37
HI-TEC Engineering Works THE POWER OF MEP+CE HI-TEC ENGINEERING WORKS COMPANY P COMPANY P COMPANY P COMPANY P R O F I L E R O F I L E R O F I L E R O F I L E MECHANICAL & ELECTRICAL CONTRACTORS, ENGINEERS NO. 109/11, GOTHAMI ROAD, COLOMBO 08, SRI LANKA. Tel: +94 +94-11-438 7545, +94-11-438 7554,+94-77-787 0280 Fax: +94-11-454 5195 E mail: [email protected] Website : www.hitec.lk The Power of MEP+CE

COMPANY PCOMPANY P R O F I L ER O F I L ER O F I L E · PDF fileCOMPANY PCOMPANY P R O F I L ER O F I L ER O F I L E ... HND-Mechanical Engineering ... Research Institute of Sri Lanka,

  • Upload
    vudieu

  • View
    229

  • Download
    3

Embed Size (px)

Citation preview

HI-TEC Engineering Works THE POWER OF MEP+CE

HI-TEC ENGINEERING WORKS

COMPANY PCOMPANY PCOMPANY PCOMPANY P R O F I L ER O F I L ER O F I L ER O F I L E

MECHANICAL & ELECTRICAL CONTRACTORS, ENGINEERS

NO. 109/11, GOTHAMI ROAD, COLOMBO 08, SRI LANKA.

Tel: +94 +94-11-438 7545, +94-11-438 7554,+94-77-787 0280

Fax: +94-11-454 5195 E mail: [email protected] Website : www.hitec.lk

The Power of MEP+CE

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 2 of 37

CONTENTS

Introduction Company Goal, Vision & Mission

3 4

Resume of the Organization 5

Leading Professionals Specialist Services Offered

6 7

Key Persons

8

Field Staff 10

Organizational Chart Project Images of the company

11

12

Appendix I: Projects Certificates 17

Appendix II: Major Projects 25

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 3 of 37

INTRODUCTION

History

Hi-Tec Engineering Works was founded as a specialist M & E engineering and contracting

company in 1990. The organization has successfully executed various mechanical and

electrical projects both in Sri Lanka and overseas, such as container terminals, laboratories,

hospitals, production facilities, offices and warehouses, dwelling units and residences, hotels

and restaurants, amusement arcades and night clubs, etc.

Strengths

The director of the company have within himself vast experience in the handling of large

projects, accumulated over several years and through the handling of diverse projects in the

past.

The projects handled include:

High & Low Tension Electrical Installations

Air-conditioning installations

Fire & burglar detection & protection systems

Civil and structural projects& Network projects

Fresh water supply and drainage systems

Interior design and decoration

(See Appendix I: Reference Project List)

The activities of the company are also broad based and diversified into allied electrical areas

such as the manufacture of ‘Hi-Tec’ Switchboards, a complete range of ‘Hi-Tec’ Luminaries

suitable for industrial, commercial and residential applications, ‘Hi-Tec’ LT Trunking and

Cable Ladder Systems and ‘Hi-Tec’ Power Factor Correction Banks.

Other areas into which our activities extend include the erection of pre-fabricated roofs and

structures, and the fabrication and installation of aluminum doors and windows.

We are well organized and equipped, with modern offices (our designs, project costing and

accounting are fully computerized), long-serving, experienced and dedicated personnel, a

range of modern tools and equipment, a sub-contracting capability extending to 050–200

skilled technical personnel, in addition to our own staff and prudent banking support.

We have worked successfully with leading architects and consultants on both local & foreign

different projects and we enjoy a cordial relationship with them. We have also worked

alongside and as sub-contractors to many leading international companies such as Mitsui

Construction Co Ltd, Penta-Ocean Wakachiku JV, Sumitomo Densetsu Co Ltd, etc.

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 4 of 37

COMPANY GOAL, VISION & MISSION

Goal

“To satisfy our customers by

supplying products and services

that consistently conforms to their

requirements, and exceeds their

expectations by continuous quality

improvement”

Vision

“To strive towards perfection in every

task undertaken, through the

harnessing of diverse skills and

resources”

Mission

“To complete every task

undertaken, to the highest level of

professional standards, through

qualified experienced and well

trained staff”

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 5 of 37

RESUME OF THE ORGANIZATION

Name of the Company

Hi-Tec Engineering Works

Business Registration Number

W/A 20621

ICTAD Registration Number & Grade

EM – 0157, Grade EM2

Registered Office

109/11, Gothami Road, Colombo 08

Operating Office & Workshop

88A, Sapumal Place, Rajagiriya

Telephone

General : +94-11-438 7545

General : +94-11-438 7554

Mr.Samarakoon (MD) : +94-77-787 0280

Facsimile : +94-11-454 5195

E-mail

General : [email protected]

General : [email protected]

Web Site : www.hitec.lk

Proprietor : Mr. S.M.D. Samarakoon

Mechanical Engineer

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 6 of 37

LEADING PROFESSIONALS

Consulting Engineer

Gihan Badiriyagodage

Chartered Electrical Engineer, B.Sc. Eng., C. Eng., MIE (SL), MIEEE (USA)

Electrical Engineer

R. A. Thilina Prabath

Mechanical Engineer

Jayawikum Suraweera

R.P.N. Senivirathne

IT Engineer

D K Wimalarathne

Quantity Surveyor

M.M.N. Mufas

Electrical Engineer (Projects)

B. Fazir Bangsajayah

Mechanical Engineers (Projects)

L. Kasun Darshana

Civil Engineer (Projects)

T. Sathish

AutoCAD Draughtsman

K.V.Chathurani

S.P.P.P. Premadasa

Safety Officer (Projects)

Samson Warnakulasuriya

Bankers

Seylan Bank Ltd, Boralla

Accountant

Kelum Perera

Auditors

R & J Association (Pvt) Ltd

Consultants & Chartered Accountants

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 7 of 37

PRINCIPAL ACTIVITIES

• Mechanical & Electrical Projects

• Civil & Structural Projects

• Plumbing And Waterworks

SPECIALIST SERVICES OFFERED

• Auto-cad based design and implementation of M & E Systems.

• Design, supply, installation and maintenance of Air-conditioning Systems.

• Design, supply, installation and maintenance of Industrial, Commercial and Residential

Electrical Installations and Packages.

• “Hi-Tec” LT Switchboards, “Hi-Tec” Cable Trays and Truncking.

• Design and implementation of Industrial, Commercial and Residential Illumination.

• External Illumination Systems – Security & Street Lighting.

• “Hi-Tec” Interior Illumination Systems

• Supply and Installation of Flame Proof Wiring.

• Supply and Installation of Overhead Power Distribution Systems.

• Supply and Installation of Armored Underground Cabling.

• Supply and Installation of Lightning Protection Systems.

• Supply and Installation of Burglar Detection & Protection Systems.

• Supply and Installation of Fire Detection and Protection Systems.

• Supply and Installation of PC Networking Hardware and Software.

• Supply and Installation of Telephone Systems.

• Supply and Installation of Audio/Video Master Antenna Systems.

• Supply, installation and maintenance of Generators.

• Supply, Installation/Erection of Pre-fabricated Roofs & Structures.

• Supply, Installation and Commissioning of Fresh/Storm/Waste Water Distribution &

Drainage Systems, Supply, Fabrication and Installation Air Ducts

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 8 of 37

DETAILS OF KEY PROFESSIONALS

No. Name Designation

Qualified with

Experience

01 S.M.D.

Samarakoon

Managing

Director

National Diploma in Technology (Mechanical

Engineering)

Faculty of Engineering (University of

Moratuwa) Sri Lanka

25 years

02 Kelum Perera Accountant MAAT, LICA, CBA

15 years

03 Fazir

Bangsajayah

Engineer

(Projects)

National Diploma in Technology (Electrical

Engineering - Power) University of Moratuwa,

Sri Lanka.

22 years

04 R.A.Thilina

Prabath Engineer

BSc Eng (Electrical & Electronic) MIEE, MIESL

University of Peradeniya, Sri Lanka

05 years

05

L Kasun

Dharshana

Mechanical

Engineer

B.Sc. (Eng) Graduate in Mechanical and

Manufacturing.

Faculty of Engineering, University of Ruhuna

05 Years

06 R P N

Senivirathne Engineer

BSc.Eng (Mechanical)

University of Peradeniya, Sri Lanka

08 years

07

Sahan

Kapugamage

Mechanical

Engineer

HND-Mechanical Engineering (Production)

05 Years

08 Daminda

Wimalarathne IT Engineer

MBCS , MCP, CCNA

10 years

09

J.C.M.K. Gamage Electrical

Engineer B.Sc (Engineering), AMIE (SL)

02 year

10

T.Sathish

Civil Engineer

NCIT (Civil Engineering), Technical College, Ratmalana

08 Years

11

M.M. Noorul

Mufas

Quantity

Surveyor

HND (Quantity Surveying and Commercial

Management

03 Years

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 9 of 37

12

Chathurani

Koralevidana

Draughtsper

son

NCED, NCT (Civil), NCT (QS), AutoCAD

05 Years

13

DB

Chandrapala

Charge-

Hand

NAB Certificate in Electrical and

Electronic Engineering

05 years

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 10 of 37

FIELD STAFF

Payroll Personnel

Skilled Electricians 50

Semi-Skilled Electricians 20

Plumbers 24

Welders 10

Fabricators 08

A/C Technician 06

Helpers 20

Drivers 06 Purchasing / Storage Personnel 02

Multi duty helpers 10

Regular Subcontractors 02

Their Personnel:

Skilled Electricians 50

Skilled Mechanical 30

Helpers As required

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 11 of 37

ORGANIZATION CHART

Managing Director

Accountant Engineering Manager (Electrical & Mechanical & Civil)

Purchasing Manager

Man Power

Controller

Test Equipment

Controller

Material

Controller

Plant

Controller

Site

Engineers

Safety

Officer

Design

Engineer

Quantity

Surveyor

Surveyors

Draftspersons Purchasing

Officer

Administration / HR

Manager

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 12 of 37

COMPLETED PROJECT IMAGES

Shell Terminal Lanka Project

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 13 of 37

Base Line Road Project

Port of Colombo Expansion Project

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 14 of 37

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 15 of 37

The Monarch Tower Project

Hambantota Administrative Complex

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 16 of 37

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 17 of 37

Appendix I: Projects Certificates

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 18 of 37

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 19 of 37

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 20 of 37

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 21 of 37

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 22 of 37

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 23 of 37

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 24 of 37

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 25 of 37

Appendix II: Major Projects PROJECT

REF NO:

PROJECT/CLIENT MAIN

CONTRACTOR TYPE OF CONTRACT DURATION

PC-001

Medical

Research

Institute of Sri

Lanka, Colombo

08

Taisei Oncho

Co Ltd, Japan.

Air-conditioning Installation

Installation of multi-type package air-

conditioners,

Cu pipes, drain pipes, etc.

Fabrication and installation of G.I. and stainless

steel ducts

Insulation of ducts.

Power supply and automatic control systems

for the

Air-conditioning installation.

December,

1989 - April,

1990

PC-002

Plant Genetic

Research Centre,

Department of

Agriculture,

Kandy

Taisei Oncho

Co Ltd, Japan.

Maintenance Contract

Air-conditioning installation, cold rooms and allied

facilities.

Fresh water supply and drainage systems

December,

1989 - April,

1990

PC-003

Tropical Findings

(Pvt) Ltd, Ring

Road 1, EPZ,

Katunayake

Dinu

Construction

Co (Pvt) Ltd

Mechanical & Electrical Installation & Steel Roof

Compilation of electrical & mechanical design for

the project.

Supply and Installation main feeder cables, main

distribution.

board, sub-distributions boards, capacitor bank,

cable trays, etc.

Laying of conduits and cables, installation of

luminaries.

Supply and installation of water-cooled central

air-conditioning system and GI steel ducting.

Supply and installation fresh water supply and

drainage system.

Fabrication and installation of steel-structured

roof.

June, 1990 -

February,

1991.

PC-004

Italian

Restaurant,

Colombo Hilton,

Colombo 01.

Dinu

Construction

Co (Pvt) Ltd

Mechanical & Electrical Installation

Compilation of electrical & mechanical design.

Supply & installation of main distribution board

and

sub-distribution boards.

Laying of Conduits and cables and installation of

lighting fittings.

Providing and installing fresh water supply and

drainage systems.

Providing and installing LP gas supply for kitchen.

December,

1990 - April,

1991

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 26 of 37

Installation, wiring, testing and commissioning of

kitchen equipment

PC-005

Head Office

Project of The

Water Supply &

Drainage

Board, Male,

Republic of

Maldives.

Mitsui

Construction

Co Ltd / Dinu

Construction

Co (Pvt) Ltd

Mechanical & Electrical Installation

Fabrication & Installation of Aluminium Doors,

Windows and Steel-Structured Roof

Compilation of electrical and mechanical design

for the project

Fabrication, supply and installation of main and

sub distribution boards.

Laying of Conduits and cables, design, fabrication,

supply and

installation of luminaries; supply and installation

of power outlets.

Testing and commissioning fresh water supply and

drainage systems.

Installation of water pumps and sanitary fittings.

Fabrication and Installation of aluminium doors

and windows.

Fabrication and installation of steel-structured

roof.

February,

1991 -

October,

1991

PC-006

Port of Colombo

Expansion

Project, Sri

Lanka Ports

Authority

Penta Ocean

/ Wakachiku

JV, Japan.

Temporary Works

Laying of cables and installation of electrical

power panels.

Provision of electrical supply for site works

Laying of conduits and cables and installation of

office equipment.

November,

1991 -

January,

1992

PC-007

Port of Colombo

Expansion

Project (Stage

111)

Access Road

Project -

Colombo Port

Penta Ocean

/ Wakachiku

JV, Japan

Mechanical & Electrical Installation

1. Access Road (2 KM)

Installation of main feeder cables and power

distribution

Erecting lamp posts, connecting power cables and

fixing

lamps.

2. Building (Gate & Facility)

Laying of conduits, cables and installing light

fittings.

Installation of substation panels and distribution

board.

Installation of 25 kW generator and the automatic

control

panels.

Water supply and drainage systems comprising:

Cast iron pipes, steel pipes, PVC pipes, FRP water

tanks, septic tanks, and the sanitary fittings.

January,

1992 -

September,

1993

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 27 of 37

PC-008

Port of Colombo

Extension

Project (1)

Jaya Container

Terminal Stage

(111)

Pettah & Patent

Slip-way

Sumitomo

Densetsu Co

Ltd, Japan.

Electrical Works

Electrical works including laying of conduits and

cables.

fixing light fittings, installation of main and sub-

panels, main

feeder cables (up to 240 sq.mm 4 core).

Installation of Hi-Bay lamps on slip-way roof (at 20

m height)

Installation of power and control panels for

mechanical systems

and lighting systems.

Installation of electrical system for workshop and

chemical

proof conduit system for battery room.

January,

1992 - July,

1993

PC-009

Port of Colombo

Extension

Project (1)

Jaya Container

Terminal Stage

(111)

Sumitomo

Densetsu Co

Ltd, Japan.

Electrical Installation

(25 Acre Container Yard)

Laying of conduits and LT & HT cables (11kV and

3.3kV) and lighting

tower, reefer outlets, fire hydrant control system

and wharf lights

11kV main power supply and power supply for

3.3kV gantry crane.

Installation of outdoor power panels, fire hydrant

panels and

telephone distribution boards.

Installation of sub-stations, power control panels

and

11kV / 3.3kV and 3.3kV / 440V step-down

transformers and panels.

Panel connections and cable joints (LT & HT)

Erecting lighting tower at height of 30 m, laying of

cables and fixing

lights (20 Nos. 1000 W lamps per tower)

Erecting reefer structure and installation of reefer

outlets and cable

connections.

Installation of 2000kW diesel generator including

oil tanks, allied pipe works and water cooling

systems.

Providing electrical system for the Administration

Building and

and the Cargo Facility Building.

Assembly of automatic water sprinkler system and

fire hydrant

system, testing and commissioning.

January,

1993 - July,

1994.

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 28 of 37

PC-010

Head Office

Buildings,

Ministry of

Foreign Affairs,

Male, Republic

of Maldives.

Mitsui

Construction

Co Ltd/Dinu

Construction.

Mechanical & Electrical Installation

Aluminium Works.

Compilation of electrical and mechanical design

for the project.

Fabrication, supply and installation of main and

sub distribution

boards

Laying of Conduits and cables, design, fabrication

supply and

installation of luminaries; supply and installation

of power outlets.

Fresh water supply and drainage systems.

Installation of water pumps and sanitary fittings.

Fabrication, supply and Installation of aluminium

doors/windows.

November,

1993 -

May, 1994

PC-011

Sri Lanka Radio

Tower

(Greater

Colombo

Telecommunicat

ion Network

Project)

Transfield

Construction

Pty, Australia

/

Sumitomo

Densetsu Co

Ltd, Japan.

Radio Transmission System

Construction of concrete foundations, assembly

and erection

of self-supporting steel towers (05 nos. at

maximum height of 165 ft)

Installation OB light and earth systems.

July, 1994 -

December,

1995

PC-012

Port of Colombo

Expansion

Project

Jaya Container

Terminals Stage

(1V)

Sumitomo

Densetsu Co

Ltd, Japan.

Electrical Installation & Steel Structure

For Container Yard

Laying of conduits and cables for reefer outlet

power panels

reefer container outlets, lighting towers, wharf

lights,

fire hydrant control systems, telephone systems,

gantry cranes (3.3kV HT cables) and main power

supply.

Installation of outdoor reefer outlet power panels,

lighting

panels and fire hydrant control panels.

Installation of substation, HT & LT. panels,

11KV/3.3KV

3.3KV/440V step down transformers, UPS and

control panels.

LT & HT cable joints & connections.

January,

1995 - April,

1996

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 29 of 37

Erection reefer outlet steel structures & fixing

reefer outlets.

Installation of two numbers 2000kW Diesel

Generators.

Installation of water cooling system.

Electrical installation for buildings.

Installation, testing and commissioning of

equipment.

Comprehensive electrical system for pilot station

(rehabilitation work)

PC-013

Equipment

Training Centre,

Battaramulla

Maruma

Corporation,

Japan.

Installation of Heavy Equipment

Installation of heavy equipment in the workshop

January,

1996 -

March, 1996

PC-014

Port of Colombo

Extension

Project (111)

Oil Terminal &

Pipe Line Project

Sumitomo

Densetsu Co

Ltd, Japan.

Electrical Installation

Laying 3.3KV VCB Incoming switchgear,

11KV/3.3KV

Step down transformers.

Comprehensive electrical system for Break Water

Building.

Installation of lamp posts on break water.

Explosion - proof Conduit system for oil patch.

February,

1996 -

December,

1996

PC-015 Crescat

Development

Project

Shin Nippon

Air-

Technologies

Co Ltd.

Hot & Cold Fresh Water System

24-story high-rise apartment tower

Hot and Cold fresh water system and drainage

system for all

toilets

February,

1997 -

December,

1997

PC-016 Nurses Training

Centre - Sri

Jayawardanapur

a General

Hospital

Sumitomo

Densetsu Co

Ltd, Japan.

Electrical installation

Electrical Installation for the academy, hostel and

dining areas

March,

1988. - Dec.

1999.

PC-017 Jung Yoon

Textiles (Pvt) Ltd

- Biyagama

- None,

Direct Award

-

Electrical Installation for Textile Factory

Compilation of the electrical design for the

project.

Electrical installation and machinery wiring for the

factory comprising:

Supply and installation of main feeder cables,

1600 A main distribution

board, sub-distribution boards, cable trays,

overhead trunking, luminaries, power outlets,

fans, etc.

March,

1998. - Sep.

1998

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 30 of 37

supply and installation of parameter and exterior

illumination system.

PC-018 Oasis Trading

(Pvt) Ltd -

Ratmalana

- None,

Direct Award

-

Electrical Installation for Garments Factory

Electrical installation and machinery wiring for

factory extension

Supply and installation of main feeder cables, 400

A main distribution

board, sub distribution boards, luminaries,

trunking, power outlets, fans, etc

March, 1988

- June, 1998.

PC-019 Port of Colombo

Extension

Project (1)

Jaya Container

Terminal Stage

(VI)

NEW NORTH

PIER (URGENT

PLAN) PROJECT

Sumitomo

Densetsu Co

Ltd, Japan.

Electrical and Mechanical Installation

Laying of conduits and LT cables for lighting

tower, fire hydrant control system.

Installation of outdoor power panels, fire hydrant

panels and

telephone distribution boards.

Installation of sub-stations, power control panels

Panel connections and cable joints (LT )

Erecting lighting tower at height of 17 m, laying of

cables and fixing lights

July, 1998 -

December,

1998.

PC-020 Sigiriya Village Dinu

Construction

Co (Pvt) Ltd

Electrical & Air-conditioning Installation

20 Chalets at the Sigiriya Village

Supply and installation of main distribution

boards, sub distribution

boards, luminaries and power control and outlet

points of the chalets.

Air-conditioning installation., Hot and cold fresh

water system and drainage system for all chalets.

March,

1995. -

December,

1995

PC-021 Port of Colombo

Extension

Project (111)

Jaya Container

Terminal Stage

(1V)

EMPTY

CONTAINER

YARD PROJECT

Sumitomo

Densetsu Co

Ltd, Japan.

Electrical Installation

Laying of conduits and LT & HT cables (11kV and

3.3kV) and lighting

tower, fire hydrant control system.

11kV main power supply and power supply for

3.3kV gantry crane.

Installation of outdoor power panels, fire hydrant

panels and

telephone distribution boards.

Installation of sub-stations, power control panels

and

11kV / 3.3kV and 3.3kV / 440V step-down

transformers and panels.

Panel connections and cable joints (LT & HT)

Erecting lighting tower at height of 30 m, laying of

cables and fixing

lights (20 Nos. 1000 W lamps per tower)

Installation of 2000kW diesel generator 2 Nos

including

May, 1998 -

April, 1999.

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 31 of 37

oil tanks, allied pipe works and water cooling

systems.

PC-022 SRI LANKA LPG

TERMINAL

PROJECT

SHELL TERMINAL

LANKA (PVT.)

LIMITED.

Stork

Engineers &

Contractors

B.V. -

Netherlands

Electrical and Instrumentation Installation

Laying of conduits, Cable trey LT cables and

Parameter lighting system

fire hydrant control system.

Main power supply from Generator .

Installation & Commissioning LPG metering

package, LPG compress

package gas oil dispenser, containerise control

room, LPG loading

package and weigh bridge, telephone distribution

boards.

Installation of sub-stations, power control panels

and

Panel connections and cable joints (LT )

Installation of diesel generator 2 Nos

Calibration and install instrument

July, 1999 -

Dec, 1999.

PC-023 BASE LINE ROAD

IMPROVEMENT

& EXTENSION

PROJECT

SRI LANKA ROAD

DEVELOPMENT

AUTHORITY

Shin Nippon

Air

Technologies

Co, Ltd.

Electrical Installation - Street Lighting

Laying of Cables and Street lighting system

Main power supply from C.E.B.

Erection of lighting poles

Installation of sub power control panels

Feb. 1999 -

March 2000

PC-024 REDEVELOPMEN

T OF QUEEN

ELIZABETH

QUAY

COLOMBO PORT

- SOUTH ASIA

GATE WAY

TERMINALS

Hyundai

Engineering

and

Construction

Co.Ltd

Electrical Installation -

Laying of conduits and cables for reefer outlet

power panels

reefer container outlets, lighting towers(40M),

wharf lights,

fire hydrant control systems, telephone systems,

gantry cranes (3.3kV HT cables) and main power

supply(11kV).

Installation of outdoor reefer outlet power panels,

lighting

panels and fire hydrant control panels.

Installation of sub station, HT & LT. panels,

11KV/3.3KV

3.3KV/440V step down transformers, UPS and

control panels.

LT & HT cable joints & connections.

Erection reefer outlet steel structures & fixing

reefer outlets.

Jan. 2000 -

March 2002

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 32 of 37

Installation of three numbers 300kW Diesel

Generators.

Electrical installation for buildings.

Installation, testing and commissioning of

equipment.

Catodic protection system

PC-025 PROPOSED

OFFICE

DEVELOPMENT

FOR SITHMA

(PVT) LTD

479, T.B.JAYA

MAWATHA,

COLOMBO – 10

SHIN NIPPON

AIR

TECHNOLOGI

ES CO. LTD.

Electrical Installation -

Laying of conduits and cables for all power

systems and data

Floor trunking, Lighting and BMS ,bus bar systems

earthling lighting fixtures

Nev 2001 to

Dec 2002

PC-026 IMPROVEMENT

OF RATNAPURA

GENERAL

HOSPITAL

RATNAPURA

SUMITOMO

DENSETSU

CO. LTD

Electrical Installation -

Laying of conduits and cables for all power

systems and data

Floor trunking bus bar systems earthling lighting

fixtures

Emergence power supply system, telephone

system, fire control system

computer wiring system,

July 2001 to

Jan 2003

PC-027 FISHERIES

TRAINING

CENTRE

PROJECT -

TANGALLA

SANKEN

LANKA CO.

LTD.

Mechanical Works

Plumbing and Air condition works

Aug .2000 to

Match 2002

PC-028 Port of Colombo

Extension

Project (111)

NNP PROJECT

Sumitomo

Densetsu Co

Ltd, Japan.

Electrical Installation

Laying of conduits and LT & HT cables (11kV and

3.3kV) and lighting

tower, fire hydrant control system.

11kV main power supply and power supply for

3.3kV gantry crane.

Installation of outdoor power panels, fire hydrant

panels and telephone distribution boards.

Installation of sub-stations, power control panels

and

11kV / 3.3kV and 3.3kV / 440V step-down

transformers and panels.

Panel connections and cable joints (LT & HT)

Erecting lighting tower at height of 30 m, laying of

cables and fixing

lights (20 Nos. 1000 W lamps per tower)

Installation of 2000kW diesel generator including

oil tanks, allied pipe works and water cooling

FEB. 2001

TO DEC.

2002

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 33 of 37

systems.

PC-029 PROPOSED

BANDARANAYAK

E

INTERNATIONAL

AIRPORT

DEVELOPMENT

PROJECT

KATUNAYAKE

SHIN NIPPON

AIR

TECHNOLOGI

ES CO. LTD.

Electrical Installation

Laying of GI conduits and cables for all power

systems and data

Floor trunking, earthling, lighting fixtures

emergence power supply system, telephone

system, fire control system

computer wiring system, BMS System

JAN.2004 TO

NOV. 2005

PC-030 AUSTRALIAN

HIGH

COMMISSION

AND CHANCERY

BUILDING

PROJECT

SHIN NIPPON

AIR

TECHNOLOGI

ES CO. LTD.

Electrical Installation

Main Feeder and Power outlets, Lighting system,

Fire Alarm system,

CCTV system, EAC system, Communication & data

system, Lightning

Protection system, Generator system, BMS

system, Q-mastic system

computer wiring system,

SEP. 2004

TO MARCH

2006

PC-031 NATIONAL

BLOOD

TRANSFUSION

SERVICES

IMPROVEMENT

PROJECT

SHIN NIPPON

AIR

TECHNOLOGI

ES CO. LTD.

Electrical Installation

Main Feeder and Power outlets, Lighting system,

Fire Alarm system,

CCTV system, EAC system, Communication & data

system, Lightning

Protection system, Generator system, BMS

system, Q-mastic system

computer wiring system,

JUNE. 2005

TO MAY

2006

PC-032 PROPOSED

MONACH

TOWER PROJECT

- 30-Story

Apartment

Tower

COLOMBO 03

APP

ENGINEERIN

G (PVT) LTD

Electrical and Mechanical Installation -

Laying of conduits and cables for all power

systems and data

Trunking systems earthling lighting fixtures

1. CCTV System, 2. Audio Video Intercom system,

3. MATV system

4. Card Access System, 5. Fire Alarm system. 6.

Lightening Protection system

Hot & Cold Fresh Water System

30-story high-rise apartment tower

Hot and Cold fresh water system and drainage

system

Fire Protection System

Sprinkler system, Wet raiser, Hose real System

JAN. 2005

TO MARCH

2008

PC-033 PROPOSED

BRITISH HIGH

COMMISSION

PROJECT

COLOMBO -07

GIBS I

INTERNATIO

NAL - UK

Electrical Installation

Laying of conduits and cables for all power

systems and data

Trunking systems earthling lighting fixtures

1. CCTV System, 2. Audio Video Intercom system,

3. MATV system

MAY 2007

TO MAY

2008

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 34 of 37

4. Card Access System, 5. Fire Alarm system. 6.

Lightening Protection system

PC-034 PROPOSED

ADMINISTRATIV

E COMPLEX

PROJECT -

HAMBANTOTA

KEYANEAM

CONSTRUCTI

ON CO LTD -

KOREA

Electrical and Mechanical Installation –

Laying of conduits and cables for all power

systems and data

Trunking systems earthling lighting fixtures

1. CCTV System, 2. Audio Video Intercom system,

3. Fire Alarm system.

4. Lightening Protection system

Hot & Cold Fresh Water System

Hot and Cold fresh water system and drainage

system

Fire Protection System

Wet raiser, Hose real System

JUNE. 2007

TO MARCH

2010

PC-035 PROPOSED

CHAYA CORAL

HOTEL PROJECT

-

HIKKADUWA

DIMO LANKA

PVT. LTD.

Electrical Installation -

Laying of conduits and cables for all power

systems and data

Trunking systems earthling lighting fixtures

1. Fire Alarm system.

JANUARY.

2011 TO

SEPTEMBER

2011

PC-036 PROPOSED

CHAYA BAY

HOTEL PROJECT

-

BERUWELA

DIMO LANKA

PVT. LTD.

Electrical Installation -

Laying of conduits and cables for all power

systems and data

Trunking systems earthling lighting fixtures

1. Fire Alarm system.

Fire Protection System

Wet raiser, Hose real System

AUGUST

2011 TO

DATE

PC-037 Port of Colombo

Expansion

Project

(Southern Port)

Hyundai

Engineering

and

Construction

Co.Ltd

Electrical and Mechanical Installation

Laying of conduits and LT & HT cables (11kV and

3.3kV) and lighting

tower, fire hydrant control system.

11kV main power supply and power supply.

Installation of outdoor power panels, fire hydrant

panels and

telephone distribution boards.

Installation of sub-station equipment, power

control panels and

11kV / 440V step-down transformers and panels.

Panel connections and cable joints (LT & HT)

Erecting lighting tower at height of 30 m, laying of

cables and fixing

lights (20 Nos. 1000 W lamps per tower), Road

Lighting System

and Building Electricals installation

Mechanical Works

Installation of Main Water Supply system (Approx.

3 Kilometers)

Installation of Drainage System (Approx. 2

JANUARY

2011 TO

DATE

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 35 of 37

Kilometers) and Treatment Plant

Pump House & Pump Station

Building Plumbing installation

Fire Protection System

Main Fire Hydrant System for Container Yard &

Fire Pump House,

Building Fire Protection System

Central Air Conditioning System

Supply & Installation of Sea Water Cooled Chiller

A/C System

In Pilot Station & Crew Accommodation.

PC-038

Lavanga Resort

& Spa (Hotel

Project)

Anudan

Holdings Pvt.

Ltd.

Electrical and Mechanical Installation

Total Electrical System, Fire detection control

system,

MATV/CCTV/PABX System,

Mechanical Works

Installation of Main Water Supply system

Installation of Drainage System Pump House &

Pump Station

Building Plumbing installation

Swimming Pool Installation

AirConditioning Works

Fire Protection System

Main Fire Hydrant System & Fire Pump House,

Building Fire Protection System

MARCH

2012 TO

JUNE 2013

PC-039 UTMT Resort

Hotel Project

Dickwella

UTMT

Resorts Pvt.

Ltd.

Electrical and Mechanical Installation

Total Electrical System, Fire detection control

system,

MATV/CCTV/PABX System.

Mechanical Works

Installation of Main Water Supply system

Installation of Drainage System Pump House &

Pump Station

Building Plumbing installation

Fire Protection System

Fire Hydrant System & Fire Pump House,

Building Fire Protection System

NOVEMBER

2011- 2014

PC-040 Neelakudah

Hotel (Hotel

Project)

Salasi Lanka

Pvt. Ltd.

External Electrical Installation

Total External Electrical System

MARCH

2013 - 2014

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 36 of 37

PC-041

ANIE VILLA

Resort Hotel

Project

Dickwella

UTMT

Resorts Pvt.

Ltd.

Electrical and Mechanical Installation

Total Electrical System, Fire detection control

system,

MATV/CCTV/PABX System.

Mechanical Works

Installation of Main Water Supply system

Installation of Drainage System Pump House &

Pump Station

Building Plumbing installation

Fire Protection System

Fire Hydrant System & Fire Pump House,

Building Fire Protection System

NOVEMBER

2013 TO

NOVEMBER

2015

PC-042 SHANGRI LA

HOTEL PROJECT

Hotel Project

Hambantota

APP

Engineering

Pvt Ltd.

Electrical and Mechanical Installation

Total Electrical System, Fire detection control

system,

MATV/CCTV/PABX System.

Mechanical Works

Installation of Main Water Supply system

Installation of Drainage System Pump House &

Pump Station

Building Plumbing installation

Fire Protection System

Fire Hydrant System & Fire Pump House,

Building Fire Protection System

FEBRUARY

2014 to

JUNE 2016

PC-043 Construction of

Enginer’s Office

at Waterfront

Intergrated

Resort Project,

Slave Island,

Colombo - 02

Hyundai-

Keangnam-

Nawaloka JV

Construction of Two storied Pre-Fabricated Steel

Building including all relevant MEP works

(Electrical, FIRE, AC & Plumbing Etc.,)

OCT 2014 to

JUN 2015

PC-044 Port of Colombo

Container

Terminal (East

Port)

Hyundai

Engineering

and

Construction

Co

.Ltd

Building And MEP Works

Sub Station, Water Tank, and Pump House

Construction

Electrical and Communication Man holes,

Electrical and Communication Duct Line

Container Yard Earting System

Building Electricals installation

Mechanical Works

JULY 2014

JUNE 2016

HI-TEC Engineering Works THE POWER OF MEP+CE

Page 37 of 37

Pump House & Pump Station

Building Plumbing installation

Fire Protection System

Main Fire Hydrant System for Container Yard &

Fire Pump House,

Building Fire Protection System.

PC-045 Construction of

2 Nos. Workers

Dormittories at

Norochcholay

Plant.

Access

Engineering

PLC

Plumbing works for two nos. dormitories

including water supply, drainage, waste &

sewerage and Bio cell Anaerobic Treatment

system.

DEC 2015 to

MAY 2016

PC-046 Construction of

New South Wing

Office for

NWSDB Head

Office

Link

Engineering

Ltd.

Fire Detection & Fire Protection

All Plumbing Related Works including the design

All Electrical Related Works including the design

JAN 2016 to

DATE

PC-047 Construction of

Haritha Villa

Project t

Thiranagama,

Hikkaduwa

Salasi Lanka

Pvt. Ltd

Building And MEP Works

Sub Station, Water Tank, and Pump House

Construction

Electrical and Communication Man holes,

Electrical and Communication Duct Line

Container Yard Earting System

Building Electricals installation

Mechanical Works

Pump House & Pump Station

Building Plumbing installation

Fire Protection System

Main Fire Hydrant System for Container Yard &

Fire Pump House,

Building Fire Protection System.

JULY 2015 to

DATE

…End…