June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software •Graphical User Interface •Naming and Numbering conventions •Project organization

June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

Embed Size (px)

Citation preview

Page 1: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Guidelines and conventions for ALICE PVSSII control software

•Graphical User Interface•Naming and Numbering conventions•Project organization

Page 2: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Selected tools and standards- news (1)

• Control applications run on Windows XP Operating System

• Linux Operating System approval from the ACC team is mandatory.

• PVSS II shall be use as the SCADA system• Framework tools shall be used for any development

of control applications • Finite State Machine shall be used for the full control

hierarchy in Alice• Sub-detector operation (states, actions, transitions..)

performed via the FSM mechanism• Except TPC and HMPID no reaction from detector side

so good agreements with these rules

Page 3: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Who is doing what? - updates

• ACC team will ensure the support for all future tools developments (Fw, PVSS.. ) ([email protected])

• Every sub-detector shall nominate a person responsible or the control software (development and maintenance) and communicate this to the ACC team – no answer

• Sub-detector responsible must ensure that the control software follow the guidelines, its integration and functionality - no answer

• Any control software prior to the final installation shall be validated in the DCS lab with a reference system, therefore a time schedule is need it from the sub-detector responsible - no answer

Page 4: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

General naming rules

• Two standards are valid:– interCapNotation – name splitting using underscore.

• Abbreviations are considered as single words.• Sub-detector identification mandatory the

standard three-letter sub-detector code shall be used (as defined in Appendix C of the document).

• Numbering starts at 0.

Page 5: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Sub-detector codes:

CodeSub-detector

spd ITS pixel detector

sdd ITS drift detector

ssd ITS strip detector

tpc TPC

trd TRD

tof TOF

phs PHOS

cpv CPV

hmp HMPID

fmd FMD

pmd PMD

v00 V0

t00 T0

mch Muon tracker

mtr Muonb trigger

zdc ZDC

emc EMCal

Acorde

Codes for other systems or objects:

CodeSystem or object

tri Trigger

hlt High Level Trigger

daq Central DAQ

dcs Detector Control System

Experiment Control System

Cooling

Gas

Electricity

fra Front absorber

saa Small angle absorber

sfr Space frame

l3m L3 magnet

dim Dipole magnet

bmp Beam pipe

exh Experimental hall

int Integration

otr Other (not classified)

Page 6: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Guidelines and conventions – 1 • PVSS project name

– project in US English language(PVSSen_US.iso88591)– every project shall be created as distributed system– naming convention for the detector top level*<dc_dcs> Ex: tpc_dcs, phs_dcs, sdd_dcs

dc Detector Code dcs abbreviation Detector Control System

*It is recommended to have one PVSSII project per detector i.e. with small number of channels (hv, lv, cooling, fero)

• PVSS System name and number– Names shall be in lowercase, underscore “_” shall be used to

separate words.– Naming convention is <dc_..> ex: tpc_dcs, phs_dcs– should intuitively describe its function and be documented by

sub-detector responsible – PVSSII system number per sub-detector is assigned by ACC

team following a written request. – electronic form available on the Alice DCS web page

Page 7: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Guidelines and conventions – 2

• OPC and DIM servers – The same naming formula

• <dc_opcsn> where opcsn = opc server name,• <dc_dimsn> where dimsn = dim server name, Ex:

tpc_opcwiener tpc_dimfero

• OPC driver numbers• Framework PVSS OPC + Simulator driver numbers are

reserved– CAEN 6, Wiener 11, Iseg 8and 9, ELMB 7,

• For any new hardware integrated in the ALICE DCS control , the OPC and Dim driver numbers will be assigned by the ACC team, following a written request.

• DIM driver numbers– will follow the same policy as OPC

Page 8: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Guidelines and Conventions - 3• Panels

– Look and feel• Will be displayed on screens with at least resolution of 1024 x 768

pixels.• Font to be used is: “Arial regular 10”; the background colour to be

used is: “_3DFace” (more conventions in the FW guidelines)• Naming of sub-systems and parameters shall be as the ones listed

(see Appendix A of the document).• Child panels shall be cascaded and have a close button at the

bottom right corner.• ALICE logo shall appear at the top left corner.• help button located at the top right corner, and give access to the

online help. • online help shall be provided in the standard format

– Naming convention• Same as the general convention , <dc_..> followed by a meaningful

abbreviation: ex: tpc_TrendingSectorA.pnl

Page 9: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Guidelines and Conventions – 4• Panels

– Path and subfolders• For new hardware integration the folder structure shall be ..newHardwareName/config – contains the config file ..newHardwareName/dplist -- contains dpfileDataPoint /

DataPointTypes ex: newHardwareDP.dpl, newHardwareNameDPT.dpl

..newHardwareName/panels – contains the corresponding panels ..newHardwareName/scripts

Page 10: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Guidelines and Conventions – 5• Development

– DataPointsTypes and DataPoints Naming scheme• PVSS II and Framework DP and DPT shall not be changed• For new hardware added the DP should be exactly the OPC

or DIM items names from the Space Name Server• The prefix (detector code) is mandatory . For DPT first letter

must be upper case for DP should be smaller case• The general naming scheme could be

<dc_ss...>, where ss is the Sub-System name Example: Tpc_hv_anode for DPT, tpc_hvAnodeSect1 for DP

• If detector need to split the name “underscore” as separation shall be used . Ex: tpc_hv_anode

Page 11: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Guidelines and Conventions – 6

• Development– Libraries and control scripts

• Wherever applicable is recommended to use the Framework ones

• Must have meaningful name• interCapNotation use is strongly recommended• Must be documented in the header file or as a

separate text file in English.• Any upgrades or bug fixes made must contain the

developer name, date and a short description of the change(s).

Page 12: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Guidelines and Conventions – 7

• Development – FSM objects

• States, actions, alarms shall follow the rules defined by PVSS, Framework and Giacinto’s presentation.

• Naming convention for: states and actions is uppercase • words can be separated by and underscore “_” (e.g.

GO_PHYSICS).• All sub-detectors must provide written documentation on

state diagram of their sub-detector, operation, action, alarms….

• Partitioning will be performed using the FSM tools in conjunction with the ECS partitioning tools

Page 13: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Guidelines and Conventions – 7

• FSM operational panels – FSM toolkit shall be used a default layout is

provided fwUi.pnl– Two zone –control zone and monitoring zone– Control zone must contain all the CU need it for

operation– Monitoring zone can be used as the detector wants– It is recommended to fill this zone with

complementary information for the operator ex: state diagram of the CU, some crucial parameters

– ACC will soon provide some standard widgets

Page 14: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Still under development!! Disregard the inconsistencies, it is shown as a working principle!!

Page 15: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu

Conclusions

• The document can be found http://alicedcs.web.cern.ch/AliceDCS/Documents/ “Guidelines and conventions for ALICE PVSSII control software “

• Still to come…– ACC will come soon with a proposed architecture for the FSM

hierarchy (tests are undergoing SP and AA)– Alarms messages and alarm handling is still to be defined, – A first proposal exist from IT-CO– Alice DCS widgets are still under discussion by the ACC team

• Strongly recommended to contact us if you are having doubts or missing information

Page 16: June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering

June 14, 2005 Alice DCS workshop, UtrechtS.Popescu