Control Chart Selection. Quality Characteristic. variable. attribute. defective. defect. no. n>1?. x and MR. constant sampling unit?. yes. constant sample size?. yes. p or np. no. n>=10 or computer?. x and R. yes. no. no. yes. p-chart with variable sample size. - PowerPoint PPT Presentation

Citation preview

Page 1: Control Chart Selection
Page 2: Control Chart Selection
Page 3: Control Chart Selection

3Control Chart Selection

Quality Characteristic

variable attribute

n>1?

n>=10 or computer?

x and MRno

yes

x and s

x and Rno

yes

defective defect

constant sample size?

p-chart withvariable samplesize

no

p ornp

yes constantsampling unit?

c u

yes no

Page 4: Control Chart Selection

Comparison of Variables v. Attributes

Variables Fit certain cases. Both mean and variation information. More expensive? Identify mean shifts sooner before large number

nonconforming.

Attributes Fit certain cases – taste, color, etc. Larger sample sizes. Provides summary level performance. Must define nonconformity.

Page 5: Control Chart Selection
Page 6: Control Chart Selection

Types of ControlControl Chart Monitors

Attribute control chartsp chart Process fraction defectivec chart number of defectsu chart defects per unit

Variables control charts

X-bar chart Process mean

R chart (Range Chart) Process variability

Page 7: Control Chart Selection

When are Shifts Detected ?Lower

SpecificationLimit

LCL UCL

UpperSpecification

Limit

Process Target

Nonconformity

Control Chart IdentifiesMean Shift Here

Attribute Chart IdentifiesMean Shift Here

Page 8: Control Chart Selection

Variables v. Attributes

Both have advantages.At High levels - Attribute charts, identify

problem areas.

At Lower levels – Variables charts, quantitative problem solving tools.

Page 9: Control Chart Selection

Ch 12- Control Charts for Attributes

p chart – fraction defectivenp chart – number defective

c, u charts – number of defects

Page 10: Control Chart Selection

Defect vs. Defective

‘Defect’ – a single nonconforming quality characteristic.

‘Defective’ – items having one or more defects.

Page 11: Control Chart Selection

Legal Concerns with Term ‘Defect’

Often called ‘nonconformity’.

Possible Legal Dialog Does your company make a lot of ‘defects’? Enough to track them on a chart ? If they are not ‘bad’, why do you call them

‘defects’, sounds bad to me. So you knowingly track and ship products

with ‘defects’?

Page 12: Control Chart Selection

Summary of Control Chart Types and LimitsTable 12.3

These are again ‘3 sigma’ control limits

Page 13: Control Chart Selection

p, np - Chart

P is fraction nonconforming.np is total nonconforming.

Charts based on Binomial distribution.Sample size must be large enough (example

p=2%)Definition of a nonconformity.Probability the same from item to item.

Page 14: Control Chart Selection

c, u - Charts

c and u charts deal with nonconformities. c Chart – total number of nonconformities. u Chart – nonconformities per unit.

Charts based on Poisson distribution.Sample size, constant probabilities.

Page 15: Control Chart Selection
Page 16: Control Chart Selection
Page 17: Control Chart Selection
Page 18: Control Chart Selection
Page 19: Control Chart Selection

How to Interpret Attribute Charts

Points beyond limits- primary test. Below lower limits means process has improved.

Zone rules do not apply.Rules for trends, shifts do apply.

Only get One Chart !!

Page 20: Control Chart Selection

Examples of When to Use

p,np charts– Number of nonconforming cables is found for 20

samples of size 100. Number of nonconforming floppy disks is found for

samples of 200 for 25 trials.

c,u charts- Number of paint blemishes on auto body observed for

30 samples. Number of imperfections in bond paper – by area

inspected and number of imperfections.

Page 21: Control Chart Selection

p-chart

Jika bohlam tidak menyala, lampu yang rusakPerusahaan ingin

Perkirakan persentase bohlam rusak dan Tentukan apakah persentase bohlam rusak terus

meningkat dari waktu ke waktu.. Sebuah peta kendali p adalah alat yang

sesuai untuk menyediakan perusahaan dengan informasi ini.

Page 22: Control Chart Selection

Notation Sample size = n = 100 Number of samples (subgroups) = k = 5 X = number of defective bulbs in a sample p = sample fraction defective = ??? p-bar = estimated process fraction

defective P = process fraction defective (unknown) p-bar is an estimate of P

Page 23: Control Chart Selection

Inspection Results

Day n X1 100 202 100 53 100 304 100 355 100 24

Page 24: Control Chart Selection

Compute p and p-bar

Day n X p=X/n1 100 20 0.202 100 5 0.053 100 30 0.304 100 35 0.355 100 24 0.24

Sum 1.14p-bar 0.23

Page 25: Control Chart Selection

p-bar (Estimated Process Fraction Defective)

kp

p bar -p

23.0514.1

k

pp

Page 26: Control Chart Selection

npppLCL

npppUCL

)1(3

)1(3

p-Chart Control Limits

Page 27: Control Chart Selection

104.100

)23.1(23.323.

356.100

)23.1(23.323.

LCL

UCL

p-Chart - Control Limits

Page 28: Control Chart Selection

p-Chart for Bulbs

0

0.1

0.2

0.3

0.4

1 2 3 4 5

Day

p

LCL

UCL

p-bar

p

Page 29: Control Chart Selection

Interpretation

The estimated fraction of defective bulbs produced is .23.

On Day 2, p was below the LCL.This means that a special cause occurred on that day

to cause the process to go out of control.The special cause shifted the process fraction

defective downward.This special cause was therefore favorable and should

be ???

Page 30: Control Chart Selection

InterpretationAfter Day 2, the special cause lost its impact

because on Day 4, the process appears to be back in control and at old fraction defective of .23.

Until the special cause is identified and made part of the process, the process will be unstable and unpredictable.

It is therefore impossible to obtain a statistical valid estimate of the process fraction defective because it can change from day to day.

Page 31: Control Chart Selection

UCL

LCL

p-Chart

Process fractions defective is shifting (trending) upward

SamplingDistribution

P = process fraction

defective PP

PP

Trend Within Control Limits

Page 32: Control Chart Selection

Applications

Think of an application of a p-chart in:SalesShipping departmentLaw

Page 33: Control Chart Selection

Use of c-Charts

When we are interested in monitoring number of defects on a given unit of product or service. Scratches, chips, dents on an airplane wing Errors on an invoice Pot holes on a 5-mile section of highway Complaints received per day

Opportunity for a defect must be infinite.Probability of a defect on any one location or any

one point in time must be small.

Page 34: Control Chart Selection

c-Chart

c-chart notation:c = number of defects

k = number of samples

defects ofnumber mean estimatedc bar -c

Page 35: Control Chart Selection

c-ChartA car company wants to monitor the number of paint

defects on a certain new model of one of its cars. • Each day one car in inspected.• The results after 5 days are shown on the next slide.

Page 36: Control Chart Selection

c-Chart

Day c c-bar LCL UCL1 5 6.6 0 14.3072 2 6.6 0 14.3073 8 6.6 0 14.3074 7 6.6 0 14.3075 11 6.6 0 14.307

Sum c 33c-bar 6.60

Page 37: Control Chart Selection

kc

c

c-Chart - Mean

6.6533

k

cc

Page 38: Control Chart Selection

ccUCLccLCL

33

c-Chart – Control Limits

Page 39: Control Chart Selection

307.14

6.636.6

3

0or 107.1

6.636.6

3

ccUCL

ccLCL

c-Chart – Control Limits

Page 40: Control Chart Selection

c-Chart for Number of Paint Defects

0

2

4

6

8

10

12

14

16

1 2 3 4 5

Car

c, n

umbe

r of d

efec

ts

c

LCL

UCL

c-bar

Page 41: Control Chart Selection

Conclusion

Process shows upward trend.Even though trend is within the control limits, the

process is out of control.Mean is shifting upwardThis is due to an unfavorable special cause.Must identify special cause and eliminate it from

process.Who is responsible for finding and eliminating

special cause?

Page 42: Control Chart Selection

Mini Case

Think of an application of a c-chart bank.

Page 43: Control Chart Selection

u-Chart

With a c chart, the sample size is one unit.A u-chart is like a c-chart, except that the

sample size is greater than one unit.As a result, a u-chart tracks the number of

defects per unit.A c-chart monitors the number of defects

on one unit.

Page 44: Control Chart Selection

u-Chart

A car company monitors the number of paint defects per car by taking a sample of 5 cars each day over the next 6 days.

The results are shown on next side.

Page 45: Control Chart Selection

Day n c u=c/n u-bar LCL UCL1 5 45 9.0 10.5 6.18 14.8882 5 58 11.6 10.5 6.18 14.8883 5 48 9.6 10.5 6.18 14.8884 5 53 10.6 10.5 6.18 14.8885 5 68 13.6 10.5 6.18 14.8886 5 44 8.8 10.5 6.18 14.888

Sum u 63.2u-bar 10.5

u-Chart

Page 46: Control Chart Selection

ku

u

5.106

2.63

ku

u

u-Chart

Page 47: Control Chart Selection

nuuUCL

nuuLCL

3

3

u-Chart

Page 48: Control Chart Selection

89.145

5.1035.10

3

18.65

5.1035.10

3

nuuUCL

nuuLCL

u-Chart

Page 49: Control Chart Selection

u-Chart

u-Chart Number of Paint Defects Per Car

02468

10121416

1 2 3 4 5 6

Car

c, n

umbe

r of d

efec

ts

LCL

UCL

u

u-bar

Page 50: Control Chart Selection

ConclusionThe process appears stable.We can therefore get a statistically valid estimate the

process mean number of defects per car.Our estimate of the mean number of paint defects per

car is 10.5, the center line on the control chart. Thus, we expect each car to have, on average, 10.5

paint defects.

Page 51: Control Chart Selection

Conclusion

Although the process is stable, the number of defects per car is too high.

Deming calls this a stable process for the production of defective product.

Important take away: A stable process (process in control) is not necessarily a good

process because it can be in control at the wrong level. A stable process is predictable, but this doesn’t mean that what

is being predicted is favorable.

Page 52: Control Chart Selection

Mini Case

Who is responsible for improving this process?

What is required to improve the process?

Page 53: Control Chart Selection

u-Chart vs. c-Chart

ncu

If n = 1, u = c and .cu

Control limits of the two chart will thereforebe the same.

Page 54: Control Chart Selection

Sample Size

Control Chart When To Use Sample Size

p-Chart Monitor the proportion of defectives in a process

At least 50

c-Chart Monitor the number of defects

1

u-chart Monitor the number of defects per unit

>1

Page 55: Control Chart Selection

In Practice

You need 25 to 30 samples before computing initial control limits.

When a special cause occurs, you should eliminate that sample and re-compute control limits ifSpecial cause is identified Eliminated or made part of process

To identify special causes, workers must keep log sheet, where they record any changes they make to the process.

Page 56: Control Chart Selection

Tracking Improvements

UCL

LCL

LCLLCL

UCLUCL

Process not centeredand not stable

Process centeredand stable

Additional improvementsmade to the process

Page 57: Control Chart Selection

Sampel SAMA…p chart

• Proporsi diketahui• Garis Tengah = p¯

pp p

n

( )1

UCL p

LCL pp p

p p

3

3

Page 58: Control Chart Selection

Sampel SAMA…p chart• Proporsi TIDAK diketahuim nomer sampel (vertikal) n ukuran sampel (horisontal) D bagian tidak sesuai p¯ = ∑Di/(mn)

Garis Tengah = p¯

pp p

n

( )1UCL p

LCL pp p

p p

3

3

Page 59: Control Chart Selection

Sampel BEDA …a. Metode INDIVIDU Batas Kendali

tergantung ukuran sample tertentu shg BKA/BKB tidak berupa garis LURUS

b. Metode RATA_RATA Ukuran sampel RATA -RATA dg perbedaan tidak terlalu besar

( n¯ = ∑n/observasi)

c. Peta Kendali TERSTANDAR dg GT=0 dan BK ± 3

Page 60: Control Chart Selection

np Chart

UCL = np np p 3 1( )

LCL = np np p 3 1( )

Note: If computed LCL is negative, set LCL = 0

assuming: np > 5n(1-p) > 5

Page 61: Control Chart Selection

c-chart dan u-chart

Mengetahui banyaknya kesalahan unit produk sbg sampel

Sampel konstan c-chart

Sampel bervariasi u-chart

Aplikasi : bercak pd tembok, gelembung udara pd gelas, kesalahan pemasangan sekrup pd mobil

Page 62: Control Chart Selection

Number of defects per unit:

c¯ = ∑ ci / n

UCL cc c 3

LCL cc c 3

c c

C - chart

Page 63: Control Chart Selection

U-chart

u¯ = ∑ ci/n n ¯ = ∑ ni/g g = banyaknya observasi

Model Individu BPA-u = u¯ + 3 √ (u¯ /ni) BPB-u = u¯ - 3 √ (u¯ /ni)

Model Rata-rata BPA-u = u¯ + 3 √ (u¯ /n¯) BPB-u = u¯ - 3 √ (u¯ /n¯)

Page 64: Control Chart Selection

Warning Conditions…..Western Electric :1. 1 titik diluar batas

kendali ( 3σ)2. 2 dr 3 titik berurutan

diluar batas kend64li (2σ)3. 4 dr 5 titik berurutan

jauh dari GT (1σ)4. 8 titik berurutan di satu

sisi GT5. Giliran panjang 7-8 titik6. 1/beberapa titik dekat

satu batas kendali7. Pola data TAK RANDOM

Page 65: Control Chart Selection

Patterns to Look for in Control Charts

Page 66: Control Chart Selection

Twenty samples, each consisting of

250 checks, The number of defective

checks found in the 20 samples are

listed below.(proporsi tidak diketahui)

4 1 5 3 2 7 4 5 2 32 8 5 3 6 4 2 5 3 6

Example………p-np chart

$115006529 25447581 1445

2655

Simon SaysAugusta, ME 01227

Page 67: Control Chart Selection

LCL = 3 .016 3(.007936) -.007808 0pp

(1 ) .016(1 .016) .015744 .007936250 250pp p

n

UCL = 3 .016 3(.007936) .039808pp

Note that thecomputed

LCLis negative.

Estimated p = 80/((20)(250)) = 80/5000 = .016

Control Limits For a p Chart$

115006529 25447581 1445

2655

Simon SaysAugusta, ME 01227

Page 68: Control Chart Selection

Tdk sesuai Proporsi Tdk sesuai Proporsi

4153274523

(4/250) = 0,016(1/250) =0,004

2853642536

(2/250) = 0,008(8/250) = 0,032

Page 69: Control Chart Selection

p Chart for Norwest Bank

0.000

0.005

0.010

0.015

0.020

0.025

0.030

0.035

0.040

0.045

0 5 10 15 20Sample Number

Sam

ple

Prop

ortio

n p UCL

LCL

Control Limits For a p Chart$

115006529 25447581 1445

2655

Simon SaysAugusta, ME 01227

Page 70: Control Chart Selection

Ukuran sampel sama = 50 ( p-chart)

no Banyak produk cacat

no Banyak produk cacat

12345678910

4253213254

11121314151617181920

35523241043

Page 71: Control Chart Selection

n =m =D =p¯ =BKA =BKB =Tabel proporsi untuk plot ke grafik

Page 72: Control Chart Selection

n = 50m = 20D = 72p¯ = 72 / (20.50) = .072p = √ (0,072)(0,928)/50 = .037BKA = 0,072 + 3(0,037) = 0,183BKB = 0,072 - 3(0,037) = -0,039

= 0Tabel proporsi untuk plot ke grafik

Page 73: Control Chart Selection

Ukuran sampel sama = 50 ( p-chart)

cacat

proporsi cacat proporsi

4253213254

(4/50 ) = 0,08(2/50) = 0,04

35523241043

(5/50) = 0,01

(10/50) = 0,20 (out) revisi(4/50) = 0,08(3/50) = 0,06

Page 74: Control Chart Selection

Revisi

p¯ = (72-10) / (1000-50) = 62/950 = 0,065

p = √ (0,065)(0,935)/50 = 0,035

BKA = 0,065 + 3 (0,035) = 0.17

BKB = 0,065 - 3 (0,035) = -0,04 = 0

Grafiknya juga berubah

Page 75: Control Chart Selection

Ukuran sampel beda (p chart)no sampel Produk cacat no sampe

lProduk cacat

12345678910

200180200120300250400180210380

1410178201825203015

11121314151617181920

190380200210390120190380200180

15261014241518191112

Jml sampel 4860 Jml Cacat 341

Page 76: Control Chart Selection

Metode Rata-rata

Sampel rata-rata n¯ = total sampel /observasi = 4860/20 = 243

p¯ = D/(n¯m) = 341 / (243.20) = 0,07 (CL) p = √ (0,07(0,93))/243 = 0,0164 BPAp = 0,07 + 3 (0,0164) = 0,119 BPBp = 0,07 - 3 (0,0164) = 0,021

Page 77: Control Chart Selection

Metode Individu

Sampel rata-rata n¯ = total sampel /observasi = 4860/20 = 243 p ¯ = D/(n¯m) = 341 / (243.20) = 0,07 (CL) semua

titik samaBP (obs-1) p = √ (0,07(0,93))/200 = 0,018 BPA = 0,07 + 3 (0,018) = 0,124 BPB = 0,07 - 3 (0,018) =

0,016……………….dst

Page 78: Control Chart Selection

Tabel Proporsi untuk Grafik

No observasi sampel cacat proporsi1234567891011121314151617181920

200180200120300250400180210380190380200210390120190380200180

141017820182520301515261014241518191112

0,0700,0550,0850,067………………………………0,0950,0500,0550,067

Page 79: Control Chart Selection

Example…c-chartno Byknya

kesalahanno Byknya kesalahan

12345678910

547685651610

11121314151617181920

978119576108

Page 80: Control Chart Selection

c¯ = ∑c/n = 152/20 = 7,6

BPA c = (7, 6) + 3 (√7,6) = 15,87BPB c = (7, 6) - 3 (√7,6) = -0,67 = 0

Page 81: Control Chart Selection

Example…u-chartno Sampel cacat no sampel cacat12345678910

20302515251020151525

514881262010610

11121314151617181920

30252525102020103020

91612106855148

Page 82: Control Chart Selection

Metode Rata-rata

Sampel Rata-rata u¯ = 192/415 = 0,462 (CL) n¯ = 415/20 = 20,75

BPAu = (0,462) + 3 √ (0,462/20,75) = 0,906 BPBu = (0,462) - 3 √ (0,462/20,75) = 0,018

Page 83: Control Chart Selection

Metode Individu

Sampel Rata-rata u¯ = 192/415 = 0,462 (CL) n¯ = 415/20 = 20,75

Batas KendaliObservasi -1 BPA-1 = (0,462) + 3 √ (0,462/20) = 0,916 BPB-1 = (0,462) - 3 √ (0,462/20) =

0,008…….dst