49
CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION STRUCTURAL DRAWINGS

CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

CONSTRUCTION OF SPORTS LABORATORY AT PAROCOLLEGE OF EDUCATION

STRUCTURAL DRAWINGS

Page 2: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GENERAL NOTES FOR STRUCTURAL DRAWINGS.

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/01

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
6. MECHANICALLY VIBRATE CONCRETE IN THE FORM TO GIVE MAXIMUM COMPACTION WITHOUT SEGREGATION OF THE CONCRETE. 7. CURE CONCRETE AS REQUIRED BY THE CLAUSE 13.5 OF IS456:2000 AND WORK SPECIFICATIONS. 8. CONCRETE SIZES AS DRAWN ARE MINIMUM AND DONOT INCLUDE APPLIED FINISHES. 9. DONOT MAKE UNSPECIFIED HOLES OR CHASES WITHOUT ENGINEER'S APPROVAL. 10. DONOT PLACE CONDUITS, PIPES AND THE LIKEWITHIN COVER CONCRETE. 11. AGGREGATES SHALL COMPLY WITH CLAUSE 5.3 OF IS456:2000. NOMINAL SIZE OF COARSE AGGREGATES SHALL BE 20MM. 12. THE CHARACTERISTICS STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 20MPA. NOTE THAT THE MEAN COMPRESSIVE STRENGTH OBTAINED FROM THE LABORATORY HAS TO BE WELL ABOVE THIS VALUE. 13. ALL FORMWORKS FOR BEAMS AND SLABS ARE TO REMOVED BEFORE CONSTRUCTION OF WALLS OR OTHER PERMANENT LOADINGS. ALL FORMWORK AND ITS REMOVAL MUST BE IN ACCORDANCE TO IS 456:2000. E. REINFORCEMENT. 1. GRADE OF STEEL USED FOR RCC WORKS SHALL BE FE500. 2. BAR NOTATION GIVES THE FOLLOWING INFORMATION IN THIS ORDER: NUMBER OF BARS BAR SIZE(MM),SPACING(MM, IF REQUIRED). 3. REINFORCEMENT IS REPRESENTED DIAGRAMATICALLY AND NOT NECESSARILY IN TRUE PROJECTION. 4. LAP REINFORCEMET ONLYAT LOCATIONS SHOWN IN THE DRAWINGS. LAP LENGTH SHALL COMPLY WITH IS456:2000. LAP SPLICES SHALL NOT BE LESS THAN THE DEVELOPMENT LENGTH IN TENSION(GENERALLY 57Ø). 5. REINFORCEMENT SHALL NOT BE CUT, BENT OR HEATED ON SITE WITHOUT ENGINEER'S APPROVAL.
AutoCAD SHX Text
6. THE DEVIATION OF REINFORCEMENT FROM ITS SPECIFIED POSITION SHALL NOT EXCEED THE FOLLOWING(MM) (a). TOLERANCE FOR COVER -0,+10MM. WHERE A NEGATIVE VALUE INDICATE A DECREASE IN SPECIFIED COVER,AND POSITIVE VALUE INDICATES AN INCREASE IN COVER. (b). TOLERANCE ON PLACEMENT OF REINFORCEMENT. FOR SLABS AND STAIRCASE -10,+10MM. FOR BEAMS, COLUMNS AND FOUNDATION -15,+15MM.
AutoCAD SHX Text
A. GENERAL 1. STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS AND OTHER ENGINEERS' DRAWINGS AND SPECIFICATIONS AND SUCH OTHER WRITTEN INSTRUCTIONS THAT ARE ISSUED. 2. ALL DIMENSIONS ARE IN MM UNLESS STATED OTHERWISE. 3. DIMENSIONS SHALL NOT BE SCALED FROM THE DRAWINGS. 4. DESIGN CONFORMS TO: (a). IS 4326:1993 EARTHQUAKE RESISTANT DESIGN AND CONSTRUCTION OF BUILDINGS. (b). IS 456:2000 CODE OF PRACTICE FOR PLAIN & REINFORCED CONCRETE. (c). IS13920:1993 DUCTILE DETAILING OF REINFORCED CONCRETE STRUCTURES SUBJECTED TO SEISMIC FORCES. (d).BUILDING CODE OF BHUTAN 2003 (e). IS1893:2002 SEISMIC RESISTANT DESIGN OF STRUCTURES. 5. VERIFY ALL SETTING OUT DIMENSIONS WITH ENGINEER/ARCHITECT. 6. REFER ANY DISCREPANCY TO ENGINEER/ARCHITECT BEFORE PROCEEDING THE WORK. 7. ALL CONSTRUCTION MATERIALS AND WORKMANSHIP SHALL COMPLY WITH THE SPECIFICATIONS FOR BUILDING AND ROAD WORKS TOGETHER WITH THE REQUIREMENTS OF ALL RELEVANT CODES OF PRACTICE REFERRED TO HEREIN AND THE REQUIREMENTS OF ALL STATUTORY AUTHORITIES. 8. ALWAYS REFER ADDITIONAL NOTES PROVIDED IN THE DRAWINGS. B. FOUNDATIONS AND FOOTINGS. 1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE BEARING CAPACITY OF 150 KN/Sq M. 2. WALLS SHALL BE PROVIDED BELOW THE PLINTH BEAMS. IT IS REQUIRED TO PROVIDE THE SAME BELOW THE INTERNAL PLINTH BEAMS AND UNDER THE PLINTH BANDS.. 3. FOOTINGS ARE DESIGNED CONSIDERING THE MINIMUM DEPTH OF 1600MM BELOW THE ORIGINAL GROUND LEVEL. NOTIFY ENGINEER SHOULD THE DEPTH OF FOOTINGS REQUIRED TO BE PROVIDED IS MORE THAN THE DEPTH SPECIFIED ABOVE. 4. ALL CONCRETE SHALL BE PLACED 'IN THE DRY'FOR FOUNDATIONS. 5. COMPACTION OF FOUNDATION SHALL BE APPROVED BY ENGINEER PRIOR TO PLACEMENT OF CONCRETE.
AutoCAD SHX Text
D. CONCRETE. 1. CONCRETE QUALITY SHALL COMPLY WITH IS 456:2000 2. PROJECT ASSESSMENT OF CONCRETE STRENGTH IS REQUIRED. 3. GRADE OF CONCRETE IS M20(1:1.5:3) FOR ALL RCC WORKS. 4. FOR THE ABOVE GRADE TO BE ACHIEVED, MAXIMUM FREE WATER-CEMENT RATIO SHALL BE 0.55, MINIMUM CEMENT CONTENT SHALL BE 300KG/M3 AND MAXIMUM AMOUNT OF WATER SHALL BE 180L. 5. WATER USED FOR MIXING AND CURING SHALL COMPLY WITH CLAUSE 5.4 OF IS 456:2000.
AutoCAD SHX Text
C. LOADING 1. THIS STRUCTURE HAS BEEN DESIGNED FOR THE FOLLOWING LOADS. (a). DEAD LOADS; UNIT WEIGHT OF WALL 10KN/M3 (AAC BLOCK) UNIT WEIGHT OF RCC 25KN/M3 UNIT WEIGHT OF PCC 24KN/M3 (b). SUPERIMPOSED (LIVELOADS) LIVELOAD FOR FLOORS 2KN/M2 LIVELOAD FOR STAIRCASE AND BALCONY 3KN/M2 LIVE LOAD FOR ROOF 0.75KN/M2 (c). WIND LOAD WIND PRESSURE 44M/S (d). OTHER LOADS: EARTHQUAKE LOAD IN ACCORDANCE WITH IS 1893:2002 ASSUMING ZONE V. 2. MAINTAIN STRUCTURE IN STABLE CONDITION DURING CONSTRUCTION. 3. DONOT PLACE OR STORE BUILDING MATERIALS ON CONCRETE MEMBERS WITHOUT ENGINEER'S APPROVAL.
AutoCAD SHX Text
7. THE COVER TO THE REINFORCEMENT NEAREST THE CONCRETE SURFACE SHALL NOT BE LESS THAN THE FOLLOWING EXCEPT WHERE SPECIFIED OTHERWISE: BEAMS 25MM COLUMNS 40MM FLOOR SLABS AND STAIRCASE 20MM FOUNDATION 50MM FOR SIDES AND 75MM FOR BOTTOM 8. BENDING OF REINFORCEMENT IN BEAMS AND COLUMNS SHALL COMPLY WITH THE REQUIREMENTS OF IS 456:2000 9. FORMWORK SHALL COMPLY WITH CLAUSE 11 OF IS 456:2000 10. STRIPPING OF FORMWORK SHALL COMPLY WITH CLAUSE 11.3 OF IS 456:2000
Page 3: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

F3

F3

F3

F3

F3

F2

F2

F2

F2

F6

F6

F7

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/02

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
3
AutoCAD SHX Text
E'
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F2
AutoCAD SHX Text
F2
AutoCAD SHX Text
F3
AutoCAD SHX Text
F3
AutoCAD SHX Text
F3
AutoCAD SHX Text
F3
AutoCAD SHX Text
F3
AutoCAD SHX Text
F3
AutoCAD SHX Text
F4
AutoCAD SHX Text
F4
AutoCAD SHX Text
F5
AutoCAD SHX Text
F5
AutoCAD SHX Text
F5
AutoCAD SHX Text
F5
AutoCAD SHX Text
BLOCK B
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
FOUNDATION LAYOUT PLAN
AutoCAD SHX Text
BLOCK A
Page 4: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

Lx DLyFOOTINGTYPE

SCHEDULE FOR FOOTING

BOTTOM STEELTOP STEEL

B A BA

DEPTH OFFOUNDATION

( Df )FOOTING

NO.

1900 355

2100400

1900

2100

2000

2400 4602400

2600 5002600

2000

2000

2000

2000

3100 5853100

2000

4400 5002800

2000

4400 5003200

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/03

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
F1
AutoCAD SHX Text
F2
AutoCAD SHX Text
ISOLATED FOOTING
AutoCAD SHX Text
ISOLATED FOOTING
AutoCAD SHX Text
12TMT @ 200 C/C
AutoCAD SHX Text
12TMT @ 200 C/C
AutoCAD SHX Text
12TMT @ 170 C/C
AutoCAD SHX Text
F3
AutoCAD SHX Text
F4
AutoCAD SHX Text
ISOLATED FOOTING
AutoCAD SHX Text
ISOLATED FOOTING
AutoCAD SHX Text
12TMT @ 200 C/C
AutoCAD SHX Text
12TMT @ 200 C/C
AutoCAD SHX Text
12TMT @ 200 C/C
AutoCAD SHX Text
12TMT @ 200 C/C
AutoCAD SHX Text
12TMT @ 200 C/C
AutoCAD SHX Text
12TMT @ 200 C/C
AutoCAD SHX Text
12TMT @ 170 C/C
AutoCAD SHX Text
12TMT @ 160 C/C
AutoCAD SHX Text
12TMT @ 160 C/C
AutoCAD SHX Text
12TMT @ 145 C/C
AutoCAD SHX Text
12TMT @ 145 C/C
AutoCAD SHX Text
12TMT @ 130 C/C
AutoCAD SHX Text
12TMT @ 130 C/C
AutoCAD SHX Text
F5
AutoCAD SHX Text
ISOLATED FOOTING
AutoCAD SHX Text
12TMT @ 200 C/C
AutoCAD SHX Text
12TMT @ 175 C/C
AutoCAD SHX Text
16TMT @ 185 C/C
AutoCAD SHX Text
16TMT @ 185 C/C
AutoCAD SHX Text
F6
AutoCAD SHX Text
COMBINED FOOTING
AutoCAD SHX Text
16TMT @ 150 C/C
AutoCAD SHX Text
16TMT @ 150 C/C
AutoCAD SHX Text
20TMT @ 130 C/C
AutoCAD SHX Text
20TMT @ 180 C/C
AutoCAD SHX Text
F7
AutoCAD SHX Text
16TMT @ 150 C/C
AutoCAD SHX Text
16TMT @ 150 C/C
AutoCAD SHX Text
20TMT @ 150 C/C
AutoCAD SHX Text
20TMT @ 150 C/C
AutoCAD SHX Text
COMBINED FOOTING
Page 5: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

PLAN FOR COMBINED FOOTING

C C

SECTIONAL ELEVATION FOR COMBINED FOOTING

Df

GLGL

TYPICAL COMBINED FOOTING TOP REINFORCEMENT PLAN

TYPICAL COMBINED FOOTING BOTTOM REINFORCEMENT PLAN

¢

¢

¢

¢

A

B

A

B

¢

¢

¢

¢

D

Df

D

150

100

75

50

GL

GL

SECTIONAL ELEVATION FOR ISOLATED FOOTING

ISOLATED FOOTING REINFORCEMENT PLAN

B

A

REFER BEAM DETAIL

250 THK. BRICK MASONRY

RRM IN 1:5 C.M

PCC, 1:4:8, 40 mm AGG.

STONE SOLING

Ground Level

RRM IN 1:5 C.M

PCC, 1:4:8, 40 mm AGG.

STONE SOLING

Ground Level

COLUMN

250 THK. BRICK MASONRY

DPC

¢

¢

¢

REFER BEAM DETAIL

DPC

COLUMN

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/04

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
150mm stone soling
AutoCAD SHX Text
100mm PCC (1:3:6)
AutoCAD SHX Text
Top Reinforcement
AutoCAD SHX Text
Bottom Reinforcement
AutoCAD SHX Text
REFER COLUMN DETAILS
AutoCAD SHX Text
TOP REINFORCEMENT
AutoCAD SHX Text
BOTTOM REINFORCEMENT
AutoCAD SHX Text
100mm PCC (1:3:6)
AutoCAD SHX Text
150mm stone soling
AutoCAD SHX Text
FILLED SOIL
AutoCAD SHX Text
FILLED SOIL
AutoCAD SHX Text
BEAM
AutoCAD SHX Text
1. FOOTINGS SHOULD BE PLACE AS PER THE LAYOUT PLAN. 2. REFER THE TABLE FOR FOOTING REINFORCEMENT FOR ITS DETAILS. 3. GRIDS FOR THE FOOTING LOCATION SHOULD BE READ FOR ITS PLACEMENT. 4. ALL THE SOFT, LOOSE SOIL BELOW THE FOOTING SHALL BE REMOVED COMPLETELY TILL HARD MURRUM IS ENCOUNTERED. THE FOOTING SHALL REST ON HARD FOUNDING STRATA. 5. ALL STRUCTURAL CONCRETE SHALL BE R.C.C. 1:1.5:3 (M20) (1 CEMENT: 1.5 SAND : 3 AGGREGATE), 20mm AGGREGATE FOR ALL STRUCTURAL ELEMENTS. 6. THE NET SAFE BEARING CAPACITY OF SOIL AT 1.6M BELOW FINISHED GROUND LEVEL IS CONSIDERED AS 140 KN/Sq.m. 7. REINFORCEMENT SHALL BE HIGH YIELD STRENGTH DEFORMED BARS (Fe500), CONFORMING TO I.S.432 OR I.S.2062 AND THE R.C.C WORK SHALL CONFIRM TO IS:456 8. UNLESS NOTED OTHERWISE, THE LAP LENGTH AND ANCHORAGE LENGTH SHALL BE 57 AND 67 TIMES DIA OF BAR FOR HYSD BARS RESPECTIVELY. 9. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE AS FOLLOWS: FOOTING = 50 ALL SIDES, 75 BOTTOM; COLUMNS = 40 ALL ROUND 10. UNLESS OTHERWISE NOTED, FOOTINGS & COLUMNS ARE PLACED SYMMETRICALLY ABOUT RESPECTIVE CENTRE LINES. 11. REFER THE BEAM LAYOUT PLAN FOR THE WALL FOOTING PLACEMENTS
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
EXTERNAL WALL FOUNDATION
AutoCAD SHX Text
INTERNAL WALL FOUNDATION
Page 6: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

C 1

C 1

C 2

C 2

C 3

C 3

C 2

C 2

C 2

C 2

C 3

C 3

C 3

C 3

C4

C 3

C 4

C 5

C4

C5

C2

C3

C2

C2

C3

C2

C5

C5

C5

C5

C5

C5

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/05

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
3
AutoCAD SHX Text
E'
AutoCAD SHX Text
BLOCK A
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
BLOCK B
AutoCAD SHX Text
COLUMN LAYOUT PLAN
Page 7: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

TABLE OF COLUMN REINFORCEMENT FOR BLOCK A

1 C 1 500 x 350 8 TMT @ 100 C/C 8 TMT @ 150 C/C

2

C 5 8 TMT @ 100 C/C 8 TMT @ 150 C/C

2 legged Ties8mmTMT @ 100 c/c

4-12TMT

zz

SECTION Z-Z FOR FLOATING COLUMN

DETAIL FOR FLOATING COLUMN IN JAMTHOG

650 x 450

GL

SECTIONAL DETAILS FOR COLUMN (BLOCK A)

b

a

D

50

06

50

65

06

50

65

05

00

50

0

D

D

D

aa

a

bb

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR

ROOF FLOOR

+2m

CEMENT CONCRETE 1:3:6, 75mm THK

STONE SOLING 150mm THK.

450 x 450

450 x 450

8 TMT @ 100 C/C 8 TMT @ 150 C/C

2 legged

Ties, 8TMT

12-16 TMT

8 TMT @ 100 C/C 8 TMT @ 150 C/C2 legged

Ties, 8TMT

8-20 TMT

+

4-16TMT

GL

SECTIONAL DETAILS FOR COLUMN (BLOCK B)

b

a

D

50

07

50

75

06

50

65

06

50

65

0

D

D

D

a

a

a

bb

FIRST FLOOR

SECOND FLOOR

ROOF FLOOR

+2m

STONE SOLING 150mm THK.

GROUND FLOOR

C 2

C 3

450 x 450 8 TMT @ 100 C/C 8 TMT @ 150 C/C2 legged

Ties, 8TMT

12-20 TMT

C 4

2 legged

Ties, 8TMT

12-16 TMT

2 legged

Ties, 8TMT

12-20 TMT

3

4

5

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/06

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
SL#
AutoCAD SHX Text
COLUMN
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
SECTIONS
AutoCAD SHX Text
SHAPE OF STIRRUPS
AutoCAD SHX Text
ALONG 'a'
AutoCAD SHX Text
ALONG 'b'
AutoCAD SHX Text
TIES
AutoCAD SHX Text
REINFORCEMENT
AutoCAD SHX Text
LONGITUDINAL
AutoCAD SHX Text
4. COLUMNS SUPPORTING STAIRCASE SHALL BE PROVIDED WITH STIRRUPS OF 8 @100MMC/C THROUGHOUT. 5. SPLICING AT GROUND FLOOR LEVEL IS PROHIBITED. 6. ONLY 50% OF STEEL ARE SPLICED AT ONE SECTION. 7. EXCEPT IN CONFINING ZONE, REST OF THE LENGTH WILL HAVE STIRRUPS OF 8 @150MM C/C. 8. HOOKS SHALL BEND AT 135° AND SHOULD BE STRICTLY 80 MM AND 100MM LONG FOR 8MM AND 10MM TIES.
AutoCAD SHX Text
1. SPECIAL CONFINING REINFORCEMENT STEEL WITH 8 @ 100MM C/C SHALL CONTINUE UP TO 500MM ON EITHER SIDE FROM THE FACE OF THE SUPPORT 2. THE MAIN REINFORCEMENT OF COLUMNS SHALL BE STRAIGHT WITHOUT KINKS OR CRANK. 3. THE SPLICE IN THE COLUMN SHALL BE AWAY FROM THE SUPPORT BY H/4 & THE SPLICE LENGTH SHALL BE THE DEVELOPMENT LENGTH(LD)OR 57XDIAMETER, STIRRUPS ARE SPACED NOT MORE THAN 150MM C/C.
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
9. IN AN EXTERNAL JOINT, BOTH THE TOP AND THE BOTTOM BARS OF THE BEAM SHALL BE PROVIDED WITH ANCHORAGE LENGTH, BEYOND INNER FACE OF THE COLUMN, EQUAL TO THE DEVELOPMENT LENGTH IN TENSION PLUS 10 TIMES THE BAR DIAMETER I.E ( LD + 10Φ ). 10. IN AN INTERNAL JOINT, BOTH FACE BARS OF THE BEAMS SHALL BE TAKEN CONTINUOUSLY THROUGH THE COLUMN. 11. COLUMN STIRRUPS MUST BE CONTINUOUS THROUGH BEAM COLUMN JOINT. 12. COLUMN BARS GOING TO THE FOOTING SHALL HAVE A BEND OF 57 TIMES THE DIAMETER OF BAR.
AutoCAD SHX Text
16 TMT, 12 NOS
AutoCAD SHX Text
16 TMT, 12 NOS
AutoCAD SHX Text
20 TMT, 8 NOS + 16TMT, 4 NOS
AutoCAD SHX Text
+
AutoCAD SHX Text
20TMT, 12 NOS
AutoCAD SHX Text
20 TMT, 12 NOS
AutoCAD SHX Text
+
AutoCAD SHX Text
+
AutoCAD SHX Text
+
AutoCAD SHX Text
+
Page 8: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

TYPICAL COLUMN SECTION AND SPLICING DETAIL

Ld

NOTE: Only 50% of the bars

are spliced at one section

Ld or 30Ø

TYPICAL COLUMN SECTION AND SPLICING DETAIL

Ld Ld

ANCHORAGEMENT

LENGTH (La):

25Ø 1675MM

20Ø 1340MM

16Ø 1075MM

12Ø 805MM

Material specification:

1.Grade of rebars.........Fy 500 (TMT) for structural steel

Fy 500( TMT) for stirrups

2. Grade of concrete...M20

3. Cover......................40mm minimum

DEVELOPMENT

LENGTH(Ld):

25Ø 1425MM

20Ø 1140MM

16Ø 915MM

12Ø 685MM

BEAM COLUMN CONNECTION DETAILS

S1

Beam

Column

10Ø @ 100mm c/c

8mm Ø @ 150mm c/c

10Ø @ 100mm c/c

8mm Ø @ 150mm c/c

TYPICAL INTERIOR BEAM - COLUMNCONNECTION DETAILS ( SIDE VIEW)

S1

Beam

L

La

La

D

10Ø @ 100mm c/c

10Ø @ 100mm c/c

D

TYPICAL EXTERIOR BEAM - COLUMNCONNECTION DETAILS ( SIDE VIEW)

50 (max)

Beam

Beam

Beam reinforcement

Column reinforcementBeam bar bent for anchorage

Beam reinforcement

Column

TYPICAL EXTERIOR BEAM - COLUMNCONNECTION DETAILS ( PLAN VIEW)(SQUARE COLUMN)

TYPICAL EXTERIOR BEAM - COLUMNCONNECTION DETAILS ( PLAN VIEW)(SQUARE COLUMN)

50(max)

Beam

Beam stirrup

Column

Beam

Column reinforcementBeam bar bent for anchorage

Beam

Beam stirrupsBeam reinforcement

Column reinforcement

Beam

ColumnBeam stirrups

Column ties

50(max)

TYPICAL INTERIOR BEAM - COLUMNCONNECTION DETAILS ( PLAN VIEW)(COLUMN)

S1

O

LO

LO

LO

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/07

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
No splice in ground to first floor
AutoCAD SHX Text
Confining Steel 8 @100mm c/c
AutoCAD SHX Text
8 @150mm c/c
AutoCAD SHX Text
(No Splicing in this region)
AutoCAD SHX Text
Confining Steel 8 @100mm c/c
AutoCAD SHX Text
8 @150mm c/c
AutoCAD SHX Text
(No Splicing in this region)
AutoCAD SHX Text
Confining Steel 8 @100mm c/c
AutoCAD SHX Text
4. COLUMNS SUPPORTING STAIRCASE SHALL BE PROVIDED WITH STIRRUPS OF 10 @100MMC/C THROUGHOUT. 5. SPLICING AT GROUND FLOOR LEVEL IS PROHIBITED. 6. ONLY 50% OF STEEL ARE SPLICED AT ONE SECTION. 7. EXCEPT IN CONFINING ZONE, REST OF THE LENGTH WILL HAVE STIRRUPS OF 8 @150MM C/C. 8. S1= 2D, WHERE D IS THE DEPTH OF THE BEAM 9. COVER OF 50MM SHOULD BE MAINTAINED FROM THE COLUMN FACE FOR THE PLACEMENT OF BEAM STIRRUPS.
AutoCAD SHX Text
1. SPECIAL CONFINING REINFORCEMENT STEEL WITH 10 @ 100MM C/C SHALL CONTINUE UP TO 600MM ON EITHER SIDE FROM THE FACE OF THE SUPPORT 2. THE MAIN REINFORCEMENT OF COLUMNS SHALL BE STRAIGHT WITHOUT KINKS OR CRANK. 3. THE SPLICE IN THE COLUMN SHALL BE AWAY FROM THE SUPPORT BY H/4 & THE SPLICE LENGTH SHALL BE THE DEVELOPMENT LENGTH(LD)OR 57XDIAMETER, STIRRUPS ARE SPACED NOT MORE THAN 150MM C/C.
AutoCAD SHX Text
NOTES:
Page 9: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

BEAM NOTES:

BEAM LAYOUT PLAN @ FOUNDATION LEVEL FOR BLOCK B

300x400 300x400

300x400 300x400

300x350

300x350

300x350

300x350

300x350

300x350

300x350

300x350

300x775

300x775

300x775

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/08

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1. Grade of concrete mix shall be M20 confirming to IS: 456-2000. 2. Reinforcement shall be high strength deformed bars of grade Fe 500. 3. Cover for the longitudinal bars in the beam shall be 25mm. 4. The hooks shall engage peripheral longitudinal bars. 5. Lap splices shall be provided only in the central half of the member length. 6. Not more than 50% of the bars shall be spliced at one section. 7. Stirrups & tie spacing for full length of splices shall not be greater than 8 @130 c/c8. The bars in the beam shall not be spliced at: a) within a joint. b) within a distance 2D from the joint face. c) within a quarter length of the member 9. Splice length should be 57 times the diameter of the bar. 10. Anchorage lengths for: 12 =805, 16 = 1075mm, 20 = 1345mm, 25 =1675mm
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
Page 10: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

30

0x3

50

30

0x4

25

30

0x4

25

30

0x6

50

30

0x6

50

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

00

30

0x4

00

BLOCK A

GROUND AND ROOF FLOOR BEAM LAYOUT PLAN

BEAM NOTES:

30

0x4

00

30

0x4

00

30

0x4

00

30

0x4

00

BLOCK B

300x350

300x350 300x350300x350

300x350

300x350 300x350300x350

300x350

300x575 300x575

300x575

300x575 300x575

300x575 300x575

300x575 300x575

300x575

300x575

300x575 300x575

300x575 300x575

300x575

300x575

300x575

300x575

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/09

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
3
AutoCAD SHX Text
E'
AutoCAD SHX Text
1. Grade of concrete mix shall be M20 confirming to IS: 456-2000. 2. Reinforcement shall be high strength deformed bars of grade Fe 500. 3. Cover for the longitudinal bars in the beam shall be 25mm. 4. The hooks shall engage peripheral longitudinal bars. 5. Lap splices shall be provided only in the central half of the member length. 6. Not more than 50% of the bars shall be spliced at one section. 7. Stirrups & tie spacing for full length of splices shall not be greater than 8 @130 c/c8. The bars in the beam shall not be spliced at: a) within a joint. b) within a distance 2D from the joint face. c) within a quarter length of the member 9. Splice length should be 57 times the diameter of the bar. 10. Anchorage lengths for: 12 =805, 16 = 1075mm, 20 = 1345mm, 25 =1675mm
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
Page 11: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

30

0x3

50

30

0x4

25

30

0x4

25

30

0x6

50

30

0x6

50

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x3

50

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

25

30

0x4

00

30

0x4

00

BLOCK A

FIRST AND SECOND FLOOR BEAM LAYOUT PLAN

BEAM NOTES:

30

0x4

00

30

0x4

00

30

0x7

75

30

0x7

75

30

0x4

00

30

0x4

00

30

0x7

75

30

0x7

75

30

0x7

75

30

0x7

75

BLOCK B

30

0x4

00

300x350 300x350300x350

300x350

300x350 300x350300x350

300x350

300x575 300x575300x575

300x575 300x575

300x575 300x575300x575 300x575

300x575

300x575

300x575 300x575

300x575 300x575300x575

300x575

300x575

300x575300x350 300x350

300x350

300x350

300x575

300x575

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/10

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
3
AutoCAD SHX Text
E'
AutoCAD SHX Text
1. Grade of concrete mix shall be M20 confirming to IS: 456-2000. 2. Reinforcement shall be high strength deformed bars of grade Fe 500. 3. Cover for the longitudinal bars in the beam shall be 25mm. 4. The hooks shall engage peripheral longitudinal bars. 5. Lap splices shall be provided only in the central half of the member length. 6. Not more than 50% of the bars shall be spliced at one section. 7. Stirrups & tie spacing for full length of splices shall not be greater than 8 @130 c/c8. The bars in the beam shall not be spliced at: a) within a joint. b) within a distance 2D from the joint face. c) within a quarter length of the member 9. Splice length should be 57 times the diameter of the bar. 10. Anchorage lengths for: 12 =805, 16 = 1075mm, 20 = 1345mm, 25 =1675mm
AutoCAD SHX Text
E''
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
Page 12: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

SECONDARY TO PRIMARY BEAM CONNECTION PLAN

PRIMARY BEAM

SECONDARY BEAM

67Db

67Db, WHERE Db IS THE DIA. OF BAR

SECONDARY TO PRIMARY BEAM CONNECTION ELEVATION

SECONDARY BEAM

PRIMARY BEAM

SLAB

HANGER BARS

10TMT, 3 NOS

SECONDARY TO PRIMARY BEAM CONNECTION SECTION Z-Z

ZZ

REINFORCEMENT ARRANGEMENT DETAIL

(ENLARGED VIEW OF SECTION Z-Z)

TOP REINFORCEMENT BAR OF SECONDARY BEAM

BOTTOM REINFORCEMENT BAR OF SECONDARY BEAM

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/11

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
STIRRUPS, 8TMT@ 75mm c/c FOR A LENGTH OF Ld
AutoCAD SHX Text
STIRRUPS, 8TMT@ 100mm c/c
AutoCAD SHX Text
BOTTOM REINFORCEMENT BAR OF PRIMARY BEAM
AutoCAD SHX Text
TOP REINFORCEMENT BAR OF PRIMARY BEAM
AutoCAD SHX Text
TYPICAL PRIMARY & SECONDARY BEAM CONNECTION DETAILS
Page 13: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

a=2d, specialconfining zone b=rest of span a=2d, special

confining zone

l1/3, extra top bar l2/3, extra top bar

a=2d, specialconfining zone b=rest of span

bottom rebarlap zone

l2

La

L/S, BEAM REBAR & SPLCING/LAPPING DETAILS

WC/S, at mid

PLINTH/TIE BEAM

D

top rebar

bottom rebar

C/S, at endW

C/S, at mid

D

top rebar

bottom rebar

FLOOR PERIPHERAL BEAMC/S, at end

FLOOR INTERNAL BEAMC/S, at mid

top rebar

D

50, max50, max

Note:1. a=2d, 8Ø@100 c/c (d=efft. depth of beam), b=rest of

span, 8Ø@130 c/c2. L/S -> length section, C/S -> cross section3. La -> Anchorage length, Ld-> Development length,4. D -> beam depth, W -> beam width

Beam notes:1. The main rebars of beam shall be anchored in to the column by length La(anchorage length) of the rebar as specified in the table2. Srirrups/hoops of 8Ø rebars-135 degrees, with an extension of 10xØ, and it is embeded in the confined core of the section3. Lap splice for tension reinforcement or bottom steel shall not be provided at (a) within a joint, (b) within a distance of 2d from the joint face or

(c) within a quarter length of the member4. The splicing of the compression or top reinforcement shall be provided near or at mid-span of the memebr5. Not more than 50% of the bars shall be spliced at one section6. The lap/splice length shall not be less than development length in tension i.e. Ld, as specified in the table7. The first stirrup should be provided at the distance of 40mm from the face of the column8. Stirrups of 8Ø@100mm c/c up to the distance of 2d from the column face9. Stirrups of 8Ø@100mm c/c shall be provided throughout the splicing length of reinforcement bar in a member (beam/column etc.)10. Minimum clear cover to the beam reinforcement shall be 25mm11. The beam formworks shall not be removed till the required strength of concrete is achieved.

Slab notes:1. The main reinforcement shall be place at bottom in the shorter direction2. The starting distribution bar shall be place within the depth of slab or 1/2 the spacing of bars3. L1, L2, L3 etc. are the span of slab in the considered direction4. The slab reinforcement shall extend wherever necessary for the cornice & slab project (refer cornice details)5. Slab reinforcment curtailment shall be as shown above (refer slab reinforcement detail)6. Minimum of 10Ø bar chairs shall be provided at appropriate locations to maintain the effective depth of slab uniform7. Minimum clear cover to slab & staircase reinforcement shall be 20mm

top rebar lap zone,(mid/near mid span)

l1

300 min.

1:6 (max.)

1:6 (max.)

10xØ

Hoops with135° bend

Where,Ø=stirrupdiameter

135°

BEAM STIRRUP DETAILS

Beam

EXTERIOR, COLUMN-BEAM JOINT(L/S) INTERI0R, COLUMN-BEAM JOINT(L/S)

Column

Column

Beam

Column

Column

Beam

Column

CORNER, COLUMN-BEAM JOINT(C/S)

Column

EXTERI0R, COLUMN-BEAM JOINT(C/S)

Beam

Column

INTERIOR, COLUMN-BEAM JOINT(PLAN)

Beam

Column

Splic

ing,Ld

3001:6

1:6

COLUMN LAP SPLICING DETAIL(L/S)

CORNER COLUMN-WALL BAND CONNECTION (C/S)

4-10Ø TMT bars

4-12Ø

RC band

Column

12Ø,vertical rebar

12Ø,vertical rebar

4-10Ø

RC band

12Ø,vertical rebar

12Ø,vertical rebar

INTERMEDIATE COLUMN-WALLBAND CONNECTION(C/S)

Column

200

COLUMN-WALL BAND CONNECTION(L/S)

8Ø@200c/c

Wall

RC Band

La 4-12Ø

Column

TYPICAL DETAIL FOR OPENING INTHE MIDDLE OF SLAB/RC WALL

2-10Ø@100 C/C,(both top &bottom, on all sides & corners)

Open

TYPICAL DETAIL FOR OPENINGNEAR BEAM/COLUMN

Beam

Open

2-10Ø@100 C/C,(both top & bottom, onsides & corners where is no beam)

Note:Opening strenthenings shall beprovided in the openings of slabwhere there is not structuralmembers running parallel on itsedges.

W

D

top rebar

bottom rebar

W

D

top rebar

bottom rebar

W

D bottom rebar

top rebar

C/S, at endW

D bottom rebar

top rebar

Note:1. Sharp bent in main reinforcment bars shall be avoided at lapping & beam-column joints. Maximum slope of 1:6 shall be maintained in the

bends.2. Lintel/band connection provision shall be kept while casting the beam, column, slab3. Vertical wall reinforcement bars shall be placed while casting the slab4. Refer table give for development length, Ld and anchorage length, La5. Special confining ties shall be provided in the columns of external beam-column joints & normal spacing ties in the interior beam-column joints6. Full lap length of rebars shall be provided confining ties & stirrups in column & beam respectively

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/12

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
TYPICAL REINFORCEMENT DETAILS IN RC MEMBERS/ELEMENTS/JOINTS/CUTS ETC.
Page 14: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

DETAILS FOR ROOF BAND

A

A

2-12Ø

3-12Ø

TYPICAL LONGITUDINAL SECTION OF FOOR BAND

2 legged 8TMT150mmc/c

2 legged 8TMT

@ 150mmc/cADDITIONAL BARS TO FILL THE GAP CREATED

WHILE CHANGING THE POSITION OF BARS

ADDITIONAL BARS TO FILL THE GAP CREATED

WHILE CHANGING THE POSITION OF BARS

YY

Y1Y1

SECTION: Y-Y

ADDITIONAL BARS TO FILL THE GAP CREATED

WHILE CHANGING THE POSITION OF BARS

XX

X1

X1

PLAN OF FLOOR BANDS AT CORNERS

X

X1

X1

X 1

X 1

X

250

15

0

SECTION: X-X

PLAN OF FLOOR BANDS AT T-JUNCTIONS

ADDITIONAL BARS TO FILL THE GAP CREATED WHILE

CHANGING THE POSITION AND DIRECTION OF BARS

SECTION: Y1-Y1

3-12Ø

2-12Ø

250

15

0

SECTION: X1-X1

3-12Ø

2-12Ø

250

15

0

SECTION: A-A

3-12Ø

2-12Ø

2 legged 8TMT

@ 150mmc/c

2 legged 8TMT

@ 150mmc/c

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/13

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
NOTE RCC BAND SIZE = 250x150 mm STIRRUPS = 8TMT @ 150 mm c/c BAND COVER = 25mm CONCRETE GRADE= M20 STEEL GRADE = 500 MPa * TO BE USED INSTEAD OF ROOF PORPS
Page 15: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

S1

A

A A

A

S1

S2

B

B

S1

S1

A

A

A

A A

A

S1

S2

B

B

S1

S1

A

A

A

A A

A

S1

S2

B

B

S1

A

A A

A

S1

S2

B

B

GRID A

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/14

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
2-20TMT+1-16TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
2-20TMT+1-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
2-20TMT+1-16TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
2-20TMT+1-16TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
4-16TMT
Page 16: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GRID B

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

S1

A

A

S1

A

A

S2

B

B

S2

B

B

S2

B

B

S2

B

B

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/15

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
2-20TMT+1-16TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT+1-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
2-20TMT+1-16TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT+1-16TMT
Page 17: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GRID C

A

A

S1

A

A

S1

S1

A

A

S1

B

B

S1

A

A

A

A

S1

A

A

S1

S1

A

A

S1

B

B

S1

A

A

A

A

S1

A

A

S1

S1

A

A

S1

B

B

S1

A

A

A

A

S1

A

A

S1

S1

A

A

S1

B

B

S1

A

A

S1

B

B

S1

B

B

S1

B

B

S1

B

B

S1

A

A

S1

A

A

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/16

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
650
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
650
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
650
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
650
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
650
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
650
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
650
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
650
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
Page 18: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GRID D

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

S2

B

B

S2

B

B

B

S2

B

BS2

B

S1

A

A

S1

A

A

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/17

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
3-20TMT
Page 19: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GRID E

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

S1S1

A

A

A

A

B

B

S2

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

S1S1

A

A

A

A

B

B

S2

A

A

S1

A

A

S1S1S1

A

A A

AS2

B

B

S1S1

A

A

A

A

B

B

S2

A

A

S1

A

A

S1S1S1

A

A

A

A

S2

B

B

S1S1

A

A

A

A

B

B

S2

BS2

B

S2

B

B

S2

B

B

S2

B

B

S1

A

A

S1

A

A

C

S1

C

C

S1

CD

DS2

C

S1

C

C

S1

CD

DS2

C

S1

C

C

S1

CD

DS2

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/18

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
SECTION C-C
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION D-D
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
6-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
STAIRCASE LANDING BEAM
Page 20: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GRID E'

AS1

A

AS1

A

S1

B

B

S1

B

B

AS1

A

AS1

A

AS1

A

AS1

A

S1

B

B

S1

B

B

AS1

A

AS1

A

AS1

A

AS1

A

S1

B

B

S1

B

B

AS1

A

AS1

A

BLOCK A

GRID E''

AS1

A

AS1

A

S1

B

B

AS1

A

AS1

A

S1

B

B

AS1

A

AS1

A

S1

B

B

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/19

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
2-16TMT
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
4-20TMT + 1-1TMT
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-20TMT + 1-1TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
4-20TMT + 1-1TMT
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-20TMT + 1-1TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
SECTION C-C
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION D-D
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
STAIRCASE LANDING BEAM
Page 21: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GRID F

A

A

S1

A

AS1

S1S1

A

A

A

A

S2

B

B

S1

S1

A

A

A

A

C

C

S1

A

A

S1

A

AS1

S1S1

A

A

A

A

S1

A

A

A

A

C

C

S1

A

A

S1

A

A

S1S1S1

A

A

A

A

S1S1

A

A

A

A

B

B

S2

S2

B

B

S2

B

B

S2

B

B

S1

A

A

S2

BS1

A

A

S1

A

AS1

S1S1

A

A

A

A

S1

A

A

A

A

C

C

S1

S2

B

B

S1

A

A

S2

BS1

S2

B

B

B

B

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/20

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
NOTE: CURTAILMENT SECTION C-C IS AT SPACING S1
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT + 1-16TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-20TMT + 1-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT + 1-16TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-20TMT + 1-16TMT
Page 22: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

A

A

S1

A

A

S1

S1

B

B

S1

B

B

A

A

S1

A

A

S1

S1

B

B

S1

B

B

S1

A

A

A

A

S1

A

A

S1

S1

B

B

S1

B

B

S1

A

A

A

A

S1

A

A

S1

S1

B

B

S1

B

B

GRID G

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/21

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
425
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
Page 23: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

A

A

S1

A

A

S1S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

C

C

S1

B

B

S2

B

B

S2

B

B

S2

B

B

S2

B

B

S2

A

A

S1

A

A

S1S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

C

C

S1

B

B

S2

B

B

S2

B

B

S2

B

B

S2

B

B

S2

A

A

S1

A

A

S1S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

C

C

S1

B

B

S2

B

B

S2

B

B

S2

B

B

S2

B

B

S2

A

A

S1

A

A

S1S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

B

B

S2

B

B

S2

B

B

S2

B

B

S2

B

B

S2

B

B

S2

GRID 1

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/22

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
E''
AutoCAD SHX Text
NOTE: CURTAILMENT SECTION C-C IS AT SPACING S1
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-20TMT
Page 24: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

A

A

S1

A

A

S1S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

B

B

S2

B

B

S2

B'

B'

S1

B

B

S2

GRID 2

A

A

S1S1

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

B

B

S2

B

B

S2

A

A

S1S1

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

B

B

S2

B

B

S2

A

A

S1

A

A

S1S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

B

B

S2

B

B

S2

B

B

S2

C

S1

C

C

S1

CD

DS2

C

S1

C

C

S1

CD

DS2

C

S1

C

C

S1

CD

DS2

B'

B'

S1

B'

B'

S1

B'

B'

S1

B'

B'

S1

B'

B'

S1

B'

B'

S1

BLOCK A

B

B

S2

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/23

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
E'
AutoCAD SHX Text
E''
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
SECTION C-C
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION D-D
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
6-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
NOTE: CURTAILMENT SECTION B'-B' S AT SPACING S1
AutoCAD SHX Text
STAIRCASE LANDING BEAM
Page 25: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GRID 3

A

A

S1

A

A

S1

B

B

S2

A

A

S1

A

A

S1

B

B

S2

A

A

S1

A

A

S1

B

B

S2

A

A

S1

A

A

S1

B

B

S2

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/24

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
2-20TMT + 1-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT + 1-16TMT
AutoCAD SHX Text
2-20TMT + 1-16TMT
AutoCAD SHX Text
2-20TMT + 1-16TMT
Page 26: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GRID 4

A

A

S1 S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

B'

B'

S1

S1

A

A

B

B

S2

BS2

B

B

B

S2

A

A

S1 S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

B'

B'

S1

S1

A

A

B

B

S2

BS2

B

B

B

S2

A

A

S1 S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

B'

B'

S1

S1

A

A

B

B

S2

BS2

B

B

B

S2

A

A

S1 S1S1

A

A

A

A

S1S1

A

A

A

A

S1S1

A

A

A

A

B

B

S2

S1

A

A

B

B

S2

BS2

B

B

B

S2

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/25

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
E'
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
NOTE: CURTAILMENT SECTION B'-B' S AT SPACING S1
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
3-20TMT
Page 27: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

GRID 5

A

A

S1

A

A

S1

B

B

S1

A

A

S1

A

A

S1

B

B

S1

A

A

S1

A

A

S1

B

B

S1

A

A

S1

A

A

S1

B

B

S2

BLOCK A

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/26

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
E'
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
ROOF BEAM
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
GROUND FLOOR BEAM
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
S1
AutoCAD SHX Text
575
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
3-20TMT
Page 28: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

A

A

S1

A

A

S1S1

A

A

S1S1

A

A

A

A

S1

A

A

S1S1

A

A

S1S1

A

A

B

BS2

B

BS2

B

BS2

B

BS2

A

A

S1

A

A

S1S1

A

A

S1S1

A

AB

BS2

B

BS2

A

A

S1

A

A

S1S1

A

A

S1S1

A

AB

BS2

B

BS2

A

A

S1

A

A

S1S1

A

A

S1S1

A

AB

BS2

B

BS2

NOTES:

GRID H & L

BLOCK B

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/27

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
Roof floor level
AutoCAD SHX Text
Second floor level
AutoCAD SHX Text
First floor level
AutoCAD SHX Text
Ground floor level
AutoCAD SHX Text
Foundation Tie beam level
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
ROOF FLOOR
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
GROUND FLOOR LVL
AutoCAD SHX Text
FOUNDATION TIE BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
2-16TMT
Page 29: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

A

A

S1

A

A

S1

A

A

S1

A

A

S1

A

A

S1

A

A

S1

B

BS2

NOTES:

GRID I & K

A

A

S1

A

A

S1

A

A

S1

A

A

S1

A

A

S1

BLOCK B

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/28

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
2
AutoCAD SHX Text
Roof floor level
AutoCAD SHX Text
Second floor level
AutoCAD SHX Text
First floor level
AutoCAD SHX Text
Ground floor level
AutoCAD SHX Text
Foundation Tie beam level
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
4-25+2-16TMT
AutoCAD SHX Text
ROOF FLOOR
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
FOUNDATION TIE BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-25+2-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
4-25+2-16TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-25+2-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
2-16TMT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
Page 30: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

NOTES:

GRID J

A

A

S1

A

A

S1

A

A

S1

A

A

S1

A

A

S1

A

A

S1

B

BS2

A

A

S1

A

A

S1

A

A

S1

A

A

S1

A

A

S1

NOTES:

BLOCK B

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/29

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
Roof floor level
AutoCAD SHX Text
Second floor level
AutoCAD SHX Text
First floor level
AutoCAD SHX Text
Ground floor level
AutoCAD SHX Text
Foundation Tie beam level
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
4-25+2-16TMT
AutoCAD SHX Text
ROOF FLOOR
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
FOUNDATION TIE BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
4-20+1-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-25+2-16TMT
AutoCAD SHX Text
4-20+1-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
4-20+1-16TMT
AutoCAD SHX Text
2-25+2-16TMT
AutoCAD SHX Text
4-20+1-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
775
AutoCAD SHX Text
300
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
2-16TMT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
2-16TMT SIDE FACE REINFORCEMENT
AutoCAD SHX Text
4-25+2-16TMT
Page 31: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

A

A

S1 S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A A

A

S1

B

BS2

B

BS2

B

BS2

B

BS2

A

A

S1 S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A A

A

S1

B

BS2

B

BS2

B

BS2

B

BS2

A

A

S1 S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A A

A

S1

B

BS2

B

BS2

B

BS2

B

BS2

A

A

S1 S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A A

A

S1

B

BS2

B

BS2

B

BS2

B

BS2

A

A

S1 S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A

S1

A

A

S1S1

A

A A

A

S1

B

BS2

B

BS2

B

BS2

B

BS2

NOTES:

GRID 6 & 8

BLOCK B

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/30

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
Roof floor level
AutoCAD SHX Text
Second floor level
AutoCAD SHX Text
First floor level
AutoCAD SHX Text
Ground floor level
AutoCAD SHX Text
Foundation Tie beam level
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
5-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
ROOF FLOOR
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
GROUND FLOOR LVL
AutoCAD SHX Text
FOUNDATION TIE BEAM
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
2-20+1-16TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
2-20+1-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
300
AutoCAD SHX Text
2-20+1-16TMT
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
2-20+1-16TMT
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
S2
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
400
AutoCAD SHX Text
300
AutoCAD SHX Text
3-16TMT
AutoCAD SHX Text
4-16TMT
AutoCAD SHX Text
2-16TMT
Page 32: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

A

AS1

A

AS1

A

AS1

A

AS1

A

AS1

A

AS1

NOTES:

GRID 7

BLOCK B

A

AS1

A

AS1

A

AS1

A

AS1

A

AS1

A

AS1

A

AS1

A

AS1

A

AS1

B

BS1

B

BS1

B

BS1

B

BS1

B

BS1

B

BS1

B

BS1

B

BS1

B

BS1

B

BS1

B

BS1

B

BS1

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/31

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
S1= 8mm @ 100mm c/c for 2D (Unless stated in the beam section)S2= 8mm @ 130mm c/c between two S1 (Unless stated in the beam section)Curtailment distances are given above the roof beam level Development length(Ld)=57*diameter of the bar & Anchorage length (La) = 67*diameter of the bar S1=2D Plinth beams should be supported on RRM foundation walls
AutoCAD SHX Text
Roof floor level
AutoCAD SHX Text
Second floor level
AutoCAD SHX Text
First floor level
AutoCAD SHX Text
Ground floor level
AutoCAD SHX Text
Foundation Tie beam level
AutoCAD SHX Text
ROOF FLOOR
AutoCAD SHX Text
FIRST FLOOR LVL
AutoCAD SHX Text
SECOND FLOOR LVL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
S1
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
4-20TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
S1
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
S1
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
350
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
S1
AutoCAD SHX Text
300
AutoCAD SHX Text
3-20TMT
AutoCAD SHX Text
2-20TMT
AutoCAD SHX Text
350
Page 33: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

FIRST AND SECOND FLOOR SLAB TOP REINFORCEMENT LAYOUT PLAN

BLOCK A

X

X

Y

Y

XX

Y

Y

BLOCK B

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/32

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1. GRADE OF CONCRETE MIX SHALL BE M20 CONFIRMING TO IS: 456-2000. 2. REINFORCEMENT SHALL BE HIGH STRENGTH DEFORMED BARS OF GRADE Fe500. 3. THE BARS ARE OF 10MM DIAMETER. 3. COVER FOR THE BARS SHALL BE 20mm. 4. SLAB THICKNESS = 150mm. 5. TOP REINFORCEMENT= 10TMT @ 135mm c/c 6. BOTTOM REINFORCEMENT= 10TMT @ 165mm c/c
AutoCAD SHX Text
DIRECTION OF REINFORCEMENT
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
3
AutoCAD SHX Text
E'
AutoCAD SHX Text
E''
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
150 C/C
AutoCAD SHX Text
150 C/C
Page 34: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

BLOCK A

FIRST AND SECOND FLOOR SLAB BOTTOM REINFORCEMENT LAYOUT PLAN

X

X

Y

Y

XX

Y

Y

BLOCK B

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/33

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
3
AutoCAD SHX Text
E'
AutoCAD SHX Text
1. GRADE OF CONCRETE MIX SHALL BE M20 CONFIRMING TO IS: 456-2000. 2. REINFORCEMENT SHALL BE HIGH STRENGTH DEFORMED BARS OF GRADE Fe500. 3. THE BARS ARE OF 10MM DIAMETER. 3. COVER FOR THE BARS SHALL BE 20mm. 4. SLAB THICKNESS = 150mm. 5. TOP REINFORCEMENT= 10TMT @ 135mm c/c 6. BOTTOM REINFORCEMENT= 10TMT @ 165mm c/c
AutoCAD SHX Text
DIRECTION OF REINFORCEMENT
AutoCAD SHX Text
E''
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
Page 35: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

BLOCK A

ROOF FLOOR SLAB BOTTOM REINFORCEMENT LAYOUT PLAN

X

X

Y

Y

XX

Y

Y

BLOCK B

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/34

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
3
AutoCAD SHX Text
E'
AutoCAD SHX Text
1. GRADE OF CONCRETE MIX SHALL BE M20 CONFIRMING TO IS: 456-2000. 2. REINFORCEMENT SHALL BE HIGH STRENGTH DEFORMED BARS OF GRADE Fe500. 3. THE BARS ARE OF 10MM DIAMETER. 3. COVER FOR THE BARS SHALL BE 20mm. 4. SLAB THICKNESS = 150mm. 5. TOP REINFORCEMENT= 10TMT @ 135mm c/c 6. BOTTOM REINFORCEMENT= 10TMT @ 165mm c/c
AutoCAD SHX Text
DIRECTION OF REINFORCEMENT
AutoCAD SHX Text
E''
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
Page 36: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

BLOCK A

X

X

Y

Y

XX

Y

Y

BLOCK B

ROOF FLOOR SLAB TOP REINFORCEMENT LAYOUT PLAN

NOTE: NO ROOF SLAB FOR BLOCK B

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/35

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
3
AutoCAD SHX Text
E'
AutoCAD SHX Text
1. GRADE OF CONCRETE MIX SHALL BE M20 CONFIRMING TO IS: 456-2000. 2. REINFORCEMENT SHALL BE HIGH STRENGTH DEFORMED BARS OF GRADE Fe500. 3. THE BARS ARE OF 10MM DIAMETER. 3. COVER FOR THE BARS SHALL BE 20mm. 4. SLAB THICKNESS = 150mm. 5. TOP REINFORCEMENT= 10TMT @ 135mm c/c 6. BOTTOM REINFORCEMENT= 10TMT @ 165mm c/c
AutoCAD SHX Text
DIRECTION OF REINFORCEMENT
AutoCAD SHX Text
E''
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
Page 37: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

CAB

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/36

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
SLAB SECTION THROUGH Y-Y (BLOCK A)
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. GRADE OF CONCRETE MIX SHALL BE M20 CONFIRMING TO IS: 456-2000. 2. REINFORCEMENT SHALL BE HIGH STRENGTH DEFORMED BARS OF GRADE Fe500. 3. THE BARS ARE OF 10MM DIAMETER. 3. COVER FOR THE BARS SHALL BE 20mm. 4. SLAB THICKNESS = 150mm. 5. TOP REINFORCEMENT= 10TMT @ 135mm c/c 6. BOTTOM REINFORCEMENT= 10TMT @ 165mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
B
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
TYPICAL SLAB SECTION
AutoCAD SHX Text
C
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
G
AutoCAD SHX Text
SLAB SECTION THROUGH X-X (BLOCK A)
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
3
AutoCAD SHX Text
D
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
E
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
E'
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
F
AutoCAD SHX Text
TYPICAL FLOOR SLAB SECTION THROUGH X-X (BLOCK B)
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
TYPICAL FLOOR SLAB SECTION THROUGH Y-Y (BLOCK B)
AutoCAD SHX Text
1
AutoCAD SHX Text
8
AutoCAD SHX Text
6
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
7
AutoCAD SHX Text
10 @ 165mm c/c
AutoCAD SHX Text
10 @ 135mm c/c
AutoCAD SHX Text
2
Page 38: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

1

5

0

WAIST SLAB

THICKNESS

21

DEVELOPMENT LENGTH FOR REINFORCEMENT

KEY PLAN FOR STAIRCASE

1

2

3

4

5

6

10 mm@200 c/c

floor level

12mmΦ@120c/c

12mmΦ@120c/c

7

8

700

10mm Φ @ 200 c/c

Extended portion for flight's top

reinforcement.

Shall be casted monolithically

7

0

0

9

10

15

0

10mmΦ@ 150c/c

10mmΦ@ 150c/c

1

2

3

4

5

6

10 mm@200 c/c

floor level

12mmΦ@120c/c

12mmΦ@120c/c

7

8

700

10mm Φ @ 200 c/c

Extended portion for flight's top

reinforcement.

Shall be casted monolithically

7

0

0

9

10

15

0

10mmΦ@ 150c/c

10mmΦ@ 150c/c

1 2

STAIRCASE SECTIONAL DETAILS

UP

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/37

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
FLIGHT A
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. THE MAIN BARS IN THE WAIST SLAB SHOULD BE EXTENDED IN THE LANDING SLAB. 2. THE LANDING SLAB SHOULD HAVE FULL BEARING LENGTH INTO THE BEAM. 3. WAIST SLAB THICKNESS =150MM AND LANDING SLAB THICKNESS=150MM. 4. TREAD = 280MM AND RISER = 175MM 5. DEVELOPMENT LENGTH Ld= 47d (d= DIA OF BAR) 6. TOTAL NUMBER OF STEPS FOR FLIGHT A+B = 20
AutoCAD SHX Text
Ld (min)
AutoCAD SHX Text
Ld (min)
AutoCAD SHX Text
FLIGHT A
AutoCAD SHX Text
FLIGHT B
AutoCAD SHX Text
FLIGHT B
AutoCAD SHX Text
FLIGHT B
AutoCAD SHX Text
FLIGHT A
AutoCAD SHX Text
FLIGHT A
AutoCAD SHX Text
FLIGHT B
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
FLIGHT A
AutoCAD SHX Text
FLIGHT B
Page 39: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

1

5

0

WAIST SLAB

THICKNESS

21

DEVELOPMENT LENGTH FOR REINFORCEMENT

KEY PLAN FOR STAIRCASE

1

2

3

4

5

6

10 mm@200 c/c

floor level

12mmΦ@120c/c

12mmΦ@120c/c

7

8

700

10mm Φ @ 200 c/c

Extended portion for flight's top

reinforcement.

Shall be casted monolithically

7

0

0

9

10

150

10mmΦ@ 150c/c

10mmΦ@ 150c/c

1

2

3

4

5

6

10 mm@200 c/c

floor level

12mmΦ@120c/c

12mmΦ@120c/c

7

8

700

10mm Φ @ 200 c/c

Extended portion for flight's top

reinforcement.

Shall be casted monolithically

7

0

0

9

10

150

10mmΦ@ 150c/c

10mmΦ@ 150c/c

1 2

UP

STAIRCASE SECTIONAL DETAILS

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/38

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
FLIGHT C
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. THE MAIN BARS IN THE WAIST SLAB SHOULD BE EXTENDED IN THE LANDING SLAB. 2. THE LANDING SLAB SHOULD HAVE FULL BEARING LENGTH INTO THE BEAM. 3. WAIST SLAB THICKNESS =150MM AND LANDING SLAB THICKNESS=150MM. 4. TREAD = 280MM AND RISER = 175MM 5. DEVELOPMENT LENGTH Ld= 47d (d= DIA OF BAR) 6. TOTAL NUMBER OF STEPS FOR FLIGHT C+D = 20
AutoCAD SHX Text
Ld (min)
AutoCAD SHX Text
Ld (min)
AutoCAD SHX Text
FLIGHT C
AutoCAD SHX Text
FLIGHT D
AutoCAD SHX Text
FLIGHT D
AutoCAD SHX Text
FLIGHT D
AutoCAD SHX Text
FLIGHT C
AutoCAD SHX Text
FLIGHT C
AutoCAD SHX Text
FLIGHT D
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
13
AutoCAD SHX Text
12
AutoCAD SHX Text
14
AutoCAD SHX Text
18
AutoCAD SHX Text
17
AutoCAD SHX Text
16
AutoCAD SHX Text
15
AutoCAD SHX Text
10
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
FLIGHT C
AutoCAD SHX Text
FLIGHT D
Page 40: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

B

B

A

A

Section at B

Section through lintel opening (External walls)

Section at A

Ø

EXTERNAL BAND LINTEL DETAILS OVER OPENINGS AND WALLS

INTERNAL BAND LINTEL DETAILS OVER OPENINGS AND WALLS

A

A

B

B

ELEVATION

LINTEL DETAILS

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/39

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
8Ø@140c/c
AutoCAD SHX Text
8Ø@140c/c
AutoCAD SHX Text
Brick wall
AutoCAD SHX Text
Brick wall
AutoCAD SHX Text
2-10ØØ
AutoCAD SHX Text
2-10ØØ
AutoCAD SHX Text
Outside
AutoCAD SHX Text
Inside
AutoCAD SHX Text
3-10ØØ
AutoCAD SHX Text
2-10ØØ
AutoCAD SHX Text
8Ø@140c/c
AutoCAD SHX Text
Opening (Door/Window)
AutoCAD SHX Text
3-10ØØ
AutoCAD SHX Text
2-10Ø
AutoCAD SHX Text
SECTION AT A&B
AutoCAD SHX Text
TOP & BOTTOM REINFORCEMENT LAYOUT IN LINTEL BAND (PLAN)
AutoCAD SHX Text
Opening Opening (Door/Window)
AutoCAD SHX Text
8Ø@140c/c
AutoCAD SHX Text
2-10Ø
AutoCAD SHX Text
Inside
AutoCAD SHX Text
Inside
AutoCAD SHX Text
2-10ØØ
AutoCAD SHX Text
LINTEL BAND SECTIONAL ELEVATION FOR INTERNAL WALL
AutoCAD SHX Text
BOTTOM REINFORCEMENT LAYOUT IN LINTEL BAND (PLAN)
AutoCAD SHX Text
BOTTOM REINFORCEMENT LAYOUT IN LINTEL BAND (PLAN)
Page 41: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

RC band atsill level

8Ø per Cornice

250

Floor slab

250mm thickbrick wall

250

Floor beam(Referbeam details)

10Ø verticalrebar

250mm thickbrick wall

780

580580

10Ø per cornice

3-16Ø

1-8Ø per cornice

3-12Ø

2-10Ø U-bar 175 c/c

8Ø@175 c/c

250

Floor slab

10Ø vertical rebar

250mm thick brick wall

2-12Ø

Floor beam(Referbeam details)

Grid line

Grid/centerline

1-12Ø1-8Ø per cornice

3-12Ø through out

Notes:

1. Slab rebars shall be extended wherever neccessary for the

slab projections & cornice(refer slab details drawings)

2. The cornice reinforcements provided are excluding the slab

reinforcement already provided

3. Cornice patterns/shapes and dimensions shall be as per

the architectural drawing details(Refer drawings

architectural drawing)

4. Refer architectural drawings for the location of different

types cornices at various floor levels.

4-12Ø

1-8Ø per cornice

Vertical reinforcement bar

3-12Ø1-8Ø@ per conice

250

Brick wall 250mm thick

250

10Ø U-bar @ 150mm c/c

Floor beam(Referbeam details)

Floor slab

10Ø verticalrebar

RC band at sill level

250mm thick brick wall

Grid/centerline

8Ø@ 200mm c/c

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/40

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
TSHETSUKHANYM CORNICE DETAILS
AutoCAD SHX Text
PHANA CORNICE DETAILS
AutoCAD SHX Text
RCC CORNICE DETAILS AT VARIOUS FLOOR LEVEL
Page 42: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

MAIN ROOF-1 TRUSS PLAN

100MMX175MM HARDWOOD GUNGCHHEN/ RIDGE POLE

80MMX100MM HARDWOOD PURLIN/DANGCHUNG

100MMX200MM HARDWOOD TSIM/ RAFTER

100MMX250MM HARDWOOD DHINGRI LANGNA/COLLAR BEAM

25219

3152

3152

3152

3152

3152

3152

3152

3152

1576

1576

1576

1576

1576

1576

1576

1576

1576

1576

1576

1576

1576

1576

1576

1576

1576

1576

80

433

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

310

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

432

80

15175

30079

7200

5750

3875

3875

3400

3250

4573

7823

ISOMETRIC B

ISOMETRIC A

10

0

12

96

10

0

26

0

10

0

12

96

10

0

12

96

10

0

26

0

10

0

1296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

803

804

100MMX175MM GUNGCHHEN/ RIDGE POLE

80MMX100MM DANGCHUNG/ PURLIN

100MMX200MM BRACING

100MMX200MM TSIM/RAFTER

100MMX175MM LUNGZEY

100MMX250MM DHINGRI LANGNA

300MMX500MM RCC GHA

100MMX260MM SHARI/KING POST

100MMX260MM SHATHUNG/POST

80MMX100MM SHARI JUGHSHING

30MMX305MM EAVES

ROOF LINE

80MMX100MM SHARI JUGHSHING

500 2925 500 2925 500 2925 500

300

300

300

300

10775

150

100

428

350

175

100

200 1625

125

260

230

200

200

730

100

175

1795

1243

125

260

100

175

1795 260 1795

260

1795

260

1625

100

200

175

150

423

100

350

1755

80

100

80

80

80

80

80

100

1243

175

125

80 80

175

100

730

125

200

200

12332

7961

1

7

2

1

1

7

2

1

2

0

2

5

2

0

2

5

7

6

3

5

7

6

3

5

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

5

2

8

7

3

9

2

7

3

9

2

25219

3152 3152 3152 3152 3152 3152 3152 3152

15761576157615761576157615761576157615761576157615761576157615761576 1576

30079

7200 5750 3875 3875 3400

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

2601296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

260

100

1296

100

1296

100

1296

100

1296

100

804 804

100

260

300

500 2653 500

300

2653 500

300

2653 500

300

2653 500

300

2653 500

300

2653 500

300

2653 500

300

2652 500

300

100MMX250MM DHINGRI LANGNA

100MMX175MM LUNGZEY

300MMX500MM RCC GHA

100MMX200MM TSIM/RAFTER

22002200

3250

4573

7823

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/41

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
MAIN ROOF-1 TRUSS DETAILS"
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
N.
AutoCAD SHX Text
NOTE: ROOF OVERHANG 2200MM
AutoCAD SHX Text
ROOF SLOPE= 14°
AutoCAD SHX Text
A'
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
ELEVATION OF MAIN ROOF -1
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
Page 43: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

300MMX500MM RCC GHA

100MMX250MM DHINGRI LANGNA

100MMX175MM GUNGCHHEN/ RIDGE POLE

80MMX100MM DANGCHUNG/ PURLIN

100MMX260MM SHATHUNG/POST

100MMX260MM SHARI/KING POST

100MMX200MM BRACING

100MMX200MM TSIM/RAFTER

100MMX175MM LUNGZEY

80MMX100MM SHARI JUGHSHING

30MMX305MM EAVES

16

04

16

04

16

04

16

04

16

04

16

04

16

04

16

04

16

04

16

04

16

04

16

04

32

07

32

07

32

07

32

07

32

07

16

03

7

20

93

7

24

50

80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 309 80 459 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80 460 80

14868

84

68

46

24

50

5077

4941

10018

14868

100MMX175MM HARDWOOD GUNGCHHEN/ RIDGE POLE

80MMX100MM HARDWOOD PURLIN/DANGCHUNG

100MMX200MM HARDWOOD TSIM/ RAFTER

80MMX100MM SHARI JUGHSHING

ROOF LINE

100MMX175MM HARDWOOD POLE

79

6

10

0

13

24

10

0

26

0

10

0

13

24

10

0

13

24

10

0

26

0

10

0

13

24

10

0

13

24

10

0

26

0

10

0

13

24

10

0

13

24

10

0

26

0

10

0

13

24

10

0

13

24

10

0

26

0

10

0

13

24

10

0

13

24

10

0

26

0

10

0

13

24

10

0

79

6

MAIN ROOF-2 TRUSS PLAN

200

100

1842 260 2011 260 2011 260 2011 260 2011 260 1842

100

200

15

0

428

10

0

12772

10

0

428

15

0

12

5

12

5

12

5

12

5

12

5

17

5

28

4

20

0

200

78

4

80

100

13

50

28

42

00

80

100

80

19

17

80

100

80

13

50

80

100

80

78

4

80

100

80

200

20

0

2

2

2

5

2

2

2

5

1

9

3

9

1

9

3

9

9745

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

6

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

7

2

3

47

2

3

4

1152

1152

30

0

1991

30

0

1993 1992 1992500 500 500500500

30

0

30

0

30

0

10468

7

4

7

6

7

4

7

6

796

100

1324

100

260

100

1324

100

1324

100

260

100

1324

100

1324

100

260

100

1324

100

1324

100

260

100

1324

100

1324

100

260

100

1324

100

1324

100

260

100

1324

100

796

500 2707 500 2707 500 2707 500 2707 500 2707 500

16537

30

0

30

0

30

0

30

0

30

0

30

0

160416041604160416041604160416041604160416041604

3207 3207 3207 3207 3207

16037

20937

2450

846846

2450

100MMX250MM DHINGRI LANGNA

100MMX175MM LUNGZEY

300MMX500MM RCC GHA

100MMX200MM TSIM/RAFTER

2200

2200

5077

4941

10018

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/42

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
MAIN ROOF-2 TRUSS DETAILS
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
A'
AutoCAD SHX Text
A
AutoCAD SHX Text
NOTE: ROOF OVERHANG 2200MM
AutoCAD SHX Text
ROOF SLOPE= 14°
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
ELEVATION OF MAIN ROOF -2
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
Page 44: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

60MMX100MM GUNGCHHEN/RIDGE POLE

40MMX50MM DANGCHUNG/PURLIN

80MMX100MM TSIM/RAFTER

80MMX120MM DHINGRI LANGNA

250MMX300MM RCC GHA

60MMX100MM LUNGZEY

80MMX120MM SHARI/KING POST

80MMX120MM SHATHUNG/POST

80MMX80MM SHARI JUGHSHING

30MMX150MM EAVES

80MMX80MM BRACING

300 2992 300

3592

25

0

25

0

12

0 200

386

10

0

60

886 120 856 120 856 120 886

60

200

12

0

386

60

33

6

30 30

63

9

42

5

80

80

4363

2275

8

2

5

8

2

5

710

710

30

30

30

30

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

2

7

8

6

5

5

7

5

5

7

5

5

7

5

5

7

5

5

7

2

7

8

6

1264

1264

1264

1264

1264

1264

1264

1264

2528

2528

2528

7584

10484

40

501

40

501

40

501

40

501

40

501

40 40

501

40

501

40

501

40

501

40

501

40

145

5632

5992

JAMTHOK ROOF-1 TRUSS PLAN

60MMX100MM GUNGCHHEN/RIDGE POLE

40MMX50MM DANGCHUNG/PURLIN

80MMX100MM POLE

80MMX80MM SHARI JUGHSHING

ROOF LINE

1200

1200

145012641264

2528

126412641264 12641450

25282528

10484

7584

1200

1200

500 2028 500 2028 500 2028 500

8084

80

1034

80

220

80

1034

80

1034

80

220

80

1034

80

1034

80

220

80

1034

80

1034

80

220

80

1034

80

ELEVATION-JAMTHOK ROOF-1

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/43

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
JAMTHOK ROOF-1 TRUSS DETAILS
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
2
AutoCAD SHX Text
A'
AutoCAD SHX Text
A
AutoCAD SHX Text
NOTE: ROOF OVERHANG 1200MM
AutoCAD SHX Text
ROOF SLOPE= 14°
AutoCAD SHX Text
2
AutoCAD SHX Text
D
AutoCAD SHX Text
E
Page 45: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

1456

2500

1250

1250

1250

1250

1456

2500

5000

7912

40

492

40

490

40

490

40

490

40

490

40

145

40

490

40

490

40

490

40

490

40

490

40

180180

5889

60MMX100MM GUNGCHHEN/RIDGE POLE

40MMX50MM DANGCHUNG/PURLIN

ROOF LINE

80MMX100M POLE

80MMX80MM SHARI JUGHSHING

JAMTHOK ROOF-2 TRUSS PLAN

10

20

80

22

08

01

02

68

01

02

08

02

20

80

10

26

80

10

20

80

22

08

01

02

08

08

0

5

4

8

5

4

8

5

4

8

5

4

8

5

4

8

2

7

3

9

5

4

8

5

4

8

5

4

8

5

4

8

5

4

8

2

7

3

9

25

0

25

0

300 2889 300

3489

90

0

12

0

386

356

60

10

0

783 120 752120 752 120 782

60

356

10

0

12

0

4260

60

60

60

37

0

58

8

37

0

80

80

80

80

613

7

6

37

6

3

613

30

30

2024

30

30

30

30

2

8

4

9

2

8

4

9

12001200

60MMX100MM GUNGCHHEN/RIDGE POLE

40MMX50MM DANGCHUNG/PURLIN

80MMX100MM TSIM/RAFTER

80MMX80MM BRACING

60MMX100MM LUNGZEY

80MMX120MM DHINGRI LANGNA

250MMX300MM RCC GHA

80MMX120MM SHARI/KING POST

80MMX120MM SHATHUNG/POST

80MMX80MM SHARI JUGHSHING

30MMX150MM EAVES

125012501250125012501250

25002500

5000

7912

500 2006 500 2006 500

5512

25

0

25

0

25

0

ELEVATION-JAMTHOK ROOF-2

14°

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/44

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
J
AutoCAD SHX Text
A'
AutoCAD SHX Text
A
AutoCAD SHX Text
7
AutoCAD SHX Text
NOTE: ROOF OVERHANG 1200MM
AutoCAD SHX Text
ROOF SLOPE= 14°
AutoCAD SHX Text
JAMTHOK ROOF-2 TRUSS DETAILS
AutoCAD SHX Text
J
AutoCAD SHX Text
7
Page 46: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

27

60

2760

1750

1750

5520

9020

18040

462

40

462

40

462

40

462

40

462

40

462

40

462

40

462

40

462

40

4750

5

1

0

5

1

0

5

1

0

5

1

0

5

1

0

5

1

0

5

1

0

5

1

0

5

1

0

4

5

9

1

80

671

150

636

1435

150

1400

150

80

150

1020

1

3

6

5

75

417

80

150

75

690

80

150

500 2250 500

3250

30

0

30

0

4

6

4

1

80MMX150MM GUNGCHHEN/RIDGE POLE

80MMX150MM SHARI SHATHUNG/POST

80MMX100MM BRACING

80MMX150MM LUNGZEY

40MMX50MM DANGCHUNG/PURLIN

80MMX150MM TSIM/RAFTER

80MMX150MM DHINGRI LANGNA

300MMX500MM RCC GHA

40MMX50MM PURLIN

80MMX150MM RAFTER

30

01

28

58

01

70

80

24

30

80

17

08

02

43

08

01

70

80

12

85

30

0

276027601750 1750

5520

9020

3001285

8017080

2430

8017080

2430

80170

80

1285300

500 2260 500 2260 500

6020

300

300

300

80MMx150MM POLE

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/45

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
A
AutoCAD SHX Text
A'
AutoCAD SHX Text
A
AutoCAD SHX Text
STAIRCASE ROOF DETAILS
AutoCAD SHX Text
NOTE: ROOF OVERHANG 1500MM
AutoCAD SHX Text
ROOF SLOPE= 10°
AutoCAD SHX Text
STAIRCASE ROOF TRUSS PLAN
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
STAIRCASE ROOF ELEVATION
Page 47: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

40

472

40

472

40

472

40

472

40

472

40

472

40

472

40

472

40

47240

472

40

472

40

472

40189

6186

80

200

80

2057

80

200

80

2057

80

200

80

2057

80

200

80

1270

300

1270

300

10750

1500

1500

72

00

40MMX50MM PURLIN

80MMX150MM RAFTER

80MMx150MM POLE

ROOF LINE

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

5

2

0

6

2

4

1

150

671

80

150

150

1425

150 150

5511

75 75 75

1052

774

4971519

1573

1709

3535

35 35

80

35

35

80

6

2

9

0

500 3875 500

30

0

30

0

4875

80MMX150MM GUNGCHHEN/RIDGE POLE

80MMX150MM SHARI SHATHUNG/POST

80MMX100MM BRACING

80MMX150MM DHINGRI LANGNA

300MMX500MM RCC GHA

80MMX150MM TSIM/RAFTER

40MMX50MM DANGCHUNG/PURLIN

80MMX150MM LUNGZEY

7200

8020080

2057 2057

8020080

2057

8020080

1270 3001270300

10750

8020080

10750

500 1917 500 1917 500 1917 500

7750

30

0

30

0

30

0

30

0

1460

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/46

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
7
AutoCAD SHX Text
A'
AutoCAD SHX Text
A
AutoCAD SHX Text
NOTE: ROOF OVERHANG 1500MM
AutoCAD SHX Text
ROOF SLOPE= 10°
AutoCAD SHX Text
CLASS ROOM-4 ROOF TRUSS PLAN
AutoCAD SHX Text
CLASS ROOM-4 ROOF TRUSS DETAILS
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
CLASS ROOM-4 ROOF ELEVATION
Page 48: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

145 891 145 891 145 891 145 891 145 891 145 891 145 891 145 891 145 891 145

9469

41

38

662

38

668

1446

174

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

465

50

9321

40MMX50MM PURLIN

145MMX150MM DHINGRI

38MMX38MM POLE

40MMX50MM PURLIN

38MMX38MM POLE

145MMX150MM DHINGRI

40

1

6

5

0

150

626 120 580 120

75

245

185

120MMX145MM POST

10468

500 145 891 145 891 145 891 145 891 145 891 145 891 145 891 145 891 145 891 145 500

11°

7

1

0

1

7

3

2

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/47

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
NOTE: ROOF OVERHANG=1200MM
AutoCAD SHX Text
ROOF SLOPE= 11°
AutoCAD SHX Text
RB-1 ROOF PLAN
AutoCAD SHX Text
A'
AutoCAD SHX Text
A
AutoCAD SHX Text
RB-1 ROOF DETAILS
AutoCAD SHX Text
RB-1 ROOF ELEVATION
Page 49: CONSTRUCTION OF SPORTS LABORATORY AT PARO COLLEGE … · 1. footings should be place as per the layout plan. 2. refer the table for footing reinforcement for its details. 3. grids

0

978 145 978 145 978 145 978 145 978 145 978 145 978 145 978

145

9127

120

480

120

480

120

626

174

2120

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

511

50

38

56

2

38

56

2

38

84

2

40MMX50MM PURLIN

145MMX150MM DHINGRI

38MMX38MM POLE

10123

497 145 978 145 978 145 978 145 978 145 978 145 978 145 978 145 978 145 500

40

15

0

626 120 480 120 480 120

1946

18

4

30

1

41

7

2

1

6

0

40MMX50MM PURLIN

38MMX38MM POLE

120MMX145MM POST

145MMX150MM DHINGRI

11°

6

1

1

6

1

1

2

2

4

1

ALL DIMENSIONS ARE IN MMUNLESS OTHERWISE STATED.

REV. DATE DESCRIPTION

NOTES

DESIGNED BY/DRAWN BY:APPROVED BY:

REVISIONSTITLE:

SCALE: NTS

DRAWING NO. :

STRUCTURE/48

LOCATION:PARO

ENGINEER(TSHERING WANGMO)

CLIENT/ OWNER: PARO COLLEGE OFEDUCATION (PCE)

..\..\..\Documents\Received Files\ABHAYA CONSULTANCY LOGO.PNG

PROJECT:SPORTS LABORATORY AT PARO COLLEGE OF EDUCATION ,PARO.

DATE: 28/01/2019

CHECKED BY:

ENGINEER(TASHI DORJI)

AS MENTIONED ABOVE

AutoCAD SHX Text
A'
AutoCAD SHX Text
A
AutoCAD SHX Text
NOTE: ROOF OVERHANG=1200MM
AutoCAD SHX Text
ROOF SLOPE= 11°
AutoCAD SHX Text
RB-3 ROOF TRUSS PLAN
AutoCAD SHX Text
RB-2 ROOF ELEVATION
AutoCAD SHX Text
RB-3 ROOF DETAILS