21
Christopher Fletcher Studying:BSc(Hons) Architectural Technology Year 3 of 5 Portfolio of Works Programme: BSc Architectural Technology | Year 2

Christopher Fletcher: Portfolio of Works - May 2014

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Christopher Fletcher: Portfolio of Works - May 2014

Christopher Fletcher Studying:BSc(Hons) Architectural Technology

Year 3 of 5

Portfolio of Works

Programme: BSc Architectural Technology | Year 2

Page 2: Christopher Fletcher: Portfolio of Works - May 2014

Boulmer Life Boat Station

Change of use – Proposed plans & details

Programme: BSc Architectural Technology | Year 2

Page 3: Christopher Fletcher: Portfolio of Works - May 2014
Page 4: Christopher Fletcher: Portfolio of Works - May 2014
Page 5: Christopher Fletcher: Portfolio of Works - May 2014
Page 6: Christopher Fletcher: Portfolio of Works - May 2014
Page 7: Christopher Fletcher: Portfolio of Works - May 2014
Page 8: Christopher Fletcher: Portfolio of Works - May 2014
Page 9: Christopher Fletcher: Portfolio of Works - May 2014
Page 10: Christopher Fletcher: Portfolio of Works - May 2014

Renders and Photoshop image

In-situ 3D Model – North View

External view looking South-west

In-situ 3D Model – North View Rendered 3D Model – North View

External view looking South-west Lobby with natural lighting

Page 11: Christopher Fletcher: Portfolio of Works - May 2014

Compact Living Pod

Creating a small, lightweight and simple living solution.

Programme: BSc Architectural Technology | Year 2

Page 12: Christopher Fletcher: Portfolio of Works - May 2014

Title: Floor and Roof & Aluminium Wall Frame Project: Virtual Project Assignment 002 Drawn By: C.Fletcher – 13038942 Scale: NTS Drawing No. 007

Page 13: Christopher Fletcher: Portfolio of Works - May 2014

Title: Wall build-up detail. Project: Virtual Project Assignment 002 Drawn By: C.Fletcher – 13038942 Scale: NTS Drawing No. 001

Plan View

Male & Female Panel connection

dimensions

Standard wall panel

dimensions

Male & Female Corner connection

dimensions

Window Opening

detail

Page 14: Christopher Fletcher: Portfolio of Works - May 2014

Title: Aluminium Floor & Roof Structure Project: Virtual Project Assignment 002 Drawn By: C.Fletcher – 13038942 Scale: NTS Drawing No. 005

Outside Corner Male and Female Connections & Dimensions

Inside Middle Male & Female Connections & Dimensions

Plan View of Roof & Floor Aluminium Structure

Page 15: Christopher Fletcher: Portfolio of Works - May 2014

Theatre Royal

Solutions to water ingress

Programme: BSc Architectural Technology | Year 2

Page 16: Christopher Fletcher: Portfolio of Works - May 2014
Page 17: Christopher Fletcher: Portfolio of Works - May 2014
Page 18: Christopher Fletcher: Portfolio of Works - May 2014

Newcastle City Council

Previous projects

Page 19: Christopher Fletcher: Portfolio of Works - May 2014

SY

STEM CERT I F I CAT ION SY

ST EM CERT I F I CAT ION

SYSTEM CERT I F I CAT ION

É Crown Copyright and database right 2013. Ordnance Survey

100019569.

Michael Murphy, Director of Communities,Architectural and Building Design Services,Civic Centre, Newcastle upon Tyne, NE1 8QH.

Tel: 0191 278 7878 ext. 23277 Fax: 0191 2783436Email: [email protected]

www.newcastle.gov.uk

Page 20: Christopher Fletcher: Portfolio of Works - May 2014

13.3

0

26.75

15.6

5

14.5

0

11.00

13.8

0

14.40

24.3013.75

4.30

24.55

10.55

8.75

A A'

B'

BC

C'

1m

1.25m1.5m

1.5m

1.5m

1.25m

1m

1m

1m

1m

Trees

MH

1m

1m

B'B

C' C

0.8m 1.25m 1.5m

1m 0.8m 1.25m 1m

A A'

Bgl

1m 1m 0.35m1.5m

This map is reproduced from Ordnance Survey material with the

permission of Ordnance Survey on behalf of the Controller of Her

Majesty's Stationery Office É Crown copyright. Unauthorised

reproduction infringes Crown copyright and may lead to prosecution

or civil proceedings.

Newcastle City Council, 100019569, 2006.

Mick Craigen, M.R.I.C.S, Head of City Design,

Technical Services, Environment & Regeneration DirectorateAllendale Road, Byker, Newcastle upon Tyne, NE6 2SZ

Tel: 0191 232 8520 ext. 23448 Fax: 0191 2783436www.newcastle.gov.uk

SY

STEM CERT I F I CAT ION SYST EM CERT I F I CAT ION

SYSTEM CERT I F I CAT ION

SCALE 1:200 @ A1

SCALE 1:200 @ A1

SCALE 1:100 @ A1

CROSS SECTIONAL VIEW OF PROPOSED MOUNDS

A CJF 21/04/10

RELOCATION OF NORTHERNMOUNDS, 3m NORTH

REPOSITIONING OF SOUTHEASTERN MOUND TO AVOIDCOVERING EXISTINGMANHOLE

B CJF 24/05/10 ADDITION OF EXTRAMOUND.

Page 21: Christopher Fletcher: Portfolio of Works - May 2014