Fax & Speed post ~~ government of I ncfia ~~~ Central Electricity Authority m-:qlf~~~ Western Regional Power Committee Q;tl) -3, lJ;f~~, Jtmt (¥), ~ - 400093 F-3, MIDC Area, Andheri (East), Mumbai - 400 093 ~ Phone: 022-2835 3222, 2820 01 94/95/96 Website: www.wrpc.gov.in ~ I:«fJ~ I:«f -m g 9001- 2008 IS/ISO: 9001- 2008 tcR:r Fax: 022-2837 0193 E-mail: [email protected] No. WRPCIComml-I/6/AllocI20161 140 To, Date: 15.01.2016 General Manager, WRLDC, POSOCO, Andheri (East), Mumbai. Subject: Readiness of SER (Jharkhand) for scheduling lOOMW from RGPPL-reg. Sir, In continuation to this office allocation letter No. WRPCIComml-I/6/Alloc1201511608 dated 30.12.2015, please find enclosed herewith letter received from Railway Energy Management Company Ltd., bearing no, REMCLlCOIPPIRGPPLl2015-16 dated 15.01.2016(copy enclosed), requesting allocation to SER (Jharkhand) for scheduling 100MW power from E-Bid RLNG capacity of RGPPL (in addition to 370MW power for CR (Maharashtra) and WR (Gujarat) for which scheduling has already been commenced. Accordingly revised allocation sheet is also enclosed. It is therefore requested to implement the allocation from OO:OOhrsof 17.01.2016 for E-Bid RLNG capacity of 470MW (i.e 300MW for CR (Maharashtra), 70MW for WR (Gujarat) and 100MW for SER (Jharkhand) as indicated under 5.0 of Railway Energy Management Company Ltd. Letter dated 15.01.2016 subject to receipt ofNOC from SLDC Jharkhand. YO~~', (S.D.Taksande) Member Secretary Encl. :As above. Copy to: 1. Joint General Manager, REMCL, SCOPE 2. Managing Director, RGPPL, New Delhi 3. Dy.Chief Electrical Engineer(TRD),WR,Mumbai. 4. Chief Engineer (PP). MSEDCL, Mumbai 5. Chief Engineer (STU). MSETCL, Mumbai

Central Electricity Authority -m m-:qlf~~~ Western ...wrpc.gov.in/htm/Share Allocation/share_allocation_rgpplRailway470MW.pdf-2 - for the above states. However, there are certain issues

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Central Electricity Authority -m m-:qlf~~~ Western ...wrpc.gov.in/htm/Share Allocation/share_allocation_rgpplRailway470MW.pdf-2 - for the above states. However, there are certain issues

Fax & Speed post

~~government of Incfia~~~

Central Electricity Authoritym-:qlf~~~

Western Regional Power CommitteeQ;tl) -3, lJ;f~~, Jtmt (¥), ~ - 400093

F-3, MIDC Area, Andheri (East), Mumbai - 400 093~ Phone: 022-2835 3222, 2820 01 94/95/96Website: www.wrpc.gov.in

~ I:«fJ~ I:«f -m g 9001-2008

IS/ISO: 9001-2008

tcR:r Fax: 022-2837 0193E-mail: [email protected]

No. WRPCIComml-I/6/AllocI20161 140To,

Date: 15.01.2016

General Manager,

WRLDC, POSOCO,

Andheri (East), Mumbai.

Subject: Readiness of SER (Jharkhand) for scheduling lOOMW from RGPPL-reg.

Sir,

In continuation to this office allocation letter No. WRPCIComml-I/6/Alloc1201511608 dated

30.12.2015, please find enclosed herewith letter received from Railway Energy Management Company Ltd.,

bearing no, REMCLlCOIPPIRGPPLl2015-16 dated 15.01.2016(copy enclosed), requesting allocation to

SER (Jharkhand) for scheduling 100MW power from E-Bid RLNG capacity of RGPPL (in addition to

370MW power for CR (Maharashtra) and WR (Gujarat) for which scheduling has already been commenced.

Accordingly revised allocation sheet is also enclosed.

It is therefore requested to implement the allocation from OO:OOhrsof 17.01.2016 for E-Bid RLNG

capacity of 470MW (i.e 300MW for CR (Maharashtra), 70MW for WR (Gujarat) and 100MW for SER

(Jharkhand) as indicated under 5.0 of Railway Energy Management Company Ltd. Letter dated 15.01.2016

subject to receipt ofNOC from SLDC Jharkhand.

YO~~',

(S.D.Taksande)

Member Secretary

Encl. :As above.

Copy to:

1. Joint General Manager, REMCL, SCOPE

2. Managing Director, RGPPL, New Delhi

3. Dy.Chief Electrical Engineer(TRD),WR,Mumbai.

4. Chief Engineer (PP). MSEDCL, Mumbai

5. Chief Engineer (STU). MSETCL, Mumbai

Page 2: Central Electricity Authority -m m-:qlf~~~ Western ...wrpc.gov.in/htm/Share Allocation/share_allocation_rgpplRailway470MW.pdf-2 - for the above states. However, there are certain issues

7. Executive Engineer, Eelctricity Deptt, DO, Daman

8. Secretary (Power), UT of DO & DNH, Daman

9. Executive Engineer, Eelctricity Deptt, DNH, Silvassa

10. Chief Electrical Engineer, Elect. Dept., Panjim, Goa

11. DGM (Comml), RGPPL, 5th Floor, Samruddhi Venture Park, MIDC, Andheri (E), Mumbai-93

12. Chief Engineer (GM),CEA, New Delhi

13. CE SLDC,Jabalpur,Madhya Pradesh.

14. CE SLDC,Gotri,Gujarat

15. CE SLDC,Jharkhand.

16. MS,ERPC,Kolkata.

17. GM,ERLDC,Kolkata

Page 3: Central Electricity Authority -m m-:qlf~~~ Western ...wrpc.gov.in/htm/Share Allocation/share_allocation_rgpplRailway470MW.pdf-2 - for the above states. However, there are certain issues

Percentage shares of RGPPL for 470 MW share of Indian Railways from Maharashtra

E-BID RLNG Other Than E-BID RLNGt er t an -

RLNG %wrt BID RLNG % wrt Other thanInstalled capacity in Installed % wrt E-Bid capacity in % wrt Installed E-Bid ShareCapacity MW capacity Share capacity MW capacity capacity

Maharshtra 0 0.00 1398.73 71.11 93.43Indian Railways** 23.89 100.00 0 0.00 0.00DD 0 0.00 39.34 2.00 2.63DNH 0 0.00 39.34 2.00 2.63Goa 0 0.00 19.67 1.00 1.31RGPPL Total(MW) 1967.08 1497.08RGPPL Total(% Share) 100.00

**The Distribution of 470MW power from RGPPL to Indian Railways is further distributed to following Nodal Railways statewise :

E-BID RLNGE-BIDRLNG %wrt

Installed capacity in Installed % wrt E-BidNodal Railway/State Capacity MW capacity Share capacity

CR (Maharashtra) 300 15.25 63.83WR (Gujarat) 70 3.56 14.89

SER (Jharkhand) 100 5.08 21.28

RGPPL Total(MW) 1967.08Total 470.00 23.89 100.00

Page 4: Central Electricity Authority -m m-:qlf~~~ Western ...wrpc.gov.in/htm/Share Allocation/share_allocation_rgpplRailway470MW.pdf-2 - for the above states. However, there are certain issues

REMCLRAlLWA. y ENEI~GYrvlAN'AG}:1\1.ENT COMPANY LIl\111'ED

(A Jcint venture of Indian Railways and RITES Limited)QIN(U930.(LQQLZQ.1 ~QQI2!206§lJ

Ref: I~EMCL/CO / PP / RGPPL/20 15-16Dt.: 15.01.2016

Member Secretary,Western Regional Power Committee,F -3, MIDC. Marol,Opp, SEEPZ , Central Road,Andheri (East),MumbaiAOO 093.

Sub: Flow' of Power from F~(}PPL·to Railways allocated by MOP

Ref: LMinistry of Power Letter No. 4/22/201 O-Th-l (Vol I) dated 01.06.2015.2. Ministry of Power Letter No. 4/22/2010-Thl (Vol-I) dated 23.12.20153. WRPC Letter No. WRPC/Cornrnl-I/6/Altoc/2015/ 1608 rx. 30.12.154. REMCL's Letter No. REMCL/COIPP/I~GPPL/2015-16 Dt. 07.01.2016

1.0 Ministry of Power vide reference (1) above had allocated 500 MW ofpower in Ratnagiri CCPP of I~GPPL to Indian Railways on temporarybasis under the PSDF support scheme up to March, 2017. Ministry ofPower vide reference (2) above allocated additional 120MW capacityfrom RGPPL to Indian Railways.

2.0 \VRPC vide reference (3) above had Further distributed the 620 M\Vpower from l~GPPL to Indian Railways to following Nodal Railways:

Pradesh)(Jharkhand)

48.39

Nodal Railway r State Installed °/r,wrt o/z) wrtcapacity Installed 8-Bid

Sharecapacity

1967.0831.52 100.00

3.0 CH [Maharashtra] has already commenced scheduling from 26th

November, 2015 and WR (Cujarat] has also commenced schedulingfrom 9th January 2016. NOC for open accfss has already been issued

~iiF{;~

Page 5: Central Electricity Authority -m m-:qlf~~~ Western ...wrpc.gov.in/htm/Share Allocation/share_allocation_rgpplRailway470MW.pdf-2 - for the above states. However, there are certain issues

-2 -

for the above states. However, there are certain issues in the state ofMadhya Pradesh which are being sorted out.

4.0 As the nO\V of power from RGPPL in the state of Madhya Pradesh maytake some time, the power How in .Jharkhand may start immediately.

5.0 Since the total requirement for Maharashtra, Gujarat & .Iharkhand IS

470 MW, the power distribution may be proportionately carried out forthe Declared Capacity (DC) given byRGPPL as follows:

Railway j State Installedcapacity

E-RLNGCapa ityinMW

WR [Gujarat] 7015.25 63.823.56

Oft) wrtE-BidRLNG

capacitycapacity

CR liVla.lidl 300 MW14.89

SE~R(-Jharkhand) lOOM\V 5.08 21.27RGPPL Total

Action taken in this regards may kindly be communicated to this office.

, ~,J~5F).:lO\~(s0;1fJ,~/.Joint General Manager

Copy to: 1. GM/WRLDC, Murnbai2. GMI ERLDC, Kolkatta3. EDjEEM, Railway Board.4. Chief Engineer (GM), CEA, New Delhi.5. CEDEjWR6. CEDEjCR7. CEDEjSER8. CEDEjWCR9. MD/RGPPL

Page 6: Central Electricity Authority -m m-:qlf~~~ Western ...wrpc.gov.in/htm/Share Allocation/share_allocation_rgpplRailway470MW.pdf-2 - for the above states. However, there are certain issues

~tJiUAsANellARAN..MGAM··LTn •.~Stl{te;LQ.Rd»i$p:~t¢h;Cenb:~;BJll~Jd

PJll)i!~:~,O~Sl,.•~tl9:O·Q~Q,'~~f~~Sl,.,24jq4~~,:.}I}m~U~;,~liJ:[email protected]

OUT\GOIN$ MESSA16E,(~):eEItA'tlQ~"Dated J3iOll~Q16.·Time14:2.(JHrs;

J. O'; •••••••••••••• -".'!'.'!''!' .••••..,•. ~~.-~ .•• l'oJ" •

.~.

To,

,Repeat{I;)~••.,...•.•,.•••..,.•....:» ••.• ,~ ••..•••.•.• ww•.·•.,·",·.h •• U ••.•·,

(2).~ "•..•.,.,..', "....•..••....;: ".'''Yi..,Ui i',~*-.~

FUJl ~ha,re):<lt:,Cen,U'~,Se§t(;lt ;a1lflO.l;l~o:n 'to .J.·S.E.B.as: per··en:titlement from 'blocK' (Xl to9.e on ..date;d 1-61Dl[2(J16 may .ple~sehe allocated andSqAed:qiing,f)J' R0J?PL IS"CJS power to JtlSNL(.·'O.\,.;;;!lW··-'a' v.)'; as ·r····e"n;''''e''s' .!I\A·t:J·'b·· 'Y'~ is·''' "O';'U"" ·t·h··":fi1'a"ste..·.'m·;.... R'.' :~l!:i'.,,'l·"d'·· wh .,.. ·h· ·1'··~~" ""~'. "..i;' '. ',,"'1"'" '.- "L'IOoU,; ,.,,' .,', .". ,"'JJ~, .... "" '. ,·i::t.U-vva.¥ .'" Ie . ..8

attached herewith.

/\

~"" ....,..".•..•..~

. i~t·oI11.b,,~ ',' .

B.ie,Jt.ctS'LO'C/l~"anehi

Page 7: Central Electricity Authority -m m-:qlf~~~ Western ...wrpc.gov.in/htm/Share Allocation/share_allocation_rgpplRailway470MW.pdf-2 - for the above states. However, there are certain issues

FORMAT-LTA-3

'~NoObjection Certificate ,of "JUSNL"

I. Name of the STU issuing NOC JUSNL

«Format in which NOC is to be-given by STtfto.-jntnr-state Entityfor submission.toC'I'U>

NOC No.~3 Dated. s:- '111.-) \'~

2. Region Eastern

3. Name of tile Entity Indian Railway

4. Status of Entity (e.g; State Utility/CP.P/IPPIDisCQl)1 ete.) '. State Utility

5. Point(s) of Connection As per list attached.

6. Max; MW ceiling. allowed-for Injection * 106 Mw - As per PPA.

7. Max. MW ceiling allowed for Drawal= 100 MW -Asper PPA.

(* STUsmay specify different MW ceilings/or differem; time blocks.dfrequired.y

8. Validity Period : From 05;12.2015 to 31,03;2017 (As per PPA) .

Wbether AppUcable or not (%) losstYeslNO,)

State transmission-losses Yes 5% Present year, but will varyyear to 'year

Distribution Licensees.losses N/A

Any other loses--

L __ '. --

II1-

. 9. Transmission losses (besides.Regional Transrnission losses)

10. Transmission charges {hesides Regl nna I;r,hllrges)

Whethel' Applicable or not Rate(Yes/No) - lRs./MWh)

State transmission charges Yes As per time to time JSERC order

Distribution Licensees charges N/A

Any other charges

Page 8: Central Electricity Authority -m m-:qlf~~~ Western ...wrpc.gov.in/htm/Share Allocation/share_allocation_rgpplRailway470MW.pdf-2 - for the above states. However, there are certain issues

',.

Date of submlssloiSchedule For Date:

15/1/201616/1/2016

To,ESE,5LDC,Ranchi

S.N. Block Quantity (MW)

1 01 (00:00-00:15) 39.612 02 (00:15-00:30) 46.173 03 (00:30-00:45) 48.92

4 04 (00:45-01:00) 48.15

5 05 (01:00-01:15) 51.39

6 06 (01:15-01:30) 47.307 07 (01:30-01:45) 47.13

8 08 (01:45-02:00) 40.78

9 09 (02:00-02:15) 42.4510 10 (02:15-02:30) 40.2111 11 (02:30-02:45) 42.9112 12 (02:45-03:00) 31:77

13 13 (03:00-03:15) 32:6914 14 (03:15-03:30) 35.1715 15 (03:30-03:45) 38.3716 16 (03:45-04:00) 37.1717 17 (04:00-04:15) 40.03-18 18 (04:15-04:30) 3.6.7719 19 (04:30-04:45) 34.8720 20 (04:45-05:00) 38.75

21 21 (05:00-05:15) 38.4422 22 (05:15-05:30) 42.7423 23 (05:30-05:45) 39.6824 24 (05:45-06:00) 36.0925 25 (06:00-06:15) 45.6026 26 (06:15-06:30) 38.8227 27 (06:30-06:45) 43.9728 28 (06:45-07:00) 48.6229 29 (07:00-07:15) 50,2130 30 (07:15-07:30) 49.9731 31 (07:30-07:45) 50.3732 32 (07:45-08:00) 55.0333 33 (08:00-08:15) 45.2034 34 (08:15-08:30) 52.2935 35 (08:30-08:45) 55.8936 35 (08:45-09:00) 62.97

~qct~~ f'~ ~ q;yc:ffi;ro

11,~ :thT Us, Cf»(ii<i>ICII - 700043

Scheduling for.IR_J.H

S.N. Block Quantity (MW) S.N. Block Quantity (MW)

37 37 (09:00-09:15) 57.00 73 73 (18:00-18:15) 31.36

38 38"(09:15-09:30) 62.72 74 74 (18:15-18:30) 37.27

39 39 (09:30-09:45) 53.76 .75 75 (18:,30-18:45) 36.47

40 40 (09:45-10:00) 61:c91 76 75 (18:45-19:00) 42.28

41 41(10:00-10:15) 53.11 77 77 (19:00-19:15) 34.26

42 42 (10:15-10:30) 5~.~9 . 78 713(19:15-19:30) 47.65

43 43 (10:30-10:45) 4~:3·?,1 ( 79' 'ji,r'{J.9:30C19:45) 35.23

44 44 (10:45-11:00) 5~l.3"0 8Q . 80:(19:45-20:00) 49.44

45 45 (11:00-11:15) ,55;-9'(; ~81 ~1.(20:00-20:15) 36.10

46 46-(11:15-11:30) 42.98 ~'.:",82 82.{20:15-20:30) 45.8947 47 (11:30-11:45) 49,95 83 83(20:30-20:45) 40.5948 48 (11:45-12:00) ,1jI"6~,83' ;....,. :,:8;4 s '84 (20:45-2i:oO) 32.08

49 49 (12:00-12:15) ", r46:-98 ;C'" '85 85 (21:00-21:15) 3.0.6950 50 (12:15-12:30) M;84 ~6 86 (21:15-21:30) 39.7151 51 (12:30-12:45). ,1)0:0.0 I:;:· . '87:~ .'87"(21:30-21:45) 31.7652 52 (12:45-13:00) ,. 55;1?2 .• . 88 88 (21:45-22:00) 35.48

53 53(13:00-13:15) ~:~)5~,$1 : .1l9 89 (22:00-22:15) 30.5754 54 (13:15-13:30)' , "'-6Q:i4 I"" " . ~O 90 (22:15-22:30) 31.0455 55 (13:30-13:45) .~c'~51.01;

, 9J. 91 (22:30-22:45) 35.6156 56 (13:4!i-14:00) '0 "I::?J~p3 z,.~ ~ ~;2 92 (22:45-23:00) 38.91'57 57(14:00-14:15) 'C:S.t98 I" 93 513(23:00-23:15) 35.8158 58 (14:15-14:30) .. 56.3J) 1/' ~4 94 (23:15-23:30) 42.1159 59.(14:30-14:45) " 56;8l . ·'B5,. ·95(23:30,23:45) 39.1360 60 (14:45-15:00) ,Sl..icf7 96 96 (23:45-24:00) 37.90

61 61(15:00-15:15) 57.91 ..62 62 (15:15-15:30) 53.'69

63 63 (15:30-15:45) 54:8164 64 (15:45"16:00) 50.7465 65 (16:00-16:15) 45.'8966 66 (16:15-16:30) 43.80

IMax (MW)

I62.97

I67 67 (i.6:30~16:45) 40.15 Min(MW) 30.5768 68(16:45-17:00) 42.0869 69 (17:00-17:15) 39.8370 70(17:15-17:30) ~0.56 \. .-+-::::71 71 (17:30-17:45) 40.1672 72 (17:45-18:00) 48.05 Dy CEE(T~-5)!JR

9002080308

••• ,. ~ ,"<A\I'14l'( (~flio)

~. \. ~, ~,ifi)(i1lfitlil ":'~. ChW Eledrical Engineer (T· ':•..,. '1!

S. e~~. GRC.l(olkatz,-"':;