—CONVEGNO FIRE – 14 OTTOBRE 2019 - GENOVA
HVAC Energy Efficiency Projects for GNVSuccess storiesSergio Divano, Technical Advisor
—
Sergio Divano, HVAC Technical Advisor for Marine, IAMP, Genoa - Italy
Slide 2
Speaker
ABB INTERNAL USE ONLY
—Sergio DivanoHVAC Technical AdvisorABB S.p.A. - Marine & PortsVia Molo Giano16128, Genoa, Italy, ITPhone: +39 010 607 3605Mobile: +39 334 6314 189 www.abb.com/marine
—Marine & Ports at a glance
Vision
Values Global footprint
» 26 countries
» 6 HBUsChina, Singapore, Finland, Norway, Sweden and US
» 20 LBU’s6 in AMEA, 9 in Europe and 5 in Americas
Marine Solutions
» Propulsion Solutions
» Electric Solutions
» Automation
» Digital Solutions
» Energy Efficiency
» 24h/7 RDS
» Services
Team
> 1800 employees
Electric. Digital. Connected.
—
Ship GNV LA SUPREMAFirst Pilot Project
Ship GNV LA SUPERBA2nd ship
Scope of workChiller Optimization System
Fast installation2 weeks
Short Payback1 year
12345
—
—Chiller Optimization System- ABB ARKM20
October 14, 2019 Slide 5
Average energy consumption on-board
Energy consumption - Passenger vessels
HVAC energy consumption – electrical load (*)
20-30% HVAC 70-80% Other
Up to 30% energy supply used for:- cabins- public areas- galley ventilation
50% Chillers 35% AHUs & fans15% Pumps
(*) average value When the ship is berthed in the port, the HVAC system becomes the main energy consumer.
—
Energy efficiency solutions through our digital offering
Chiller Optimization System- ABB ARKM20
October 14, 2019 Slide 6
Cruise Ferry Operating
Target vessels
HVAC ELECTRICAL LOAD4 ÷ 8 MW
HVAC ELECTRICAL LOAD2 ÷ 4 MW
FOCUSVessels sailing in warm environmentswill receive higher energy savings.
—Introducing ABB ARKM2O
October 14, 2019 Slide 7
ARKM20 monitors comfort requirements determined by users as well as ambient conditions (temperature and humidity), processing this information to get the most efficient chiller set-points.
To do this ARKM20 not only connects to the chillers, but also with devices, onboard control systems and onshore providing relevant information.
Chillers are designed for optimum performance in specific ambient conditions which may only occur 10% of the time, leaving significant room for improvement of chiller performance while conditions differ from design assumptions up to 90% of the time.
By optimizing the chilled water setpoint continuously the chiller energy consumption decreases significantly.
Connecting
—Introducing ABB ARKM20
October 14, 2019 Slide 8
In a chiller, the electrical power absorbed by the compressormotor depends on the pressure difference that thecompressor has to produce.
Increasing the chilled water set-point, the pressure differencedecreases and therefore the absorbed power decreases too.
Increasing the chilled water set-point temperature by +1°C, theelectric power consumption decreases by 3÷4%.
Important note: the system does not change and affect theindoor temperature set-points.
Decreasing your energy consumption
—Introducing ABB ARKM20
October 14, 2019 Slide 9
How does it work – set-point change
Manual process ABB ARKM20The set-point is typically changed by onboard engineer/s depending on the season or climate zone.
ABB ARKM20 defines and sets the optimized chilled water setpoint every 5 minutes.
Variable conditions allow to optimize the setpoint:- night/day- port/navigation- empty/full of passenger- high/low humidity
Creates operational efficiencies
—Introducing ABB ARKM20
October 14, 2019 Slide 10
System architecture – how does it work?
Existing HVACcontrol system
Optimized chilledwater set-point to chillers
ABB
Remote supportTriggering & AlertingPredictive MaintenanceConsulting
Energy Report
Remote dashboard
Remote connection
CUSTOMER OFFICE
ABB-ARKM20Online
ABB-ARKM20Onboard
AshoreOnboard
—
October 14, 2019 Slide 11
Saving Results & Pay Back
Direct Savings
In a monthly basis, saving is 70 MWh On annual basis saving is around 600-700 MWh Based on energy cost EUR 0,11/kWh, annual saving is around 77K EUR
Pay back time
12 months
Indirect HVAC Savings
With chillers adjusted to most efficient settings for actual demand, additional potential savings on re-heaters and other equipment, on yearly basis around 500-1.000 MWh
—ABB ARKM20
October 14, 2019 Slide 12
Remote dashboard
—
Ship GNV EXCELSIOR
Purchase orderProject Amount: 162 k€
Estimated pay back: 2 years
Scope of workRetrofit of HVAC automation control system
Fast project (5 months)PO date: March 2019 End of Commissioning: July 2019
ABB productsSolution based on ABB portfolio.
12345
—
—HVAC Control System Retrofit – GNV Excelsior
October 14, 2019 Slide 14
Scope of work
October 14, 2019
TrainingMaterials SupplyEngineering CommissioningAssistance
» Training onboard for GNV Crew
» Delivery of all HVAC components
» Design and engineering activities
» Commissioning of new control system and variablefrequency drives
» Site assistanceduring installation
—HVAC Control System Retrofit
October 14, 2019 Slide 15
Value Proposition
October 14, 2019
DataSavingControl IntegratedComfort
» Data available for ashore customer office reporting
» Energy saving and CO2 emissions reduction are continuously displayed and remotely reported
» Short pay-back <2 yrs
» Accurate control of HVAC system
» Integrated solutionwith common interface
» More comfort for passengers
» Reduced noise and vibration
—HVAC Control System Retrofit – GNV Excelsior
October 14, 2019 Slide 16
Products and materials delivered
October 14, 2019
WorkstationValvesField Instrumentation Control PanelsVFD
» No. 1 workstation for remote control in Engine Control Room
» No. 68 new valves and actuators (chilled water and hot water circuits)
» No. 131 new instruments (temperature / humidity / CO2/pressure)
» No. 8 HVAC control cabinets with ABB PLC model AC500
» No. 30 Variable Frequency Drives ABB model ACS880
—HVAC Control System Retrofit – GNV Excelsior
October 14, 2019 Slide 17
Products and materials delivered
October 14, 2019
—HVAC Control System Retrofit – GNV Excelsior
October 14, 2019 Slide 18
Field Instrumentation Valves Control Panels
Before the retrofit - 20 years old
—HVAC Control System Retrofit – GNV Excelsior
October 14, 2019 Slide 19
ABB AC500
HVAC field instrumentation connected with ABB PLC AC500
ABB Control Panels
Control Panels linked through the new HVAC control network
ABB Drives
ACS880 Drives for air handling unit motors
ABB Workstation
Engineering workstation with ABB PC (B&R)
After the retrofit – New ABB products
—HVAC Control System Retrofit – GNV Excelsior
October 14, 2019 Slide 20
First Energy Report
October 14, 2019
Recorded period: August 1st÷ September 21st 2019 First 50 days Recorded data: 1200 values Reference baseline: full load motor power -10% Energy saving during the reference period: 123 MWh CO2 emission saving: 95 Ton
It is our intent to provide solutions to the current and near future fleet where technology is used alongside competent ship’s officers.
Thank you.Any questions?