TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT 0936_041320 KAUFMAN COUNTY CONSTRUCTION PROJECTS 2020 HIGHWAY PROJECTS: Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 TxDOT graphic *Unmapped. CONTACT INFORMATION Lisa Walzl – Public Information Officer (214) 320-4403 [email protected] SOURCE: Texas Department of Transportation. SPRING • Q2 2020 Connecting You With Texas KAUFMAN COUNTY PROJECTS UNDER CONSTRUCTION (SPRING Q2 2020) # CSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete 1 0751-02-026 FM 148 FM 1390 to FM 1388 Reconstr. existing pvmt. and add shoulders Jul-2018 Nov-2018/ Sep-2020 A. L. Helmcamp, Inc. $7.8 M 80% 2 0751-02-025 FM 148 At Buffalo Creek Replace bridge and approaches Jul-2018 Oct-2018/ Dec-2020 B & E Construction $2.7 M 50% 3 0751-01-046 FM 148 South of US 80 to SP 557 Widen from 2-lane rural to 4-lane divided Jun-2018 Oct-2018/ Sep-2020 Ed Bell Construction Co., Inc. $11.3 M 80% 4 0095-14-029 I-20 Big Brushy Creek to SH 34 Rehabilitate exisitng roadway May-2019 Jul-2019/ Nov-2020 Texas Materials Group, Inc. $21.1 M 55% 5 2815-01-008 FM 2757 FM 740 to FM 741 Reconstruct existing pavement and add shoulders Feb-2019 Apr-2019/ Jun-2020 Longview Bridge and Road, LTD. $3.9 M 90% 6 2249-01-008 FM 460 US 80 to FM 740 Reconstruct existing pavement and add shoulders Mar-2019 Jun-2019/ May-2020 Ed Bell Construction Company $1.5 M 99% 7 0095-13-043 I-20 I-635 to Big Brushy Creek Full depth repair and mill and overlay Mar-2019 Jun-2019/ Sep-2020 Austin Bridge & Road, LP $24.4 M 65% 8 0173-02-071 SH 34 FM 1390 to FM 1388 Reconstruct existing pavement, add shoulders, and replace bridges and approaches Apr-2019 Jul-2019/ Sep-2022 Sterling Delaware Holding Company, Inc $33.2 M 20% 9 0095-05-059 US 80 FM 429 to Van Zandt C/L Median cable/concrete barrier Jun-2019 Oct-2019/ Jun-2020 Altus Construction, LLC. $4.1 M 55% 10 2555-01-012 FM 2578 FM 987 to SH 34 Reconstruct Existing Pavement and Add Shoulders Dec-2019 May-2020/ May-2021 AK Gillis & Sons, Inc. $7.1 M 0% ESTIMATED TOTAL $117.1 M NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of SPRING Q2 2020. 4 3 2 1 9 5 6 7 8 10 20 KAUFMAN CO. HUNT CO. ELLIS CO. KAUFMAN CO. KAUFMAN CO. KAUFMAN CO. KAUFMAN CO. VAN ZANDT CO. DALLAS CO. KAUFMAN CO. ROCKWALL CO. KAUFMAN CO. VAN ZANDT CO. N 5 miles Elmo KAUFMAN Lake Ray Hubbard Crandall . Cedar Creek Reservoir New Terrell City Lake Post Oak Bend City Rosser Cottonwood Grays Prairie Oak Grove Kemp Talty Mabank Forney Heath Mclendon-Chisholm 429 751 429 429 429 148 148 557 740 548 740 741 987 90 90 2578 1392 205 243 243 90 198 274 34 34 34 175 175 175 80 2860 1390 1390 2613 3094 3396 1391 1836 1895 1895 2727 2515 2965 34 34 80 80 2728 20 20 986 548 740 1641 2451 148 2728 148 205 1836 1388 148 175 3039 2728 2932 Projects Under Construction 148 To I-635 Combine Oak Ridge TERRELL Scurry TxDOT graphic NOTE: Highlighted areas are not drawn to scale.

Construction Projects - Kaufman Countyftp.dot.state.tx.us/.../construction/kaufman-cst.pdf · 2020-01-16 · TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT KAUFMAN COUNTY CONSTRUCTION

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction Projects - Kaufman Countyftp.dot.state.tx.us/.../construction/kaufman-cst.pdf · 2020-01-16 · TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT KAUFMAN COUNTY CONSTRUCTION

TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

0936

_041

320

KAUFMAN COUNTY CONSTRUCTION PROJECTS2020 HIGHWAY PROJECTS:

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

TxDOT graphic*Unmapped.

CONTACT INFORMATIONLisa Walzl – Public Information Officer (214) 320-4403 • [email protected]

SOURCE: Texas Department of Transportation.

SPRING • Q2 2020

Connecting You With Texas

KAUFMAN COUNTY PROJECTS UNDER CONSTRUCTION (SPRING Q2 2020)

# CSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 0751-02-026 FM 148 FM 1390 to FM 1388Reconstr. existing pvmt. and add shoulders

Jul-2018Nov-2018/Sep-2020

A. L. Helmcamp, Inc. $7.8 M 80%

2 0751-02-025 FM 148 At Buffalo Creek Replace bridge and approaches Jul-2018Oct-2018/Dec-2020

B & E Construction $2.7 M 50%

3 0751-01-046 FM 148South of US 80 to SP 557

Widen from 2-lane rural to 4-lane divided

Jun-2018Oct-2018/Sep-2020

Ed Bell Construction Co., Inc.

$11.3 M 80%

4 0095-14-029 I-20Big Brushy Creek to SH 34

Rehabilitate exisitng roadway May-2019Jul-2019/ Nov-2020

Texas Materials Group, Inc.

$21.1 M 55%

5 2815-01-008 FM 2757 FM 740 to FM 741Reconstruct existing pavement and add shoulders

Feb-2019Apr-2019/Jun-2020

Longview Bridge and Road, LTD.

$3.9 M 90%

6 2249-01-008 FM 460 US 80 to FM 740Reconstruct existing pavement and add shoulders

Mar-2019Jun-2019/May-2020

Ed Bell Construction Company

$1.5 M 99%

7 0095-13-043 I-20I-635 to Big Brushy Creek

Full depth repair and mill and overlay Mar-2019Jun-2019/Sep-2020

Austin Bridge & Road, LP

$24.4 M 65%

8 0173-02-071 SH 34 FM 1390 to FM 1388Reconstruct existing pavement, add shoulders, and replace bridges and approaches

Apr-2019Jul-2019/Sep-2022

Sterling Delaware Holding Company,

Inc$33.2 M 20%

9 0095-05-059 US 80FM 429 to Van Zandt C/L

Median cable/concrete barrier Jun-2019Oct-2019/Jun-2020

Altus Construction, LLC.

$4.1 M 55%

10 2555-01-012 FM 2578 FM 987 to SH 34Reconstruct Existing Pavement and Add Shoulders

Dec-2019May-2020/May-2021

AK Gillis & Sons, Inc. $7.1 M 0%

ESTIMATED TOTAL $117.1 M

NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of SPRING Q2 2020.

4

3

2

1

9

5

6

7

8

10

20

KAUFMAN CO.

HUNT CO.

ELLIS CO.

KAUFMAN CO.

HENDERSON CO.

KAUFMAN CO.

KAUF

MAN

CO.

KAUF

MAN

CO.

VAN

ZAND

T CO.

DALL

AS CO

.

KAUF

MAN

CO.

ROCKWALL CO.

KAUFMAN CO.

VAN

ZAND

T CO.

N

5 miles

Elmo

KAUFMAN

LakeRayHubbard

Crandall

Malloy Bridge

Rd.

Cedar CreekReservoir

NewTerrell CityLake

Post OakBend City

RosserCottonwood Grays Prairie

Ennis

Oak Grove

Kemp

Talty

Mabank

WillsPoint

Forney

Heath Mclendon-Chisholm

Seagoville

Mesquite

DALLAS CO.

ELLIS CO.

429751

429

429

429

148

148

660

557740

548

740

741

987

90

90

2578

1392

205

243243

90

198

198

274

34

34

34

175

175

175

80

2860

1390

1390

2613

3094

3396

3080

1391

1836

1895

1895

2727

2515

2965

34

34

80

80

2728

20

20

986548

740

1641

2451

148

2728

148

205

1836

1388

148

175

3039

2728

2932

Projects Under Construction

148

To I-635

Combine

Oak Ridge

TERRELL

Scurry

TxDOT graphicNOTE: Highlighted areas are not drawn to scale.