6
ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels (GUIs) to be proposed at the sub-detector DCS groups as : Access Control panel; DCS control panels; full detector FSM control (REM: distributed system); In this way, when integrated in the ALICE DCS, the operation of each sub-detector can be done via a set of GUIs having the same ‘look and feel’; Once approved, by the end of March 06, the first prototype of GUIs will be available on the ALICE DCS site along with instructions for their integration in your present DCS project; The proposed GUIs will be periodically updated according to the suggestions/comments that will be collected from the DCS users after a certain time of usage .

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels

Embed Size (px)

Citation preview

Page 1: ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1

Standardization of the DCS control panels

• The ACC is elaborating a set of panels (GUIs) to be proposed at the sub-detector DCS groups as :

– Access Control panel; – DCS control panels;– full detector FSM control (REM: distributed system);

• In this way, when integrated in the ALICE DCS, the operation of each sub-detector can be done via a set of GUIs having the same ‘look and feel’;

• Once approved, by the end of March 06, the first prototype of GUIs will be available on the ALICE DCS site along with instructions for their integration in your present DCS project;

• The proposed GUIs will be periodically updated according to the suggestions/comments that will be collected from the DCS users after a certain time of usage .

Page 2: ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 2

The DCS Access Control The DCS Access Control

1 ° Once the operator starts the DCS project from the PVSS consolle, this panel will be the first

panel to be automatically opened

Detector

Standard FW login window

Access control Commands:LogoutChange UserSet PasswordFind User

2° Pushing the WXP standard button then the FW login panel will appear. Only once authenticated the main DCS control panel will appear (see next slide) giving at the User the corresponding rights

of operations

Page 3: ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 3

3° The main DCS control panel as provided for the FSM in the FW

-For a FSM hierarchy of a distributed system, as on the top of the figure,the pannel below is automatically provieded by the SMI++ tool in the FW;

-Tha ACC, starting from this standard proposes a new panel that integrates extra features

M3 M4 M5 M6 M7

DCS

M1

Racks

M2PC2

PC1

Monitoring zone:Available Space f or the detector representation

DETECTOR

Detector locator

Page 4: ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 4

Detector locator

Title Bar related to the Panel

Message & Info window

Operator Tools bar

FSM Control Zone

Expert Tools bar

Detector Monitoring Zone

3° bis : The ACC proposal for the standard DCS panel

Short cut on critical lower parts of the FSM hierarchy

Page 5: ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 5

Deep inside the GUI for the FSM Deep inside the GUI for the FSM CONTROL ZONECONTROL ZONE

FSM servers status and FSM Control windows

button

FSM Node control status widget

Hierarchy children control status widget

Specific FSM Node status widgets

The HMPID FSM Control Window

DEAD

DEAD

DEAD

DEAD

DEAD

DEAD

In the distributed project on two machines, the FSM engines have to be started on each machine via the relevant FW editor/navigator windows. Here it is proposed a series of panels which :•integrates the “start/stop all” FSM engines in one button;•Give the FSM servers status;•provides the operation mode setting (included, excluded, shared..etc) for the DCS FSM processes;•Synoptic view of all the FSM processes• provides the editing/downloading of the corresponding FSM configuration file. This is a new proposed feature, so far not included in the FW.

Page 6: ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 6

Conclusion

• By the end of March 06 the proposed set of GUIs will be available on the ALICE DCS web page

• Instructions will be provided for their installation and test in the user DCS project

• In order to improve these panels, feedback from user will be welcome