    QUALITY ASSURANCE / QUALITYCONTROL (QA/QC) MANUAL

    KINGDOM OF SAUDI ARABIA

    P.O. BOX 10257, DAMMAM 31433

    KINGDOM OF SAUDI ARABIA

    Tel. No. +966 3 8417007

    Fax. No. +966 3 8423281

    DOCUMENT NO. MACO-QM-001 REV.0

    THIS QUALITY MANUAL IS THE ONLYCONTROLLED AND VALID VERSION.ALL OTHER VERSIONS ARECONSIDERED TO BEUNCONTROLLED AND MAY NOT BE

    USED FOR WORK CONTROLLINGPURPOSES.DOCUMENT NO. MACO-QM-00101

    thApril 2009

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    2/172

    QUALITY ASSURANCE / QUALITY CONTROL

    (QA/QC) MANUAL

    P.O. BOX 10257, DAMMAM 31433

    KINGDOM OF SAUDI ARABIA

    Tel. No. +966 3 8417007

    Fax. No. +966 3 8423281

    1 ISSUED FOR APPROVAL Prepared By: CHECKED BY APPROVED BY APPROVED BY2 QA/QC Quality Manual APT YSB NMZ SMZ

    3 SIGNATURE/DATE

    REVISION HISTORY: Document Recipients:

    1 Revision 1 April 1, 2009 1. Gen. Manager 4. Project Managers

    2 2. Asst. Gen. Manager 5. QA/QC Department

    3 3. Business Dev. Manager 6. Purchasing/Finance Depts.

    DOCUMENT NO. MACO-QM-001 VOL. 1REV.

    0

    THIS QUALITY MANUAL IS THE ONLY

    CONTROLLED AND VALID VERSION.ALL OTHER VERSIONS ARE

    CONSIDERED TO BE

    UNCONTROLLED AND MAY NOT BE

    USED FOR WORK CONTROLLING

    PURPOSES.

    DOCUMENT NO. MACO-QM-001

    01th

    APRIL 2009

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    3/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-001

    Rev. 0

    Quality Manual MACO-QM-001

    QUALITY ASSURANCE/QUALITY

    CONTROLMANUAL

    MACO-QM-001

    VOL. 1

    APPROVAL SHEET

    -i-

    Description Name Designation Signature Date

    Prepared

    By:A.P. Togle

    QA/QC Senior Engineer

    Manar Arabian Corp.

    Approved

    By:

    Y. S.

    Bahrawy Projects Manager

    Approved

    By:N. M. Zahrani

    Assistant General

    Manager

    Approved

    By:S. M. Zahrani General Manager

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    4/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-001

    Rev. 0

    Quality Manual MACO-QM-001

    QUALITY ASSURANCE/QUALITY

    CONTROL MANUAL

    MACO-QM-001

    VOL. 1

    REVISION HISTORY

    -ii-

    Revision No. Purpose of Revision Issue Date

    0 Submitted for Approval. April 01, 2009

    1

    2

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    5/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    Quality Manual iii MACO-QM-001

    TABLE OF CONTENTS

    SECTION HEADING PAGE NO.

    Approval Sheet i

    Revision History Sheet ii

    Table of Contents iii

    1 Company Quality Policy 01

    2 Project Scope 03

    3 Normative References 03

    4 Terms and Definitions 05

    5 Quality Management System 09

    5.1 General Requirements 09

    5.2 Documentation Requirements 10

    5.2.1 General 105.2.2 Quality Manual 10

    5.2.3 Control Of Documents 10

    5.2.4 Control Of Records 11

    6 Management Responsibility 12

    6.1 Management Commitment 126.2 Customer Focus 12

    6.3 Quality Policy 13

    6.4 Planning 136.4.1 Quality Objective 13

    6.4.2 Quality Management System Planning 14

    6.5 Responsibility, Authority, and Communication 14

    6.5.1 Responsibility and Authority 146.5.2 Appointing a Quality Manager/Management

    Representative 19

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    6/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    Quality Manual iv MACO-QM-001

    6.5.3 Internal Communication 196.6 Management Review 19

    6.6.1 General 19

    6.6.2 Review Input 19

    6.6.3 Review Output 20

    7 Resource Management 20

    7.1 Provision Of Resources 207.2 Human Resources 20

    7.2.1 General 20

    7.2.2 Competence, Awareness and Training 217.3 Infrastructure 22

    7.4 Work Environment 22

    8 Project Execution/Product Realization 22

    8.1 Planning of Project Execution 228.2 Customers Related Processes 22

    8.2.1 Determining Project Requirements 22

    8.2.2 Reviewing Project Requirements 238.2.3 Customer Communication 23

    8.3 Design and Development 23

    8.4 Purchasing 238.4.1 Purchasing Processes 23

    8.4.2 Purchase Information 24

    8.4.3 Verification of Purchased Products 24

    8.5 Production and Service Provision 258.5.1 Control of Production and Service Provision 25

    8.5.2 Validation of Processes for Production & Service 26

    8.5.3 Identification and Traceability 268.5.4 Proponents Property 27

    8.5.5 Preservation of Material and Equipment 27

    8.6 Control of Monitoring and Measuring Devices 27

    9 Measurement, Analysis, and Improvement 28

    9.1 General 28

    9.2 Monitoring and Measuring 299.2.1 Customer Satisfaction 29

    9.2.2 Internal Audit 29

    9.2.3 Monitoring and Measuring of Processes 309.2.4 Monitoring and Measuring of the Work 30

    9.3 Control of Non-Conforming Product 31

    9.4 Analysis of Data 31

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    7/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    Quality Manual v MACO-QM-001

    9.5 Improvements 329.5.1 Continual and Improvement 32

    9.5.2 Corrective Action 32

    9.5.3 Prevent Potential Nonconformities 32

    Attachment 1: Organizational Charts 34

    Attachment 2: Resumes of Key Personnel 35

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    8/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 1 of 35 MACO-QM-001

    SECTION 1: COMPANY QUALITY POLICY

    The intent of this Quality Manual is to define the Quality Assurance/QualityControl requirements to be implemented within Manar Arabian Corporation

    (MACO) and for each project, and to ensure that all Quality related activities are

    planned adequately to cover all parameters specified in each contract.

    MACO will ensure that vendors, suppliers, fabricators and subcontractors have

    in place a Quality Assurance Program that meets applicable requirements of thisQuality Plan including conformity with the applicable requirements of ISO

    9001/2000 and other applicable Engineering Standards of each Proponent.

    The Quality Plan describes a system of QA/QC procedures and processes

    encompassing documentation, material, engineering, procurement, construction,installation, testing and pre-commissioning.

    The prime objective of the Management of MACO is to provide a uniform

    system for the performance, monitoring, quality assurance, safety & lossprevention reporting activities and controlling of all contract and work activities

    in a manner which conform to contractual requirements.

    In order to achieve this objective, it is the policy of MACO to establish and

    maintain an efficient and effective quality control and quality assurance program,

    planned and developed in conjunction with all management functions.Determination of conformance of work to contract requirements is verified on

    the basis of objective evidence of quality.

    The quality assurance program of MACO is based upon the requirements of

    Schedule Q Quality Assurance and Quality Control, Inspection and Testing,

    and Quality Construction Procedures of each contract.

    MACO Quality Manual and the systems included therein, describe how the

    quality assurance program of MACO is designed to ensure that all quality

    requirements are recognized and that a consistent and uniform control of theserequirements is adequately maintained. MACOs Quality Manual also defines

    how effective control is established.

    No company can be successful without satisfied customers. Our success has been

    achieved by a continuing commitment, to our customers, to provide them with

    what was promised. This lies at the very heart of our quality objectives. We have

    always taken on board the definition of quality as being first time conformanceto defined requirements. Moreover, we have adopted the premise that quality is

    driven by and defined by the customer. In short, we have a strong customer focus

    and are convinced that quality is what the customer says it is.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    9/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 2 of 35 MACO-QM-001

    The function of this Quality Manual (QM) therefore is to describe and set out the

    general quality policies, Construction Procedures and practices of all Proponents

    and MACO. It serves as a reference between the Proponents QualityRequirements and MACOs internal Quality Management System. It is a

    management tool to keep employees of MACO, as well as to its subcontractors,

    aware of the responsibilities with the internal quality approach and can be usedfor marketing. It is also a suitable training document. It can reduce the learning

    curve due to employee turnover and can assist in the continuity of events in

    such case. Measurement of the cost of quality must be a fundamentalconsideration in design, in the development and in the maintenance of the

    system. The need to impose discipline, where it was previously not considerednecessary, can only be achieved if the potential rewards of improvement

    profitability and turnover are appreciated by the ill disciplined.

    A person who makes no mistakes makes nothing and will never gain experience.

    However, the secret is to build upon ones mistake and never repeat them. This is

    the basic principle of Quality Management and it is the prime reason why a

    formal Quality System must be introduced. As companies grow and theirorganization and structure become more complex, the informal systems which

    served MACO well when it was smaller can no longer be tolerated.

    Quality Management is a key ingredient in maintaining the continuous success of

    MACO. There will always be a danger that the discipline, which it imposes on

    us, will be regarded by some as an additional layer of bureaucracy. This we willguard against at all times. The principle of Quality Management must be

    company wide. In fact, they must extend even further and become a cooperative

    venture between our sub-contractors and ourselves. This is fundamental to theeventual success of sub-contracts since our sub-contractors must also take on

    board our definition of quality and establish documents and maintain effective

    and economical Quality Systems to ensure and demonstrate that products i.e.

    results of activities of processes, conform to specified Proponents Qualityrequirements.

    This Quality Manual, and the typical procedures outlined herein describe howMACO Quality Management System is designed to ensure that quality

    requirements are recognized and that consistent and uniform control of theserequirements is adequately maintained. The Quality Plan defines how effectivecontrol is established by use of formal written procedures. The Quality Manual

    System includes provision for prompt detection of discrepancies and for timely

    and effective corrective action.

    Mr. Saeed Mohammad Al Zahrani Mr. Nabil Al Zahrani

    General Manager Assistant General Manager

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    10/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 3 of 35 MACO-QM-001

    SECTION 2: PROJECT SCOPE

    As per Project Scope of Work.

    SECTION 3: NORMATIVE REFERENCES

    ISO 9000:2000 Quality Management Systems-Fundamentals andVocabulary

    ISO 9001:2000 Quality Management Systems-Requirements. ISO 9002 Control Processes NEC National Electrical Code NFPA National Fire Protection Association NEMA National Electrical Manufacturers Association Saudi Government Safety and Security Directives ASTM American Society for Testing & Materials ANSI American National Standards Institute UL United Laboratories ASTM D638 Test Method for Tensile Properties of Plastics ASTM D1586 Standard Method for Penetration Test ASTM D2290 Standard Test Method for Apparent Tensile

    Strength

    ASTM D2412 Standard Test Method for External LoadingProperties of Plastic Pipe By Parallel Plate

    ASTM D2487 Standard Test Method for Classification of Soilsfor Engineering Purposes

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    11/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 4 of 35 MACO-QM-001

    ASTM D2583 Standard Test Method for Indentation Hardnessof Rigid Plastics by Means of Barcol Impressor

    ASTM 2992 Standard Method for Obtaining HydrostaticDesign Basis for Fiberglass

    ASTM D3567 Standard Method for Determining Dimensions ofFiberglass Pipe and Fittings

    ASTM D3681 Standard Test Method for Chemical Resistanceof Fiberglass Pipe in a Deflected Condition

    ASTM D3754 Standard Specification for Fiberglass Sewer andIndustrial Pressure Pipe

    ASTM D4161 Standard Specification for Fiberglass Pipe JointsUsing Flexible Elastomeric Seals

    ACI American Concrete Institute Royal Commission Guideline Specification Sections:

    02722 Sewerage System

    15060 General Requirement for Pipe Work

    02220 Structure Excavating and Backfill

    02221 Trenching, Bedding, Backfilling and Compacting

    02210 Earthworks

    03348 Cast-In-Place Concrete

    02326 Road Crossings

    09940 Surface Painting of Steel Supports

    03245 Fusion Bonded Epoxy

    02554/02555 Asphalt Road/Sub Grade Material

    AWWA American Water Works Association SAES Saudi Aramco Engineering Standards

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    12/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 5 of 35 MACO-QM-001

    SAMSS Saudi Aramco Material Systems Specifications SAER Saudi Aramco Engineering Requirements SAEP Saudi Aramco Engineering Procedures SATIP Saudi Aramco Typical Inspection Plans SAIC Saudi Aramco Inspection Checklists BICSI-TDMM Building Industry Consulting Services International

    Telecommunications Distribution Methods Manual

    SECTION 4: TERMS AND DEFINITIONS

    Appraisal: Assessment of a suppliers capability of controlling quality,

    carried out before placing orders.

    Certification: The authoritative act of documenting compliance withrequirements.

    Note: The requirements can relate to personnel, processes, products,

    organizations and services.

    Compliance: An indication or judgment that the product or services meets therequirements of the relevant specification or regulation; also the state of

    meeting the requirements.

    Customer: Recipient of a product provided by the supplier.

    Notes:

    1. In a contractual situation, the customer is called the COMPANY i.e.

    Proponent .

    2. The customer may be, for example, the ultimate consumer, user,

    beneficiary or purchaser.

    3. The customer can be either external or internal to the organization.

    Corrective Action: Action taken to eliminate the causes of an existing

    nonconformity, defect or other undesirable situation in order to preventrecurrence.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    13/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 6 of 35 MACO-QM-001

    Documentation: Any recorded or pictorial information describing, defining,

    procedures or results.

    Defect: Non-fulfillment of an intended use or requirement.

    Design Control: The verification that design criteria comply with specifiedrequirements; that design data and methods are valid for the range of

    application; and that the completed design satisfies the design criteria.

    Design Review: A documented, comprehensive and systematic examination

    of a design to evaluate its capability to fulfill the requirements for quality,identify problems, if any, and propose the development of solutions.

    Note: A design review can be conducted at any stage of the design process, but

    should not in any case be conducted at the completion of this process.

    Hold Point: Inspection or test may not proceed without the QA/QCorganization representative in attendance.

    Improvement: Actions taken by MACO to increase the effectiveness andefficiency of activities and processes in order to provide added benefits to both

    MACO and its Sub-contractors.

    Inspection Assignment Package: A set of documents that include the details

    of purchased material/equipment and their quality requirements needed to

    perform full inspection at the vendor/sub-vendor facility.

    Inspection: An activity such as measuring, examining, testing or gauging one

    or more characteristics of an entity and comparing the results with specified

    requirements in order to establish whether conformity is achieved for eachcharacteristic.

    Non-conformity: Non-fulfillment of a specified requirement.

    Note:The definition covers the departure or absence of one or more quality

    characteristics (including dependability characteristics), or quality system

    elements from specified requirements.

    Pre-Commissioning: Testing of system components for continuity, operabilityand in the case of the process plants, their ability to withstand operating

    pressure prior to the introduction of feedstock or other final products into the

    facility.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    14/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 7 of 35 MACO-QM-001

    Procedure: A specified way to perform an activity.

    Notes:In many cases, procedures are documented (e.g. quality system procedures).

    When a procedure is documented, the term written procedure or

    documented procedure is frequently used.

    Product: Result of activities or processes.

    Notes:

    1. A product may include service, hardware, processed materials, softwareor a combination thereof.

    2. A product can be tangible (e.g. assemblies or processed materials) orintangible (e.g. knowledge of concepts), or a combination thereof.

    3. A product can be either intended (e.g. offering to customer) or unintended(e.g. pollutant or unwanted effects).

    Quality: The totality of characteristics of an entity that bear on its ability to

    satisfy stated and implied needs.

    Quality Policy: The overall intentions and direction of an organization with

    regard to quality, as formally expressed by top management.

    Quality Management: All activities of the overall management function that

    determine the quality policy, objectives and responsibilities, and implement

    them by means of quality planning, quality control, quality assurance andquality improvement with MACOs Quality system.

    Quality System: MACOs organizational structure, procedures, processes and

    resources needed to implement quality management (ISO 9001:2000).

    Quality Control: MACO employs operational techniques and activities that

    are used so that its operations and services conform to the quality requirementsas laid down in Proponents documents.

    Quality Assurance: All the planned and systematic activities implementedwithin MACOs Quality Management System, and demonstrated as needed, to

    provide adequate confidence that an entity will fulfill requirements for quality.

    Quality Plan: A document specifying which procedures and associatedresources shall be applied by whom and when to a specific project, product,

    process or contract (ISO 9001:2000).

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    15/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 8 of 35 MACO-QM-001

    Quality Audit: A systematic and independent examination to determine

    whether quality activities and related results comply with planned

    arrangements and whether these arrangements are implemented effectively and

    are suitable to achieve objectives.

    Repair: Action taken on a non-conforming product so that it will fulfill the

    intended usage requirements although it may not conform to the originallyspecified requirements.

    Notes:

    Repair is one type of disposition of a non-conforming product.

    Repair includes remedial action taken to restore, for usage, a once conforming

    but now non-conforming product, for example, as part of maintenance.

    Review: An independent assessment undertaken by an individual or group for

    the area under review.

    Rework: Action taken on a non-conforming product so that it will fulfill the

    original requirement.

    Note:

    Rework is one type of disposition of a non-conforming product.

    Safety-related: Pertaining to those items of plant, the satisfactory

    performance of which is important to the prevention of consequences of such

    accidents.

    Specification: The document that prescribes in detail the requirements with

    which the product or service has to comply.

    Shall: Shall expresses a provision that is binding between two or more

    parties.

    Standard: A document approved by a generally recognized body which

    results from the process of formulating and applying rules for an orderlyapproach to a specific activity.

    Service: The results generated, by activities at the interface between the

    supplier and the customer and by the supplier internal activities, to meet

    customer needs.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    16/172

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    17/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 10 of 35 MACO-QM-001

    Reports of such evaluations will be maintained by QA Manager for the

    duration of the project. Any noncompliance will be resolved to the satisfaction

    of MACO and records maintained.

    5.2 Documentation Requirements:

    5.2.1 General:

    MACO has established the following documentation for its quality

    management system:

    Quality policy and quality objectives This Quality Manual

    Documented procedures (The procedures have been attached )

    Planning, operation, and process control documentation such as: Test and Inspection Plans Work instructions Records of internal reviews Inspection and test reports Internal/external audit reports and corrective action Other documentation used to ensure effective planning

    operation and control.

    5.2.2 Quality Manual:

    The Quality Manual identifies the scope of the Quality Management System,

    and any exclusion to the requirements of ISO 9001:2000 and Proponent

    Quality Systems. It includes procedures and documents covering workactivities. It includes a description of sequences and interactions of processes

    that fall under the scope of the Quality Management System.

    5.2.3 Control of Documents:

    The Quality Manual, referenced procedures and Inspection & Test Plans are

    controlled documents. QA Manager is responsible to ensure the initial issueand subsequent changes are acknowledged by those authorized to receive the

    Quality Manual.

    A documented procedure has been established to control documents required

    for the Quality Management System. Project documents will be maintained at

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    18/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 11 of 35 MACO-QM-001

    the Project office of MACO. Access to these files will be limited to Project

    Manager, QA Manager and associated QA personnel.

    Project Manager is responsible to review all project documents forconformance to the contract prior to submitting to the proponent. This reviewwill be indicated on each item by signature. All documents transmitted to

    Proponent will identify the action taken by the engineer. The document status

    will be updated based on the response.

    Methods will be used to track the status of transmittals that require action bythe recipient. Each document transmitted to Proponent will be accompanied by

    a covering letter that identifies the general nature of the document transmitted.

    All original documents will be maintained by Document Controller as detailed

    in Document & Data Control Procedure (MACO-QMP-004). A list of all

    documents and its status of revision will be maintained by DocumentController and updated every week.

    Documents issued for construction will be approved by qualified andauthorized individuals as required by the contract as detailed in Quality

    Management Procedure QMP-004.

    As-built documents will be maintained by Document Controller at MACO

    Project Office. An index of as-built documents will be maintained as part ofthe file. As-built conditions will be recorded on project documents by redline.

    All documents will be verified for accuracy by QA Manager or his assignee

    and will be transmitted to Proponent, by Project Manager at the end of theproject.

    Only the latest authorized issue of project documents will be available for use

    by contractor personnel. Documents not authorized for use, voided documents

    or superseded documents will be marked and placed in a different file at adifferent location as a means to prevent use.

    Project Manager is responsible for reviewing the contract and identifying

    submittals and deliverables to be transmitted to Proponent. A submittal log

    will be maintained by MACO.

    Controls will be established to track the status of any item on the list thatrequires authorization or approval. These items will not be released until

    approved or authorized.A copy of the approved quality plan, procedures and Inspection & Test Plans

    for use will be available at all locations where work is undertaken for thisproject.

    5.2.4 Control of Records:

    A documented procedure to control the identification, storage, retrieval,

    protection, retention and disposition of quality records will be established. The

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    19/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 12 of 35 MACO-QM-001

    procedure will be incorporated with adequate requirements of Proponent

    applicable standards.

    Project records will be stored in suitable environment to prevent damage ordeterioration and to prevent loss. Records will be filed by subject, date, filecategory, etc.

    An index of project records will be part of the file. Responsibility for the

    accuracy and completeness of the records is assigned to QA Manager. Access

    to records will be under the control of Project Manager. Removal of records toa location other than the immediate area where the file is located will be

    restricted to authorized persons like Project Manager, Project Engineer and QA

    Manager. Measures to identify removed files and their current location will be

    maintained.

    Project Manager will identify those records to be transmitted to the proponentupon completion of the project and transmit the appropriate records.

    MACO records that provide evidence of conformance to requirements and ofthe effective operation of MACO's quality management system will be

    identified, stored, protected, and retained. Retrieval will be controlled. QA

    Manager is responsible for identifying the records to be retained, retentiontime, disposal method, and for arranging for their protection and controlled

    retrieval.

    SECTION 6: MANAGEMENT RESPONSIBILITY

    6.1 Management Commitment:

    The top management of MACO is committed to the development andimprovement of the quality management system by:

    Communicating the importance of meeting the proponents, regulatory,and legal requirements by means of meetings and memos to the

    associated personnel.

    Establishment of a quality policy and objectives. Conducting management reviews in accordance with this QualityManual and other Proponent quality documents. Ensuring the availability of necessary resources in accordance with

    Section 7 of this Quality Manual.

    6.2 Customer Focus:

    MACO ensures Proponents satisfaction by:

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    20/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 13 of 35 MACO-QM-001

    Reviewing contract requirements, Quality Management System, andprocedures for compatibility and submit modifications as appropriate.

    Allocating trained and qualified staff resources in accordance withAttachment I of Schedule Q and other documents to perform projecttasks.

    Schedule and reporting progress in sufficient detail to control projectcost.

    Training personnel as required. Performing management reviews and internal quality audits as

    specified in Proponents quality documents.

    Establish a program for problem identification and resolution andproblem prevention.

    Maintaining data control systems and records of project activities.6.3 Quality Policy:

    MACO has the following quality policy regarding the quality of the goods and

    services we offer to our customers.

    The quality assurance program of MACO is based upon the requirements of

    ISO 9001/2000 Standards and Inspection and Testing of the contract.

    MACO Quality Manual and the systems included therein, describe how thequality assurance program of MACO is designed to ensure that all qualityrequirements are recognized and that a consistent and uniform control of these

    requirements is adequately maintained. The MACO Quality Manual also

    defines how effective control is established.

    It is reviewed for relevancy and appropriateness of objectives at regular

    intervals and communicated to those performing the work.

    6.4 Planning:

    6.4.1 Quality Objective:

    Top management of MACO has identified the following quality objectives for

    the projects. The objectives are measurable, consistent with policy, relevant to

    the successful completion of each project, and attainment of objectives isconsidered as part of our effort for improvement. The objectives include

    meeting contract requirements, resource allocation, and schedule control.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    21/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 14 of 35 MACO-QM-001

    6.4.2 Quality Management System Planning:

    The elements that comprise the quality planning process are this Quality

    Manual, Proponents Test and Inspection Plans, Project Organizational Chartsthat prescribe personnel allocations and mobilizations, titles of individuals,subcontractors necessary to complete the Work, and the integration of Quality

    improvement initiatives described in paragraph 6.6 Management Review and

    9.0 Measurement and Monitoring.

    When conditions require change, the process is controlled and the integrity ofthe quality management system is maintained. The changes to the quality

    system are controlled, i.e., allocation of resources, changes in work scope,

    internal procedures or work instruction modifications are detailed in MACO-

    QMP-003 Procedure for Project Change Control.

    6.5 Responsibility, Authority, and Communication

    6.5.1 Responsibility and Authority:

    MACOs project organization chart has been attached along with this QualityManual. Project Manager is responsible for maintaining the organizational

    charts.

    All QC personnel willfunctionally report to theQuality Assurance Manager.

    While assigned to each project, quality personnel will be dedicated to the work

    and perform no other function on any project.

    MACO has assigned responsibilities and authority in the following manner.

    Project Manager Project Quality Assurance/Quality Control Manager Project/Site Engineer Quality Control Engineer Supervisor/Foreman Document Controller Materials ControllerProject Manager

    The Project Manager has overall authority and responsibility for all aspects of

    the Project. His responsibilities include but are not limited to the following:

    Representation of MACO towards Proponent for all matters relating toa Contract.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    22/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 15 of 35 MACO-QM-001

    Overall management of the project activities and control of the relatedpersonnel.

    Approval of the Project Master Schedule and control of its fulfillment. Implementation of any step which may be required to prevent or

    minimize delays, budget over-running, conditions adverse to qualityobjectives.

    Submittal of progress reports. Maintenance and coordination of contacts with the local authorities for

    all matters related to the work execution.

    The above task will be achieved by coordinating activities of theProject Personnel.

    Project Quality Assurance/Quality Control Manager

    The Quality Assurance Manager directs activities of the Project Quality

    Organization, reporting directly to the Management, but maintaining anoperational link with the Project Sponsor. His responsibilities include but are

    not limited to:

    Preparation, review, updating and distribution of the Project QualityManual/Plan.

    Issue of Project Quality procedures, Project Inspection and Test Plansand forms.

    Review of Quality documentation issued by MACO. Assignment of Quality related tasks within the framework of the

    project.

    Review of Inspection Reports and of related NonconformanceReports.

    Evaluation of Suppliers/Sub-contractors Quality systems Verification,by means of a planned Audit schedule that the established Quality

    Program is being implemented by Subcontractors.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    23/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 16 of 35 MACO-QM-001

    Verification by means of a planned Audit schedule that therequirements set in the Quality Manual is met.

    Coordination and supervision of activities relative to the collation of theProject Record Books.

    Determining and reporting to the Project Management, the principalcauses of quality losses.

    Determining with the Project Manager where improvements arerequired and where necessary, recommending corrective action.

    Project/Site Engineer

    The Project Engineer directs and coordinates the engineering activities

    pertinent to execution of the Project. His responsibilities include but are not

    limited to:

    Ensure the interdisciplinary coordination of the various specialistdesign groups and optimization of solutions.

    Verify the compliance of design with the Project quality requirementsand contractual obligations.

    Ensure the timely availability of pertinent technical documents as perestablished document release schedule. Promote any steps which may be required to prevent or minimize

    delays of engineering activities.

    Analyze changes in the Scope of Work and assist the ProjectManager/Project Planning and Cost Control in assessing the relevantcosts and implications.

    Issue of Purchase Requests for material and/or equipment related to theProject.

    Quality Control Engineer/Inspector

    His responsibilities include but are not limited to:

    Managing Quality Control functions for the Project including planningof Quality Control inspections and preparation of reports.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    24/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 17 of 35 MACO-QM-001

    Controlling corrective actions. Monitor inspections progress, review reports and documentation and

    verify, upon completion of the work, that all requirements have beenmet and that the required Quality records have been collated and filed.

    Monitoring on a day to day case MACO Project complaints with theapproved quality plan(s).

    Following a suitably start and approved procedure for the formalcontrol of deviation/waivers from the job specification.

    Review and approve as necessary, quality related procedures such as: Welding procedure specifications Welding procedure qualifications Welder qualification NDT procedures Heat treatment procedures Cleaning and pressure testing procedures Preservation procedures

    Oversee the daily content and consistency of subordinate inspectorsdaily inspection logbooks.

    Note: The Quality Control Engineer is supported by Supervisor and

    discipline inspectors.

    Supervisor/Foreman/APR

    He is responsible for coordinating and solving problems that may arise in

    connection with the revision or updating of field engineering, during

    performance of the Work assigned to MACO. His responsibilities include

    but are not limited to:

    Monitor implementation and adequacy of the construction/installationprocedures established for the project.

    Receipt of all the technical documentation on site. Filing, reproducing and distribution of all technical documents required

    for performance of the Work.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    25/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 18 of 35 MACO-QM-001

    Updating and revision of the drawings according to amendments andmodifications carried out in field.

    Verify the progress of work and collect planning and reportingdocumentation to be included in the overall progress report.

    Evaluate site changes and if acceptable obtain Proponents approval. Verify that the quality standard of work is in compliance with

    contractual specification and approved procedures.

    Transmit to the Project Management offices all necessarydocumentation generated on site.

    Document Controller

    The Document Controller will manage all the information concerning the

    Project. His responsibilities include but are not limited to:

    Promote the formal management of the information system. Interface with peripheral units and sites to activate training on the use

    of the info system.

    Record and manage incoming and outgoing correspondence. Distribute documents in a controlled manner. Organize the correspondence archive and make sure that this is aligned

    with the one on site.

    Materials Controller

    The Materials Controller reports to the Construction Manager. Hisresponsibilities include but are not limited to:

    Receiving inspection and record keeping of all material both freeissue from Proponent and MACO supplied material.

    Reporting of non-conformances, the monitoring of careful segregationof quarantined material and rectification of defects and clearance of

    material from quarantine.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    26/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 19 of 35 MACO-QM-001

    Assuring the traceability of uniquely identified critical materials whilematerials are in storage.

    The monitoring and recording of the condition and state of preservationof materials released from storage for processing and/or construction.

    6.5.2 Appointing a Quality Manager:

    MACO has assigned Quality Assurance Manager as the management

    representative for quality on each project. He will ensure the qualitysystem is established, maintained and implemented and will report to top

    management on a monthly basis and make recommendations for qualitysystem improvements. Reports will be issued in writing to topmanagement and maintained in an open status until the resolution of

    outstanding items. The management representative for quality will assurethat the project team is aware of customer requirements regarding the

    project.

    6.5.3 Internal Communication:

    The Quality Manager ensures the processes of the quality managementsystem and their effectiveness are communicated throughout the

    organization by distribution of audit reports, management reviews

    procedures, and work instructions.

    6.6 Management Review

    6.6.1 General:

    MACO top management will review the Quality Management System at

    least once every six months to ensure its suitability, adequacy, and

    effectiveness. The QMS, quality policy, and quality objectives will beevaluated for any needed change. Records of these reviews will be

    maintained.

    6.6.2 Review Input:

    Management reviews will utilize:

    Internal and external quality audit results.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    27/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 20 of 35 MACO-QM-001

    Customer performance evaluation. Process performance and product conformance results. Preventive and corrective action status. Follow up on actions from previous management reviews. Other changes that could affect the QMS.6.6.3 Review Output:

    Results of management reviews will be recorded and addressed as

    appropriate:

    Improvements in the QMS and its processes. Improvements in project related to Proponents requirements. Resource needs.Action items will be followed up on at subsequent management reviews toensure closure. A copy of the results of this Management Review will be

    forwarded to the Proponents within two weeks after the management

    review meeting.

    SECTION 7: RESOURCE MANAGEMENT

    7.1 Provision of Resources

    Project Manager is responsible to assess organizational and project needs including

    oversight functions and develop resource requirements in order to assure resourcesnecessary to implement and improve the processes of the QMS and address

    Proponents satisfaction issues are provided in a timely manner.

    7.2 Human Resources:

    7.2.1 General:

    MACO will assign personnel to the project in accordance with Proponentsquality documents that is competent on the basis of applicable education,

    training, skills, and experience. All personnel assigned to each project will

    meet the minimum qualification and experience levels specified in theProponents quality documents. Project Manager is responsible to review

    the contract to determine any customer requirement for competency level

    of personnel assigned to the project and ensure that assignment of

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    28/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 21 of 35 MACO-QM-001

    personnel including subcontractors meet the requirements. Resumes of all

    quality personnel including sub-contractor quality personnel will be

    submitted to Proponent for review and approval at least two weeks prior to

    the start of the work. All procedures and personnel qualifications forspecial processes will be submitted 30 days prior to the start of work.

    MACO will provide on a monthly basis a listing of approved personnel

    forecast to be mobilized in the next 60 days as well as list of personnel to

    be demobilized in the next 60 days.

    MACO planned staffing levels will comply with Proponents approved

    quality plan. Reduction from required level of quality personnel will

    require Proponents written approval.

    Anticipated changes in personnel due to vacation, temporary assignments

    or resignations will be advised to Proponent at least 30 days in advance ofthe scheduled absence. All other changes such as for illness andemergency leaves will be advised as soon as possible.

    7.2.2 Competence, Awareness, and Training:

    MACO has developed position descriptions for those personnelperforming activities affecting quality that identify competency

    requirements. Project Manager maintains the latest issue of position

    descriptions.

    Project Manager is responsible to identify training needs and assuretraining is performed. Personnel lacking required competencies willreceive training such as formal, informal, or on-the-job. MACO will

    provide training as deemed appropriate to satisfy competency needs or

    utilize external training sources.

    MACO will evaluate the effectiveness of the training through periodicinternal audits, review and analysis of employee generated errors,

    omissions, rework, and nonconformities.

    MACO employees and sub-contractors will be made aware of theproject quality requirements and how their work activities contribute tothe achievement of quality objectives. This is achieved through regular

    awareness presentations to personnel and subcontractors, projectkickoff meetings, project position descriptions, project organization

    charts, toolbox meetings, newsletters, performance evaluations

    MACO will maintain records of education, training skills, andexperience for personnel effecting quality. QA Manager is responsible

    to ensure appropriate record including records of training activities andsubject matter of the training are maintained.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    29/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 22 of 35 MACO-QM-001

    7.3 Infrastructure

    MACO provides a work environment suitable for it to achieve its business objective

    and satisfy project requirements. Workplace and associated facilities, equipment,

    hardware, software, and support administrative services will be provided as requiredfor the project. Accessibility to computers, appropriate software and other tools will be

    issued to authorized personnel.

    7.4 Work Environment

    This section is addressed in the Safety and Fire Prevention Program Manual (MACO-SFPP-001).

    SECTION 8: PROJECT EXECUTION

    8.1 Planning of Project Execution:

    MACO will plan and document the project execution process. The documentation forproject execution is stated in paragraph 5.2 of this Quality Manual.

    The quality objectives for the design, procurement, and construction activities are

    identified.

    The design, procurement, construction, pre-commissioning processes,documentation,resources, and facilities will be established for each project.

    Acceptance criteria for the work will be developed where appropriate.

    Records attesting to conformity of process and resulting Work will be maintained by

    QA Manager. Records include:

    Inspection reports and certificates. Disposition reports. Internal quality audit results and closures.

    Records of management reviews.Project acceptance by Proponent will be documented by Mechanical Completion

    Certificate(s) (MCC).

    8.2 Customers Related Processes:

    8.2.1 Determining Project Requirements:

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    30/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 23 of 35 MACO-QM-001

    MACO will review the contract agreement to determine customer

    requirements. Project Manager will evaluate these requirements and

    determine any additional requirements including regulatory and legal ones,

    which may not have been identified by the proponent, and need to beimplemented to support the delivery of the Work.

    8.2.2 Reviewing Project Requirements:

    MACO has assigned the responsibility to review the contract to Project

    Manager. The Project Manager will ensure that the requirements areunderstood, and that we have the capability of performing the work. The

    contract will be reviewed by Project Manager to ensure any agreed-to

    changes have been incorporated. The review will be documented in the

    following manner and records maintained. The procedure for contractreview has been detailed in MACO-QMP-001 Procedure for ContractReview.

    Changes to contracts will be controlled. The Project Manager is authorized

    to accept changes to contracts, identify any restrictions or levels of

    acceptance.

    Changes will be documented and issued to all staff responsible forexecution of the original contract by Project Manager.

    8.2.3 Customer Communication:

    Project Manager is responsible to establish and maintain communication

    with Proponents Representative regarding engineering, procurement,inspection, or construction/pre-commissioning activities. He will have

    weekly meetings with the Proponent Representative.

    Project Manager is responsible for evaluation of the Proponents feedback/

    complaints and responding to them.

    8.3 Design and Development

    The Quality Manual of MACO sub-contractor for Design and Development

    should be attached with this Quality Manual.

    8.4 Purchasing:

    8.4.1 Purchasing Process:

    Where subcontractors and suppliers are engaged to work on each project,their capability to perform the assigned scope of work is evaluated by

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    31/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 24 of 35 MACO-QM-001

    Project Manager in accordance with applicable quality documents. Physical

    surveys, when needed will be performed by a qualified auditor and

    supported by a technical specialist for the equipment under consideration.

    Except as provided in the quality document, evidence of qualification ofsubcontractors and suppliers will be provided to Proponent.

    Records of subcontractor and supplier performance will be maintained by

    Project Manager. Subcontractors and suppliers with a record of poor

    performance will be excluded from future consideration. Evaluation criteriaare defined. Evaluation of subcontractor and supplier performance will

    take place at regular intervals. Project Manager is responsible to follow up

    on identified areas of poor performance.

    8.4.2 Purchase Information:In accordance with any pertinent documents, purchase orders with

    subcontractors and suppliers will define service or product requirements,Quality management system requirements, applicable procedures, and

    processes, equipment, and personnel qualifications in sufficient detail to

    ensure the work performed, meets the purchase order requirements. Allrequisitions will be reviewed by Project Manager for technical and quality

    requirements prior to submitting to Proponent for review.

    8.4.3 Verification of Purchased Products:

    In accordance with Proponents related documents, work performed by thesuppliers and sub-suppliers will be reviewed for conformance to contract

    requirements and accepted by Project Manager and documented by QA

    Manager.

    Project Manager is responsible to ensure that the equipments and materialsordered for the project under the contract meet contract requirements and

    are delivered on time. The following steps will be taken to ensure that the

    suppliers are capable of providing appropriate items.

    Supplier suborders will be reviewed for conformance to the originalpurchase order requirement and document.

    The manufacturer/supplier quality program in accordance with ISO

    9001:2000 will be verified by QA Manager.

    Manufacturer/supplier capabilities to supply items that meet technical

    requirement in a timely manner will be evaluated. Once fabrications starts,progress will be reported on a weekly inspection/fabrication status report to

    Proponent.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    32/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 25 of 35 MACO-QM-001

    Applicable supplier process control procedures (i.e., welding, heat

    treatment, NDT, refractory installation) will be reviewed by QA Manager

    and submitted to Proponent as required.

    Equipment/material delivered for use on the project will be inspected byProject Manager at the supplier/sub-supplier facilities in accordance with

    Proponents related document. Rejected material will not be allowed to be

    shipped. Non-conforming materials will be returned to originator or

    marked in a manner that will prevent its use.

    Records of supplier inspections will be prepared following each inspection

    or weekly for resident inspectors and submitted to Proponent.

    Inspection Disposition Reports will be prepared within two weeks

    following release to ship material and submitted to the proponent.

    8.5 Production and Service Provision:

    8.5.1 Control of Production and Service Provision:

    MACO has established the following controls applicable toconstruction and construction management activities. These activities

    are reflected in the detailed Proponents Test and Inspection Plan and

    form part of this Quality Plan.

    Activities are planned. Activities are scheduled. Acceptance criteria are defined. Adequate resources (tools, equipment, trained personnel) are available

    to perform the work.

    The work environment is safe and conforms to health and safetyrequirements in the contract.

    Methods are employed to monitor resource expenditure againstexpected results.

    Procedures, work instructions, and/or installation instructions areavailable to the workforce. Codes, standards and other references, including portions of the

    contract are available to the workforce.

    Standards of workmanship are implemented. Where required, licensed or certified personnel are assigned to the

    project to perform activities requiring such license or certification.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    33/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 26 of 35 MACO-QM-001

    A program to monitor the effectiveness of these process controls is inplace and implemented.

    Criteria for release, approval, and acceptance are established.8.5.2 Validation of Processes for Production and Service:

    The validation of the design is the constructed project that satisfies

    Proponents requirements.

    The validation of certain construction processes can only be ascertainedwhen load is applied or operation is initiated. For the project, these

    processes include:

    Welding. Structural Concrete Placement. Paving and Asphalting. Coating. Bolt Tensioning.MACO assures these processes can achieve planned results through:

    Process qualification. Equipment and personnel qualification. Defined methods and procedures. Records will be maintained and revalidation performed as necessary.Applicable construction process procedures identified in Proponents

    quality documents, if not included in this Quality Manual, will be

    submitted for Proponents review at least 30 days prior to start of theconstruction activity.

    8.5.3 Identification and Traceability:

    MACO will develop and maintain a system to identify, design, or report

    documents so they remain traceable to their originator and containcustomer identification, as may be required by the contract.

    A Document Transmittal form has been developed for this purpose and is

    attached with this Quality Manual.

    MACO will develop and maintain a system to identify construction

    materials and equipments to the extent required by the contract orapplicable codes and standards. Nonconforming material will be identified

    or removed to prevent inadvertent use.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    34/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 27 of 35 MACO-QM-001

    For this contract, the following will be included:

    Tagging is employed to identify equipment and material on the project.

    To the extent traceable in a contract requirement MACO will develop and

    maintain a system for unique identification of the work or batches. QA

    Manager is responsible for implementing the system and retainingappropriate records. Nonconforming material will be identified or removed

    to prevent inadvertent use.

    8.5.4 Proponents Property:

    MACO will develop and maintain a system to receive, log, and maintainProponents supplied documents, data. Project Manager is responsible

    for this function and will advise the Proponents Representative of anyitems that are unsuitable for use, lost, or damaged.

    All Proponents supplied material will be inspected against the shipping

    documents for accuracy and damage, by Project Manager and stored in

    such a way to prevent damage or deterioration.

    Project Manager is responsible for the final disposition of supplied items atthe conclusion of the project in accordance with contract requirements.

    8.5.5 Preservation of Material and Equipment:

    During the development of the plans and specifications, MACO willevaluate construction material and equipment and include in the plans andspecifications any requirements for handling, storage, packaging,

    preservation, and delivery necessary to ensure requirements are met.

    Procurement Manager is responsible for this activity. Equipment suppliers

    will be requested to provide storage and preservation procedures forpurchased equipment.

    QA Manager will review the construction contract and ascertain through

    the inspection process that requirements for handling, storage, packaging,

    preservation, and delivery necessary to ensure requirements are beingimplemented by the subcontractors, and suppliers. Nonconforming

    conditions will be documented.

    MACO will establish, maintain and implement a program for handling,

    storage, and preservation of equipment and material for this project. Thedetailed procedure for the above mentioned activities are described in

    Quality Management Procedure MACO-QMP-009.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    35/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 28 of 35 MACO-QM-001

    8.6 Control of Monitoring and Measuring Devices:

    MACO and sub-contractor(s) will establish, maintain, and implement a written

    program to identify, control, and calibrate measurement and monitoring devices usedto assure conformity of work as required by the contract. The program will containthe following elements:

    Identification of what equipment needs to be monitored and measured. Identification of equipment and instruments that require calibration to maintain

    capability.

    Listing of such equipment and instruments, frequency of calibration, andevidence calibration took place. Calibration frequency will be based on the moststringent of Proponents standards, other applicable standards, or manufacturer

    recommendations. If no standards apply, the calibration cycle will not exceed

    six months.

    Unless equipment calibration is performed by the manufacturer or Proponentsapproved agency, the following will apply:

    Availability and use of calibration instructions, manufacturers' instructions,codes, or national standards for calibration.

    A program of corrective actions to repair or replace items that do not meetacceptance criteria.

    A program to ensure measuring and monitoring devices are protected fromdamage deterioration and unauthorized alterations of settings.

    A program of corrective actions for previously accepted work, if defectiveequipment and instruments were used to inspect or test the work.

    Confirmation that computer software used as a basis of product acceptance isacceptable for the intended application. Confirm prior to use and as necessarythereafter.

    Records to demonstrate calibration and verification.The detailed procedure has been described in Quality Management Procedure MACO-

    QMP-020.

    SECTION 9: MEASUREMENT, ANALYSIS AND IMPROVEMENT

    9.1 General:

    MACO has defined, planned and implemented the following measurement,monitoring, analysis and improvement activities to assure conformity and achieve

    improvement.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    36/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 29 of 35 MACO-QM-001

    Customer satisfaction. Internal audits. In-process reviews/inspections/tests. Control of nonconformities. Data analysis. Corrective, preventive, and improvement activities.9.2 Monitoring and Measuring

    9.2.1 Customer Satisfaction:MACO has developed the following methods to obtain data and monitorcustomer satisfaction and/or dissatisfaction.

    Weekly meeting minutes. Correspondence.9.2.2 Internal Audit:

    MACO has established, and will maintain, and implement an internal

    quality audit program to verify that quality activities and related results

    comply with planned contractual arrangements and to determine theeffectiveness of the quality program and associated procedures. The

    internal quality program has the following attributes:

    Internal procedures govern these activities. Internal audits will be scheduled based on requirements of Proponents

    quality documents. The schedule will be transmitted to the Proponents

    Representative within 30 days of the effective date of the contract.

    Personnel conducting internal audits are capable of objectivity andimpartiality in conducting audits. They will not audit their own area.

    Reports of internal audit results will be generated and issued to affecteddepartments. Company management and the proponents will receivecopies of report within two weeks of audit completion.

    Corrective action will be monitored and brought to a close. Follow-up internal audits will be conducted as appropriate, to ensure

    implementation of corrective action, and the results reported toCompany management and to Proponent.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    37/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 30 of 35 MACO-QM-001

    The activities of subcontractors working under this quality managementsystem will be included in the audit program.

    The activities of subcontractors working under their own qualitymanagement system will be audited. As a minimum such subcontractor

    quality audits will be conducted every six months.

    QA Manager is assigned responsibility to implement the internalquality audit program.

    9.2.3 Monitoring and Measuring of Processes:

    The project execution processes described in Section 5.7 of this QualityManual necessary to achieve Proponents requirements are measured and

    monitored. These methods will confirm the continuing ability of eachprocess to satisfy its intended purpose. When planned results are not

    achieved, corrective preventive actions will be taken to assure conformity.

    9.2.4 Monitoring and Measuring of the Work:

    MACO will establish, maintain, and implement a program to control the

    development, review, and release of designs that are in conformance withProponents requirements. The program will be controlled by written

    procedures, instructions, or checklists as appropriate. Results will be

    recorded, authenticated, and distributed in accordance with written

    procedures.

    The measurement, monitoring, and acceptance of the design are addressed

    in the design and development section.

    MACO will establish, maintain, and implement a program to control

    procurement, inspection and acceptance of equipment, material, andconstruction activities performed by MACO's own work forces or its

    subcontractors. Records will be maintained.

    QA Manager will ensure that incoming equipment and materials are

    inspected and accepted for project use prior to incorporation intoconstruction. When material is received without Inspection Release, the

    QA Manager will perform inspection against the purchase orderrequirements and verify that the equipment and material meets thespecified standards. The process will bedocumentedduring construction.

    QA Manager will inspect the quality of the construction effort through

    regular inspections of the work in progress, as agreed to in the respective Test and Inspection Plan, approved by the Proponent. Activities will be

    recorded via inspection and test reports attached to relevant procedures and

    work instructions and acceptance verified against written acceptance

    criteria obtained from applicable contract documents or referenced codes

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    38/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 31 of 35 MACO-QM-001

    and standards. QA Manager will notify Proponent by initiating Requests

    for Inspection (RFI) for all inspection points coded as Witness or Hold.

    Testing, if required in the contract, will be performed by qualifiedpersonnel to written procedures, with acceptance criteria defined and

    results identified and transmitted to Proponent.

    All test results will be documented on forms appropriate for the tests, and

    dated and signed by the test personnel. Results will be issued as requiredby the contract.

    QA Manager is responsible to supervise and accept or reject all contractor-

    performed inspections and tests.

    9.3 Control of Non-Conforming Product:

    MACO has a program to detect and correct nonconforming conditions in design andrelating to work output of its own staff or others under contract to MACO.

    Any nonconformance discovered by outside sources will be processed by QA

    Manager.

    During procurement and construction, any conditions that do not meet contractrequirements and that cannot be corrected by the end of the workday will be rejected

    and documented.

    QA Manager will track the condition until restoration to the designed conditions or

    until the "as-installed" condition is accepted by Proponent. All violations of the

    Proponents standards and specifications that result in "as-installed" or "use-as-is"recommendations will be documented as Waiver in accordance with Proponents

    quality documents.

    The Proponent will be notified of all (MACO and subcontractor) nonconformancereports within 48 hours of issue and prior to closing of the NCR.

    Corrective action will be implemented as described in paragraph 8.3.

    9.4 Analysis of Data:

    MACO collects and analyzes appropriate data to determine the suitability and

    effectiveness of its quality management system and to identify where improvementscan be made in the quality management system.

    The following data are gathered and analyzed, QA Manager is responsible for the

    effort and to ensure closure where QMS improvements are warranted.

    Conformity of products to requirements. Measuring and monitoring data. Trends of both positive and negative compliance.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    39/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 32 of 35 MACO-QM-001

    Internal quality audit data.9.5 Improvements:

    9.5.1 Continual and Improvement:

    MACO facilitates continual improvement of the quality management

    system and acting upon the following:

    Quality policy changes. Goal/objective changes. Implementation of the results of management review, audit findings. Analysis of nonconformities. Corrective action and preventive actions implemented.MACO will establish measurement systems and track performance for any

    Proponents specified improvement initiatives in accordance with

    Proponents quality related document.

    Project Manager is responsible to assure implementation of this planningfor improvement effort.

    9.5.2 Corrective Action:

    MACO has established a corrective action program to eliminate the causes

    of the nonconformity and prevent its recurrence.

    Corrective action will be appropriate to the severity of the nonconformity

    identified.

    A documented procedure for corrective action has been established and is

    included in this Quality Manual.

    The procedure addresses nonconformity identification (including customer

    complaints), cause determination, action to prevent recurrence, identifyingand implementing the corrective action, recording results, determining if

    the corrective action was implemented and effective in resolving the

    nonconformity.

    9.5.3 Prevent Potential Nonconformities:

    MACO has a program of preventive action, which anticipates the potentialcauses of nonconformities and works to reduce or eliminate these potential

    causes.

    A documented procedure for preventive action has been established and is

    included in this Quality Manual.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    40/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 33 of 35 MACO-QM-001

    The procedure identifies potential nonconformities, their probable cause,

    determination of preventive action needed, implementation of preventive

    action, and determining if the preventive action was effective in preventing

    the nonconformity.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    41/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 34 of 35 MACO-QM-001

    DOCUMENT TITLE:

    ATTACHMENT 1

    ORGANIZATIONAL CHARTS

    DOCUMENT NO.:

    MACO-ORG-001

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    42/172

    YASSE

    RBA

    JubailInd.

    Di

    Mana

    eceptionist

    Pro

    ject

    pManager

    alSiteEngr.

    SiteEngr.

    ricalSite

    remen

    teForeman

    lTechnicians

    abors

    abors

    Accountant/Admin.

    HRAWY

    v.Projects

    ger

    PurchasingSupervisor

    LocalPurchaser

    anager

    MechanicalSiteEngr.

    InstrumentationSite

    Engr.

    Mech.SiteForeman

    Inst.SiteForeman

    Mechanical

    Technicians

    Labors

    Inst.Technicians

    Ad

    Ope

    EXECUTIVESECRETARY

    EXTERNALAUDITOR

    OsamaElSawy

    Bldg.

    ConstructionManager

    RedaGameel

    SEC/STCProjectsManager

    Project/SiteEngineers(6)

    Foremen(37)

    SkilledCraftsmen(40)

    Labors(118)

    Project/SiteEngineers

    Foremen

    SkilledCraftsmen

    SkilledCraftsmen

    elAlZahrani

    rationsManager

    AdelSubaie

    Water&SewageProjec

    Manaer

    Foremen(10)

    SkilledCraftsmen(40

    Labors(150)

    Project/SiteEngineers

    YousefMohammad

    HassaProjectsManage

    Project/SiteEngineer

    Foremen

    SkilledCraftsmen

    SkilledCraftsmen

    Moham

    mP

    NabilM

    Assista

    Saeed

    G

    en

    ts )(4)

    r s

    Badr

    Al-

    Workshop/Moto

    Work

    shop

    Skilled

    Mec

    L

    abor

    PurchasingM

    C

    lerk

    LocalPu

    rcha

    dSalehAlZahrani

    ESIDENT

    ohd.AlZahrani

    tGen.

    Manager

    ohd.AlZahrani

    eralManager

    Abdul

    Fina T

    Chi

    Ac

    ahrani

    rpoolManager

    Foreman

    hanics(10)

    s(10)

    anager

    sers(2)

    llahEl-Hossin

    nceManager

    amerEzzat

    efAccountant

    countants(5)

    Cashier

    OR

    HishamIbrah

    Technical.Engg.M

    QA/QCEngineers/Supervisors

    SafetyEngineers/Supervisors

    DrawingOfficeSupervisor

    CADOperators(3)

    EstimationEngr.Mechanical

    EstimationEngr.E

    lectrical

    ANIZAT

    QA/QC/SAFETYManager

    imanager

    QuantitySurveyor

    EstimationEngr.C

    ivil

    EstimationEngr.S

    tructural

    EstimationEngr.

    Instrumentation

    QSa

    IONCH

    SaadAl-Zahrani

    HRPublicAffairsManager

    AlaaKamel/MoeedAl-Zahrani

    Secretary/Clerk

    SaeedAbd.Al-Zahrani

    PublicRelationsOfficer

    /QCInspectors

    fetyInspectors

    DakeelAl-Zahrani

    PublicRelationsOfficer

    KhamisAl-Zahrani

    PublicRelationsOfficer

    HassanAl-Zahrani

    PublicRelationsOfficer

    RT

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    43/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 35 of 35 MACO-QM-001

    DOCUMENT TITLE:

    ATTACHMENT 2

    RESUMES OF KEY PERSONNEL

    DOCUMENT NO.:

    MACO-CV-001

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    44/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-TOC

    Rev. 0

    Quality Manual Page 1 of 2 MACO-QM-001

    TABLE OF CONTENTS

    QUALITY MANAGEMENT PROCEDURES

    SL NO. PROCEDURE DESCRIPTION DOCUMENT NO.

    1 CONTRACT REVIEW MACO-QMP-001

    2 QUALITY ASSURANCE IN DESIGN MACO-QMP-002

    3 PROJECT CHANGE CONTROL MACO-QMP-003

    4 DOCUMENT AND DATA CONTROL MACO-QMP-004

    5 CONTROL OF QUALITY RECORDS MACO-QMP-005

    6 SELECTION OF VENDORS AND SUBCONTRACTORS MACO-QMP-006

    7 PREPARATION, STYLE AND FORMAT OF PROCEDURES MACO-QMP-007

    8 PURCHASING MACO-QMP-008

    9 HANDLING, STORAGE, PACKAGING AND DELIVERY MACO-QMP-009

    10 RECEIVING INSPECTION MACO-QMP-010

    11 MATERIAL IDENTIFICATION AND TRACEABILITY MACO-QMP-011

    12 CONTROL OF CUSTOMER SUPPLIED PRODUCT MACO-QMP-012

    13 PROCESS CONTROL MACO-QMP-013

    14 CORRECTIVE AND PREVENTIVE ACTION MACO-QMP-014

    15 CONTROL OF NON-CONFORMANCE MACO-QMP-015

    16 CONSTRUCTION INSPECTION MACO-QMP-016

    17 INTERNAL QUALITY AUDITS MACO-QMP-017

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    45/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-TOC

    Rev. 0

    Quality Manual Page 2 of 2 MACO-QM-001

    TABLE OF CONTENTS

    QUALITY MANAGEMENT PROCEDURES

    SL NO. PROCEDURE DESCRIPTION DOCUMENT NO.

    18 TRAINING MACO-QMP-018

    19 SPECIAL PROCESSES MACO-QMP-019

    20 CONTROL OF INSPECTION, MEASURING AND TEST MACO-QMP-020

    21 INSPECTION AND TEST STATUS MACO-QMP-021

    22 INSPECTION AND TESTING MACO-QMP-022

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    46/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QM-001

    Rev. 0

    QA/QC MANUAL Page 35 of 35 MACO-QM-001

    DOCUMENT TITLE:

    ATTACHMENT 2

    RESUMES OF KEY PERSONNEL

    DOCUMENT NO.:

    MACO-CV-001

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    47/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-001

    Rev. 0

    Page 1 of 6 MACO-QMP-001

    DOCUMENT TITLE:

    PROCEDURE FOR:

    CONTRACT REVIEW

    DOCUMENT NO.:

    MACO-QMP-001

    Index Page

    1 Purpose: 2

    2 Scope: 23 References: 2

    4 Definitions: 25 Procedure: 2

    6 Documentation: 6

    001 04/01/09 MACO-QMP-001 APT GJR NZ

    ISSUENO.

    ISSUEDATE

    DESCRIPTIONPREPARED

    BYCHECKED

    BYAPPROVED

    BY

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    48/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-001

    Rev. 0

    Page 2 of 6 MACO-QMP-001

    1 PURPOSE

    1.1 To define the responsibility and methods to be used for ensuring a review of the

    contract documentation and scope is undertaken immediately following award ofcontract by the project and lead engineering team to promote a working

    understanding of the technical basis and identify any needs for clarification or

    additional information.

    2 SCOPE

    2.1 This procedure describes the requirements for a formal Contract Review

    immediately following transfer of documentation from the Proposal Departmentto the Project Manager after Contract Award, to ensure the following:

    That all contract requirements are clearly understood by theProject Team disciplines lead staff and any supporting

    corporate Supervisors involved in the project initiations. That any changes to standard work practices are recognized

    and accepted by the Project Manager and all affected corporate

    supervisors. That any clarification or outstanding information required from

    the Proponent is identified and actioned by the Project

    Manager.

    3 REFERENCES

    None

    4 DEFINITIONS

    4.1 Definitions relevant to this procedure are listed in Section 2.4 of the Quality

    Manual and ISO-8402, Quality Management and Quality Assurance Vocabulary.

    5 PROCEDURE

    5.1 Proposal Stage

    5.1.1 Where practical, intended Project personnel shall be involved withthe valuation of the Proponents Invitation to bid and the

    preparation of documents for the Proposal.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    49/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-001

    Rev. 0

    Page 3 of 6 MACO-QMP-001

    5.1.2 On Proposals for major projects, the nominated Project Manager should ifpracticable prepare and issue a Project Execution Strategy to summarize

    the manner in which Manar Arabian Corp. (MACO) would execute the

    contract if it were awarded. This document normally forms part of theProposal Submission.

    5.2 At Contract Award

    Upon award of the contract the appointment of the Project Manager is confirmed

    in writing, by distribution to Department Managers of the Project Handover

    Meeting Report.

    The Project Manager shall be advised by the Proposal Manager and/or

    Commercial Department of any special requirements he should comply withregarding Project execution arising since Proposal Submission. He should meet as

    necessary, with the Proposal Manager and relevant team members to discuss any

    questions he may have with regard to the contract specifications, errors oromissions and Client involvement.

    5.3 Handover to Projects

    The Project Manager shall receive from the Proposals Manager a complete

    Package of Proposal documentation, including all subsequent submissions and

    correspondence. Collectively, this now comprises the contract documentationpackage, and is passed over by the Proposal Manager under cover of a

    completed Project Handover Meeting Report.

    The Package shall include:

    The original proposal files with all supporting documentation. Estimate/Budget and scope of work, neatly presented with all

    associated backup and explanation including contributions from all

    disciplines and Departments.

    And as necessary the following:

    Amendments made during the negotiations. All Proponents correspondence and meeting notes. All internal meeting notes. All technical and commercial documentation. Final Contract (if available).

    The Project Manager shall be responsible for distribution within the Project team

    and to other parties involved.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    50/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-001

    Rev. 0

    Page 4 of 6 MACO-QMP-001

    The Project Manager shall thoroughly review the documentation and becomefamiliar with the contents of the contract and all related documents.

    5.4 Meeting Preparation

    The activities listed below should preferably be started before the Effective Date

    of the contract but in any case, not later than 5 working days after the effectivedate.

    The Project Manager, having acquired a sound knowledge of the contract

    requirements and the relevant Proposal Documentation, will allocate his ProjectTeam responsibilities.

    The Project Manager will uniquely identify parts of the contract documentationpackage plus the Manar Arabian Corp. (MACO) Contract Execution Strategy (if

    prepared for inclusion in the proposal) and determine the necessary distribution as

    appropriate to all project team members using the transmittal in Appendix 1.

    The transmittal will also:

    State the planned date for the Contract Review Meeting. State whether or not the Project Manager wishes to receive

    responses in writing before the above meeting.

    Each recipient shall critically review the supplied documents, listing any items

    not fully understood or where a possible misunderstanding may arise and any

    information or clarification is required from the Proponent.

    These listings shall be made in the form of written specific queries.

    Particular attention shall be paid to ensure the following:

    Lines of communication That these are clearly defined by meansof organization chart, job descriptions are understood andworkable.

    Interfaces That these are clearly defined understood and includeinterfaces of disciplines with each other, with third parties and

    with the client. Work Scope That the Design Criteria including the scope of

    work which shall constitute the design database, are established,

    agreed with client and issued and understood by those responsible

    for the work.

    For projects with, a large multi-volume Contract Documentation Package a

    member(s) of the Project Team will extract the Design Data Base utilizing the

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    51/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-001

    Rev. 0

    Page 5 of 6 MACO-QMP-001

    Contract Documentation package, in logical sequence, related to the overallprocess basis and engineering disciplines involved. A full index to identify the

    location of each data category will be prepared if not included in the Clients

    Documentation.

    This Design Data Base will be issued to all attendees of the Contract Review

    Meeting, supplementing information distributed direct from the ContractDocumentation Package.

    That the issued Execution Strategy, if prepared and Quality Plan clearly indicate

    where the contract work instructions differ from the standard working practices.

    That the Contract Execution Strategy is prepared and that Planning Schedules and

    Work Packages are understood by those responsible for the work. That anyidentified needs for the development of procedures, work instructions and design

    briefs, are identified and included in the agenda for the Meeting.

    5.5 Contract Review Meeting

    The timing of the Contract Review meeting must be considered balance between

    just sufficient prior time for the preparatory activities stated in 2.4 above and theneed to hold the meeting before actual contract work commences in detail, e.g.

    process system calculations. The Meeting should normally take place not later

    than 10 working days after Effective Date of Contract.

    The Contract Review Meeting shall be chaired by the Project Manager, who will

    ensure that the minutes of meeting are taken, using Appendix 2 as an immediaterecord/cover sheet.

    The relevant Proposals Manager and other previously involved Proposal staffshall attend the Meeting at the request of the Project Manager.

    The agenda for the Meeting will either be based on the responses received in

    advance (if requested by the Project Manager), as per 5.3 & 5.4 above, or will betabled by the Project Manager.

    All assigned Lead Proposal Staff will have prepared a statement of all criteria for

    their discipline prior to any start of any project (contract) activities.

    Items discovered (omissions, discrepancies, clarifications, etc) during the meeting

    preparation phase shall be discussed, resolved and mounted, during the meeting.

    Where necessary, formal requirements for clarification and further informationshall be compiled at the meeting as an addendum to the Minutes for subsequent

    follow-up by the Project Manager as per sections 5.3 & 5.6 below.

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    52/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-001

    Rev. 0

    Page 6 of 6 MACO-QMP-001

    During the Meeting, any changes required in relation to standard workingpractices to satisfy the requirements of the project (e.g. Specialist Sub-Contract

    requirements) will be reviewed and responsibilities assigned for the preparation of

    adequate project specific instructions, including procedures and technicalguidelines. (Such project specific requirements will be subsequently issued to the

    Project Manager for review and approval for use on the project). The project

    specific instructions prepared above will be forwarded to Document Control need.

    5.6 Follow-up Action

    After the Meeting, the Project Manager, or his assigned Project Engineer will co-ordinate resolution of any points in 5.3, 5.5, and 5.6, which can be handled within

    Manar Arabian Corp. (MACO).

    A letter to the Client is then prepared by Project Manager or his assigned Project

    Engineer, explaining all requests for clarification information which cannot be

    handled internally. This letter is compiled within 5 working days maximum afterthe review meeting. The Project Manager will maintain an action log until the

    queries are satisfactorily resolved.

    A response is expected from the Proponent in the normal turn around time forproject correspondence as defined for the contract.

    Each department and or discipline will maintain a file of, or have access to, therelevant documents i.e. works scope, Proponents specifications, Proponents

    philosophies, regulatory requirements, relevant national and international

    standards, and MACOs standards and procedures which are applicable to theirScope of Work.

    6 DOCUMENTATION

    6.1 Contract Document Transmittal

    6.2 Contract Review Meeting

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    53/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-002

    Rev. 0

    Page 1 of 9 MACO-QMP-002

    DOCUMENT TITLE:

    PROCEDURE FOR:

    QUALITY ASSURANCE IN DESIGN

    DOCUMENT NO.:

    MACO-QMP-002

    Index Page

    1 Purpose: 22 Scope: 2

    3 References: 24 Definitions: 2

    5 Procedure: 2

    6 Documentation: 9

    001 04/01/09 MACO-QMP-002 APT GJR NZ

    ISSUE

    NO.

    ISSUE

    DATEDESCRIPTION

    PREPARED

    BY

    CHECKED

    BY

    APPROVED

    BY

  • 8/2/2019 Complete Maco Quality Manual Vol. 1

    54/172

    QUALITY ASSURANCE/QUALITY CONTROL

    MANUAL

    Doc. No. MACO-QMP-002

    Rev. 0

    Page 2 of 9 MACO-QMP-002

    1 PURPOSE

    To define the Quality