CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 1

ALICE TOF DCS

Answers to DCS Commissioning and Installation related questions

ALICE week at CERNO. Pinazza and the TOF team

Page 2: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 2

Subsystems

HV LV FEE Cooling Gas VME

Page 3: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 3

Sub systems status• HV

– PVSS: ok for both 3.1 and 3.6 (with FW and OPC, custom and standard panels)– FSM: ok on 3.1, not ported yet on 3.6 – HW: 2 SY1527 delivered, ready to be installed in CR4-Z02 and CR4-Z03, needs of 1-ph power

and ethernet connection, besides HV cables (tested, few connectors missing)• LV

– PVSS: fwCAEN is working correctly with 3.6, worse with 3.1, standard panels– FSM: (see FSM for HV)– HW:

• 4 SY1527 and branch controllers delivered, 2 ready to be installed (racks O03-O32, I03-I32, needs of 1ph power, eth, EASY bus patch)

• 12 Maciste: 1 to 2 ready to be installed in racks O04-O31 (1ph power –svc-, 3-ph power, EASY bus, LV bars)

• FEE– PVSS: ok, dpt and dp ready, simple panels, DIM -services and commands- prepared, tested,

strictly FED compliant– FSM: not ready – HW: 2 SM installed with FEE devices, lab setup at Cern and in Italy (see Integration);

needs for optical fibers to PCs in CR3, cooling on SM08• Cooling: PVSS, FSM, HW unknown• GAS: PVSS, FSM, HW unknown• VME: PVSS, FSM, HW unknown

Page 4: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 4

TOF DCS SW issues

• PVSS 3.1 SP2– HV, FEE and FSM projects ok– LV (with new fwCAEN) not yet correct (OPC addresses)

• PVSS 3.6 – HV, LV, FEE projects ok– Unable to convert any of the previous projects– Unable to convert FSM project

HV LV FEE FSM

PVSS 3.1 ok no ok ok

PVSS 3.6 ok ok ok wip

(frozen) ECS interfaceddevelopment

Page 5: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 5

FSMTOF

TOF_SM00TOF_SM08

HV LV

CAEN Ch CAEN Ch DIM devices

CAEN CAEN

OPC OPC

DIM

FERO

CTRL PC

FEE

… … …©P.Antonioli

ECS © F.Cindolo

work in progress

Page 6: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 6

TOF_DCSApplies to: TOF_DCS, TOF_NN_DCS, TOF_INFRA

OFF

STANDBY

STBY_CONFIGURED

GO_STANDBYGO_OFF

MOVING_STBY_CONF

CONFIGURE (RUNMODE)

READY

CALIBRATING

CALIBRATE

ERROR

GO_STBY_CONF

RECOVER

MOVING_READY

GO_READY

All states can fall to the ERROR state

GO_STANDBY

TOF_DCS_NODE

Page 7: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 7

Installation at P2

Page 8: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 8

Installation news

Cables, connections and services in the pit are not fully available 1-ph power

3-ph power LV bars

Ethernet Easy bus

HV connections (CR4) Optical fibers

After last survey at Point 2, we‘re still missing many connectors (rack side). This/next week we’ll hopefully begin to install devices in the racks in UX and CR

Supermodule 08• Starting probably this week, the supermodule will

finally be pushed in its final position• At present, our effort is to set all the connections

and services needed for the SM to be switched on, operated and tested as soon as possible

Page 9: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 9

Final Installation at P2

• Complete SW with PVSS 3.6– A running (but not final) version is going to be installed in

the next days, to test and operate the first SMs – Complete system: not before mid May

• Network, cables and connectors– To be checked early this week

• Devices– Hopefully this week:

• HV PS in CR4• LV PS (SY and Maciste) side O

– PCs: 4/21 linux “farm” pc ready in CR3 (remaining 17 not before May)

Page 10: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 10

Integration

Page 11: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 11

DCS+ECSF. Cindolo

Page 12: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 12

Integration

• DAQ, DA, ECS validated (Dec ’06-Feb ‘07)• Further integration tests to be performed in the TOF

lab at Cern:– February 28: Test of ECS+DCS (CERN, TOF) – March 19-22: Integration test for all DCS components of

TOF in ECS (TOF) with real HW– April 10-13: Combined test with TRG, DAQ, DCS, ECS, DA

on real HW

Page 13: CERN, 2007-03-06O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and

CERN, 2007-03-06 O.Pinazza: ALICE TOF DCS 13

Conclusions

• SW: Main PVSS subprojects are beings used in the TOF lab; not in their final version, but almost fully functional– Still missing: alarms, interlocks, Oracle archiving, complex

FEE procedures (ex. Calibration, error recovery actions), FSM-FEE tree

• HW: Most of the hardware has been delivered and the first devices are being installed probably this week to test SM08

• Integration tests have started