Metis Knowledge Series
Report on :
Commissioning
Projection of
Thermal and Hydro
Power Plants for FY12
®
K Rnowledge edefined
8/6/2019 Commissioning Projection of Thermal and Hydro Power Plants for Fy12 (1)
http://slidepdf.com/reader/full/commissioning-projection-of-thermal-and-hydro-power-plants-for-fy12-1 2/4
India being a predominantly high energy consumer has a huge need of electricity to manage the ever
increasing demand that fuels a growing economy. Thermal and hydro based fuel sources play animportant role in our country's energy mix. India has one of the largest reserves of coal in the world, butthe question of energy security still remains high.
The last few years have seen a record breaking generation capacity addition. However targetachievement for the current five year plan (FYP) is far from complete. An estimated 78 GW of capacitywas expected to be added in the present FYP. However with various issues hampering the sector, the
target has repeatedly been revised with the final figure standing at 51 GW approximately
®
K Rnowledge edefined
Metis Knowledge Series
eport on :
Commissioning Projection of Thermal and Hydro Power Plants for FY12
The targeted capacity as per the Ministry of Power's review is at 28 GW for the current year, i.e. 2011-12.Out of this a meagre 1285 MW has been achieved and the remaining year is expected to add around 6-
8 GW only, way below the planned target. Timely commissioning of power plants remains the key areaof concern.
One of the major delays in the commissioning of projects is the lack of timely availability of equipmentsfor power projects. India's indigenous equipment capacity at present is strained with limited capacity tosupport the planned capacity addition. Nearly 6900 MW from the year's target of 28000 MW is slipping,out of which 5336 MW is from BHEL's end alone.
Source : Metis/MoP
Source : Metis/MoP
In light of these, Metis has come out with a report on Commissioning Projection of Thermal and Hydro
Power Plants for FY12, highlighting the current status and expected completion targets of criticalprojects in the current year, on which the performance of the present plan depends
Status of Equipment Supply for Capacity Addition (In MW for Fy12)
8/6/2019 Commissioning Projection of Thermal and Hydro Power Plants for Fy12 (1)
http://slidepdf.com/reader/full/commissioning-projection-of-thermal-and-hydro-power-plants-for-fy12-1 3/4
®
K Rnowledge edefined
Metis Knowledge Series
eport on :
Commissioning Projection of Thermal and Hydro Power Plants for FY12
a. Indian power sector overview
a.
Current scenario
i.
Year-wise capacity addition
ii.
Fuel-wise capacity addition
b.
Regulatory Overview
c.
11th
plan targets and
achievement till date
d.
Commissioning Target for 2011 -12
a.
List of projects to be commissioned in FY12
i.
Quarter wise commissioning targets
b.
Actual and slippages
i.
Thermal
1.
Coal based power projects
2.
Gas based power projects
ii.
Hydro
iii.
Equipment providers targets
c.
Status of Major projects
i.
Central
ii.
State
iii.
Private
e.
Major Issues
Conclusion
Table of Contents
List of Tables
1. Year-wise capacity addition (in MW)
2. Fuel-wise capacity addition (in MW)
3. 11th plan capacity addition target achievement (in MW)
4. Quarter-wise planned thermal capacity addition including slippage
5. Quarter-wise planned hydro capacity addition including slippage
6. Equipment provider capacity addition target and expected slippage
7. FY 12, Quarter 1 capacity addition
8. Commissioning projection for central sector thermal projects
9. Commissioning projection for state sector thermal projects
10. Commissioning projection for private sector thermal projects
11. Commissioning projection for central sector hydro projects
12. Commissioning projection for state sector hydro projects
13. Commissioning projection for private sector hydro projects
8/6/2019 Commissioning Projection of Thermal and Hydro Power Plants for Fy12 (1)
http://slidepdf.com/reader/full/commissioning-projection-of-thermal-and-hydro-power-plants-for-fy12-1 4/4
Booking Details
®
ubscriber : INR 5,000Non Subscriber : INR 7,500
would like to book the copy for the report on Commissioning Projection of Thermal & Hydro Plants for FY
2012, pl find enclosed payment of INR______________ vide cheque / DD no ____________ Dated
__________ in favour of Metis Business Solutions Pvt. Ltd.
ooking Fee
or booking please contact
Metis Knowledge Series
Report on :
Commissioning Projection of Thermal and Hydro Power Plants for FY12