04/2019 Ukraine NA NA NA

2. Other airspace changes (including future plans) Date of

Implementation State(s)

concerned Airspace change

23 MAY 2019 Ukraine 71.040c / 16.026c Free Route Airspace Ukraine, Step 1 (Sc 1b) - Phase 2 Implemented cross-border H24 Free Route Airspace within ACC Kyiv and ACC Dnipro (FRA KIDRO) from FL275 to FL660.

25 APR 2019 Finland Renamed Finland FIR as Helsinki FIR and renamed Tampere ACC as Helsinki ACC. Change of Tampere radar call sign to Helsinki Control and change of location indicator EFES to EFIN.

25 APR 2019 Finland Extended Free Route Airspace procedures into EFHK TMA between F095 – F285.

25 APR 2019 Finland Single CDR category implemented.

25 APR 2019 Belarus Bi-directional instead of uni-directional flows were implemented on the following route segments: Z494 KOMAP – OKNOD and N743 DELON – KOMAP.

25 APR 2019 Bulgaria

Implementation of new significant points ADRIN, ALMER, ATFIR, BIZUK, ZAPRE and ZODIK. Change in RNAV routes L602, L605, L606, L622, L742, L744, L852, L863, L867, M19, M987, N127, N181, N133, N605, N618, N739, Q6,

Q24, Q27, T214, T226, T228, T343, T516, T517, T777, Y505 and Y553. Implementation of new RNAV Route Y94. Implementation of new VFR Routes - V434 and V435. Implementation of CTA Sofia Sectors. Update of information. Update of En-route charts. Burgas aerodrome - update of information for operations in low visibility conditions. Gorna Oryahovitsa aerodrome - change in coordinates of DVOR/DME GRN. Update of Aerodrome Chart (ADC), Visual Approach Chart and

Area Chart. Sofia aerodrome - update of the information for transit flights. Change in Instrument Approach Charts (IAC) ILS RWY 27 Update of information for frequencies in FIR, UIR and TMA. Update of En-route charts. Gorna Oryahovitsa aerodrome - change in frequency and cnannel of DVOR/DME GRN. Update of information for frequencies of Blagoevo, Bohot, Daskal Atanasovo, Dolna Banya, Kazanlak, Erden, Ruse, Sofia West airfields and

Marina Dinevi heliport

25 APR 2019 Poland • Insertion of point USEGI in route T425: BALBA – USEGI – MONOV (BALBA – USEGI bidirectional) • Insertion of point OGVET in route T267: BALBA – OGVET – NATEV (BALBA – OGVET bidirectional)

Page 41: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

D-4 RDGE/31 – Summary of Discussions – Appendix D D-4

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Date of Implementation

State(s) concerned Airspace change

07 NOV 2019 Armenia, Georgia Cross-border FRA operation (Free Route Airspace in South Caucasus Area) - FRASC

07 NOV 2019 Hungary SEEFRA STEP 1 - H24 X-Border FRA area through Bulgaria, Romania and Hungary

Page 42: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

D-5 RDGE/31 – Summary of Discussions – Appendix D D-5

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Date of Implementation

State(s) concerned Airspace change

05 DEC 2019 02 JAN 2020 Poland

• L867: PEKOT – REGLI, bidirectional, FL95-FL660 (AIRAC 02.01.2020); • Y218: ABSAG – ALUKA, odd, FL95-FL660 (AIRAC 05.12.2019); • Deletion of point AMTEK (AIRAC 02.01.2020).

_________________________

Page 43: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

E-1 RDGE/31 – Summary of Discussions – Appendix E E-1

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

APPENDIX E — RDGE ACTION PLAN (STATUS 13 SEPTEMBER 2019)

(paragraph 4.1 refers)

Ref # TASKS RESPONSIBLE BODIES TARGET DATE PROGRESS/REMARKS

2/18. Identify already agreed route alignments which need full implementation and seek to achieve this aim.

States, Operators Every RDGE On-going.

2/20. Rationalise use of route designators States, EUROCONTROL, ICAO

Every RDGE On-going.

3/8. Provide operators' requirements for routes proposed in ATS Route Catalogue Operators Every

RDGE

On-going. IATA requested to carry out internal coordination when developing route and airspace proposals so as to ensure that requests were consolidated prior to being submitted and present WP at RDGE meetings on their findings and proposals.

3/12. Provide information regarding status of implementation of ATS routes for update of the ATS route catalogue

States, Operators, EUROCONTROL, ICAO

Before every RDGE On-going.

3/15. Provide feedback on ICARD to ICAO States, EUROCONTROL, ICAO

Every RDGE On-going.

4/5.

Provide SAAM evaluations of proposals, using traffic figures of the busiest day in January and August, affecting the Baltic Sea area and Black Sea area and if relevant, MID Asia and interface area

EUROCONTROL Every RDGE As and when required.

5/14. Progress implementation of Flexible Use of Airspace (FUA) States, ICAO When required On-going.

6/14. Regular update of ICARD Database States Next RDGE On-going.

6/15. Progress implementation on RNAV ATS route designators' compatibility States Next RDGE On-going.

Page 44: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

E-2 RDGE/31 – Summary of Discussions – Appendix E E-2

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Ref # TASKS RESPONSIBLE BODIES TARGET DATE PROGRESS/REMARKS

10/01 Improve user interface of the European Route Network Improvement Plan/ ERNIP Database

States ICAO Paris EUROCONTROL

Every RDGE On-going.

10/03 Release of 5LNCs reserved in ICARD and not published in AIPs

States ICAO EUROCONTROL

Every RDGE Coordination taking place between ICAO and States concerned. Ongoing.

12/02 Rationalisation of use of existing like-sounding 5LNCs in close geographical location

ICAO Paris EUROCONTROL Operators States

Every RDGE On-going.

16/01

Provide State Reports, including the information on the environmental benefits from the implementation of operational improvements, for the RDGE meetings

States ICAO Paris

Every RDGE meeting

States to provide their reports in order to progress the ATS route development indicating the system (mileage, time) and environmental (fuel, CO2) savings – to be addressed at RDGE/31

18/01 Harmonization of National AIP publications of lower and upper vertical limits for ATS routes to ensure compliance with Annex 15

States RDGE/32

ICAO and EUROCONTROL to coordinate follow-up actions to identify discrepancies together with States. At RDGE/32 list of discrepancies will be presented for review. Following these meetings, information on discrepancies will be submitted to EANPG for possible insertion into the Air Navigation Deficiencies List.

19/01 Removal of 5LNC duplicates in ICAO EUR/NAT Region

ICAO ICARD Data Manager RDGE/30+ Nearly completed in the ICAO EUR/NAT Region.

On-going.

19/02 Resolve outstanding issues related to significant airspace changes planned to take place in Moscow FIR

Belarus Russian Federation Ukraine

During 2020 Regular progress report expected at RDGE meetings.

Deleted: 1

Deleted: 1

Page 45: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

E-3 RDGE/31 – Summary of Discussions – Appendix E E-3

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Ref # TASKS RESPONSIBLE BODIES TARGET DATE PROGRESS/REMARKS

20/01

Harmonization of national Airspace AIP publications issues to ensure full compliance with ICAO provisions, in particular, Annex 15, Doc 10066 and ICAO Doc 8126

States ICAO Paris RDGE/32

On-going. ICAO & EUROCONTROL to coordinate on future contributions. At RDGE/32 list of discrepancies will be presented for review. Following these meetings, information on discrepancies will be submitted to EANPG for possible insertion into the Air Navigation Deficiencies List.

20/02

Clarification on the status of non-standard charts (differences in the publication of coordinates/information which had been taken out of national AIPs but are re-published by companies using their own standards)

States ICAO Paris RDGE/32 On-going, ICAO & EUROCONTROL to

coordinate on future contributions.

20/04 Consider the implementation of the ATS route P173 bi-directional.

ICAO Paris ICAO Bangkok Afghanistan Turkmenistan

RDGE/32

P173 uni-directionally implemented. Further results on the assessments/studies from Afghanistan requested to make this route segment also bi-directional.

20/06 Removal of duplicated or non-EUR/NAT route designators in ICAO EUR/NAT Region

ICAO ICARD RD Data Managers RDGE/32+ Coordination is ongoing with ICAO Headquarters

and other Regional Offices.

21/01 Coordinate between Japan, Russian Federation and ICAO to resolve FIR coordinates of AVGOK.

ICAO Paris, ICAO Bangkok Japan Russian Federation

RDGE/32 ICAO to address this issue at a higher level as per report from Far East Subgroup report at RDGE/26. EANPG59-RASG-EUR06 Conclusion/16 refers.

26/03

Resolve the long-standing issue of the unallocated airspace (NO-FIR area) between Murmansk FIR and Bodø FIR/OFIR/ Norway FIR.

Norway Russian Federation RDGE/32

ANSPs have forwarded proposals to CAA. Discussions are ongoing at the ministerial level and progress will be reported at RDGE/32.

27/04

Indicate implementation priorities (Short, medium and long-term) in route proposals requiring inter-regional coordination with APAC Region

RDGE States ICAO Paris ICAO Bangkok

Every RDGE

All Stakeholders concerned requested to indicate priority timelines of proposals impacting the interface with States in APAC Region and update RDGE Catalogues accordingly. ON-GOING

Deleted: 1

Deleted: 1

Deleted: 1

Deleted: 1

Deleted: 30

Deleted: 1

Deleted: Progress to be reported at RDGE/30.

Deleted: 1

Deleted: 1

Page 46: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

E-4 RDGE/31 – Summary of Discussions – Appendix E E-4

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Ref # TASKS RESPONSIBLE BODIES TARGET DATE PROGRESS/REMARKS

29/01

Provide feedback on proposals impacting Afghanistan, China, I.R. Iran, Iraq, Japan, Pakistan and South Korea in Middle Asia and Far East Subgroups’ ATS Route Catalogues.

ICAO Paris ICAO Bangkok ICAO Cairo Afghanistan China I. R. Iran Iraq Japan Pakistan South Korea

Post RDGE/32 ICAO Paris requested to coordinate with ICAO Regional Offices Bangkok and Cairo in order to receive feedback from States concerned.

COMPLETED

29/03 Provide feedback on benefits gained on routes that have been implemented by Russian Federation.

IATA RDGE/32 To be addressed at RDGE/32.

30/01 Traffic normalisation in Damascus FIR

ICAO HQ ICAO Cairo ICAO Paris EUROCONTROL NM

RDGE/32

1. ICAO HQ withdrawal of SL. 2. ICAO Cairo to share information on meeting that was organized. 3. Review of impact on States and overall EUR network.

30/02 Traffic normalisation in Baghdad FIR (re-opening of KABAN westbound)

ICAO Cairo ICAO Paris EUROCONTROL NM Bahrain, Iraq, Kuwait, I. R. Iran, Bulgaria, Romania, Turkey

RDGE/32

1. Developments need to be addressed in MID Region (Iraq, I. R. Iran).

2. Enhancement of interface between MID and EUR Regions for traffic flows to/from Gulf area.

3. Coordination with States in EUR Region required.

30/03 Share information on outcome of bilateral meeting between China and Russian Federation with RDGE

China Russian Federation RDGE/32 Provide information on outcome once the meeting

has taken place.

Deleted: 1

Deleted: 29/02

Deleted: Share the Guidelines on FRA Design document with RDGE members.

Deleted: EUROCONTROL

Deleted: RDGE/31

Deleted: EUROCONTROL NM will provide copies at RDGE/31.

Deleted: 1

Deleted: 1

Deleted: 1

Deleted: Syria

Deleted: 1

Deleted: (in summer 2019)

Deleted: 1

Deleted: of bilateral meeting

Page 47: CPWG/27 WP/10 22/10/2019 · 2019. 10. 17. · agreed are reflected in the RDGE ATS Route Catalogue. 1.5 The CPWG, as part of an agreement with the ICAO EURNAT Office in 2012, provides

E-5 RDGE/31 – Summary of Discussions – Appendix E E-5

RDGE31_SoD_Draft_v190930.docx DraftSeptember 2019

Ref # TASKS RESPONSIBLE BODIES TARGET DATE PROGRESS/REMARKS

30/05 Coordinate on RDs allocation process for RNAV implementations

ICAO Paris IAC RDGE/31+ On-going

31/01 Initiate High Seas Coordination Procedure for UDROS-ABSAX on behalf of Turkey ICAO Paris Post-RDGE/31 High Seas Coordination Procedure to be initiated

as a direct outcome of RDGE/31.

31/02 Initiate High Seas Coordination Procedure for GOBLI-DIGAM on behalf of Ukraine ICAO Paris Post-RDGE/31 High Seas Coordination Procedure to be initiated

as a direct outcome of RDGE/31.

31/03

Address flight planning issues related to FRA implementation and removal of ATS routes in order for CFSP software to be updated so that the full benefits of FRA can be provided to airspace users

IATA ICAO Paris RDGE/32 IATA to raise this issue at IATA RCG.

ICAO Paris to inform EASPG of this issue.

31/04 Clarify guidance on minimum distance for proximity check of homophonous 5LNC ICAO Paris RDGE/32

To present at RNDSG/98 and report progress at next RDGE. Agreed guidance will be provided to ICAO Headquarters to update ICARD 5LNC Handbook.

31/05 Provide objectives for proposals proposed by Uzbekistan Uzbekistan Post-RDGE/31 Uzbekistan to provide information by email for

Secretariat update of ERNIP database.

— END —

Deleted: 30/04

Deleted: Review RDs for planned RNAV implementation in Kazakhstan and Russian Federation

Deleted: ICAO Paris¶EUROCONTROL NM

Deleted: RDGE/31

Deleted: Provide chart of all planned routes.¶COMPLETED.

Deleted: Further progress to be reported at RDGE/31.