19 October 2010 CEP #1 Combining Offshore EOR and CCS in Denmark IEA Offshore EOR Symposium 20 th October 2010 Nigel Jenvey, Director, EOR Project Manager

Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010CEP#1

Combining Offshore EOR and CCS in Denmark

IEA Offshore EOR Symposium

20th October 2010

Nigel Jenvey, Director, EOR Project Manager

Page 2: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 2 19 October 2010

Maersk is a global conglomerate that has existed for more than a hundred years

…with more than 117,000 employees worldwide

Maersk is an international company recognised for its activities

within shipping, energy, offshore, retail and industry

Page 3: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#3

The Importance of EOR to Maersk Oil

• Significant incremental production potential in Denmark

• Breaking new ground in our pursuit for reserves

• Pivotal role in supporting late life assets to increase

commercial recovery

• Technical and commercial challenges to overcome

There are many technically applicable EOR

technologies, but very few are

commercially applied…

Page 4: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#4

Maersk Oil EOR Related Experience – DUC Gas Injection

• Tyra gas injection (since 1987)

• Gorm crestal gas injection into the gas cap (1982-1994)

• Tyra gas injection into the oil rim (1999)

Gas Breakthrough in Two Months

( Injector to Producer 1000 feet )

Tyra Gas Injection Test

0

10

20

30

40

50

60

Jan-99 Jan-99 Mar-99 Apr-99 May-99 Jun-99 Jul-99 Aug-99 Sep-99 Oct-99 Nov-99 Dec-99 Jan-00 Feb-00 Mar-00 Apr-00 May-00 Jun-00

Gas R

ate

mm

scfd

twc-21a-gas production

twc-10 gas injection

Page 5: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#5

Maersk Oil EOR Related Experience – Qatar WAG Pilot

Source: IPTC-13327

Well 6

Well 5

• 6 month lean gas injection test (2008)

• Evaluate gas breakthrough and post-injection

water injectivity

Page 6: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#6

Maersk Oil EOR Related Experience – Algeria WAG Pilot

• October 2003-December 2006

• WAG injection well, with dedicated

updip monitor well 160m away

• Immiscible and miscible gas injection

cycles

• Evaluate target oil and injectivity

Page 7: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 7 19 October 2010

The Time for EOR is Now for Denmark

Source: DEA

Page 8: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#8

DUC Infrastructure

• 50 platforms

• 1 subsea completion

• 65 pipelines – approx. 800km

• 182 oil production wells

• 68 gas production wells

• 17 gas injection wells

• 94 water injection wells

• Some 700 onshore employees

• Some 500 offshore employees and 1000 contractors

Page 9: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#9

Remaining, 71%

DUC Field Recovery

• Residual oil• Thin oil columns• Bypassed oil• etc

Potential IOR and EOR, ?%

Scope Production, 4%

Produced, 19%

Remaining Production, 6%

Remaining, ?%

Page 10: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 10 19 October 2010

Dan Field Location

Page 11: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#11

Dan Field Production

0

5.000

10.000

15.000

20.000

25.000

30.000

35.000

40.000

45.000

50.000

55.000

60.000

65.000

70.000

75.000

80.000

85.000

90.000

95.000

100.000

105.000

110.000

115.000

120.000

125.000

130.000

135.000

140.000

Jan-7

0

Jan-7

3

Jan-7

6

Jan-7

9

Jan-8

2

Jan-8

5

Jan-8

8

Jan-9

1

Jan-9

4

Jan-9

7

Jan-0

0

Jan-0

3

Jan-0

6

Jan-0

9

Jan-1

2

Jan-1

5

Date

Prod

ucti

on

, B

OP

D

Depletion Waterflood

Actual Forecast

Page 12: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#12

Dan Field Development

2 KM

Page 13: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#13

2 KM

Halfdan

Seismic data indicates good areal sweep

Page 14: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#14

CO2 Sourcing Options

• Natural

• Industrial Processes (CO2 Capture)

• Gas Processing

• Refineries

• Manufacturing (cement, steel, fertilisers)

• Power

• Carbon Capture and Storage requires other funding mechanisms for implementation

$10/tonne

$30/tonne

$60/tonne

$90/tonne

Page 15: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#15

CCS Economics

Source: McKinsey

Page 16: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#16

Projected Growth of the new CCS industry

Source: IEA CCS Roadmap

Page 17: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 17 19 October 2010

• More than 750 million tonnes of CO2 are emitted annually from large

stationary sources relatively close to the North Sea

• Much of the North Sea geology is potentially suitable for CO2 storage, but

saline aquifers need exploration, appraisal and development

• Certain UK, Norwegian and Danish oil/gas fields are suitable for storage and

enhanced recovery techniques

Source: GESTCO

CO2 Storage Capacity

Page 18: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 18 19 October 2010

Not many sizeable CCS projects exist without EOR

Source: IPCC Special Report on CCS

How much CO2 storage capacity is

required for CCS when it is a „transitional‟

technology?

Page 19: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 19 19 October 2010

Worldwide EOR and CCS Potential

Source: Advanced Resources International

Page 20: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#20

CO2 Transport

• Today no ships transport industrial CO2 emissions

• CO2 Shipping can be cost competitive and is more flexible than

pipelines

• Maersk Tankers has designed a semi-pressurised/semi-fridgerated

20,000 m3 ship

• Interface with offshore discharge requirements key

Source: Yara

CO2 CAPTURE

CO2CO2

CO2 TRANSPORT

POWER

PLANT

CO2 OIL

CO2 INJECTION FOR STORAGE / EOR

Page 21: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#21

CO2 Transport

Semi-pressurized/

semi-refrigerated:

-55 degC and 6.5 bar

Underground Storage

100 - 300 bar

Fully-pressurized:

20 degC and 70-80 bar

Page 22: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 22 19 October 2010

Maersk Tankers’ 20,000 CBM CO2 Carrier

Source: HHI

Page 23: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 23 19 October 201023

1. Submerged Turret Off-Loading (STL) system

• Offloading under the ship

• Least exposure to weather/swell

• High installation costs*

Offshore CO2 Off-loading

• Offloading over the bow

• Highest exposure to weather/swell

• Lower installation costs*

2. Single Anchor Off-Loading (SAL) System

* The subsea system at the offshore field needs to be taken into consideration

Page 24: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 24 19 October 2010

A combination of an FSIU and CO2 carriers can be developed in the same way Maersk has developed its Floating Production Storage and Offloading (FPSO) logistics

• The ships are connected via a bow loading system and a stern discharge system

Page 25: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#25

Combining CCS and CO2 EOR

1. How to achieve a constant CO2 import rate?

• In-field phased development (aka “roll-the-flood” or “pattern-

by-pattern”)

• Alternative EOR/Storage field development

2. How to deal with different source timing/volumes?

• Phased development (aka “partial field expansion”)

• Pre-investment for full-field application

• Alternative EOR/Storage field development

• 2 key field development questions:

Page 26: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#26

Full-field CO2 EOR – an illustration

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 5 10 15 20 25 30

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Waterflood CO2 Import (Falling)

Non-economic WF CO2 EOR

CO

2 Im

po

rt R

ate

, %

Oil P

rod

ucti

on

Rate

, %

Years

Page 27: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

19 October 2010#27

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 5 10 15 20 25 30

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

CO

2 Im

po

rt R

ate

, %

Oil P

rod

ucti

on

Rate

, %

Phased CO2 EOR – an illustration

Years

Waterflood CO2 Import (Phsd/Cons)

Non-economic WF CO2 EOR Phasing

Page 28: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

28

• Given miscibility, CO2 EOR recovery can vary due to 3 main reasons:

1. Conformance2. Target Oil3. Injectivity

• These can vary over any single field due to natural or man-made variations

• Reducing the uncertainty and calibrating forecasts is key to improve the quality of decision making, via:

– Field waterflood performance– Analogue field performance– Laboratory tests– Field tests

CO2 EOR – Recovery Uncertainty

0,0E+00

1,0E-07

2,0E-07

3,0E-07

4,0E-07

5,0E-07

6,0E-07

7,0E-07

0 2 4 6 8 10 12 14Time after injection in FA-11 (d)

Co

ncen

trati

on

(g

/l)

FA-11 2-FBA

FF-07 4-FBA

FA-01B 3,4-DFBA

FB-23 2,6-DFBA

FE-07 2,4,5-TFBA

Source: DUC

Page 29: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

29

Opportunity exists for new CO2 EOR

projects to be more efficient with recovery

given availability of lower cost CO2

CO2 EOR – Development Opportunities

Page 30: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

30

Topsides33%

Brownfield29%

Wells38%

– Manifolds (production, test, injection, gas lift, original)

– Utilities (water injection, seawater lift, cooling/heating,

diesel, potable water, emergency power)

– Workovers (tubing change out, tie-back

casing, sidetracks)

– Gas lift modifications (CO2 contamination)

– Separation (2 stage production, test)

– Metering (oil, water, HC gas, CO2 import, CO2

injected, CO2 flared/vented, power)

– Gas processing(compression, pumping,

dehydration, vent, flare)

– Utilities (fuel gas, cooling/heating,

instrument air, N2, chemicals, hydraulics, drains, fire detection and supression)

– Pipelines

CO2 EOR – Implementation Costs

Page 31: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 31 19 October 2010

Dan Facilities

FF

FG

FC

FD

FB

FA

FE

To Tyra EastTo Gorm

To/From Halfdan HDA

From Halfdan HBB

From Kraka

E

C

B

AD

Page 32: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

Slide no. 32 19 October 2010

CO2 Development on Dan

FF

FG

FC

FD

FB

FA

FE

To Tyra EastTo Gorm

To/From Halfdan HDA

From Halfdan HBB

From Kraka

E

C

B

AD

Scope on FE:• CO2 Injection Manifold• CO2 Production Manifold• CO2 Test Manifold

Scope on FA:• CO2 Injection Manifold• CO2 Production Manifold• CO2 Test Manifold

Utilities from F Complex:• Water Injection• Produced Water• Seawater lift• Cooling medium• Diesel• Potable Water• Main Power• Emergency Power

Scope on FB:• CO2 Injection Manifold• CO2 Production Manifold• CO2 Test Manifold

Scope on FF:• CO2 Injection Manifold• CO2 Production Manifold• CO2 Test Manifold

Scope on A & D:• CO2 Injection Manifold• CO2 Production Manifold• CO2 Test Manifold

Scope on New Deck:• 2 stage separation• Test separator• Crude metering, export• LP compression• Injection compression• Import CO2 pumping• TEG Dehydration• Fuel gas• Seawater lift

• Cooling medium• Instrument Air• Nitrogen• Chemical injection• HPU skid• HP, LP, Atmos vent• Closed/HO/NHO drains• Firewater

Page 33: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

33

CO2 EOR – CCS Verification

2. Monitoring – of the injection facilities, the storage complex, and where appropriate the surrounding environment

• Potential requirements for projects under the EU CCS Directive:

Source: IPCC

Source: Environmental Geology, Springer

1. Site Characterisation – to ensure no significant risk of leakage, environmental damage or health impact

3. Abandonment – to allow the transfer of responsibility

Page 34: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

34

EOR is an enabling commercial step towards constructing an infrastructure that can handle CO2 emissions from Northern Europe

CENS was the 1st industry project in 2001Original concept proposed a main CO2 pipeline

infrastructure in the North Sea capable of transporting more than 30mtCO2/yr

Adapted to be a phased development

Courtesy: CO2 Global

CO2 EOR – North Sea Network

Page 35: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

35

What are we doing about it?

• Assessing the potential commercial application of CO2 EOR linked with CCS

– EU co-funded (NER300) CCS project timeline

Now 2011 2012 2013 2014 2015

Expre

ssio

n o

f in

volv

em

ent

EU

Fundin

g

application

EU

Fundin

g

announcem

ent

CO

2In

jection

FEED Construction

Possib

le I

nj

Test

Page 36: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Insert department name via

• CO2 EOR may become a viable technique to increase recovery and extend the field life of certain DUC fields.

• To enable this, given the current risks/costs of implementation, EOR in combination with CO2 Storage is being persued to mature a commercial opportunity

• This will require phasing of the EOR flood:

– To maintain a constant CO2 import rate, given CO2 recycling

– Due to the available CO2 volumes initially from CCS demo projects

• Subject to initial successful standalone CO2 EOR/Storage field implementation, further implementation may be possible in other DUC fields and thereby mitigate the impacts of continued oil production decline

Summary

Page 37: Combining Offshore EOR and CCS in Denmarkiea-eor.ptrc.ca/2010/assets/F11_Slides.pdf · •Some 700 onshore employees •Some 500 offshore employees and 1000 contractors #9 19 October

Thank you