PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL08) AMOUNT SR Soil investigation The contractor shall implemented of exploratory drilling and Note mechanical test in all types of soil with on site testing and the issuance of the final report which contain the test results and recommendations of the foundation work. 01 Research and treatment for cavities Implementation through a perforating exploratory(cavity probing) In 1 M all types of rock to determined the horizontal and vertical elongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities and voids of rock with all necessary work accordance with the technical specifications and instructions of the Supervising engineer EXTERNAL WORKS The bidder is advised to visit the site before quoting the rates in order to get himself familiarize with the present site conditions SITE GRADING Bulk excavate over site on unclassified ground including all hard and rock layers to reduced levels generally in cutting profiles the work shall include clear away to approved disposals.  All additional excavation required for temp orary w orks and sp aces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation SITE PREPARATION AND GRADING 02 Excavation oversite on unclassified ground including all hard and 2500 M 3 rock layers (if any) to reduced levels generally in cutting profiles and forming depressions, falls and the like and clear away to approved disposal tip. 03 Fill oversite with approved imported fill material according to site 9590 M soil report recommendation including compaction in making up levels to required formations, embankments, contouring and the like as per drawings and spec. Excavation material may be used as fill material if found suitable Note and approved by the Engineer (client's representative) 04  Approved fill material sele cted from excavated material including M³ price only compaction as per spec. To Collection SR ITEM DESCRIPTION QTY UNIT RATE Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP 1 / 24 REVISED PAGE Date: MAY 2012

CL08 (MAY 2012)

Embed Size (px)

Citation preview

Page 1: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 1/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SR

Soil investigation

The contractor shall implemented of exploratory drilling and Notemechanical test in all types of soil with on site testing and theissuance of the final report which contain the test results andrecommendations of the foundation work.

01 Research and treatment for cavities

Implementation through a perforating exploratory(cavity probing) In 1 Mall types of rock to determined the horizontal and verticalelongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities andvoids of rock with all necessary work accordance with thetechnical specifications and instructions of the Supervisingengineer EXTERNAL WORKS

The bidder is advised to visit the site before quoting the rates inorder to get himself familiarize with the present site conditions

SITE GRADING

Bulk excavate over site on unclassified ground including all hardand rock layers to reduced levels generally in cutting profiles thework shall include clear away to approved disposals.

 All additional excavation required for temporary works and spaces,shoring, dewatering, removal of surplus excavated materials,support, temporary spoil heaps and general compaction

EXCAVATION AND EARTHWORK

Necessary moving or transportation about the site excavationmaterial including handling to temporary stockpile or ultimatedisposal off site is to be included in the unit rate of excavation

SITE PREPARATION AND GRADING

02 Excavation oversite on unclassified ground including all hard and 2500 M3

rock layers (if any) to reduced levels generally in cutting profilesand forming depressions, falls and the like and clear away toapproved disposal tip.

03 Fill oversite with approved imported fill material according to site 9590 Msoil report recommendation including compaction in making uplevels to required formations, embankments, contouring and the

like as per drawings and spec.

Excavation material may be used as fill material if found suitable Noteand approved by the Engineer (client's representative)

04  Approved fill material selected from excavated material including M³ price onlycompaction as per spec.

To Collection SR

ITEM DESCRIPTION QTY UNIT RATE

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

1 / 24

REVISED PAGE

Date: MAY 2012

Page 2: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 2/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

PAVING AND SURFACING

01 400x400x60mm thk .precast concrete ( beige color ) shotblasted 2065 M2

with photocatalytic titanium dioxide coating including 100mm

thick cast-in-place concrete slab with A193-WWF mesh

reinforcement, 20mm thick cement mortar setting bed, moisture

barrier, compacted subgrade as per detail A1 on drawing XL301

02 400x400x60mm thk .precast concrete ( grey color ) shotblasted 718 M2

with precast concrete (light grey color ) shotblasted with

photocatalytic titanium dioxide coating including 100mm thick

cast-in-place concrete slab with A193-WWF mesh reinforcement,

20mm thick cement mortar setting bed, moisture barrier,

compacted subgrade as per detail A2 on drawing XL301

03 400x400x40mm thk .precast concrete ( beige & brown color ) 776 M2

shotblasted with 200x200x30mm thk . Grey precast band,with

photocatalytic titanium dioxide coating including 100mm thick

cast-in-place concrete slab with A193-WWF mesh reinforcement,

20mm thick cement mortar setting bed, moisture barrier,

compacted subgrade as per detail A3 on drawing XL301

04 400x400x60mm thk .precast concrete ( beige & brown color ) 1630 M2

shotblasted with 200x200x60mm thk . Dark Grey precast band

with photocatalytic titanium dioxide coating including 100mm

thick cast-in-place concrete slab with A193-WWF meshreinforcement, 20mm thick cement mortar setting bed, moisture

barrier, compacted subgrade as per detail A4 on drawing XL301

05 400x400x30 mm thk. Polished granite paving ( dark & light 115 M2

colors ) with 200x200x30mm thk .dark color Granite band

including 100mm thick cast-in-place concrete slab with

 A193-WWF mesh reinforcement, 20mm thick cement mortar 

setting bed, moisture barrier, compacted subgrade as per detail

B5 on drawing XL301

06  Asphalt pavement comprising 80mm thick bituminous wearing 6554 M2

course, and granular base course including prime coat and

compacted subgrade as per detail C on drawing XL301

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

2 / 24

REVISED PAGE

Date: MAY 2012

Page 3: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 3/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

CURBS AND EDGING

01 Precast concrete curb, 300X500X150 mm exposed aggregate 1450 Mfinish including bedding, haunching, cast in place concrete base

and concrete grout behind curb, 20mm thick cement mortar 

setting bed, on compacted subgrade, as per detail 1 on drawing

XL302

02 Handicapped ramps including fixing, finishing and the like as per  9 M2

drawings and specifications

SUNDRIES

03 Precast concrete wheel stopper including dowels, grouting

and accessories for complete installation as per detail 4 ondrawing XL302 and specification

04 Precast concrete wheel stopper including fixings 149 No.

Tree/palm pit surround

05 Formation of cast iron tree / palm pits surround including 42 No.

concrete edge pavers and cement mortar setting bed as detail 2

on drawing XL302

Manufacturer's standard outdoor sings, letters and plaques

including fixings, finishes, accessories complete as per details on drawing XL602 and as per specifications

06 Ref. type 1 ( DIRECTIONAL SIGN ) 1 No.

07 Ref. type 2 ( GRAND MOSQUE SIGN ) 2 No.

08 Ref. type 3 ( GRAND MOSQUE PARKING SIGN ) 3 No.

09 Ref. type 4 ( BOYS ELEMENTARY SCHOOL SIGN ) 1 No.

10 Ref. type 5 ( GIRLS ELEMENTARY SCHOOL SIGN ) 1 No.

11 Ref. type 6 ( SCHOOLS PARKING SIGN ) 1 No.

12 Ref. type 7 ( ADVERTISING PANEL ) 2 No.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

3 / 24

REVISED PAGE

Date: MAY 2012

Page 4: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 4/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

Manufacturer's standard outdoor sings, letters and plaques

including fixings, finishes, accessories complete as per 

details on drawing XC-05 and as per specifications

01 Ref. type I-2 (ENTRY ) 1 No.

02 Ref. type R1-1 ( STOP ) 2 No.

03 Ref. type R2-1 (GIVE WAY ) 5 No.

04 Ref. type R5-1 ( ENTRY PROHIBTED ) 1 No.

05 Ref. type W11-1 ( PEDESTRAIN CROSSING ) 4 No.

Thermoplastic paint for traffic marking on pavement inparking and driveways including lane strips , studs , and the

like complete as shown on drawing XC-04 and specification

06 Straight arrows 23 No.

07 Straight & curved arrows 4 No.

08 Curved arrows 6 No.

09 Handicapped marking on floor  5 No.

10Parking lane marking 853 M

11 White stop line 37 M

12 Pedestrain crossing 43 M

13 White edge line 1315 M

14 Direction separation lines ( passing permitted) 456 M

15 Direction separation lines ( passing prohibited) 212 M

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

4 / 24

REVISED PAGE

Date: MAY 2012

Page 5: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 5/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

MISCELLANEOUS STRUCTURES

Reinforced concrete ( ETS ROOM ) under ground with stairsincluding earthworks, concrete works, water proofing ,

doors , finishing and all associated work as per drawing

CL08-S301 and spec.

01 ETS Room 1 Item

Pre cast concrete KIOSK , 1400 mm × 1400 mm , 3000 mm

height including earthworks, footings, steel plates, fixings,

finishings, and all associated work as detail 3, drawing

XL302

02 Pre cast concrete kiosk 1 No.

LANDSCAPING

Trees/palms including pit excavation, stakes and ties, soil

planting mix, mulching, filter membrane and drainage

layer all as details and planting schedule as per detail P1,

P2 on on drawing XL-401

03 P/Wf  10 No.

Trees/palms including pit excavation, stakes and ties, soil

planting mix, mulching, filter membrane and drainagelayer all as details and planting schedule as per detail P1,

P2 on on drawing XL-401

04 T/Af  36 No.

05 T/Fm 32 No.

Shrubs and ground cover including planting, site excavation

as required, soil planting mix, mulching, filter membrane

and drainage layer all as per details and planting schedule

as per detail P3, on drawing XL-401

06 S/Hs 10 No.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

5 / 24

REVISED PAGE

Date: MAY 2012

Page 6: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 6/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

LANDSCAPING

Shrubs and ground cover including planting, site excavationas required, soil planting mix, mulching, filter membrane

and drainage layer all as per details and planting schedule

as per detail P3, on drawing XL-401

01 G/As 315 No.

02 G/Cgp 606 No.

Lawn planting, including soil planting mix, filter membrane

and drainage layer all as per details and planting schedule

as per detail P4, on drawing XL-401

03 L/Cd 1496 M2

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

6 / 24

REVISED PAGE

Date: MAY 2012

Page 7: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 7/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 14 - CONVEYING SYSTEMS

AUTOMATED WASTE COLLECTION SYSTEM

Supply and provide all required to construct, test and

operate automated waste collection system, consisting of 

the following items:-

01 Discharge valve room without basement floor including required 1 No.

earthworks, concrete works for the vacuum room masonry for the

vacuum room and electromechanical works and all required works

as detailed on drawing no. STM - ITCCP2 - TD - 009. Contractor 

shall perform all required coordination with other trades to ensure

proper installation and operation of the complete system to

transport waste from tower chute to pipenetworks as shown ondrawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and

according to manufacturer's standards and specifications

02 Outdoor Load station. including required earthworks, concrete 3 No.

works, masonry and electromechanical works for the vacuum

room and PAI service box and all required works as detailed on

drawing no. STM - ITCCP2 - TD -013 and 014 Contractor shall

perform all required coordination with other trades to ensure proper 

installation and operation of the complete system to transport

waste from villas and playgrounds to pipenetworks as shown on

drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and

according to manufacturer's standards and specifications

PIPE WORK

Supply and installation of Automated waste collection

system piping. Item shall include the earth works,

insulation, ,concentric reducer, puddle flanges ,inspection

covers and all required materials and equipments to

complete the transport pipe line from DV rooms , outdoor 

load stations and full vacuum load stations to waste plant

03 Ø 508mm under/above ground transport pipe 360 M

RC MANHOLE

Supply and install cast insitu or precast reinforced concretemanhole ,the item shall include excavation, backfill

insulation ,inspection cover and all required to complete the

work.

04 RC manhole to suit required location in sitesas shown on drawings 7 No.

STM - ITCCP2 - TD 001 to 016

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

7 / 24

REVISED PAGE

Date: MAY 2012

Page 8: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 8/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15 - MECHANICAL

PLUMBING INSTALLATION

WASTE AND DRAINAGE INSTALLATION

Supply, install and testing pipework, UPVC schedule 40, the

work shall include but not limited to fittings, supports, cast

iron pipes on roof for vent with caps, installation, all

associate works and all materials and equipments required

to complete and finish the work according to drawings,

specification and code of practices

01 75 mm dia. 37 M

02 100 mm dia. 215 M

03 150 mm dia. 665 M

04 200 mm dia. 265 M

Accesssories

05 Ground cleanout 100 mm dia, ref. GCO 2 No

06 Glly trap, ref. GT 1 No

Construction work for briks inspection chamber, the work

shall include bit not limited to earth work, plain concrete

for foundation BED, concrete channel at chamber DED withstandard cast iron manhole frame and double cover and all

materials and equipments required to complete and finish

the work according to specifications, drawings and code of 

practice

07 Inspection chamber, ref. (IC) 600x600mm 25 No

08 Sedimentation chamber 2 No

09 Slow down chamber 1 No

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

8 / 24

REVISED PAGE

Date: MAY 2012

Page 9: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 9/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15 - MECHANICAL

MANHOLE AND COVERS

Supply , install, testing and commissioning precast

concrete sewer manholes with standard traffic (heavy duty)

type cast iron manhole covers and frames, access ladders,

concrete channel at manhole bed, foundation bed, drop

pipe to manhole where required, all associated earthworks,

damp proofing, and all materals, equipments required to

complete and finish. the work according to specifications

section 02605, 02730, drawings and code of practices

01 Sewer manhole, ref. (SMH) 11 No.

POTABLE WATER INSTALLATION

Supply, install and testing pipework, UPVC Schedule 80 for 

potable water the work shall include but not limited to

fittings, supports, all associate works and all materials and

equipments required to complete and finish the work

according to drawings, specification and code of practices

02 50 mm dia. 110 M

03 63 mm dia. 60 M

04 100 mm dia. 435 M

Reinforced concrete under ground water tank and pump

room with proprietary cast iron manhole covers and frames

the work shall include but not limited to earthworks,

concrete works, sump pit, and submersible pump internal

lining and water proofing, access ladders, pipework and

valving, test main fold vent pipes, truck fill pipework with

back flow preventer, ventilating fan and duct work within

tank and pump room structure, and UPVC schedule 80

drainge pipe from submersible pump to the nearest sewer 

manhole and all materials and equipments required to

complete and finish the work according to drawings,

specification and code of practices

05 Potable & fire water tank 1 Item

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

9 / 24

REVISED PAGE

Date: MAY 2012

Page 10: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 10/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

POTABLE WATER SUPPLY SYSTEM

Supply, installation and test Packaged type constantpressure booster potable water pumps, set of one duty and

one stand by pump, including piping and valving network

within pump chamber, complete with all controllers,

accessories for automatic operateion and all associate

works as per code standard and as described on drawings

and specification

01 Ref. PWP- 3 CAP 150 GPM & 42.18 M TDH 1 Set

02 Ref. PWP- 5 CAP 75 GPM & 38.67 M TDH 1 Set

03 Ref. PWP- 6 CAP 75 GPM & 38.67 M TDH1 Set

04 Ref. CP CAP 317 GPM & 6 M TDH 1 Set

Accessories

05 Water meter assembly 100 mm dia., ref. WMA 1 No

06 Back flow preventer assembly, 100mm dia., ref. BFPA 1 No

FIRE WATER UTILITIES

Supply, installation and test Pipework, UPVC class 5

including fittings, trenching, back fill supports system and

all associate works as per code standard

07 63 mm dia. 8 M

08 100 mm dia. 160 M

09 150 mm dia. 110 M

Supply, installation and test Electrically driven horizontal

split case centrifugal fire pump, including piping network

and valving within pump chamber,complete with all

controllers, accessories for automatic operateion and all

associate workks as per code standard and as scheduled ondrawings and specification

10 Ref. FP-1 CAP 750 GPM & 91.39 M TDH 1 No

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

10 / 24

REVISED PAGE

Date: MAY 2012

Page 11: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 11/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15 - MECHANICAL

Supply, installation and test diesel driven horizontal splitcase centrifugal fire pump, including piping network and

valving within pump chamber,complete with all controllers,

accessories for automatic operateion and all associate

workks as per code standard and as scheduled on drawings

and specification

01 Ref. FP -2 CAP. 750 GPM & 91.39 MTDH 1 No

Supply, installation and test Electrically driven peripheral

turbine Jockey pump, including piping network and valving

within pump chamber, complete with all controllers,

accessories for automatic operateion and all associate

workks as per code standard and as scheduled on drawings

and specification

02 Ref. JP-1 CAP. 75 GPM & 100 MTDH 1 No

IRRIGATION WATER INSTALLATION

Supply, install and testing pipework, UPVC Schedule 80 for 

Irrigataion water the work shall include but not limited to

fittings, supports, all associate works and all materials and

equipments required to complete and finish the work

according to drawings, specification and code of practices

03 25 mm dia. 135 M

04 32 mm dia. 55 M

05 40 mm dia. 325 M

06 50 mm dia. 400 M

07 75 mm dia. 80 M

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

11 / 24

REVISED PAGE

Date: MAY 2012

Page 12: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 12/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15 - MECHANICAL

IRRIGATION WATER INSTALLATION

Accessories

01 Supply and installation irrigation controller as detailed on drwings 1 No.

and as per specifications

02 Supply and installation bubbler for shrubs, ground cover and 143 No.

succulents

03 Supply and installation bubbler for trees and palm tree 254 No.

04 Supply and installation spray lawn sprinkler 30 No.

05 Gate valve W/valve box 40 mm dia., 2 No.

06 Gate valve W/valve box 50 mm dia., 1 No.

07 Gate valve W/valve box 75 mm dia., 5 No.

Supply and installation remote control valve assembly

including piping complete with valve box, Y-strainer,

accessories and all associated works as detail on drawing

and as per specifications section 02810

08 Ref. RCV 25mm dia. 1 No.

09 Ref. RCV 40mm dia. 1 No.

10 Ref. RCV 50mm dia. 6 No.

DIESEL FUEL STORAGE TANK INSTALLATION

Allow for underground fiberglass diesel fuel storage tank

with required capacity including concrete anti-flotation

pad, heavy duty traffic type manhole ring and cover,

pipework, valves duplex diesel fuel transfer pumps, steel

ladder, pea gravel bed, earthworks, fixings and accessories

all as detailed on drawings

11 Proprietary tank units 1 Item

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

12 / 24

REVISED PAGE

Date: MAY 2012

Page 13: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 13/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15 - MECHANICAL

Allow for the design, supply, construction, installation,development, testing and disinfection of water well

including submersible deep water pump, pumps related

equipment, piping cabling fitting, accessories as shown on

drawings and specified in specifications

01 Deep water well 1 Item

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

13 / 24

REVISED PAGE

Date: MAY 2012

Page 14: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 14/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15B - MECHANICAL

HVAC INSTALLATIONS

CHILLED WATER SYSTEM

Under ground pipe work

Supply, install and test black steel pipe work including

fittings thermal insulation, trench work , backfill flexible

connections and accessories as per required drawings and

spec. sections15050 to 15140 ,15510

01 150 mm dia. 150 M

02 100 mm dia. 130 M

03 80 mm dia. 215 M

ETS room pipe work

Supply, install and test black steel pipe work including

fittings thermal insulation, flexible connections and

accessories as per required drawings and spec.

sections15050 to 15140 ,15510

04150 mm dia. 60 M

05 80 mm dia. 50 M

06 32 mm dia. 25 M

07 25 mm dia. 10 M

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

14 / 24

REVISED PAGE

Date: MAY 2012

Page 15: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 15/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15B - MECHANICAL

HVAC INSTALLATIONS

CHILLED WATER SYSTEM

Supply, install and test reinforced concrete valve box

including two valves as details on drawings and

specifications

01 80mm dia., 3 No.

Supply and install heat exchanger including valves and short

length piping as detailed on drawings and as per 

specifications

02 Ref. HEX-01 to 04, 300 KW capacity 4 No.

Supply, install, test and commission, variable speed chilled

water centrifugal inline pumps unit including valves, flexible

connections, Y-striners, mounting and fixing to pads

(measured separately) as detailed on drawing and

specifications

03 Ref. SCWP-01 to 04, 8 L/S capacity 25 m TDH 4 No.

Supply, install and commission, expansion tank as detailedon drawings and specifications

04 Ref. ET, 300 liter capacity 1 No.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

15 / 24

REVISED PAGE

Date: MAY 2012

Page 16: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 16/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15B - MECHANICAL

HVAC INSTALLATIONS

CHILLED WATER SYSTEM

Supply, install and commission, air separator tank as

detailed on drawings and specifications

01 Ref. AS 1 No.

Supply, install, test and commission, Fan coil units ducted

type including control valves, pressure & temperature,

gauge, Y-strainer mounting and fixing as per drawings and

specifications section 15781

02 Ref. FCU-02, 12.2 KW cooling capacity 2 No.

Supply, install, test and commission, of electric works and

motor control centers MCC C/W weather proof, magnetic

starters, cabinets including power cables, wiring and

conduits and cable trays from the MCC to HVAC equipment,

interlocks, earthing ...etc, all materials and equipments

required to complete and finish the work according to

drawings, specifications and code of practices

03Ref. MCC- CWP 1 No.

Supply, install, test and commission automatic chemical

dosing unit as detailed on drawings and specifications

04 Ref. ACDU 1 No.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

16 / 24

REVISED PAGE

Date: MAY 2012

Page 17: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 17/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 16 - ELECTRICAL

Smart Metering System

Supply, installation , testing and commissioning of Smart

Metering System comprising of M-bus master controller 

,M-bus IP router, complete with soft ware, including

electronic KWH meter, interface with water meter& digital

BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each

meter, and the necessary connection to TCP/IP net work

and all associated works required as shown on drawing and

as described in specifications

To suit Building Smart Metering System as required to form a Note

complete and fully operative system to link all project buildingswith the existing data center at phase (1)

01 Electronic KWH meters 4 No

02 M-bus master controller complete with software 4 No

03 M-bus IP router  4 No

MAIN AND SUB-MAIN POWER

Sub-Main Circuit: supply , install , testing and

commissioning 600/1000V XLPE multicore copper cable in

direct buried including junction boxes, connection for 

feeders and various power loads as shown on drawings and

coordination & integration with other systems shall be

conducted during work execution as per technical

specifications, drawings and by making arrangement with

supervising engineer to achieve the work to the best

possible and specifications

04 4C-16mm2-CU/XLPE/STA/PVC / direct buried 490 M

05 4C-95mm2-CU/XLPE/STA/PVC/ direct buried 80 M

06 2(4C-185mm2-CU/XLPE/STA/PVC)/ direct buried 115 M

07 2(4C-300mm2-CU/XLPE/STA/PVC) / direct buried 125 M

08 3(4C-300mm2-CU/XLPE/STA/PVC) / direct buried 90 M

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

17 / 24

REVISED PAGE

Date: MAY 2012

Page 18: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 18/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 16 - ELECTRICAL

MAIN AND SUB-MAIN POWER

Supply , install , testing and commissioning of panel boards

including grounding, circuit breakers, grounding, fixings,

and all associated works as required and shown on

drawings and coordination & integration with other systems

shall be conducted during work execution as per technical

specifications, drawings and by making arrangement with

supervising engineer to achieve the work to the best

possible and specifications

01 Ref. EPP- IP54 1 No

02 Ref. EPP1- IP54 1 No

03 Ref. MCC ( supplied and installed by others ) 1 No NIC

OUTDOOR MAN/ HAND HOLE

Supply, install, testing and commissioning reinforced

concrete manholes and hand holes connected via UPVC

conduit, complete with hand hole bolted type metal cover,

drain pipe outlet, including trenching and backfilling for 

UPVC conduits for power and communication cables in

UPVC conduit, tapes, , grounding, all as required to suit

locations as shown on drawings and coordination &

integration with other systems shall be conducted during

work execution as per technical specifications, drawings

and by making arrangement with supervising engineer to

achieve the work to the best possible and specifications

04 Power manhole (1800x1800x1800mm) ( Ref.PMH). 1 No

05 Power hand hole (600x600x600mm) ( Ref.PHH). 5 No

06 Communication hand hole (600x600x600mm) ( Ref.CHH). 7 No

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

18 / 24

REVISED PAGE

Date: MAY 2012

Page 19: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 19/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 16 - ELECTRICAL

POWER INSTALLATION

Supply , install, testing and commissioning of power and

sockets accessories including all necessary boxes,

faces(according to the engineer approval ) comprising

cables, conduits, fittings, connections, from the outlets to

Panel boards feeder associated works as required to suit the

locations shown on drawings Coordination with other 

disciplines shall be conducted during work execution as per 

technical specifications, drawings and by making

arrangement with supervising engineer to achieve the work

to the best possible and specifications

01 Floor mounted ,Junction box, 3 No.

02 Disconnect switch, non-fused with pilot light, weatherproof,16A, 1P, 3 No

230V for waste collection & fuel pump

03 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 1 No

230V for fuel pump

ETS ROOM AND PUMP ROOM

04 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 4 No

1P, 230V for EF-01,PWP-5,6 &CP-1

05 Disconnect switch, non-fused with pilot light, weatherproof, 32A, 3 No

1P, 230V for lift pump , sub pump & PWP-3

06 Disconnect switch, non-fused with pilot light, weatherproof,40A, 1 No

3P, 400V for MCC-CWP

07 Disconnect switch, non-fused with pilot light, weatherproof,200A, 1 No

3P, 400V for fire pump & jockey pumps

08 Disconnect switch, fused with pilot light, weatherproof, 20A, 1P, 2 No

230V for FCU-02

09 Single phase socket outlet , weatherproof , 10 A, 230V, grounding 2 No

type

10 Duplex socket outlet , weatherproof ,16 A,230V, grounding type 1 No.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

19 / 24

REVISED PAGE

Date: MAY 2012

Page 20: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 20/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 16 - ELECTRICAL

LIGHTING INSTALLATION

Supply, install , testing and commissioning of switches

lighting accessories including all necessary boxes,

switches, faces, conduits, wires (according to the engineer 

approval ) associated works as required to suit the locations

shown on drawings .Coordination with other disciplines

shall be conducted during work execution as per technical

specifications, drawings and by making arrangement with

supervising engineer to achieve the work to the best

possible and specifications

ETS ROOM AND PUMP ROOM

01 Single pole one-way switch weatherproof (13A) 2 No.

Supply, install , testing and commissioning of lighting

fixture outlets and including conduits, wires and all boxes

belong to Lighting Panel boards and associated works as

required to suit the locations shown on drawings

.Coordination with other disciplines shall be conducted

during work execution as per technical specifications,

drawings and by making arrangement with supervising

engineer to achieve the work to the best possible and

specifications

ETS ROOM AND PUMP ROOM

02 Lighting fixture outlets 10 No

Supply ,install, testing and commissioning of lighting

fixture (furnished with lamp and electronic blast,

accessories and internal wires) mounting accessories.

(according to the engineer approval ) associated works as

required to suit the locations shown on drawings

.Coordination with other disciplines shall be conducted

during work execution as per technical specifications,

drawings and by making arrangement with supervising

engineer to achieve the work to the best possible and

specifications

ETS ROOM AND PUMP ROOM

03 Ref, F1 10 No

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

20 / 24

REVISED PAGE

Date: MAY 2012

Page 21: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 21/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 16 - ELECTRICAL

DATA AND VOICE SYSTEM INSTALLATION

Supply, install, testing and commissioning of 

telecommunication system comprising of data / telephone

outlet including associated cable /wires, conducting,

interfacing works& connection to be connected @ UB01 ,

shall make arrangement and required coordination with

supervising engineer to complete the work as shown on

drawings and as described in specification

01 Wall mounted telecommunication outlet, 1 ports, weatherproof, 1 No

(one tel ) for ATM , ref. T01

FIRE ALARM SYSTEM

Supply, install, testing and commissioning of fire detection

 /alarm system comprising of detectors, pull stations,

modules including associated cable /wires, conducting,

interfacing works& connection to be connected @ UB01 ,

shall make arrangement and required coordination with

supervising engineer to complete the work as shown on

drawings and as described in specification

To suit fire alarm system network equipped with:

ETS ROOM AND PUMP ROOM

02 Ceiling mounted optical smoke detector, 2 No

03 Fire alarm interface unit 1 No

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

21 / 24

REVISED PAGE

Date: MAY 2012

Page 22: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 22/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 16 - ELECTRICAL

MAIN TELECOMMUNICATION SYSTEM NETWORK

Supply, installation, testing and commissioning distribution

network for data and telephone system to connect all

buildings/floor distributers BD/FD to the primary/secondary

active switch as shown on drawings. Item includes cables\

wires in conduits and all associated works as required for the

whole network in the site. Coordination with other disciplines

shall be conducted during work execution as per technical

specifications, drawings by making arrangement with

supervising engineer according to manufacturer's

recommendations to achieve the complete work to the best

possible

01 To suit all network system 1 Item

MAIN FIRE ALARM SYSTEM NETWORK

Supply, installation, testing and commissioning distribution

network for fire alarm system to connect all FACPs in all

buildings with each other as shown on drawings. Item

includes cables\ wires in conduits and all associated works

as required for the whole network in the site. Coordination

with other disciplines shall be conducted during work

execution as per technical specifications, drawings by

making arrangement with supervising engineer according

to manufacturer's recommendations to achieve the

complete work to the best possible

02 To suit all network system 1 Item

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

22 / 24

REVISED PAGE

Date: MAY 2012

Page 23: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 23/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 16 - ELECTRICAL

BUILDING MANAGEMENT SYSTEM (BMS)

Supply, install, testing, commissioning and integrating the

building / cluster BMS system or sub system items

(equipment controllers, routers, cables inside the building

between system items, conduits, boxes, fiber optic

cables,..etc) with phase 1 main BMS system (located in the

data center)via LAN network as shown on the building

drawings, indicated in plumbing, HVAC and electrical input/

output schedules (all BMS schedules) and as described in

the specifications, consisting of but not limited to:

01 To suit building BMS system network and the system should be 1 Item

applicable to linked with existing operating system in phase one

after getting approval from service and operation team in phaseone to complete the work to the best possible

GROUNDING SYSTEM

Supply, install, test and commissioning a grounding system

for cluster comprising bare copper conductors for 

grounding all electrical and mechanical equipments in the

cluster and all required works for connecting in one

grounding system In addition to all earthwork, connections,

clips, copper clad steel rods in ground test wells with cast

iron covers situated around the building as required and all

associated works as necessary to provide a complete

grounding system, all as shown on drawing . Coordination

with other disciplines shall be conducted during work

execution as per technical specifications, drawings and by

making arrangement with supervising engineer to achieve

the work to the best possible and specifications

02 To suit grounding system for network of cluster  1 Item

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

23 / 24

REVISED PAGE

Date: MAY 2012

Page 24: CL08 (MAY 2012)

7/28/2019 CL08 (MAY 2012)

http://slidepdf.com/reader/full/cl08-may-2012 24/24

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL08)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

Collection

Sheet - 1

Sheet - 2

Sheet - 3

Sheet - 4

Sheet - 5

Sheet - 6

Sheet - 7

Sheet - 8

Sheet - 9

Sheet - 10

Sheet - 11

Sheet - 12

Sheet - 13

Sheet - 14

Sheet - 15

Sheet - 16

Sheet - 17

Sheet - 18

Sheet - 19

Sheet - 20

Sheet - 21

Sheet - 22

Sheet - 23

To Bill Summary SR