Presentation on DRR Schemes of Cox-Bazar District – Moheshkhali

Cox-Bazar District – Moheshkhali

Embed Size (px)

DESCRIPTION

Cox-Bazar District – Moheshkhali

Citation preview

Presentation on DRR Schemes of

Cox-Bazar District – Moheshkhali

District wise Scheme Summary District Upazilla Union Scheme Code

Project Title/Details

Budget Beneficiaries

Cox’ Bazar Moheshkhali Saplapur

CBZ 0613004 Maintenance of Saplapur Cyclone shelter cum High School.

1,272,550 1,800

Presentation on Saplapur Union under Moheshkhali Upazila DRR Schemes Location of Proposed scheme

Pre condition of the Saplapur Cyclone shelter

Front View of the Shelter Side view of the Shelter

Pre condition of the Saplapur Cyclone shelter

Damage condition of RCC Drop wall Damage condition of Drop wall & outer wall

Pre condition of the Saplapur Cyclone shelter

Condition of the Beam Condition of the window shuter

Pre condition of the Saplapur Cyclone shelter

Condition of the Roof, in side of the Stair case wall.

Pre condition of the Saplapur Cyclone shelter

Condition of Door Roof Slab of the Building

Major Hazards and Impact of Saplapur Union.

Hazard

Flood, flash flood, Cyclone and Tidal surge:

People do not have easy access to cyclone shelter and hygienic sanitation facilities.

Impact:

Raised intervention shall ensure safe access to shelter during flood, Flash Flood, Cyclone and Tidal surge events.

Rational for the Maintenance of Cyclone shelter

This is the Existing Cyclone shelter which was constructed by the Gono Sashtha Kendra in 1991 after the devastating Super Cyclone.

After construction no maintenance have been done by any GO and NGO authority.

Presently condition of the shelter is not good enough. Mainly toilet is un useable, some door, window, plaster, drop wall, lime-tressing, floor, color is found damaged.

No water supply system is exist in the shelter.

If any initiative for maintenance is not taken for this shelter immediately then with in short time this structure will be totally un useable.