62
E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03 CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue Edouard-Belin 31401 TOULOUSE Cedex 4 Rond-point de l'Espace 91023 EVRY Cedex SDS/G BP 254 - 97377 KOUROU CEDEX PROJECT IDENTIFICATION CODE VG-CT-211-C-0001-CNES ISSUE: 2 REVISION: 0 Issue or last revision date:03/04/2003 AUTHOR REF.: SDS/PL/OI/2003-00051 CLASS: 1 CATEGORY: 1 RESERVED FOR MANUFACTURER PROJET: VEGA GROUND SEGMENT DOCUMENT TITLE: SPECIAL TECHNICAL CONDITIONS OF CONTRACT GROUND MECHANICAL INFRASTRUCTURES NAME & FUNCTION DATE & SIGNATURE PREPARED PAR: T. FIGEAC SDS/PL/OI Technical Officer 16/04/2003 APPROVAL: J. BERTRAND SDS/PL/OI 16/04/2003 ACCEPTANCE: M. VALES SDS/PL/SV Project Coordinator 16/04/2003 APPLICATION AUTHORIZED PAR: M. CARDONE ESA/LAU-IPT/GSM GS Manager DISTRIBUTION Nb A I SDS/SG/MC/BT1 1 X SDS/PL 1 X SDS/PL/SV 1 X SDS/PL/OI 1 X SDS/PL/SE 1 X SDS/PL/IR 1 X SDS/SM 1 X SDS/AP 1 X SDS/AP/SF 1 X SDS/AP/MR 1 X SDS/G 1 X AE/DE 1 X ESA/IPT M. Cardone 1 X D. Coulon 1 X A=Action I=Information

CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

Embed Size (px)

Citation preview

Page 1: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Sous-Direction Développements Sol

18, Avenue Edouard-Belin 31401 TOULOUSE Cedex 4

Rond-point de l'Espace 91023 EVRY Cedex

SDS/G BP 254 - 97377 KOUROU CEDEX

PROJECT IDENTIFICATION CODE

VG-CT-211-C-0001-CNESISSUE: 2 REVISION: 0

Issue or last revision date:03/04/2003

AUTHOR REF.: SDS/PL/OI/2003-00051

CLASS: 1 CATEGORY: 1

RESERVED FOR MANUFACTURER

PROJET: VEGA GROUND SEGMENT

DOCUMENT TITLE:

SPECIAL TECHNICAL CONDITIONS OFCONTRACT

GROUND MECHANICAL INFRASTRUCTURES

NAME & FUNCTION DATE & SIGNATURE

PREPAREDPAR:

T. FIGEACSDS/PL/OI

Technical Officer

16/04/2003

APPROVAL:J. BERTRAND

SDS/PL/OI

16/04/2003

ACCEPTANCE:M. VALESSDS/PL/SV

Project Coordinator

16/04/2003

APPLICATIONAUTHORIZED

PAR:

M. CARDONEESA/LAU-IPT/GSM

GS Manager

DISTRIBUTION Nb A I

SDS/SG/MC/BT1 1 X

SDS/PL 1 X

SDS/PL/SV 1 X

SDS/PL/OI 1 X

SDS/PL/SE 1 X

SDS/PL/IR 1 X

SDS/SM 1 X

SDS/AP 1 X

SDS/AP/SF 1 X

SDS/AP/MR 1 X

SDS/G 1 X

AE/DE 1 X

ESA/IPT

M. Cardone 1 X

D. Coulon 1 X

A=Action I=Information

Page 2: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Sous-Direction Développements Sol

18, Avenue Edouard-Belin 31401 TOULOUSE Cedex 4

Rond-point de l'Espace 91023 EVRY Cedex

SDS/G BP 254 - 97377 KOUROU CEDEX

LANGUE: Eng ISSUE: 2 REVISION: 0

ISSUE OR LAST REVISION DATE: :03/04/2003

PROJECT IDENTIFICATION CODE

VG-CT-211-C-0001-CNES

DATASHEET

IT FILE

D: \Donnees\Secrétariat\Projet VEGA\AO Février 2003\2_Docsmodifies suite à PRE-

TEB\Francais\OITF0005103_20A_CCTP.doc

Total number of pages (incl.appendices and cover pages):

No. of pagesin appendix:

TITLE:

SPECIAL TECHNICAL CONDITIONS OF CONTRACTGROUND MECHANICAL INFRASTRUCTURES

AUTHOR (S) SDS/PL/OI T. FIGEAC

DOCUMENT TYPE

CCTP - Special Technical Conditions of Contract

PHYSICAL CLASSIFICATION CONTRACT No. CLASS: 1

CATEGORY: 1

ABSTRACT

This document is a complement to the Mechanical Technical Specifications and describes the scope of supplies and services. It highlights the main study orworks constraints existing between this contract and other contracts and within the work packages of this contract.

KEY WORDS (selected by author) RESERVED FOR MANUFACTURERS

CCTP (special technical conditions of contract)VEGAMECHANICAL

Page 3: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 3/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

ISSUE REVISION DATE PURPOSE OF CHANGE

1 0 12/02/2003 Original Issue.

2 0 31/03/2003 Modifications following PRE-TEB. Translated from original document in French.

Page 4: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 4/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

CONTENTS

1. PURPOSE ............................................................................................................................................................................5

2. DOCUMENTATION ..........................................................................................................................................................5

2.1. APPLICABLE DOCUMENTS .............................................................................................................................................52.2. REFERENCE DOCUMENTS...............................................................................................................................................62.3. GUIDELINE PLANS (FOR INFORMATION PURPOSES ONLY) ..............................................................................................72.4. CIVIL ENGINEERING DRAWINGS....................................................................................................................................8

3. ORGANIZATION OF THE SERVICE ............................................................................................................................9

4. GROUND INSTALLATION MISSION..........................................................................................................................11

5. TECHNICAL DESCRIPTION ........................................................................................................................................13

5.1. MOBILE GANTRY .........................................................................................................................................................135.1.1. Work Package 1 (phase I): Structure (main framework, secondary framework) and Fixed platforms(excluding mobile shutters)..................................................................................................................................................135.1.2. Work Package 2 (phase I): Cladding and Roofing ............................................................................................165.1.3. Work Package 3 (phase I): Rooms and Trade Works .......................................................................................185.1.4. Work Package 4: Traveling Crane and Lifting Facilities .................................................................................205.1.5. Work Package 5: Launcher Doors and Traveling Crane Shutter .....................................................................235.1.6. Work Package 6: Lift ........................................................................................................................................265.1.7. Work Package 7: Motorization, Bogies and Coiled Cables..............................................................................285.1.8. Work Package 8: Elevator Platforms and Platform Shutters............................................................................305.1.9. Work Package 9: Adaptation of Upper Composite Tooling (phase II) .............................................................32

5.2. UMBILICAL MAST ........................................................................................................................................................345.2.1. Work Package 10: Structure and doors (phase II)............................................................................................345.2.2. Work Package 11: Swing Systems of Umbilical Connectors (phase II) ............................................................37

5.3. BUNKER FITTING OUT ..................................................................................................................................................395.3.1. Work Package 12: Table Secured to the Bunker (phase I).................................................................................395.3.2. Work Package 13: Access Under the Nozzle (phase II) ....................................................................................425.3.3. Work Package 14: Container erection swivels (Phase II) ................................................................................44

5.4. MISCELLANEOUS .........................................................................................................................................................475.4.1. Work Package 15: Pallet and Prime Mover (phase I) ......................................................................................475.4.2. Work Package 16: Cushion Mounted Spacers (phase I)...................................................................................495.4.3. Work Package 17: Anti-self-propelling system (phase II).................................................................................515.4.4. Work Package 18: Participation of Industrial Contractor in Integrated and Combined Tests ........................555.4.5. Work Package 19: First Equipment Batch........................................................................................................565.4.6. Work Package 20: General Ground Infrastructure Mechanical Services ........................................................575.4.7. Work Package 21: Dolly Interface....................................................................................................................61

6. APPENDICES....................................................................................................................................................................62

Page 5: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 5/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

1. PURPOSEThese specifications encompass all requirements necessary for design and installation of VEGAmechanical infrastructures. These specifications set down the general definition of requirementsspecifying the services and scopes of supplies.

2. DOCUMENTATION

2.1. Applicable Documents

SDS Management Specification

� VG-SM-211-C-0004-CNES: Management Specification Applicable to Mechanical Contractors

� VG-SOW-2-C-0003-IPT: Statement of Work

General Specification

� DS-IT-AP-40: Ground General Specification - General� MSG-SGS-401: Environment acceptance and qualification specifications for equipment and

wiring (Electronic version not available)� DS-IT-IR-32: Ground General Specification - Civil Engineering Works� DS-IT-AP-36: Ground General Specification - Painting and Protection� DS-IT-OI-41: General Specification - Mechanical and special metal structures� DS-IT-PL-42: Welding technical instruction� DS-IT-PL-46: Traveling crane design and manufacturing rules� DS-IT-IR-37: Lightning protection� DS-IT-IR-33: Electrical installations in an explosive atmosphere� DS-IT-IR-34: General high current requirements� DS-IT-OI-45: General system requirements in clean zone� VG-AP-211-C-0007-CNES: Mechanical Infrastructure Contract: Product Assurance

Requirements and Tasks� VG-OP-2-C-002-CNES: VEGA Ground Segment Project product flowchart� VG-ST-211072-C-0008-CNES: Technical Specification - Gantry structures and cladding� VG-ST-2110731-C-0009-CNES: VEGA Gantry Traveling Crane Technical Specification� VG-ST-212074-C-0010-CNES: Technical Specification - Umbilical mast� VG-ST-2120732-C-0011-CNES: Dolly Interface Plate Technical Specification� VG-ST-212073-C-0012-CNES: Table and Pallet Technical Specification� VG-ST-211071-C-0017-CNES: Gantry translation system Technical Specification� VG-ST-21107-C-0018-CNES: Access and Walkways Technical Specification

Page 6: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 6/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

Ground Quality Specifications

� VG-RS-2-C-0002: VEGA work site rules

� CSG-RS-210-CN: CSG safety regulations (volume 2: fascicule 1 - Ground Installations)

Other Documents

� DTU-CM66: Structural steel design rules (and addendum 1980)

� DTU-NV65 and Appendices: Rules defining the effects of snow and wind on buildings (issue2000)

� ATEX 94/9/EC Directive

� European Directive 89/336/EEC on electromagnetic compatibility

The supply shall comply with French and European regulations and standards in force.

2.2. Reference documents

None

Page 7: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 7/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

2.3. Guideline plans (For information purposes only)� 1602 FD 1739 0010: Vega Integration Building - Guideline plan - Civil Engineering interface� 1602 FD 1739 0011: Vega Integration Building - Guideline plan - Level 14200/16400� 1602 FD 1739 0012: Vega Integration Building - Guideline plan - Level 18400� 1602 FD 1739 0013: Vega Integration Building - Guideline plan - Level 21200� 1602 FD 1739 0014: Vega Integration Building - Guideline plan - Level 24000� 1602 FD 1739 0015: Vega Integration Building - Guideline plan - Level 26600� 1602 FD 1739 0016: Vega Integration Building - Guideline plan - Level 29200� 1602 FD 1739 0017: Vega Integration Building - Guideline plan - Level 31800� 1602 FD 1739 0018: Vega Integration Building - Guideline plan - Level 34400� 1602 FD 1739 0019: Vega Integration Building - Guideline plan - Level 37000� 1602 FD 1739 0020: Vega Integration Building - Guideline plan - Level 58150 - Traveling crane� 1602 FD 1739 0021: Vega Integration Building - Guideline plan - Cross-section AA� 1602 FD 1739 0022: Vega Integration Building - Guideline plan - Cross-section BB� 1602 FD 1739 0023: Vega Integration Building - Guideline plan - Elevator platform, plate 1/4� 1602 FD 1739 0023: Elevator platform bottom view, plate 2/4� 1602 FD 1739 0023: Elevator platform front view, plate 3/4� 1602 FD 1739 0023: Elevator platform side view, plate 4/4� 1602 FD 1739 0024: Vega Integration Building - Guideline plan - Doors� 1602 FD 1739 0025: Vega Integration Building - Guideline plan - Cross-section CC� 1602 FD 1739 0026: Vega Integration Building - Guideline plan - Level 55000� 1602 FD 1736 0027: Geometrical environment for acoustic study� 1602 FD 1736 0028: Detailed drawing - pallet� 1602 FD 1736 0029: Detailed drawing - nozzle� 880 FD 1739 0020: Umbilicals, Swing System: General and details� 880 FD 1739 0021: Umbilicals, Release: POP1 set� 880 FD 1739 0022: Umbilicals, Release (details)� 880 FD 1739 0023: Umbilicals, Release (details)� 880 FD 1739 0024: Umbilicals, Release (details)� 880 FD 1739 0136: Umbilicals, Braking; POP1 (Speltra) POP B (ESCA) set� 880 FD 1739 0026: Umbilicals, Standard Recipient, 1500: Metal frame and quilt details� 880 FD 1739 0117: POP link accessories

Page 8: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 8/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

2.4. Civil Engineering Drawings

� 1600 GD 1739 0001: Vega Launch Zone: Existing general layout drawing

� 1600 GD 1739 0002: Vega Launch Zone: Work site installation

� 1600 GD 1739 0003: Vega Launch Zone: Roadway project

� 1601 BD 1739 0001: Vega Launch Area: Level + 14.000 m project

� 1601 BD 1739 0002: Vega Launch Area: Ground Floor project

� 1601 BD 1739 0003: Vega Launch Area: Basement project

� 1601 BD 1739 0004: Vega Launch Area: BB and CC cross-sections

� 1601 BD 1739 0005: Vega Launch Area: AA and DD cross-sections

� 163 BD 2674 264 D: P.C.U. Bunker, under rocket, floor at +14.00 installation and details of towerrunning tracks.

Page 9: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 9/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

3. ORGANIZATION OF THE SERVICEThe Mechanical infrastructure contract holder (Work Package 20) shall ensure the co-ordination forperformance of erection works and integration of all components in the gantry, i.e. the items from theEnergy, Air-conditioning, Fluids and Low Current Contracts as well as the items from the variousmechanical contract Work Packages.

This service is divided into two phases. The first phase (phase I) relates to Ground Installations forwhich the definition is clearly separated from the launcher studies, or for which launcher assumptions aresufficiently precise. The second phase (phase II) relates to Ground Installations for which the definitionis related to launcher assumptions, which are not precise enough at the present time but with a definitionpreservatory for these installations, thus enabling a ceiling estimate to be calculated.

This CCTP includes the following Work Packages, broken down into phase I and phase II:

� Work Package 1 (phase I): Structure and Fixed Platforms� Work Package 2 (phase I): Cladding and Roofing� Work Package 3 (phase I): Rooms and Trade Works� Work Package 4 (phase I): Traveling crane and Lifting Facilities� Work Package 5 (phase I): Launcher Doors and Traveling crane Shutter� Work Package 6 (phase I): Lift� Work Package 7 (phase I): Motorization, Bogies and Coiled Cables� Work Package 8 (phase I): Elevator Platforms and Platform Shutters� Work Package 9 (phase II): Adaptation of Upper Composite Tooling� Work Package 10 (phase II): Umbilical Mast Structure and Doors� Work Package 11 (phase I): Swing Systems of Umbilical Connectors� Work Package 12 (phase I): Table Secured to the Bunker� Work Package 13 (phase II): Access Under the Nozzle� Work Package 14 (phase II): Stage Container Erection Swivels� Work Package 15 (phase I): Pallet and Prime Mover� Work Package 16 (phase I): Air-cushion Mounted Spacers� Work Package 17 (phase II): Anti-self-propelling system� Work Package 18 (phase I): Participation of Industrial Contractor in Integrated and Combined Tests� Work Package 19 (phase I): First Equipment Batch� Work Package 20 (phase I): General Ground Mechanical Infrastructure Service� Work Package 21 (phase I): Dolly Interface

Page 10: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 10/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

The main events related to the service are:

- critical industrial design reviews authorizing manufacturing phase starting

- factory qualification/acceptance of certain sub-assemblies authorizing shipment to the site

- Acceptance of Mechanical/Civil Engineering interfaces enabling on site erection mechanical activitiesto start,

- gantry closed-covered authorizing the other contractors to work in the gantry

- industrial acceptance and test review board.

These events constitute the main milestones indicated in the appended time schedule.

Page 11: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 11/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

4. GROUND INSTALLATION MISSIONSome of these installations are located in the launch zone, on the ELA1 launch pad. They re-use theELA1 ground infrastructures, modified according to the INFRASTRUCTURE Contract (outside theservice).

These infrastructures are connected to the roadway network of the Guiana Space Center.

These infrastructures, fitted with the equipment from the other Work Trades, enable the integration,preparation, testing and launching of the Vega launcher, comprising:

� A first solid fuelled stage (P80) transported vertically on its launch pallet via the road network. TheUPG dolly fitted with a spacer comprising a docking device is used for this transfer operation.

� A 1/2 interstage skirt transported vertically in its transport container via the road network

� A second solid fuelled stage (Z23), transported horizontally in its transport container via the roadnetwork

� A third solid fuelled stage (Z9), transported horizontally in its transport container via the road network

� A fourth storable propellant upper stage (AVUM), transported vertically in its transport container viathe road network

� A composite (fairing + payload), transported vertically on a transfer trailer via the road network fromthe EPCU.

To perform the above, the following operations must be carried out in these installations:� reception of the P80 on it pallet and positioning on the ZLV host structure,� preparation and check of P80, requiring particular access under this stage� hoisting of the ½ skirt with the crane and assembly on P80, connections and checking� erection of Z23 in its container with the crane, hoisting of the stage with the crane and assembly on

the ½ skirt, connections and checking,� erection of Z9 in its container with the crane, hoisting of the stage with the crane and assembly on

Z23, connections and checking.� hoisting of AVUM with the crane and assembly on Z9, connections and checking,� hoisting of the composite with the crane, assembly on AVUM, connections and checking.� filling of AVUM with propellant,� connection of swing system cables and release cables for umbilical connectors,� withdrawal of the platforms,� opening of doors and withdrawal of the gantry,� revalidation of the pallet after launching

Page 12: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 12/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

Ground mechanical installations are also compatible with related maintenance operations and palletrevalidation operations after launching.

Installations comprise the following items:

� the mobile gantry comprising a metal framework, cladded and mainly fitted with: doors (personnelaccess and integration of launcher stages), a traveling crane, three fixed platforms with fold-awayshutters, two elevator platforms, one lift, stairways and rapid evacuation chute, translationinstallations (motorization and bogies), technical rooms.

� the umbilical mast with the swing system for umbilical connectors

� the host structure for the pallet in the bunker, with its removable floors

� the pallet and its transfer prime mover (top pallet and bottom pallet)

� the pallet spacer fitted with a docking device

� the container erection swivels, the anti-swing device for stage hoisting (1/2 skirt, AVUM, composite,etc.)

� the anti-self-propelling system

� the modified dolly.

Operations related to the preparation of the upper part also require proper leveling of existing equipment,especially Ariane 4 fairing harnesses.

Page 13: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 13/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5. TECHNICAL DESCRIPTIONLevels indicated in this document are given in IGN altitude: 14 m level corresponds to the current levelof the mobile gantry running area concrete slab.

5.1. Mobile gantry

5.1.1. Work Package 1 (phase I): Structure (main framework, secondaryframework) and Fixed platforms (excluding mobile shutters)

The structure of this assembly is described in documents “VG-ST-211072-C-0008-CNES:Technical Specification - Gantry structures and cladding”, and “VG-ST-21107-C-0018-CNES:Access and Walkways Technical Specifications”.

5.1.1.1. Required services

Services cover at least the following points:

- Detailed studies of the main and secondary framework and of the gantry fixed platforms making itpossible to satisfy all specifications and to supply the corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

- Study of gantry stability under the effect of wind and under the effect of launcher blast at lift-off.- Calculation of lowering of loads, supply of corresponding files, weight budget- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.1.1.2. Scope of supply

In particular the supply comprises:

- The main structure for the frameworks and roofing and assembly components, bracing, stability,pillars, beams, trusses

- Secondary framework for attachment of cladding (stringers), and roofing (purlins) and relatedassembly components.

- Stairways, circulation floors, fixed or removable guard rails, landings and decking- Beams and running tracks (with ground straps) of gantry as well as stops (definition of the track

and calculation of forces to be picked up by the stops, which are the responsibility of the TravelingCrane Work Package)

- The monorail of the external working platform, secured under the roof access walkway.- The lift pylon.

Page 14: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 14/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.1.3. On-site erection services

These services shall include at least:

- Erection of general main and secondary frameworks. Erection shall be on the Cossway, ontemporary supports compatible with the future bogie installation.

- Running tracks and related attachment installations shall be erected by the INFRASTRUCTUREContract Holder, who will carry out reworks on sealing and protection of the Cossway.

- The management of all handling facilities, personnel access and safety required for erection- Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)- The management of energy power supply for all heavy facilities required for erection

5.1.1.4. Works sequencing constraints (Refer to schedule):

With the other Contracts:

Previous services:- Carried out by the INFRASTRUCTURE Contract: installation of gantry running tracks, rework on

sealing and protection of the Cossway

Next services:- Not applicable.

With the other Work Packages of the Mechanical Contract:

Previous services:- Not applicable.

Next services:1. crane erection (Work Package 4: Traveling Crane and Lifting Facilities)2. elevator platform erection (Work Package 8: Elevator Platforms and fixed Platform Shutters)3. cladding erection (Work Package 2: Cladding and Roofing)4. bogie erection (Work Package 7) will take place during the performance of Work Package 1

(Structure and Fixed Platforms).

Page 15: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 15/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.1.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� INFRASTRUCTURE Contract: Position of gantry running tracks on the bunker

Output data to forward to other contracts� INFRASTRUCTURE Contract: position of lift pylon for study and construction of the lift well

Services within the contract:Input data from other work packages- Work Package 4 (Traveling Crane and Lifting Facilities): Lowering of loads from traveling crane

and lifting facilities- Work Package 2 (Cladding and Roofing): Loads relating to cladding and stringer separation

requirements- Work Package 6 (lift): Lift operating loads for pylon sizing

Output data to forward to other work packages- Work Package 7 (Motorization, Bogies and Coiled Cables): Lowering of loads from the gantry

assembly

Study sequencing constraints

1. Crane prior studies2. crane lowering of loads3. Framework prior studies4. gantry lowering of loads5. motorization, bogie study6. calculation of bogie and gantry lowering of loads to the bunker

Page 16: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 16/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.2. Work Package 2 (phase I): Cladding and Roofing

The specifications corresponding to this work package are described in document “VG-ST-211072-C-0008-CNES: Technical Specification Gantry Structures and Cladding”

5.1.2.1. Required services

Services cover at least the following points:

- Detailed studies of roofing and cladding making it possible to satisfy all specifications and tosupply the corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection, sealing- Preparation of operations files (User's Manual, maintenance plan, description of batch of spare

parts)- Supply of an inventory of the supply, with costs

5.1.2.2. Scope of supply

In particular the supply comprises:

- Cladding, related assembly components, and its sealing installation- Roofing, related assembly components, and its sealing installations

5.1.2.3. On-site erection services

These services shall include at least:

- Cladding, roofing and sealing component assembly.- The final expected configuration is closed-covered.

5.1.2.4. Works sequencing constraints (Refer to schedule):

With the other Contracts:

Previous services:

� Not applicable.

Next services:

� Carried out by the Energy, Air-conditioning, Fluids, Low Currents Contracts with regard to themobile gantry.

Page 17: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 17/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

With the other Work Packages of the Mechanical Contract:

Previous services:1. framework erection (Work Package 1: Structure and Fixed Platforms)2. crane erection (Work Package 4: Traveling Crane and Lifting Facilities)3. elevator platform erection (Work Package 8: Elevator Platforms and Mobile Shutters)

Next services:- lift erection (Work Package 6: lift)- rooms and trade works (Work Package 3: Rooms and Trade Works)- launcher doors and traveling crane shutter erection (Work Package 5)

5.1.2.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contractsNot applicable.

Output data to forward to other contractsNot applicable.

Services within the contract:Input data from other work packages- Work Package 1 (Framework): Architectural definition of main and secondary structure- Work Package 1 (Framework): Final position of cladding stringers- Work Package 5 (Launcher Doors and Traveling Crane Shutter): Sealing principle between the

gantry and doors

Output data to forward to other work packages- Work Package 1 (Structure and Fixed Platforms): Spacing requirements for cladding stringers- Work Package 5 (Launcher Doors and Traveling Crane Shutter): definition of cladding at

door/gantry interface

Study sequencing constraints- Framework studies- Cladding and Roofing study

Page 18: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 18/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.3. Work Package 3 (phase I): Rooms and Trade Works

The specifications corresponding to this work package are described in document “VG-ST-211107-C-0018-CNES: Access and Walkways Technical Specifications”

5.1.3.1. Required services

Services cover at least the following points:

- Detailed studies of rooms and trade works making it possible to satisfy all specifications and tosupply the corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

- Provisions for MCT frames- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection, sealing- Preparation of operations files (User's Manual, maintenance plan, description of batch of spare

parts)- Supply of an inventory of the supply, with costs

5.1.3.2. Scope of supply

In particular, the supply consists of:

- Partitions of rooms, technical floors or false ceilings, access doors.- Safety shower, rapid evacuation chute unit (booths fitted with American style doors, chute, cord,

chute protection tubes, evacuation shower)- Recessed wall cabinets for fire hose stations.- The inflatable seal between the gantry and the Cossway, and its control desk.- An interface control bay for the remote control configuration (seal inflation/deflation).

Excluded:

- Cable channels- MCT frames or bushing of partitions or cladding for air-conditioning sheaths, fluid piping, sheaths

or hoses- Fire hose stations (Fluids Contract)

5.1.3.3. On-site erection services

These services shall include at least:

- Erection of rooms, technical floors or false ceilings, access doors.- Erection (drilling of openings, attachment and sealing) of MCT frames for routing of electrical

cables (high and low currents) piping or ventilation sheaths through partitions (for the Fluids,Energy, Air-Conditioning or Low Current contracts)

- Erection of the rapid evacuation chute and related equipment.- The management of all handling facilities, personnel access and safety required for erection.- Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)

Page 19: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 19/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.3.4. Works sequencing constraints (Refer to schedule):

With the other Contracts:

Previous services:

� NOT APPLICABLE.

Next services:

� Erection of installations related to the contracts of other Trades working in the gantry (air-conditioning, energy, fluids, low currents, checkout equipment (BCV))

With the other Work Packages of the Mechanical Contract:

Previous services:- erection of structure and fixed platforms (Work Package 1)- erection of cladding and roofing (Work Package 2)

Next services:- erection of gantry motorization (Work Package 7)

5.1.3.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Not applicable.

Output data to forward to other contracts� Definition of rooms (Energy, Air-conditioning, Fluids, Low Current, Checkout equipment (BCV)

Contracts)

Services within the contract:Input data from other work packages- Work Package 1 (Structure and Fixed Platforms): Architectural definition of main and secondary

structure- Work Package 2 (Cladding and Roofing): Definition of cladding

Output data to forward to other work packages- Work Package 7 (gantry motorization): definition of rooms

Study sequencing constraints1. framework studies2. cladding and roofing study3. trade work study

Page 20: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 20/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.4. Work Package 4: Traveling Crane and Lifting Facilities

The structure of this set is described in document ”VG-ST-2110731-C-0009-CNES: VegaGantry Traveling Crane Technical Specification”.

5.1.4.1. Required services

Services cover at least the following points:

- Detailed studies of traveling crane and lifting facilities making it possible to satisfy all specificationsand to supply the corresponding files,

- Dependability study,- Sizing of components and verification of their resistance to environmental constraints, supply of

corresponding files,- Calculation of lowering of loads, supply of corresponding files, definition of running track,- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.1.4.2. Scope of supply

In particular, the supply consists of:

- The equipped traveling crane with two ATEX push button boxes and five connection boxes.- The anti-swing device for hoisting of the upper composite, comprising two hoists with related

control means, two tensioning force calibration systems for hoist cables, two ground anchoringplates, the hook guide structure.

- Supply of crane position information to the door work package for management of prohibitedmovement between the crane and the upper door-shutter.

- Management of upper door and shutter position information for crane translation movementauthorization.

- Outside supply: crane running tracks

Page 21: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 21/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.4.3. On-site erection services

These services shall include at least:

- Erection of the crane assembly. Erection shall be on the Cossway on the main structure of thegantry.

- Running tracks and related attachment systems shall have been installed by the Structure WorkPackage contractor.

- All handling facilities and personnel access and safety required for erection- Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)- Energy supply for all heavy facilities required for erection included.- Regulatory tests

5.1.4.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:

� Not applicable.

Next services:

� Carried out by the Energy contract: Crane electrical power supply

With the other Work Packages of the Mechanical Contract:

Previous services:1. framework erection (Work Package 1 structure)2. crane running track erection (Work Package 1 structure)

Next services:1. elevator platform erection (Work Package 8: elevator platforms and mobile shutters)2. erection of Cladding and Roofing (Work Package 2)

5.1.4.5. StudiesPerformance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Not applicable.

Output data to forward to other contracts� Electrical characteristics of the system to the Energy contract

Page 22: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 22/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

Services within the contract:Input data from other work packages- Work Package 1 (structure): Definition of the main structure of the mobile gantry

Output data to forward to other work packages- Work Package 1 (structure): Lowering of loads from traveling crane- Work Package 5 (Launcher Doors and Traveling Crane Shutter): Crane anti-collision

management method with components of this Work Package 5

Study sequencing constraints- crane studies (Work Package 4)- crane lowering of loads- framework studies (Work Package 1)

Page 23: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 23/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.5. Work Package 5: Launcher Doors and Traveling Crane Shutter

The structure of this assembly is described in document ”VG-ST-211072-C-0008-CNES:Technical Specification Gantry structures and cladding”.

5.1.5.1. Required services

Services cover at least the following points:

- Detailed studies of the launcher door and crane shutter assembly making it possible to satisfy allspecifications and to supply the corresponding files,

- Dependability study,- Sizing of components and verification of their resistance to environmental constraints, supply of

corresponding files,- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.1.5.2. Scope of supply

In particular, the supply consists of:

- The 4 launcher doors, with two leaves and control desk and power supply/control cables fromenergy supply point delivered by the Energy Work Package.

- Electric cylinders and door sensors- Inflatable seals with the inflation/deflation fluid equipment- The traveling crane shutter, with control desk and power supply/control cables from the energy

supply point, made available by the Energy Work Package.- Electric cylinders and shutter sensors.- Inflatable seals with the inflation/deflation fluid equipment- Supply of upper door and shutter position information to the work package crane (Work Package

4), for management of prohibited movement between the upper door/shutter and crane.- One door control interface rack for remote controlled mode (opening/closing of doors and

inflation/deflation of seals)- Management of crane position information for upper door and shutter closing/opening movement

authorization.

Page 24: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 24/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.5.3. On-site erection services

These services shall include at least:

- Erection, wiring and air connection (inflatable seals) of the door and shutter assembly.- All personnel access facilities and safety facilities required for erection included- Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)- Doors shall be erected using the traveling crane.- Regulatory tests

5.1.5.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:

� Not applicable.

Next services:

� Carried out by the Energy Contract: power supply of doors and traveling crane shutter

With the other Work Packages of the Mechanical Contract:

Previous services:- framework erection (Work Package 1: structure)- crane erection (Work Package 4: crane)- elevator platform erection (Work Package 8: elevator platforms and mobile shutters)

Next services:

� NOT APPLICABLE.

5.1.5.5. StudiesPerformance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Not applicable.

Output data to forward to other contracts� Electrical characteristics of the system to the Energy contract

Page 25: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 25/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

Services within the contract:Input data from other work packages- Work Package 1 (structure): Definition of mobile gantry main and secondary structure- Work Package 2 (roofing and cladding): Interfaces of the main gantry structure with the cladding

Output data to forward to other work packages- Work Package 4 (traveling crane): Definition of the delivery interfaces of open traveling crane

shutter and door reports

Study sequencing constraintsSequencing constraints1. framework studies (Work Package 1)2. cladding studies (Work Package 2)3. door studies (Work Package 5)

Page 26: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 26/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.6. Work Package 6: Lift

The structure of this assembly is described in document ”VG-ST-21107-C-0018-CNES: Accessand Walkways Technical Specification”.

5.1.6.1. Required services

Services cover at least the following points:

- Detailed studies of the lift assembly making it possible to satisfy all specifications and to supplythe corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.1.6.2. Scope of supply

In particular, the supply consists of:

- Supply of the lift assembly and associated doors.- Associated safety systems.

5.1.6.3. On-site erection services

These services shall include at least:

- Erection of the lift assembly.- All personnel access facilities and safety facilities required for erection included- Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)- Regulatory tests

5.1.6.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:Not applicable.

Page 27: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 27/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

Next services:

� Carried out by the Energy Contract: lift electric power supply

With the other Work Packages of the Mechanical Contract:

Previous services:- framework erection (Work Package 1: structure)- cladding erection (Work Package 2)- trade work erection (Work Package 3)- lift erection (Work Package 6)

Next services:

� Not applicable.

5.1.6.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� INFRASTRUCTURE Contract: definition of the lift well

Output data to forward to other contracts� Electrical characteristics of the system to the Energy contract

Services within the contract:Input data from other work packages- Work Package 1 (structure): Definition of the mobile gantry main structure- Work Package 3 (trade work): Definition of trade work interfaced with the lift

Output data to forward to other work packages- Work Package 1 (structure): Definition of forces interfaced with the pylon

Study sequencing constraints1. framework studies (Work Package 1)2. trade work studies (Work Package 3)3. lift studies (Work Package 6)

Page 28: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 28/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.7. Work Package 7: Motorization, Bogies and Coiled Cables

The structure of this assembly is described in document ”VG-ST-211071-C-0017-CNES:Gantry Translation Technical Specification”.

5.1.7.1. Required services

Services cover at least the following points:

� Detailed studies of the gantry translation system assembly (motorization and bogies) making itpossible to satisfy all specifications and to supply the corresponding files,

� Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

� Detailed definition, preparation of the manufacturing drawing set,� Material procurement and associated certificates,� Manufacturing, anti-corrosion treatment,� Dimensional checks and associated certificates,� Trial erection, if necessary, according to complexity,� Packaging and transport, with description of packing list,� Preparation of erection procedures� On-site erection� Geometrical checks� Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)� Supply of an inventory of the supply, with costs

5.1.7.2. Scope of supply

In particular, the supply consists of:

� Bogies and related components for attachment to the gantry structure.� Translation motorization and connection to bogies and to control station and to energy supply

source� Local control station.� Control interface rack for remote control configuration� For the gantry link: the coiled cables with its channel and attachment beams

Excluded from the supply:� running tracks (supplied by the INFRASTRUCTURE Contract)� stops (supplied by the INFRASTRUCTURE Contract)

5.1.7.3. On-site erection services

These services shall include at least:

� Bogie erection and assembly with the main gantry structure.� Installation of motorization, control desk and control interface rack� Connections� Erection of channel supports, channels and coiled cables� All personnel access facilities and safety facilities required for erection included� Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)� Regulatory tests

Page 29: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 29/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.7.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:Carried out by the INFRASTRUCTURE Contract: erection of running tracks

Next services:Carried out by the Energy contract: electric power supply of the motorization unit

With the other Work Packages of the Mechanical Contract:

Previous services for erection of the motorization unit:1. Work Package 1 (structure): framework erection2. Work Package 2 (Cladding and Roofing): cladding erection3. Work Package 3 (Rooms and Trade Works): room erection

Next services:

� Bogie erection will take place during the framework erection phase (Work Package 1).

5.1.7.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� INFRASTRUCTURE Contract: position of running tracks on the bunker� Mass and centering budget of equipment from the different work packages (air-conditioning,

energy, fluids, low current, checkout equipment (BCV), on-board equipment)

Output data to forward to other contracts� To the INFRASTRUCTURE Contract: definition of lowering of loads of the gantry assembly� To the Energy contract: electrical characteristics of the gantry motorization system

Services within the contract:Input data from other work packagesWork Package 1 (Structure and Fixed Platforms): Definition of the mobile gantry main structure andlowering of loads from the gantry assembly

Output data to forward to other work packagesNot applicable.

Study sequencing constraints1. framework studies (Work Package 1)2. bogie and gantry motorization studies (Work Package 7)

Page 30: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 30/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.8. Work Package 8: Elevator Platforms and Platform Shutters

The structure of this assembly is described in document ”VG-ST-21107-C-00018-CNES:Access and Walkways Technical Specification”.

5.1.8.1. Required services

Services cover at least the following points:

- Detailed studies of the two gantry elevator platforms and of the platform shutters for levels 18400,21200, 24000 making it possible to satisfy all specifications and to supply the corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

- Detailed definition, preparation of the manufacturing drawing set,- Definition and studies of the motorization of elevator platforms and platform shutters- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.1.8.2. Scope of supply

In particular, the supply consists of:

- Elevator platforms, related motorization, instruments, coiled power supply and control cables,control desks, guidance tracks.

- Elevator platform guard rails, rack shutters- Platform shutters of levels 18400, 21200, 24000 equipped with guard rails, motorization of

shutters and related control desk.- Plenum structure to mark out the suction zone under the AVUM refueling hose connection points

5.1.8.3. On-site erection services

These services shall include at least:

- Erection of guidance tracks on the main gantry structure.- Erection of elevator platforms- Erection of the plenum structure- Erection of platform shutters for levels 18400, 21200, 24000- Electrical connections (power and control)- The management of all handling facilities, personnel access and safety required.- Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)- Energy supply for all heavy facilities required for erection included

Page 31: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 31/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.8.4. Works sequencing constraints (Refer to schedule):

With the other Contracts:

Previous services:

� Not applicable.

Next services:

� Carried out by the Energy Contract: power supply of the motorization unit

With the other Work Packages of the Mechanical Contract:

Previous services:1. framework erection (Work Package 1: Structure and Fixed Platforms)2. crane erection (Work Package 4: traveling crane)

Next services:1. erection of launcher doors (Work Package 5: Launcher Doors and Traveling Crane Shutter)

5.1.8.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Not applicable.

Output data to forward to other contracts- To the Energy contract: System electrical characteristics

Services within the contract:Input data from other work packages- Work Package 1 (Structure and Fixed Platforms): Definition of the gantry main structure- Work Package 1 (Structure and Fixed Platforms): Definition of fixed floors of levels 18400, 21200,

24000

Output data to forward to other work packages- Work Package 1 (Structure and Fixed Platforms): Forces at the interface with the gantry structure

Study sequencing constraints

� Crane prior studies (Work Package 4)� Crane lowering of loads� Elevator platform prior studies (Work Package 8)� Elevator platform lowering of loads� Framework studies (Work Package 1)

Page 32: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 32/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.9. Work Package 9: Adaptation of Upper Composite Tooling(phase II)

The equipment corresponding to this Work Package shall make it possible to meet the accessrequirements listed in the interface specification.

In particular, equipment corresponds to:

- for the operations on the composite, the four access scaffolding installations to the Ariane 4composite to be modified to adapt it to the dimensions of the Vega launcher fairing.

5.1.9.1. Required services

Services cover at least the following points:

- Detailed studies of modifications to make to the four existing scaffolding installations- Sizing of components and verification of their resistance to environmental constraints, supply of

corresponding files,- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection, adaptation of existing structures- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.1.9.2. Scope of supply

In particular, the supply consists of:

- Complementary components constituting the adaptations needed for existing scaffoldinginstallations

5.1.9.3. On-site erection services

These services shall include at least:

- Erection of complementary components on existing scaffolding installations- The management of all handling facilities, personnel access and safety required for the

modification works and for erection.

Page 33: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 33/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.1.9.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:

� Not applicable.

Next services:

� Not applicable.

With the other Work Packages of the Mechanical Contract:

Previous services:

� Not applicable.

Next services:

� Not applicable.

5.1.9.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Formulation of requirements in terms of access to the fairing (on-board data)

Output data to forward to other contracts� Not applicable.

Services within the contract:Input data from other work packages� Not applicable.

Output data to forward to other work packages� Not applicable.

Study sequencing constraints

� Not applicable.

Page 34: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 34/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.2. Umbilical mast

5.2.1. Work Package 10: Structure and doors (phase II)

The structure of this assembly is described in document ”VG-ST-212074-C-0010-CNES:Technical Specification Umbilical Mast”.

5.2.1.1. Required services

Services cover at least the following points:

- Detailed studies of the mast with its anchoring systems making it possible to satisfy allspecifications and to supply the corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

- Calculation of lowering of loads, supply of corresponding files,- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.2.1.2. Scope of supply

In particular, the supply consists of:

- The metal structure of the mast, the mast anchoring systems in the bunker, the sealed doors, theinternal floors, the metal ladders, the door for connection on the rear side of fluid networksbetween the mast and the gantry.

- The supports for electric racks and associated dampers- The stainless steel tube at the front side of the top part of the mast (length 3 m, diameter 1 inch)

5.2.1.3. On-site erection services

These services shall include at least:

- Attachment of anchoring points in the concrete.- Erection of the equipped mast.- The management of all handling facilities, personnel access and safety required for erection- Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)- Energy supply for all heavy facilities required for erection included

Page 35: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 35/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.2.1.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:- Carried out by the INFRASTRUCTURE Contract: pick up of sealing and Cossway protection

Next services:- Carried out by the Fluids Contract: erection of AVUM and fairing ventilation circuits- Carried out by the Energy contract: installation of current connectors and lighting circuits found in

the mast- Carried out by the Low Current Contract: erection and wiring of low current equipment in the mast- Carried out by the BCV Contract: erection and wiring of racks

With the other Work Packages of the Mechanical Contract:

Previous services:

� Not applicable.

Next services:

� erection of equipment for Swing Systems (Work Package 11: Swing Systems of UmbilicalConnectors)

5.2.1.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Definition of Civil Engineering Works in the mast attachment zone by the INFRASTRUCTURE

Contract

Output data to forward to other contracts- Lowering of loads of the mast assembly for the INFRASTRUCTURE Contract- Definition of the mast for the Energy, Fluid, Low Current, Checkout equipment (BCV) Contracts.

Services within the contract:Input data from other work packages- Work Package 1 (Structure and Fixed Platforms): definition of the heights of the various gantry

work levels

Output data to forward to other work packages� To Work Package 11 (Swing Systems), definition of the mast

Page 36: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 36/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

Study sequencing constraints1. Work Package 10: mast study2. Work Package 11: swing system study

5.2.1.6. Studies

Input data from other work packages or contracts� Not applicable.

Output data to forward to other work packages or contracts� Not applicable.

Sequencing constraints

� Not applicable.

Page 37: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 37/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.2.2. Work Package 11: Swing Systems of Umbilical Connectors (phase II)

The structure of this assembly is described in document ”VG-ST-212074-C-0010-CNES:Technical Specification Umbilical Mast”.

The supply shall correspond to the equipment defined on the following drawings:- Swing system point drawing (ref: 880 FD 1739 0020): 2 swing system points- Release and counter weight point drawing (ref: 880 FD 1739 0021, 0022, 0023, 0024,

0136): 2 release points- Quilt drawing (ref: 880 FD 1739 0026): 2 quilts- POP box drawing (ref: 880 FD 1739 0117): 1 box

5.2.2.1. Required services

Services cover at least the following points:

� Material procurement and associated certificates� Manufacturing, anti-corrosion treatment,� Dimensional checks and associated certificates,� Trial erection, if necessary, according to complexity,� Packaging and transport, with description of packing list,� Preparation of erection procedures� Erection in plant in the umbilical mast� Geometrical checks� Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)� Supply of an inventory of the supply, with costs

5.2.2.2. Scope of supply

In particular, the supply consists of:

The components required to implement the two umbilical connectors, being:� Two swing system points� Two release points with dollies (2), transfer pulleys (2), guide tubes (2) with check ratchets and

counter weights (2)� A connection box for the POP cables� An MCT frame at the front side of the mast for routing electrical umbilical connector cable� Two umbilical connector reception quilts

Excluded from the supply:� The ventilation sheath

5.2.2.3. On-site erection services

These services shall include at least:

� Erection of the POP box� Erection of release and swing systems.� Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)

Page 38: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 38/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.2.2.4. Works sequencing constraints (Refer to schedule):

With the other Contracts:

Previous services:Not applicable.

Next services:Not applicable.

With the other Work Packages of the Mechanical Contract:

Previous services:1. erection of the mast (Work Package 10: mast)2. erection of the gantry (Work Package 1: structure and Work Package 2: Cladding and Roofing)3. installation of motorization (Work Package 7: Motorization, Bogies and Coiled Cables)The gantry must be in the forward position on the launch zone

Next services:NOT APPLICABLE.

5.2.2.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts- Position of launcher connectors (altitude, angular position)

Output data to forward to other contracts� Not applicable.

Services within the contract:Input data from other work packages� Work Package 10 (Structure and Umbilical Mast Doors): definition of mast geometry

Output data to forward to other work packages� Not applicable.

Study sequencing constraints1. Position of launcher connectors and launcher deflection (launcher data)2. Definition of the position of swing systems and of cable length (Work Package 11: Swing Systems

of Umbilical Connectors)

Page 39: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 39/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.3. Bunker fitting out

5.3.1. Work Package 12: Table Secured to the Bunker (phase I)

The structure of this assembly is described in document ”VG-ST-212073-C-0012-CNES: Tableand Pallet Technical Specification”.

5.3.1.1. Required services

Services cover at least the following points:

- Detailed studies of the pallet host structure in the launch zone making it possible to satisfy allspecifications and to supply the corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

- Calculation of lowering of loads, supply of corresponding files, centering and weight budget- Calculation and supply of the rigidity matrix- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.3.1.2. Scope of supply

In particular, the supply consists of:

� The metal structure of the pallet support in the launch zone making the link with the concretestructure of the launch pad, the beams and the pallet translation running tracks on the launch padand related support structure, and the stops.

� The blanking system of the flame chute hole.� The access facilities around the pallet (removable floor) as well as the facilities required for

installation and withdrawal of facilities.

Page 40: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 40/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.3.1.3. On-site erection services

These services shall include at least:

� Attachment of pallet support structures in the concrete.� Adjustment of pallet bearing point height� Erection of the structure and pallet prime mover translation running beam assembly (running

tracks and stops included), anti-corrosion protection.� Erection of the flame chute hole stopper.� Erection of the removable access floor around the pallet (level 14000)� All handling facilities and personnel access and safety required for erection� Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)� Energy supply for all heavy facilities required for erection included

5.3.1.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:

� Carried out by the INFRASTRUCTURE Contract: sealing pick-up and protection of Cossway andflame chute fitting out

Next services:

� Not applicable.

With the other Work Packages of the Mechanical Contract:

Previous services:

� Not applicable.

Next services:Work Package 15 (Pallet and Prime Mover): erection of Pallet and Prime Mover

5.3.1.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� INFRASTRUCTURE Contract: definition of the concrete interface for attachment of the table, of

the flame chute hole stopper and the pallet prime movertranslation running tracks

Page 41: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 41/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

Output data to forward to other contracts� To the INFRASTRUCTURE Contract: the lowering of loads at the flame chute level and at pallet

prime mover translation track level, definition of interfaces with the INFRASTRUCTURE Contract

Services within the contract:Input data from other work packages� Work Package 15 (Pallet and Prime Mover): Mechanical interface with the pallet and the prime

mover: lowering of loads of the pallet on the table, lowering of loads of the pallet + prime moveron the prime mover running tracks

Output data to forward to other work packages� Work Package 16 (cushion mounted spacer): Height of pallet translation running tracks� Work Package 15 (Pallet and Prime Mover): height of pallet bearing surface

Study sequencing constraints1. definition of the bunker architecture in the table environment (INFRASTRUCTURE Contract)2. Study of the table secured to the bunker (Work Package 12: Table Secured to the Bunker)

Page 42: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 42/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.3.2. Work Package 13: Access Under the Nozzle (phase II)

The structure of this assembly is described in document ”VG-ST-212073-C-0012-CNES: Tableand Pallet Technical Specification”.

5.3.2.1. Required services

Services cover at least the following points:

� Detailed studies of access facilities to the zone under the nozzle making it possible to satisfy allspecifications and to supply the corresponding files,

� Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

� Detailed definition, preparation of the manufacturing drawing set,� Material procurement and associated certificates,� Manufacturing, anti-corrosion treatment,� Dimensional checks and associated certificates,� Trial erection, if necessary, according to complexity,� Packaging and transport, with description of packing list,� Preparation of erection procedures� On-site erection� Geometrical checks� Regulatory tests, where applicable� Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)� Supply of an inventory of the supply, with costs

5.3.2.2. Scope of supply

In particular, the supply consists of:

� The access facilities under the nozzle and pallet zone, as well as the facilities required for theirinstallation and removal.

5.3.2.3. On-site erection services

These services shall include at least:

� Erection of access facilities and their necessary adaptations� All handling facilities and personnel access and safety required for erection� Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)� Energy supply for all heavy facilities required for erection included

Page 43: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 43/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.3.2.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:

� Carried out by the INFRASTRUCTURE Contract: sealing pick-up and protection of Cossway andflame chute fitting out

Next services:

� Not applicable.

With the other Work Packages of the Mechanical Contract:

Previous services:

� Work Package 12 (Table Secured to the Bunker): erection of table and access

Next services:

� Not applicable.

5.3.2.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Access requirements and definition of operations in the zone under the nozzle. (on-board data)

Output data to forward to other contracts� NOT APPLICABLE.

Services within the contract:Input data from other work packages� Work Package 12 (Table Secured to the Bunker): definition of the table system

Output data to forward to other work packages� NOT APPLICABLE.

Study sequencing constraints1. Studies on the Table Secured to the Bunker (Work Package 12)2. Scenario of launcher operations in the zone under the nozzle (launcher)3. Studies of access under the nozzle (Work Package 13)

Page 44: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 44/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.3.3. Work Package 14: Container erection swivels (Phase II)

The purpose of this work package is to supply the metallic parts enabling the erectionoperations of the containers of stages Z23 and Z9 to be carried out.

5.3.3.1. Design constraints

Constraints related to ZLV:

� This equipment is installed specifically for erection operations of containers and shall be removedafter completion. Floor anchoring systems will leave no obstacles at circulation level (level11500).

� This equipment shall be fitted with interfaces enabling handling with the traveling crane, gantrycapacity 40 tons.

External environmental constraints:

� Temperature 19°c to 32°c� Hygrometry from 60% to 100 %� Salty atmosphere� Nominal wind speed 24 m/s, limit 33 m/s

Constraints related to the launcher:

� Containers to erect are of the 40 foot size type:� Length: 12192 mm; Width: 2438 mm, Height: 2591 mm� Maximum weight of a container is 40 tons

Implementation constraints:Equipment shall perform the following functions:� swivel axis for rotation of containers from the horizontal position to the vertical position. Rotation

is carried out with the traveling crane, 40T gantry, attached to the end of the container.� holding of the container vertical once erected� access between the ground and access facilities of the container when the container is vertical.

The two swivel assemblies shall be sized for a force applied to the swivel centerline of 40 tonsvertically and 10 tons horizontally.

The position of container erection swivels shall leave a space between the container and the verticaledge of the bunker, compatible with the stage outlet for the container and container hoisting.

Page 45: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 45/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.3.3.2. Required services

Services cover at least the following points:

� Detailed studies of the erection swivels and the related anchoring installations making it possibleto meet the specifications, supply of corresponding files,

� Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

� Detailed definition, preparation of the manufacturing drawing set,� Material procurement and associated certificates,� Manufacturing, anti-corrosion treatment,� Dimensional checks and associated certificates,� Trial erection, if necessary, according to complexity,� Packaging and transport, with description of packing list,� Preparation of erection procedures� On-site erection� Geometrical checks� Regulatory tests, if necessary� Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)� Supply of an inventory of the supply, with costs

5.3.3.3. Scope of supply

In particular, the supply consists of:

� Erection swivels with their handling facilities, ground attachment components (hardware andanchoring systems)

5.3.3.4. On-site erection services

These services shall include at least:

� Construction of floor anchoring installations, erection and control of the position.� All handling facilities and personnel access and safety required for erection� Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)� Energy supply for all heavy facilities required for erection included

5.3.3.5. Works sequencing constraints (Refer to schedule):

With the other Contracts:

Previous services:

� Carried out by the INFRASTRUCTURE Contract: earthworks of the dolly circulation zone

Next services:

� Not applicable.

Page 46: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 46/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

With the other Work Packages of the Mechanical Contract:

Previous services:

� Not applicable.

Next services:

� Not applicable.

5.3.3.6. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Definition of containers and the geometrical interface between containers and swivels (on-board

data)

Output data to forward to other contracts� Not applicable.

Services within the contract:Input data from other work packages� Not applicable.

Output data to forward to other work packages� Not applicable.

Study sequencing constraints1. Container studies (Launcher contract)2. Erection swivel studies (Work Package 14)

Page 47: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 47/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4. Miscellaneous

5.4.1. Work Package 15: Pallet and Prime Mover (phase I)

The structure of this assembly is described in document ”VG-ST-212073-C-0012-CNES: Tableand Pallet Technical Specification”.

5.4.1.1. Required services

Services cover at least the following points:

- Detailed studies of the pallet and prime mover structure making it possible to satisfy allspecifications and to supply the corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

- Design and supply of the rigidity matrix- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.4.1.2. Scope of supply

In particular, the supply consists of:

- The metal structure of the pallet and its position adjustment installation, the pallet anchoringinstallation on the table

- The pallet translation prime mover and control desk

5.4.1.3. On-site erection services

These services shall include at least:

- Installation of the pallet with its prime mover in the launch zone- Position adjustments on the launch zone. Geometrical checks of the pallet position of the launch

pad.

Page 48: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 48/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.1.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:

� Not applicable.

Next services:

� Not applicable.

With the other Work Packages of the Mechanical Contract:

Previous services:

� Work Package 12 (Table Secured to the Bunker): erection of the table

Next services:

� Not applicable.

5.4.1.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Definition of the interface between the pallet ring and the 0/1 skirt rear frame (Launcher contract)

Output data to forward to other contracts- To the Launcher contract: the rigidity matrix of the pallet anchored to its table bearing points- To the INFRASTRUCTURE Contract: the definition of the lowering of loads of the loaded prime

mover

Services within the contract:Input data from other work packages- Work Package 12 (Table Secured to the Bunker): definition of the mechanical interfaces between

the pallet and the table bearing points and between the prime mover and the bunker table.

Output data to forward to other work packages- Work Package 16 (cushion mounted spacer): definition of the mechanical interface between the

prime mover and the spacer- Work Package 12 (Table Secured to the Bunker): definition of the lowering of loads of the loaded

prime mover as well as the definition of the lowering of loads of the loaded pallet.

Study sequencing constraints

� Not applicable.

Page 49: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 49/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.2. Work Package 16: Cushion Mounted Spacers (phase I)

The structure of this assembly is described in document ”VG-ST-2110732-C-0011-CNES Primemover Interface Plate Technical Specification”.

5.4.2.1. Required services

Services cover at least the following points:

- Detailed studies of the structure, of the installation of cushion mounted spacers making it possibleto satisfy all specifications and to supply the corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files,

- Design and supply of the rigidity matrix,- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.4.2.2. Scope of supply

In particular, the supply consists of:

- The metal structure of the support, the cushion mounted spacers, the pallet prime movertranslation running tracks.

- The air control installation of the air-cushion mounted spacer, the movement device of the spacerfor the docking phase, the connection hose to the 6 bar air network of the launch zone bunker.

5.4.2.3. On-site erection services

These services shall include at least:

- The installation test on the dolly, the operating tests loaded with the prime mover and the pallet.

Page 50: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 50/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.2.4. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:

� Not applicable.

Next services:

� Not applicable.

With the other Work Packages of the Mechanical Contract:

Previous services:

� For tests: the availability of the pallet with its prime mover (Work Package 15)

Next services:

� Not applicable.

5.4.2.5. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts� Not applicable.

Output data to forward to other contracts� Not applicable.

Services within the contract:Input data from other work packages- Work Package 12 (Table Secured to the Bunker): Definition of the height of pallet translation

running tracks on the bunker- Work Package 15 (Pallet and Prime Mover): Definition of the interface between the pallet and

prime mover and the spacer, pallet weight and prime mover.

Output data to forward to other work packagesNOT APPLICABLE.

Study sequencing constraints1. Pallet weight and prime mover2. Spacer studies

Page 51: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 51/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.3. Work Package 17: Anti-self-propelling system (phase II)

The purpose of this work package is the supply of systems making it possible to counter-effectthe self-propelling phenomenon of the various launcher stages.

The anti-self-propelling system comprises two units:

- a component assembly installed on the pallet: 4 blades with their supports

- a component assembly installed in the framework of the gantry roof: IPN beams installedunder roof purlins

The purpose of this equipment is:

- for blades to perforate the skin of P80 in case of untimely lift-off, which should entail itsexplosion

- in the case of IPN beams installed under the roof purlins, constitute a roof obstacle impedingintegral lift-off of stage Z23 or Z9 outside the gantry area.

The operating principle of the blades is as follows:

- During the passive life phase (nominal configuration), the blades are set to idle position,held in position by a safety pin (impeding any unwanted activation).

Virole du propulseur

Axe de rotation

Ensemble support

Goupille de sécurité

Couteau partie active

Jeu réglable

Elingue d’entraînement

Manche

Liaison élingue propulseur

Support assembly

Booster sling linkBooster flange

Driving sling

Safety pin

Rotation axis

Blade active part

Adjustable clearance

Shaft

Page 52: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 52/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

In case of accidental ignition of P80, P80 lift-off activates the blades via the slings linking thestage and the blade. The slings bring the blades in contact with the booster after havingsheared the safety pins.

Liaison élingue propulseur

When the blade enters into contact with the booster structure, it continues to be driven by itsown movement and perforates the structure.

Longueur d’enfoncement

Rupture de l’élingue

The second device is in the roof and consists of IPN 200 beams (100 meters) secured to thepurlins.

Booster sling link

Sling rupture

Depth of indentation

Page 53: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 53/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.3.1. Design constraints

External environmental constraints:

� Temperature 19°c to 32°c� Hygrometry from 60% to 100 %� Salty atmosphere� Nominal wind speed 24 m/s, limit 33 m/s

Constraints related to the launcher:

� The blades may be removed for the P80 installation phases on the pallet and for launching.� The fixed structures, blade supports to the pallet, must be compatible with the launcher release

fairing at 7.2° take-off (half-angle at summit).� The blade device must also be compatible with the PAP growth potential and access required to

the PCE launcher.� The supporting structure of the blades must be sized taking into account a radial horizontal force

of 15 tons per blade. Under this load, movement of the blade rotation axis must be less than 40mm.

Implementation constraints:

� The blade supporting structures must be sized to ensure blade penetration.� During nominal lift-off of the launcher, the supporting structures of blades are subject to the

launcher jets entailing, in particular, a vertical pressure of 8 bar (absolute).

5.4.3.2. Required services

Services cover at least the following points:

- Detailed studies of blades, supports and slings, roof beams making it possible to satisfy allspecifications and to supply the corresponding files,

- Sizing of components and verification of their resistance to environmental constraints, supply ofcorresponding files, sizing of components de fixation

- Determination of stresses at interfaces and supply of the corresponding file- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment,- Dimensional checks and associated certificates,- Trial erection, if necessary, according to complexity,- Packaging and transport, with description of packing list,- Preparation of erection procedures- On-site erection- Geometrical checks- Regulatory tests, if necessary- Preparation of definition files, manufacturing files, inspections and tests, operations files (User's

Manual, maintenance plan, description of batch of spare parts)- Supply of an inventory of the supply, with costs

5.4.3.3. Scope of supply

In particular, the supply consists of:

- 4 equipped blades, 4 supports, 4 slings and 100 m of bridge.- Assembly devices.

Page 54: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 54/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.3.4. On-site erection services

These services shall include at least:

- The construction of systems, erection and control of position.- All handling facilities and personnel access and safety required for erection- Site electrical power supplied to box by the Energy contract (capacity: portable tooling power

supply)- Energy supply for all heavy facilities required for erection included

5.4.3.5. Works sequencing constraints (Refer to schedule)

With the other Contracts:

Previous services:Not applicable.

Next services:Not applicable.

With the other Work Packages of the Mechanical Contract:

Previous services:Work Package 15 (Pallet and Prime Mover): erection of pallet

Next services:Not applicable.

5.4.3.6. Studies

Performance of studies shall be interfaced as follows with other services:

Services outside the contract:Input data from other contracts- Definition of the launcher geometry at bottom part, definition of the thicknesses of launcher skin.

In the blade work zone (launcher data)- Volumes available for installation of blades taking into account potential growth requirements

(PAP) and access constraints (PCE) (launcher data)

Output data to forward to other contracts- At launcher: force level applied by slings when safety pins shear.

Page 55: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 55/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

Services within the contract:Input data from other work packages- Work Package 15 (Pallet and Prime Mover): definition of the pallet

Output data to forward to other work packages- To Work Package 15 (Pallet and Prime Mover): definition of forces at the interface with the pallet

Study sequencing constraints1. P80 studies: definition of the launcher skin (Launcher contract)2. Blade studies (Work Package 17))

5.4.4. Work Package 18: Participation of Industrial Contractor in Integrated andCombined Tests

As final acceptance of systems cannot be granted before performance of integrated andcombined tests, the Industrial Contractor must ensure, following industrial acceptance tests andup to the end of combined tests, a maintenance and design authority service.

Page 56: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 56/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.5. Work Package 19: First Equipment Batch

The Holder of the Ground Infrastructure Mechanical Contract shall provide, for a period of oneyear, the spare parts required for operational maintenance of systems provided, being:

- Traveling crane and lifting facilities

- Launcher doors and traveling crane shutter

- Lift

- Gantry motorization, bogies

- Elevator platforms and platform shutters

- Access under the nozzle

- Pallet and prime mover

- Air-cushion mounted spacer

- Anti-self-propelling system

Page 57: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 57/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.6. Work Package 20: General Ground Infrastructure Mechanical Services

5.4.6.1. Classified installations

Structures of the VEGA Project Ground Segment (and in particular the launch zone) shall be subjectto an operation authorization in compliance with the ICPE regulations.

Each Industrial Contractor with a Ground Segment Contract for the VEGA Project shall comply withthis regulation and provide all necessary documents to produce the operation authorization request(DDAE) following a request from CNES.

5.4.6.2. Scheduling and planning

The Industrial Contractor in charge of the INFRASTRUCTURE Contract shall be responsible for thescheduling and planning of the site works which are the responsibility of the contract holders(Mechanical, Civil Engineering Works Infrastructure, Fluids and Instruments and Ground Checkoutequipment contracts).

Works consist in analyzing the elementary tasks concerning works, determining their sequencing aswell as related critical path by means of charts and in proposing steps targeted at observing worksturnaround time.

5.4.6.3. Coordination

Coordination between the works under the responsibility of contract holders (Mechanical, CivilEngineering Works Infrastructure, Fluids and Instruments and Ground Checkout equipment contracts)shall be performed by the Industrial Contractor in charge of the INFRASTRUCTURE Contract, whetherthese works are carried out by the INFRASTRUCTURE Industrial Contractor himself or by the contractholder of another work package, or by a sub-contractor certified by the Prime Contractor (SDS).

Coordination consists in harmonizing the actions of the various partners in time and space duringworks and managing the inter-company health and safety boards.

All Industrial Contractors shall formally and beforehand inform the INFRASTRUCTURE IndustrialContractor and the Prime Contractor (CNES/SDS) about any works involving other contract holders ofthe project at the date of the works considered.

Coordination between the works under the responsibility of the contract holders and existing systemson ELAs shall be the responsibility of the Prime Contractor CNES (SDS). The contractor shall formallyinform beforehand to the Prime Contractor (SDS) of any work on existing equipment or structures atthe date of the works envisaged.

5.4.6.4. Control

Works control shall be performed by the Prime Contractor (SDS) for all contracts related to the VEGAProject Ground Segment.

Control involves the application as of the beginning of works and until all outstanding work has beenreleased, within the time frame set down in the works contracts, the various organizational stepsdecided upon as part of scheduling and coordination.

Page 58: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 58/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.6.5. Documentation

Documentation management carried out in compliance with the management specification of theproject INFRASTRUCTURE contract (VG-SM-211-0004-CNES) requires in particular the constitutionand presentation of industrial files at five development steps:- Industrial Preliminary Design review (RDPI)- Industrial Critical Design Review (RCDI)- Technical report before phase 0 tests- Technical report before phase 1 tests- Final Test Review Board [C.R.E.] (final file supplied in 5 copies).

Note: Key Points, RDPI and RCDI shall be organized at the Industrial Contractors' expenses.

5.4.6.6. Summary of Execution Studies

The summary of execution studies for all contracts shall be provided by:- The MECHANICAL Contract for all works concerning the gantry, the mast and the launch table- The INFRASTRUCTURE Contract for all works, excluding the gantry, the mast and the launch

table, i.e. the bunker, the flame chutes, roadworks and miscellaneous networks, VEGA offices andVEGA operations room of CDL3.

These Industrial Contractors shall each chair a summary cell in which the Prime Contractor (SDS)shall participate. In particular, these Industrial Contractors shall ensure that a works summary iscarried out for:

- All provisions in works (position, dimensions, quantity, etc.)

- Laying and routing of all networks in works (cross-overs, relative positions, etc.)

- Terminal equipment (positions, dimensions, etc.).

The documents drafted following the summary committee meeting shall be forwarded to SDS forapproval.

- All Industrial Contractors of the VEGA Project shall provide their plans and working drawings tothe Industrial Contractor in charge of the summary committee.

- The Industrial Contractor in charge of the summary shall specify the format of documents to beprovided (IT installation and hard copy) as well as the number of copies (at least 3 hard copiesand one computer copy).

5.4.6.7. Cleaning

The Industrial Contractor for Civil Engineering Works shall be responsible for cleaning as necessaryduring works of all project structures: bunker, VEGA offices, VEGA operations room at CDL3(excluding the gantry) and the nearby environment of sites so as to maintain them in a good state ofcleanliness.

For final acceptance of works, the Industrial Contractor shall fully clean all works and surroundingareas with regard to Civil Engineering Works.

Page 59: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 59/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.6.8. Earthquake regulations

Sizing of buildings and equipment shall take into account the horizontal response spectrum on theKourou site for V and V-VI (SMS) intensities: SPECTRE RG1-60 (5%) set at 0.05 g (S2).

5.4.6.9. SPS Coordination

The contract holder of this contract shall comply with all requirements:- in the General Coordination Plan (PGC), prepared by the SPS Coordinator accredited by the

Sponsor- of the CNES Site Regulations.These documents are appended to the call for tenders.

5.4.6.10. Work site installations

Work site installations shall comply with the requirements of the PGC and of the Site Regulations.

Work interfacing with other buildings of ELAs for connection of installations (air-conditioning, energy,telephone, miscellaneous network cut-off, etc.) shall be planned with SDS and work site operators.

A site box and tapping, a water tapping and regulatory installations for work sites shall be part of theservices due by the Civil Engineering Works contract holder. These services shall be defined withSDS and the SPS Coordinator in compliance with the PGC recommendations.

The proposal shall include a provisional plan for work site installations. The cost for such installationsshall be indicated in the proposal.

5.4.6.11. Schedule

The proposal shall include a detailed schedule of works per trade as well as a study schedule. Theschedule shall be in full compliance with the key dates of the general schedule of the operation.

Page 60: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 60/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.6.12. Site Exploration

As part of works consisting of rehabilitating existing structures, Industrial Contractors arebound to carry out a technical visit to sites to record and obtain all information needed for theirestimate and to determine services to provide.In particular, Industrial Contractors will be aware of:- the exact condition of structures,- site access constraints for all contractors carrying out Civil Engineering Works in the ELA

complex,- safety constraints,- constraints related to the Guyanese environment.

Page 61: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 61/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

5.4.7. Work Package 21: Dolly Interface

The scope of this Work Package comprises the modification of the dolly required to make itcompatible with the transport of P80 (spacer, prime mover and pallet).

This modification consists in setting up four anchoring points (4) on the dolly, making it possibleto rigidly tie the pallet to the dolly by means of 4 galvanized turnbuckles, 24’’ long, 2’’ indiameter.

These anchoring points shall be removable.

5.4.7.1. Required services

Services cover at least the following points:- Detailed studies of anchoring fittings,- Detailed definition, preparation of the manufacturing drawing set,- Material procurement and associated certificates,- Manufacturing, anti-corrosion treatment- Dimensional checks and associated certificates- Packaging and transport, with description of packing list- On-site erection.- Preparation of definition files, manufacturing files, controls.- Supply of an inventory of the supply, with costs.

5.4.7.2. Scope of supplies

In particular, the supply consists of:- The 4 attachment yokes of side of turnbuckles with their related attachment components.

5.4.7.3. On-site erection services

These services shall include at least:- Installation of these yokes on the dolly

5.4.7.4. Sequencing constraints

No constraints.

5.4.7.5. Studies

Performance of studies shall be interfaced as follows with other services:

Input data from other contracts- Maximum declared level of the loaded dolly to support (on-board data)

Output data to forward to other contracts- NOT APPLICABLE.

Page 62: CENTRE NATIONAL D'ETUDES SPATIALES VG-CT-211 …emits.sso.esa.int/emits-doc/ESRIN/AO4412En-E-OITF... · CENTRE NATIONAL D'ETUDES SPATIALES Sous-Direction Développements Sol 18, Avenue

E_OITF0005103_20A_CCTP.doc SDS validated version Printed on 16 / 04 / 03

CENTRE NATIONAL D'ETUDES SPATIALES

Ddocument title: SPECIAL TECHNICAL CONDITIONS OF CONTRACT

GROUND MECHANICAL INFRASTRUCTURES

Sous-direction Développements Sol (SDS)

VG-CT-211-C-0001-CNES

Page: 62/62 Iss.: 2 Rev.: 0 Date: :03/04/2003

Services within the contract:Input data from other work packages- Work Package 15 (Pallet and Prime Mover) and Work Package 16 (pallet spacer): position of

pallet anchoring points during transport.

Output data to forward to other work packages- NOT APPLICABLE.

Study sequencing constraints1. Pallet, prime mover and spacer studies (Work Packages 15 and 16)2. Anchoring study on the dolly (Work Package 21).

6. APPENDICES