Draft Environmental Impact Assessment Report 2014
135 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
CHAPTER– 6
ADDITIONAL STUDIES
(RISK ASSESSMENT AND DISASTER
MANAGEMENT PLAN)
Draft Environmental Impact Assessment Report 2014
136 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
Risk Assessment
General Assessment:
The environment is at risk of exposure during transportation, storage, disposal, or
destruction of ethyl alcohol. In almost every scenario, the threat of environmental
exposure is contingent upon the proper handling of the chemical substance. Accidental
spills, large or small, can result in fire, explosion, and possible contamination of the
surrounding environmental mediums (water, soil, and air).
1. Introduction
The word 'disaster' is synonymous with 'emergency' as defined by the Ministry of
Environment and Forests (MoEF). An emergency occurring in the proposed
Enhancement plant is one that may affect several sections within it and/ or may cause
serious injuries, loss of lives, extensive damage to environment or property or serious
disruption outside the plant. It will require the best use of internal resources and the use
of outside resources to handle it effectively. It may happen usually as the result of a
malfunction of the normal operating procedures. It is imperative to conduct risk analysis
for all the projects where hazardous materials, fuels are handled.
The following have been addressed as part of the risk analysis.
ü Introduction
ü Hazard Identification and Risk Analysis
ü Risk Reducing Measures
The Introduction deals with the objective and methodology of carrying out the risk
analysis. Hazard Identification and Risk Analysis discusses about the various types of
hazards associated with the operation of the Plant due to process, storage & handling,
human errors, electric failures and natural calamities. It also presents the calculated
frequencies of occurrence of different accident scenarios for the identified potential
hazard occurrence in the proposed plant and the details of consequence modelling/
analysis for the identified potential accidents/disaster scenarios in the plant. Risk
Reducing Measures based on the calculated frequencies and consequences.
An industry with its complex nature of activities involving various plant machineries, raw
materials, products, operations, intermediates and environmental discharge has a
number of associated hazards. A minor failure can lead to major failure resulting into a
disaster causing heavy losses to life, property and environmental. Risk assessment
studies are being conducted to ensure safety and reliability of any new plant, through a
Draft Environmental Impact Assessment Report 2014
137 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
systematic and scientific methods to identify possible failures and prevent their
occurrences before they actually cause disasters and production loss.
Accidents can occur in any industry despite of taking efforts to prevent them. The
suffering and damage as a result of the accident is determined by the potential for loss
surrounding the event, but by taking correct action at the time of the occurrence of the
incidence the full potential loss can largely avoided and effective action will be possible if
a pre-planned and practiced procedure for handling major emergencies utilizing the
combined resources of factory and the outside emergency services is in existence.
The best way of managing an emergency lies in its prevention it is recognized that in
spite of our best efforts to prevent emergencies by good engineering design and
construction, reliable safety system careful selection of personnel & training, audits and
inspections, use of state of art technology and sophisticated equipments etc. things can
still go wrong therefore it is essential to properly prepare, develop and update
emergency plans and rehearse them and be prepared for emergencies. The objective of
the emergency plan is to contain and control incidence to safe guard the employees and
any one nearby who might be affected and to minimize property loss & to protect the
environment.
2. Safety, Health & Environment Policy:
Safety Policy:
01. We believe that accidents are preventable and health hazards can be minimized by
Training and Retraining of the employees.
02. We will comply all the legislation & rules regarding Safety & Health.
03. We are committed to provide safe machinery, equipment, methods & tools and to
continual improvement in Health and Environment (HSE) performance.
04. Our Policy is to maintain Safety beyond compromise.
05. We believe that rules are sacred and must be observed.
Draft Environmental Impact Assessment Report 2014
138 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
06. While on duty, we will concentrate on our job.
07. Care & Caution is our guide in the life.
08. Safety, Security & Punctuality keep us always happy.
09. Our Motto – No Accidents due to human failure.
10. Our employees are more valuable than anything and we expect the employees to
follow the HSE norms.
Environment Policy:
We shall –
1. Conduct our operation in an environment friendly manner and to comply with the
relevant regulation and prevent pollution.
2. Strive for continuous improvement in our environmental performance by setting
challenging targets.
3. Conduct necessary programmes to enhance environmental awareness amongst
our employees and the general populace around plant and site.
4. Strive to conduct industrial and commercial operation in such a way that the
quality of the environment now and in the future is preserved.
5. Make wastes and effluents value added products in an environment friendly
manner.
6. Demonstrate our commitment through involvement of all employees for
achievement of environmental performance.
3. Identification of Hazards Sugar and Co generation Plant :
Sl. Operatio
Draft Environmental Impact Assessment Report 2014
139 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
No
.
n /
Process /
Departme
nt
Hazards
Identification.
Precautionary measures taken. Remark.
1 Cane
yard /
sugar
cane
milling
1) Movement of
trucks and tractors
in haphazard
manner may
cause accident.
1) For smooth movement of vehicles
route marking is done properly and
two-way traffic is arranged separately
for incoming and outgoing of cane and
controlled by adequate security staff.
Driving license & other legal
documents are checked strictly at
entry gate.
In case of
any
emergency
the units will
be tripped
immediately
by using
tripping
devices.
2) The sugar cane
is lifted through
crane & there are
chance of cane
bundle being
dropped.
2) Safety Helmets and training is
provided to the workers working near
cane lifting area.
3) Collapse of
EOT crane due to
damaged wire
rope and improper
clamping
3) Cranes,wire ropes and lifting
tackles are tasted once in a year by
competent Authority and routine
preventive maintenance will carried
out.
4) Miss-operation
of cranes due to
defect in eyes of
crane operators
may cause of
accident.
4)Eye testing of cane operators will be
done periodically.
5) Unguarded
machinery
5) All rotating dangerous machines in
mill section are provided with
adequate guards.
Draft Environmental Impact Assessment Report 2014
140 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
6) Slippery floor 6) Floor washing is done regularly.
7) Flying of
Bagasse particles
7) Suitable face mask are provided
and flying of Bagasse will be
minimized at possible extent.
8) Electrical short
circuiting
8) Suitable fire extinguisher are kept
and loose electrical connections are
avoided.
Draft Environmental Impact Assessment Report 2014
141 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
2 Clarificati
on
section
1) Leakage of So2
gas
1) All sulphur Burners and related
pipelines are tested properly during
off-season and necessary preventive
maintenance will be taken to avoid
any damage in season. Workers are
provided with necessary PPEs.
Safety
shower cum
Eye wash
fountain is
installed at
working
area.
2) Contact with
lime dust & milk of
Lime.
2) Workers are provided with
necessary PPEs.
Sufficient
ventilation is
provided.
3) Slippery floor 3) Leakage of juice and water will be
avoided.
4) Heat stress at
sulphur furnace
4) Necessary ventilation is provided
and workers are provided with
suitable PPEs.
3 Evaporati
on and
Pan
boiling
section.
1) Slippery floors
and walk ways.
As explained above.
Sufficient
free air flow
is
maintained
& air cooler
& pedestal
fans are
installed at
pan floor &
at
evaporator
section
2) Juice leakage
from valves.
3) Heat stress in
surrounding area.
4) Un-guarded
crystallizer units.
4 Centrifug
al section
1) Machine
operators are
exposing to
noise,vibration and
heat stress.
1) All operators are provided with
necessary PPEs
Draft Environmental Impact Assessment Report 2014
142 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
2) Leakage of
steam,hot water
due to which
slippery floor
causes.
2) As explained above.
3) Unguarded
machineries.
3) All rotating dangerous machines
are well guarded and properly
covered with inter locking
arrangement.
4) All
centrifugal
machines
are tested
once in a
year from
competent
authority.
4) Collapse of
centrifugal
machines due to
imbalance of
basket & shaft.
4) During off-season and season
preventive maintenance will be
prepared for testing of shafts &
baskets.
5) Electrical short
circuiting.
5) As explained above.
Draft Environmental Impact Assessment Report 2014
143 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
5 Sugar
drying
and
cooling /
packing
Godown.
1) Lot of dust,
noise and
vibration.
As explained above.
2) Fire hazards
due to loose wiring
/ defective
electrical
appliances.
As explained above.
3) Un-guarded
Hopper drives.
As explained above.
4) Back injury due
to improper
handling of bags.
Training to the workers regarding
safe handling of sugar bags.
5) Entanglement
of persons on the
moving conveyors.
Pull card system provided.
6) Slippage and
falling of bags in
sugar Godown.
The pyramid system of bag stacking
is followed
Proper ventilation will be provided. 7) Ventilation
6 Boiler
section.
1) Failure of
pressure parts &
explosion.
As sugar industry is a seasonal one
during off-season all the pressure
parts are tested for its thickness, and
if necessary replacement of tubes
and other pressure parts will be
carried out with the permission of
statutory bodies.
Boiler are
manufacture
d by reputed
manufacture
s registered
with
statutary
authorities
and repair
work if any
will be
2) High Temp work
area.
Lagging of all high temperate lines
and steam lines to avoid heat
dissipation in working area.
3) Fire at Bagasse Separate high pressure fire hydrant
Draft Environmental Impact Assessment Report 2014
144 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
yard. line is provided. carried out
by IBR
approved
contractors.
7 Co-
generatio
n Plant (
Turbine &
Power
House)
1) Noise
Less noise equipment are selected
and regular preventive maintenance
to keep the noise level to minimum.
2) Fire
The sound proof control room panel
is provided and minimum numbers of
workers with minimum duration with
PPE's like ear plugs and Muffs.
Sand buckets and fire extinguisher
are provided and workers are
trained.
3) Shock
Operators are issued Shock
resistance rubber hand gloves &
safety shoes. Electrical grade rubber
Mat is also provided to all panel
board control room. Also chart is
displayed regarding First-aid if
person got electrical shock.
Draft Environmental Impact Assessment Report 2014
145 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
8 Switch
Yard
1) Fire
In Switch Yard only hazard is Fire &
Electrical Shock. Suitable and
Sufficient Fire extinguishers are kept
near Transformer. Person’s are also
trained in fire extinguisher operation.
Total switch yard area is barricaded
to avoid unauthorized entry inside the
premises. Caution boards are also
displayed. Electrical grade rubber
mat is provided wherever necessary.
2) Electrical Shock
9 Diesel
Storage
tank.
1) Fire
We have storage of 130 KL of HSD
inside the factory for power house
use during emergency.
1) Suitable and sufficient fire
extinguisher are kept and person's
are trained.
2) Sand buckets are also provided
near HSD tanks.
2) Leakage of
HSD.
3) Suitable Dyke wall with proper
drainage arrangement is provided.
4) Permission / License is obtained
from legal authorities & it is get
Renewed time to time.
5) Storage area is completely
barricaded to avoid unauthorized
entry of person.
6) Smoking is strictly prohibited &
sign boards are also displayed.
7) Tanks are properly Earthed to
avoid static electricity.
8) Tanks is constructed as per
Draft Environmental Impact Assessment Report 2014
146 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
applicable IS standards.
10 Molasses
Tanks
1) We have
storage of 34000
MT of molasses in
tanks. There is
source of ordinary
fire hazards;
Molasses when
stored for a long
time without being
turned over there
is likelihood of
spontaneous
combustion. No
flame or smoke
will be seen but
whole content
becomes solid
mode of ashes.
Hence it should
not be allow to be
stored for a long
time and it should
be always kept in
semisolid
condition.
External water cooling arrangement
is done so that during summer,
Molasses temperature will be kept
normal.
2) Spillage due to
failure of Tanks
overflow and
leakages.
. Dyke walls are provided so that
spilled molasses will be collected in
that Dyke wall.
. Constructed as per applicable IS
Standard by the reputed fabricators.
. Hydro static test is carried out
Draft Environmental Impact Assessment Report 2014
147 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
periodically during off-season and
any leakages found will be rectified.
Safety Precautions During Storage and Handling of Hazardous Material
Bagasse & Coal :
Bagasse & coal are the main sources of fire in sugar factory especially dried Bagasse is
highly combustible in nature. It catches fire automatically by way of spontaneous
combustion without external sources if it is stored for a long time. The fine bagasse will
accumulate in all workplace like electrical cables,steam pipes. If they are not cleared
periodically they will catch the fire and lead to big loss to industry. The bagasse and coal
will come under Class ' A ' fire which needs to be extinguished by water spray method
only. We propose to store coal in separate coal yard and separate fire hydrant system
will be made after storage of coal in coal yard.
Existing Control Measures at Bagasse Yard.
Bagasse yard is open area where large amount of bagasse being stored. At present we
are having two bagasse yard one is outside the factory premises & another one is inside
factory premises at boiler section.
1) At outside factory premises we are having storage capacity of 40000 MT of baled
bagasse.
a) We are having two fire hydrant 10HP pumps with 50 mt head connected to water
well.
b) Water is sprayed through hydrant points total 36 points with fire hose & fire
hydrant valve.
c) In summer season one separate fire fighting team will be formed to keep
continuous watch and for spraying water near bagasse stack so that surrounding
area is kept cool.
d) Round the clock security is working to avoid unauthorized entry inside premises.
Draft Environmental Impact Assessment Report 2014
148 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
e) Smoking is strictly prohibited & sign boards are also displayed.
f) Water well is connected to both river water & bore well water.
g) Lighting arrestors are also provided to protect against Lighting.
h) Telephone arrangement is made during emergency. Telephone no 407
i) Security persons are with full fledged communication system.
2) In boiler area also where small amount of bagasse is being stored, we are having two
Separated fire hydrant line covering entire bagasse yard & belt conveyors. One line is
having 6 hydrant points connected to delivery of +ve section of four pumps having
capacity 45 lit / sec pressure 5 kg/cm2 & head of 50mtr. Another high pressure fire
hydrant pump line is having 14 hydrant points connected to pump of 7 kg pressure.
Discharge 2000LPM & head 70 mtrs with + ve section. Both pumps are connected to
water reservoir of capacity 5 Lakh Lit used for both fire fighting and process & water is
supplied to reservoir directly from river water through high pressure pumps. Also we are
having DG set to run the pumps during power failure. Same precautionary measure
taken as at out side bagasse yard area.
Health Hazard:
Bagasse is very hazardous especially dried & fine bagasse for health of the workers
working there. Due to prolonged inhalation of fine bagasse a disease may occur i.e
Bagassosis. Hence due attention must be given to health of the workers.
Measures:
1) Suitable face masks & goggles will be provided to workers working in that place,
strict use will be enforced.
2) Periodical medical checkup of workers will be done & health records will be
maintained.
Draft Environmental Impact Assessment Report 2014
149 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
Sulphur storage & preparation of SO2 gas:
Sulphur will be used in our industry for the manufacture of SO2 gas. The oxygen present
in the air reacts with sulphur & SO2 is formed. This gas is used for clarification of juice &
syrup.
Hazards of SO2 Gas:
So2 is one of the most widely encountered contaminants in the workplace.So2 is an
irritant gas. It may enter the body through the respiratory tract and cause respiratory
problems. In sugar industry So2 poisoning will be of chronic in nature. The substance
has local irritant action & produces a sensation of burning & pain in nose & throat.
Safety & Health Measures:
1) Sufficient ventilation is maintained in this work.
2) Workers are provided with gas mask to prevent inhalation of So2 gas.
3) Safety shoes, goggles, hand gloves & aprons are provided to the workers to
protect from the heat & fire.
4) Periodical medical checkup of the workers will be done and health records will be
maintained.
5) Smoking & eatables will be strictly avoided in that area.
6) Safe operating procedures will be displayed.
7) Eye wash fountain is installed at work area.
Hazards in Sulphur Storage:
Sulphur is highly combustible material. It comes under class ' A ' fire. we are having
200mt of sulphur storage in godown.
Measures taken:
1) Full fledged fire hydrant system will be provided.
2) Suitable fire extinguishers are kept in godowns.
3) Smoking is strictly prohibited.
Draft Environmental Impact Assessment Report 2014
150 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
4) Godown is kept with locking arrangement.
5) Suitable PPE's (Personal Protective Equipment) are provided those handling sulphur.
6) Adequate ventilation and natural lighting is provided.
7) Cautionary boards are displayed.
HCL Storage:
We are having storage capacity of 30 MT for boiler make up water treatment & HCL is
required is stored in FRP storage tanks. The only hazard in this area is release toxic
vapor.
The following remedial measures are taken.
1) Storage of HCL in FRP tanks, which will be located in the area free from all
ignition sources.
2) Sufficient water is provided during emergency.
3) All vents are taken to open area where there is no danger to workers.
4) People working in this area will be fully trained during emergency.
5) Handling of HCL is totally by mechanical system. So that there should be no
spillage all joints are leak proof.
6) Cautionary notices & instructions will be displayed.
7) Smoking & eatables are strictly avoided in this area.
8) Dyke wall is provided to storage tank.
9) Eye wash fountain is provided at working area.
H2So4 STORAGE:
We are storing H2so4 at D.M.Plant for water treatment purpose.H2so4 is stored in
carboys and kept in a separate room and carboys are kept on sand. Total storage
capacity 5MT.
Measures will be taken:
1) H2so4 is highly corrosive chemical and it is kept in separate room.
2) Sufficient ventilation is provided.
3) Cautionary boards are displayed.
4) All required PPE's are provided for handling H2so4.
Draft Environmental Impact Assessment Report 2014
151 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
5) Eye wash fountain is provided near D. M. plant area.
6) Safe operating procedures are displayed.
Sugar Godowns:
Since sugar is combustible material due importance is to be given for fire safety in sugar
storage godown. Sugar is packed in gunny bags and PP bags and stored in sugar
godown. We are having 19 sugar godowns of storing capacity 15 lakhs of sugar bags.
Falling of sugar bag bunches on workers is a major concern. Hence due importance is
given while stacking of sugar bags so that there is no slippage of bags from stack.
Precautionary Measures:
1) Suitable fire extinguishers are kept in sugar godown.
2) Smoking is strictly prohibited.
3) All electrical arrangement is flame proof.
4) Sufficient ventilation will be provided to godowns.
5) Sugar is stacked properly to avoid slippage of bags.
6) Sugar bags are stacked in pyramid shape. Only well experienced contractor is
engaged in sugar bag stacking work.
7) Training is given to concerned workers regarding safety precautions to be taken
while handling of sugar bags in sugar godowns.
Noise & hazards & control measures.
Noise is one of most common health hazards found in the work place. Exposure to
excessive noise can cause noise induced hearing loss. In Sugar Industry high level
noise areas are
1) Generator room.
2) Turbine house.
3) Boiler house.
4) Centrifugal Machines.
5) Noise due to steam leakages.
6) Compressor room.
Draft Environmental Impact Assessment Report 2014
152 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
Noise control measures are divided into the following categories:
1) Elimination
2) Substitution
3) Isolation
4) Engineering control at source and in transmission path.
5) Personal Protection Equipments.
All above methods will be tried to reduce the noise level in the factory and ensured that
there will be no bad effects noise in the work place.
In addition to this following steps will be taken-
1) Suitable Personal Protective Equipments are provided for workers expose to
noise like Ear plugs,Ear Muffs etc.
2) Acoustic measures will be provided wherever necessary.
3) Periodical medical checkup of workers is being done and necessary action will be
taken.
4) Noise aspects are taken care in the design process of the plant.
5) Noise level departments layout is designed in such way that noise will not effect
other departments.
6) Noise level is measured periodically and if exceeds prescribed normal then
necessary action will be taken.
7) Training and Education of workers.
Safety Precautions while Operating ESP (Electrostatic Precipitator)
We have installed two numbers ESP for 80T & 70T Krupp boilers for controlling
environment pollution. The only hazard present is Fire & Explosion.
Causes:
1) Unburnt % in fly ash
2) Prolong accumulation / storage of fly ash.
3) Air ingress
4) Excess Carbon Monoxide generation during upset conditions
Draft Environmental Impact Assessment Report 2014
153 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
Control Measures:
1) Control over combustion
2) Periodic checking of ash
3) In order to ensure the air tightness each of the by-pass chute opening should
have air tight blanks. The blank will be allowed to open only after I D fan stops.
4) Carbon Monoxide monitoring kit to be installed at upstream and well ahead of
ESP.
5) Fix a carbon monoxide monitor well upstream of ESP- with a tripping logic for all
T/R sets while carbon monoxide set point goes above the set point.
6) Main equipment (boiler) operation should be efficient so that proper combustion
happen and reducing the risk of carbon monoxide generation.
7) The ESP should be maintained properly for all tightness so that ambient air
ingress can be controlled within permissible limit. Regular checking door
gasket will reduces the chances of such air ingress by 85%.
Do's & Don’t of ESP operation of boiler:
Many of times ESP cannot be commissioned at boiler because of low temperature
interlock, which is associated to lower boiler load. in that situation you cannot start up T /
R sets because of low temperature interlock, but you need to run all ESP auxiliaries at
all the time including the ash handling system and the bypass chute remains closed at
all time please note that during start up the chances of accident are more due to process
instability & high carryover of unburnt. For more details of operation and safety
measures please refer operation and maintenance manual given by the manufacture
and kept at boiler section.
Identification of Hazards in Distillery Plant:
Sl
.
N
o
Operation
/ Process /
Departmen
t
Hazards
Identification.
Precautionary measures
taken.
Remark.
1 Fermentati
on section
1) Fire
1.All electrical appliances are
flame proof like motors,lighting
etc,.
In case of any
emergency
the units will
Draft Environmental Impact Assessment Report 2014
154 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
2) Fermentation
odour
3) Slippery floor
4)Un- guarded
machinery
5) Noise
6)Leakage of
fermentation wash
2.Suitable fire extinguisher are
kept in section
3.Smoking and using of mobile
is strictly prohibited.
4) Unauthorized person's entry
is restricted.
5) No smoking boards are
displayed.
7) Full fledged fire hydrant
system is provided to cover the
entire area.
1. Adequate ventilation is
provided.
2.Workers are provide suitable
PPE
3. Good housekeeping is
maintained.
1. All pumps, pipelines, are well
maintained. And are checked
periodically to avoid leakages.
2. Necessary gutters are
provided to avoid overflow.
3. Floor washing is done in every
shift.
All rotating dangerous
machineries in this section's are
provided with adequate guards.
Workers are provided with
suitable PPE's.
be tripped
immediately
by using
tripping
devices.
Safety shower
Draft Environmental Impact Assessment Report 2014
155 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
7) Static electricity
1. Suitable dye wall will be
provided. So that spilled
fermented wash will be collected
in dye wall.
2. All tanks are constructed as
per IS standard by the reputed
fabricators.
3. Every year thickness testing
will be done & necessary action
will be taken. Proper earthing is
provided to all tanks, to avoid
static electricity Hazards.
cum Eye wash
fountain is
installed at
working area.
Sl
.
N
o
Operation
/ Process /
Departmen
t
Hazards
Identification.
Precautionary measures
taken.
Remark.
2 Distillation
section
1) Fire
2) Noise
3)Leakage of
Distillation
As explained above.
3 Ware
House
1) Fire
2) Leakage of
Denatured spirit.
3) Static electricity
4) Loading
/unloading of spirit.
As explained above.
1. Proper earthing is done to
vehicles & tans before filling.
Draft Environmental Impact Assessment Report 2014
156 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
2.Proper checking of pipeline
tanks and pumps
3. Before transfer, take
approval from Electrician &
using flame proof pump, tube
light, No naked light, No
smoking zone.
4. Keeping fire extinguisher,
water line ready at ware
house.
4 R.S./ N.S.
ware
house
1) Fire
2) Leakage of
Rectified spirit.
3) Leakage of
Neutral spirit.
4) Static electricity
5) Slippery floor
As explained above.
5 Ethanol
ware
house
1) Fire
2) Leakage of
Ethanol
3) Static electricity
4) Slippery floor
As explained above.
Draft Environmental Impact Assessment Report 2014
157 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
Sl.
No
Operation /
Process /
Department
Hazards Identification.
Precautionary measures taken.
Remark.
6 Cask ware
house
1) Fire
2) Leakage of Malted
spirit.
3) Static electricity
4) Slippery floor
As explained above.
7 IML Section/
Bottling ware
house.
1)Fire hazards due to
loose wiring / defective
electrical appliances.
2)Back injury due to
improper handling of box.
3)Entanglement of
persons on the moving
conveyors.
4) Ventilation
5)Flying/strucking of
glass pieces due to
broken bottles.
Routine preventive maintenance will
be carried out.
Suitable fire extinguisher are kept
and loose electrical connections are
avoided.
Training to the workers regarding
safe handling of box.
Pull card system& Emergency
switches are provided.
Proper ventilation will be provided.
Workers are provided with safety
goggle,hand gloves & gumboots for
handling bottles.
As Explained above
Draft Environmental Impact Assessment Report 2014
158 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
6)Leakage of blending
vat
8 Packed
liquor ware
house
1) Fire
2)Leakage of alcohol
As Explained above
4. Risk Involved Through Risk Analysis.
1) Fire & explosion.
2) Electrical Shock.
3) Bursting of boiler.
4) Electrical short circuiting.
5) Collapse of tall structures.
6) Failure of machinery.
7) Leakage of Hazardous / toxic materials like Co2 gas
5. Severity / severity mapping:
If any emergency occur, the severity of the incident will be within factory premises & not
outside the premises at any cost.
6. Identification of emergency in each hazard activity:
It is already defined in this on site emergency plan in heading “ Identification of hazards
in sugar & cogen plant.”
7. Mitigation measures required:
It is already defined in this on site emergency plan in heading “ Identification of hazards
in sugar & co-generation plant.”
8. Mitigation measures possessed by industry:
We are having following mitigation measures in our industry.
1) Full fledged fire fighter of capacity 4500 lit & additional Foam tank of 500lit
Capacity.
2) Fire hydrant system at bagasse yard, belt conveyors, Entire distillery & IML
section.
Draft Environmental Impact Assessment Report 2014
159 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
3) Suitable PPE's like safety shoes, helmet, goggles, mask.
4) We are having separate Ambulance facility round the clock.
5) Emergency siren.
6) Emergency organization.
7) Well trained fire fighters & first aider.
8) Full fledged occupational health centre.
9. Identification of Mutual aid partners:
We have not defined any mutual aid partners; we have sufficient resources at our own to
mitigate the emergency. if at all required we will call nearest Fire stations like Athani,
Chikkodi etc.
10. Identification of resource suppliers:
We have not identified the resources suppliers. We are having our own.
11. Alert Action plan (Action on site):
1. The effective handling of an emergency will depend on the decision and
action taken at the time, based on the situation and seriousness of the
incident. Each and every incident cannot be foreseen and hence it is not
practicable to include every action which may be required to be taken in a
given situation, however certain actions which are of general nature must be
considered in the emergency management plan. Hence suitable guidelines for
all major foreseeable incidences must be included in the emergency
management plan.
2. Incident controller shall initiate all such actions as essential on the shop floor.
3. Evacuate all the personal on the shop floor not required for controlling the
situation or hazard.
4. Shall immediately grasp the problem / hazard and shall give instructions to
the concerned teams to act in a manner required to control the situation.
5. In case of fire, shall ring up the fire force.
6. Simultaneously shall call the workman in the fire fighting procedures and
organize controlling / extinguishing the fire.
7. With the view to ensure that declarer / controller of emergency shall have
assistance from the teams former.
Draft Environmental Impact Assessment Report 2014
160 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
12. Control room :
The security office shall function as the control room since security office is ideally
situated nearer to the main gate and away from the plant there shall be no problem with
regard to vapor / smoke of any toxic substances affecting security office. However,
should there be a situation where/ when entire premises have to be declared as
emergency the control room shall operate from the FSS office which is outside the main
gate. Required communication facility like walky talkies, mobiles & telephone facility is
provided. Required resources like PPE's, fire extinguishers, firefighting equipments like
fire hose, valves are kept in security office. Important telephone numbers list is displayed
at control room.
13. Site Plan:
Site plan is enclosed.
14. MSDS:
Major chemical MSDS are enclosed.
15. List of Important Telephone Numbers:
Fire fighter 265 / 273
Ambulance 265 / 273
Telephone operator 09
Hospital / Medical Officer 277
Chief engineer 250
Manager Administration 205
Safety officer 434
Security 267
Distillery I / c 261
Shift engineer / chemist
Boiler Engineer
268
423
Draft Environmental Impact Assessment Report 2014
161 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
16. ON SITE EMERGENCY STRUCTURE:
Sl.
No.
Designation Personnel Responsible Scope of responsibilities
1. INCIDENT
CONTROLLER
(In charge of the
scene of the
incident)
CHIEF ENINGEER will be
the incident controller
during the general shift and
whenever present in the
works.
SECURITY OFFICER
/SECURITY WATCHMAN.
will be the incident
controller during all 24 hrs &
holidays also.
1) As soon as he has been
made aware of an
incidence, the incident
controller should decide
whether a major
emergency exists or is
likely. If so he should
immediately activate the
onsite emergency plan
2) He should assume duties
of the site main controller
pending the latter’s arrival,
in particular to:
1. Ensure the emergency
services have been
called.
2. Direct the shutting
down and evacuation
of the areas likely to be
affected.
3. Ensure the key
personal have been
summoned
3) His main function,
however, is to direct all
operations at scene of the
incident as follows.
Ø Rescue and fire
fighting operations
until the arrival of fire
Draft Environmental Impact Assessment Report 2014
162 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
brigade.
Ø Search for casualties
Ø Evacuation of non-
essential workers to
assembly areas.
Ø Set up a
communications point
with telephone or in
case of failure of
telephone
communication use
walky-talky messenger
contact with the
emergency control
center.
Ø Give advice and
information as
requested to the
emergency services.
Sl.
No.
Designation Personnel Responsible Scope of responsibilities
2. SITE MAIN
CONTROLLER
Managing Director: Will be
site main controller during
general shift.
SECURITY OFFICER/
WATCHMAN SECURITY:
Will be site main controller
during all 24 hrs & holidays
also.
Ø The Site main
controller should go to
the emergency control
center and take charge
from the incident
controller for over all
control
Ø If he decides that a
major emergency
exists or is likely, he
should ensure that the
emergency services
Draft Environmental Impact Assessment Report 2014
163 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
have been called and
the on site plan is
activated.
Ø He shall take over the
situation and shall start
in such a manner as to
control the situation
and curb it as soon as
possible.
Ø Control the traffic
movement within the
works.
Ø Issue authorized
statements to the news
media.
Ø Control rehabilitation of
affected areas after
emergency.
Ø Ensure that proper
consideration is given
to the preservation of
evidence.
Draft Environmental Impact Assessment Report 2014
164 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
Emergency organization:
Communication Team
Team A Team B Team C
Team D
Communication Team:
1) Manager (Administration)
2) Security officer
3) Shift Telephone Operator
4) Head Timekeeper
Team A
1) Shift Engineer/Boiler Engineer
2) Shift Chemist
3) Electrical Engineer.
4) Fire fighting team
1) Shri R.T.Patil
2) Shri M.G.Mataguli
3) Shri L.S.Ganennavar
4) Shri D.V.Gharge
5) Shri C.S.Khurd
6) Shri B.H.Jagli
7) Shri M.R.Hukkeri
8) Shri R.T. Visapure
9) Shri A.L.Mallewade
SITE MAIN CONTROLLER – Managing Director
INCIDENT CONTROLLER – CHIEF ENGINEER
Draft Environmental Impact Assessment Report 2014
165 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
Team B
1) Chief Chemist
2) Workshop I/c
3) Dy. Manager (P)
4) Timekeeper
5) Distillery & IML Incharge.
Team C
1) Factory Manager
2) Safety Officer
3) Medical Officer
4) Environment Engineer
5) Motor Department I/c
Team D
Personnel’s which are not included in emergency action team.
Role of communication team:
Manager (Administration)
Ø Proceed to control center and take orders from main site controller.
Ø Arrange mutual aid/fire brigades as requested by main site controller.
Ø Inform police if advised by main site controller.
Ø Inform neighbouring factories.
Ø Requisition vehicles and ambulance as required.
Security Officer/Watchman
After getting information activate the siren.
Control Traffic at the gate.
Arrange a guard at gate to inform incoming essential personal of the nature of
emergency.
Prevent unauthorized entry.
Depute guard to control traffic and block roads at the scene of emergency.
Inform about location of emergency to mutual aid / city fire brigade.
Assemble all the victims at assembly point.
Draft Environmental Impact Assessment Report 2014
166 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
Telephone operator.
On receipt of information in case of siren is not yet actuated, inform security personal to
blow siren.
Inform security so that guards are released to control traffic around the emergency-
visitors are kept out.
Await further instructions from site main controller and keep telephone free from
incoming calls.
Inform others as directed by site main controller.
ROLE OF ACTION TEAM A:
Inform site main controller / telephone operator of location and nature of emergency.
Switch off electrical supply.
Alert every occupant to leave the area to reach the assembly point safely.
Simultaneously trained employees to start fire fighting and rescue operation
Follow instruction of incident controller / site main controller.
Ensure that fire hydrant systems / pumps are in good condition.
Provide engineering assistance to incident controller/ site main controller.
Proceed to scene of emergency.
Consult area supervisor regarding special precautions if any.
Decide line of action in consultation with incident controller/ site main controller.
Keep stock e.g. water, personal protective equipments.
ROLE OF ACTION TEAM B:
Ensure that fire pumps are operating normally.
Shut off power.
Shut down the plant in consultation with incident controller/ site controller.
Evacuate to assembly points in a single line by the safest route without panic
Stand in lines assembly point for ease of head count.
Section in charge has to take head count and locate missing persons if any.
Follow instruction from incident controller/ site main controller.
Get back to your work place (if safe) and when all clear signal is received from site main
controller.
Draft Environmental Impact Assessment Report 2014
167 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
ROLE OF ACTION TEAM C:
Safety/Environment Officer.
Approach the site of incidence immediately
Be in contact with incidence controller/ site main controller.
Coordinate between incidence controller/ site main controller and other key personal.
Check evacuation and head count is done properly at assembly point near the affected
area.
Follow instructions from main site controller.
Notify evacuation squad if required.
Medical Officer
Keep ambulance ready to proceed to scene of emergency at short notice.
Priorities casualties for treatment.
Considered casualties for special treatment.
Arrange hospitalization, additional ambulances.
Call trained first aid members for assistance.
M.T.D. In charge
Arrange transport as required.
Arrange driver for ambulance.
Requisition vehicles, drivers as necessary for evacuation.
First aid team:
1) Shri D V Patil
2) Shri D.D.Datar
3) Shri P.A.Herawade
4) Shri M.B.Kumbhar
5) Shri R.Y.Shirgannavar
6) Shri S.B.Patil
8) Shri R.B.Vasawade
9) Shri R.M.Billur
10) Shri N.P.Savant
Proceed to affected area / medical center as requested and render all assistance.
Draft Environmental Impact Assessment Report 2014
168 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
ROLE OF ACTION TEAM D:
Leave the site immediately by the safest route to assembling point.
Assist in head count at assembly point.
Avoid panic.
Do not go to scene of emergency unless specifically instructed by site main controller
Do not re enter site unless directed personally or announced.
17. Types of emergencies considered:
A major Emergency or disaster occurring at works is the one that may affect several
departments within works and may cause serious injuries, loss of life, extensive damage
to property or serious disruption outside the works. Usually a major emergency is the
result of malfunctioning or bypassing of inbuilt safety devices and systems. Deviation
from the normal operating procedure. Emergency disasters could be due to natural
causes or manmade causes they include.
1) Fire and explosion
2) Bursting of Boiler
3) Leakage/Spillage of Effluent/molasses/chemicals ( Spent wash/ Effluent)/
chemicals/spirit/flammable materials/Alcohol ( Spent wash/ Effluent)
4) Malfunctioning of E.T.P
5) Plane crash over the works
6) War (affecting works e.g. Bombing over the works)
7) Over flow of E.T.P (Discharge Pumps failure)
8) Toxic releases like Methane & Co2 gas
18. Objectives:
The main objective of the emergency plan should be to make optimum use of all
available resources both internal and external to achieve the followings.
Ø Contain the extent of emergency and cascading effects of the original
emergency and bring the incident under control with priority to saving life and
preventing further injury.
Ø Controlling the original incident and prevent an onsite emergency from turning
in to an offsite emergency report.
Ø Mitigate the consequences of the emergency by arranging rescue and
Draft Environmental Impact Assessment Report 2014
169 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
treatment casualties.
Ø Safe guard over the people.
Ø Minimize the damage to environment property.
Ø Identify any fatalities and notify the relatives.
Ø Provide for the need of relatives.
Ø Secure the safe rehabilitation of affected areas.
Provide authentic and authoritative information to the news media through the
Companies authorized person.
19. Safe Assembly Points and Emergency Exits:
We have marketed and identified assembly points at following Work places where
nearby workers can gather safely during emergency.
1) Main gate.
2) In front of distillery section.
3) In front of civil department.
4) Sugar cooling tower (i.e. In front of Godown No.7)
5) Co generation Cooling tower.
6) Co generation ash bed area.
7) M.T.D. Front area.
Also we have marked and identified section wise emergency exits and gangways and
shown in annex II. We have trained all workers in respect of above points.
20. Notification of Emergency/Duties of employee during emergency:
1) If the employee notices the symptoms of fire, leakage of chemical or any other
unusual occurrences he has to inform the Security Department through
Telephone No 273 and Safety Department Telephone No 434, Electrical
Department Telephone No 256, Workshop Incharge Telephone No 259, If the
telephone is out of order send a special messenger to the Security Department.
Also he has to specify the exact location and cause for the first inform the shift
Incharge who is at all times on the shop floor shall identify the same, he shall
report to the chief engineer.
2) Use the suitable fire extinguisher available in the department if there is leakage of
chemicals do not allow anybody to touch or smoke nearby and flush with water
Draft Environmental Impact Assessment Report 2014
170 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
and in case of electrical short circuit use appropriate fire extinguisher don’t use
water in case of electric short circuit.
3) If the fire seems to be uncontrollable call fire brigade/fire fighting team & also
inform them exact location & causes of fire so that they will come with right type
of fire extinguishers.
4) Immediately arrange for removing the combustibles nearby.
5) Cool the surrounding area with the help of fire hydrant water.
6) Fire fighting operations or approach should be from the opposite direction of
smoke.
7) In case anybody trapped must wear breathing apparatus before enter into the
smoke for rescue.
8) Clear the public gathering.
Security Department:
a) Order the fire crew to reach the spot at shortest possible time.
b) Arrange to start the fire hydrant pump.
c) Barricade the area.
d) Instruct the main gate person to keep open the gate full for fire brigade entry.
e) Instruct one security guard to come along with the fire brigade from the gate to
avoid searching the spot.
f) Arrange to remove the nearby fire prone wastes.
Safety Department:
a) Visit the spot immediately has quick check over the spot for explosives
combustible Materials etc.
b) Arrange for switching off the electrical mains pertaining to that area.
c) If the area is covered with dense smoke, see that the people must wear
respirators.
d) If anybody falls down on the ground because of the suffocation arrange for the
medical treatment.
21. Declaration of Emergency:
Under this plan the Chief Engineer is identified and nominated as the
DECLARER/CONTROLLER OF EMERGENCY. No sooner he gets information from
shift in-charge ,he shall move to the place of hazard/calamity & he shall assess the
Draft Environmental Impact Assessment Report 2014
171 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
situation & decide to declare emergency either in particular section or in the entire plant.
If the Emergency is to be declared in one section the other plant will work normally.
He shall start functioning in such a manner as to control the situation & curb it as soon
as possible. Only the site main controller should declare the end of emergency and such
declaration should be made only after his fully satisfied the following things.
· All fires have been extinguished.
· There is no risk of re-ignition.
· Source of emission of hazardous gas has been effectively isolated.
· All gas clouds have been disposed and
· No toxic contamination exists.
· After considering all these aspects and satisfying him that the site is safe to
enter the emergency reader may order entry to restore the normalcy. he shall
then arrange for blowing the siren three times which indicates an all clear
signal.
22. Warning system:
· One electrical operated hooter siren & steam blown siren installed on the top
roof of the Factory. It can be heard throughout the factory premises and
nearby outside area also. The siren will be blown to indicate the emergency.
· Internal telephones & Walky –Talkies and Mobiles are available from all
places to inform emergency at a time at any time.
· On getting the warning all those should act as per the role mentioned in the
action team.
23. Emergency Shutdown of Various Sections:
The only hazards i.e. expected in the factory are fire: immediate action to be taken in
each of the sections for the purpose of emergency shutdown would be as under.
1) MILL SECTION
Stop D.C. Drives.
2) BOILER SECTION
Stop the Boiler.
Draft Environmental Impact Assessment Report 2014
172 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
3) CLARIFICATION SECTION
Switch of the pumps & steam Valves.
4) BOILING HOUSE & PAN SECTION:
Switch of the Machines, Valves & pumps.
5) Turbine House.
Stop the Turbines.
At Distillery / IML Section
1) CUT OF MAINS SUPPLY
2) DISTILLERY SECTION
Stop all distillations.
3) BOILER SECTION
Stop the Boilers.
4) BOTTLE FILLING SECTION:
Switch off the filling lines and stop filling.
5) PACKING SECTION:
Stop packing.
6) STOP ETHNOL PROCESS.
24. Evacuation of Personnel:
Siren will blown within short note many times in addition to the shouting for evacuation
and security staff] runs to each department to drive out the person safe place. When a
major accident occurs and if there is case of workmen has supervisory personnel
fainting or losing consciousness any other type of accident, it shall be the responsibility
of Team-B to evacuate them in the vehicle to our dispensary after providing necessary
Draft Environmental Impact Assessment Report 2014
173 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
First Aid in the office. The well laid out roads in around the plant in factory premises and
they should choose the safest road to come out from the plant.
25. Accounting of personal:
Accounting of personnel will be done at each assembly point by timekeeper & section
Incharge. Total strength will be tallied with actual attendance at timekeeper office. If
anybody is missing immediately inform to any one of emergency team for necessary
action. When persons engaged in the department or in emergency the section in
charges are responsible to bring out the employee to safe place and make arrangement
for their medical treatment, department head also visits the site of emergency to ensure
that nobody has been trapped. The persons who have trained in the First Aid and
Firefighting also quick check up for ensuring that nobody has been trapped. It shall be
the responsibility of Team B to immediately take stock of the personnel on duty and
cross check with the personnel who have come out of the plant / have got stuck-up. This
team shall co-ordinates with team D and ensure that all personnel are accounted for. It is
also essential for team ' B ' to counter check with the security if any visitors or transport
workers have entered the plant and if so they should also be accounted for.
26. Controlling of Emergency:
The declarer / controller of emergency shall take steps to train all the teams & shall draw
up an action plan forthwith. The maintenance in charge is marked as Work incident
controller and he shall act as the Incharge at the site of the hazard to control the entire
operations.
27. Arrangements for medical treatment:
We have full fledged own occupational health center with all facilities & required staff to
treat injured during emergency & also we will shift the injured persons to nearby
hospitals & if higher treatment is required we can arrange to shift the injured persons to
Miraj city hospital which we have close contact.
Draft Environmental Impact Assessment Report 2014
174 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
28. Information to the relatives of injured:
Chief engineer & Dy. Manager (Personal) will inform the relatives of injured through
phone & messengers.
29. Information to the government authorities:
Manager (A& P), CE & Dy. Manager (Personal) will communicate govt. authorities
regarding emergency occurred and status.
30. Law and Order:
We have close contact with the Kagwad Police station to meet our emergency
requirement.
The Dy. Director of Factories & Director of Factories, Member secretary and State
Pollution Control Board, shall also be informed.
31. All Clear Signals:
Once the emergency is controlled and normalcy regained completely and the
DECLARER / CONTROLLER OF EMERGENCY is of the opinion that there is no further
hazard involved there and the work can go on normally, he shall then arrange for
blowing the siren three times which indicates an all clear signal.
32. Emergency Transport Facility:
We have sufficient vehicles to transport injured persons. We are having separate motor
department of our own & they have the facility to control the situation also we have one
full fledged ambulance ready round the clock.
33. Drawing of fire hydrant and Extinguishers:
Details are enclosed in (Annexure II & III) & location of fire extinguishers is given below
Location wise Fire Extinguisher Details
Sr.
No.
Location Type Capacity Qty.
1 Sulphur House CO2 4.5 kg. 2 Nos.
2 -do- D.C.P. 10 kg. 1 No.
Draft Environmental Impact Assessment Report 2014
175 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
3 Boiling House CO2 4.5 kg. 2 Nos.
4 -do- D.C.P. 10 kg. 1 No.
5 Sugar House CO2 4.5 kg. 2 Nos.
6 -do- D.C.P. 10 kg. 1 No.
7 Shift In-charge Cabin. CO2 4.5 kg. 2 Nos.
8 -do- D.C.P. 10 kg. 2 Nos.
9 Mill Turbine CO2 4.5 kg. 2 Nos.
10 -do- D.C.P. 10 kg. 1 No.
11 -do- CO2 22.5 kg. 1 No.
12 Workshop CO2 4.5 kg. 1 No.
13 -do- D.C.P. 10 kg. 2 Nos.
14 Store Water type
CO2
9 Ltr. 3 Nos.
15 Civil CO2 4.5 kg. 1 No.
16 -do- D.C.P. 10 kg. 1 No.
17 Main Gate CO2 4.5 kg. 2 Nos.
18 -do- D.C.P. 10 kg. 1 No.
19 Weighbridge CO2 4.5 kg. 1 No.
20 -do- D.C.P. 10 kg. 1 No
21 Material Godown Water type
CO2
9 Ltr. 1 No.
22 Sulphur Godown Water type
CO2
9 Ltr. 3 Nos.
23 M.T.D. CO2 4.5 kg. 1 No.
24 -do- D.C.P. 10 kg. 1 No.
25 Sugar Godown Water type
CO2
9 Ltr. 2 Nos.
26 Belt Conveyor CO2 4.5 kg. 1 No.
27 -do- D.C.P. 10 kg. 1 No.
28 Diesel Tank Foam type 9 Ltr. 5 Nos.
29 Switch yard D.C.P. 22 kg. 2 Nos.
30 -do- CO2 22.5 kg. 1 No.
31 Cogen Cooling Tower CO2 9 Ltr. 1 No.
32 Back TFR D.C.P. 22 kg. 1 No.
Draft Environmental Impact Assessment Report 2014
176 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
33 Triveni Turbine down side. CO2 22.5 kg. 2 Nos.
34 Centrifugal CO2 22.5 kg. 1 No.
35 80 T. Boiler CO2 22.5 kg. 1 No.
36 TFR D.C.P. 22.5 kg. 2 Nos.
37 33x66 Mill TFR CO2 22.5 kg. 2 Ns.
38 42x84 Mill TFR CO2 22.5 kg. 1 No.
39 42x84 Mill CO2 22.5 kg. 1 No.
40 D.C. Drive D.C.P. 10 kg. 1 No.
41 Power House CO2 4.5 kgs. 2 Nos.
42 -do- D.C.P. 10 kg. 1 No.
43 Paras Boiler CO2 4.5 kg. 1 No.
44 -do- D.C.P. 10 kg. 1 No.
45 70 T. Boiler D.C.P. 10 kg. 1 No.
46 Boiler Compressor CO2 4.5 kg. 1 No.
47 Paras Boiler I.D. CO2 4.5 kg. 1 No.
48 70 T. Boiler I.D. CO2 4.5 kg. 1 No.
49 Cogen. TFR CO2 22.5 kg. 1 No.
50 Cogen. Turbine CO2 4.5 kg. 1 No.
51 -do- D.C.P. 22.5 kg. 5 Nos
At Distillery & IML Section:
Location wise Fire Extinguisher Details
Sr.
No.
Location Type Capacity Qty.
1 Distillery (old) D.C.P. 10 kg. 1 No.
2 Distillery (old) D.C.P. 5 kg. 1 No.
3 Distillery (old) Main Panel
Board. D.C.P. 4.5 kg. 1 No.
4 Distillery (old) Pump House D.C.P. 5 kg. 1 No.
5 Distillery (old) D.N.S.
Warehouse D.C.P. 5 kg. 1 No.
6 Praj Distillery Panel Board CO2 4.5 kg. 2 Nos.
Draft Environmental Impact Assessment Report 2014
177 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
7 Praj Distillery warehouse Water type 9 Ltr. 1 No.
8 Distillery Column No. 2 D.C.P. 10 kg. 1 No.
9 Distillery Col. No. 4 D.C.P. 5 kg. 1 No.
10 Fermentation House D.C.P. 5 kg. 2 Nos.
11 Packed liquor ware house D.C.P 5kg 2Nos
12 Packed liquor ware house Water Type 9lit 2Nos
13 IML bottling CO2 22.5kg 2Nos
14 IML bottling D.C.P 10 kg. 2Nos
34. Location of First Aid Boxes.
We have kept and maintained First Aid Boxes with prescribed medicines in all sections.
Location of First Aid Boxes is given below.
Sl No. Location
1 T. K. OFFICE
2 DISTILLERY (PRAJ)
3 DISTILLERY (IMFL)
4 SULPHUR HOUSE / CHEMICAL
5 PAN SECTION (CHEMICAL)
6 SUGAR HOUSE
7 BELT
8 M.T.D.
9 KRUPP BOILER
10 PARAS BOILER
11 POWER HOUSE
12 D. M. PLANT
13 SWITCH YARD
14 CIVIL
15 COGEN. TURBINE
16 42”x 84” Mill
17 33”x 66” Mill
18 WORKSHOP – Welder
19 WORKSHOP – Moulder shop
Draft Environmental Impact Assessment Report 2014
178 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
20 FIRE FIGHTER
21 AMBULANCE
22 ENVIRONMENT DEPT.
23 TRAINING CENTRE
35. Electrical drawings:
Details are enclosed in (Annexure IV)
36. Display of prominent telephone numbers of at least:
Deputy Commissioner (0831) 2407200
Superintendent of / Local Police (0831) 2405204
Local Police Kagawad (08339) 264633
Fire Services Athani
Chikkodi
Sadalga
(08289) 251740
(08338) 273333
(08338)251900
Hospitals – Ugar sugar hospital
Wanless Hospital Miraj
(08339) 272230
(0233) 222329
Occupier / Manager (08339) 272230
Directorate of Factories & Boilers (080) 26531201
Karnataka State Pollution Control
Board Bangalore, Belgaum
(080) 25581383
(0831)2459121
Blood Bank – Dr.Shirgaokar Blood
Bank Sangli.
(0233) 2372376
Vasantdada Blood Bank Miraj (0233) 2222319
Draft Environmental Impact Assessment Report 2014
179 M/s Ugar Sugar Works Ltd.Ugar Khurd, Tal: Athani, Dist: Belgaum
37. Key personal of the industry:
Name of the Person Designation Telephone number
P.V.Shirgaokar Executive VC 9972022205
S.S.Shirgaokar Managing Director 9972022206
N.S.Shirgaokar Joint Managing Director 9972024447
C.S.Shirgaokar Joint Managing Director 9972024448
G.N.Bellary DGM (A&P) 9900559181
S.N.Gurav Dy. Manager (P) 7259186058
D.K.Pendse DGM(Sugar) / Factory
Manager
9900559190
R.B.Shegunshi Safety Officer 9972372425
S.S.Sardesai DGM El ( Sugar
&Cogen)
9900559160
C.G.Pimpalkar DGM ( Process) 9900559188
B.N.Akiwate DGM (Cogen) 9900559162
N.B.Kagwade Dy.CE (cogen) 9972372423
M.B.Joshi CE El (Sugar & Cogen) 9900559177
Dr.B.V.Zadbuke Medical Officer 9740979188
Dr.S.M.Pattanshetty Chief Env. Manager 9900559179
D.B.Patil Distillery I / c 9972372427
B.T.Viapure
S.V.Shula
IML Manager
IML Incharge
9900559168
9972372428
Namdev Kharade Security Officer 9740083842
38. Waste disposal:
Waste should be disposed off in scientific manner. Debris should be collected in tractor
and trailers and dumped for land filling purpose. For this state rules and regulations
regarding waste disposal will be considered.
*****