Yakout Mansour President & Chief Executive Officer CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Monterey Plaza Hotel October 8-10, 2007

CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza

Embed Size (px)

Citation preview

Page 1: CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza

Yakout MansourPresident & Chief Executive Officer

CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition

Monterey Plaza HotelOctober 8-10, 2007

Page 2: CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza
Page 3: CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza

M A R C H 8 - 9 , 2 0 0 7

Board/Management Planning Session, Five-Year Business Plan, 2007-2011

3

Ground

Upper Limit

Nominal

Lower Limit

Page 4: CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza

4

What is necessary to integrate 20% renewable generation offers a good example.

We have published engineering studies on how to integrate renewable generation to meet the 20% RPS.

Intermittency and timing of wind generation creates operational challenges. Morning and evening ramp will increase 20-30%. Potential wind forecast errors will drive the need for increased regulation capacity (as

much as 500 MW) and a much deeper supplemental energy stack. Over-generation will occur during certain hours but can be mitigated by minimal

curtailment.

Needed integration services can be provided by: Hydro, IF there is enough water. New thermal, IF it has the right characteristics. Existing thermal, IF it is kept operating at certain levels (but could defeat the purpose).

Other mitigation measures are also necessary: Advanced Demand Response Curtailment mechanisms Improved technology Better forecasting tools

Maintaining existing generation is essential (although replacement or re-powering can work).

Page 5: CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza

5

What does it take to integrate a higherRPS in California.

Case GWh Avg. Mw Nameplate Mw

20% RPS 55,657 6,353 13,614

33% RPS ~ 93,000 10,500 26,000

Achieving 33% requires us to meet two times load growth with renewables between now and 2020.

The increase in need for capacity, ramping, and regulation to achieve 33% RPS is not linear – it is much greater.

Regional diversification is important technically and economically.

Key questions are: Can we retain and invest in more non base-load facilities?

Does retirement or replacement make sense?

“There isn’t anything we cannot do.”

“What is it?” and “How much does it cost?”

Page 6: CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza

6

What is necessary to achieve AB 32 reductions.

20% RPS reduces 2020 electric emission down to 2008 level (Optimistic – Mw for Mw).

2008 to 1990 Gap 33% RPS can bring it closer.

• Need to add new transmission infrastructure, maintain and enhance existing generation capacity, and achieve much better regional integration.

Other non-fossil technologies and sequestration can bring it closer

• Conflicts with 33% RPS target. High RPS combined with restrictions on other resources presents a

major infrastructure issue that we need to sort out.

Assumption: Reduce CO2 emissions by 30% in 2020.

Page 7: CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza

7

Generators are necessary for reliable grid operations.

Meet demand.

Meet local/zonal requirements.

Provide regulation and other ancillary services.

Generators are required to:

Page 8: CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza

8

Many generators that use Once Through Cooling today are located in areas within the CAISO control area that require generation to be located within the load pocket in order to meet local capacity requirements.

Any policy that eliminates capacity must be coordinated to provide for replacement capacity.

Many coastal plants are needed for local reliability.

SONGS

To Intermountain

To Celilo

Malin

Captain Jack

USA

Diablo

Canyon

MEXICO

McCullough

El Dorado

Mohave

Palo Verde

Humboldt

North CoastNorth Bay

Greater Bay Area

Sierra

Stockton

Greater Fresno

Kern

LA Basin

San Diego

WEST EAST

Big CreekVentura

SONGS

Page 9: CFEE Roundtable Conference on State & Regional Energy Issues: Managing the Transition Yakout Mansour President & Chief Executive Officer Monterey Plaza

9

The CAISO’s commitment to aligning operations with state policies is unwavering.

The ISO has acted to support State renewable resource policies. Tehachapi transmission project review and approval. FERC declaratory order and remote resource interconnection tariff. Participating Intermittent Resource Program.

The ISO is actively participating in ongoing policy initiatives California Renewable Energy Transmission Initiative Greenhouse Gas deliberations

We look forward to working with State leaders to ensure that successful implementation of State policy priorities.

It is critical to be systematic and thorough in considering policy choices.