Construction Technology30 Hour - Part 1Student Workbook
Issue: US120/30/2a-IQ-0201B
Copyright 2005, LJ Technical Systems. No part of thisPublication may be adapted or reproduced in any material form,without the prior written permission of LJ Technical Systems. Written by: LJ Technical Dept
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW1.1
Assignment 1 Comparing Columns
On Table 1.1 fill in how many mass units each column was able to bear before it failed.
Type of Column Total Mass
Round
Square
Table 1.1
Assignment 2 Resources for Construction
Complete the following table.
Category Job Title Main TaskMeasures land, draws maps, lays out highways.Installs water and sewage system.Calculates time and materials for a needed for a project.Lays foundations and other stone work.Draws plans and designs some details.Applies wall covering to protect and enhance.Construct walls and other wooden structures.Designs buildings and manages construction project.Finishes interior walls ready for painting.Carries out structural, mechanical and system designs.Erects steel structures.Installs electrical system.
Table 2.1
Assignment 3 Strength of Materials
Calculate stress and strain for the sample material.
Force (lbs) Stress Extension Strain 500 0.05"1000 0.10"1500 0.15"2000 0.20"2500 0.25"3000 0.30"3500 0.50"3700 0.90"
Table 3.2
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW1.2
Use your information from Table 3.2 to plot a graph of stress versus strain.
Graph 3.1
Assignment 4 Construction Materials
Complete Table 4.1, showing examples of construction materials:
Example Use
Solid
Liquid
Gas
Table 4.1
Assignment 5 Properties of Wood
Fill in how many mass units each beam was able to bear before it failed.
Type of Beam Total Mass
Strengthened along grain
Strengthened across grainTable 5.1
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW1.3
Assignment 6 Concrete - Liquid Stone?
Record the deflection of the concrete beam.
Initial Reading = .................... inches.
Mass Unit Added Deflection Mass Unit Added Deflection1 62 73 84 95 10
Table 6.1
Total Mass units added before the beam failed = .................... .
Assignment 7 Reinforced Concrete
Record the deflection of the reinforced concrete beam.
Initial Reading = .................... inches.
Mass Unit Added Deflection Mass Unit Added Deflection1 62 73 84 95 10
Table 7.1
Total Mass units added before the beam failed = .................... .
Assignment 8 Problem & Solution: Beam Technology
Complete the specifications for your beam design ...
Materials used: ..........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Cost of beam $ ....................(Show your workings)
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW1.4
Draw your beam design here...
Assignment 10 Architectural CAD (I)
Fill in the name of your Floorplan CAD file: "................................ .bmf"[Use the file convention: your CLASS ID, your INITIALS and the ASSIGNMENT NUMBER]
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW1.5
Assignment 12 Surveying the Site
Plot a cross section of the Site Map shown in Diagram 12.1 of the Assignment Guide.
Assignment 13 A Firm Foundation Record the deflection of the foundation sections.
Initial Reading = .................... inches.
Pile Foundation Pier FoundationsMass Unit Added Deflection Mass Unit Added Deflection
1 12 23 34 45 56 67 78 89 9
10 10Table 13.1
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW1.6
Assignment 14 Construction Techniques
Use this diagram to complete your pentagon and hexagon patterns.
Shade the pentagons in the diagram below.
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW1.7
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW2.1
Assignment 16 Advanced Architectural CAD (I)Fill in the name of your Floorplan CAD file: "................................ .bmf"
[Use the file convention: your CLASS ID, your INITIALS and the ASSIGNMENT NUMBER]
Assignment 17 Advanced Architectural CAD (II)Fill in the name of your Floorplan CAD file: "................................ .bmf"
[Use the file convention: your CLASS ID, your INITIALS and the ASSIGNMENT NUMBER]
Assignment 18 A Roof Over Your Head
Record your Truss design here...
Balsa Sticks used - ............... Inches Cost (based on $5 per inch)- $...........................
Total amount of units the Kingpost truss held before failing - ............................
Total amount of units your truss held before failing - ............................
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW2.2
Assignment 19 On the Move! - Building Dynamics
Record the frequency at which each skyscraper vibrates.
Skyscraper Frequency RangeSkyscraper 1
Skyscraper 2
Skyscraper 3
Assignment 20 Water and Waste Systems
Complete the plan for a residential plumbing system.
WH BuildingMain
SewerOutlet
Diagram 20.1
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW2.3
Assignment 21 Electrical Systems
Record the minimum gauge of wire required for each circuit in Diagram 21.2 of the Assignment Guide.
Branch Circuit Current Carried Minimum Wire GaugeLightingSmall ApplianceCooker (Range)Air ConditioningWater Heater
Assignment 22 Computers in Construction Technology Use Table 22.1 from the Assignment Guide to write the correct computer application against
each construction task.
Computer Application Construction TaskCalculation of cut and fill for excavation
Generate a walk through model of the finished factory
Draw a layout of the plumbing system
Calculation of loading on foundations
2D & 3D steel frame analysis
Generate a color drawing of the finished factory
Visualize the effect of building a dam
Analysis of effects of heavy snow fall on roof
Estimate cost for projects
Calculation of seasonal heating & cooling demands
Draw a plot plan
Test Energy Efficiency Solutions
Table 22.1
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW2.4
Assignment 23 Managing a Construction Project
Use Table 23.3 in the Assignment Guide to plot a Work Schedule graph.
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW2.5
Assignment 24 Heat Transfer and How to Stop It
Record your results of the Climate chamber experiment here.
Wooden Roof Insulated RoofTemperature (°F) Temperature (°F)
Time (mins) Inside Outside Time (mins) Inside Outside0 01 12 23 34 45 56 67 78 89 910 1011 1112 1213 1314 1415 15
Plot the temperature readings for both the Wooden Roof and Insulated Roof.
10 5 6 7 8 9 11 12 13 14 15102 3 4
60
70
80
90
100
110
120
130
Temperature(°F)
Time (mins) 10 5 6 7 8 9 11 12 13 14 15102 3 4
60
70
80
90
100
110
120
130
Temperature(°F)
Time (mins)
Graph 24.1 Wooden Roof Graph 24.2 Insulated Roof
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW2.6
Assignment 26 Building a Truss Bridge Record the deflection of the balsa beam. Initial Reading = .................... inches.
Mass Unit Deflection Mass Unit Deflection1 2
Assignment 27 Bridges, Bridges, Everywhere! Record the deflection of the truss bridge. Initial Reading = .................... inches.
Mass Unit Deflection Mass Unit Deflection1 2
Assignment 28 Tunneling Technology Make notes as you watch the 'Introducing Eurotunnel' video...
Construction of the Tunnel: ....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Advantages of the Tunnel: .....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Using Diagram 29.2 of the Assignment Guide, arrange the letters in the right order to spell outa well-known Eurotunnel phrase.
Stage 1 2 3 4 5 6 7 8Picture Letter
Assignment 29 Problem & Solution: Designing a TechnologyLab Part 1
Fill in the name of your Technology Lab CAD file: "................................ .bmf"[Use the file convention: your CLASS ID, your INITIALS and the ASSIGNMENT NUMBER]
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW2.7
Draw your plot plan here
Assignment 30 Problem & Solution: Designing a TechnologyLab Part 2
Fill in the name of your Technology Lab CAD file: "................................ .bmf"[Use the file convention: your CLASS ID, your INITIALS and the ASSIGNMENT NUMBER]
Construction Technology (30 hour) - 73.12 Student Workbook
LJ Technical Systems SW2.8
CUT 1
APPLY
GLUE
CUT2
To assemble template: CUT 1 and CUT 2 to paper edges, apply glue, align overlap and join.
Template for Truss Bridge – Assignment 26