WBC Collaboration

“We want to engage with customers to help us all understand what will be delivered at each stage, capture any missing, changed or delayed requirements and ensure a positive Customer Experience”

To do this we:

• Hold frequent bilaterals

• Encourage direct customer involvement

• Provide “War Room” Support

• Flexibly reprioritise each 90 day development cycle

• Add and amend requirements with our customers

We need to take this approach forward into the End to End testing world.

Page 3: Cleo Carris and Jim Feenan 12 th December, 2007  WBC Leadership Review Slides

WBC – Providing a Positive Customer Experience

“We are aiming for a Smooth and Seamless CE delivered through joint testing & collaborative development and communications”

We do this with:

• A CE roadmap planned and measured throughout the trial, launch and in-life stages of WBC.

• Use measurable CE targets to share underlying test results with customers, rather than getting bogged down in reams of test results.

• We focus on delivering a positive E2E CE for BTW, the CP and their EU customers.

• We help customers deliver a marketing and sales message based on the CE delivered by the product.

Page 4: Cleo Carris and Jim Feenan 12 th December, 2007  WBC Leadership Review Slides

WBC CE Roadmap - High Level View    Milestones

  High Level Measures POCService

TrialCustomer Trial (1)

Launch(Apr 08)

Customer Trial (2)

In Life(Q3)

Mar-09Commit

QoS & CE Provide to ODD L2C AP/EP NA NA 96% 96% 96% 96% 96%

  ELFs L2C AP/EP NA NA 7% 7% 7% 7% 4%(1)

RFT L2C EUA 80% 80% 85% 85% 87% 87% 95%

  ELF EUA N/A 8% 8% 8% 8% 7% 4%(1)

  RFT T2R EUA 50% 50% 60% 60% 65% As 20C 95% (6)

Repeat Reports N/A 20% 20% 20% As 20C As 20C As 20C (7)

  Cleared in objective time T2R AP/EP NA NA 86% 86% 86% 86% 86%

  Repeats T2R AP/EP NA NA 18% 18% 18% 18% 18%

Provisioning exceptions Migrations  NA NA  3% 2%  2%  1% 1%

  ELFs Migrations  NA NA  8% 8%   8%  7% 4%(1)

 

  CT L2C EUA 8WD 6.5WD 5WD 5WD 5WD 5WD

SelectableLead time(2)1 Hr (3)

  CT L2C AP/EP N/A 23WD 10WD 10WD 10WD 10WD 5WD(4)

  CT T2R EUA <96Hrs <72Hrs <50Hrs <40Hrs <40Hrs <40Hrs 2-24 (5)

  CT T2R AP/EP N/A 7Hrs 7Hrs 6Hrs 6Hrs 6Hrs 5Hrs

 

  In-life Fault Rate N/A N/A N/A 0.1 0.1 0.1 0.08

  Billing Accuracy N/A N/A 100% 100% 100% 100% 100%

  CP satisfaction with WBC service. NA 60% 80% 90% 80% 90% 90% (8)

Page 5: Cleo Carris and Jim Feenan 12 th December, 2007  WBC Leadership Review Slides

WBC CE Roadmap – Consolidates underlying CE criteria and test results

Division/Author/OwnerMay 9, 2006www.btwholesale.com

WBC CE Roadmap - High Level View

NA

N/A

N/A

N/A

<96Hrs

N/A

8WD

NA

NA

NA

NA

N/A

50%

N/A

80%

NA

NA

POC

1%1%2%2%3%NAProvisioning exceptions Migrations

As 20C (7)As 20CAs 20C20%20%20%Repeat Reports

95%87%87%85%85%80%RFT L2C EUA

90% (8)90%80%90%80%60%CP satisfaction with WBC service.

100%100%100%100%100%N/ABilling Accuracy

0.080.10.10.1N/AN/AIn-life Fault Rate

5Hrs6Hrs6Hrs6Hrs7Hrs7HrsCT T2R AP/EP

2-24 (5)<40Hrs<40Hrs<40Hrs<50Hrs<72HrsCT T2R EUA

5WD(4)10WD10WD10WD10WD23WDCT L2C AP/EP

SelectableLead time(2)1 Hr (3)5WD5WD5WD5WD6.5WDCT L2C EUA

4%(1)7%8%8%8%NAELFs Migrations

18%18%18%18%18%NARepeats T2R AP/EP

86%86%86%86%86%NACleared in objective time T2R AP/EP

95% (6)As 20C65%60%60%50%RFT T2R EUA

4%(1)7%8%8%8%8%ELF EUA

4%(1)7%7%7%7%NAELFs L2C AP/EP

96%96%96%96%96%NAProvide to ODD L2C AP/EPQoS & CE

Mar-09Commit

In Life(Q3)

Customer Trial (2)

Launch(Apr 08)

CustomerTrial (1)

Service TrialHigh Level Measures

Milestones

Trial & launch success criteria – customer service requirements

As 20CAs 20CAs 20CAs 20C20%60%NAMaximum % CP manual handlingSupport/ Resource

100%100%99%99%95%90%NAEUA & AP/EP Product Compliance with Handbook, STINs etc

100%100%99%99%95%90%TBDEUA & AP/EP availability of product functionality

Product Functionality

99.995%TBDTBDTBDTBDTBDTBDNetwork service availability (including planned outages)

6.1.46.1.46.1.45.0.35.0.35.0.35.0.3Network releases availabilityNetwork

Same as IPstream

16%18% total order types

15% provide, cease, modify

20% simprovide

20% provide, cease & modify

50% simprovide

60% provide, cease & modify

100%Maximum % Customer Service manual handling

99%99%99%99%90%50%NASuccess rate of T2R transactions

99%99%99%99%90%50%NASuccess rate of L2C transactions

5000OSS live test environment requirement volume dependency

TBDTBDTBDTBDTBDTBDTBDBB E2E system response time (L2C & T2R) - latency

99%99%99%99%90%50%NABB E2E system & OSS network availability (inc planned outages)

TBDCycle 8Cycle 8Cycle 7Cycle 6Cycle 5ManualDevelopment cycle availabilityOSS

2mTBD200003000300025015EUA volume ramp-up profile (up to)Volume Profiles

Mar-09CommitIn Life

Customer Trial (2)Launch

Customer Trial (1)

Service TrialPOCHigh Level Measures

Milestones

Trial & launch success criteria – CP & EU requirements

TBDTBDTBDTBDTBDTBDTBDEtc – to be determined

90%90%80%90%80%60%NAEU Perception of WBC Service

40%40%40%40%40%NANA% on higher line rate than Max

5%5%5%5%10%NANA% on lower line rate than Max

0.005%0.005%0.005%0.005%0.05%0.5%NA% flappers

5 days5 days5 days8 days10 daysNANATime to stabiliseQoS & CE

Mar-09CommitIn Life

Customer Trial (2)Launch

CustomerTrial (1)

Service TrialPOCHigh Level Measures

Milestones

Trial & launch success criteria – customer migration additional requirements

TBDTBDTBDTBDTBDTBDTBDEtc – to be determined

TBDTBDTBDTBDTBDTBDTBDVolume supported

TBDTBDTBDTBDTBDTBDTBDNo of single line regressions

TBDTBDTBDTBDTBDTBDTBDAve time out of service

TBDTBDTBDTBDTBDTBDTBDNo of outagesQoS & CE

Mar-09CommitIn Life

Customer Trial (2)Launch

CustomerTrial (1)

Service TrialPOCHigh Level Measures

Milestones

1-Urgent2-High

Defects - Age Graph

Times: D-Days, W-Weeks, M-Months, Y-Years

0D

1D

2D

3D

4D

5D

6D

1W

2W

3W

4W 1M

2M

3M

4M

5M

6M

7M

8M

Nu

mber

of D

efe

cts

40

35

30

25

20

15

10

5

0

27

9

2

14

10

13

10

23

12

5

2

38

10

31 1

3 21

4.081.473.2Test run rate4.080.943.2Pass run rate

19/11/2007

12/11/2007UAT Start date - duration 30 days

RequiredActualPlanned

8No. of tests in flight2No. of tests descoped

32%% Tests possible complete10%% Inflight25Total number of tests run1%% Failed79%% of initial no. possible

21%% Passed77No. of tests possible

1Failed19No. of tests blocked16Passed98Initial no. of tests

wBc Q2/Cycle 6 L2C IVVT High level progress

4.081.473.2Test run rate4.080.943.2Pass run rate

19/11/2007

12/11/2007UAT Start date - duration 30 days

RequiredActualPlanned

8No. of tests in flight2No. of tests descoped

32%% Tests possible complete10%% Inflight25Total number of tests run1%% Failed79%% of initial no. possible

21%% Passed77No. of tests possible

1Failed19No. of tests blocked16Passed98Initial no. of tests

wBc Q2/Cycle 6 L2C IVVT High level progress

High Level View

Lower Level CE Support Requirements Detailed network &

IVV&T results

Page 6: Cleo Carris and Jim Feenan 12 th December, 2007  WBC Leadership Review Slides

WBC product overview

CP

CMSANs

Aggregation Point 1

Metros

BRAS

Aggregation Point 20

*

*

*EU

*

*

*EU

MSIL

MSIL Downstream Network

WBC – three main components

EUA Aggregation Point & Extension Path

Customer Network & Interconnect

123

What Does End to End Testing Mean for WBC? ->

Page 7: Cleo Carris and Jim Feenan 12 th December, 2007  WBC Leadership Review Slides

WBC End to End Testing overview

CP

CMSANs

AggregationPoint 1

Metros

BRAS

AggregationPoint 20

*

*

*EU

*

*

*EU

MSIL

MSIL Downstream Network

CP

CMSANs

AggregationPoint 1

Metros

BRAS

AggregationPoint 20

AggregationPoint 1

Metros

BRAS

AggregationPoint 20

*

*

*EU

**

**

**EU

*

*

*EU

**

**

**EU

MSIL

MSIL Downstream Network

123Internet

End Users CP Help Desks Web Portals

CPE

B2B GatewaysBTW SMC

email

VOIP

VAD/ IPTV

WBC ProductCP Servers &

Interface

People OSS

Support Systems

Page 8: Cleo Carris and Jim Feenan 12 th December, 2007  WBC Leadership Review Slides

CPE Compatibility Testing is also a key component of the E2E testing story for Customers