127

Construction of educational facilities

Embed Size (px)

DESCRIPTION

Presentation for the construction of schools and other educational facilities

Citation preview

Page 1: Construction of educational facilities
Page 2: Construction of educational facilities
Page 3: Construction of educational facilities

CONTENTS

AQUILINE GROUP

EDUCATIONAL PROJECTS TEAM

EDUCATIONAL FACILITIES PROJECT PORTFOLIO

BERMA GROUP

Page 4: Construction of educational facilities
Page 5: Construction of educational facilities

AQUILINE GROUP

Page 6: Construction of educational facilities
Page 7: Construction of educational facilities

ICT SOLUTIONS FOR PROCESS IMPROVEMENT

ICT infrastructures and networks

Systems engineering

Business software solutions

Control and continuous improvement integrated system

Process improvement consultancy

Research, development and innovation projects

Page 8: Construction of educational facilities

A TRACK RECORD

OF SUCCESS

Growing since 1997

Investment in RDI equivalent to 17% of the turnover

Dozens of registered patents and intellectual property rights

University Chair Aquiline

in the Polytechnic University of Cartagena

Lean Management Academy

in the Naval and Marine

Technology Center of Murcia

Page 9: Construction of educational facilities

AQUILINE-UPCT UNIVERSITY CHAIR GOALS

Setting up of a laboratory for technological development

Support to final projects and internships

Development of the scholarship program for UPCT students

Conduction of training and dissemination activities

Carrying out of RDI projects

Promotion of the creation of technology-based companies

Page 10: Construction of educational facilities

AQUILINE-UPCT UNIVERSITY CHAIR MILESTONES

Leadership in a 6 million Euro project of technological cooperation between SME

Agreement for the carrying out of training sessions with:

· Association of Economists

of the Region of Murcia

· Association

of Qualified Economic and Financial Experts of the Region of Murcia

· Naval and Marine Technology Center of Murcia

Master in Management of the Continuous Improvement

Page 11: Construction of educational facilities

LEAN MANAGEMENT ACADEMY

Training activity carried out along with the Naval and Marine Technology Center of Murcia

Training given by our experts with the highest expertise and international prestige in Lean Management and Six Sigma

Eminently practical approach for senior and middle managers

Training sessions for companies of different sectors such as naval, metal, aeronautical, etc.

Page 12: Construction of educational facilities

RELIABLE

PARTNERS

We are working for years as partners of the most solvent companies in their technology specialties

Page 13: Construction of educational facilities

Since 2006 holding

UNE-EN-ISO 9001 certification for IT services including the software

design, development and deployment

Level 2 of maturity of the standard CMMI acknowledging us among the European companies with the highest level of quality of software

CERTIFIED

EXCELLENCE

Page 14: Construction of educational facilities

INSTITUTIONAL RECOGNITION AND BACKING

Backing from

regional, national and European institutions

1st technological project in the Region of Murcia

that received European funds

2012 Award for Innovation

in Management and Organization

granted by the Development Institute of the Region of Murcia

Page 15: Construction of educational facilities

EDUCATIONAL PROJECTS

TEAM

Page 16: Construction of educational facilities
Page 17: Construction of educational facilities

ORGANIZATION CHART EDUCATIONAL PROJECTS

Page 18: Construction of educational facilities
Page 19: Construction of educational facilities

M.D. EDUARDO PÉREZ GARCÍA MANAGEMENT OF EDUCATIONAL PROJECTS EDUCATION AND POSTGRADUADE TRAINING Doctor of Medicine and Surgery | University of Murcia | 1999 Bachelor’s Degree in Pharmacy | Complutense University of Madrid | 1987 Associate’s Degree in Nutrition | Nutrition School of Granada | 1988 Pharmacist Specialist in Clinical Analysis | Ministry of Education and Science | 1990 Master’s Degree in Nutrition and Diet Therapy | University of Murcia | 1998 University teacher in the program “Drug Development” | University of Granada | 2003 Master’s Degree in Geriatric Pharmacy | Lumentia | 2004 Master’s Degree in Comprehensive Pharmacy Care | Lumentia | 2004 Associate’s Degree in Human Nutrition and Dietetics | Alfonso X el Sabio University | 2011 Project Management | 2011 Bachelor’s Degree in Optics | Alfonso X el Sabio University | 2012 WORK EXPERIENCE Drugstore Owner Pharmacist | Drugstore | 1987 – present Analyst | Private laboratory | 1987 - 1997 Salvador E018 -02 Research Team | University of Murcia | 1990 – 2002 Associate Professor | San Antonio Catholic University of Murcia | 1998 - 2000 Executive Chairman | Aquiline ICT Group | 2001 - present Director of the University Chair “ICT for SMEs” | Polytechnic University of Cartagena | 2009 - present Participation in R&D projects financed in competitive biddings Research leader in project “The Spanish Teenagers at the Nutrition Crossroads of the Next Millennium” | Financed by Carlos III Health Institute | 1999-2002 Leader of the project “ERP for SMEs in Collaborative Environment in Open Source Software” | 2005 – 2007 Leader of the project “Smart Advanced Security System”| Granted by PROFIT program | 2006 – 2007 Key participant in the project “Global GNU Compiler Collection” | Granted by PROFIT program and ITEA clusters of the EUREKA European program | 2006 - 2008 Leader of the project “Smart Agent for Remote Administration, S.A.R.A.” | Granted by Development Institute of the Region of Murcia | 2008 Leader of the project “Platform of Dynamic Modules in Java Applied to the Advanced Resource Management” | Granted by CDTI | 2009 – 2011 Leader of the project “Computer Platform for the Process Management” | Granted by Avanza program | 2011 – 2012 Leader of the project “iTriage + iNurse” | Granted by Avanza program | 2011 - 2012

Page 20: Construction of educational facilities

Participation in R&D projects contracted with private companies Leader of the project “Application to Manage a Hemodialysis Center” | 1992 – 1995 Leader of the project “Software and Hemodialysis” | 1995 – 1996 Leader of the project “Software for Nutrition in Kidney Failure” | 1997 – 1998 Leader of the project “Design of Software for Nutrition Assessment” | 2001 Leader of the project “Nutrition Evolution in Chronic Renal Patients on Hemodialysis in the Region of Murcia” | 2001 Leader of the project “Nutrition Project in 6- to 12-Year-Old Children of Alhama de Murcia” | 2002 Leader of the project “Ábaco Application for Business Management” | 2003 Leader of the project “Network Appliance for the Management of the Data Networks Security” | 2006 Leader of the Project “Application for the Management of the Quality Management Systems” | 2006 Leader of the Project “Windows Application for the Fast Dispensation of Prescriptions” | 2007 Leader of the Project “System and Device for the Registry, Invalidation and Storage of Safety Seals” | 2011 AWARDS First national prize for research | Royal Academy of Medicine and Surgery of Murcia | 1997 First national prize for research in sport medicine 2000 | University of Oviedo | 2001 OTHER 6 registered patents and intellectual property rights Ph. D. Supervisor for 4 theses 45 books, publications and communications Associate Member of the Royal Academy of Medicine and Surgery of Murcia Member of the Board of Directors of the CENTIC ICT Technology Center Member of the Board of Directors of the TIMUR Association of ICT Companies

Page 21: Construction of educational facilities

ANDY CHAN DESIGN ARCHITECT EDUCATION AND POSTGRADUADE TRAINING Architect professionally registered in Spain (COAG) and United Kingdom (ARB) RIBA Diploma in Professional Practice and Management Pt. 3 | London South Bank University, UK | 1999 RIBA Diploma in Professional Practice and Management Pt. 2 | Canterbury School of Architecture, UK | 1998 Honors Bachelor’s Degree in Architecture. RIBA Diploma in Professional Practice and Management Pt. 1 | Canterbury School of Architecture, UK | 1993 A large number of courses in business management, business marketing, client relationship management (CRM), international business development, project & construction management, planning & urbanism, sustainable architecture, landscaping, interior design, etc. WORK EXPERIENCE Architecture Director | Eggloo | 2007 – present Sunway Medical Center 3. 300-bedroom A&E hospital in Kuala Lumpur, Malaysia 24-bedroom wellbeing center in Almería with health treatment facilities 700 homes in Johor Bahru, Malaysia 3,500 sqm agricultural exhibition center in Huéscar Master planning of Llanos Silva development in Granada. 240 ha Master planning of a 227 ha sustainable park in Manzanares for industrial, commercial and office use 180-bedroom 5-star hotel & spa resort and 120 holiday apartments in Razlog, Bulgaria Baneasa Shopping City. 85,000 sqm shopping mall in Bucharest, Romania 288-bedroom 5-star hotel & spa resort and 125 villas in Tripoli, Libya Chengdu Towers. Four 22-story private residential towers in China. 102,000 sqm Master planning of a 275 ha development in Qinzhou, China Managing Director | Ilidium, S.L. | 2002-2007 35 professionals offering a complete range of services such as architectural, planning, interior design, landscaping, project & construction management, quantity surveying, engineering, surveying, real estate agency, etc. 42 modern loft apartments in La Ñora 135 individual village houses in El Valle, Granada 253 ha rural urbanization in El Valle, Granada 1,200 sqm rural farmhouse hotel Project Architect | Paskin Kyriakides Sands Architects | 1998 – 2002 Project architect involved in all RIBA stages Refurbishment of 12,000 sqm office in Emerald Street, London, UK

Page 22: Construction of educational facilities

245 luxury apartments and houses in Kings Road, London, UK Queen Elizabeth College. 118 luxury apartments in a listed building in London, UK Stahl House. 18 luxury duplex dwellings in London, UK 39 luxury apartments in Hall Road, London, UK, in collaboration with Phillip Starck 155 apartments with private gardens, pool and gym in Westfield, London, UK 22 duplex dwellings in a listed façade building in Ludgate Square, London, UK 6,500 sqm headquarters office development in Herbrand Street, London, UK Standard House. Refurbishment of 10,000 sqm office in London, UK Project Architect | Akiprima Architects S.B. | 1993 - 1996 Project architect in charge of commercial, residential, industrial and hospitality projects from inception to completion Sunway Medical Center 2. 350-bedroom A&E hospital in Kuala Lumpur, Malaysia Mabec Harley Davidson showroom in Selangor, Malaysia Seberang Jaya Business Hotel. 4-star 20-story hotel with 175 bedrooms in Seberang Jaya, Malaysia Sunway Lagoon Resort Hotel. 5-star resort with 438 bedrooms in Kuala Lumpur, Malaysia Sunway Hotel in Phnom Penh, Cambodia. 4-star hotel with 138 bedrooms Canon central warehouse in Petaling Jaya, Malaysia. 22,000 sqm Seberang Jaya Shop Office in Penang, Malaysia. 84 3-story units

Page 23: Construction of educational facilities

MARÍA TERESA DEL CASTILLO SERRANO PROJECT MANAGEMENT EDUCATION AND POSTGRADUADE TRAINING Associate’s Degree in Aerospace Engineering | Polytechnic University of León | 2012 Associate’s Degree in Aeronautical Engineering, specialty Airports and Air Transportation | Polytechnic University of Madrid | 1992 Master’s Degree in Management of Construction and Real Estate Companies | Polytechnic University of Madrid | 1993 Polyethylene Welding for Natural Gas Channeling training course | Acuster | 1993 Authorized Gas Installer | Ministry of Industry | 1994 Consolidation of Stonework Walls seminar | Escuela superior de Arquitectura de Valencia | 1997 Advanced Techniques of Structural Assessment, Rehabilitation and Calculation of Structures Reinforcements seminar Project Manager in Real Estate Development Management | Kepler Group | 2005 WORK EXPERIENCE Administrative Concessions and Operations Manager | Intersa | 05/1999-actualidad Management and development of the real estate assets of Intersa Group · Urbanization

Numerous urban-development projects, the main ones being: Urbanization El Valle Golf Resort in Baños y Mendigo | 22.7 million €

Urbanization in Santiago de la Ribera | 9.5 million €

Urbanization Residencial Mar de la Plata in Puerto de Mazarrón | 6 million €

· Sports and complementary uses operations Sport boats inner harbor in the south of Curra dock | 50 million €

JC1 sports complex with heated swimming pool, 4-star hotel and business center | 29.5 million €

El Raval sports center | 7.7 million €

Indoor swimming pool in the General Air Force Academy of San Javier | 1.5 million €

Indoor heated swimming pool in Totana | 1.5 million €

Indoor swimming pool in El Paretón, Totana | 0.3 million €

· Sewage treatment plants

9 sewage treatment plants with flow from 1.4 to 9.5 million m3 · Parking lots

Cuartel de Artillería parking lot in Murcia | 18.5 million €

La Vega underground parking lot in Murcia | 13.8 million € Glorieta de San Vicente underground parking lot in Lorca | 1 million €

Page 24: Construction of educational facilities

· Education centers

Cultural center and public parking lot in Pilar de la Horadada | 4.4 million €

High school in Archena | 2.3 million €

Lecture room building Polytechnic University of Cartagena | 1.2 million €

Nursery school in Águilas | 0.7 million €

· Auditoriums

Auditorium of Torre Pacheco | 2.6 million €

Auditorium of Abanilla | 1.6 million €

Auditorium of Santomera | 1.1 million €

· Other projects

Oil products storage depot in Escombreras | 4.5 million €

Other projects for public and private contracts: construction, unique buildings, remodeling, refurbishment, repairs, restoration, fitting-out, extension, etc. Numerous studies for bidding for all kind of administrative concessions, the main one being the collaboration in the bid for the tender: “Project design, construction and operation of the Airport of the Region of Murcia” Site Manager | Isolux Watt | 12/1998 – 05/1999 Heated swimming pool, Alcantarilla Site Manager | Villegas, S.L. | 05/1996-12/1998 Restoration of building in the Literary University of Valencia | 12 million €

Jesús García Candel and Sierra del Oro high schools in Abarán Refurbishment of the Nursing College | Polytechnic University of Valencia Residential developments Site Manager | Cyasa, S.A. | 01/1993-05/1996 Designer of projects and collaboration works | Freelance | 1992-1994 Planning of the construction documents of “Operational and logistic center in the freight terminal of the Vitoria Airport”, commissioned by European Air Transport, subsidiary of DHL for air freight Reinforcement of the foundations in Plaza Juan XXIII building, using micropiles Site supervisor in Valencia Airport | AENA | July-September 1992

Page 25: Construction of educational facilities

LAURA SERRANO ANTÓN ENGLISH-GERMAN-SPANISH TRANSLATOR AND INTERNATIONAL SECRETARY EDUCATION AND POSTGRADUADE TRAINING Master’s Degree in Specialized German-Spanish Translation, specialty legal translation | 2012 Bachelor’s Degree in Translation and Interpretation, English and German| University of Murcia | 2010 Course in Translation and Intercultural Mediation | University of Murcia | 2008 Course in Legal Translation | University of Murcia | 2007 Expert in translations of websites, technical and biomedical documentation B2 level in Italian WORK EXPERIENCE Translator and Interpreter | Aquiline ICT Group | 2012 - present Conference interpreter in CEBIT IT Fair in Hannover | Siemens | 2012 Translator | Kern AG, Lingua-World and Intraduct translation agencies | 2011 Spanish Teacher | Mallinckrodt Institute in Dortmund | 2010 Private English and German Teacher | 2005-2010

KHADIJA AMINE EL FADILI ARAB-FRENCH-SPANISH TRANSLATOR AND INTERNATIONAL SECRETARY EDUCATION AND POSTGRADUADE TRAINING Bachelor’s Degreee in French and Arab Philology | Mohamed V University of Casablanca Associate’s Degree in Primary School Teaching Participation in a number of courses and seminars about intercultural mediation Expert in translation and intercultural mediation WORK EXPERIENCE Translator and Interpreter | Aquiline ICT Group | 2012 - present Translator and Mediator | Social Services Center of Alhama de Murcia | 2006 - 2011 Teacher | Amina Bent Ouahab School of Casablanca, Morocco | 09/79 – 12/92 Teacher | Derb Neglise School of Casablanca, Morocco | 09/78 – 09/79 Teacher | Errazi School of Casablanca, Morocco | 09/77 – 09/78 Teacher | Continuing Training Center of Casablanca, Morocco | 09/76 – 09/77 Teacher | Moulay Rachid High School of Tiznit, Morocco | 02/74 – 09/76

Page 26: Construction of educational facilities

JULIO ALFARO VALERO SITE MANAGEMENT EDUCATION AND POSTGRADUADE TRAINING Bachelor’s Degree in Architecture | Polytechnic University of Madrid | final year project pending (in progress) Assistant’s Degree in Architecture | Polytechnic University of Madrid | 1997 WORK EXPERIENCE Group Manager | Intersa | 03/2006 - present · New Hospital of Cartagena

120 million € budget

160,000 sqm plot For 115,307 sqm built area 15 operating rooms, 127 + 68 doctor’s offices, 54 outpatient medical rooms, 33 outpatient surgical rooms, 2 radiotherapy rooms, 1 nuclear medicine room, 1 PET-CT, short stay unit, pre-admission unit, extension of the outpatient medical hospital, neonatal ICU, burns and plastic surgery unit, maxillofacial surgery unit, angiology and vascular surgery unit, allergy treatment unit, pediatric surgery. Double data center. Heliport 1,780 parking spaces 2 gyms, 1 indoor swimming pool, 1 shopping mall, 2 cafeterias, 1 auditorium/convention center · La Flota sports complex in Murcia | 18 million € budget

26,168 sqm built area Sports center, indoor swimming pool, recreational swimming pool, urban spa, gym, 8 paddle courts 1,331 sqm locker rooms and bathrooms; 546 sqm terrace, cafeteria and restaurant; 500 sqm local police facilities; 613 underground parking spaces · Underground parking lot La Vega in Murcia | 20 million €

49,890 sqm 4-story underground built area 10,240 sqm urbanization and sports courts on ground floor 1,588 sqm office buildings and accesses · Palacio del Agua sports complex in Orihuela | 6.5 million €

9,342 sqm plot area 2 heated indoor swimming pools, 2 outdoor swimming pools, 2 paddle courts, 7-a-side soccer pitch, spa area, conference hall, offices and multipurpose rooms · European Business and Innovation Center of Murcia | 3.1 million €

5,444 sqm built area on a 6,293 sqm plot

Page 27: Construction of educational facilities

· Tomás Guillén office building and car dealer facilities in Murcia | 14.3 million €

30,445 sqm built area 12 floors above ground Car dealer facilities on ground floor 4 floors below ground, repair shop on the first underground floor and 600 parking spaces Site Manager | Corsan Corviam Construcción, S.A. | 10/2003 - 02/2006 155-apartment building in Madrid | 13 million €

Clinical Veterinary Hospital of Alfonso X el Sabio University of Madrid | 5.9 million €

The largest veterinary hospital in Europe 201-apartment building in Molina de Segura | 25.3 million €

Production Manager | Ferrovial Agromán | 05/2002 - 10/2003 120-apartment building in Madrid | 9.4 million €

Page 28: Construction of educational facilities

MARÍA ÁNGELES FERNÁNDEZ BAÑOS CIVIL ENGINEER EDUCATION AND POSTGRADUADE TRAINING Degree in Civil Engineering | Catholic University of Murcia | 2012 Associate’s Degree in Public Works Engineering | University of Alicante | 1997 Project Management Recovery of the Heritage as a Tourism Resource course | University of Alicante Regeneration of the Coastline seminar | University of Alicante Accessibility to the Physical Environment course | University of Alicante Occupational Health and Safety Postgraduate Teacher Certification Program | University of Murcia WORK EXPERIENCE Project Manager | Intersa | 2008 - present Technical support to the collaborating urban planning entity of Alhama for the management of the works of the Special Infrastructure Plan of Alhama de Murcia Special Plan of Common Infrastructures of the Tourism-Residential Developments in the South of the Municipality of Alhama de Murcia | 125 million €

Design of the partial urbanization plan for an area in Moratalla Planning of urbanization project for a tertiary/public use area in Ulea Planning of redistribution and demarcation projects for tertiary/public use urbanization units in Ulea Site Manager | Intersa | 1999 - 2008 Urbanization and infrastructures in the surroundings of the Polytechnic University of Cartagena Remodeling and construction works for infrastructures in Cartagena Urbanization of an area in Pilar de la Horadada Restoration of swimming area in San Pedro del Pinatar Urbanization for El Valle Golf Resort development in Baños y Mendigo Site Manager | Gesticar | 1999 Site Manager of Decathlon in Alicante Engineer | Relesa | 1998 Engineer | Santiago Ribera Architecture Studio | 1997-1998

Page 29: Construction of educational facilities

CARLOS BAILE RODRÍGUEZ CIVIL ENGINEER EDUCATION AND POSTGRADUADE TRAINING Bachelor’s Degree in Civil Engineering, specialty City Zoning and Planning | Polytechnic University of Madrid | 2007 Master course in Occupational Health and Safety | Emsemul | 2008 - 2009 WORK EXPERIENCE Project coordinator, project manager and designer engineer | IDDI, S.L. | 2007 - present · Special Plan of Common Infrastructures of the Tourism-Residential Developments in the South of

the Municipality of Alhama de Murcia | 125 million €

Project management and technical support to the collaborating urban planning entity Plan design Design of the amendment to the plan for the inclusion of the Paramount theme park and the Lifestyle-Center area Ejecución de Prolongación de la Red de Abastecimiento “Las Cañadas” · Sierra de Alhama Golf Resort Area in Alhama de Murcia | 2,373,723 sqm

For 2,200 homes, golf course, 2 hotels and shopping area Project management and y technical support to the promoters Design of the partial urbanization plan and the program of urban renewal Design of the amendment to the partial urbanization plan and the program of urban renewal for the inclusion of the Paramount theme park · La Pinilla Golf Resort Area in Fuente Álamo | 2,100,000 sqm For 2,400 homes, golf course, hotel and shopping area Project management and technical support to the promoters · Area in Ulea | 213,432 sqm

For 127,991 built sqm of tertiary-public use Project management and technical support to the promoter Design of the amendment to the partial urbanization plan and the demarcation, redistribution and urbanization projects · Areas in Torrealta, Molina de Segura | 396,146 sqm

Project management and technical support to the promoter Design of the partial urbanization plan and the program of urban renewal Site Manager | Sethome Promoción y Construcción, S.A. | 2004 – 2007 145 homes in Móstoles | 10 million € 20 homes in Collado Villalba | 3.1 million €

Page 30: Construction of educational facilities

Production Manager and Site Manager Assistant | Sethome Promoción y Construcción, S.A. | 2004 - 2007 126 homes in Las Tablas, Madrid | 6,184,000 €

120 homes in Majadahonda, Madrid | 8,273,000 €

Page 31: Construction of educational facilities

JOSÉ ANTONIO CABRERA ROS INDUSTRIAL ENGINEER EDUCATION AND POSTGRADUADE TRAINING Bachelor’s Degree in Industrial Engineering, specialty Mechanics | Polytechnic University of Valencia | 2002 Associate’s Degree in Industrial Engineering, specialty Mechanics | Polytechnic University of Valencia | 1996 Feasibility Analysis of Real Estate Developments course Technical Building Code course | Professional Association of Architects of Murcia Local and Regional Proceedings course | Professional Association of Industrial Engineers of the Region of Murcia Environmental Regulation and Legislation course | Polytechnic University of Valencia Waste Management | Polytechnic University of Valencia Management of the Environmental Quality, Ecodesign, Environmental Management | Polytechnic University of Valencia Expert in Electricity Tariffs Advising | Professional Association of Industrial Engineers of the Region of Murcia WORK EXPERIENCE Project Management | Intersa | 2006 - present Responsible for the management of the company’s administrative concessions Site management of design development drawings and construction documents of JC1 Sports Complex in Murcia | 32,740 built sqm Design development drawings and construction documents of offices in Murcia | 10,269 built sqm Design development drawings and construction documents of industrial premises | 3,122 built sqm Design development drawings and construction documents of heated indoor swimming pool in Beniaján | 7.6 million €

Design development drawings and construction documents of heated indoor swimming pool in Gandía | 7.8 million €

Special Plan of Common Infrastructures of the Tourism-Residential Developments of the South of the Municipality of Alhama de Murcia | 125 million €

Urban planning project of area in Ulea

Site Manager, Quality Coordinator, Occupational Health and Safety Coordinator and Facilities Supervisor | Doalco | 2002 - 2006 Construction of psychiatric pavilion in El Palmar Old people’s homes in Bañeres de Mariola, La Nucia and El Puig

Page 32: Construction of educational facilities

Refurbishment of Bishop’s Palace in Orihuela Redevelopment of accesses to Orihuela Building for municipal facilities in Polop Refurbishment of Savior’s Cathedral in Orihuela Restoration of Santa Pola and Castalla castles Construction of indoor swimming pool in Beniel and Cieza Construction of psychiatric pavilion in El Palmar After Sales Service | John Deere | 2000 - 2002 Technical training to John Deere dealers Field technical diagnosis with machines and tractors

Page 33: Construction of educational facilities

PEDRO ANTONIO LÓPEZ MARTÍNEZ TELECOMMUNICATIONS ENGINEER | ARCHITECT EDUCATION AND POSTGRADUADE TRAINING Associate’s Degree in Telecommunications Engineering | Polytechnic University of Cartagena | 2006 Associate’s Degree in Architecture | Polytechnic University of Cartagena | final year project pending (in progress) Common Telecommunication Infrastructures course | Polytechnic University of Cartagena Occupational Health and Safety Expert. Preventive Officer | European Business School of Murcia Advanced course in Restoration and Preservation of Buildings. Construction Pathologies and Treatment Techniques | Professional Association of Architects and Construction Engineers of Murcia Data Center Design Awareness | Data Center Dynamic WORK EXPERIENCE Plant design engineer | Aquiline ICT Group | 09/2005 – present Design and project management of the new data center | Cartagena Port Authority | 2012 Project management for more than 4,000 m optical fiber installation, including submarine stretch | Cartagena Port Authority | 2010 Design and installation of the new data network | Torrevieja City Council | 2010 Design and installation of the new data network | Alfonso X el Sabio High School of Murcia | 2008 Remodeling and extensión of the voice and data network | Virgen de la Arrixaca University Hospital of Murcia | 2006

Page 34: Construction of educational facilities

MAXIMINO PUJANTE MORENO ECONOMIST – FINANCIAL AUDITOR EDUCATION AND POSTGRADUADE TRAINING Financial Auditor | 2006 Master’s Degree in Financial Auditing | 1999 Bachelor’s Degree in Business Administration and Management | San Pablo CEU University of Elche | 2005 Associate’s Degree in Business Studies | Universidad de Murcia | 1996 Master’s Degree in International Trade Management | 1997 WORK EXPERIENCE Financial Manager for the Real Estate Development Area and the Administrative Concessions | Intersa | 2003 - present Preparation of the accounting and financial statements. Fiscal analysis and preparation of the tax declarations Control of liquid assets, current accounts, revolving credit accounts, bank discount, etc. Cash flow forecasting. Deals and negotiations with banks. Control of the collection from public and private clients Economic control of monthly costs per project, deviations analysis and justification. Preparation of feasibility studies for all the current projects Supervision of the accounting operations regarding the administrative concessions. Submission to the public administration of all the necessary information for the requested grants and subsidies, etc. Analysis and preparation of the feasibility analysis for the study of new investment projects and all kind of administrative grants and subsidies

Consultant and Auditor | Ralsa Gestión | 07/2001 – 02/2003 Global analysis of companies with audit, preparation of real financial statements, tax analysis, etc. Preparation of feasibility and business plans Restructuring of large companies in difficulties. Preparation of feasibility plans, business analysis and cost and resource optimization. Controlling. Clients’ staff training Management of the construction works of the delegation in Murcia | FCC Construcción, S.A. | 10/2000 – 08/2001 Control of costs and civil engineering works Auditor | Auditores y Contables, S.L. | 02/1999 – 10/2000 Financial statements audit, revision of financial statements, etc.

Page 35: Construction of educational facilities

EDUCATIONAL FACILITIES

PROJECT PORTFOLIO

Page 36: Construction of educational facilities
Page 37: Construction of educational facilities

PROJECT Construction of the Raúl Vázquez Transportation and Logistics Integrated Training Center 16,178 m2 built area

LOCATION La Celsa, Madrid

CLIENT Regional Ministry of Education of the Autonomous Community of Madrid

BUDGET 18,566,308.92

EXECUTION PERIOD March 2005 – January 2008

TRANSPORTATION AND LOGISTICS

INTEGRATED TRAINING CENTER

Page 38: Construction of educational facilities

TRANSPORTATION AND LOGISTICS

INTEGRATED TRAINING CENTER

Page 39: Construction of educational facilities

CAMPUS OF ESPINARDO UNIVERSITY OF MURCIA

PROJECT Remodeling and refurbishment of buildings “T” and “D” and urban development works

LOCATION Espinardo, Murcia

CLIENT Autonomous Community of the Region of Murcia. Murcia Science Park Foundation

BUDGET 7,675,481.79 €

EXECUTION PERIOD April 2010 – Ongoing

Page 40: Construction of educational facilities

EDUCATIONAL CENTER UNIVERSITY OF CÓRDOBA

PROJECT Construction of 5-story educational center

LOCATION Córdoba

CLIENT University of Córdoba

BUDGET 4,945,477.98 €

EXECUTION PERIOD Pending contract signing

Page 41: Construction of educational facilities

VOCATIONAL TRAINING CENTER IN VILLAVERDE

PROJECT Construction of vocational training center: 5,578.98 m2 built area building, multi-purpose pavilion, etc.

LOCATION Villaverde, Madrid

CLIENT Regional Ministry of Education of the Autonomous Community of Madrid

BUDGET 4,591,141.96 €

EXECUTION PERIOD December 2003 – August 2004

Page 42: Construction of educational facilities

VOCATIONAL TRAINING CENTER IN VILLAVERDE

Page 43: Construction of educational facilities

LECTURE ROOM BUILDING UNIVERSITY OF VALENCIA

PROJECT Construction of a new lecture room building in the Tarongers University Campus

LOCATION Valencia

CLIENT University of Valencia

BUDGET 4,585,080.02 €

EXECUTION PERIOD September 2010 – Ongoing

Page 44: Construction of educational facilities

LIBRARY IN MAJADAHONDA

PROJECT Construction of the new central library. 4,247 m2 built area

LOCATION Majadahonda, Madrid

CLIENT Town Council of Majadahonda

BUDGET 4,491,532.10 €

EXECUTION PERIOD October 2006 – December 2008

Page 45: Construction of educational facilities

LIBRARY IN MAJADAHONDA

Page 46: Construction of educational facilities

SPECIAL EDUCATION CENTER IN LAS ROZAS

PROJECT Construction of different buildings (educational pavilion, school cafeteria, gym, janitor’s home) 3,624 m2

LOCATION Las Rozas, Madrid

CLIENT Regional Ministry of Education of the Autonomous Community of Madrid

BUDGET 3,959,693.64 €

EXECUTION PERIOD March 2004 – January 2005

Page 47: Construction of educational facilities

SPECIAL EDUCATION CENTER IN LAS ROZAS

Page 48: Construction of educational facilities

SPECIAL EDUCATION CENTER IN LAS ROZAS

Page 49: Construction of educational facilities

HIGH SCHOOL IN LAS TORRES DE COTILLAS

PROJECT Construction of high school

LOCATION Las Torres de Cotillas, Murcia

CLIENT Town Council of Las Torres de Cotillas

BUDGET 3,702,258.74 €

EXECUTION PERIOD January 2010 – October 2010

Page 50: Construction of educational facilities

HIGH SCHOOL IN LAS TORRES DE COTILLAS

Page 51: Construction of educational facilities

HIGH SCHOOL IN HUMANES

PROJECT Construction of high school, sports ground, gardens, etc.

LOCATION Humanes, Madrid

CLIENT Regional Ministry of Education of the Autonomous Community of Madrid

BUDGET 3,584,322.94 €

EXECUTION PERIOD October 2008 – September 2009

Page 52: Construction of educational facilities

HIGH SCHOOL IN HUMANES

Page 53: Construction of educational facilities

SCHOOL IN SAN FULGENCIO

PROJECT Construction of the Jose María Manresa Navarro school 3,880.66 m2 total built area on a 7,345.63 m2 plot

LOCATION San Fulgencio, Alicante

CLIENT Autonomous Community of Valencia. Ciegsa

BUDGET 2,961,434.36 €

EXECUTION PERIOD June 2008 – August 2009

Page 54: Construction of educational facilities

LABORATORIES MIGUEL HERNÁNDEZ UNIVERSITY OF ELCHE

PROJECT Extension of the building Torregaitán for laboratories and offices in the University Campus of Elche

LOCATION Elche, Alicante

CLIENT Miguel Hernández University of Elche

BUDGET 2,834,925.40 €

EXECUTION PERIOD January 2008 – October 2009

Page 55: Construction of educational facilities

PROJECT Construction of the Institute of Information Technologies and Systems in the University Campus of Ciudad Real

LOCATION Ciudad Real

CLIENT University of Castilla-La Mancha

BUDGET 2,620,025.40 €

EXECUTION PERIOD December 2008 – December 2009

IT INSTITUTE UNIVERSITY OF CASTILLA – LA MANCHA

Page 56: Construction of educational facilities

IT INSTITUTE UNIVERSITY OF CASTILLA – LA MANCHA

Page 57: Construction of educational facilities

RESEARCH CENTER UNIVERSITY OF BURGOS

PROJECT Construction of the industrial technology research center

LOCATION Burgos

CLIENT University of Burgos

BUDGET 2,503,050 €

EXECUTION PERIOD Pending contract signing

Page 58: Construction of educational facilities

SCHOOL IN MÓSTOLES

PROJECT Construction of a school

LOCATION Móstoles, Madrid

CLIENT Autonomous Community of Madrid. Arpegio

BUDGET 2,380,476.47 €

EXECUTION PERIOD October 2010 - Ongoing

Page 59: Construction of educational facilities

SCHOOL IN USERA DISTRICT, MADRID

PROJECT Construction of a school

LOCATION Madrid

CLIENT City Council of Madrid

BUDGET 2,344,729.70 €

EXECUTION PERIOD May 2008 – October 2009

Page 60: Construction of educational facilities

SCHOOL IN USERA DISTRICT, MADRID

Page 61: Construction of educational facilities

SCHOOL IN VALLECAS

PROJECT Construction of school 1,500 m2

LOCATION Vallecas, Madrid

CLIENT City Council of Madrid

BUDGET 2,322,163.70 €

EXECUTION PERIOD March 2009 – January 2010

Page 62: Construction of educational facilities

SCHOOL IN VALLECAS

Page 63: Construction of educational facilities

CULTURAL CENTER IN MAZARRÓN

PROJECT Construction of a cultural center

LOCATION Mazarrón, Murcia

CLIENT Town Council of Mazarrón

BUDGET 2,319,834.39 €

EXECUTION PERIOD July 2010 - Ongoing

Page 64: Construction of educational facilities

HIGH SCHOOL IN ARCHENA

PROJECT Construction of a high school

LOCATION Archena, Murcia

CLIENT Regional Ministry of Education of the Autonomous Community of the Region of Murcia

BUDGET 2,310,353.44 €

EXECUTION PERIOD January 2002 – October 2002

Page 65: Construction of educational facilities

HIGH SCHOOL IN ARCHENA

Page 66: Construction of educational facilities

DAY CARE CENTER IN TORREJÓN DE ARDOZ

PROJECT Construction of a day care center for children between 0 and 3 years old, 1,440 m2

LOCATION Torrejón de Ardoz, Madrid

CLIENT Town Council of Torrejón de Ardoz

BUDGET 2,279,481.59 €

EXECUTION PERIOD April 2008 – June 2009

Page 67: Construction of educational facilities

DAY CARE CENTER IN TORREJÓN DE ARDOZ

Page 68: Construction of educational facilities

SCHOOL IN TETUÁN DISTRICT

PROJECT Construction of a school

LOCATION Madrid

CLIENT City Council of Madrid

BUDGET 2,174,753.94 €

EXECUTION PERIOD March 2009 – April 2010

Page 69: Construction of educational facilities

SCHOOL IN TETUÁN DISTRICT

Page 70: Construction of educational facilities

SCHOOL IN FUENTE ÁLAMO

PROJECT Extension of school 2,901.19 m2 built area

LOCATION Fuente Álamo, Murcia

CLIENT Town Council of Fuente Álamo

BUDGET 2,094,005.25 €

EXECUTION PERIOD December 2008 – April 2010

Page 71: Construction of educational facilities

VICENTE MEDINA HIGH SCHOOL IN ARCHENA

PROJECT Extension of high school 2,846.14 € built area

LOCATION Archena, Murcia

CLIENT Town Council of Archena

BUDGET 1,903,775.03 €

EXECUTION PERIOD December 2006 – June 2008

Page 72: Construction of educational facilities

CERVANTES SCHOOL IN IBI

PROJECT Construction of a school

LOCATION Ibi, Alicante

CLIENT Autonomous Community of Valencia. Ciegsa

BUDGET 1,765,029.61 €

EXECUTION PERIOD March 2010 – Ongoing

Page 73: Construction of educational facilities

NUESTRA SEÑORA DE BEGOÑA SCHOOL IN SAGUNTO

PROJECT Restoration, demolition and construction works in a school

LOCATION Sagunto, Valencia

CLIENT Autonomous Community of Valencia

BUDGET 1,750,758.19 €

EXECUTION PERIOD February 2009 – October 2009

Page 74: Construction of educational facilities

SAGRADO CORAZÓN SCHOOL IN PUERTO LUMBRERAS

PROJECT Construction of a school. 3,275m2 built area. 3,644 m2 exterior area with playground, multi-sport ground, etc.

LOCATION Puerto Lumberas, Murcia

CLIENT Town Council of Puerto Lumbreras

BUDGET 1,697,033.87 €

EXECUTION PERIOD March 2010 – July 2010

Page 75: Construction of educational facilities

SAGRADO CORAZÓN SCHOOL IN PUERTO LUMBRERAS

Page 76: Construction of educational facilities

SCHOOL IN MATAELPINO

PROJECT Construction of a school. 1,084 m2 built area

LOCATION El Boalo, Madrid

CLIENT Regional Ministry of Education of the Autonomous Community of Madrid

BUDGET 1,694,949.75 €

EXECUTION PERIOD February 2007 – January 2008

Page 77: Construction of educational facilities

SCHOOL IN MATAELPINO

Page 78: Construction of educational facilities

HIGH SCHOOL IN PILAR DE LA HORADADA

PROJECT Refurbishment and extension of high school

LOCATION Pilar de la Horadada, Alicante

CLIENT Town Council of Pilar de la Horadada

BUDGET 1,644,450.80 €

EXECUTION PERIOD April 2002 – October 2002

Page 79: Construction of educational facilities

JESÚS GARCÍA SCHOOL IN LORQUÍ

PROJECT Construction of school: 12 classrooms, multi-purpose room for 70 students, etc.

LOCATION Lorquí, Murcia

CLIENT Town Council of Lorquí

BUDGET 1,496,820.54 €

EXECUTION PERIOD March 2008 – February 2009

Page 80: Construction of educational facilities

SCHOOL IN ARANJUEZ

PROJECT Construction of school: 9 classrooms

LOCATION Aranjuez, Madrid

CLIENT Regional Ministry of Education of the Autonomous Community of Madrid

BUDGET 1,448,116.36 €

EXECUTION PERIOD April 2010 – September 2010

Page 81: Construction of educational facilities

SCHOOL IN ARANJUEZ

Page 82: Construction of educational facilities

SCHOOL IN EL BERCIAL

PROJECT Construction of school: 8 classrooms

LOCATION Getafe, Madrid

CLIENT Town Council of Getafe

BUDGET 1,444,912.83 €

EXECUTION PERIOD December 2007 – July 2008

Page 83: Construction of educational facilities

SCHOOL IN EL BERCIAL

Page 84: Construction of educational facilities

LA FORTUNA DAY CARE CENTER IN LEGANÉS

PROJECT Construction of a day care center for children between 0 and 6 years

LOCATION Leganés, Madrid

CLIENT Town Council of Leganés

BUDGET 1,352,975.45 €

EXECUTION PERIOD July 2010 – March 2011

Page 85: Construction of educational facilities

DAY CARE CENTER IN LEGANÉS

PROJECT Construction of a day care center for children between 0 and 6 years

LOCATION Leganés, Madrid

CLIENT Town Council of Leganés

BUDGET 1,308,571.32 €

EXECUTION PERIOD July 2010 – March 2011

Page 86: Construction of educational facilities

DAY CARE CENTER IN MURCIA

PROJECT Construction of a day care center. 1,309.86 m2. Playgrounds

LOCATION Murcia

CLIENT Escuela Murciana de 1ª infancia, S.C.L.

BUDGET 1,289,158.17 €

EXECUTION PERIOD January 2009 – September 2009

Page 87: Construction of educational facilities

DAY CARE CENTER IN MURCIA

Page 88: Construction of educational facilities

DAY CARE CENTER IN YUNQUERA DE HENARES

PROJECT Construction of a day care center

LOCATION Yunquera de Henares, Guadalajara

CLIENT JCCM. Gicaman

BUDGET 1,211,343.40 €

EXECUTION PERIOD July 2008 – December 2009

Page 89: Construction of educational facilities

DAY CARE CENTER IN YUNQUERA DE HENARES

Page 90: Construction of educational facilities

LECTURE ROOM BUILDING POLYTECHNIC UNIVERSITY OF CARTAGENA

PROJECT Construction of the General Lecture Room II and the Electrochemistry and Smart Materials Center

LOCATION Cartagena, Murcia

CLIENT Polytechnic University of Cartagena

BUDGET 1,175,764.19 €

EXECUTION PERIOD November 2001 – August 2002

Page 91: Construction of educational facilities

LECTURE ROOM BUILDING POLYTECHNIC UNIVERSITY OF CARTAGENA

Page 92: Construction of educational facilities

CABO DE LA HUERTA HIGH SCHOOL IN ALICANTE

PROJECT Construction of a 4-story building as an extension of a high school. 1,038 m2 built area

LOCATION Alicante

CLIENT Autonomous Community of Valencia. Ciegsa

BUDGET 1,109,356.66 €

EXECUTION PERIOD January 2007 – August 2008

Page 93: Construction of educational facilities

MULTI-PURPOSE CENTER IN VALLADOLID

PROJECT Fitting-out of a multi-purpose municipal center

LOCATION Valladolid

CLIENT Town Council of Valladolid

BUDGET 1,009,046.76 €

EXECUTION PERIOD September 2010 – December 2010

Page 94: Construction of educational facilities

JUAN MANUEL MONTOYA SCHOOL IN VALENCIA

PROJECT Construction of a school

LOCATION Valencia

CLIENT Autonomous Community of Valencia. Ciegsa

BUDGET 981,764.20 €

EXECUTION PERIOD September 2009 - Ongoing

Page 95: Construction of educational facilities

DAY CARE CENTER IN ALTEA

PROJECT Construction of a day care center

LOCATION Altea, Alicante

CLIENT Town Council of Altea

BUDGET 857,415.03 €

EXECUTION PERIOD August 2010 - Ongoing

Page 96: Construction of educational facilities

PUBLIC LIBRARY IN TORREVIEJA

PROJECT Rehabilitation of unique building for its use as a public library

LOCATION Torrevieja, Alicante

CLIENT Town Council of Torrevieja

BUDGET 855,479.07 €

EXECUTION PERIOD October 1999 – December 2000

Page 97: Construction of educational facilities

AZARBE RESIDENCE HALL OF THE UNIVERSITY OF MURCIA

PROJECT Refurbishment and extension of the Azarbe Residence Hall

LOCATION Murcia

CLIENT University of Murcia

BUDGET 800,927.31 €

EXECUTION PERIOD August 2010 - Ongoing

Page 98: Construction of educational facilities

DAY CARE CENTER IN ÁGUILAS

PROJECT Demolition of an old day care center and construction of a new one

LOCATION Águilas, Murcia

CLIENT Regional Ministry of Education of the Autonomous Community of Murcia

BUDGET 744,906.90 €

EXECUTION PERIOD November 2000 – September 2001

Page 99: Construction of educational facilities

DAY CARE CENTER IN ÁGUILAS

Page 100: Construction of educational facilities

DAY CARE CENTER IN XILXES

PROJECT Construction of a day care center. 1,162 m2 built area

LOCATION Xilxes, Castellón

CLIENT Town Council of Xilxes

BUDGET 706,814.26 €

EXECUTION PERIOD September 2007 – January 2009

Page 101: Construction of educational facilities

PUBLIC LIBRARY IN TORREJÓN DE LA CALZADA

PROJECT Construction of public library

LOCATION Torrejón de la Calzada, Madrid

CLIENT Autonomous Community of Madrid. Arpegio

BUDGET 592,477 €

EXECUTION PERIOD December 2006 – November 2007

Page 102: Construction of educational facilities

FERNANDO DE LOS RÍOS SCHOOL IN LAS ROZAS

PROJECT Construction of pavilion for school

LOCATION Las Rozas, Madrid

CLIENT Town Council of Las Rozas

BUDGET 564,710.15 €

EXECUTION PERIOD March 2006 – February 2007

Page 103: Construction of educational facilities

REPAIRS IN PUBLIC LIBRARY IN MURCIA

PROJECT Roof repairs in a public library

LOCATION Murcia

CLIENT Spanish Ministry of Culture. Department of Cultural Infrastructures and Equipment

BUDGET 563,339.80 €

EXECUTION PERIOD October 2010 – March 2011

Page 104: Construction of educational facilities

DAY CARE CENTER IN MOLINA DE SEGURA

PROJECT Construction of a day care center

LOCATION Molina de Segura, Murcia

CLIENT Town Council of Molina de Segura

BUDGET 538,390 €

EXECUTION PERIOD July 2010 – December 2010

Page 105: Construction of educational facilities

STUDENT BARRACK IN NAVY DIVING CENTER OF CARTAGENA

PROJECT Fitting-out of equipment and student barracks

LOCATION Cartagena

CLIENT Spanish Ministry of Defense

BUDGET 456,649 €

EXECUTION PERIOD September 2000 – September 2001

Page 106: Construction of educational facilities

NEWTON COLLEGE IN ELCHE

PROJECT Construction works for a private college: water supply and sewage, paving, etc.

LOCATION Elche, Alicante

CLIENT Newton College, S.L.

BUDGET 448,956.04 €

EXECUTION PERIOD July 2000 – December 2000

Page 107: Construction of educational facilities

UNIVERSITY FACILITIES UNIVERSITY OF MURCIA

PROJECT Fitting-out of the university buildings for their compliance with the accessibility regulation

LOCATION Murcia

CLIENT University of Murcia

BUDGET 179,402.11 €

EXECUTION PERIOD August 1999 – December 1999

Page 108: Construction of educational facilities

INFANTE JUAN MANUEL HIGH SCHOOL IN MURCIA

PROJECT Repairs in the electrical installation in high school

LOCATION Murcia

CLIENT Regional Ministry of Education of the Autonomous Community of the Region of Murcia

BUDGET 143,793.41

EXECUTION PERIOD October 2009 – December 2009

Page 109: Construction of educational facilities

BERMA GROUP

Page 110: Construction of educational facilities
Page 111: Construction of educational facilities

A VAST EXPERIENCE IN CONSTRUCTION PROJECTS

More than 22 years of experience in manufacturing, transportation and assembly of prefabricated concrete structures, slabs and enclosures for civil works, industrial construction and building works More than 500 works successfully executed

Page 112: Construction of educational facilities

61,000 m2 production plant in Quintanar del Rey, Cuenca

45,000 m2 production plant In Montalbo, Cuenca

Cutting edge technology

Capability to adapt our standard products to the specific clients needs

Technical department to offer global design solutions adapted to each building project

CONSTRUCTION

TECHNOLOGY AND MEANS

Page 113: Construction of educational facilities

PRODUCTION PLANTS

Page 114: Construction of educational facilities

PRODUCTION PLANTS

Page 115: Construction of educational facilities

PRODUCTION PLANTS

Page 116: Construction of educational facilities

PRODUCTION PLANTS

Page 117: Construction of educational facilities

PRODUCTION PLANTS

Page 118: Construction of educational facilities

PRODUCTION PLANTS

Page 119: Construction of educational facilities

PRODUCTION PLANTS

Page 120: Construction of educational facilities

PRODUCTION PLANTS

Page 121: Construction of educational facilities

PRODUCTION PLANTS

Page 122: Construction of educational facilities
Page 123: Construction of educational facilities

KEY FIGURES

TURNOVER HUMAN RESOURCES

YEAR AMOUNT (€) YEAR AMOUNT (employees)

2008 9,722,983 2008 60

2009 8,298,309 2009 51

2010 6,987,392 2010 47

2011 7,903,346 2011 53

2012 8,749,033 2012 48

Page 124: Construction of educational facilities

PROJECT PORTFOLIO

PROJECTS

NO.

NAME AND DESCRIPTION OF THE PROJECT

1 Industrial premises for furniture storage in Vall d’Uxó, Castellón

2 Logistic center in Airport Area of Barajas, Madrid

3 Industrial premises for glass storage in Almassora, Castellón

4 Development of 72 industrial buildings in L’Hota Vella Industrial Estate in Bétera, Valencia

5 Development of 72 industrial buildings in Romica Industrial Estate in Albacete

6 Industrial premises for furniture storage in Casasimarro, Cuenca

7 Industrial premises for furniture storage in Caudete, Valencia

8 Industrial premises for wood industry company in Cuenca

9 Industrial premises for photovoltaic cells storage in Cuenca

10 Industrial premises for electrical materials storage in Cuenca

11 Industrial premises for electrical materials storage in Requena, Valencia

12 Agricultural buildings for straw storage in Briviesca, Burgos

13 Industrial premises for workshop in Villarrobledo, Albacete

14 Industrial premises for workshop in Villamarxant, Valencia

15 Industrial premises in Mercasalamanca, Salamanca

16 Development of 18 industrial buildings in the Industrial Estate of Villena, Alicante

17 Industrial premises for bottles storage in Vallamalea, Albacete

18 Industrial premises for machinery storage in Casas ibáñez, Albacete

19 Industrial premises in Fuente del Jarro Industrial Estate in Paterna, Valencia

20 Industrial premises in Industrial Estate of Picassent, Valencia

21 Industrial premises in Vara de Quart Industrial Estate in Valencia

22 Premises for pharmaceutical industry in University Campus of Alcalá de Henares

23 Industrial premises in Fuente de Pedro Naharro, Cuenca

24 Industrial premises for hardware store in Carlet, Valencia

25 Industrial premises in Alborala, Valencia

Page 125: Construction of educational facilities

NO.

NAME AND DESCRIPTION OF THE PROJECT

26 Industrial premises for construction laboratory in Tarancón, Cuenca

27 Industrial premises for mycelium laboratory in Autol, La Rioja

28 Indoor swimming pool in Minglanilla, Cuenca

29 Industrial premises in Industrial Estate of Catadau, Valencia

30 Hotel in Sepes Industrial Estate, Cuenca

31 Cultural art center in Campillo de Altobuey, Cuenca

32 Warehouse, cafeteria and supermarket premises for a petrol station in Betxi, Castellón

33 Champion retail premises in Quintanar del Rey, Cuenca

34 Champion retail premises in Cuenca

35 Champion retail premises in Santa Ana, Murcia

36 Champion retail premises in Onda, Castellón

37 Champion retail premises in Vallajoyosa, Alicante

38 Decathlon retail premises in Águilas, Murcia

39 Decathlon retail premises in Onda, Castellón

40 Decathlon retail premises in Rivas Vaciamadrid, Madrid

41 Wall of prefabricated concrete panel in Madrid-Valencia high-speed line railway

42 Slab for protection of Isabell II Channel pipeline in Leganés

A large number of enclosure works for industrial premises, multi-sport pavilions and other buildings

Numerous slabs for schools, helthcare centers, residential blocks and all type of buildings

Page 126: Construction of educational facilities
Page 127: Construction of educational facilities

HEADQUARTERS COMMUNITY

Avda. Juan Carlos I, 55. Edif. JC1. Planta 16 www.aquiline.es/linkedin

30100 Murcia. Spain. EU www.aquiline.es/xing

T +34 968 235337 www.aquiline.es/twitter WEBSITE www.aquiline.es/facebook www.aquiline.es/google+ www.aquiline.es www.aquiline.es/flickr E-MAIL www.aquiline.es/youtube

[email protected]