PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SR
Soil investigation
The contractor shall implemented of exploratory drilling and Notemechanical test in all types of soil with on site testing and theissuance of the final report which contain the test results andrecommendations of the foundation work.
01 Research and treatment for cavities
Implementation through a perforating exploratory(cavity probing) In 1 Mall types of rock to determined the horizontal and verticalelongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities andvoids of rock with all necessary work accordance with thetechnical specifications and instructions of the Supervisingengineer EXTERNAL WORKS
The bidder is advised to visit the site before quoting the rates inorder to get himself familiarize with the present site conditions
SITE GRADING
Bulk excavate over site on unclassified ground including all hardand rock layers to reduced levels generally in cutting profiles thework shall include clear away to approved disposals.
All additional excavation required for temporary works and spaces,shoring, dewatering, removal of surplus excavated materials,support, temporary spoil heaps and general compaction
EXCAVATION AND EARTHWORK
Necessary moving or transportation about the site excavationmaterial including handling to temporary stockpile or ultimatedisposal off site is to be included in the unit rate of excavation
SITE PREPARATION AND GRADING
02 Excavation oversite on unclassified ground including all hard and 2500 M3
rock layers (if any) to reduced levels generally in cutting profilesand forming depressions, falls and the like and clear away toapproved disposal tip.
03 Fill oversite with approved imported fill material according to site 9590 Msoil report recommendation including compaction in making uplevels to required formations, embankments, contouring and the
like as per drawings and spec.
Excavation material may be used as fill material if found suitable Noteand approved by the Engineer (client's representative)
04 Approved fill material selected from excavated material including M³ price onlycompaction as per spec.
To Collection SR
ITEM DESCRIPTION QTY UNIT RATE
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
1 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 2/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
PAVING AND SURFACING
01 400x400x60mm thk .precast concrete ( beige color ) shotblasted 2065 M2
with photocatalytic titanium dioxide coating including 100mm
thick cast-in-place concrete slab with A193-WWF mesh
reinforcement, 20mm thick cement mortar setting bed, moisture
barrier, compacted subgrade as per detail A1 on drawing XL301
02 400x400x60mm thk .precast concrete ( grey color ) shotblasted 718 M2
with precast concrete (light grey color ) shotblasted with
photocatalytic titanium dioxide coating including 100mm thick
cast-in-place concrete slab with A193-WWF mesh reinforcement,
20mm thick cement mortar setting bed, moisture barrier,
compacted subgrade as per detail A2 on drawing XL301
03 400x400x40mm thk .precast concrete ( beige & brown color ) 776 M2
shotblasted with 200x200x30mm thk . Grey precast band,with
photocatalytic titanium dioxide coating including 100mm thick
cast-in-place concrete slab with A193-WWF mesh reinforcement,
20mm thick cement mortar setting bed, moisture barrier,
compacted subgrade as per detail A3 on drawing XL301
04 400x400x60mm thk .precast concrete ( beige & brown color ) 1630 M2
shotblasted with 200x200x60mm thk . Dark Grey precast band
with photocatalytic titanium dioxide coating including 100mm
thick cast-in-place concrete slab with A193-WWF meshreinforcement, 20mm thick cement mortar setting bed, moisture
barrier, compacted subgrade as per detail A4 on drawing XL301
05 400x400x30 mm thk. Polished granite paving ( dark & light 115 M2
colors ) with 200x200x30mm thk .dark color Granite band
including 100mm thick cast-in-place concrete slab with
A193-WWF mesh reinforcement, 20mm thick cement mortar
setting bed, moisture barrier, compacted subgrade as per detail
B5 on drawing XL301
06 Asphalt pavement comprising 80mm thick bituminous wearing 6554 M2
course, and granular base course including prime coat and
compacted subgrade as per detail C on drawing XL301
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
2 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 3/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
CURBS AND EDGING
01 Precast concrete curb, 300X500X150 mm exposed aggregate 1450 Mfinish including bedding, haunching, cast in place concrete base
and concrete grout behind curb, 20mm thick cement mortar
setting bed, on compacted subgrade, as per detail 1 on drawing
XL302
02 Handicapped ramps including fixing, finishing and the like as per 9 M2
drawings and specifications
SUNDRIES
03 Precast concrete wheel stopper including dowels, grouting
and accessories for complete installation as per detail 4 ondrawing XL302 and specification
04 Precast concrete wheel stopper including fixings 149 No.
Tree/palm pit surround
05 Formation of cast iron tree / palm pits surround including 42 No.
concrete edge pavers and cement mortar setting bed as detail 2
on drawing XL302
Manufacturer's standard outdoor sings, letters and plaques
including fixings, finishes, accessories complete as per details on drawing XL602 and as per specifications
06 Ref. type 1 ( DIRECTIONAL SIGN ) 1 No.
07 Ref. type 2 ( GRAND MOSQUE SIGN ) 2 No.
08 Ref. type 3 ( GRAND MOSQUE PARKING SIGN ) 3 No.
09 Ref. type 4 ( BOYS ELEMENTARY SCHOOL SIGN ) 1 No.
10 Ref. type 5 ( GIRLS ELEMENTARY SCHOOL SIGN ) 1 No.
11 Ref. type 6 ( SCHOOLS PARKING SIGN ) 1 No.
12 Ref. type 7 ( ADVERTISING PANEL ) 2 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
3 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 4/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
Manufacturer's standard outdoor sings, letters and plaques
including fixings, finishes, accessories complete as per
details on drawing XC-05 and as per specifications
01 Ref. type I-2 (ENTRY ) 1 No.
02 Ref. type R1-1 ( STOP ) 2 No.
03 Ref. type R2-1 (GIVE WAY ) 5 No.
04 Ref. type R5-1 ( ENTRY PROHIBTED ) 1 No.
05 Ref. type W11-1 ( PEDESTRAIN CROSSING ) 4 No.
Thermoplastic paint for traffic marking on pavement inparking and driveways including lane strips , studs , and the
like complete as shown on drawing XC-04 and specification
06 Straight arrows 23 No.
07 Straight & curved arrows 4 No.
08 Curved arrows 6 No.
09 Handicapped marking on floor 5 No.
10Parking lane marking 853 M
11 White stop line 37 M
12 Pedestrain crossing 43 M
13 White edge line 1315 M
14 Direction separation lines ( passing permitted) 456 M
15 Direction separation lines ( passing prohibited) 212 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
4 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 5/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
MISCELLANEOUS STRUCTURES
Reinforced concrete ( ETS ROOM ) under ground with stairsincluding earthworks, concrete works, water proofing ,
doors , finishing and all associated work as per drawing
CL08-S301 and spec.
01 ETS Room 1 Item
Pre cast concrete KIOSK , 1400 mm × 1400 mm , 3000 mm
height including earthworks, footings, steel plates, fixings,
finishings, and all associated work as detail 3, drawing
XL302
02 Pre cast concrete kiosk 1 No.
LANDSCAPING
Trees/palms including pit excavation, stakes and ties, soil
planting mix, mulching, filter membrane and drainage
layer all as details and planting schedule as per detail P1,
P2 on on drawing XL-401
03 P/Wf 10 No.
Trees/palms including pit excavation, stakes and ties, soil
planting mix, mulching, filter membrane and drainagelayer all as details and planting schedule as per detail P1,
P2 on on drawing XL-401
04 T/Af 36 No.
05 T/Fm 32 No.
Shrubs and ground cover including planting, site excavation
as required, soil planting mix, mulching, filter membrane
and drainage layer all as per details and planting schedule
as per detail P3, on drawing XL-401
06 S/Hs 10 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
5 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 6/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
LANDSCAPING
Shrubs and ground cover including planting, site excavationas required, soil planting mix, mulching, filter membrane
and drainage layer all as per details and planting schedule
as per detail P3, on drawing XL-401
01 G/As 315 No.
02 G/Cgp 606 No.
Lawn planting, including soil planting mix, filter membrane
and drainage layer all as per details and planting schedule
as per detail P4, on drawing XL-401
03 L/Cd 1496 M2
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
6 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 7/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 14 - CONVEYING SYSTEMS
AUTOMATED WASTE COLLECTION SYSTEM
Supply and provide all required to construct, test and
operate automated waste collection system, consisting of
the following items:-
01 Discharge valve room without basement floor including required 1 No.
earthworks, concrete works for the vacuum room masonry for the
vacuum room and electromechanical works and all required works
as detailed on drawing no. STM - ITCCP2 - TD - 009. Contractor
shall perform all required coordination with other trades to ensure
proper installation and operation of the complete system to
transport waste from tower chute to pipenetworks as shown ondrawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and
according to manufacturer's standards and specifications
02 Outdoor Load station. including required earthworks, concrete 3 No.
works, masonry and electromechanical works for the vacuum
room and PAI service box and all required works as detailed on
drawing no. STM - ITCCP2 - TD -013 and 014 Contractor shall
perform all required coordination with other trades to ensure proper
installation and operation of the complete system to transport
waste from villas and playgrounds to pipenetworks as shown on
drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and
according to manufacturer's standards and specifications
PIPE WORK
Supply and installation of Automated waste collection
system piping. Item shall include the earth works,
insulation, ,concentric reducer, puddle flanges ,inspection
covers and all required materials and equipments to
complete the transport pipe line from DV rooms , outdoor
load stations and full vacuum load stations to waste plant
03 Ø 508mm under/above ground transport pipe 360 M
RC MANHOLE
Supply and install cast insitu or precast reinforced concretemanhole ,the item shall include excavation, backfill
insulation ,inspection cover and all required to complete the
work.
04 RC manhole to suit required location in sitesas shown on drawings 7 No.
STM - ITCCP2 - TD 001 to 016
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
7 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 8/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATION
WASTE AND DRAINAGE INSTALLATION
Supply, install and testing pipework, UPVC schedule 40, the
work shall include but not limited to fittings, supports, cast
iron pipes on roof for vent with caps, installation, all
associate works and all materials and equipments required
to complete and finish the work according to drawings,
specification and code of practices
01 75 mm dia. 37 M
02 100 mm dia. 215 M
03 150 mm dia. 665 M
04 200 mm dia. 265 M
Accesssories
05 Ground cleanout 100 mm dia, ref. GCO 2 No
06 Glly trap, ref. GT 1 No
Construction work for briks inspection chamber, the work
shall include bit not limited to earth work, plain concrete
for foundation BED, concrete channel at chamber DED withstandard cast iron manhole frame and double cover and all
materials and equipments required to complete and finish
the work according to specifications, drawings and code of
practice
07 Inspection chamber, ref. (IC) 600x600mm 25 No
08 Sedimentation chamber 2 No
09 Slow down chamber 1 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
8 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 9/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15 - MECHANICAL
MANHOLE AND COVERS
Supply , install, testing and commissioning precast
concrete sewer manholes with standard traffic (heavy duty)
type cast iron manhole covers and frames, access ladders,
concrete channel at manhole bed, foundation bed, drop
pipe to manhole where required, all associated earthworks,
damp proofing, and all materals, equipments required to
complete and finish. the work according to specifications
section 02605, 02730, drawings and code of practices
01 Sewer manhole, ref. (SMH) 11 No.
POTABLE WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for
potable water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
02 50 mm dia. 110 M
03 63 mm dia. 60 M
04 100 mm dia. 435 M
Reinforced concrete under ground water tank and pump
room with proprietary cast iron manhole covers and frames
the work shall include but not limited to earthworks,
concrete works, sump pit, and submersible pump internal
lining and water proofing, access ladders, pipework and
valving, test main fold vent pipes, truck fill pipework with
back flow preventer, ventilating fan and duct work within
tank and pump room structure, and UPVC schedule 80
drainge pipe from submersible pump to the nearest sewer
manhole and all materials and equipments required to
complete and finish the work according to drawings,
specification and code of practices
05 Potable & fire water tank 1 Item
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
9 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 10/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
POTABLE WATER SUPPLY SYSTEM
Supply, installation and test Packaged type constantpressure booster potable water pumps, set of one duty and
one stand by pump, including piping and valving network
within pump chamber, complete with all controllers,
accessories for automatic operateion and all associate
works as per code standard and as described on drawings
and specification
01 Ref. PWP- 3 CAP 150 GPM & 42.18 M TDH 1 Set
02 Ref. PWP- 5 CAP 75 GPM & 38.67 M TDH 1 Set
03 Ref. PWP- 6 CAP 75 GPM & 38.67 M TDH1 Set
04 Ref. CP CAP 317 GPM & 6 M TDH 1 Set
Accessories
05 Water meter assembly 100 mm dia., ref. WMA 1 No
06 Back flow preventer assembly, 100mm dia., ref. BFPA 1 No
FIRE WATER UTILITIES
Supply, installation and test Pipework, UPVC class 5
including fittings, trenching, back fill supports system and
all associate works as per code standard
07 63 mm dia. 8 M
08 100 mm dia. 160 M
09 150 mm dia. 110 M
Supply, installation and test Electrically driven horizontal
split case centrifugal fire pump, including piping network
and valving within pump chamber,complete with all
controllers, accessories for automatic operateion and all
associate workks as per code standard and as scheduled ondrawings and specification
10 Ref. FP-1 CAP 750 GPM & 91.39 M TDH 1 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
10 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 11/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15 - MECHANICAL
Supply, installation and test diesel driven horizontal splitcase centrifugal fire pump, including piping network and
valving within pump chamber,complete with all controllers,
accessories for automatic operateion and all associate
workks as per code standard and as scheduled on drawings
and specification
01 Ref. FP -2 CAP. 750 GPM & 91.39 MTDH 1 No
Supply, installation and test Electrically driven peripheral
turbine Jockey pump, including piping network and valving
within pump chamber, complete with all controllers,
accessories for automatic operateion and all associate
workks as per code standard and as scheduled on drawings
and specification
02 Ref. JP-1 CAP. 75 GPM & 100 MTDH 1 No
IRRIGATION WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for
Irrigataion water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
03 25 mm dia. 135 M
04 32 mm dia. 55 M
05 40 mm dia. 325 M
06 50 mm dia. 400 M
07 75 mm dia. 80 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
11 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 12/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15 - MECHANICAL
IRRIGATION WATER INSTALLATION
Accessories
01 Supply and installation irrigation controller as detailed on drwings 1 No.
and as per specifications
02 Supply and installation bubbler for shrubs, ground cover and 143 No.
succulents
03 Supply and installation bubbler for trees and palm tree 254 No.
04 Supply and installation spray lawn sprinkler 30 No.
05 Gate valve W/valve box 40 mm dia., 2 No.
06 Gate valve W/valve box 50 mm dia., 1 No.
07 Gate valve W/valve box 75 mm dia., 5 No.
Supply and installation remote control valve assembly
including piping complete with valve box, Y-strainer,
accessories and all associated works as detail on drawing
and as per specifications section 02810
08 Ref. RCV 25mm dia. 1 No.
09 Ref. RCV 40mm dia. 1 No.
10 Ref. RCV 50mm dia. 6 No.
DIESEL FUEL STORAGE TANK INSTALLATION
Allow for underground fiberglass diesel fuel storage tank
with required capacity including concrete anti-flotation
pad, heavy duty traffic type manhole ring and cover,
pipework, valves duplex diesel fuel transfer pumps, steel
ladder, pea gravel bed, earthworks, fixings and accessories
all as detailed on drawings
11 Proprietary tank units 1 Item
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
12 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 13/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15 - MECHANICAL
Allow for the design, supply, construction, installation,development, testing and disinfection of water well
including submersible deep water pump, pumps related
equipment, piping cabling fitting, accessories as shown on
drawings and specified in specifications
01 Deep water well 1 Item
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
13 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 14/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Under ground pipe work
Supply, install and test black steel pipe work including
fittings thermal insulation, trench work , backfill flexible
connections and accessories as per required drawings and
spec. sections15050 to 15140 ,15510
01 150 mm dia. 150 M
02 100 mm dia. 130 M
03 80 mm dia. 215 M
ETS room pipe work
Supply, install and test black steel pipe work including
fittings thermal insulation, flexible connections and
accessories as per required drawings and spec.
sections15050 to 15140 ,15510
04150 mm dia. 60 M
05 80 mm dia. 50 M
06 32 mm dia. 25 M
07 25 mm dia. 10 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
14 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 15/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Supply, install and test reinforced concrete valve box
including two valves as details on drawings and
specifications
01 80mm dia., 3 No.
Supply and install heat exchanger including valves and short
length piping as detailed on drawings and as per
specifications
02 Ref. HEX-01 to 04, 300 KW capacity 4 No.
Supply, install, test and commission, variable speed chilled
water centrifugal inline pumps unit including valves, flexible
connections, Y-striners, mounting and fixing to pads
(measured separately) as detailed on drawing and
specifications
03 Ref. SCWP-01 to 04, 8 L/S capacity 25 m TDH 4 No.
Supply, install and commission, expansion tank as detailedon drawings and specifications
04 Ref. ET, 300 liter capacity 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
15 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 16/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Supply, install and commission, air separator tank as
detailed on drawings and specifications
01 Ref. AS 1 No.
Supply, install, test and commission, Fan coil units ducted
type including control valves, pressure & temperature,
gauge, Y-strainer mounting and fixing as per drawings and
specifications section 15781
02 Ref. FCU-02, 12.2 KW cooling capacity 2 No.
Supply, install, test and commission, of electric works and
motor control centers MCC C/W weather proof, magnetic
starters, cabinets including power cables, wiring and
conduits and cable trays from the MCC to HVAC equipment,
interlocks, earthing ...etc, all materials and equipments
required to complete and finish the work according to
drawings, specifications and code of practices
03Ref. MCC- CWP 1 No.
Supply, install, test and commission automatic chemical
dosing unit as detailed on drawings and specifications
04 Ref. ACDU 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
16 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 17/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 16 - ELECTRICAL
Smart Metering System
Supply, installation , testing and commissioning of Smart
Metering System comprising of M-bus master controller
,M-bus IP router, complete with soft ware, including
electronic KWH meter, interface with water meter& digital
BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each
meter, and the necessary connection to TCP/IP net work
and all associated works required as shown on drawing and
as described in specifications
To suit Building Smart Metering System as required to form a Note
complete and fully operative system to link all project buildingswith the existing data center at phase (1)
01 Electronic KWH meters 4 No
02 M-bus master controller complete with software 4 No
03 M-bus IP router 4 No
MAIN AND SUB-MAIN POWER
Sub-Main Circuit: supply , install , testing and
commissioning 600/1000V XLPE multicore copper cable in
direct buried including junction boxes, connection for
feeders and various power loads as shown on drawings and
coordination & integration with other systems shall be
conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best
possible and specifications
04 4C-16mm2-CU/XLPE/STA/PVC / direct buried 490 M
05 4C-95mm2-CU/XLPE/STA/PVC/ direct buried 80 M
06 2(4C-185mm2-CU/XLPE/STA/PVC)/ direct buried 115 M
07 2(4C-300mm2-CU/XLPE/STA/PVC) / direct buried 125 M
08 3(4C-300mm2-CU/XLPE/STA/PVC) / direct buried 90 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
17 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 18/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply , install , testing and commissioning of panel boards
including grounding, circuit breakers, grounding, fixings,
and all associated works as required and shown on
drawings and coordination & integration with other systems
shall be conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best
possible and specifications
01 Ref. EPP- IP54 1 No
02 Ref. EPP1- IP54 1 No
03 Ref. MCC ( supplied and installed by others ) 1 No NIC
OUTDOOR MAN/ HAND HOLE
Supply, install, testing and commissioning reinforced
concrete manholes and hand holes connected via UPVC
conduit, complete with hand hole bolted type metal cover,
drain pipe outlet, including trenching and backfilling for
UPVC conduits for power and communication cables in
UPVC conduit, tapes, , grounding, all as required to suit
locations as shown on drawings and coordination &
integration with other systems shall be conducted during
work execution as per technical specifications, drawings
and by making arrangement with supervising engineer to
achieve the work to the best possible and specifications
04 Power manhole (1800x1800x1800mm) ( Ref.PMH). 1 No
05 Power hand hole (600x600x600mm) ( Ref.PHH). 5 No
06 Communication hand hole (600x600x600mm) ( Ref.CHH). 7 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
18 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 19/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 16 - ELECTRICAL
POWER INSTALLATION
Supply , install, testing and commissioning of power and
sockets accessories including all necessary boxes,
faces(according to the engineer approval ) comprising
cables, conduits, fittings, connections, from the outlets to
Panel boards feeder associated works as required to suit the
locations shown on drawings Coordination with other
disciplines shall be conducted during work execution as per
technical specifications, drawings and by making
arrangement with supervising engineer to achieve the work
to the best possible and specifications
01 Floor mounted ,Junction box, 3 No.
02 Disconnect switch, non-fused with pilot light, weatherproof,16A, 1P, 3 No
230V for waste collection & fuel pump
03 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 1 No
230V for fuel pump
ETS ROOM AND PUMP ROOM
04 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 4 No
1P, 230V for EF-01,PWP-5,6 &CP-1
05 Disconnect switch, non-fused with pilot light, weatherproof, 32A, 3 No
1P, 230V for lift pump , sub pump & PWP-3
06 Disconnect switch, non-fused with pilot light, weatherproof,40A, 1 No
3P, 400V for MCC-CWP
07 Disconnect switch, non-fused with pilot light, weatherproof,200A, 1 No
3P, 400V for fire pump & jockey pumps
08 Disconnect switch, fused with pilot light, weatherproof, 20A, 1P, 2 No
230V for FCU-02
09 Single phase socket outlet , weatherproof , 10 A, 230V, grounding 2 No
type
10 Duplex socket outlet , weatherproof ,16 A,230V, grounding type 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
19 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 20/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 16 - ELECTRICAL
LIGHTING INSTALLATION
Supply, install , testing and commissioning of switches
lighting accessories including all necessary boxes,
switches, faces, conduits, wires (according to the engineer
approval ) associated works as required to suit the locations
shown on drawings .Coordination with other disciplines
shall be conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best
possible and specifications
ETS ROOM AND PUMP ROOM
01 Single pole one-way switch weatherproof (13A) 2 No.
Supply, install , testing and commissioning of lighting
fixture outlets and including conduits, wires and all boxes
belong to Lighting Panel boards and associated works as
required to suit the locations shown on drawings
.Coordination with other disciplines shall be conducted
during work execution as per technical specifications,
drawings and by making arrangement with supervising
engineer to achieve the work to the best possible and
specifications
ETS ROOM AND PUMP ROOM
02 Lighting fixture outlets 10 No
Supply ,install, testing and commissioning of lighting
fixture (furnished with lamp and electronic blast,
accessories and internal wires) mounting accessories.
(according to the engineer approval ) associated works as
required to suit the locations shown on drawings
.Coordination with other disciplines shall be conducted
during work execution as per technical specifications,
drawings and by making arrangement with supervising
engineer to achieve the work to the best possible and
specifications
ETS ROOM AND PUMP ROOM
03 Ref, F1 10 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
20 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 21/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 16 - ELECTRICAL
DATA AND VOICE SYSTEM INSTALLATION
Supply, install, testing and commissioning of
telecommunication system comprising of data / telephone
outlet including associated cable /wires, conducting,
interfacing works& connection to be connected @ UB01 ,
shall make arrangement and required coordination with
supervising engineer to complete the work as shown on
drawings and as described in specification
01 Wall mounted telecommunication outlet, 1 ports, weatherproof, 1 No
(one tel ) for ATM , ref. T01
FIRE ALARM SYSTEM
Supply, install, testing and commissioning of fire detection
/alarm system comprising of detectors, pull stations,
modules including associated cable /wires, conducting,
interfacing works& connection to be connected @ UB01 ,
shall make arrangement and required coordination with
supervising engineer to complete the work as shown on
drawings and as described in specification
To suit fire alarm system network equipped with:
ETS ROOM AND PUMP ROOM
02 Ceiling mounted optical smoke detector, 2 No
03 Fire alarm interface unit 1 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
21 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 22/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 16 - ELECTRICAL
MAIN TELECOMMUNICATION SYSTEM NETWORK
Supply, installation, testing and commissioning distribution
network for data and telephone system to connect all
buildings/floor distributers BD/FD to the primary/secondary
active switch as shown on drawings. Item includes cables\
wires in conduits and all associated works as required for the
whole network in the site. Coordination with other disciplines
shall be conducted during work execution as per technical
specifications, drawings by making arrangement with
supervising engineer according to manufacturer's
recommendations to achieve the complete work to the best
possible
01 To suit all network system 1 Item
MAIN FIRE ALARM SYSTEM NETWORK
Supply, installation, testing and commissioning distribution
network for fire alarm system to connect all FACPs in all
buildings with each other as shown on drawings. Item
includes cables\ wires in conduits and all associated works
as required for the whole network in the site. Coordination
with other disciplines shall be conducted during work
execution as per technical specifications, drawings by
making arrangement with supervising engineer according
to manufacturer's recommendations to achieve the
complete work to the best possible
02 To suit all network system 1 Item
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
22 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 23/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 16 - ELECTRICAL
BUILDING MANAGEMENT SYSTEM (BMS)
Supply, install, testing, commissioning and integrating the
building / cluster BMS system or sub system items
(equipment controllers, routers, cables inside the building
between system items, conduits, boxes, fiber optic
cables,..etc) with phase 1 main BMS system (located in the
data center)via LAN network as shown on the building
drawings, indicated in plumbing, HVAC and electrical input/
output schedules (all BMS schedules) and as described in
the specifications, consisting of but not limited to:
01 To suit building BMS system network and the system should be 1 Item
applicable to linked with existing operating system in phase one
after getting approval from service and operation team in phaseone to complete the work to the best possible
GROUNDING SYSTEM
Supply, install, test and commissioning a grounding system
for cluster comprising bare copper conductors for
grounding all electrical and mechanical equipments in the
cluster and all required works for connecting in one
grounding system In addition to all earthwork, connections,
clips, copper clad steel rods in ground test wells with cast
iron covers situated around the building as required and all
associated works as necessary to provide a complete
grounding system, all as shown on drawing . Coordination
with other disciplines shall be conducted during work
execution as per technical specifications, drawings and by
making arrangement with supervising engineer to achieve
the work to the best possible and specifications
02 To suit grounding system for network of cluster 1 Item
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
23 / 24
REVISED PAGE
Date: MAY 2012
7/28/2019 CL08 (MAY 2012)
http://slidepdf.com/reader/full/cl08-may-2012 24/24
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL08)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
Collection
Sheet - 1
Sheet - 2
Sheet - 3
Sheet - 4
Sheet - 5
Sheet - 6
Sheet - 7
Sheet - 8
Sheet - 9
Sheet - 10
Sheet - 11
Sheet - 12
Sheet - 13
Sheet - 14
Sheet - 15
Sheet - 16
Sheet - 17
Sheet - 18
Sheet - 19
Sheet - 20
Sheet - 21
Sheet - 22
Sheet - 23
To Bill Summary SR