Coca-Cola’s Atlanta Landfill Gas Cogeneration Project
Richard Crowther – Coca-Cola
1
Coca-Cola’s Strategic Focus
3
WATER STEWARDSHIP
SUSTAINABLE PACKAGING
ENERGY & CLIMATE
on Sus t a i nab i l i t y ?
focus Where does Coca -Co l a
Al te rna t i ve Energy
P r o d u c t D e l i v e r y
F l e e t T r a n s p o r t a t i o n
P r o d u c t i o n E f f i c i e n c y
4 Key Areas for Energy & Climate
5
Fuel Cells
Bio-Fuels
Solar Power
Cogeneration
Wind
Alternative energy sources considered
6
1. Project must deliver net economic savings versus the default energy source
2. Coca-Cola should retain full ownership of all “Green” benefits generated
3. Suppliers must guarantee the long-term performance of the projects
4. All analysis must be realistic including tax treatment & inflation factors
6. We do not desire to be power exporters
7. We prefer PPAs style agreements
Our Requirements for Clean Energy Project Development
Key Project Partners • Mas Energy
• Republic Services
• Atlanta Gas Light
• GE Jenbacher
• Veolia Energy N.A.
• Crowder Construction
6.525 MW combined heat & power plant using landfill gas
• Landfill gas processing
• 6.0 mile dedicated pipeline
• 3 Jenbacher J616 engines
• Heat recovery steam generators
• Steam turbine chiller
• Start-Up 3/2012, 15 months to build
Project Overview
System Schematic
7 | Page
Appendix A
Cooling&Dehydra on
SiloxaneRemoval
PolishingBed
GasCompressor
2.175MWGen-set
2.175MWGen-set
2.175MWGen-set
HRSG
HRSG
HRSG
1065TonSteam-Driven
Chiller
LandfillGastoExis ngFlare
SiloxaneBedRegen&Destruc onFlare
SteamtoProcess,HVAC
ChilledWatertoProcess,HVAC
6.0mileDedicatedLFGpipelinetoTrigenera onPlant
11,400lb/hourof125psigsteam
ElectricitytoCoca-Cola&GaPower