Click here to load reader
View
65
Download
10
Embed Size (px)
DESCRIPTION
City Development Plan Madhya Pradesh
Citation preview
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 1 of 99
City Development Plan for Barhi Town
TABLE OF CONTENTS
EXECUTIVE SUMMERY………………………………………………………………………………………… …………8
CHAPTER 1: PROJECT INTRODUCTION ............................................................................................ 15 1.1 Project Award and Introduction of Client ........................................................................................................15 1.2 Project Brief, Scope & Objectives .....................................................................................................................16 1.3 Methodology ....................................................................................................................................................16 1.4 Structure of the Report ....................................................................................................................................20
CHAPTER 2: PHYSICAL FEATURES OF THE TOWN ....................................................................... 21
2.1 GENERAL CITY PROFILE ........................................................................................................................................21
2.1.1 Historical Importance ..................... ................................................... ................................................... ............. 21 2.1.2 Katni District Profile .................... ................................................... ................................................... ................ 21 2.1.3 Location and connectivity ................ ................................................... ................................................... .......... 21 2.1.4 Climate & Rainfall ....................... ................................................... ................................................... ................ 21 2.1.5 Topography and Geology .................... ................................................... ................................................... ........ 22 2.1.6 Wind Direction ............................ ................................................... ................................................... ................ 22 2.1.7 Base Map........................................... ................................................... ................................................... .......... 23
CHAPTER 3: DEMOGRAPHIC & SOCIO-ECONOMIC PROFILE ..................................................... 24 3.1 Demography ........................................................................................................................................................24
3.1.1 Population Growth Trend ..................... ................................................... ................................................... ........ 24 3.1.2 Population Projections ...................... ................................................... ................................................... ............ 25 3.1.3 Population Density .......................... ................................................... ................................................... .............. 25 3.1.4 Average household Size ...................... ................................................... ................................................... .......... 26 3.1.5 Other Demographic Indicators.................................................................... ................................................... ..... 26 3.1.6 Issues ...................................... ................................................... ................................................... ....................... 26
3.2: SOCIO ECONOMIC PROFILE .................................................................................................................................26
3.2.1 Sex Ratio ......................................... ................................................... ................................................... .............. 26 3.2.2 Literacy Rate .............................. ................................................... ................................................... ................... 26 3.2.3 Work Participation Ratio (WPR) ................................................................ ................................................... ...... 26 3.2.4 Occupation Structure ....................... ................................................... ................................................... ............ 27 3.2.5 Industries/trade and commerce ................................................................. ................................................... .... 28
CHAPTER 4: PHYSICAL PLANNING AND GROWTH MANAGEMENT ......................................... 30 4.1 Spatial Growth Trends .........................................................................................................................................30 4.2 Spatial Distribution of Population ........................................................................................................................30 4.3 Land use...............................................................................................................................................................30 4.4 Master plan Provision ..........................................................................................................................................31 4.5 Housing ................................................................................................................................................................31 4.6 Housing in Barhi ...................................................................................................................................................31 4.7 Housing demand for the year 2035 ......................................................................................................................32 4.8 Unauthorised colonies/Settlements ....................................................................................................................32 4.9 Future Growth Direction ......................................................................................................................................32
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 2 of 99
City Development Plan for Barhi Town
CHAPTER 5: TOWN INFRASTRUCTURE ............................................................................................ 34
5.1 Water Supply .......................................................................................................................................................34
5.1.1 Quality and Quantity of Water at Source .................................................... ................................................... . 34 5.1.2 Quality and Quantity of Water in distribution System ...................................... ............................................. 35 5.1.3 Water Distribution Arrangement..................... ................................................... ........................................... 35 5.1.4 Internal Distribution Networks .................... ................................................... ............................................... 35 5.1.5 Coverage & Supply ................................. ................................................... ................................................... .. 36 5.1.6 Institutional Set-up .............................. ................................................... ................................................... .... 37 5.1.7 Operation & Maintenance (O&M) ..................... ................................................... ......................................... 37 5.1.8 Present and Future Demand and Supply Gaps ............................................................ .................................. 38 5.1.9 Water Supply Project .............................. ................................................... ................................................... . 38 5.1.10 Comparative Analysis (Service Levels) ................................................................ .......................................... 39 5.1.11 SWOT Analysis ..................................... ................................................... ................................................... ... 39 5.1.12 Key Issues ........................................ ................................................... ................................................... ........ 39 5.1.13 City specific Strategies and Action Plans ............................................................ ........................................... 40
5.2 Sewerage System .............................................................................................................................................41
5.2.1 Existing Sewerage System........................... ................................................... ................................................ 41 5.2.2 Household Latrines .................... ................................................... ................................................... .............. 41
5.3 Existing Sanitation System ...................................................................................................................................42
5.3.1 Public Toilets .................................... ................................................... ................................................... ........ 42 5.3.2 Present, Future Demand and Supply Gaps ............................................................... ..................................... 42 5.3.3 Sanitation Projects ............................... ................................................... ................................................... .... 42 5.3.4 Comparative Analysis with the UDPFI, CPHEEO Guidelines ............................................... ........................... 42 5.3.5 SWOT Analysis ..................................... ................................................... ................................................... .... 43 5.3.6 Key Issues ........................................ ................................................... ................................................... ......... 43 5.3.7 City specific Strategies and Action Plans ............................................................ ........................................... 43
5.4 Solid Waste Management ....................................................................................................................................44
5.4.1 Quantity of Waste Generated ....................... ................................................... ............................................. 44 5.4.2 Constituents of Municipal Waste ................... ................................................... ............................................ 45 5.4.3 Current practices of Solid Waste Management........................................................... .................................. 45 5.4.4 Segregation & Storage of Solid Waste .............. ................................................... .......................................... 45 5.4.5 Primary and Secondary Collection .................. ................................................... ............................................ 45 5.4.6 Processing & Disposal of Waste..................... ................................................... ............................................. 46 5.4.7 Vehicles for Solid Waste collection and Transportation ............................................... ................................. 46 5.4.8 Institutional Set-up .............................. ................................................... ................................................... .... 46 5.4.9 Estimation of Waste Collection .................... ................................................... .............................................. 47 5.4.10 Comparative Analysis with Guidelines .............. ................................................... ......................................... 47 5.4.11 SWOT Analysis ..................................... ................................................... ................................................... ... 47 5.4.12 Key Issues ........................................ ................................................... ................................................... ........ 48 5.4.13 City specific Strategies and Action Plans ............................................................ ........................................... 48
5.5 Drainage System ...............................................................................................................................................49
5.5.1 Existing Drainage System .................... ................................................... ................................................... .......... 49 5.5.2 Major Water Bodies .......................... ................................................... ................................................... ............ 49 5.5.3 Tertiary Drains ............................. ................................................... ................................................... .................. 49 5.5.4 Flood-prone Areas or Environmentally Sensitive Areas ........................................... ........................................... 49 5.5.5 Air and Noise pollution ..................... ................................................... ................................................... ............ 50 5.5.6 Present and Future Demand and Supply Gaps ...................................................... ............................................. 50
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 3 of 99
City Development Plan for Barhi Town
5.5.7 SWOT Analysis................................ ................................................... ................................................... ............... 51 5.5.8 City specific Strategies and Action Plan ....................................................... ................................................... .... 51
5.6 Traffic & Transport ...............................................................................................................................................52
5.6.1 Existing Traffic & Transportation Scenario ..................................................... ................................................... .. 52 5.6.2 Travel Characteristics............................. ................................................... ................................................... .. 52 5.6.3 Intermediate Public Transport System ................................................................. ......................................... 53 5.6.4 Parking Assessment ................................ ................................................... ................................................... . 53 5.6.5 SWOT Analysis ..................................... ................................................... ................................................... .... 54 5.6.6 Service Adequacy and Key Issues ...................................................................... ............................................ 54 5.6.7 City specific Strategies and Action Plan ............................................................. ............................................ 54
5.7 Street lighting & fire fighting ............................................................................................................................56
5.7.1 Existing Situation of Street Lights .............. ................................................... ................................................ 56 5.7.2 Fire Services ..................................... ................................................... ................................................... ........ 56 5.7.3 Present and Future Demand and Supply Gaps ............................................................ .................................. 56 5.7.4 SWOT Analysis ..................................... ................................................... ................................................... .... 56 5.7.5 City specific Strategies and Action Plan ............................................................. ............................................ 56
5.8 Urban Poor and Their Accessibility to Basic Services ........................................................................................57
5.8.1 Introduction .............................. ................................................... ................................................... .................. 57 5.8.2 Poverty in the Town ............................... ................................................... ................................................... .. 57 5.8.3 Information pertaining to BPL Population and Slum Population ......................................... ......................... 58 5.8.4 Present and Future Housing Demand ................. ................................................... ........................................ 58 5.8.5 SWOT Analysis ..................................... ................................................... ................................................... .... 59 5.8.6 Issues ............................................ ................................................... ................................................... ........... 59 5.8.7 City specific Strategies and Action Plans ............................................................ ........................................... 60
5.9 Social infrastructure .........................................................................................................................................60
5.9.1 Educational Facilities ................ ................................................... ................................................... ............... 60 5.9.2 Health Facilities.................................. ................................................... ................................................... ...... 61 5.9.3 Socio-Cultural Facilities ......................... ................................................... ................................................... ... 61 5.9.4 Recreation/ Leisure/ Parks and Play Grounds .......................................................... ..................................... 62 5.9.5 Markets ........................................... ................................................... ................................................... ......... 62 5.9.6 Crematoria & Burial Grounds ....................... ................................................... .............................................. 62 5.9.7 City specific Strategies and Action Plans ............................................................ ........................................... 62
CHAPTER 6 INSTITUTIONAL FRAMEWORK .............................................................................. 63
CHAPTER 7 MUNICIPAL FINANCE ....................................................................................................... 65
7. Present Scenario ....................................................................................................................................................65
7.1 Revenue and Capital Accounts: ................. ................................................... ................................................... ....... 65 7.1.1 Financial status: ........................... ................................................... ................................................... ................. 65 7.1.2 Composition of own revenue and expenditure: .................................................... ............................................. 66
CHAPTER 8 CAPITAL INVESTMENT PLAN (CIP) & FINANCIAL OPERATING PLAN (FOP) 67
8.1 City Investment Plan - Introduction .....................................................................................................................67
8.1.1 Water Supply System (WS) .................... ................................................... ................................................... ....... 67 8.1.2 Sewerage .................................... ................................................... ................................................... ................... 68
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 4 of 99
City Development Plan for Barhi Town
8.1.3 Storm Water Drains (SWD) .................... ................................................... ................................................... ....... 69 8.1.4 Solid Waste Management (SWM) ................................................................... ................................................... . 69 8.1.5 Sanitation .................................. ................................................... ................................................... .................... 70 8.1.6 Traffic & Transportation (T&T) .............. ................................................... ................................................... ........ 71 8.1.7 Electricity and Street Lighting ............. ................................................... ................................................... .......... 72 8.1.8 Urban Poor .................................. ................................................... ................................................... .................. 73 8.1.9 Environmentally Sensitive Areas ................................................................ ................................................... ...... 73 8.1.10 Urban Governance ........................... ................................................... ................................................... ........... 73 8.1.11 Social Infrastructure ...................... ................................................... ................................................... .............. 74
8.2 FINANCIAL OPERATING PLAN (FOP) - Introduction: .............................................................................................75
8.2.1 Objective and Methodology: .................. ................................................... ................................................... ...... 75 8.2.2 Assumptions and Reforms ..................... ................................................... ................................................... ....... 75 8.2.2.2 Municipal Taxes: .................................................. ................................................... ......................................... 76 8.2.2.3 Non-Tax Sources .................................................. ................................................... .......................................... 78 8.2.2.4 New O&M Cost .................................................. ................................................... ............................................ 78
CHAPTER 9: URBAN REFORMS ............................................................................................................ 82
CHAPTER 10: SUMMARY OF WORKSHOP PROCEEDINGS.......................................................... 84 10.1 Purpose and Importance of the workshop .........................................................................................................84 10.2 Stakeholder Identification .................................................................................................................................84 10.3 Preparation of hand-outs and questionnaires ....................................................................................................85 10.4 District level Workshop/Meeting at District Head Quarters (Jabalpur). .............................................................85 10.5 Extended Discussion with Deputy Director ........................................................................................................86 10.6 Town level Workshop/Meeting at Town Level: ..................................................................................................86
10.6.1 Preparation for the workshop................................................................... ................................................... ..... 86 10.6.2 Presentation on Town profile and discussion with participants ................................. ...................................... 87 10.6.3 Summary of the Sector Analysis ................................................................ ................................................... .... 87 10.6.4 Workshop Summary ........................... ................................................... ................................................... ........ 88 10.6.5 Photographs taken during the workshop ......................................................... ................................................ 90
CHAPTER 11: CITY VISION .................................................................................................................... 91 11.1 Public Opinion on Existing Infrastructure Facilities and Services in Barhi ...........................................................91 11.2 Public opinion on prioritizing the proposed list of developments ......................................................................92 11.3 Planning, developing and managing urban growth in Municipal area ................................................................93 11.4 Sectoral strategy framework ..............................................................................................................................93 11.5 Conclusion: Brief strategies, actions and projects for the city ............................................................................95
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 5 of 99
City Development Plan for Barhi Town
LIST OF TABLES
TABLE 3.1: DECADAL GROWTH RATE OF THE TOWN ........................................................... ............................................ 25 TABLE 3.2: POPULATION PROJECTION OF THE TOWN ........................................................ ............................................. 26
TABLE 3.3: POPULATION PROJECTION OF THE TOWN(INCLUDING KHANNA PANCHAYAT) ............................ ................ 26
TABLE 3.4: AREA, POPULATION & GROWTH RATE ............................................................ ............................................... 26 TABLE 3.5: CATEGORY WISE WORK FORCE ............... ................................................... ................................................... .. 27
TABLE 3.6: OCUPATION STRUCTURE .................... ................................................... ................................................... ...... 28
TABLE 3.7: IMPORTANT COMMODITIES .................. ................................................... ................................................... ... 29 TABLE 4.1: WARD-WISE DETAILS OF THE TOWN ............................................................. ................................................. 3 0 TABLE 4.2: UDPFI STANDARDS FOR LAND USE ............................................................. ................................................... 30 TABLE 4.3: LAND USE BREAKUP ...................... ................................................... ................................................... ........... 31 TABLE 4.4: DETAILS OF HOUSES, HOUSEHOLDS AND HOUSEHOLDS SIZE OF BARHI ................................ ........................ 32 TABLE 4.5: HOUSING DEMAND FOR THE YEAR 2035 .......................................................... .............................................. 32 TABLE 5.1: DETAILS OF WATER SOURCE & SYSTEM ......................................................... ................................................ 34 TABLE 5.2: DETAILS OF ELSR IN BARHI .............. ................................................... ................................................... ......... 35 TABLE 5.3: DETAILS OF THE DISTRIBUTION SYSTEM ....................................................... ................................................. 3 5 TABLE 5.4: DETAILS OF WATER SUPPLY CONNECTION IN BARHI TOWN ......................................... ................................ 36 TABLE 5.5 : DETAILS OF WATER CONNECTIONS IN BARHI .................................................... ............................................ 36 TABLE 5.6 : DOMESTIC WATER SUPPLY DETAILS IN BARHI – 2011 ............................................ ....................................... 37 TABLE 5.7: DETAILS OF WATER CHARGES IN BARHI – 2011 ................................................. ............................................ 38 TABLE 5.8: WATER DEMAND ASSESSMENT – 2035 ........................................................... .............................................. 38 TABLE 5.9: SERVICE LEVELS IN BARHI ............... ................................................... ................................................... ......... 39 TABLE 5.10 : DETAILS INDICATING THE EXISTING SANITATION FACILITIES ................................... ................................... 41 TABLE 5.11 : DETAILS HOUSEHOLD LEVEL SANITATION FACILITIES ........................................... ....................................... 41
TABLE 5.12 : DETAILS OF PUBLIC CONVENIENCE FACILITY .................................................. ............................................. 42 TABLE 5.13 : DEMAND ASSESSMENT – 2035 ................................................................ ................................................... . 42 TABLE 5.14 : SERVICE LEVELS IN BARHI .............. ................................................... ................................................... ........ 42 TABLE 5.15 : SOLID WASTE DETAILS IN BARHI – 2011 ..................................................... ................................................. 4 5 TABLE 5.16 : SOLID WASTE TRANSPORT AND DISPOSAL ARRANGEMENTS ......................................... ............................. 46 TABLE 5.17 : STAFF FOR SOLID WASTE MANAGEMENT IN BARHI ............................................... ..................................... 47 TABLE 5.18 : DETAILS OF CURRENT SERVICE LEVELS ....................................................... ................................................. 4 7 TABLE 5.19 : DETAILS INDICATING THE EXISTING DRAINAGE CONNECTIONS .................................... .............................. 49 TABLE 5.20 : DETAILS OF ENVIRONMENTAL SENSITIVE AREAS ................................................ ........................................ 50 TABLE 5.21 : DEMAND AND SUPPLY GAPS FOR SWD SYSTEM.................................................... ...................................... 50 TABLE 5.22 : ROAD SURFACE DETAILS ................. ................................................... ................................................... ....... 52 TABLE 5.23 : DETAILS OF STREET LIGHTING IN BARHI ..................................................... ................................................. 5 6 TABLE 5.24 : WARD WISE BPL & SLUM DETAILS ............................................................ ................................................... 58 TABLE 5.25 : SLUM MATRIX WITH REFERENCE TO INFRASTRUCTURE COVERED .................................... ......................... 59 TABLE 5.26 : DETAILS OF THE EDUCATIONAL INSTITUTIONS IN BARHI ........................................ .................................... 60 TABLE 5.27 : DETAILS OF MEDICAL FACILITIES IN BARHI .................................................. ................................................ 61 TABLE 5.28 : DETAILS OF FUTURE DEMAND FOR THE MEDICAL FACILITIES ..................................... ................................ 61 TABLE 8.1: INVESTMENT REQUIREMENTS FOR WATER SUPPLY SECTOR .......................................... .............................. 67 TABLE 8.2: INVESTMENT REQUIREMENTS FOR SEWERAGE SECTOR .............................................. ................................. 68 TABLE 8.3: INVESTMENT REQUIREMENTS FOR STORM WATER DRAINS SECTOR .................................... ....................... 69 TABLE 8.4: INVESTMENT REQUIREMENTS FOR SOLID WASTE MANAGEMENT SECTOR ................................ ................. 69 TABLE 8.5 : INVESTMENT REQUIREMENTS FOR SANITATION SECTOR ............................................ ................................. 70 TABLE 8.6 : INVESTMENT REQUIREMENTS FOR TRAFFIC & TRANSPORTATION ..................................... .......................... 71 TABLE 8.7: INVESTMENT REQUIREMENTS FOR STREET LIGHTING .............................................. .................................... 72 TABLE 8.8: INVESTMENT REQUIREMENTS FOR URBAN POOR.................................................... ..................................... 73 TABLE 8.9: INVESTMENT REQUIREMENTS FOR ENVIRONMENTALLY SENSITIVE AREAS .............................. .................... 73 TABLE 8.10 : INVESTMENT REQUIREMENTS FOR SOCIAL INFRASTRUCTURE FACILITIES ............................ ...................... 74 TABLE 8.11 : SUMMARY OF PROPOSED INVESTMENTS ......................................................... ........................................... 74 TABLE 10.1 : SUMMARY/FINDINGS OF THE SECTOR WISE ANALYSIS AND TOWN PROFILE OF BARHI .................. ........... 87
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 6 of 99
City Development Plan for Barhi Town
TABLE 11.1 : SHOWS THE PRIORITIZATION FOR VARIOUS DEVELOPMENTS. ...................................... ............................. 92
LIST OF MAPS
MAP 1.1 Base map
MAP 2.1 Density map
MAP 4.1 Landuse map
MAP 4.2 Future growth map
MAP 5.1 Existing water supply system of Barhi
MAP 5.2 Existing solid waste disposal location map
MAP 5.3 Drainage network Map
MAP 5.4 Environmental Sensitive Areas
MAP 5.5 Road network in Barhi
MAP 5.6 Location of Slums
LIST OF ANNEXURES
ANNEXURE - I FOP
ANNEXURE - II Proposed Landuse Map
ANNEXURE - III Proposed Water Supply Network Map
ANNEXURE - IV Proposed Sewerage System Map(DEWATS)
ANNEXURE – V Proposed Solid waste Disposal Map
ANNEXURE – VI Proposed Road Network Map
EXECUTIVE SUMMARY
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 7 of 99
City Development Plan for Barhi Town
Executive Summary
I. Overview
The Jawaharlal Nehru National Urban Renewal Mission (JnNURM) is an ambitious programme of the
Government of India to bring about improvements in the existing urban service levels and urban
infrastructure in a financially sustainable manner. The primary objective of the programme is to create
economically productive, efficient, equitable and responsive cities. The projects that qualify under this
scheme include sub-sectors of water supply, sewerage and sanitation, drainage, solid waste management,
traffic and transportation facilities, housing infrastructure and basic services for urban poor. Further, special
projects including urban transit systems, urban expressways, sea-links and other sectors of similar nature
would also be covered under this scheme. In order to access funds through the mission, the state
government and the cities seeking assistance require to sign-up to a set of reforms covering various areas of
urban management and good governance.
The City Development Plan (CDP) shall provide a comprehensive long term strategy (Vision 2035) as well as
a City Investment Plan (CIP), based on which the concerned ULB's can approach and be eligible to the
funding under GoI /GoMP schemes along with their own and other sources of finances based on priority
actions and projects identified in the CDP. The document shall also provide Financial Operating Plan (FOP) to
direct the ULBs for mobilizing various financial resources to implement the identified priority projects. The
scope of the services include all necessary steps formulated in JnNURM Toolkit 2, that would help to prepare
the CDP, such as Data Collection & Field Visits, Municipal Staff & all Stakeholders consultative meetings,
Sector Analysis, organising necessary workshops for the successful completion of the CDP. The specific
objectives of the project are as follows;
• CDP would scale up existing urban development and poverty alleviation schemes within a
comprehensive and coherent strategic planning framework, in order to ensure optimal benefit from
available resources to the citizens of the ULBs.
• CDP would aim to catalyze new thinking and provoke debate through a consultative stakeholder
driven process. The vision and strategic thrusts of the CDP would be built around the lessons and
findings of a comprehensive and rigorous stakeholder consultation and documentation process.
• It is expected that the CDP would serve the purpose and meet the requirements of UIDSSMT and
IHSDP programmes as well as JnNURM and other development schemes.
• The CDP will generate specific priority actions and projects that can be the basis, for mobilizing
funds from diversified sources.
Government of Madhya Pradesh has taken up a huge task of preparation of CDPs for 293 towns and the
consultancy of preparation of reports has been awarded to various consultants and the Barhi is one of the
towns out of the 7 towns assigned to Aarvee Associates.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 8 of 99
City Development Plan for Barhi Town
II. Town Profile
Barhi town is constituted in the year 1981, with an area of 18.09 sq. kms and it constitute of 15 municipal
wards. The salient feature of Barhi City is its strategic located on the gateway to few importance tourist
places in Madhya Pradesh state like Bhandharghad National Park, Khajuraho, Amarkantak, Chitrakutt and
Maihar.
Barhi is a town with Nagar Parishad status in Barhi tehsil of Katni district in the state of Madhya Pradesh.
Barhi geographically lies between 23.9°N latitude and 80.8°E Longitude, at an altitude of 361 meters (1184
feet's) above mean sea level and it is nearly 51 Km away from the District headquarters Katni and around
457 Kms from the state Headquarter Bhopal. The town is well connected with Road, where State Highway
11 and 10 will intersect at core area of the town. The town is also connected by railway line.
The physical development is extending towards Katni and Badanpur towns, which is predominantly linear
development in nature. Thus, pockets of agricultural land are still available for development within the
municipal limits. In the other parts of the town, physical development is observed in South-East direction.
III. Infrastructure Assessment
� Water Supply
Barhi is predominantly dependent on ground water source for water supply. Presently, water is drawn from
a depth of 100 – 120 ft. Direct pumping is in practice for storage and distribution of water supply. As per the
assessment made by the officials at Nagar Parishad of Barhi, there are 24 tube wells in the town. Water is
supplied through tankers to the areas where water supply is scarce and areas not covered with distribution
network. The present per capita water supply is 50 LPCD.
� Sewerage
Barhi lacks adequate sanitary facilities. Three out of ten houses have no latrine facilities indicating open
defecation in the town. As per the sanitation surveys conducted during 2008, about 65 percent households
have access to improved sanitation within household and remaining 35 percent households lack these
facilities. About 60 percent of the households have septic tank connections. As per the discussions with the
Nagar Parishad officials, as per 2011, there are 20% of households with no latrine facilities (Open
defecation).
� Solid Waste Management
As per the Nagar Parishad officials, approximately 3.5 tons of waste is collected per day which indicates a
collection performance of 80 per cent. There is door-to-door collection system is in practice in Ward No.'s
1,5, 6,7,9 and 13 of the town. Landfill site is proposed near to ward number 15, which is 3 km away from
the city core. The total extent of the site is about 6.0 acres.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 9 of 99
City Development Plan for Barhi Town
� Storm Water Drains
The total length of tertiary drains as per available data is 12 km. Out of this, pucca drains length is 5 km and
remaining 7 km length is kutcha in nature. The total drain length accounts to 82 per cent of total road
length. There are three water bodies existing in the city, comprising of about 19 ha in its area.
� Traffic & Transportation
Barhi is well accessed by road. Barhi town is connected with the region through SH-10, which connects the
town to Katni and Mahiriya. The effective carriage width of the state highway is affected in the central part
of the town due to the activities related to the informal sector activities and dispersed pedestrian movement.
The total road length in Barhi is 14.5 km out of which 10.5 km is maintained by the Nagar Parishad and
remaining 4.0 km by the PWD. Around 29 percent of the roads laid by cement concrete. The share of WBM
roads is 27.5 per cent and remaining 43.5 per cent are earthen roads.
� Street Lighting
In Barhi there are about 400 street lights with different types of electrical fixtures. The average spacing of
street light poles ranges between 45 m to 50 m, as against the norm of 30 m indicating gross inadequacy of
the system. However, this condition is not uniform.
� Urban Poor
As per the latest estimate of poverty in Barhi have converged to between 50 to 60 percent of total
population. As per the latest estimate made available by Nagar Parishad - Barhi, the slum population in the
town stands at 4465, which accounts to 32 percent of the total population and total slum households are
812, which accounts to 28.0 percent of total households.
� Social Infrastructure Facilities
The town has one government hospital and three clinics are providing health services. There are 9 primary
schools in the town. In addition to the primary schools, there are 3 other schools that are catering to the
needs of secondary education and senior secondary education. The town does not have any land earmarked
for Socio-cultural activities except a community hall.
Weekly market (Mela ground) is located in ward-6, where the total no. of shops are about 1,000 and 10,000
people visit on that day. Lack of parking place at Mela ground is leading to the congestion in the area there
by obstructing the pedestrian and traffic movement. There are 3 burial grounds in the town, which are
primarily serving the needs of Hindu and Muslim religions.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 10 of 99
City Development Plan for Barhi Town
IV. Documentation of Consultative Workshops
� Kick-off Workshop
In the initial (Kick-off Meeting) stage, Project Consultants, M/s
Aarvee associates architects engineers and consultant’s pvt ltd.,
team comprising of Mr. K. Jagadeesh, Mr. B.NeelaKantam Raju, and
Mr. Raghu ram, Ms. Sukeerthi and Mr. Ravi Teja visited Jabalpur on
21st Nov, 2011 and held discussions with Dy. Director, Urban
Development Department at Jabalpur divisional office. On behalf of
the Divisional Commissioner, Jabalpur, Dy. Director, Urban
Development Department, Jabalpur Division chaired the start-up meeting and addressed the Presidents and
CMO’s of all 7 project towns.
Further, consultant’s team visited the Barhi town on 22/11/2011 and
conducted “a one day kick-off” meeting at Nagar Parishad Office. The
President, Chief Municipal Officer (CMO), ULB Officials and other Ward
Parishads were present in the workshop. Consultants briefed about the
project objectives and importance to the stakeholders.
� 2nd Stage Workshop at state & ULB level
In the 2nd Workshop stage, M/s Aarvee associates architects
engineers and consultants pvt ltd representatives, Mr. K.
Jagadeesh, Mr. Raghuram and Mr. Vishwanath, Urban and
environmental planner, visited Jabalpur on 13th April, 2012 and
held initial discussions with Director, Urban Development
Department at Jabalpur Divisional Office. Shri Gulshan Bamra,
Collector, Jabalpur District has reviewed the progress of the CDP work and Chaired the meeting, addressed
the CMO’s and representatives of all 7 project towns. Detailed deliberations were made with Shri. Rajeev
Nigam, Dy. Director, urban development. He emphasized on;
• Provision of Water Supply, Sanitation and Solid Waste
Management,
• Relocation of slums
• Imparting training on folk art and folk culture to the slum
dwellers
• Inculcate Social Awareness
• Provision of a buffer zone (Urban Forest) along the river
bed
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 11 of 99
City Development Plan for Barhi Town
The 2nd stage town level workshop was organized by Aarvee
associates Pvt. Ltd with the co-operation of Chief Municipal Officer
(CMO) Barhi and active participation of Municipal staff. The
information on conducting the workshop was passed onto Nagar
Parishad well in advance so as to involve as many as identified
stakeholders to participate in the workshop. Workshop on CDP
was held at Barhi Nagar Parishad on 28th of May 2012. The
purpose of the workshop was to involve stakeholders and facilitate
in the discussions, record the Comments & obtain suggestions so as to incorporate them into the plan
preparation of CDP.
Summary of workshops
On the whole, there was very good response from all the stakeholders and the major proposals for the
development of Barhi Town are expressed below:
• Provision of potable drinking water
• Provide better Drainage Network/DEWATS system.
• Provision of root-zone treatment method to recycle the waste water
• Provide better public transportation system
• Provision of Bus stand/bus shelters along the proposed by-pass
• Improvements to the Solid Waste Management practices like implementation of Door-to-
door collection system.
• Provision of recreational facilities like parks, playgrounds, community halls.
• Provision of women and child healthcare facilities.
• Provision of Diploma/ITI institutions for better employment oppurtunities to youth.
• Provision of agro-based industries like warehouses and cold storages.
• Provision of basic services with Inclusive Planning.
� 3rd Stage Workshop at ULB level
The 3rd stage/final town level workshop was organized by Aarvee
associates Pvt. Ltd with due consultations with Chief Municipal
Officer (CMO) Barhi and active participation of Municipal staff. The
information on conducting the workshop was passed onto Nagar
Parishad well in advance so as to involve as many as identified
stakeholders to participate in the workshop. Workshop on CDP
was held at Barhi Nagar Parishad on 22nd of December 2012.
The purpose of the workshop was to deliberate on the City
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 12 of 99
City Development Plan for Barhi Town
Investment Plan and Financial Operation Plan. Total investment for the Barhi town is estimated to the tune
of about Rs. 62.55 crores by the end of the plan period 2035. All the major proposals are incorporated as
suggested in the earlier workshop held at Barhi town. The stakeholders have readily accepted the
investment plan as well financial operation plan and have expressed their willingness to pay the taxes as per
the Financial Operating Plan.
The sizable investment (58% of the total investment) is worked
out for traffic and transportation sector proposals followed by
urban poor sector. As of now water supply system is quite
sufficient in the town and needs the improvement of pipeline
system at un-served areas. Provision of bus stand, bus shelters,
bye-pass road, additional dust bins & vehicles and landfill site
area and other social infrastructure facilities like parks, play
grounds and community halls are covered in the investment
plan.
V. Investment Plan
The summery of Sector wise Investment Required for Implementation of Proposed Projects are as follows;
Sector wise Summery of
Investments
Total Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-2015 2015-2025 2025-2035
Water Supply (WS) 512.91 323.81 103.85 85.25
Sewerage 150.60 41.025 73.05 36.525
Sanitation 78.60 78.6 0 0
Solid Waste Management (SWM) 112.62 86.62 20.66 5.33
Storm Water Drains (SWD) 219.75 101.63 83.75 34.38
Traffic & Transportation (TT) 3658.25 71.50 1761.75 1825.00
Street Lighting (SL) 70.25 32.65 16.9 20.7
Social Infrastructure (SI) 155.00 65.00 71.25 18.75
Environment 30.00 15.00 15.00
Urban Governance 10 10 0 0
Urban Poor (UP) 1258.00 283.60 365.40 609.00
Grand Total 6255.98 1109.43 2511.61 2634.93
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 13 of 99
City Development Plan for Barhi Town
VI. Vision Statement
To develop Barhi Town as an important urban center by improving
the economic activities with infrastructure and
better Quality of Life.
VII. Urban Reforms
S.No Mandatory Reforms
Reforms Status at ULB Remarks Target
1
Adoption of the modern accrual-based double entry system of accounting in ULBs and Parastatal agencies
Yet to be Implemented
System was not implemented
due to lack of awareness, professional manpower and software procurement/equipment. Keen
to adopt the system.
October, 2013
2
Introduction of a system of E-governance using IT
applications such as GIS & MIS etc.
Yet to be Initiated
System was not implemented due to lack of funds, except
few stand-alone desktop
machines being used for accounting purpose. Keen to
adopt the system with additional funds availability.
March,
2014
3 Reform of Property Tax with
GIS applications Yet to be Initiated
GIS Mapping for utilities need
to be done for effective collection.
July, 2013
4
Levy of reasonable User
Charges by ULBs with the
objective that the full cost of O&M is collected within the
next 5 years.
Partially achieved,
except water and consolidated taxes
Collecting water tariff from
household level and collection efficiency is about 60%. UGD
taxes are nil due to absence of system and street lighting
tax is minimal.
2016-17
(UGD system
may not be
considered due to
proposal
of DEWATS)
5 Internal earmarking within local body budget for basic
services to urban poor.
Yet to be
Considered
As of now, ULB is not able to
spend any amount for urban poor sector. Specific
allocations have not been made in the budget for urban poor.
2014-2015
6
Provision of basic services to
Urban Poor including security of tenure at affordable prices,
improving housing and infrastructure facilities
Partially Initiated ULB has issued few "Pattas" to slum dwellers in the past
years
2013-2014
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 14 of 99
City Development Plan for Barhi Town
S.No Optional Reforms
Reforms Status
at ULB Remarks Target
1
Revision of bye-laws to streamline the approval process for construction of buildings, development of site
etc
Yet to be Initiated Possible with the directives of State level stance.
These
Reforms are
targeted for
implement
ation simultane
ously with the
implementation of
Mandatory
reforms
2 Conversion of land from agriculture to non-agriculture
Yet to be Initiated Possible with the directives of State level stance.
3 Introduction of property title
certification system in ULB Yet to be Initiated
Possible with the directives of
State level stance.
4
20-25% of land earmarking for EWS & LIG category with
a system of cross subsidization
Yet to be Initiated Possible with the directives of
State level stance.
5 Revision of byelaws to make rainwater harvesting mandatory in all buildings
Yet to be Initiated Possible with the directives of State level stance.
6 Bye-laws for re-use of
recycled water Yet to be Initiated
Possible with the directives of
State level stance.
7 Encouraging PPP models Yet to be Initiated Possible with the directives of
State level stance.
PROJECT INTRODUCTION
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 15 of 99
City Development Plan for Barhi Town
CHAPTER 1: PROJECT INTRODUCTION
1.1 Project Award and Introduction of Client
The Urbanization in Madhya Pradesh is at a faster rate, due to which Urban Local Bodies of the state are
experiencing hard challenges to facilitate the requirements of the growing population with limited technical
and financial resources. GoI as well as GoMP have initiated a number of programmes/schemes to meet the
growing demands of infrastructure and service delivery. The list of GoI schemes include: Urban
Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) and Integrated Housing and
Slum Development Programme (IHSDP). On the other hand GoMP has initiated DFID funded MPUSP, which
links reforms with investment in infrastructure for the poor. In addition to the above there are several other
programmes that have been initiated by the GoI and GOMP.
Preparation of the CDP will take advantage of the Revised CDP preparation toolkit/Heritage cities toolkit
prepared by GoI under JNNURM and UADD/CMAMP guidelines. These toolkits shall provide guidance to the
formulation of a CDP based on the concept of a consultative strategic planning process.
Focus areas: Government of Madhya Pradesh is planning to improve the water supply system of the towns
by upgrading the prevailing systems. Hence, this CDP shall be focusing on water supply sector as one of the
key area in a comprehensive manner. The revenue generation (revenue from ULBs own sources specially
property tax etc.) and strategies for the enhancement of the same shall also be incorporated in the CDP.
Currently planning is only a discretionary function of ULBs in MP and there is a general lack of planning
culture even in the larger Corporations. The CDP's of four cities of MP (Bhopal, Indore, Jabalpur, Ujjain),
included in JNNURM have been already prepared, along with the CDP's of 96 ULBs in the State. The lessons
learnt from these exercises need to be incorporated into the proposed CDPs. The CDP will be linked to the
overall spatial planning, policy framework of Master Plan and more importantly into the annual municipal
budgeting. Linking the investment plan of the CDP with the municipal budgets will be crucial in ensuring the
O&M and thus sustainability of the infrastructure assets created.
Preparation of the CDP shall include city development strategies, which are out comes of a structured
consultative process. The process will enable elected representatives, key staff of MC departments,
parastatal agencies and other institutions, policy makers and the citizens to participate and plan for spatial,
social and economic development of the concern cities. A City Development Plan (CDP) will present both a
vision of a desired future perspective for the city and the ULB’s strategic framework of sectoral plans
translated into actions that define on how the ULB, together with other stakeholders, intends to work
towards achieving their long-term vision for the next five years.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 16 of 99
City Development Plan for Barhi Town
This project of “preparing the City Development Plan (CDP)” for Barhi Parishad Area, Madhya
Pradesh has been entrusted to Aarvee Associates Architects Engineers & Consultants Pvt. Ltd
(Consultant) ,Hyderabad. The work is assigned through Commissioner, Urban Administration and
Development Department, Government of Madhya Pradesh (Client). The aim of this exercise is to
support various Cities/Urban Local Bodies of Madhya Pradesh with a comprehensive City Development Plan
(CDP) for their long term vision.
1.2 Project Brief, Scope & Objectives
The CDP shall provide a comprehensive long term strategy (Vision 2035) as well as a City Investment Plan
(CIP), based on which the concerned ULB's can approach and be eligible to the funding under GoI /GoMP
schemes along with their own and other sources of finances based on priority actions and projects identified
in the CDP. The document shall also provide Financial Operating Plan (FOP) to direct the ULBs for mobilizing
various financial resources to implement the identified priority projects. The scope of the services include all
necessary steps formulated in JNNURM Toolkit 2, that would help to prepare the CDP, such as Data
Collection & Field Visits, Municipal Staff & all Stakeholders consultative meetings, Sector Analysis, organising
necessary workshops for the successful completion of the CDP. The specific objectives of the project are as
follows;
• CDP would scale up existing urban development and poverty alleviation schemes within a
comprehensive and coherent strategic planning framework, in order to ensure optimal benefit from
available resources to the citizens of the ULBs.
• CDP would aim to catalyze new thinking and provoke debate through a consultative stakeholder
driven process. The vision and strategic thrusts of the CDP would be built around the lessons and
findings of a comprehensive and rigorous stakeholder consultation and documentation process.
• It is expected that the CDP would serve the purpose and meet the requirements of UIDSSMT and
IHSDP programmes as well as JNNURM and other development schemes.
• The CDP will generate specific priority actions and projects that can be the basis, for mobilizing
funds from diversified sources.
1.3 Methodology
The CDP is prepared through a participatory process, wherein the various stakeholders, citizens and the
concerned authorities play a major role in the formation of the vision for the future development of the city.
The planning process therefore has to be a consultative one, with stakeholders representing a varied
spectrum of qualification taking part in the discussions and dialogue leading to the formulation of a vision,
development of objectives, identification of priority sectors and projects. CDP is prepared as a multistage
exercise, mainly with the following Stages;
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 17 of 99
City Development Plan for Barhi Town
Stage 1: Mobilization and Inception
The Consultants with ULB support would organize a one day kick-off workshop to familiarize the
stakeholders with the purpose, process, and expected outcomes of the CDP and build confidence,
understanding and commitment to the CDP. The kick off workshop will help in deriving a consensus along
with the stakeholders firming the process and agreeing upon a structured programme to take the CDP
forward.
Stage 2: Assessment of Existing Situation
In this stage, interaction with various stakeholder groups (meetings, workshops, focus group discussions,
etc.) and review relevant publications, reports, GOs, resolutions, procedures, laws etc. to analyze the current
situation in each of the sector identified. In-depth analysis of the existing situation, covering the
demographic profile, economic profile, urban governance, Physical & Social infrastructure facilities, and
environmental aspects. Gap analysis and future needs will be calculated/identified at every sector level.
Stage 3: Development of City Vision and Sector Goals and Strategies
Based on the cities present scenario and SWOT analysis, the future city vision statement will be formulated.
Discussion will be initiated on strategies, priorities and major actions that may be required in the next five
years to move towards the vision 2036. To achieve the city vision, it is imperative to identify the necessary
goals and strategies for each sector.
Stage 4: Development of Strategies and Priority Actions
The strategies will be evaluated from the perspective of stakeholders contribution in achieving the vision and
sector goals. Criteria will be developed for prioritizing the strategies, programmes and projects in
consultation with the Steering Group. The priority actions will support the strategies to achieve the sector
goals.
Stage 5: Preparation of City Investment Plan (CIP) and Financial Operating Plan (FOP)
City Investment Plan (CIP) and Financial Operating Plan (FOP) are the key components in the entire process
of City Development Plan (CDP). Based on the availability of resources, logical sequencing of actions and
potential for immediate implementation, the Consultants will prepare a City Investment Plan (CIP) in
consultation with ULB that lays out the cost and revenue estimates of all priority projects in the next five
years. The preparation of the CIP is a reiterative process requiring adjustments to individual projects as well
as changes in scheduling to make the whole package work financially. The City Investment plan would be
supported with a Financial Operating Plan (FOP).
Stage 6: Draft City Development Plan (CDP)
The Draft CDP includes City Investment Plan (CIP), Financial Operating Plan (FOP), duly considering the
feedback from all the stakeholders and working groups.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 18 of 99
City Development Plan for Barhi Town
Stage 7: Final CDP Document
The final CDP document incorporating the feedback from the workshop and the inputs received at the 2nd
Stage State Level discussion.
In all the above stages, the consultations with all the Stakeholders and working groups will be made
extensively. The following Methodology is adopted for entire process of City Development Plan (CDP) for
Barhi Nagar Parishad.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 19 of 99
City Development Plan for Barhi Town
Fig 1.1 Methodology Followed for the CDP
Stage 1: Mobilisation and Inception Kick-off Workshop with officials of Municipality.
and other key parastatal agencies ,
Data needs and requirements. Reconnaissance visit of project area.
Stage 2: Assessment of Existing Situation
Sector Analysis
City Profile
1st Stage District Level
1st Stage State Level
Presentation
2nd Workshop to Prioritize Sector Strategies &
Proposals
Stage 3: City Vision and Sector Goals and Strategies
Sector Strategies Vision, Goal and Strategies
Stage 4: Strategies and Priority Actions
Evaluation of Strategies
Reform Action Plans
Stage 5: City Investment Plan (CIP) and FOP
Project Costing and Funding Sources Scheduling Priority Actions and CIP
FOP to Support CIP
Stage 6: Draft CDP including CIP & FOP
Performance Monitoring indicators etc.,
Workshops to Finalise Draft CDP
3rd Workshop to Finalise Draft CDP
2nd Stage District Level Presentation to finalise Draft
2nd Stage State Level Presentation to finalise
Draft CDP
Stage 7: Final CDP including CIP & FOP
Performance Monitoring indicators and Council
Resolution
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 20 of 99
City Development Plan for Barhi Town
1.4 Structure of the Report
Chapter 1: Introduction: Detailed description of Project background and Methodology adopted for the
entire City Development Plan (CDP) process.
Chapter 2, 3 & 4: City Profile: It includes City Profile, Physical features, Demography details, Socio-
Economic details and Housing scenario.
Chapter 5: City Infrastructure: This chapter deals with Physical and Social Infrastructure analysis, demand-
gap analysis, formation of goals, strategies and action plans for respective sectors, SWOT analysis
Chapter 6: Institutional Framework
Chapter 7: Municipal Finance: deals with Income and Expenditure analysis
Chapter 8: Capital Investment Plan: Detailed and summary of Sector wise Investment Required for
Implemetation of Proposed Projects and Financial Operating Plan
Chapter 9: Urban Reforms: status of Mandatory and optional reforms at both ULB and State level
Chapter 10: Summary of Workshop Proceedings
Chapter 11: City Vision: Provide the city vision along with the consolidated sector strategies
PHYSICAL FEATURES OF
THE TOWN
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 21 of 99
City Development Plan for Barhi Town
CHAPTER 2: PHYSICAL FEATURES OF THE TOWN
2.1 GENERAL CITY PROFILE
2.1.1 Historical Importance
Barhi town is constituted in the year 1981, with an area of 18.09 sq. kms and it constitute of 15 municipal
wards. The salient feature of Barhi City is its strategic located on the gateway to few importance tourist
places in Madhya Pradesh state like Bhandharghad National Park, Khajuraho, Amarkantak, Chitrakutt and
Maihar.
2.1.2 Katni District Profile
Katni District is a district of Madhya Pradesh State, which is constituted in the year 2011. Earlier, it is in the
part of Jabalpur District. Katni also known as Murwara (Katni) or Mudwara and its lies between 23° 37’N to
24° 80’ N latitude and 79° 57’ E to 80° 58’ East Longitude. Katni town serves as the administration
headquarters district. Katni is also known as the city of lime because it is rich in reserves of limestone.
Katni district extends with an area of 4949.59 km². The district is located in the Northeastern part of Madhya
Pradesh it forms the Northern district of Jabalpur commissionerate division. Mudwara Katni, Chhoti Mahanadi
and Umdar are the main rivers of this district.
2.1.3 Location and connectivity
Barhi is a town with Nagar Parishad status in Barhi tehsil of Katni district in the state of Madhya Pradesh.
Barhi geographically lies between 23.9°N latitude and 80.8°E Longitude, at an altitude of 361 meters (1184
feet's) above mean sea level and it is nearly 51 Km away from the District headquarters Katni and around
457 Kms from the state Headquarter Bhopal. The town is well connected with Road, where State Highway
11 and 10 will intersect at core area of the town. The town is also connected by railway line.
2.1.4 Climate & Rainfall
Even through Barhi is a town, by virtue of its village environment, the town is pleasant and healthy. It is
generally dry except in monsoon. The cold season start from November to February followed by the hot
season from March to the middle of June. The period from mid-June to the end of September is the rainy
season. The months of October constitute the post-monsoon or transition season.
The maximum temperature is at about 45 degree Celsius and low is at 18 degree Celsius. Rainfall
The average rainfall in Barhi is approx. 915.7 mm. The rains usually start in the month of June, with the
maximum number of rainy days experienced during the months of July and August.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 22 of 99
City Development Plan for Barhi Town
2.1.5 Topography and Geology
Physiographical Barhi town is located in elevated position and slope towards south west direction. It is
located to nearby rich deposit lime stone area i.e., Bujabuja area.
Mahanadi is the principal river of the district, which flow on the North West direction, at distance of 10 kms
from center the town.
2.1.6 Wind Direction
Winds are controlled by the shifting of pressure belts. They are predominantly from South-West during the
monsoon.
Figure 2.1 Location Map of Barhi Town
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 23 of 99
City Development Plan for Barhi Town
2.1.7 Base Map
The scaled Base Map is not available for Barhi Nagar Parishad. However, a guide map with all the roads and
ward boundaries was acquired from the Nagar Parishad. Taking this map as reference, scaled Base Map has
been prepared using Google satellite imageries. The Preliminary Base map thus Prepared is shown in Map
No.2.1.
DEMOGRAPHIC & SOCIO-
ECONOMIC PROFILE
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 24 of 99
City Development Plan for Barhi Town
CHAPTER 3: DEMOGRAPHIC & SOCIO-ECONOMIC PROFILE
3.1 Demography
3.1.1 Population Growth Trend
The Population of Barhi Nagar Parishad as per 2011 census is 13,946. The population details of the Barhi
town for the past three decades are as follows;
Table 3.1 Decadal Growth Rate of the Town
Year Population Decadal
Growth rate
Growth
Difference
Incremental
Increase
% Decadal
Increase
Yearly %
Increase
1991 8192
2001 10923 0.33 2731 2731 33.34 3.33
2011 13946 0.28 3016 285 27.61 2.76
Source: Census of India, 2001 & 2011
From the above table it is evident that the Population growth rate in Barhi town is declined from 33.34 % to
27.61 % for the year 2001 to 2011. It is mainly due to establishment of few administrative offices like Barhi
Tehsil office, Sub-electricity Station, Warehouses, Police Station, Government Degree College in Khanna
Panchayat, which is vicinity village that resulted in out-migration of population from the Town to Khanna
Panchayat.
Figure 3.1 Decadal Growth Rate of the Town
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 25 of 99
City Development Plan for Barhi Town
3.1.2 Population Projections
The Projections of population for future years are worked out in three different methods for the year 2015,
2025 & 2035. The details of Population projection are
Table 3.2: Population Projection of the Town
Sl.
No. Methods
Population
for 2011 Year 2015 Year 2025 Year 2035
1 Arithmetic Increase method 13946 15088 17962 20835
2 Geometric increase method 13946 15638 20404 26622
3 Incremental increase method 13946 16927 20199 23757
In Keeping the view of developments in Khanna Panchayat and also in consultation with officials of Barhi, it
is could be advantage in extension of Barhi Nagar Parishad limits by adding of Khanna Panchayat.
Table 3.3: Projected Population of the town
Sl. No. Methods 2011 2015 2025 2035
1 Arithmetic Increase method 17939 20257 26053 31848
2 Geometric increase method 17939 23975 51339 141407
3 Incremental increase method 17939 23849 30043 36523
The above projected population figures indicate that the population by all methods except Geometric
Increase method is above the Average growth rate of Barhi and looks on higher side. So, from the past
Population growth trend, it is appropriate to consider Incremental Increase Projection as appropriate,
figuring to population of 36,523
3.1.3 Population Density
As per 2011 census, Gross Population density of Barhi town is 8 Persons per Hectare, which is on lower side
when compared to UDPFI standards for Small town. But the core area and its surrounding areas in the town
are densely populated.
Table 3.4: Population, Area & Density Details of the Town
Year Population Area in Ha Population Density Per Ha
1991 8192 1809 5
2001 10923 1809 6
2011 13946 1809 8
Source: Census of India, 2011
Map No.3.1 shows the Density Details of Barhi
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 26 of 99
City Development Plan for Barhi Town
3.1.4 Average household Size
As per 2011 census, the total number of households in Barhi Town is 2846; the average household size is
4.9. And there is slight increase in avg. household size from 4.3 to 4.9 for the year 1991 to 2011.
3.1.5 Other Demographic Indicators
As per 2011 Census, the total SC population of Barhi is about 1109 and ST Population is 977. The total share
of SC population is 10 percent of the total population and 9 percent is ST population.
3.1.6 Issues
Other than agriculture activities and household industries like bamboo basket making, there is no other
alternative source for employment in the town. Due to that there is out-migration of population in search of
employment to nearby cities i.e., Jabalpur, Katni, Satna, Rewa, Nagpur and Bhopal.
3.2: SOCIO ECONOMIC PROFILE
3.2.1 Sex Ratio
From the figure, it can be seem that there is gradual increase in sex ratio from 898 to 933 for the year 1981
to 2011, it can be analysis in two ways, one is out-migration of male population in search of employment
and another is proper execution of government schemes
related to the improve and safeguard female population such
as Ladli Laxmi Yojana, Gaon Ki Beti Yojana, Free cycle
distribution, Pratibha Kiran YojanaJanani Suraksha Yojana,
Mukhyamantri Kanyadan Yojana etc.,.
The sex ratio of the city is higher than the State (920) and
district (925) figures Figure 3.2 Sex Ratio of the Town
3.2.2 Literacy Rate
As per 2011 census, Barhi has an average literacy rate of
57.64%, lower than the national average of 59.5%; with 62%
of the males and 38% of females literate
3.2.3 Work Participation Ratio (WPR)
As per 2011 census, work force participation (i.e., Main Workers, Marginal Workers, Cultivators and Labors)
is 34.13% of total population.
Table 3.5: Category-wise Workforce
S.No Category Total Population Male Female
1 Total Workers 4761 3582 1179
2 Main Worker 3494 2857 637
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 27 of 99
City Development Plan for Barhi Town
S.No Category Total Population Male Female
3 Marginal Workers 1267 725 542
Source: Census of India, 2011
Figure 3.4 Classification of WPR Figure 3.5 Gender Ratio – WPR
3.2.4 Occupation Structure
As per 2011 Census, it has been observed that 7.75 % of the workers in Barhi are engaged in Household
Activities (can be seen from figure), 63.07 % in Other Activities like trade and commerce activities, business
activities, employees, and other small scale industrialists and 29.17 % in primary activities i.e cultivators and
agricultural laborers.
Table 3.6: Occupational Structure
Category Cultivators Agriculture Household Others
Workers 448 941 369 3003
Percentage 9.41 19.76 7.75 63.07
Figure 3.6 Occupation Structure
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 28 of 99
City Development Plan for Barhi Town
3.2.5 Industries/trade and commerce
The hinterland of the town is predominantly agricultural in nature. The town caters to the trading and other
activities of the surrounding areas. A Weekly market is also held in the town to serve the town population
and surrounding village population.
Table 3.7: Important commodities available in Barhi
Particulars Commodities details
1 2 3
Imported Kirana Cloth Cement
Export Lime stone Cassette Food grain
Manufactured Cassete Bidi Gitti creshar
Source: Census Handbook and Barhi Town
3.3 SAIL
3.3.1 Introduction
SAIL‘s iron & Flux mines are spread over the states of Jharkhand, Orissa, Chattisgarh and Madhya Pradesh.
These mines are operated as captive sources of raw materials for its integrated steel plants. Operations of
SAIL’s mines in Jharkhand, Orissa, Chattisgarh and Madhya Pradesh are controlled by Raw Materials Division
(RMD) of SAIL. The Limestone mining project of Kuteshwar Limestone Mine located in katni District of
Madhya Pradesh state was started at right bank lease in 1973 as a captive source of Limestone for use as
flux mainly in the steel melting shops (SMS) of Bokaro Steel Plant (BSL). Subsequently, mining operations at
Left Bank Lease of Kuteshwar Limestone Mine were also started during 1992-93. In the year 1990, the mine
was brought under RMD, SAIL with a view to supply Limestone to other SAIL steel plants. The Kuteshwar
Limestone Mine consists of two mining lease on the two flanks of river chhoti Mahanadi i.e. Right Bank
Lease and Left Bank Lease. The present combined production capacity of both the leases under Kuteshwar
Limestone Mine is 0.9 Million Tonnes per Annum (MTPA).
Details of the area
Village, Tehsil, District & State Kuteshwar Village, Vijayraghavgarh Tehsil,
Katni District, Madhya Pradesh
Mine Lease area 91.14 ha
Nature of the area Plain
Toposheet No 63 D/16 & 64 A/13
Latitude & Longitude Latitude : 230 58’ 28” to 230 59’ 22”
Longitude : 800 48’ 55” to 800 49’ 43”
General Climatic Conditions
Max. Temperature (Annual) 45.20 C
Min. Temperature (Annual) 04.00 C
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 29 of 99
City Development Plan for Barhi Town
Annual Rainfall (Average) 808.8 mm
Wind Pattern during study period Northwest during Summer Season
Elevation above mean sea level 332 m to 343 m AMSL
Historical / Important Places
Archaeological / Historically Important Site None within 10 km radius of the ML area
Sanctuaries / National Parks None within 10 km radius of the ML area
Important Religious & Tourist Places None within 10 km radius of the ML area
Environmental Sensitive Place
Mahanadi River – Adjacent
Bhadar Nadi – 6.6 km E
Jarjara Nallah – 6.8 km N
Gahra Nallah – 2.1 km SW
Hardua RF 5.1 km NW
Karreha RF 7.5 km N
Bara RF 9.0 km NE
Open Mixed Jungle 6.7 km SE
Bandhavgarh National Park 13.2 km S
3.3.2 Topography:
The Mine lease area falls in the southern foot hills of the kaimur range. The area is generally flat to
moderately undulating and is intersected by some nallahs.
3.3.3 Socio – Economic Development Measures:
In accordance to the MoEF guidelines, SAIL has envisaged its policy on Corporate Social Responsibility (CSR)
and committed towards economic as well as social development. The policy also aims improving the quality
of life of the workforce and their families as well as the local community and society at large.
Proposed Budget for Socio-Economic Welfare Activities (For Year 2013-14)
PHYSICAL PLANNING AND
GROWTH MANAGEMENT
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 30 of 99
City Development Plan for Barhi Town
CHAPTER 4: PHYSICAL PLANNING AND GROWTH MANAGEMENT
4.1 Spatial Growth Trends
The physical development is extending towards Katni and Badanpur towns, which is predominantly linear
development in nature. Thus, pockets of agricultural land are still available for development within the
municipal limits. In the other parts of the town, physical development is observed in South-East direction.
4.2 Spatial Distribution of Population
The Municipal area is divided into 15 wards for civic administration. The ward wise population is given in
the following table.
Table 4.1: Ward-wise Details of the Town
Ward Number Ward Name Person Male Female
1 Ballabh Bhai Patel 1036 534 502
2 Maharana Pratap 1352 680 672
3 Dr. Bheemrao Ambedkar 475 234 241
4 Chandrashekhar 990 536 454
5 Ram Manohar Lohiya 440 239 201
6 Jawahar Lal Nehru 553 289 264
7 Shaheed Bhagat Singh 577 309 268
8 Lal Bahadur Shastri 696 354 342
9 Mahatma Gandhi 512 263 249
10 Maulana Ajad 962 503 459
11 Indira Gandhi 641 319 322
12 Vivekanand 606 301 303
13 Vijaynath 1239 658 581
14 Shiwaji 2369 1236 1128
15 Rajeev Gandhi 1498 756 738
Total 13946 7214 6724
Source: Census of India, 2001 & 2011
4.3 Land use
The essential characteristics of land use and its pattern have to be analyzed to have a better approach to
its problems and proposals. The land use map has been prepared based on Google image interpretation
and subsequent ground truth verification.
Table 4.2: UDPFI Standards for Land Use
Land use % of Developed Area
Small Towns Medium Towns Large Cities Metro Cities
Residential 45 – 50 40-45 35-40 35-40
Commercial 2 – 3 3 - 4 4 -5 4-5
Industrial 8 – 10 8-10 10-12 12-14
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 31 of 99
City Development Plan for Barhi Town
Land use % of Developed Area
Small Towns Medium Towns Large Cities Metro Cities
Public & Semi Public 6 – 8 10-12 12-14 14-16
Recreational 12 – 14 18-20 18-20 20-25
Transport & Communication 10 – 12 12-14 12-14 15-18
Agriculture & Water bodies Balance balance balance balance
The land use percentages were calculated using the prepared base map and the available data. The
residential land comprises of 7.63% of total land, the agriculture area comprises of almost 79.7%. Map
4.1 shows the Existing Land Use Map of Barhi town. The following table provides the calculated land use
percentages.
Table 4. 3: Land use Breakup
Sl. No Land use Area (Ha) % to Developed land % to total area
1 Residential use 138.04 41.74 7.63
2 Commercial use 1.36 0.41 0.08
3 Mixed use 5.60 1.69 0.31
4 Public and Semi Public 2.50 0.76 0.14
5 Recreation use/Open 60.48 18.29 3.34
6 Transportation 122.70 37.11 6.78
Developed Land 330.68 100.00
7 Agriculture Area 1441.70 79.70
8 Water bodies 20.28 1.12
Total 1809.01 100.00
Source: Google image interpretation and subsequent site visits
Map No. 4.1: Existing Landuse of Barhi
4.4 Master plan Provision
With the absence of no master plan in place for the town lead to unplanned, haphazard development.
4.5 Housing
Housing is the constituent of the social infrastructure of the economy. Like the other constituents, such
as the system of education and health, housing divergences also can either reduce or enhance the
disparities in the society.
4.6 Housing in Barhi
According to the census 2001 & 2011, existing housing units are 3896. The housing is spread in all the
15 wards of Barhi town.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 32 of 99
City Development Plan for Barhi Town
Table 4. 4: Details of houses, households and households size of Barhi
Years Total Population
No. of occupied
residential
Houses
No. of
Households
Average
Household Size
1991 8192 1865 1920 4.3
2001 10923 2016 2190 5.0
2011 13946 NA 2846 4.9
Source: Census, 2001 & 2011
4.7 Housing demand for the year 2035
We assumed that the average household size would not fall less than 4.9 by 2011, 2015, 2025 and 2035.
Table 4. 5: Housing demand for the year 2035
Category Existing
(2011)
Projected years
2015 2025 2035
Population 17939
( Barhi + Khanna Panchayat) 23849 30043 36523
Households 3588 4770 6010 7305
Household size 5.0 5.0 5.0 5.0
By the year 2035 the additional Houses required are 3718 taking into the consideration one
home/development per one household. The land requirements for these housing needs are taken into
consideration in the proposed Land Use map.
4.8 Unauthorised colonies/Settlements
It has been observed that, there are few Unauthorized Settlements in ward 14 & 15 in the land belongs
to Railway authority and Forest Department.
4.9 Future Growth Direction
In future, growth of the town guides along SH 11 & 10, which is towards Katni and Maihar road, due to
the upcoming 6 thermal plants in South-West of Barhi Town.
Map 4.2: Anticipated Future Growth Map
Figure 4.1: location of proposed Thermal Plant
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 33 of 99
City Development Plan for Barhi Town
TOWN INFRASTRUCTURE
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 34 of 99
City Development Plan for Barhi Town
CHAPTER 5: TOWN INFRASTRUCTURE
Infrastructure is the basic requirement of urban life and its adequacy and accessibility are two important
ingredients key contributors in the up-gradation and enrichment of quality of urban life which is the
primary objective of any planned development effort. The extent and the nature of problems faced by
different towns vary by size, geographical conditions & local natural resources, state/regional differentials
in the resource availability & the policies, resource base of local authorities and several such factors
directly or indirectly affecting the population of cities/towns.
Social amenities and infrastructure fall under the social welfare objectives of the urban development
programmes, as distinct from economic development objectives and especially in the context of the
rapidly developing liberalized and competitive economic scenario. These infrastructure facilities are
broadly classified into two aspects,
Physical Infrastructure Social Infrastructure
Water Supply Health
Sewerage & Sanitation Education
Solid Waste Management Recreational Facilities
Storm Water Drains Social security
Traffic & Transportation Housing
Street Lighting
5.1 Water Supply
5.1.1 Quality and Quantity of Water at Source
Barhi is predominantly dependent on ground water source for water supply. Presently, water is drawn
from a depth of 100 – 120 ft. Direct pumping is in practice for storage and distribution of water supply.
As per the assessment made by the officials at Nagar Parishad of Barhi, there are 24 tube wells in the
town. Water is supplied through tankers to the areas where water supply is scarce and areas not covered
with distribution network. Currently the quantum of water supplying in Barhi is approximately 0.69 MLD.
The details are shown in the Table.
Table 5.1: Details of Water Source & System
Sl. No. Ground Source Particulars Details
1. Number of Tube wells 13
2. Number of Hand pumps 98
3. Number of ELSR’s 2
4. Quantum of water Supplied (MLD) 0.69
5. Per capita consumption (LPCD) 50
6. Estimated Transmission and Distribution losses (% of total supply) 15-20
Source: Nagar Parishad Barhi
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 35 of 99
City Development Plan for Barhi Town
5.1.2 Quality and Quantity of Water in distribution System
The available data only indicates to total water storage capacities at town level. However, it does not
provide details on the quantity of water supplied at ward level. Presently there are two ELSR’s are
available for water storage.
The total available storage capacity of these ELSR's is 0.44 ML. As per the Census of India 2011, the
population is estimated to 13,946. Assuming consumption of 135 lpcd, the total demand for water supply
is 1.88 MLD. Assuming the storage capacity required is 33
percent of the total water supply, the demand is 0.62 ML. It is
observed that the current shortage of storage capacity is about
0.18 ML. The demand of water supply (both Barhi Nagar
Parishad and Khanna Panchayat) by the end of the horizon
period of CDP is about 5.0 MLD for which additional storage
capacity of 1.63 ML is required by 2035. Table 16 indicates the
details of the ELSR and the wards covered. Map 5.1 indicates
the water supply system of the town.
Table 5.2: Details of ELSR in Barhi
Sl.
No. Location of ELSR’s
Capacity
(in ML) Wards Covered
1. ELSR-1, Ward 4 –
Eight tube wells are connected to this ELSR
0.18 1,3,4,5,6,7 & 8
2. ELSR-2, Ward 7 –
Five tube wells are connected to this ELSR
0.26 9,10,11 &13
Total Storage Capacity (ML) 0.44
Source: Nagar Parishad Barhi
5.1.3 Water Distribution Arrangement
The existing water distribution system in the town is very old and is connected at various places with new
pipelines. GI pipes with diameters ranging from 1.5 mm to 2.0 mm form majority of the water supply
network. About 10 km of length of pipeline is laid for distribution system and it accounts to 68 percent of
the existing road length. The details of the water supply distribution system given in Table
Table 5.3: Details of the Distribution System
Main Types Distribution Main Details or Dimension
Range
Percentage of Coverage
Network
a. PVC 2.0 mm to 2.5 mm 5
b. GI 1.5 mm to 2.0 mm 65
Source: Nagar Parishad, Barhi, 2010-11
5.1.4 Internal Distribution Networks
The total number of household service connections is 943. There are no metered connections in the
town. Apart from this, 20 hand pumps and 120 Public Stand Posts are catering to water supply. It is
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 36 of 99
City Development Plan for Barhi Town
observed that the commercial service connections are very less numbering to mere 12. The total number
of water supply connections increased in the 865 to 943 in past three years. The details of service
connections and growth rates are indicated in the following Table.
Table 5.4: Details of Water Supply Connection in Barhi Town
Year Connections % Growth of Connections
2009-10 865
2010-11 900 4.0
2011-12 943 4.7
Source: Nagar Parishad, Barhi 2010-11
The domestic connections account to 91.7 percent of the total connections and 31 percent of the total
households. The total commercial connections are account to 1.3 per cent of total connections. There are
66 public stand posts, which serves 2.4 percent of total households. Table indicates the details of the
service connections in the town.
Map 5.1: Existing Water Supply System of Barhi
Table 5.5: Details of Water Connections in Barhi
Sl. No.
Particulars Units
1 Total Population – 2011 13,946
2 Number of Households – 2011 2,846
Connections Number % to total
Connections
% to total
Households
3 Domestic 865 91.7 31.7
4 Non-domestic (other than industrial) 12 1.3 0.4
5 Industrial 0.0 0.0 0.00
6 Public Stand Posts 66 7.0 2.4
Total Number of Connections 943 100.0 > 30.0
Source: Nagar Parishad, Barhi, 2010-11
5.1.5 Coverage & Supply
The distribution network covers 68 percent of the developed area. Water is supplied for a total of 4
hours per day during winter and 2 hours per day in summer. Barhi has very infrequent and interrupted
water supply due to frequent and untimely power cut. The per capita supply works out to 50 LPCD. Out
of 24 tube wells, 11 are directly connected to supply network. Thus, the current water supply system is
severely dependent on electricity. The areas which are not covered under supply network are located in
ward no’s 2 & 12.
As per the assessment of officials at Nagar Parishad, low pressure areas are located in six wards. The
detail of the existing coverage & supply is indicated in the following Table
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 37 of 99
City Development Plan for Barhi Town
Table 5.6 : Domestic Water Supply Details in Barhi – 2011
S. No. Particulars Units
Per Capita Supply
1 Population – 2011 13,946
2 Water Supply (in MLD) 0.69
3 Current Per Capita water supply per day (in LPCD)including loss 50.0
4 Per capita supply as per CPHEEO Norm (in LPCD) 135.0
Coverage
5 % population covered under piped Water Supply
6 Areas
with
Surplus Supply Nil 0.0 %
Moderate Supply All wards (except wards with less
supply and no supply) 75.0 %
Less Supply Ward No. 1, 3, 5,13 15.0 %
No Supply Ward No. 2, 12 10.0 %
Storage Capacity
7 Total Storage Capacity available (in ML) 0.44
Total Storage Capacity required (in ML) 1.06
Deficit (in ML) 0.62
Distribution Network (%)
8 Good 50
Fair 10
Poor 40
Staff Details
9 Permanent Staff Nil
10 Temporary Staff 14
Source: Nagar Parishad, Barhi, 2010-11
Irrespective of supply from ELSR, every ward is getting the direct supply from remaining tube wells. The
assessment made by the officials at Nagar Parishad, Barhi suggests that the distribution and transmission
losses are about 15 to 20 percent.
5.1.6 Institutional Set-up
The O&M of the water supply system is taken care of by the Nagar Parishad, Barhi. Currently, both
technical and non-technical duties related to water supply are discharged by 14 temporary employees of
Nagar Parishad. With the growing population, the demand for adequate services is increasing and the
role of the local body as a service provider calls for better performance.
5.1.7 Operation & Maintenance (O&M)
The sustainability of water supply system is assured only if local resources are generated for O&M by the
ULB. The systematic planning, expansion and maintenance requires dedicated planning approach.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 38 of 99
City Development Plan for Barhi Town
Cost Recovery
Nagar Parishad collects a flat rate of Rs.50.00 per month per household for domestic connection and
Rs.150.00 for non-domestic connection. In small towns like Barhi no user charges are collected on pro-
rata basis, the reason being absence of metering devices. None of the connections in Barhi are metered.
The charge for new connection is Rs.1200 which includes road cutting charges. Table 5.7 gives the
details of the flat rate per month and the installation of new connection charges.
Table 5.7: Details of Water Charges in Barhi – 2011
Description Charges Per Connection (in Rs)
1. Flat Rate per Month
• Domestic 50.00
• Commercial 150.00
2. New Connection Charges
• Domestic 1000.00 + 200.00 (road cutting)
• Commercial 1000.00 + 200.00 (road cutting)
Source: Nagar Parishad, Barhi, 2010-11
5.1.8 Present and Future Demand and Supply Gaps
The present per capita water supply is 50 LPCD. The future population growth calls for:
� Augmentation of water on a sustainable basis.
� Increase in storage capacity to meet the requirement of the growing population and increased
developed areas.
Table 5.8: Water Demand Assessment – 2035
Particulars Phase 1 Phase 2 Phase 3
2011-2015 2015-2025 2025-2035
• Projected Population 23848 30043 36522
• Projected Households 4770 6009 7305
• Total quantum of water required (in MLD) @ 135 lpcd per capita
3.22 4.06 5.00
• Required capacity of treatment plant (in MLD) 3.22 4.06 5.00
• Additional Storage capacity (in ML) 1.06 1.34 1.63
Source: Analysis
The cumulative water demand projected for the coming 25 years is indicated in the Table. Considering a
per capita supply of 135 LPCD, the total domestic water demand will be 3.42 MLD by 2036. Adequate
facilities for water storage, treatment and supply should be planned.
5.1.9 Water Supply Project
As on now, the town is not covered under any planned schemes/projects for Water supply system in the
town.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 39 of 99
City Development Plan for Barhi Town
5.1.10 Comparative Analysis (Service Levels)
The water system in the town can be improved by efficient extension of the water supply network,
increase in the number of Household Service Connection’s, rehabilitation works, and efficient cost
recovery plans. The existing system is not adequate to meet the growing demand of the population. The
current service levels are indicated in the following Table
Table 5.9: Service Levels in Barhi
Indicator Norm Existing Levels
• Per Capita Supply 135 lpcd 50 lpcd
• Storage capacity 33.0 per cent 63.0 percent
• Length of distribution network as per cent to total
road length 100 per cent
69 percent
• Treatment Plant capacity 100 per cent Nil
• Number of HHs with HSC connections 100 per cent 31.0 percent
• Loss due to leakages 20 per cent 25 percent
Source: Analysis
5.1.11 SWOT Analysis
Strengths
•• Location of natural Water Body
(Mahanadi) is potential for future
requirement
Weaknesses
•• Predominantly Majorly dependent on ground
water
•• Inadequate network length
•• Age of current supply system
•• Lack of adequate man power
Opportunities
•• Implementation of rain water
harvesting
•• Existing treatment plant can be improved for future requirement
Threats
•• High dependency on electricity as the supply is
also dependent on pumping through motors
•• Poor distribution of water can lead to health problems and unhygienic conditions in the city.
5.1.12 Key Issues
• No treatment plant in the town
• Ground water level is decreasing annually.
• Lack of metered connections, reflecting the loss in ULB revenue
• The flat rates are required to be revised as the amount collected is very meager.
• The distribution system is not adequate as various parts of the town are not connected or
integrated to the system.
• Lack of manpower has affected the operation and maintenance of water supply system including
the revenue collection..
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 40 of 99
City Development Plan for Barhi Town
• No initiatives for rain water harvesting, reuse of waste water and lack of community participation
and awareness in improving water management system, system efficiency, O&M and decision
making.
• There is no water quality monitoring done on a regular basis both at the transmission end and
consumer end
5.1.13 City specific Strategies and Action Plans
Issue Goal Strategies Action plans/Proposals
Water
Source
To provide
surface
water
source
• Identify proper "Network
Plan" for Intake Pipe line
& Raising Main” from surface source to the town.
• Improve the existing
“Water Treatment Plant”
• Increase the capacity of
"Centrifugal Pumps".
• Surface source from
“Mahanadhi” (8 km away from the town)
• 1 km length of intake pipeline & 8 km length of raising main has to be laid.
• 5.00 MLD capacity of WTP has
to be constructed. • 75 hp capacity of centrifugal
pumps are required
Inadequate
storage
capacity
100 %
storage
capacity
• Identify the location and
number of ELSR’s
required. • Storage capacity should
meet future demand
• 2 ELSR’s are required.
• 1.63 ML of additional storage
capacity is required by the end
of the plan period – 2035
Inadequate
Coverage
and Supply
Network
100 %
coverage
with
"potable
water
supply"
• Replacement and extension of existing
network system.
• Phase-wise replacement
of pipe lines. • Supply network plan for
future developments
• 5 km length of existing network system has to be
replaced. • 4.5 km length of network has
to be laid in unserved areas.
• 31 km length of pipeline
network has to be laid in future development areas.
Inadequate
man power
for
“Operation
&
Maintenance
”
100 %
O&M
Recovery
• Capacity building
programmes for ULB staff
to improve skills. • Provide metered
household service
connections in a phased
manner. • Regular monitoring
system.
• Training & capacity building
programs for ULB staff. • New connections for 1000
households in a phased
manner.
• Water rate should revise time to time
• Priority Actions
• Provision of water supply system with “Mahanadi” River (8 km away from the town) as the
source
• 5 km length of water supply network system has to be replaced
• 4.5 km length of network system has to be developed in the un-served areas • Provision of 5.00 MLD Capacity of Water Treatment Plant (WTP) near to the surface source
• 1 km length of intake pipeline has to be laid to draw the water from Mahanadhi River to WTP
• 8 km length of Raising main has to be laid from WTP to Service Reservoirs
• 31 km length of network system has to be laid for future development areas
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 41 of 99
City Development Plan for Barhi Town
5.2 Sewerage System
5.2.1 Existing Sewerage System
Hundred percent network coverage for sewerage system is one of the high priority needs of any
developing town and taking up the same would present a major challenge to the implementation
capability of ULBs. Lack of Under Ground Sewerage system in Barhi also leads to unhygienic conditions
in the town.
Table 5.10: Details indicating the Existing Sanitation Facilities, 2011
Particulars Nos.
1. Total Number of Households 2,846
Particulars % of Total No. of Households
2. Per cent of Households having Bathroom
Facility within the House 36.5
3. Type of Connectivity for Waste water Outlet
1. Closed Drainage 31.29
2. Open Drainage 30.17
3. No Drainage 38.53
Source: Census 2011
Sewage & Sullage Collection
The domestic waste water presently passes through the open drains along the road side. In the areas
not served by any kind of drainage network, the waste water flows on the roads and in few places get
stagnated.
The areas within the core area (ward no’s 4, 11, 10 & 13) has lack proper waste water disposal. Thus,
the waste water is to flow allowed in open areas or vacant sites in these localities. The blocking of drains
by solid waste is the main cause for stagnation of waste water.
5.2.2 Household Latrines
Barhi lacks adequate sanitary facilities. Three out of ten houses have no latrine facilities indicating open
defecation in the town.
Table 5.11: Details indicating the Existing Sanitation Facilities
Particulars % of Total No. of Households
(2011)
% of Total No. of
Households (2011)
• Pit Latrine 7.46 5
• Water Closet 25.27 77.11
• Other Latrine 4.18 3.18
• No Latrine 63.08 15
Source: Census 2011
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 42 of 99
City Development Plan for Barhi Town
5.3 Existing Sanitation System
As per the sanitation surveys conducted during 2008, about 65 percent households have access to
improved sanitation within household and remaining 35 percent households lack these facilities. About 60
percent of the households have septic tank connections.
5.3.1 Public Toilets
There is one public convenience with 4 seats in the town. The average users per day are estimated to be
10. The details of public conveniences are shown in the Table.
Table 5.12: Details of Public Convenience facilities
Public Convenience Systems (Sulabh Sauchalaya)
a. Public Conveniences 1
b. Total Seats 4
c. No of Users/ Day 10
Source: Nagar Parishad, Barhi
5.3.2 Present, Future Demand and Supply Gaps
The cumulative sewerage demand projected for the coming 25 years is indicated in the Table 23.
Considering a per capita supply of 135 LPCD the total domestic sewerage demand will be 4 MLD by 2035
(considering 80 percent of total water demand).
Table 5.13: Demand Assessment – 2035
Particulars Phase 1 Phase 2 Phase 3
2011-2015 2015-2025 2025-2035
• Projected Population 23848 30043 36522
• Quantum of water required (in MLD) 4770 6009 7305
• Total quantity of sewage (in MLD) 3.22 4.06 5.00
• Length of Trunk Lines (600 mm dia) 2.58 3.24 4.00
• Length of lateral Lines (100 mm dia) 10
• Capacity of treatment plant (in MLD) 40 27
Source: Analysis
5.3.3 Sanitation Projects
At present, there are no Proposed or On-going Projects for augmentation of existing Sewerage system in
the town.
5.3.4 Comparative Analysis with the UDPFI, CPHEEO Guidelines
As per the UDPFI/ CPHEEO norms, about 80 per cent of the total water supply is assumed to be
discharged as sewage. Hence the total sewage generated is estimated about 4.0 MLD.
Table 5.14: Service Levels in Barhi
Indicator Norm Levels
Sewerage Estimated 80 % of water supply 4.0 MLD
Source: Analysis
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 43 of 99
City Development Plan for Barhi Town
5.3.5 SWOT Analysis
Strengths
•• One-third of households
have access to improved
sanitation.
Weaknesses
•• Lack of under Ground sewerage(UGS)
•• Lack of Treatment Plant
•• Laying of CC roads in major parts of the town without
provisions for UGS system
•• Mostly the sewage goes into the open drains.
•• Inadequate public conveniences
•• Surface drains are used to carry the sewerage leading to environment hazards
Opportunities
•• Availability of undeveloped
land for locating amenities
•• Decentralized waste water
management systems
(Small Diameter Gravity
Sewer(SDGS) Systems)
Threats
•• Letting out of sewage and sullage into open areas can
lead to health hazards
•• Prospective degradation of environment due to water
and Air pollution
•• Dangi Talab & Bada Talab are getting heavily polluted as a result of sewage inflow.
5.3.6 Key Issues
• Absence of an UGS system, open defecation and stagnation of sewage leading to environmental
and health problems.
• Low coverage of individual disposal system and about 35 percent of the households resort to
open defecation.
• Sewage and waste water entering the water bodies resulting in pollution.
• Mixing up of solid waste with the sewage leading to choking of drains.
5.3.7 City specific Strategies and Action Plans
Issue Goal Strategies Action plans/Proposals
Under Ground
Sewerage
(UGS) system
Provision of
UGS with 100
% coverage
• Conducting a detailed physical
survey
• Coverage of core areas on
priority basis
• Extension of network to new
developed areas
• Preparation of a
Comprehensive
Sewerage network
plan.
• 10 km length of trunk
lines & 67 km of lateral
lines has to lie.
Open
defecation
Remove the
practice of
open
defecation
• Improving the existing public
toilets by providing adequate
facilities.
• 25 percent of the households
shall be provided with LCS
focusing on urban poor.
• Improvement of
existing public toilets: 1
Nos.
• Constructing public
toilets in unserved
areas: 4 Nos.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 44 of 99
City Development Plan for Barhi Town
• Construct the new public toilets
in unserved areas.
• Construction of Low
Cost Sanitation units
for 25 percent of the
total Households: 1115
Nos.
Absence of
sewerage
treatment
plant
Provision of
mini
sewerage
treatment
plant
• Capacity of STP should meet
the current gap and future
requirements in a phased
manner.
• Sewerage quality analysis
needs to be upgraded.
• 4.0 MLD capacity of
Small Diameter Gravity
Sewer (SDGS) or
Decentralized Waste
Water Treatment
system (DEWTAS) has
to construct.
Lack of
Operation &
Maintenance
Adopt the
‘utility
mapping’
system
• Training & capacity building
programs for ULB staff.
• Regular monitoring system.
• Private Sector
participation in O&M to
increase efficiency of
service delivery.
Priority Actions
• Provision of Public Conveniences near Bus stand and market junction
• Laying 67 km length sewer lines by 2035
• Construction of toilets through low cost sanitation programs
• Construction of public toilets in slums & poor settlements
• Campaign at town level on stopping open defecation
• Provision of Small Diameter Gravity Sewer or Decentralised Waste Water Treatment system
5.4 Solid Waste Management
Unorganised disposal of Solid waste affects major pollutants in a town resulting harmful health effects on
its residents. Urbanization has changed the composition of waste generated in larger towns and cities. It
is seen that the amount and kind of waste generated varies according to the income level. While most of
the residents are unaware of the health hazards, the contributors too are equally unaware of the effects
of pollution on the Town. These risks can be properly managed and their negative effects can be
minimized. Hence, there is a need for proper collection, storage, transportation and scientific disposal of
such waste by the respective local governments.
5.4.1 Quantity of Waste Generated
The quantity of solid waste generated in Barhi has increased in the past few years due to the growth of
commercial and service activities. At present the solid waste generated at household level and in from
revise streets is collected either directly from the dustbins and open dumping points. The regular
collection is confined to the main streets of the town. The details of the existing SWM system are detailed
in the following Table.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 45 of 99
City Development Plan for Barhi Town
Table 5.15: Solid Waste Details in Barhi – 2011
Sl. No. Particular Details
1. Total Population (2011) 13946
2. Waste generated from households 3.5
3. Amount of Hospital Waste Generated (in tons) -
4. Total Waste Generated Per Day (in tons) 3.5
5. Total Waste Collected Per Day (in tons) 3.5
6. Collection Performance (%) 80 %
Note: Nagar Parishad, Barhi
The average solid waste generated in Barhi town is about 3.5 tons per day. The major source of waste
generation is the domestic waste. There is no hospital waste generated in the town.
5.4.2 Constituents of Municipal Waste
The various sources of solid waste are domestic and
commercial. Out of the total waste generated in Barhi around 60
percent is domestic waste and 40 percent is commercial waste.
The domestic waste has both biodegradable and non-
biodegradable components. Some of the biodegradable
components are vegetable waste, meat waste, poultry waste,
leftover food, etc. The non-biodegradable waste comprises of
plastic, rubber, packaging materials, metal, batteries, and
construction waste.
5.4.3 Current practices of Solid Waste Management
There is door-to-door collection system is in practice in Ward No.'s 1,5, 6,7,9 and 13 of the town.
5.4.4 Segregation & Storage of Solid Waste
At present there are no standard practices followed for segregation and storage.
5.4.5 Primary and Secondary Collection
Both primary and secondary type of collection is practice in the town. In some areas, the solid waste is
collected from houses and is deposited at a predetermined location from where it is carried to dumping
site through trucks.
As per the assessment of officials at Nagar Parishad officials, approximately 3.5 tons of waste is collected
per day which indicates a collection performance of 80 percent. The main roads are swept every day and
the waste is deposited in the containers, and is taken to dumping site. The shortfall in the collection
process is due to the following reasons:
• Throwing the waste into drains which is left unattended.
• Less manpower for day to day collection.
• Non-availability of adequate infrastructure in terms of number of tractors, dustbins, equipment’s,
etc.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 46 of 99
City Development Plan for Barhi Town
• Improper dumping points and unscientific disposal methods like open dumping of waste on
roadsides, vacant sites, etc.
• Improper collection methods.
5.4.6 Processing & Disposal of Waste
It is informed by the officials at Nagar Parishad that a new land fill site is proposed near to ward 15,
which is 3 km away from the city Centre. The total extent of the site is about 6.0 acres. The following
Table 26 indicates the existing transport & disposal arrangements. Map 5.2 shows disposal location
points.
Map 5.2 shows disposal location points.
Table 5.16: Solid Waste Transport and Disposal Arrangements
Particulars Units
1. Number of Dustbins 10 ( which are Poor Condition)
2. Total Number of Vehicles (Tractor) 1
3. Capacity of each vehicle 4 tons
4. Total Number of Tippers/Handcarts 8
5. Age of Vehicle (in Years) 12 years
6. Persons per vehicle 1 driver + 5 persons
7. Total Capacity of Vehicles (in tons) 2
8. Number of trips per day per vehicle 3
9. Type of Disposal Open Dumping
Source: Nagar Parishad, Barhi
5.4.7 Vehicles for Solid Waste collection and Transportation
The Nagar Parishad owns 1 tractor for disposal of solid waste. Capacity of each tractor is 4.0 tons.
Number of trips per day per vehicle is two. The distance traversed by each tractor per day is around 4 km
and the weekly hour of operation is 8 hours. However lack of adequate infrastructure and manpower has
led to improper removal and transfer methods.
5.4.8 Institutional Set-up
Solid Waste Management is enlisted in the state list and is the obligatory responsibility of the ULB
handled by the Health wing of each municipality. The MSW rules 2000 putsforth detailed guidelines for
the entire process of solid waste management. The staffs for SWM include Environmental Engineer,
Health Officer, Health Inspector and field staff including drivers, cleaner & loaders. The number of staff in
the ULBs varies depending on the size of the ULB.
The staffing pattern as provided by the Nagar Parishad, Barhi indicates that currently 8 employees of
Nagar Parishad are discharging the duties of Solid waste and Sanitation and additional 12 persons are
employed for attending various duties. The details of the staff are indicated in the Table
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 47 of 99
City Development Plan for Barhi Town
Table 5.17: Staff for Solid Waste Management in Barhi
Staff for SWM Number
Safai Daroga/Driver 2
Safai Karmachari 6
Total 8
Temporary staff/Daily Wages 12
Grand Total 20
Source: Nagar Parishad, Barhi
5.4.9 Estimation of Waste Collection
Estimated waste generation in the town by the year 2035 is about 9.1 tons. Approximately 7.3 tons of
waste collection will be done based on existing collection performance.
5.4.10 Comparative Analysis with Guidelines
Table 5.18: Details of Current Service Levels
Indicator Norms Number of Units
� Waste collection performance 90 – 100 % 80
� Spacing of Dustbins 100 m Irregular
� Road length per conservancy staff 400 – 600 m 1500 m
� Conservancy staff per 100 population 3 0.15
Source: Analysis
5.4.11 SWOT Analysis
Strengths
•• Door to Door collection is in
practice
•• Execution of new land fill site
Weaknesses
•• Multiple disposal points.
•• Dumping process is within the town.
•• Absence of Slaughter houses & mutton
markets
•• Community bins are not available at convenient locations.
•• Functional overlap-sanitation & solid waste
management
Opportunities
•• Adaptation of Vermi
Composting methods
Threats
•• Possibility of public health hazards as the
dumping yard s are located in the town
•• Absence of segregation of bio medical waste
from private clinics
•• Lack of solid waste management facilities in
the town leading to indiscriminate dumping of
garbage
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 48 of 99
City Development Plan for Barhi Town
5.4.12 Key Issues
• Absence of segregation of waste at source.
• The staff in the ULB is skeletal.
• The locations of dustbins should be fixed with proper intervals and at proper places so that
efficiency can be increased.
• The existing transportation infrastructure and resources are inadequate.
• Although the quantity of biomedical waste generated in Barhi is very less, the improper handling of
the waste from the private clinics results to infectious conditions.
5.4.13 City specific Strategies and Action Plans
Issue Goal Strategies Action Plans/ Proposals
Open
dumping
Suitable space
(landfill site) for disposal of
waste
• Initiating segregation of
waste at source.
• Place collection bins
wherever is necessary (suitable locations).
• Provision of adequate facilities
at landfill site (Platform,
fencing, watchmen shed etc.). • Provision of 5 litter bins in
commercial areas & 74
community bins in the town
by the end of plan period-2035.
Absence of
Door-to-Door (D2D) collection in few wards
100% D2D
collection system
• Identification of primary
collection points. • Scheduling the timings of
collection. • Provision of adequate
equipment & vehicles.
• Provision of 5 auto tippers, 15
try cycles for primary collection.
• Provision of 2 metal
containers and 2 dumper
placer vehicles for secondary collection.
Lack of skilled
man power
Strengthen the
existing system
• Structuring of man power
requirements and assignment
of responsibilities.
• Conducting capacity building &
Training programmes.
Absence of segregation of
waste at the source
Encourage “Scientific
methods” for segregation
• “Recycling and Reuse”
methods has to put in practice.
• Development of sanitary land fill
site. • Equipment and infrastructure as
per MSW guidelines 2000.
Priority Actions
• Provision of infrastructure & man power required for efficient solid waste management
• Provision of slaughter house • Development of solid waste land fill site
• Construction of Vermi-composting yard
• Campaign for segregation of waste at source
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 49 of 99
City Development Plan for Barhi Town
5.5 Drainage System
5.5.1 Existing Drainage System
The storm water drainage system in the town comprises of only tertiary drains due to the limitations in
the availability of data, the analysis is confined to the macro level. The storm water drains need to be
strengthened by separating the sanitation, sewerage and drainage aspects, which are currently
intermixed. Barhi needs to develop an adequate storm water drainage network in a scientific manner,
taking into consideration key parameters of precipitation intensity, catchments delineation, percolation
characteristics and surface run-off.
5.5.2 Major Water Bodies
There are two major water bodies existing in the city. And the total area is about 28 hectares. At present,
waste water is directly disposed into major water bodies. It is leading to un-hygienic conditions in the
area. Few of the slums are developing around these water bodies.
Primary & Secondary Drains: There is lack of primary drains in the town.
Map 5.4 shows Drainage network map.
5.5.3 Tertiary Drains
The tertiary drains are the roadside, built-up open or closed drains and those of the unlined kutcha type.
The total length of tertiary drains as per available data is 5 km. The total drain length accounts to 35
percent of total road length. Table 33 indicates the details of the type of storm water drains in the town.
The road –drain ratio works out to 1:0.82. In the other words, for every 1000 m road length, 820 m drain
length is available.
Table 5.19: Details indicating the Existing drainage connections
Drain Type Length (km)
1. Open Drains – Pucca 5.0
2. Open Drains – Kutcha 7.0
3. Closed Drains -
Total 12.0
4. % to Total Road Length 82 percent
5. Road – Drains Ratio 1: 0.82
Source: Census 2001
Map 5.4: Environmentally Sensitive Areas
5.5.4 Flood-prone Areas or Environmentally Sensitive Areas
Environmentally sensitive areas in urban areas require prior attention as they are prone to pollution due
to the increasing demand for land for various development needs, generation of biodegradable and non-
biodegradable wastes, sewage, etc. Thus, environmentally sensitive areas needs protection from the
likely ill effects caused due to human interactions. Environmentally sensitive areas can also potentially
result in health hazards if not protected.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 50 of 99
City Development Plan for Barhi Town
Table 5.20 Details of Environmental Sensitive Areas
Particulars Area
(ha) Tenure Status Condition Remarks
Bhadhe Talab 8 Govt. regulated Moderate lacks
maintenance
Sangi Talab 10 Govt. Un-
regulated
Moderate lacks
maintenance
Talab ( Nearby
SAIL Office)
1 Pvt. Un-
regulated
Bad lacks
maintenance
Source: Nagar Parishad, Barhi
5.5.5 Air and Noise pollution
Due to presence of steel authority of India within the municipal limits, we can observe movement of
heavy container trucks on State Highway which passes through the center of the town causing air and
noise pollution.
It is noticed that, due to the Stone crushing activities in Udana village, which is located at a distance of 8
kms from the town which causing damage to building structures and also causing noise pollution.
5.5.6 Present and Future Demand and Supply Gaps
Table 5.21 : Demand and Supply Gaps for SWD System
Sl.
No. Components
Length
in km/ Nos.
1 Existing Municipal road length 14.5
2 Additional road length required 31
3 Contemplated road length 46
Barhi
Stone Crushing
Activity Area
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 51 of 99
City Development Plan for Barhi Town
Sl. No.
Components Length
in km/ Nos.
4 Existing pucca drain length 12
5 Rehabilitation of existing pucca drain length 2.5
6 Provision of pucca drains in un-served areas (current gap) 9.5
7 Provision of pucca drains in future expansion areas 25
8 Number of lakes requiring development 3
Source: Analysis
5.5.7 SWOT Analysis
Strengths
•• Considerable Size of water body
Weaknesses
•• Inadequate coverage area of drainage system
Opportunities
•• Development of recreational
spots in abutting areas of water bodies
Threats
•• Pollution of major water bodies
•• Stagnation of waste water in old areas
5.5.8 City specific Strategies and Action Plan
Issue Goal Strategies Action Plans/ Proposals
Lack of road
side pucca
drains
• Provision of
road side
drains
• Rehabilitation of existing drains
system and extension in un-
served areas.
• Provision of road side drains in
future extension areas.
• Rehabilitation of road side
pucca drains: 2.5 km.
• Extension of drainage
network in un-served
areas: 9.5 km.
• Provision of road side
drains in future expansion
areas: 25 km.
Lack of
Maintenance
of “Three
Talab's”
• Protection and
conservation
of water
bodies.
• Avoiding the mixing of sewage
and solid waste with the storm
water.
• To avoid flooding on streets.
• Properly collecting the rain
water through proper drainage
network. Connecting the water
bodies.
• Letting out of the sewage
water into the tank only
after treatment.
• Plantation around the
Bhada Talab, Sangi Talab
and New Talab.
• Provision of rain water
harvesting.
Provision of
drains along
lanes in city
core areas
• To create
sufficient
space for
laying of the
drainage
system
• Removing and avoiding
encroachments.
• Lying of new roads after
completing the drainage
network.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 52 of 99
City Development Plan for Barhi Town
Priority Actions
• Refurbishment of existing drainages
• Improvement of drainages in outer areas
• Provision of 31 km length of drainages by 2035
• Implementation of Rain Water Harvesting
• Development of green belts for the protection of nallahs & water bodies
5.6 Traffic & Transport
5.6.1 Existing Traffic & Transportation Scenario
Barhi is well accessed by road. Barhi town is connected with the region through SH-10, which connects
the town to Katni and Mahiriya. The effective carriage width of the state highway is affected in the
central part of the town due to the activities related to the informal sector activities and dispersed
pedestrian movement.
Table 5.22: Road Surface Details
Surface Type Length
(km)
% to Total
Length
Condition of Road
(in km)
Good Fair Bad
A. Municipal Roads
1. Concrete 3.0 20.6 1.5 1.5 -
2. Water Bound Macadam 2.5
17.5 - 1.5 1.0
3. Earthen 5.0 34.4 - - 5.0
Total 10.5
B. State Highways 4.0 27.5 2.0 2.0 -
Total 14.5 3.5 5.0 6.0
Source: Nagar Parishad, Barhi
The total road length in Barhi is 14.5 km out of which 10.5 km is maintained by the Nagar Parishad and
remaining 4.0 km by the PWD. Around 20 percent of roads laid by cement concrete. The share of WBM
roads is 17 percent and remaining 35 percent are earthen roads.
Map 5.5: Map shows the road network in Barhi
5.6.2 Travel Characteristics
Barhi has higher concentration of pedestrians especially along mayan road, katni road and amarpon
village. The town does not have dedicated footpath along any of the main roads. The related facilities like
street furniture, drinking water fountains, shaded seating and waiting areas are absent. The junctions
are not regulated by traffic signals and lack traffic safety measures to guide the traffic and pedestrian
movement.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 53 of 99
City Development Plan for Barhi Town
Rail & Air connectivity
Barhi Town lacks both rail and air connectivity. The nearest railway station is located at Jabalpur, which is
at a distance of 140 km from the town.
Need for Bypass
A lot of physical development has crossed the by-pass road in northern direction of the city and to avoid
the movement of heavy container trucks passing through the center of the town. Hence a bypass is
required widening for longer run to avoid the regional traffic entering the town.
By-pass
For the preliminary analysis, it is noticed that they is a lot of inter-state traffic (heavy container) moves
along the State highway 11, which pass through the town and in future there is proposal of thermal
plants near Buabuja Village, which will also add some-more inter-state traffic movement in the town
along SH 10, both these traffic have to pass through the core area of the town and which results traffic
congestion and degradation of environment. So it is essential to develop By-pass connected SH 10 & SH
11 in South-West direction.
Junctions
There are four main junctions in the town namely, Bus stand
Junction, Market Junction, petrol station Junction and Baghat singh
junction. The effective width of the roads leading to the junction is
low due to lot of informal, commercial & parking. These junctions
need to be widened and provided with traffic signals, signages,
kerbs & foot paths
5.6.3 Intermediate Public Transport System
The main modes of transport in the town are two-wheelers and Intermediate Public Transport
(IPT).Other than rickshaws there is no other alternative available in the town. Lack of adequate parking
areas has resulted in vehicles being parked along the SH-10 in the town. The unregulated movement and
irregular parking of these vehicles creates problem to vehicular and pedestrian movement. The intra city
commuting is predominantly pedestrian.
5.6.4 Parking Assessment
There are no organized parking areas in the town for any type of
mode. The rickshaws, jeeps, and the two-wheelers are haphazardly
parked in all parts of the commercial and institutional areas. On
street parking is not regulated. There are no bus bays, bus shelters
and truck terminal in the town. The absence of organized parking
is leading to congestion at junctions and market areas.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 54 of 99
City Development Plan for Barhi Town
5.6.5 SWOT Analysis
Strengths
•• Arterial road network is organized
Weaknesses
•• Organic form and congestion due to encroachments in old area
•• Laying of CC roads without laying service
networks
•• Absence of foot paths and medians
•• Absence of signaling systems at junctions
•• Lack of maintenance of bus stand
•• Lack of parking places
Opportunities
•• land available for bus stand
•• Developing bypass road & truck
terminals
Threats
•• Regular interaction of local traffic with regional traffic along the arterial roads can lead to
congestion and accidents
•• Lack of access to emergency facilities in residential areas
5.6.6 Service Adequacy and Key Issues
• Lack of bus station
• The regional traffic passing through the town has put the pedestrian safety at stake. The interior
roads cut the National Highways at many points indicative of conflicting points.
• The roads widths are narrow in old areas which create problems to emergency services such as
ambulance and fire services.
• Most of the roads in the older parts are with CC surfaced. Remaining roads are kutcha in nature,
causing problems especially during rainy season. The road side drains being very small in narrow
roads in older areas, during rainy season the entire road gets drained.
• Foot paths are completely absent in all parts of the town. The pedestrian movement is displaced
hindering the traffic movement.
• The main roads carrying heavy traffic are interconnected by narrow streets; this sometimes leads
to choking of traffic flow. These streets are also used as shortcuts leading to loss of quietude in
residential areas.
• Lack of organized parking for IPT modes.
5.6.7 City specific Strategies and Action Plan
• • Traffic & Transportation
A
Lack of Bus
Stand
Provision of bus
stand with
proper amenities &
adequate facilities
• Improve the existing bus stand
with adequate facilities
• Provide mini-bus stands
wherever is necessary
• Improve the existing bus
stand
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 55 of 99
City Development Plan for Barhi Town
• • Traffic & Transportation
B
Lack of Bus
Shelters
Provision of bus
shelters along
the highway
• Placed bus shelters wherever is
necessary
• Provision of bus shelter
along market junction &
baghat singh junction
C
Regional
traffic is passing
through the town
To minimize
the interaction of regional
traffic with local traffic
• Provision of “Bye Pass” to
divert the regional traffic from
the town • Provision of “Truck Terminals”
along the SH-10
• 4 km length of “Bye-pass
road” has to be laid
• Provision of truck
terminal along Katni road (2035)
D
Non-
uniform and narrow
widths of roads
To make
uniform and regular width of
the roads
• Removal of current
encroachments and avoiding
future encroachments • Widening of roads
Improvement of Existing
roads: • Earthen roads to WBM
roads: 5 km
• WBM Roads to CC
Roads: 2.5 km Resurfacing of existing
roads:
• CC Roads: 1.5 km
• WBM Roads: 2 km
• Widening of Roads:
• SH-10: 4km • sub-arterial roads: 4 km
E
Lack of
public parking
spaces
Provision of
“On street and Off street”
parking space in appropriate
locations
• Provision of parking spaces for
Rickshaws & Autos
• Provision of parking spaces in
commercial public & semipublic places
• Provision of parking
spaces near Bus stand
junction, market junction for rickshaws, 2 & 4
wheeler vehicles.
F
Improper
Road
Junctions
Improving
junctions for
safe and smooth flow of
traffic
• Widening of junctions
• Provision of traffic signaling
systems
• Provision of medians
• Improvement of Bus
stand junction, Police
junction
• Traffic signals at all the
junctions. • 4 km Length of median
along SH-10
G
Lack of
Foot Path
• Improvem
ent of
foot paths
• Provision of foot paths along
the main roads & commercial
areas
• Roads Requiring
Footpaths:
• State Highway 10: 4
km
• Priority Actions
• Widening of SH-10
• Provision of foot paths along the main roads
• Provision of parking areas near junctions & Markets
• Provision of medians along SH-10 & 11
• Provision of high mast poles along Major roads
• Provision of traffic signaling systems at Bus stand junction, market junction and baghat
singh Junction
• Provision of By-pass road
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 56 of 99
City Development Plan for Barhi Town
5.7 Street lighting & fire fighting
5.7.1 Existing Situation of Street Lights
Street lighting is an important component of Traffic safety and management. In Barhi there are about
400 street lights with different types of electrical fixtures. The average spacing of street light poles
ranges between 45 m to 50 m, as against the norm of 30 m indicating gross inadequacy of the system.
However, this condition is not uniform.
Table 5.23: Details of Street Lighting in Barhi
Description Street Lights Percentage to Total
1. High Mast Lamps - -
2. Energy Saver Lamps(CFL) 200 50
3. Sodium Vapour Lamps 10 2.5
4. Tube Lights 190 47.5
Total 400 100.00
Source: Nagar Parishad, Barhi
5.7.2 Fire Services
There is no fire station in the town, but there is a fire tender for emergency purpose. Fire station is
located at district headquarters Katni.
5.7.3 Present and Future Demand and Supply Gaps
The total number of street lights required for the present scenario is about 345 numbers.. By end of the
horizon period, an additional 1045 street light are to be provided.
5.7.4 SWOT Analysis
Strengths
•• Barhi town is nearer to district
headquarter
•• Proper access from Katni
Weaknesses
•• Lack of power supply, Manpower for fire
services.
Opportunities
•• Land available for fire and fighting
services.
Threats
•• High density development in core area
5.7.5 City specific Strategies and Action Plan
Issue Goal Strategies Action Plans/ Proposals
Inadequa
te Street Lights
100 %
coverage of streets
lighting in
the town
Provision of street
lights in un-served areas.
Assessment of street lights in future
development areas.
Current gap:
• Provision of sodium vapour: 45 Nos.
Additional street lights:
• Replacement of existing Energy saver lights
to sodium vapour lamps: 230Nos.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 57 of 99
City Development Plan for Barhi Town
Issue Goal Strategies Action Plans/ Proposals
Provision of high mast
poles.
• Replacement of tube lights to sodium
vapour lamp: 70 Nos.
• Street lighting for Additional Road length: 810 Nos.
• Provision of High Mast lamps: 3 Nos.
5.8 Urban Poor and Their Accessibility to Basic Services
5.8.1 Introduction
The urban poor and slums are by-product of economic development and urbanisation process. As per
2001 population census, 285.35 million people reside in urban areas. It constitutes 27.8 percent of the
total population of the country. In post-independence era while population of India has grown three
times, the urban population has grown five times. The rising urban population has also given rise to
increase in the number of urban poor. It is indispensable to analyse status of poverty for any city
development exercise. Besides it becomes more important in the state like Madhya Pradesh where level
of poverty is relatively higher.
This section deals with the access of urban poor in Barhi to basic services, drawing from secondary
information as well as site visits to slums in the town, and interaction with local residents. The aim is to
identify key issues in service delivery to the poor in Barhi and suggest strategies that would enable the
Nagar Parishad, Barhi to address issues and fulfill its mandate of providing basic services to the poor in
the town.
5.8.2 Poverty in the Town
Various estimates of poverty in Barhi have converged to between 50 to 60 percent of total population. As
per the latest estimate made available by Nagar Parishad - Barhi, the slum population in the town stands
at 5,576, which accounts to 40 percent of the total population and total slum households are 1,013,
which accounts to 55.0 percent of total households.
It is now widely understood that poverty is experienced through a variety of dimension of which low
income is only one. Further that within the poor, there are important differences in depth of poverty, the
ability of poor households to graduate from poverty and the relative vulnerability of different groups to
withstand risks to livelihood such as unemployment, sickness and eviction. Effective poverty reduction
programmes need to be able to differentiate these groups and design appropriate and targets responses.
A total of 6,993 persons in Barhi have been identified as those living Below Poverty Line (BPL). This
would mean that more than 57 percent of total population in the town is living Below Poverty Line.
Although the figures suggest that a majority of slum dwellers in Barhi are living Below Poverty line. A
major poor population lives around the “water body” areas where they have ancestral shelters to live in
but are mostly unemployed.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 58 of 99
City Development Plan for Barhi Town
5.8.3 Information pertaining to BPL Population and Slum Population
There are mainly two different types of houses in Barhi – characterized by type of their housing
condition. Majorly tiled roof houses are observed in entire city and wood and bamboo materials used for
housing in slums. The total slum population of Barhi town is 4465.
Map 5.6 shows Location of Slums
Table 5.24: Ward Wise BPL & Slum Details
Ward No Ward Name 2011-slums
HH Population
Ward No.1 Ballabh Bhai Patel 75 414
Ward No.2 Maharana Pratap 98 541
Ward No.3 Dr. Bheemrao Ambedkar 35 190
Ward No.4 Chandrashekar 72 396
Ward No.10 Maulana Ajad 70 385
Ward No.11 Indira Gandhi 47 256
Ward No.12 Vivekananda 44 242
Ward No.13 Vijayanath 90 496
Ward No.14 Shivaji 172 946
Ward No.15 Rajeev Gandhi 109 599
Total 812 4465
Source: Nagar Parishad, Barhi
5.8.4 Present and Future Housing Demand
The information on housing scenario in slums is not available. However, it was indicated that about 60
per cent of the slum dwellers live in temporary shelters and during the reconnaissance visits, it was
observed that most of the houses are constructed using brick, wood and bamboo materials.
Housing Condition in Slum Area
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 59 of 99
City Development Plan for Barhi Town
Table 5.25: Slum Matrix with reference to Infrastructure covered
Ward Name Ward
No.
La
nd
Te
nu
re
Wa
ter
Su
pp
ly
(Pip
ed
)
Sa
nit
ati
on
(Se
we
r Lin
e)
SW
M
Str
om
Wa
ter
Dra
ins
Str
ee
t L
igh
ts
Ro
ad
s
Ed
uca
tio
n
He
alt
h
So
cia
l
Se
cu
rity
Ballabh Bhai Patel 1 Pvt
Maharana Pratap 2 Pvt
Dr. Bheemrao
Ambedkar 3 Pvt
Chandrashekar 4 Pvt
Maulana Ajad 10 Pvt
Indira Gandhi 11 Pvt
Vivekananda 12 Pvt
Vijayanath 13 Pvt
Shivaji 14 Govt.
Rajeev Gandhi 15 Govt.
Covered
Partially Covered
5.8.5 SWOT Analysis
Strength
•• Availability of land for relocating the slums
Weakness
•• Inadequate physical and social infrastructure facilities
•• Poor condition of housing status
•• Lack of awareness programmes for poverty
reduction schemes
Opportunities
•• Motivate private sector to participate in slum up-gradation projects
Threats
•• Environmental degradation due to lack of access to improved sanitation
5.8.6 Issues
Following are the issues based on the analysis done through secondary sources as well as observations
and discussions with ULB engineers, community based organizations and slum dwellers. Major issues in
brief are given below:
• Inadequate infrastructural facilities like water supply, sewerage and roads, etc.
• Concentrating the major slums in same location
• Lack of comprehensive urban poverty reduction strategy
• In absence of proper strategy and policies to create affordable housing stock for the urban poor
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 60 of 99
City Development Plan for Barhi Town
• Un-regulated physical development.
5.8.7 City specific Strategies and Action Plans
Urban Poor & Slums
Issue Goal Strategies Action Plans/ Proposals
Lack of access to
basic services
• Universalization of
basic services
• Awareness of the slum
development schemes and programs
• Equitable access to basic services with minimum standards, within the
affordability limit and willingness to pay
• Livelihood Promotion and
Community Development
• Implementation of slum
up-gradation programmes
• Relocate the existing
slums along the “major water bodies”
• Provide affordable housing stock
• Providing adequate social
and physical
infrastructure facilities
5.9 Social infrastructure
5.9.1 Educational Facilities
The availability of skilled manpower for diversification of economic base in a town depends on the
provision of quality education. There are 5 primary schools in the town. In addition to the primary
schools, there are other schools that are catering to the needs of secondary education and senior
secondary education. People from surrounding villages are dependent on Barhi town for education
purpose. The details of the existing educational institutions are provided in Table.
Table 5.26: Details of the Educational Institutions in Barhi
Type Norm (UDPFI) Existing
Cumulative Demand
Projected Population 15333 18818 22302
2011 2016 2026 2035
Primary No. 1/ 2500 population 5 7 8 9
Area 0.4 Ha - 2.0 2.4 2.8
Secondary/
High School
No. 1/ 7500 population 1 1 2 3
Area 1.6 Ha - 4.8 4.8 6.4
Senior
Secondary School
No. 1/ 7500 population 1 1 2 3
Area 1.6 Ha - 4.8 4.8 6.4
College No. 1/ 125000
population
0 0 0 1
Area 4.0 Ha - - - 4.0
Poly Technic No. 1/ 1000,000 0 0 0 1
Area 2.4 Ha - - - 2.4
Source: Town Directory, Census of India, 2011
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 61 of 99
City Development Plan for Barhi Town
The nearest engineering, and medical institutions are available at Katni, which is at a distance of 28 km
from the town.
A total of 9 primary schools & 3 secondary and senior secondary schools are required by the end of
horizon period. Considering the dependency of the surrounding rural areas, possibility of developing a
general college & a polytechnic college is factored into the educational requirements of the town, though
the population size of Barhi is less.
5.9.2 Health Facilities
The town has a government hospital and 2 male doctors working in the hospital. The details of the
medical facilities available in Barhi town are provided in Table 41. To avail specialized services, people
resort to travelling to Katni. There is a request by the public to have a female doctor in the hospital & to
upgrade the hospital with 30 beds.
Table 5.27 : Details of Medical Facilities in Barhi
Medical Facilities Nos. Number of Doctors
1. Hospitals 1 2
2. Health Centres 1 1
3. Others/Clinics 3 3
Source: Barhi
The available data is compared with UDPFI guidelines to assess the adequacy of medical facilities. The
details of future demand for the medical facilities are provided in Table.
Table 5.28: Details of Future Demand for the Medical Facilities
Type Norm (UDPFI) Existing
Cumulative Demand
Projected Population 15333 18818 22302
2011 2016 2026 2035
Hospital No. 1 for 100000
persons
1 1 1 1
Area 3.7 Ha - 3.7 3.7 3.7
Maternity
Centers/Clinics
No. 1/ 45000
population
3 3 3 4
Area 0.2 Ha - 0.6 0.6 0.8
Community
Health Centers
No. 1/ 45000
population
1 1 1 2
Area 0.2 Ha - 0.2 0.2 0.4
Source: Town Directory, Census of India, 2011
5.9.3 Socio-Cultural Facilities
The town does not have any land earmarked for Socio-cultural activities except community hall. Presently
community hall is not in use because lack of maintenance. There are no proper recreational and cultural
facilities available in the town. Table indicates the requirement of recreational facilities for the town by
the end of horizon period.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 62 of 99
City Development Plan for Barhi Town
5.9.4 Recreation/ Leisure/ Parks and Play Grounds
It is observed that there is a deficiency in recreational facilities in the town. There is a park in the town.
Only two play ground is located in school premises. There is a need to develop and maintain further
recreational facilities in the town. At present, town level sports facilities are not available.
5.9.5 Markets
The major activity is observed at daily market, which is located along the NH in the town. This market
primarily caters the daily needs of the population of the town. The market runs for 6 days in a week.
About 200-300 people visit the market on a regular week day. Weekly market (Mela ground) is located in
ward-6, where the total no.of shops are about 1,000 and 10,000 people visit on that day. Lack of parking
place at Mela ground is leading to the congestion in the area there by obstructing the pedestrian and
traffic movement.
5.9.6 Crematoria & Burial Grounds
There are 3 burial grounds in the town, which are primarily serving the needs of Hindu and Muslim
religions. The burial grounds and crematoria are maintained well. In quantity, these are sufficient to cater
to the present needs however; there is a need for allotting more space for the same.
5.9.7 City specific Strategies and Action Plans
Social Infrastructure
Issue Goal Strategies Action Plans/ Proposals
Inadequate
social
infrastructure
Development
of social
infrastructure to improve the
Quality of Life
� Development higher
education facilities,
vocational training centers and job oriented training
facilities � Improvement of specialized
health services � Provision of cultural &
recreational facilities
� Provision of additional burial grounds
� Provision of firefighting facilities
� Provision of hotels facilities
for visitors (outsiders)
Provision of Educational facilities:
• Primary schools: 9
• Secondary high schools: 3 • Senior secondary schools: 3
• ITI college: 1 • Polytechnic college: 1
Provision of Heath facilities: • Hospitals: 0
• Maternity hospitals: 1
• Community health centers: 1 Provision of cultural facilities:
• Community halls: 3 • Recreation club: 1
• Auditorium: 1
Provision of land for additional burial grounds: 2
Provision fire station: 1 Provision of hotels: 2
Priority Actions
• Provision of town level Fire Station
• Provision of Improvement of Existing Parks
• Provision of Burial Grounds
• Provision of ITI College
• Provision of Community Halls
INSTITUTIONAL
FRAMEWORK
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 63 of 99
City Development Plan for Barhi Town
CHAPTER 6 INSTITUTIONAL FRAMEWORK
The Organizational Structure of the deliberative wing in Barhi Nagar Parishad
Figure 6.1: Organization Structure of the deliberative wing in Barhi Nagar Parishad
As shown in the above figure, President and Vice-President are the elected bodies, whereas the Nagar
Parishad is headed by Chief Municipal Officer.
Public sphere
in Bhopal
President/Chairperson
Ward Councilors
President in Council
Appeal Committee
Ward Committee
Advisory Committee
Departments under Nagar Parishad - Housing, Environment and Public works Department - Water Works Department - Health and Medical Department - Market Department - Education Department - Women and Child Welfare Department - Food and Civil Supplies Department - Rehabilitation and Employment Department - Revenue Department - Law and General Administration Department
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 64 of 99
City Development Plan for Barhi Town
The organizational Structure of the Executive wing in Barhi Nagar Parishad
Figure 6.2: Organization Structure of the Executive wing in Barhi Nagar Parishad
Chief Municipal Officer
- Public Works Department - Housing, Sanitation Department - Water Supply Department - Finance and Accounts Department - General Administration
Departments - Revenue & Tax Department - Public Relation and Library
Department - Fire Brigade & Workshop Department - Law Section and Legal Cell
Department - Planning and Development
Department - Garden and Parks Department
Zonal Officers
Technical Staff
Non
Technical Staff
Ward Officers
Divisional Officer (OSD)
Departmental Heads
MUNICIPAL FINANCE
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 65 of 99
City Development Plan for Barhi Town
CHAPTER 7 MUNICIPAL FINANCE
7. Present Scenario
The Nagar Parishad prepares the budgets for every year. For the purpose of the analysis, the Nagar
Parishad finances of Barhi have been reviewed for the last four years, commencing from the financial
year 2008-09 and also the items of account have been categorized under the following major heads.
7.1 Revenue and Capital Accounts:
All recurring items of income and
expenditure are included under
revenue head. These include taxes,
charges, salaries, maintenance
expenditure, etc., and an item
under capital accounts are non-
recurring in nature and includes
loans, contributions by GoMP, other agencies and capital grants under various State and Central
Government programmes. Expenditure items include expenses booked under developmental works.
7.1.1 Financial status:
Revenue income of Barhi Nagar Parishad has grown to a level of Rs.96.98 lakhs in the financial year
2011-12 from INR 47.87 lakhs in financial year 2008-09, the revenue income had registered an average
annual growth of 29%, whereas the revenue expenditure increased at an average annual rate of 47%.
It can be clearly known that the growth rate in revenue income is less than growth rate in expenditure,
which leads to negative in revenue operating surplus. Since, lack of revenue operating surplus, the
capital account transactions are also considered for the purpose of the Analysis. The capital receipts
include the grants, amounts from state financial corporation etc.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 66 of 99
City Development Plan for Barhi Town
7.1.2 Composition of own revenue and expenditure:
The revenue expenditure is more than revenue income. Since, there is no revenue operating surplus.
Accordingly, the capital Income and expenses are also considered for the purpose of the analysis. The
graph shows the composition of own revenues and revenue expenditure of Nagar Parishad:
CAPITAL INVESTMENT
PLAN (CIP) & FINANCIAL
OPERATING PLAN (FOP)
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 67 of 99
City Development Plan for Barhi Town
CHAPTER 8 CAPITAL INVESTMENT PLAN (CIP) & FINANCIAL OPERATING PLAN (FOP)
8.1 City Investment Plan - Introduction
The Capital Investment Plan is the multi-year scheduling of identified and prioritized investments. The
CIP is developed after the in-depth analysis of existing infrastructure, service delivery gaps and various
stakeholder workshops at town and state level. The strategies identified/structured for improvement of
existing service gaps and proposal for future requirement.
The proposed projects are identified under three components;
• Projects for system Augmentation,
• Projects for system Refurbishment and
• Other Development projects.
8.1.1 Water Supply System (WS)
The total investment requirement for the water supply sector is estimated at about Rs. 512.91 Lakh. The
investment requirement is estimated for various components of water supply system, including Storage
facility, pipeline for clear water transmission, internal distribution network and installation of water
meters. The investment requirement for leak detection and rectification in the transmission mains and
internal distribution system is also estimated.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the water supply system is presented in Table
Table 8.1 Investment Requirements for Water Supply Sector
Water Supply (WS)
Gap/
Demand Unit
Unit Cost
(lakhs)
Total Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-2015
2015-2025
2025-2035
A. System Refurbishment
Existing improvement of
pipeline network 5 km 5.5 27.50 27.50 - -
laying of network system in un-served Areas 4.5 km 5.5 24.75 24.75 - -
Sub Total (A) 52.25 52.25 0.00 0.00
B. System Augmentation
Pipeline system for future/additional road length 31 km 5.5 170.50 - 85.25 85.25
Additional storage capacity 0.62 ML 60 37.20 18.60 18.60 -
Additional Treatment Plant Capacity 3.61 MLD 11 39.71 39.71 - -
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 68 of 99
City Development Plan for Barhi Town
Water Supply (WS)
Gap/ Demand
Unit
Unit
Cost (lakhs)
Total
Amount (lakhs)
Phase 1
Phase 2
Phase 3
2012-
2015
2015-
2025
2025-
2035
Centrifugal pumps capacity required 75 hp 0.17 12.75 12.75 - -
Raising Main Length 8 km 20 160.00 160.00 - -
Intake Pipeline length 1 km 5.5 5.50 5.50 - -
Sub Total (B) 425.66 236.5
6 103.85 85.25
C. Others
Capacity Building Programmes for ULB Staff LS 5.00 5.00 - -
DPR Preparation including
topographic survey LS 30.00 30.00 - -
Sub Total (c) 35.00 35.00 0.00 0.00
Grand Total (A+B+C) 512.91 323.8
1 103.85 85.25
8.1.2 Sewerage
Proposed projects in sewerage sector were identified based on the future demand. In this sector
proposals are to prepare “Root-Zone treatment system” instead of Underground drainage system. Total
proposed investment is Rs. 150.60 lakh, which also includes conducting capacity building programmes at
town level.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the sewerage system is presented in Table
Table 8.2: Investment Requirements for Sewerage Sector
Sewerage Gap/
Demand Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-
2015
2015-
2025
2025-
2035
A. System Refurbishment
Sewerage network plan- Root
zone system LS 2.00 2.00 - -
Sub Total (A) 2.00 2.00 0.00 0.00
B. System Augmentation
Provision of DEWATS (Baffled
treatment system) 7305 No's 0.02 146.10 36.53 73.05 36.53
Sub Total (B) 146.10 36.53 73.05 36.53
C. Others
Capacity Building Programmes
for ULB Staff LS 2.50 2.50 - -
Sub Total (c) 2.50 2.50 0.00 0.00
Grand Total (A+B+C) 150.60 41.03 73.05 36.53
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 69 of 99
City Development Plan for Barhi Town
8.1.3 Storm Water Drains (SWD)
The proposed investment for storm water drainage sector includes upgradation and remodeling of kutcha
to pucca drains, open drains to closed drains and formation new drains in uncovered areas in the city.
The total investment proposed in this sector is Rs. 219.75 lakh and the summary of projects and
corresponding capital investment requirement for augmentation and refurbishment of the storm water
drainage system is presented in Table
Table 8.3: Investment Requirements for Storm Water Drains Sector
Storm Water Drains (SWD)
Gap/ Demand
Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-
2015
2015-
2025
2025-
2035
A. Rehabilitation
Rehabilitation of existing road side drains 2.5 Km 2 5.00 5.00 - -
Provision of road side drains in un-served areas 9.5 Km 5.5 52.25 52.25 - -
Sub Total (A) 57.25 57.25 0.00 0.00
B. Refurbishment
Pucca drains in future
expansion areas (in km) 25 Km 5.5 137.50 34.38 68.75 34.38
Improvement of Lakes 3 No's 5 15.00 - 15.00 -
Provision of Rainwater
harvesting system LS 10.00 10.00 - -
Sub Total (B) 162.5 44.38 83.75 34.38
Grand Total (A+B) 219.75 101.63 83.75 34.38
8.1.4 Solid Waste Management (SWM)
Proposed projects identified in Solid water Management component consist of procurement of additional
primary collection vehicles, secondary collection vehicles, and transportation vehicles like Dual loaded
dumped placers. For scientific disposal of waste generated in city, development of Landfill sites for non-
recyclable solid waste disposal and Compost site development for recyclable wastes. Total capital
investment proposed in this component is Rs. 112.62 lakh, and the summary of projects and
corresponding capital investment requirement for augmentation and refurbishment of the solid waste
management system is presented in Table
Table 8.4: Investment Requirements for Solid Waste Management Sector
Solid Waste Management
(SWM)
Gap/ Demand
Unit Unit Cost
(lakhs)
Total Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-2015
2015-2025
2025-2035
A. Household Level
Auto tippers (1 for 900-1000 HH) 5 HH 2.4 12.00 3.00 6.00 3.00
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 70 of 99
City Development Plan for Barhi Town
Solid Waste Management (SWM)
Gap/ Demand
Unit
Unit
Cost (lakhs)
Total
Amount (lakhs)
Phase 1
Phase 2
Phase 3
2012-
2015
2015-
2025
2025-
2035
Try Cycles (1 for 300-400 HH) 15 HH 0.08 1.20 0.30 0.60 0.30
Community Bins (1 for 50-60
HH) 74 HH 0.01 0.74 0.74 - -
Sub Total (A) 94.00 13.94 4.04 6.60 3.30
B. Commercial Area
Litter Bins (1 for 200m) 5 m 0.01 0.05 0.05 - -
Sub Total (B) 5 0.05 0.05 0.00 0.00
C. Street Sweeping & Drain desilting
push carts (1 for 2km) 125 km 0.065 8.13 2.03 4.06 2.03
Sub Total (c) 125 8.13 2.03 4.06 2.03
D. Secondary Collection
Metal Container (1 for 2000 HH) 2 HH 0.25 0.50 0.50 - -
Dumper Placer vehicles 2 10 20.00 10.00 10.00 -
Sub Total (D) 4 20.50 10.50 10.00 0.00
E. Disposal site
Improvements at site
(fencing/storage/segregation) LS 50.00 50.00 - -
Land acquisition for landfill site 1 Ha 10 10.00 10.00 - -
Construction of Sanitary landfill
site LS 5.00 5.00 - -
Sub Total (E) 65.00 65.00 0.00 0.00
F. IEC Activities LS 5.00 5.00 - -
Sub Total (F) 5.00 5.00 0.00 0.00
Grand Total (A+B+C+D+E+F) 112.62 86.62 20.66 5.33
8.1.5 Sanitation
Proposed projects in Sanitation sector were identified based on the future demand. In sanitation sector it
is proposed to construct 4 nos of public toilets across various locations in the city. Total proposed
investment is Rs. 78.60 lakh, which also includes conducting capacity building programmes at town level
and construction of Low Cost Sanitation Units.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the Sanitation system is presented in Table
Table 8.5 : Investment Requirements for Sanitation Sector
Sanitation Gap/
Demand Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-
2015
2015-
2025
2025-
2035
A. System Refurbishment
Improvement of Existing 1 No's 3 3.00 3.00 - -
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 71 of 99
City Development Plan for Barhi Town
Sanitation Gap/
Demand Unit
Unit
Cost
(lakhs)
Total
Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-
2015
2015-
2025
2025-
2035
Public Toilets
Sub Total (A) 3.00 3.00 0.00 0.00
B. System Augmentation
Construction of New Toilets 4 No's 6.5 26.00 26.00 - -
Construction of low cost
sanitation units 1115 No's 0.04 44.60 44.60 - -
Sub Total (B) 70.60 70.60 0.00 0.00
C. Others
Capacity Building
Programmes for ULB Staff LS 5.00 5.00 - -
Sub Total (c) 5.00 5.00 0.00 0.00
Grand Total (A+B+C) 78.60 78.60 0.00 0.00
8.1.6 Traffic & Transportation (T&T)
The proposed investments in road improvement works consist of strengthening /improvement to existing
roads, upgradation of roads, widening of sub arterial roads in the city and new formation of roads in
extension areas to maintain a better circulation pattern. The investment proposed in road improvement
works is Rs. 3658.25 Lakh. A summary of projects and corresponding capital investment requirement for
augmentation and refurbishment of the Traffic & Transportation is presented in Table
Table 8.6 : Investment Requirements for Traffic & Transportation
Traffic & Transportation
(TT)
Gap/
Demand Unit
Unit Cost
(lakhs)
Total Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-2015
2015-2025
2025-2035
A. Existing Improvement
CC roads 1.5 km 2.5 3.75 - 3.75 -
WBM roads 2.5 km 20 50.00 50 - -
Sub Total (A) 53.75 50 3.75 0
B. Up gradation of existing
roads
WBM to CC roads 2.5 km 10 25.00 - 25 -
Kucha to WBM roads 5 km 22 110.00 110 - -
Sub Total (B) 135 110 25 0
C. Widening of Roads
SH 10 4 km 25 100.00 100 0.00 0.00
Sub-Arterial road 4 km 25 100.00 - - 100
Sub Total (C ) 100 0 0 100
D. Laying of New roads
laying of roads in future 46 km 75 3450.00 - 1725 1725
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 72 of 99
City Development Plan for Barhi Town
Traffic & Transportation (TT)
Gap/ Demand
Unit
Unit
Cost (lakhs)
Total
Amount (lakhs)
Phase 1
Phase 2
Phase 3
2012-
2015
2015-
2025
2025-
2035
development areas
Sub Total (D) 3450 0 1725 1725
E. Parking Facilities
Near Bus stand 1 LS 0.5 0.5 - -
Near Market Junction 1 LS 0.5 0.5 - -
Sub Total (E) 1 1 0 0
F. Bus Shelters
Along police station 1 No's 2.5 2.50 2.5 - -
Sub Total (F) 2.5 2.5 0 0
G. Junction Improvements
(no's)
Bus stand 1 No's 8 8.00 8 - -
police station 1 No's 8 8.00 - 8 -
Sub Total (G) 16 8 8 0
H. Foot Paths (km)
Along SH 10 4 Km 7.5 30.00 30 0.00 0.00
Sub Total (H) 30 30 0 0
I. Provision of Bye Pass
“Bye-pass road” 4 Km 400 1600.00 1600
Sub Total (I) 1600 0 0 1600
Grand Total 5388.25 201.5 1761.75 3425
PWD Investment 1730.00 130 0.00 1600.00
ULB Investment 3658.25 71.5 1761.75 1825
8.1.7 Electricity and Street Lighting
The proposed projects in street lighting include replacement repaired and old tube fixtures and
installation of new fixtures as per standards. To curtail the energy consumption in street lighting sector
power saving switches (CFL) has been proposed. Total investment in street lighting is Rs. 70.25 lakh.
Table 8.7: Investment Requirements for Street Lighting
Street Lighting (SL) Gap/
Demand Unit
Unit Cost
(lakhs)
Total
Amoun
t (lakhs)
Phase
1
Phase
2
Phase
3
2012-2015
2015-2025
2025-2035
Provision of Sodium Vapour/CFL 45 No's 0.15 6.75 6.75 - -
Replacement of bulbs to CFL 200 No's 0.1 20.00 10 10 -
Street Lighting for additional
road length 230 No's 0.15 34.50 6.9 6.9 20.7
Provision of high mast lamps 3 No's 3 9.00 9 - -
Grand Total 70.25 32.65 16.9 20.7
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 73 of 99
City Development Plan for Barhi Town
8.1.8 Urban Poor
To improve the basic infrastructure facilities inside the slum area and for redevelopment, rehabilitation of
slums following projects have been identified with a total investment of Rs.1258 lakh
Table 8.8: Investment Requirements for Urban Poor
Urban Poor (UP) Gap/
Demand Unit
Unit Cost
(lakhs)
Total Amount
(lakhs)
Phase
1
Phase
2
Phase
3
2012-2015
2015-2025
2025-2035
A. Slum Upgradation
Construction of houses 812 No's 1.5 1218.00 243.6 365.4 609
Health & Education Programmes LS 15 15 - -
Sub Total (A) 1233 258.6 365.4 609
B. Livelihood Promotion
Provision of training centers/meeting halls etc. LS 15 15 - -
Sub Total (B) 15 15 0 0
C. Social Security
Security of tenure for urban poor LS 10 10 - -
Sub Total ( C ) 10 10 0 0
Grand Total 1258 283.6 365.4 609
8.1.9 Environmentally Sensitive Areas
To improve the living environment in the Town, list of projects have been proposed which include
afforestration. Total investment proposed for urban environmental improvement is Rs.30 lakhs.
Table 8.9: Investment Requirements for Environmentally Sensitive Areas
Description Unit Unit Cost
(lakhs)
Amount
(Lakhs)
Phase 1
2012-
2015
Phase 2
2015-
2025
Phase 3
2025-
2035
Afforestration – in Lake/ Pond Catchments Areas 3 10 30 15 15 -
Total 30 15 15
8.1.10 Urban Governance
For efficient management of the increasing administrative responsibilities and the welfare activities it is
proposed for e governance, restructuring of Municipal Council (institutional strengthening) organization
setup to take up new responsibility, double entry accounting system, town planning and municipal
information system (MIS), property Mapping – GIS for efficient collection performance. Besides this
capacity building and periodic training also proposed with a total investment of Rs. 10.00 lakh.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 74 of 99
City Development Plan for Barhi Town
8.1.11 Social Infrastructure
Total investment proposed under this head is Rs. 155.00 lakh, which include development of community
halls, renewal of existing commercial establishments, construction of slaughter houses, electric
crematorium, construction of vegetable markets and facilities like social security and emergency services
etc. The detailed cost estimates are presented in Table
Table 8.10 : Investment Requirements for Social Infrastructure Facilities
Social Infrastructure (SI)
Unit Unit Cost
(lakhs)
Total Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-2015
2015-2025
2025-2035
Fire & Emergency
Services LS 75 - 56.25 18.75
Parks & Playgrounds LS 25 25 - -
Community Halls LS 15 - 15 -
Crematorium Facilities LS 10 10 - -
Market/Slaughter house/Mela Ground LS 15 15 - -
Social Security LS 15 15 - -
Grand Total 155 65 71.25 18.75
Summary of Sector wise Investments
The summary of proposed investment is presented in Table 8.11. Total investment proposed is Rs.
6255.98 lakh out of which Rs. 4997.98 lakh is proposed for urban infrastructure and governance and Rs.
1258.00 lakh is proposed for basic services to the urban poor and housing for urban poor.
Table 8.11: Summary of Proposed Investments
Sector wise Summery of Investments Total
Amount
(lakhs)
Phase 1 Phase 2 Phase 3
2012-2015 2015-2025 2025-2035
Water Supply (WS) 512.91 323.81 103.85 85.25
Sewerage 150.60 41.025 73.05 36.525
Sanitation 78.60 78.6 0 0
Solid Waste Management (SWM) 112.62 86.62 20.66 5.33
Storm Water Drains (SWD) 219.75 101.63 83.75 34.38
Traffic & Transportation (TT) 3658.25 71.50 1761.75 1825.00
Street Lighting (SL) 70.25 32.65 16.9 20.7
Social Infrastructure (SI) 155.00 65.00 71.25 18.75
Environment 30.00 15.00 15.00
Urban Governance 10 10 0 0
Urban Poor (UP) 1258.00 283.60 365.40 609.00
Grand Total 6255.98 1109.43 2511.61 2634.93
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 75 of 99
City Development Plan for Barhi Town
8.2 FINANCIAL OPERATING PLAN (FOP) - Introduction:
The Financial Operating Plan (FOP) is a multi-year forecast of finances of the Nagar Parishad. The FOP
has been generated for a short term period (0 to 3 yrs) beginning 2013-14 to 2015-16, and also for the
long-term period till 2035-36. In the context of this assignment, the FOP is generated for the short term
and has been extended for the long-term (20 years) to essentially provide a snapshot of the impact of
identified investments on the municipal finances in the long run.
8.2.1 Objective and Methodology:
The objective of this plan is to assess the investment sustenance capacity of the Nagar Parishad with
respect to the project cost identified in the Capital Investment Plan (CIP) as part of the City
development plan (CDP). FOPs are essentially a financial forecast, worked out on the basis of the
realistic assumptions and the growth trends of various components of given Revenue and Capital
Receipts and expenditure.
The investment sustenance of the Barhi Nagar Parishad is assessed using a Financial Operating Plan
(FOP) model. The FOP is a multi-year forecast of finances for a term till 2035-36. This analysis is first
done without introducing the identified capital investments in order to arrive at the borrowing and
investment capacities. The second step is to introduce certain reforms and consider necessary
measures, which is expected to improve the financial capability of the Nagar Parishad. The third step is
the sustainability will be checked with the reforms and without reforms. In simple, FOP is worked out
under three scenarios, viz.
a) Base Case; i.e. “Do Nothing” Scenario
b) Introduce reforms with no capital Investments; and
c) Investment Sustenance.
8.2.2 Assumptions and Reforms
The Analysis is based on a whole range of assumptions related to income and expenditure. These
assumptions plays a vital role to ascertain the investment sustenance and would also provide a tool to
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 76 of 99
City Development Plan for Barhi Town
test certain specific policy decisions regarding revenue and expenditure drivers on the overall Parishad
fiscal situation. It explains the assumption adopted for the three FOP scenarios:
8.2.2.1 Assumptions for Forecasting Income and Expenditure:
Generally, the assumptions for forecasting Nagar Parishad income and expenditure for the three
scenarios are considered based on past trends (4-year average growth trend or 4-year compound annual
growth rate - CAGR, whichever is lower)-
8.2.2.2 Municipal Taxes:
The primary tax sources, viz. property tax, water tax/charge are forecasted based on assumptions on the
base (number of assessments) and basis (tax demand per assessment) and the collection efficiencies. In
addition to the above taxes, provision is also made for estimating income from solid waste, subject to
implementation of the proposed scheme.
Property Tax
1. Number of Assessments
In case of property tax, the total number of property tax assessments in 2011-12 as per BNP (Barhi
Nagar Parishad) records adopted as the base and the property tax assessments are 2783. The number of
properties in BNP has increased from 2783 to 11519 at a CAGR of 6.28 per cent during 2012-13 to 2034-
35. A nominal growth rate of 2.00 per cent (equivalent to forecast population growth rate of 6.32 per
cent during 2012-13 to 2034-35) is adopted for forecasting the number of property tax assessments.
2. Tax Demand per Assessment
The annual property tax demand per assessment in 2011-12 is Rs 200/- for pucca houses and is assumed
to be revised by 25 per cent beginning from 2012-13, at a conservative growth rate of 15 percent for
each three years. The presumed rate for analysis for domestic houses is Rs.250 and commercial is Rs.350
Per annum.
3. Collection Efficiency
The average property tax collection efficiency during 2009-10 to 2011-12 was 77 per cent of tax
demands. It is assumed that BNP would consider 80% in 2012-13 and gradually increase its tax collection
performance to 90 per cent against arrears and current tax demand respectively.
Water Tax/Charges
4. Number of Assessments
Presently, there are 943 water connections, out of which, 913 are domestic and 30 are commercial,
which is 33.88% of the property tax assessments. Based on the population, the water connections are
assessed by dividing 5 people per house-hold. In this regard, based on the growth of the population, the
connections are increased to 5237 for the year 2034-35.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 77 of 99
City Development Plan for Barhi Town
5. Tax Demand per Assessment
The average monthly water tax demand per assessment in 2011-12 is Rs. 50 for domestic and Rs.150 for
commercial and is proposed/assumed to be revised to Rs. 80 Per month and Rs.180 per month for
domestic and commercial respectively beginning from 2012-13, at a conservative simple growth rate of
15 per cent per 3 years. The new water connection in 2011-12 is Rs.1200 and is proposed to be revised
to Rs.1400 & Rs.1500 from 2012-13 for domestic and commercial connections respectively, at a
conservative simple growth rate of 15 per cent per 3 years.
6. Collection Efficiency
It is assumed that BNP would gradually increase its tax collection performance from 80 percent to 90
percent against arrears and current tax demand respectively.
Solid waste charge
It does not levy a solid waste charge currently. Hence this tax is not considered in the base case
scenario. However, if this scheme, envisaged as part of the CIP is implemented, it is assumed that BNP
would levy a solid waste charge.
7. Number of Assessments
The ultimate number of assessments for solid waste charge is purely based on the property tax
assessments. It is assumed the total number of property tax assessments is the base for the collection of
revenue.
8. Tax Demand per Assessment
It is assumed that the average monthly solid waste charge demand is Rs. 25 per house hold for domestic
Rs.35 for commercial and it is also assumed that the rate will be revised for every three years at a
conservative growth rate of 15 per cent per every three years.
9. Collection Efficiency
It is assumed that BNP would gradually increase its tax collection performance from 55 percent to 90
percent against arrears and current tax demand respectively.
Other Taxes
Other relatively insignificant taxes like Road tax, improved technology tax, Market fees, tourists tax, etc.,
are forecast to grow at a nominal rate of 10-15% per cent per annum. These rates are assumed on the
basis of CAGR and Average annual growth (trend) rate, whichever is lower.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 78 of 99
City Development Plan for Barhi Town
8.2.2.3 Non-Tax Sources
The non-tax sources of revenue income, viz. municipal own sources, compensation and assigned revenue
and revenue grants are forecast based on past trends. The establishment expenditure of BNP has grown
at an average CAGR of about 19 per cent during the last four years. The same growth rate 1-15% per
annum is assumed for forecasting establishment expenditure. The other expenditures are assumed based
on CAGR and average 4 year trend.
8.2.2.4 New O&M Cost
The capital investments envisaged as per the CIP are bound to impose additional establishment and O&M
expenditure on BNP. Such additional expenditure is estimated based on percentage of capital costs as
estimated by the consultants from their experience in other projects.
FINANCIAL OPERATING PLAN
Before moving to the various scenarios, it is necessary to discuss the details of the Capital Investment
Plan (CIP) and its application on the FOP. The next paragraphs detail on the same. For the purpose of
incorporating new investments, Let us discuss the below:
Phasing of new investments: The identified investments are phased into three; the first one, being
the short term is made for 5 years beginning 2011. The second phase is the mid-term and begins from
2016-2026, and the third one being the long term ends with 2035-36.This is based on the demand and
priorities. The following table gives the details of phasing of investments.
Amount Rs.(lakhs)
The Grant from the central and state government is considered as 80:10 and the Nagar Parishad will get
its contribution as Loan from outside institutions.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 79 of 99
City Development Plan for Barhi Town
O&M Costs: The details of O&M costs for each sector have been worked out and the same has been
incorporated in the analysis. The annual growth rate of O&M cost is 8% per annum. The details of O&M
calculation:
Loan calculations: The Grant mix between central and State Government (GoMP) is taken at a ratio of
80:10, while ULB contribution stays at 10% is considered as Loan taking from outside Organisation. The
following loan terms have been assumed.
Sr.No ParticularsAmount Rs.
In lakhs
1 Loan amount (Rs.) 625.60
2 Interest (%) 7.00%
3 Repayment period 15 years
4 Morotorium period 3 Years
The Principal and interest repayments for the Loan taken is
Description Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
Year 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
1 Principal Outstanding 0.00 0.00 0.00 625.60 629.63 633.95
2 EAI 0.00 0.00 0.00 39.76 39.76 39.76
3 Interest due 43.79 43.79 43.79 43.79 44.07 44.38
Sl.No.
A) SCENARIO 1: Base Case; i.e. “Do Nothing” Scenario :
The financial operating plan, under the first scenario which is a ‘Do Nothing’ situation (without
introduction of new investments). The details of same can be seen here
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 80 of 99
City Development Plan for Barhi Town
It is to be noted that the above FOP is done without introducing any new investments. The TE/TR ratio
during the year 2034-35 is 1.02 and having negative closing balance of Rs.-12.95 crores at the end of the
plan i.e 2034-35. The Computations of the base case scenario has given in annexure.
B) Scenario 2 Introduce reforms with no capital Investments;
We are introducing reforms that are likely, rather necessary for the ULB to execute, in order to improve
their financial position. Certain assumptions have been made on this account, which are the prevailing
trends in various other places. However, based on the assumptions that are already discussed above, the
FOP is prepared.
It is to be noted that the above FOP is done without introducing any new investments. But by introducing
some reforms with assumptions. The TE/TR ratio during the year 2034-35 is 0.83 and having a closing
balance of Rs.13.91 crores at the end of the plan i.e 2034-35.
C) Scenario 3: Investment Sustenance Plan:
This scenario is done to test the strength of ULB after incorporating the new investments on to scenario
2. While the same set of assumptions on management measures is made as in Scenario 2 is assumed
and considered here. The table is
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 81 of 99
City Development Plan for Barhi Town
It is to be noted that the above FOP is done by introducing new investments. The TE/TR ratio during the
year 2034-35 is 0.97 and having a closing balance of Rs.13.33 crores at the end of the plan i.e 2034-35.
Recommendations:
The recommendation suggested therefore, is that the Nagar Parishad shall first introduce certain
management reforms and also certain management measures (not included in FOP) to start with, try
outsourcing activities, which will enhance revenues. It is advised after implementing measures, then the
Nagar Parishad is better to move to the Capital Investment plan. i.e implementing the measures gives
rather cash flows than capital investment.
Suggested Measures:
The following measures are suggested to be implemented by the management of Nagar Parishad, which
is helpful for the improvements in managing the municipal activities. A few are given below:
� Improvement to Property tax collections- Have tie-ups with nationalized banks and open ‘E-SEVA’
centers (like in Andhra Pradesh at Vijayawada Municipal Corporation) for collection of property
tax, so that payments become easier and will improve collection efficiency.
� Do Campaigns within the community to explain the benefits of payment of taxes
� Address Government to expedite in resolving court cases, if any, the books of the municipality.
� We suggest to Impose penalties on unauthorized connections
� As a final step and a more technologically advanced step, it is suggested that the ULB goes in for
GIS mapping of the entire properties, which will help in bringing all properties into tax net. This
needs to be updated periodically. A separate cell in the Municipal Administration is to be
maintained in this regard.
� Automatic revision of property tax rates and other taxes once in 3 years shall be made
mandatory.
On the expenditure side minimal reforms are helpful to reduce manpower and operational expenditure
can be attempted such as:
� Introduce machinery for water supply like for pumping etc., and there by the Human resource
cost for the new investment can be reduced.
� Outsource of solid waste management activities involving primary and secondary collection; there
are possibilities where, even the vehicles purchases can be invested by the operator.
� Similarly, maintenance of street lights can be outsourced to ESCO (Energy Saving Companies
� Periodical maintenance of pumps, etc. can prevent huge O&M expenditure and this also can be
outsourced.
URBAN REFORMS
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 82 of 99
City Development Plan for Barhi Town
CHAPTER 9: URBAN REFORMS
The Reforms under JnNURM aim at strengthening urban governments and to decentralize and devolve
functions, finances and functionaries to them so as to enable them to function as self-governing
institutions providing services efficiently and effectively. Broadly, the reforms aim to:
• Provide for an integrated governance framework with transparency and clear lines of
authority and accountability to achieve the objectives of ‘good urban governance’;
• Facilitate and promote inclusiveness, civic engagement and effective participation of the civil
society in city management;
• Contribute towards financial sustainability of cities - strengthen the financial base of the cities
and make them bankable;
• Enable the cities to work towards planned and integrated provision and operation and
maintenance of infrastructure;
• Develop partnerships with public, private and other sectors for better provision and delivery
of services;
• Extend the canvas of IT and e–Governance to all aspects of city management for efficient,
effective and timely service delivery; and
• Promote pro-poor urban governance and work towards slum free cities with universal,
adequate and affordable housing and basic services;
• Ensure renewal and revival of inner cities;
• Contribute to municipal capacity enhancement.
Implementation of Reforms Implementation of governance reforms is central to JnNURM. These reforms address issues of urban
governance and urban poverty in a sustainable manner. In what follows, an overview of mandatory and
optional reforms is presented.
S. No
Mandatory Reforms Reforms
Status at ULB Remarks Target
1
Adoption of the modern accrual-based double entry
system of accounting in ULBs and Parastatal agencies
Yet to be
Implemented
System was not implemented
due to lack of awareness, professional manpower and
software procurement/equipment. Keen
to adopt the system.
October,
2013
2
Introduction of a system of E-governance using IT
applications such as GIS & MIS etc.
Yet to be
Initiated
System was not implemented due to lack of funds, except
few stand-alone desktop
machines being used for accounting purpose. Keen to
adopt the system with additional funds availability.
March, 2014
3 Reform of Property Tax with
GIS applications
Yet to be
Initiated
GIS Mapping for utilities need
to be done for effective collection.
July, 2013
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 83 of 99
City Development Plan for Barhi Town
4
Levy of reasonable User
Charges by ULBs with the
objective that the full cost of O&M is collected within the
next 5 years.
Partially
achieved, except
water and consolidated
taxes
Collecting water tariff from
household level and collection efficiency is about 60%. UGS
taxes are nil due to absence of system and street lighting tax
is minimal.
2016-17 (UGS system
may not be
considered due to
proposal of DEWATS)
5
Internal earmarking within local
body budget for basic services to urban poor.
Yet to be
Considered
As of now, ULB is not able to
spend any amount for urban poor sector. Specific
allocations have not been made in the budget for urban
poor.
2014-2015
6
Provision of basic services to Urban Poor including security of tenure at affordable prices,
improving housing and
infrastructure facilities
Partially Initiated ULB has issued few "Pattas" to
slum dwellers in the past years 2013-2014
S.No Optional Reforms Reforms Status
at ULB Remarks Target
1
Revision of bye-laws to
streamline the approval process for construction of buildings,
development of site etc
Yet to be Initiated Possible with the directives of State level stance.
These Reforms are
targeted for
implementation
simultaneously with the
implementa
tion of Mandatory
reforms
2 Conversion of land from agriculture to non-agriculture
Yet to be Initiated Possible with the directives of State level stance.
3 Introduction of property title
certification system in ULB Yet to be Initiated
Possible with the directives
of State level stance.
4 20-25% of land earmarking for EWS & LIG category with a
system of cross subsidization
Yet to be Initiated Possible with the directives
of State level stance.
5
Revision of byelaws to make
rainwater harvesting mandatory in all buildings
Yet to be Initiated Possible with the directives
of State level stance.
6 Bye-laws for re-use of recycled
water Yet to be Initiated
Possible with the directives
of State level stance.
7 Encouraging PPP models Yet to be Initiated Possible with the directives
of State level stance.
SUMMARY OF WORKSHOP
PROCEEDINGS
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 84 of 99
City Development Plan for Barhi Town
CHAPTER 10: SUMMARY OF WORKSHOP PROCEEDINGS
10.1 Purpose and Importance of the workshop
Developing a Vision for the City is essential for the preparation of the City Development Plan (CDP). A
Vision is a statement of where the City/Town wishes to grow, within a given time frame, and is often
expressed in terms of clear expectations. It defines the potential of the city and reflects its unique
attributes in terms of comparative and competitive advantages, values and preferences of the city
residents, relationship of the city to state, national and global economies and of course, the history and
physical characteristics of the city. A vision aligns stakeholders’ energies to work cohesively for the
development of the city. Cities need to systematically consider the future requirements, and design Vision
statement to address the shape of the future for the horizon year.
The main purpose of Stakeholders Workshop is to formulate and develop City Vision and Sector goals and
strategies for Barhi Parishad. The CDP shall reflect the priorities and concerns of the public at city level.
Therefore, at different stages, consultative workshops with various stakeholders required to be
conducted.
10.2 Stakeholder Identification
As per Terms of Reference of “preparation of CDP for Barhi Town” the following stakeholders have been
identified and involved for the workshop.
• MLA (Member of Legislative Assembly)
• Municipal Chairperson
• Ward Councilors
• Chief Municipal Officers
• Town and Country Planning Department – Regional Representative
• Line Departments of the State Government such as Pollution Control Broad, Health Department,
Tourism Department, PHED, PWD, Traffic and transportation etc.,
• Private Sector agencies such as chambers of commerce and industry,
• South Eastern Coalfield Limited – Representative
• Government School – Representative
• State Bank of India – Representative
• Inspector of Police
• Non-governmental and community based organizations
• Representatives of the poor communities
• Representatives of ongoing urban development Programmes
• Representatives of media
All the stakeholders and the citizens of the Town become the planning partners of the City Development
Plan.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 85 of 99
City Development Plan for Barhi Town
All the stakeholders identified play an important role in the City Development Planning Process and their
suggestions on various issues regarding the improvement of the quality of life in the Town are very much
a part of the City Development Plan.
10.3 Preparation of hand-outs and questionnaires
A four page Handout/questionnaire has been prepared which briefs the process of “City Development
Plan” and particularly the Vision and Goals stage of the Process. The later part is a questionnaire
designed to extract the opinions of all the stakeholders in an organized format. The first part focuses on
performance of existing infrastructure and the second part intends to identify the priority projects
necessary for the people (Appendix 1 provides the handout/questionnaire used for the presentation).
10.4 District level Workshop/Meeting at District Head Quarters (Jabalpur).
In the 2nd Workshop stage, M/s Aarvee associates architects engineers and consultants’ pvt ltd
representatives, Mr. K. Jagadeesh, Mr. Raghuram and Mr. Vishwanath urban and environmental planner
visited Jabalpur on 13th April, 2012 and held initial discussions with Director, Urban Development
Department at Jabalpur Divisional Office. Shri Gulshan Bamra, Collector, Jabalpur District has revised
the progress of the CDP work and Chaired the meeting, addressed the CMO’s and representatives of all 7
project towns.
District level Workshop
On behalf of the consultant team, Mr. K. Jagadeesh, Manager and Mr. Raghuram, Urban Planner
presented the methodology of the study, Visions and Strategies foreseen for the preparation of City
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 86 of 99
City Development Plan for Barhi Town
Development Plan. The consultants addressed the importance of data inputs from various line
departments in the plan preparation. Handouts have been circulated to all the representatives of 7 towns
and details are showed in Annexure.
All the suggestions were recorded during the meeting, and shall be incorporated in the Priorities and
Projects stage.
10.5 Extended Discussion with Deputy Director
Detailed deliberations were made with Shri. Rajeev Nigam, Dy. Director, urban development
Department, Jabalpur Division. He emphasized on
• Provision of Water Supply, Sanitation and Solid Waste Management,
• Relocation of slums
• Giving training on folk art and folk culture to the slum dwellers
• Imparting social awareness
• Provision of a buffer zone (Urban Forest) along the river bed
Discussion with Deputy Director
10.6 Town level Workshop/Meeting at Town Level:
10.6.1 Preparation for the workshop
The workshop was organized by Aarvee associates Pvt. Ltd with the co-operation of Chief Municipal
Officer (CMO) Barhi and the Municipal staff. The information on conducting the workshop was passed
onto Nagar Parishad well in advance so as to invite various identified stakeholders to participate in the
workshop. Workshop on CDP was held at Barhi Nagar Parishad on 28th of May 2012. The purpose of
the workshop was to involve stakeholders and facilitate to various discussions, record the Comments &
suggestions to finally incorporate in the preparation of CDP.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 87 of 99
City Development Plan for Barhi Town
10.6.2 Presentation on Town profile and discussion with participants
The workshop started with Introduction to the CDP Process and importance of the public participation in
the process. Firstly, the town profile and sector analysis has been presented to facilitate the discussion
among the participants (Please see enclosed appendix 2 for the copy of presentation). The
summary/Findings of the “Sector Analysis” is also done in the following section of the report.
10.6.3 Summary of the Sector Analysis
The following are the Summary/findings of the sector wise analysis and Town Profile of Barhi, which was
explained to the stakeholders.
Table 10.1 : Summary/findings of the Sector Wise Analysis and Town Profile of Barhi
Sectors Analysis
Demography
• The Population of the Municipal area according to the 2011 census is 13946.
• Proposal for including of Khanna Panchayat into Barhi Nagar Parishad
• Decadal Growth rate was 0.28 % for the 2001 – 2011 years
• Population Density (Persons per Hectare) was 8 (2011 year)
• The estimated population for the year 2035 is 36523
Landuse • The residential land comprises of 7% of total land,
• The agriculture area comprises of almost 80%
Income and
expenditure
• Income
• Property taxes, Grants, other revenues are the major Income sources • Property taxes and grants are gradually increasing year by year, which explains the
increase in growth and development activities • Expenditure
• Health facilities, new construction, salaries and other expenditure are the major
expenditure sectors.
• The priority has been clearly on improving health facilities and new construction of
various infrastructure provisions
Economic
base
• Agriculture & business are the main Source of Economy
• The current workforce participation in Barhi is about 35.9 percent.
Housing • Number of households are 2788 and average households size is 5.0
• By the year 2035 the additional Houses required are 1672
Water supply
• Nagar Parishad also plays a role in water supply, having 13 Tube wells, 98 hand
pump facility. • Water Supply deficiency wards are 2, 15
• Population covered by water supply is (75%) and 50 LPCD
• Total demand of water will be 3.01 MLD
• Additional Storage capacity for the year 2035 is 1.63 ML
Sewerage/
sanitation
• Sanitation system is completely through open drains along the roadways and
houses • Some of the ward’s drains are maintained properly, but there are issues with the
stocking of water due to waste materials in the drain.
• This problem is acute in rainy season.
• There are no regularly planned drains in slum residing wards.
• The storm water also runs through the same drains causing stocking problems in
rainy season.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 88 of 99
City Development Plan for Barhi Town
Sectors Analysis
Solid waste management
• Nagar Parishad is responsible to collect and transfer the solid waste generating
from all the households in the Nagar Parishad
• Tractors available for solid waste collection and transfer
• The collection frequency is once a week, leading to stockage of waste along
roadside and near dust bins • Some of the slum wards have a very poor management of solid waste; the
situation demands for a better frequency of waste collection from the Nagar
Parishad • No segregation of waste
• Estimated waste generated for the year 2035 is 9.1 tonnes
Roads and Transportation
• Barhi Nagar Parishad is well connected by roads to surrounding areas of Katni and
other nearby places. • The total road length in Barhi is 14.5 km.
• Provision of By-pass Road
• There is no Public Transport facility available in Barhi Nagar Parishad to nearby
places.
Electricity
• The town is well developed with almost 85% of households having electricity
connections.
• The remaining 15% of the households who are not having connections are the
squatter settlements. • 10 to 12 hours of power cut a day.
• There are provisions for street lighting in the main roadways of Nagar Parishad.
Educational
• There are 5 primary and 1secondary
• A total of 9 primary schools, 3 secondary are required by the end of horizon
period. • At college level education, people try to study in Katni.
Health • The Barhi town has only 1 dispensary which does not have satisfactory health
facilities when compared to standards.
Other facilities • There is two petrol filling facility in Barhi.
• There are 1 park and 2 play grounds
Slums
• There are slums located at every ward in Barhi Nagar Parishad
• The total slum population of Barhi is around 4465, comprising 31% of total
population
• The BPL Population is around 6993.
• There is no government housing scheme implemented in Barhi Nagar Parishad for
Slums • The open drains present are either fully or partially covered with trash leading to
water stagnancy and posing an unsafe / unhygienic environment
• No Public Toilet available
Environmental
Sensitive Areas
• Barhi has many Sites which needs to be considerd like railway crossing, core areas
where water logging happening and along SH-10
10.6.4 Workshop Summary
The Meeting was attended by the president, Chief Municipal Officer and all the Municipal Councilors and
general public attended the meeting and gave their valuable suggestions for development of the town.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 89 of 99
City Development Plan for Barhi Town
The workshop summary has been explained in following stages.
1. In the welcome statement, the Chief Municipal Officer briefed the Purpose of the meeting.
2. The Engineer of Barhi Municipal Council has also elaborated on the role and need for the CDP.
3. Mr.Jagadeesh, Mr. Raghu Ram and Mr. Vishwanath, Urban Planners representing Aarvee Associates
Pvt Ltd Hyderabad for this project made a Presentation on the Sector analysis and Town Profile on the
following topics.
The Town profile and sector analysis included the following topics
• Introduction about CDP
• Demography Study
• Land use analysis
• Income and Expenditure analysis
• Economic base of the Town
• Housing
• Physical infrastructure
• Water Supply
• Storm water/Sanitation
• Solid Waste Management
• Transportation and Roads
• Electricity
• Social Infrastructure
• Educational Facilities
• Health Facilities
• Other Facilities
• Slums and Environmental Sensitive Areas
• Urban Reforms
• Financial Operating Plan
• Funding Pattern
• Percentage increase in taxes to raise the fund by Nagar Parishad to meet the proposed
projects.
Detail deliberations took place on the above subjects and many suggestions were given to finalize a
vision statement for development of Barhi Town.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 90 of 99
City Development Plan for Barhi Town
10.6.5 Photographs taken during the workshop
CITY VISION
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 91 of 99
City Development Plan for Barhi Town
CHAPTER 11: CITY VISION
Introduction
The city development plan is a statement of objectives, policies and standards upon which the physical
economic and social development of the Nagar Parishad are based. The city development plan is based
on proposed broad land use plan (Master plan) showing the existing and proposed locations and intensity
of land development for specific uses such as residential, commercial, industrial, agricultural and
educational uses. The future of the community lies in the vision of the city development plan, so it is
crucial that the city development plan be well thought out and carefully written with the needs of the
community at the forefront, with the continuous involvement of various stakeholders and general public.
Developing a vision statement should be the first step when preparing or writing a city development plan,
a well-crafted statement will tie the rest of the plan together.
Vision Statement
To develop Barhi Town as an important urban center by
improving the economic activities with infrastructure and
better Quality of Life.
11.1 Public Opinion on Existing Infrastructure Facilities and Services in Barhi
The following figure shows the rating on quality of existing infrastructure services expressed by the
stakeholders of Barhi Town.
Figure 11.1 Shows the rating of quality of existing infrastructure services
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 92 of 99
City Development Plan for Barhi Town
As shown in the above figure – The blue color stretch represents “good”, red color represents
“satisfactory” and Green color represents the “not satisfactory” opinions of the people. Even though some
of the facilities represent major portion as satisfactory at present, the service levels would become largely
deficient in the coming years. The CDP aims at evaluating and providing satisfactory service levels for the
year 2035.
11.2 Public opinion on prioritizing the proposed list of developments
Based on the priorities given by the Stakeholders in the Questionnaires, the following ranking for various
proposed developments are identified. The following table provides the prioritization for various
developments.
Table 11.1: shows the prioritization for various developments.
Type of Development Priority
New Water Treatment Plant and Supply system 1
Re-design of all open drains 3
Encourage small scale industries 4
Public Transportation Facility 5
Proper collection, segregation and disposal of solid waste 6
Housing schemes for Economically weaker sections 7
City level Recreational Activity Park 8
Provision of Children Parks and Film Theatres 9
Self-Employment schemes from government 10
Allotment of Houses for Retired people through a share based scheme 11
New Market center providing spaces to all types of commodity Providers 12
Re-Design of Bus Stand Space 13
City beautification 14
From the above table it is observed that the first and foremost priority in town which needs immediate
attention is provision of better and sustainable source for water supply system. The provision of housing
schemes for economically weaker sections, Encouraging setting up of small scale industries, re-design of
open drains, job training Programmes, public transportation facility, better garbage disposal, and
provision of children parks and theatres would be the priorities to form a lively and healthy living city. The
developmental aspects like water supply, drainage, garbage etc., leads to healthy environmental
Condition in the town and also helps in improving quality of the life in the town.
Vision statement
The city development plan is a statement of objectives, policies and standards upon which the physical
economic and social development of the Nagar Parishad are based. The city development plan is based
on proposed broad land use plan (Master plan) showing the existing and proposed locations and intensity
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 93 of 99
City Development Plan for Barhi Town
of land development for specific uses such as residential, commercial, industrial, agricultural and
educational uses. The future of the community lies in the vision of the city development plan, so it is
crucial that the city development plan be well thought out and carefully written with the needs of the
community at the forefront, with the continuous involvement of various stakeholders and general public.
Developing a vision statement should be the first step when preparing or writing a city development plan,
a well-crafted statement will tie the rest of the plan together.
Essential elements of the vision
Because a vision statement will eventually be incorporated into the city development plan, it is essential
that the community identity or unique resources are identified, so that they are preserved through the
development process. Such categories may include, but are not limited to environmental resources such
as streams, mature woodlands, and agricultural resources historic cultural and scenic resources such as
parks and recreation areas and non-renewable resources of economic value such as sand, gravel, land,
mineral deposits. The vision statement in the city development plan must be specific to be effective. The
community should be proactive with its vision statement.
VISION STATEMENT: Planned Development for Nagar Parishad Barhi (2035)
11.3 Planning, developing and managing urban growth in Municipal area
By the year 2035, municipal area would have well planned development with economically productive and
environmentally sustainable aspects of growth. The development area will be well planned and balanced
with a focus on basic Infrastructure development, also planning for slum rehabilitation. High Quality
services such as water supply, sanitation, waste management, street lighting, health, housing and public
transport will be available to all. Development area will be governed by participatory, responsive and
people-oriented local government.
11.4 Sectoral strategy framework
The overall vision for the town and the Prioritization of the key sectors paved the way to formulate sector
specific vision and strategies. This sector specific approach with year wise strategies will be instrumental
in framing the action plan/ implementation plan. The sector specific reforms and investments are an
integral part of the year wise strategies and would be dealt in CIP section of the CDP.
I. Water Supply
At present there are 24 Tube wells in the town which draws about 0.69 MLD. The required supply of
water for the year 2035 would be almost to the tune of 5.00 MLD.
Vision
“Vision is to provide adequate and clean water in an equitable, efficient and sustainable manner”.
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 94 of 99
City Development Plan for Barhi Town
II. Sewerage
Analysis from the sewerage sector reveals that sewerage network coverage and maintenance is very low.
The entire town has open drainage system. The poor and slum dwellers lack safe sanitation facilities and
hence are prone to health related diseases. There is also no storm water drains available for the town
Vision
“Vision is to create a healthy community by providing high quality sewerage and storm drain services
based on the principles of quality, equity, value and responsiveness”.
III. Solid Waste Management
The local governments should effectively involve in efficiently collecting and disposing of solid waste,
encourage people to practice segregation of solid waste at source.
Vision
“Vision is to achieve environmentally sustainable waste management practices.”
IV. Development of open spaces
Small open spaces and vacant areas are available in the Town which could be used as public parks.
Developing the recreational spaces with adequate green coverage would also bring lot of relief to the
inhabitants.
Vision
Vision is to create healthy community environment by development of open spaces and recreational
spaces with Public Private Partnership (PPP).
V. Effective management of urban land
As most of the development is confined to only core area, there is lot of vacant urban land available that
can be effectively used for future development in town. The management of these land parcels must be
through efficient land use plan and with flexible land use zoning regulations.
Vision
“Vision is to prepare an efficient land use plan with optimum utilization of land for present and future
needs and implement the plan in an effective manner.”
VI. Urban Poverty
With about 40% of the population in town living in slums and BPL households are 4.50%, urban poverty
is a major issue confronting the town
Vision
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 95 of 99
City Development Plan for Barhi Town
“The vision is to uplift the quality of life and to place the town slum free as possible by 2035” The goals
formulated to achieve the vision are:
� Access to qualitative and affordable basic services
� 100 % literacy
� Universal access to primary health care and no one should die of preventable diseases
� Ensure livelihood to all urban poor
� Tenurial security and Affordable Housing
� Provision of land tenure security
� Community empowerment
� Linking livelihoods to town’s economy
� Development of housing through partnerships – PPP
� Relocation of slums located in hazardous and vulnerable Areas
� Provision of basic infrastructure – both physical (water, roads, sanitation and sewerage) and
social infrastructure (clinics, schools, training facilities, etc).
11.5 Conclusion: Brief strategies, actions and projects for the city
Urban Planning & Growth Management
The key issues emerging out of planning and growth management is that in-spite of not having master
plan for Barhi town, its lacks in implementation and managing the development in an organized fashion,
which is leading to unplanned haphazard development. Absence of strategic project implementation
mechanism and inadequate financial resources to implement the schemes, lack of private sector
community participation in development process were identified as the existing challenges before the city
Managers.
The CDP process has undergone extensive dialogue with the technical people and public opinion in
prioritizing the key sectors for investments and reform initiatives. The following are the top prioritized
proposals which may guide, facilitate the Town to have a sustainable infrastructure and satisfactory living
conditions with enhanced quality of life.
• Re-design and development of open drains
• New water treatment plant and supply system –
• Development of Solid Waste Management system- door to door collection
• Housing schemes for economically weaker sections
• Encouragement of small scale agro-based industries- Warehouses and cold storage
• Providing Public Transportation System
• Providing Recreational Facilities
SPECIAL PAPER
SPECIAL PAPER
ON
ENVIRONMENT & MINING ACTIVITY �������������
��������������������� ������������������� ������������������������� ������������������������
�������� ����� ��������� ������� ���� ������� ����� �������������� ��� � � ��������� ������ ��� ��������
����������� ��� � � �������� ��������� � � ����� ��������������� ��� ����������� �������� ������� ��
����� ������ �� ��� ��� � ��������� ����� ���� ���� ����� ���� � ����� ��� ����� ��� ��� � �
������������������������������������������� �!������"���� �������������������������������������� �
���������������������������������������� ��������������������� ����������������������������
������������������������������������������������������������������������������������
���� ����������������
Barhi
Stone Crushing Activity Area
�����������������������
#�� ������������������������� �����$%&$ ���� �����������$&�'%�����(����� �����������������#�� ��
)������������������������������� �������������������������������������������� ���*���� ��������(�
# ��� ��� ���+�������� *��( � , �-��� � � ����(����( �) ����(���� ������� ���� � �*�������������#�� ��
+�����*���� ���������.'$$����������$/ %/%���
�
,��� ���� 0������� ����� 1,0�2� ��� �� ��-��� ������
�����������������������������������������3������ ������
��� "����� 0������ 13�"02�� "�� �������� ����� ��(���� �����
�������� ������ � � ��������� ��� 3�"0� �������� � � ������
4������� � ����� ���������5'''���������� ��� ��� �������&(��
����� ����� � � ������ � � ������ ���� ��� ��������� ������� ������
.''� ���� �����4������� . 5''� ����� ��� ������ � �� 4����� ���
�� �� ������� 6�� ��� ����� ��� ���� � 75 '''� ����� ���
�����������4�����������#� �� �,������(� �8 ��( ��������) �������� ��
�
������)39�1)��������3������9������������2���� �3�"0���� ���������������3������������������������������
��(� ���(� � ����� ������� � �� ���� � ������� ���������� ���� ���������� ��� � � ��������:������� � ��� ����
�������&�(������������ � �*��������������� �3�"0�������!���������������������� �)39���������
������ �� ����������� ������������������ �������� �#�� ���������������
�
�����������
�������������� �� ��
+����� ���� ������� �������� ������ ���� �������� ��� �����
���� �����������������������������4��������;���� �������
���� ���(�� ��� � ��� �������� ��� � �� <������� -��� ���� � �
������������ ��� ������ �������� ������� � � ����� ����� ���� ��
������� ��� �� ������� ��� � ���� ���������� ��� ����� �����
����������������� ���������������)������������ ���� �������
����������������������(��������������������� ��������������
��������������������������4���������������
�������!�����""#�����
���� ������ ���� ����������� ���������� ��� ����������
���� ����������������������������� ���������� � �� �
���� ��� ����� � ����� ��� ����� � � ����� =������� ��� �����
�������������������������� ����������������������������
����� ���������������������������� � � ��� �������������
������� ����������� ������ ���4�������������������+����
���������� ����� � � ��� �������� ���� ��� �������� ����
�������(����������������������
��!�$���������
;������������� ����������� �� �������������������� ������������������������������������
"������������������������� �(���������������������������������������������������������
��� �������� � � ���������� )������� �������� � ������ ��� ������� � ��� ��� ���������� ������� ���������
������� � ��������� ���<� ���� ������ ���� ������(��� 0�(� ���� �� �� �������� � � ��� � ���� ��� �
���������������������������������)�������� ���������������� ������������������� �����������������
�����������������������������
��������%"���&"������
0������������ ������ ��������������������� ������� �� �� ����������� ���������������������
�� � ���������������� ������������������6�<�������� ������ � ������ �������� � ���������
�����������"���������������������������� �����������������������������������������������������
���� ����������+���������������������� ������������������������������������������ ��������
������������� ���� �� ������������������������������������������ �����������������
'�%���������#������
� � ����� ��� ������� ���� ��������� �������� ��� �������� ���
��� ��� � � ����� ��������� �������� ���������� ��� �
����������� ����� ��� � � �� �� ������� � ��(� ������������
���� ����� ����� ������� � ����������� ������ ������������
������� � �� ��� �������� ��� ���� �������� 4������ ���
������ ��� ������� ���������� 3��� �������� ��� ����������
������������� ���(�����������������(������� ��������
��� ������� ����� ����� ��� � ���� �������� ���� ������� ��� ���� � ��� ������� ����� ����� ���� � ���
�������������������������������<�������������������
�����������������
� ������������������������������������������ ������������������� ���������� ��������������
�������� ������ ���� ��� � �������� ����� �������� ������ � ��� ���� ���� ���(� ����� � � ����������
���������������������(��������������������������������>�
• =��� ����� ���� ����� ��� ��� �� ��������� ��� �� �������� ����� ��� �������� � � ����� �����
��������������4����������������������������������������������
• 3������� ���(� ��� ��� �� ����������� ��� ��� � �� ���� � ��� � � ���� ����� ������ ��� � ��������
������������� ���� ������������������ ��������� ��������������������������������������
�������������������������
• =������������������������������������������������������������������������������� �����
���������� ����� �����(� ��� ���������� �� ����� �������� ������ ��� ����� � � �����
������������� ��� ����������������� ��� �� �������� ������ ��� ���� ������� � ���������� ������
���(������������������� ����������������������������������� ��������������
• � � ������� ������� ����� � � ���(� ��� ����������� ���� ���� ����� ��� ��� �� ������ ���
������������������������������������������
• ����������������������������� ����� �����������������(����������������������������
��������������������������������:�������
• "������������������������������������������������������������������ ���������������� ��
���������������
• ������������������������������� �������� �������������� ���� ��������������������������������
������������������������������������������� ���������������������� ������������������
� ������������������������ ������
• 9�������� ����������������������(����������������������������������������������������
• ;����������������������������������������������
��������������������������������������
��������������������������� ��������������������������������(���
• 3������������������ ���������������������������������������������(������������������
��� ��������� +���� ��������� ��� ����� ���������� ��������������� ����� ��� ������� ��� ��
�������������������
• +��������������������������������������� ��������������������������������
• ��������������������������������������� ����������������� ���� �����
• 3����������������������?������������������������
• 6�������� ��� �� � ����� ��������� �������� ��(� ������� ��� ������� ��� � �������� ����
�������������������������������������� �4����������������(������� � �� �������������
���������������
• ��������� �������� ��� � � ������� ��� ��� �� ���� ���� �������� ������� ������ =�������� ���
���������������������������<����������������������(�����������������+����������������������
��������������� ������������ ���� ���� ��� ������������� ��� ��������� ��� ����������<��<
��������������
• � ��(� �������� ����� ����������� ��� ��� �� ���� ���� ����� ���� ��������� ��� ��������� ���������
��������
• � ��(���������������� ������������������� ������������� ��������)?* �������������������
�������� ����������������������������� �������
=����������������)��������������
• =����������������)����������������������������������������(�������������������
���� ������������� ������� ��� ���(���� ��������� ���� �� ������ ����� ���� ���� ��(�� �
����������� ���� ����� ���� ����������� ����������� ��� ������ *������������ ������� �������
�������� ���������������� ������������������������������������������������������
�
�
WORKSHOP HANDOUTS
12/19/2011
1
ehar {dH.mg �moOZm 2e8{d8�mo3
ehar ÓemgZ Am–a {dH.mg {d^mJ6 �Ï� ÓXoe gaH.ma
1
n[a�moOZm gœ{jÒV Am–a godmAm| H.m H.m��7jo¿:
� e8{d8�mo8 go ~šhV XrK H.m{bH. H.m� 7Zr{V 2{d©OZ #!$&3 2{d©OZ #!$&3 2{d©OZ #!$&3 2{d©OZ #!$&3 Ho. gmW7gmW ehar {Zdoe �moOZmehar {Zdoe �moOZmehar {Zdoe �moOZmehar {Zdoe �moOZm
2e8{Z8�mo3 CnbÖY H.amZm h– {Oggo gœ~œ{YV e8.Wm8{Z8 Ho.Ðà gaH.ma6 �8n�8 gaH.ma �moOZm Ho.
gmW7gmW e8{d8�mo8 �| ÓmW{�H.Vm H.m� Am–a n[a�moOZm nhMmZ Ho. AmYma na IwX Ho. Edœ AÐ�
8moVm| go {Z{Y�mœ ÓmÒV H.aZo �mo°� hm|Jr 0
� BZ X.VmdoOm| �| {dÁmr� n[aMmbZ �moOZm{dÁmr� n[aMmbZ �moOZm{dÁmr� n[aMmbZ �moOZm{dÁmr� n[aMmbZ �moOZm 2{d8n8�mo83 ^r Xr OmE Vm{H. e8{Z8�mo8 nhMmZr JB
n[a�moOZmAm| Ho. AZwnmbZ Ho. {bE {d{^Ñ {dÁmr� 8moVm| go YZ OwQ>m gHo. 0
� godmAm| Ho. H.m� 7jo¿ �| Oo EZ EZ �w Ama E� Qy>b{H.Q>7# �| ~mVmE JE g^r AmdD�H. H.X�
em{�b hm| {Oggo e8{d8�mo nyam H.aZo �| �XX {�b gHo. O–go AmYma gm�J�r O�m H.aZm Am–a
jo¿7Xm–am6 ZJa n[afX H.��mo[a�m| Am–a g^r AÐ� XmdoXmam| go ^|Q>6 jo¿ {dDbofU AmdD�
H.m� embmAm| H.m Am�moOZ Am–a e8{d8�mo [anmoQ> nyam H.aZm 0
2
12/19/2011
2
� ehar {dH.mg �moOZm �| eha H.m gmnoj �h¾d Am–a AZwÄD� XmoZmo h— 0
� �h eha Ho. dV �mZ {dH.mg H.s p.W{V Xem Vm h– {H. A~ h� H.hm¦ h– ?
� �h n[adV Z H.s {XemAm| H.mo ~VmVm h– {H. h�| H.hm¦ OmZm h– ?
� �h X~md jo¿m| H.s nhMmZ H.admVm h– {H. ÓmW{�H.Vm AmYma na h�| N�m H.aZm Mm{hE ?
� Bg�| n[adV Z bo AmZo Ho. {bE d–H.pÞnH. am.Vo6 H.m� Zr{V Am–a h.Vjon H.m ^r gwPmd hmoVm h– {H. h�| bQ� ÓmÒV H.aZo �|
H–.go h.Vjon H.a| 0
� Bg�| R�o.�dH . Am–a {d©OZ hmoZo go OmZ gH.Vo h— n[a�moOZmAm| H.s nhMmZ H–.go hmo Am–a AZwnmbZ H–.go H.a| 0
� �h gwgœ.Wm{nV H.aVm h– {H. {Zdoe {ZU � Ho. �yÞ�mœH.Z Ho. {bE VH .gœJV Edœ gwgœJV T>mœMo go H–.go {ZnQ>m OmE 0
n[aM�:n[aM�:n[aM�:n[aM�:
3
� Odmhabmb ZohÝ. ZoeZb A~ Z [a{Zdb {�{eZ 2Oo8EZ8EZ8�w8Ama8E�3 H.mo Ï�mZ �| aIVo hVE ehar {dH.mg
�moOZm ~Zm�r JB h– Vm{H. {H.©R.m�Vr C¾nmXH.Vm6 gR. b6 Ð�m�gœJV Am–a Ó^mdZr� eham| Ho. bQ� V–�ma {H.�o
Om gHo. 0
� Bg bQ� H.mo ÓmÒV H.aZo Ho. CÇoD� go �h gœH|.{ÃV H.a Vm h– {H. Am{W H. Am–a gm�m{OH. AmYm[aH. gœ.WmZ Ho.
{dH.mg6 H.m� 7Zr{V {Og�| ehar Jar~ bmoJm| H.mo Ó^m{dV H.aZo dmbr g�.�mE¦6 gaH.mar ZJanm{bH.mAm| H.mo
�©O~yV H.aZo Amoa CZHo. {dÁmr� boIm7OmoIm Am–a ~OQ> ÓUmbr VWm Ó{H.�m6 Odm~Xohr Am–a nmaX{e Vm bmZo Ho.
{bE T>mœMm V–�ma H.aZm6 ^y{� Am–a Jšh {Z�m U {dnUZ na Ó^md S>mbZo {d{YH. ~mYmAm| H.mo XYa H.aZo Ho. N�m
Cnm� {H.�o OmEœ 0
� �h eham| H.mo AmYma ÓXmZ H.aVm h– {Og�œo ehar jo¿m| �| gwYma bmZo Am–a ehar AmYm[aV T>mœMm| Ho. {bE Ó¾�j
{Zdoe H.aZo �| �XX {�b gHo. 0
n[aM�:n[aM�:n[aM�:n[aM�:
4
12/19/2011
3
dJuH.aU Edœ Ó{H�.�m AZwgaU
!Q>oO7" gœJ�hU Am–a Ómaœ^:
Bg Ad.Wm �| ZJa n[afX6 XmdoXma Am–a H.m� dJ Ho. gX.� Am–a ZJa H.m gd}jU H.aZo dmbmoH.� Mm[a�m| Ho. {bE EH. {H.H.7Am¥R. H.m� embm Am�mo {OV H.s OmVr h– 0
!Q>oO7# dV�(mZ n[ap!W{V�m| H.m {ZYm�aU:
dV �mZ n[ap.W{V�m| H.m JhZ {dDbofU {H.�m OmVm h– {Og�| S>o�moJ�m{R.H. ÓmoR.mBb6 EH.moZm{�H.ÓmoR.mBb6 A~ Z JdaZ|g6 A~ Z BÐR�.m.Q¨>NMa Am–a EZdamBZ�|Q>b EgnoNQ> em{�b h– 0
!Q>oO7$ {gQ>r {d©OZ H.m {dH.mg Am–a jo¿ b0� Edœ H.m��7Zr{V:
eha H.m gmnoj Am–a {d©OZ H.m {dH.mg
!Q>oO7% H.m��Zr{V�m| Am–a ÓmW{(H.Vm H.m�� H.m {dH.mg:
eha Ho. ^mdr {dH.mg Ho. {bE eha Edœ {d©OZ H.s dV �mZ p.W{V�m| �| Z©OXr{H.�mœ bmZo hoVw EH.H.m� 7ÓUmbr V–�ma H.aZm 0
5
!Q>oO7& eha {Zdoe �moOZm 2e8{Z8�mo3 Am–a {dÁmr� ÓMmbZ �moOZm 2{d8Ó8�mo3:
eha {Zdoe Am–a {dÁmr� ÓMmbZ �moOZm g{hV {dÁmr� H.m� 7Zr{V V–�ma H.aZm 0
!Q>oO7' S¨>mÕQ> {gQ>r {dH.mg �moOZm 2e8{d8�mo3:
g^r XmdoXmam| Edœ H.m� Xbm| go ÓmÒV R.sS>7~–H. H.mo Ï�mZ �| aIVo hVE eha {Zdoe �moOZm 2e8{Z8�mo3 Am–a{dÁmr� ÓMmbZ �moOZm 2{d8Ó8�mo3 g{hV S¨>mÕQ> {gQ>r {dH.mg �moOZm V–�ma H.aZm 0
!Q>oO7( Aœ{V( e8{d8�mo8 ÓboI:
Aœ{V� H.m� embm H.s R.sS> ~–H. 2Ó{V{H�.�m3 VWm am´� .Va MMm go ÓmÒV Ó{V{H�.�m H.mo em{�b H.aVo hVEAœ{V� eha {dH.mg �moOZm V–�ma H.s OmEJr 0
Cn�w NV g^r .Q>oOm| �| g^r XmdoXmam| Am–a H.m� Xbm| Ho. gmW ß�mnH. Ý.n go nam�e {H.�m OmEJm 0
dJuH.aU Edœ Ó{H�.�m AZwgaU
6
12/19/2011
4
H.m`�7ÓUmbr 2gr8S>r8nr83:H.m`�7ÓUmbr 2gr8S>r8nr83:H.m`�7ÓUmbr 2gr8S>r8nr83:H.m`�7ÓUmbr 2gr8S>r8nr83:
7
H.m��embm H.m CÇoB� Am–a (h¾d:
� XmdoXmam| 2.Q>oH. hmoÞS>a3 H.s H.m� embm H.m �w®� CÇ oD� {gQ>r {d©OZ H.m {dH.mg H.aZm h– Am–a ZJa n[afX Ho. jo¿ bQ� VWm�moOZm ~ZmZm h– 0 e8{d8�mo8 eha .Va Ho. bmoJmoœ H.s ÓmW{�H.VmAm| Am–a {MœVmAm| H.mo XYa H.aVm h– 0 AV: {^Ñ7{^Ñ MaUm| �|AZoH. ÓH.ma Ho. XmdoXmam| Ho. {bE H.m� embm Am�mo{OV H.aVr h– 0
� eha {dH.mg �moOZm 2e8{d8�mo3 V–�ma H.aZo Ho. {bE eha Ho. {d©OZ H.m {dH.mg H.aZm AmdD�H. h– 0 {d©OZ V–�ma r goeha9ZJa H.s Xem Am–a {Xem H.m {X�oJ�o g�� Ho. ^rVa nVm MbVm h– Am–a .nbQ AnojmEœ gm�Zo Am OmVr >h— 0
� �h eha H.s j�Vm VWm VwbZm¾�H. Am–a Ó{V�moJr lod>VmAm |6 �yÞ� Am–a eha {Zdm{g�m| H.s ngœX6 eha Am–a am´�6 ame¨> Am–a{dDd Am{W H. p.W{V H.m gœ~œY Am–a eha H.s Eo{Vhm{gH. Am–a ^m–Jmo{bH. {deofVmAmoœ H.mo {ZÝ.{nV H.aVm h– 0
� Bg {d©OZ go eha Ho. {dH.mg Ho. {bE XmdoXmam| Ho. ggpNVerb H.m� H.aZo H.s H.m� epNV H.m nVm MbVm h– 0
� eham| Ho. ^{db� H.m EH. nÈ{VnyU �moOZm H.mo AnZmZo H.s AmdD�H.Vm h– Am–a #!$& df Ho. {bE ^{db� Ho. AmH.maZwgma{d©OZ .Q>oQ>�|Q> V–�ma H.aZm h– 0
8
12/19/2011
5
�{gQ>r ÓmoR.mBb
�Ozgmœp®�H.s>
�gm_m{OH. Am{W H. nmDd {M¿
�^m–{VH. �moOZm~ÈVm Edœ dš{È Ó~œYZ
�jo¿ {dDbofU
• Ob Amny{V Ó~ÐYZ
• R>mog Hy.S>m> Ó~œYZ
• �b ß�d.Wm6 ~mT> Ob {ZH.mgr9gR.mB Ó~ÐY
• g…S>H. Am–a n[adhZ
• .Q¨>rQ> bmBQ> Am–a Ap°Ze�Z
• JœXr7~.Vr VWm gœdoXZerb n�m daU jo¿ 9 X{©H.�mZygr jo¿
• gm�m{OH. ß�d.Wm 2BœR�.m.Q¨>NMa3
�n�m daUr� gœdoXZerb Edœ gœajU jo¿
� ZJa n[afX Ho. Am�7 ß�� H.m gœ{jÒV {ddaU
Data Requirement
������������������������������������9
शहर �वकास योजना – ������
�������������������������������������
����� ������������������������������
���������������� �������������������� �������������������������������� ��������� ��������� ��������� ��������� ��������� ��������� ��������� ������������� � �� !� "
"�� "##�� �# "$� "��#�$�� "#��� �$ $ � �"�!��
%�&���'���(��(����)�����
****������������ %�&���'���(������%�&���'���(������%�&���'���(������%�&���'���(���������� +��,-��.��*/�����0+��,-��.��*/�����0+��,-��.��*/�����0+��,-��.��*/�����0���� 1�������1�������1�������1����������� 2������ �$!�"�� 3�34�"�� 5��)����� ��$3� #�#!�$�� ����6������27������6���� "�4#� #��8�
8�� ���9�� 4�3#� #�$��4�� ������� �""�:#� 3�:!�3�� ������ �88��:#� : �:��:�� 6������� "#�"!� ���"�!�� ��*�;������6�� 3#�8!� 4�"$�� ��(�<=��(�<=��(�<=��(�<=���� �!# �##� �##�##�
�
����������+���)�����
������������������������
�������������������� ��������������������������������"#�4"#�4"#�4"#�4���� "#"4"#"4"#"4"#"4���� "#$4"#$4"#$4"#$4�
�� >������������� "#"$4� "3#4$� $�!8!�"� 5�����?@A�B���� "$ :4� 4�$$ � �8�8#:�$$$$���� ������������������������������������ "$!8 "$!8 "$!8 "$!8 ���� $##8$$##8$$##8$$##8$���� $34"$$34"$$34"$$34"$����
��
CHECKLIST
Latitude
Longitude
Average rainfall (annual) MM
Height above mean sea level Mts
Municipal area (1991) Sq kms
Municipal area (2001) Sq kms
Municipal area (2011) Sq kms
Date of Constitution of ULB Date
Historic importanceIn one or two
sentences
Population Year 1981 (under Municipal
boundary only)
Population Year 1991 (under Municipal
boundary only)
Population Year 2001 (under Municipal
boundary only)
Population Year 2011 (under Municipal
boundary only)
Name of Population projection Method
Projected population adopted Year 2015
Projected population adopted Year 2025
Projected population adopted Year 2035
Land Use% Standard (as per
UDPFI)
Land use (Tentative
in Sq kms )
Land use (Tentative
in percentage)
Residential 48.0 1.38 7.63
Commercial 2.0 0.09 0.50
Mixed 0.0 0.05 0.28
Public - semi public 8.0 0.025 0.14
Agriculture 5.0 14.41 79.64
Industrial 10.0 0 0.00
Roads 12.0 1.24 6.85
Green area 7.0 0.65 3.59
Sensitive 3.0 0 0.00
Water bodies 5.0 0.25 1.38
Total 18.095 100.00
36522
La
nd
Use
No Significant History for this town
Po
pu
lati
on
Town level
5772
8192
10923
13939
Arithmetic Increase
23848
30043
To
wn
Bri
ef
Geographical location (Town)23⁰9'
80⁰8'
500
361
18.09
18.09
18.09
City ProfileCompanyName Aarvee Associates
ULB Name Barhi
Whether the Sectoral Analysis report is as per UADD requisites Yes
Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total
Name of ward Ballabh Bhai Patel Maharana Pratap Dr. Bheemrao Ambedkar Chandrashekar Ram Manohar Lohiya Jawahar lal Nehru Bhagat Singh Lal Bahadur shastri Mahatma Gandhi Maulana Ajad Indira Gandhi Vivekananda Vijayanath Shivaji Rajeev Gandhi
Ward Population (2011) 1036 1352 475 990 440 553 577 696 512 962 641 604 1239 2364 1498 13939
Area (sq kms) 1.13 5.44 0.07 0.12 0.02 0.01 0.03 0.02 0.01 1.98 0.23 0.73 1.23 0.40 6.63 18.03
Density (PPSqkm) 918 248 6807 8532 27385 98536 22661 45884 51635 486 2770 830 1007 5891 226 773
Male 534 680 234 536 239 289 309 354 263 503 319 301 658 1236 756 7211
Female 502 672 241 454 201 264 268 342 249 459 322 303 581 1128 738 6724
SC NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
ST NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
BPL
Sex ratio 940 988 1030 847 841 913 867 966 947 913 1009 1007 883 913 976 932
Literacy rate (%) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Primary schools 0 0 0 0 0 0 0 0 1 1 0 0 2 1 0 5
No. of Primary Health Center 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1
No. of Households 188 246 86 180 80 101 105 127 93 175 117 110 225 430 272 2534
Primary occupation (Majority) Business Business Business Business Business Business Business Business Business Business Business Business Business Business Business
Seconday occupation Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper Shopkeeper
Tertiary occupation Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture
No. of SS/LS industrial units 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
No. of Commercial
establishments6 0 0 0 3 2 0 0 0 0 0 0 8 0 0 19
No. of Slum pockets 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15
Slum population 414 541 190 396 0 0 0 0 0 385 256 242 496 946 599 4466
No. of Slum Households 75 98 35 72 0 0 0 0 0 70 47 44 90 172 109 893
No. of Individual water
connections in the ward66 86 30 63 28 35 37 44 33 61 41 38 79 150 95 887
No. of Community water
connectionsNil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
No. of Commercial water
connections4 0 0 0 2 2 0 0 0 0 0 0 4 0 0 12
No. of Tubewells 1 0 1 1 1 1 1 1 1 1 1 1 1 1 0 13
No. of Handpumps 10 6 7 9 8 6 8 7 9 1 0 5 7 7 8 98
No. of OHTs 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 2
% Coverage of piped water
supply60 5 60 60 60 60 60 60 60 60 60 10 60 60 60
No. of Individual Toilets 122 160 56 117 52 65 68 82 61 114 76 71 146 279 177 1647
No. of Individual Septic tanks 66 86 30 63 28 35 37 44 33 61 41 38 79 150 95 887
No. of Community Septic tanks NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Community toilets Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
% of population - Open
defecation10-15% 10-15% 10-15% 10-15% 10-15% 10-15% 10-15% 10-15% 10-15% 10-15% 10-15% 10-15% 10-15% 10-15% 10-15%
No. of Dust bins 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15
Wardwise Waste generated
(Kgs)Na Na Na Na Na Na Na Na Na Na Na Na Na Na Na
Road sweeping (1 time or 2
times)1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total no. of sanitary workers in
the ward0 1 0 1 0 1 0 1 0 1 0 1 0 1 0
Length of Pucca road (Mts) 5.5
Length of Kuccha road (Mts) 5
Length of State Highway 4 km
Length of National Highway Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Length of Road side drains
Pucca (Mts)1 0.5 0.7 0 0 0 0 0 1 0 0.5 0 1.5 0 0 5.2
Length of Natural drains
(Nallah) Pucca/Channelized
(Mts)
0 0 0 0 0 0 0 0 0 2 0 0 0 0 5 7
Length of Natural drains
(Nallah) Kuttcha (Mts)Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
No. of Streetlights
No. of Electricity connections 151 197 69 144 64 80 84 101 74 140 93 88 180 344 217
City Profile (Ward Wise)
Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total
Name of ward Ballabh Bhai Patel Maharana Pratap Dr. Bheemrao Ambedkar Chandrashekar Ram Manohar Lohiya Jawahar lal Nehru Bhagat Singh Lal Bahadur shastri Mahatma Gandhi Maulana Ajad Indira Gandhi Vivekananda Vijayanath Shivaji Rajeev Gandhi
City Profile (Ward Wise)
Name of Tourist site if any Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Name of Heritage site if any Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Bus stop (No.) 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0
Bus stand(No.) 0 1 (proposed) 0 0 0 0 0 0 0 0 0 0 0 0 0
Parks (No.) 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0
Playground(No.) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
No. of Residential properties 160 209 73 153 68 85 89 108 79 149 99 93 191 365 231
No. of Commercial properties 6 0 0 0 3 2 0 0 0 0 0 0 8 0 0 19
Total Property tax collection (in
Rs.)19213 25073 8809 18360 8160 10256 10701 12908 9495 17841 11888 11201 22978 43841 27707 258431
Property tax coverage(in %) 60-65% 60-65% 60-65% 60-65% 60-65% 60-65% 60-65% 60-65% 60-65% 60-65% 60-65% 60-65% 60-65% 60-65% 60-65%
Available Government land (Sq
kms)Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
Source Tube well Well River/Lake
No. of Tubewell / River / Well 13 0 0
Water Supplied by Tubewell /
River / Well in MLD0.69 0 0
0.69
50
50 (Flat)
55
0
Mahanadhi
2.41
No
887
NA
Nil
once in 3 months
NA
NA
3.5
NA
5
35
Dangi Talab
Not Yet
250
3.50
1
80
No
No
Located in Ward-15
Allotted site
No
4
2 Trolleys
No
SH-10
Passing through the town
CC 3
WBM 2.5
Total (kms) 5.5
(kms) 5
(kms) 20
Total length of Kuccha roads (kms)
Gap w.r.t Standards
Distance of the Dumping site/landfill site from main
settlement area (Kms)
No. of Tractor trolleys/vehicles available with the ULB
for carrying Solid waste to the LF site
If site for Scientific disposal is not allotted then
whether formally requested by the ULB
Road
s
Name of National Highway passing from or nearby
from the town (NH-XYZ)
Distance of National Highway if nearby from the town
(NH-XYZ) in Kms
Name of State Highway passing from or nearby from
the town (SH-XYZ)
Distance of State Highway if nearby from the town
(SH-XYZ) in Kms
Total length of Pucca roads (Kms)
SW
M
Per capita Solid waste generation (Considering
Standards) (in gms)
Total SW generation (in Tons)
Frequency of SW collection by the ULB (1 time per
day/2 times per day)
Collection efficiency of the ULB (%)
Any initiative for DTDC (Yes /No)
Any initiative for scientific disposal of waste
Name of dumping/ landfill site
Is the existing site Dumping site or allotted site for
Scientific disposal
Area of allotted landfill site for Scientific disposal
Dra
inage
Name of natural nallah (Storm water drain)
Length of natural nallah (Storm water drain) Kms
Ultimate disposal point of nallah
Length of road side drain (Kms)
Coverage of road side drainage w.r.t roads (%)
Ultimate disposal point of Road side drains
Any treatment plant/procedure adopted
Sew
erage
Total sewage generation (MLD)
Whether any treatment plant exists (Y/N),If yes
mention capacity
Total no. of individual septic tanks
Total no. of community septic tanks
Total no. of Sewage/Mud pumps available with the
Frequency of Cleaning Individual Septic tanks
Frequency of Cleaning Community Septic tanks
Sectoral Analysis
Ph
ysi
cal
Infr
ast
ruct
ure
Wate
r S
up
ply
Existing Source
Total water supply in the town (MLD)
Existing Supply rate (LPCD) considering distribution
losses
Water Charges per household per month (Rs.)
Flat/Metered
% Coverage under paid water supply
Whether any treatment plant exists (Y/N),If yes
mention capacity (MLD)
Proposed source (Surface)
Sectoral Analysis
Yes
Yes Mini-Bus service
1 Bus stand junction
2 Market Junction
3 -
- Nil
500
400
190
200
0
10
0
400 KV Katni
220KV
132KV
1200
230
Y (Single phase)
14
Nil
Nil
Nil
Nil
Nil
Nil
Mahanadhi / No Forest / Nil
Madhya Pradesh Environ….Act 199..
Near Railway Crossing Area due to heavy
vehicles movement
4
Government 1
Beds 16
Private 2
Beds 14
No
Name of
townKatni
Distance
(Kms)50
5 (Students capacity)
1 (Students capacity)
0
0
NA
NA
Nil
Nil
NA
Name of
SchemeBeneficiaries
Deendayal
antodaya
Widow
pension
No. of Secondary/High schools
No. of Colleges
No. of ITI
Soci
al
secu
rity
sch
emes
No. of Beneficiaries under SJSRY (Street Vendor)
No. of Beneficiaries under Haath thela/Rickshaw
chalak yojna
No. of Rain Basera/Night Shelter
Ownership of Rain Basera (with ULB/Rental)
No. of Beneficiaries under Gharelu Kamkaji Mahila
Yojana
Name of other Social security
schemes
Prevailing Environmental Act/s
Areas facing threats
Soci
al
Infr
ast
ruct
ure
Hea
lth
No. of Primary Health centres/Dispensary
No. of Hospitals
Multispeciality hospital if any (Y/N)
Name of Nearby town reffered for
Treatment
Ed
uca
tion No. of Primary schools
Her
itage
& t
ou
rism
Her
itage
&
tou
rism
Name of Heritage site/s
Ownership/agency
Prevailing Heritage Act/s
Name of Tourist site/s
Ownership/agency
Total no. of Pilgrims/ Tourists visiting town per day
En
vir
on
men
t
Name of River/Lake/Forest range/Any specific species
Pow
er
Location of Substation
http://www.mptransco.nic.in
Total no. of residential connections
Total no. of Commercial connections
Any subsidy for BPL (Y/N)
Duration of Electricity supply per day (in Hrs)
Str
eet
ligh
tin
gTotal no. of street lights
No. of Streetlights under working condition
No. of Streetlights having Tubes
No. of Streetlights having CFL
No. of Streetlights having Incandescent bulbs
No. of Streetlights having LED
No. of Streetlights having LPS
Tra
ffic
& t
ran
sport
ati
on Total no. of vehicles in the town
Bus stand (yes/No)
Any intracity mass transport mode (yes/no)
Name of locations facing major traffic
issues
Name of the street beautified as per the
instructions of UADD
Ph
ysi
cal
Infr
ast
ruct
ure
Ward
No
Name of Slum
pocket/ reference
name
Notified/
Un-notified
Ward
population
Slum
population
Individual
water
connections
No. of
Community
taps
No. of
Handpump
s
No. of
Individual
toilets
No. of
Community
toilets
No. of
Pucca
houses
No. of Semi
pucca
houses
No. of
Kuccha
houses
No. of
Permanent
pattas
distributed
No. of
Temporary
pattas
distributed
No. of
Primary
school in
the slum
No. of
Primary
Health
centres in
the slum
Beneficiarie
s under
social
security
schemes
Any
intervention
s under
IHSDP
(Y/N)
1Ballabh Bhai
PatelNotified 1036
41450 Nil 6 41 Nil 4 46 33 NA NA NA NA NA N
2Maharana
PratapNotified 1352
54165 Nil 5 54 Nil 5 60 43 NA NA NA NA NA N
3Dr. Bheemrao
AmbedkarNotified 475
19023 Nil 9 19 Nil 2 21 15 NA NA NA NA NA N
4 Chandrashekar Notified 990 396 48 Nil 9 40 Nil 4 44 32 NA NA NA NA NA N
10 Maulana Ajad Notified 962 385 46 Nil 5 39 Nil 4 42 31 NA NA NA NA NA N
11 Indira Gandhi Notified 641 256 31 Nil 7 26 Nil 3 28 20 NA NA NA NA NA N
12 Vivekananda Notified 604 242 29 Nil 11 24 Nil 2 27 19 NA NA NA NA NA N
13 Vijayanath Notified 1239 496 60 Nil 6 50 Nil 5 55 40 NA NA NA NA NA N
14 Shivaji Notified 2364 946 114 Nil 8 95 Nil 9 104 76 NA NA NA NA NA N
15 Rajeev Gandhi Notified 1498 599 72 Nil 4 60 Nil 6 66 48 NA NA NA NA NA N
Total Notified 11161 4465 535.8 70 447 45 491 357
Sectoral AnalysisSlums & Urban Poor
Income Tax
Past Year Balance 40052.00 22997.00 22997.00
Present Year Collection 128451.00 108500.00 134311.00 175000.00
Electricity Tax
Past Year Balance 37000.00 10549.00 20275.00 26677.00
Present Year Collection 38861.00 62315.00 91323.00 125000.00
Tourists Tax 752812.00 870942.00 1344758.00 1400000.00
others 80000.00 190000.00 50000.00 150000.00
Collection Under Special Rules
Kanji House 5185.00 8045.00 17410.00 20000.00
Others 4811.00 17695.00 7523.00 10000.00
Total 1047120.00 1308098.00 1688597.00 1929674.00
Collections from Water Tax
Without Meter 289617.00 254860.00 370650.00 400000.00
Vinighanon par byaj Tap Connection 16000.00 18000.00 53000.00 60000.00
Others, From Tankers 6400.00 7650.00 12500.00 15000.00
Sarvajanik pradharshni aur mela 68442.00 128000.00 130600.00 132000.00
Chamda aur singon ki bikri 17000.00 20000.00
Others, Audit Collection 2536 20653 11158 20000
Bajas bikri nikay ke khaton se expenditure 216634.00 140501.00 141000.00
Other Details 69953.00 6835.00 25143.00 27000.00
Nikshep 132700.00 118900.00 166842.00 170000.00
Total 222189.00 363022.00 343644.00 378000.00
Revenue from other sources
Najul Bhoomi se bhinn anny bhoomo se prapthi 10350.00 45650.00 50000
Kanij Royalty 86199.00 13194.00 15000
Income from Najul Bhoomi 30320.00 65266.00 15000
Markets or Slaughter Houses 62000.00 167000.00 38000.00 150000
Vishisht prayojanarth prapth abhidan vikas 32550.00 5370.00 27409.00 28000
Nagar Vikas Upakar 6896.00 107236.00 67570.00 70000
Dhan petiyonse praptiy ration card I.P.L 1477.00 2919.00 5551.00 5575
Vivid praptiya suchana ka adhikar 48.00 1300.00 180.00 500
Bharath Ghar 9500
Matsya Sangrah Kshetra 50000
Naav Fees 900.00 560.00 575
Chuna Eet Bhatta Stapit kiye jaane ke liye anugyapith fee 500
Khadya aur pay padharton ke 1100.00 1700.00 9000.00 9500
Baghikon ke liye anugyanpti fee sahukari licence 9650.00 5700.00 9050.00 9100
Ferry ke liye anugyapti fee 3800.00 4800.00 6100.00 6100
Prathilipi Fee 24369.00 34859.00 55479.00 56000
Vacant Land 217002.00 287941.00 287695.00 300000
From Building 10000.00 10000.00 1000000
Jann mrutyu panjiyan 76.00 383.00 2956.00 2000.00
Nagar aur anya aghiniyamon ke antarghat huye dhand ki rashi ke aghiniyamon ke shaskiya anudhan
composition samjoutha shulk 5000.00
Purana Bhandar aur purana saman ke vikriya aagam 1000.00
Octroi 3555872.00 5510224.00 7088380.00 7100000.00
Grand Total 4825181 7181344 9120621 9407674
Grants & Donation (Madhya B) 445868 402130.00 357829.00
Samanya and vishesh prayojnarth IHSDP 132900.00 132900.00 200000.00 200000.00
Shasan se
Samanya prayojan ke liye vidhyak /sansad 390000.00 110000.00 440000.00 450000.00
Vishisht prayojan ke liye (Road Repair) 288750.00 509300.00 546800.00 500000.00
Shekshnik prayojan ke liye rajya vith 512136.00 1052900.00 1467700.00 348000.00
Aushadhiyon ke prayojan ke liye mulbuth 1750450.00 1887200.00 2858900.00 1406000.00
manoranjan kar ke liye environment 499500.00
Staniiya Nikayon se
Tax Receipts
Income from Municipal Property
Fees, Service Charges & Penalties
Revenue Transfers
Capital Receipts
12 v vith 699300.00 699400.00 848500.00
13 v vith 850000.00
Hostel Facility B.R.G.F 506000.00 2152500.00 1900000.00
Samanya prayojan ke liye jal parivahan 564510.00 769600.00 429000.00 400000.00
Shaikshanik karyon ke prayojan ke liye talab gahrikaran / sukha rahat 650000.00 1000000.00
Shaikshanik karyon ke pratojan ke liye kichanshod 300000.00
Other parameters Model colour 190000.00
Samanya prayojan ke liye abhidan samvi. Shiksh 28000.00
shaikshanik karyon ke liye abhidhan census 122105.00 100000.00
aushidh prayojan ke liye abhidhan vikendrikaran 410500.00
Mukhya mantri kanyadhan 60000.00 70000.00
rashtriya yojana 1442025.00 1768820.00 1881281.00 1900000.00
mudrank shulk 283842.00 234869.00
Grand Total 2904000 5871229 4019604 9124000
Revenue Expenditure 2008-09 2009-10 2010-11 2011-12
Establishment of general admin offices and repair of vehicles 738130 1080965 1201353.00 1501980
Allowance 16940 37999.00 52914.00 25000.00
Emergency 69148 80191.00 161213.00 160000.00
Establishment of Revenue department and payment to officials 580573 642306.00 692163.00 1073208.00
Allowance 19376 13798.00 13638.00 15000.00
Emergency 101252.00 100000.00
Tax on octroi and boundaries
Allowance 228256 246720.00 274377.00 313200.00
Pension 27286 48298.00 153788.00 160000.00
Total 1679709 2150277 2650698 3348388
Anshudhan (samanya prayojan ke liye) Documentry Expenditure 518128
Others Photocopy Machine 90000.00
Parshadhon ka parichay poster 35000.00
Inverter Cost 30593.00 39280.00 30000.00
Computer Cost
Muldhan ka pratidhan Furniture/Almarah 44913.00 10011.00 50000.00
Interest Girls School shops loan 24990.00 30000.00
Allowance 1000.00
Private companies expenditure 634020.00 100000.00
145191
28640 89494.00 21561.00 55000.00
15196 23050.00 24500.00
Swagat Sarkar Samaroh 57506 30794.00 38849.00 40000.00
Kanooni Prabhar 3000 14000.00 29500.00 35000.00
Bhavishya nidhi mein anshdhan , pension, updhan, anukampa bhatta 141400 159824.00 170130.00 200000.00
Nirvachan 2670 61351.00 18959.00 10000.00
Telephone Trunk Call (lekha)Examination fee 9487 7873.00 4606.00 5000.00
Vigyanpan/Stationery 96541 155981.00 197496.00 200000.00
Dhak Ticket 1250 1000.00 250.00 2000.00
Vahan Kiraya 167292 130200.00 57800.00 60000.00
Others Nikay ke vahnon par vyay 106174.00 201912.00 150000.00
Others 14000.00 34540.00
Repair of Buildings Haat Bazaar 292316.00 333066.00
Shopping Comples 1000000.00
Kanji House
EmergencyProvisions 5725.00 3750.00 6000.00 8000.00
office expenditure
Sarvajanik pradharshni mele gandhi mela jangannan Trust Anshdhan
Establishments and Salaries
Dhak Bangalow saray hotel dharmshala and rest house
Construction Chabutra shod 136575.00
Emergency rangmanch nirman 102117.00 20744.00
Constructing and maintenance Entrance 34697.00
Others Catching of monkeys 80136.00
Vruksh vardhan sarvajanik udhyan baatika
Open Land vrukshropan 18349.00 8136.00 5320.00 50000.00
Establishment Park Provison 725774.00 672209.00 240974.00 200000.00
Other Activities
Talab ki med mein shod nirman 20154.00
Anshdhan talab ki maed par boundary 320743 236213.00 136921.00
Favvara nirman 26051.00
30000.00
54000.00 70000.00
Pashuchikitsa prabhar – general 1123925.00 1667750.00 1297859.00 1800000.00
Suraksha Pension
Establishment Rashtriya Pari.saha. 60000.00 60000.00 60000.00 100000.00
Birth, death and marriage ka panjiyan 2000.00
Total 3330323 4154500 3804133 4377500
Health Care and its Facilities
Water Supply
Establishment 171845 126870.00 143645.00 1125720
Emergency 169266 319940.00 363874.00 100000
Repair and Sangaran 509825 575067.00 806504.00 810000
Expenditure for New Activities (Puji Expenditure) 118945 1177970.00 1270334.00 1200000
Construction and Maintenance of Wells and Jalashayon Pyao 4224 20000
Tanker Rent/ Maintenance 4752 17382.00 16838.00
227527 21650 50000
112097 339325.00 469308.00 500000
Rajya shasan ko deya bhu rajasva submersible mo. 148498 165000.00 483056.00 500000
Avakshayan nidhi stopdam/ dhandhaha nala 47119.00 14076.00 1500000
Rrun ka Prathidhan From Tanker jalapurthi 446560 861474.00 406520.00 400000
Muldhun ka pratidhan dhangi lake 76599.00 160239.00
Interest Talab gaharikaran 631767.00 1000000
Electricity Bill 936241 1105991.00 1451455.00 1450000
Rrun nivaran nidhi ka bhugthan tractor par vyay 18863
Pump House 10933
Shod Nirman 118992
Jal Saharan and Sangaran
Establishment Nala Construction 9440.00 372762.00 805500
Establishment Puliya Construction 15387.00 337880.00
Maintenance and Sandharan Public Toilets 629068 411927.00
Public Security
Agni/Fire/Diesel
Permanent Establishment/Provisional 250560
Allowance 10000
Emergency Services and other material (Agni instrument, engine balti ka kray and repair etc) 25532 27360.00 5160.00 10000.00
Total 3653168 5298501 6933418 9731780
Samajik kalyankari aapada rahat karyakalap mukhya mantri kanyadhan
public health and services
Land allocated for Water Supply Scheme Pipeline
Public Works
Establishment 1960.00 6800.00 1910.00 5000.00
Institution 50000.00
Construction of Higher Secondary School 74698.00 2435.00 400000.00
Maintenance 43808.00
Construction of BT Roads and Nalas 40797 255632 1998006 1750000
Repair and navnikaran W.B.M 89204 297690 362426 935000
Anshdhan (Land Acquisition)
Other Works Samudhayik Bhavan 113574
Repair works 30544 105999 167025 278000
Bhandar and anya prabhar
machinery ya upkaran karidhi 1765 62640
Education for all
Upkaran aur aakasmiktha madhya.bo 195131 574795 123031 215849
Rent of the Building Compulsory 28000
Previous Students ko panchvade 466121
Bhavanon ka kiraya kitchen shod nirman 58790 241210
Stapna model kal.kanya sha.bhava. 177850 30519
Rrun ka pratipadan
Muldhan ka pratipadan 16074.00
Rrun nivaran ka bhugthan 8882.00
Mal Vahan aur sandas
Swastya adhikari ki stapna aakasmiktha 43740.00 129458.00 141587.00 163356.00
Sarvajanik sandason ke liye stayee stapna 2344.00 18248.00 20000.00
Niji sandas tos apashisht prabandh 48766.00 51800.00 900000.00
Construction and wages to the workers 450164.00 644574.00 810496.00 1645176.00
Astayee Stapnaa 244814.00 373289.00 612060.00 150000.00
Others Solid Waste Vehicle/ Plastic Bags 51256.00 5010.00 10970.00 50000.00
Construction Cleaning Material Cost 1000.00 9925.00 6654.00 15000.00
Provisional Establishment Cleaning 234386.00 122471.00 50000.00
Aushadhalay and chikitsalay
Phynil/Malaria 86233.00 190192.00 107385.00 150000.00
Vividh pravhar, rogiyon ke aahar sahith (Hotel) fagging machine cost 461721.00
Sakramak prabhar fagging oil cost 25000.00
Total 1782184 3809646 4547344 7099066
Electricity
Expenditure towards purchasing material (kerosene lamp, bulb, its repairs etc) 108347.00 1021317.00 627841.00 700000.00
Electricity Supply Cost 212202.00 127581.00 202328.00 210000.00
End of Van prani sarp and stray dogs 365088.00 560005.00 2992.00 50000.00
Solar Street Lights 100000.00
Others 24507.00 14211.00 11660.00 10000.00
Asadharan and Rrun
Prathibhutiyon mein rrun nivaran sanchith nidhi 275000
Bachat Bank aaykar 113338 161451 203729 205000
Rrun Nivaran nidhi mein bhugthan vannijya kar 138134 66499 115844 116000
Agrami vetkar 56609 367547 238253 240000
Stayee karmachari kalyani nidhi (L.W.F) 3397 96938 53503 54000
Nikshep 8473 92060 100700 101000
Total 1030095 2782609 1556850 1786000
11475479 18195533 19492443 26342734
- construction of buildings 39917.00
others
Capital Expenditure
improvements
Reforms Achieved (Y/N)
Any City specific
Strategies
adopted
Preliminary
estimate (if any)
for
implementation
Implementing
agency
2012-13 2013-14 2014-15 2015-16
Full migration of double accounting
System
N
Property tax reforms, 85% coverage
ratio and 90% collection ratio
N
Levy of user charges : full recovery of O
& M charges for sewerage, water supply
and SWM
N
Internal earmarking of basic services to
urban poor
N
E-governance N
Provision of basic services to urban poor
including security of tenure at affordable
prices, improved housing, water supply,
sanitation
N
Reforms Action Plan
Time line to achieve reforms till 2015
ANNEXURES
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 96 of 99
City Development Plan for Barhi Town
Annexure-I
Details Assumption
Tax receipts
Property Tax 10%
Public Consolidated Tax 12%
Water Supply 15%
Road Tax 5%
Improvement Tax 1%
City development tax 13%
Other Improvement taxes 0%
Market fees 8%
Naye Pulo Patkar 3%
Najul Ayi 1%
Others 1%
Income from property
Rajhyashasan se udhaar 1%
Kule Bazzar prapth kiye gaye Udhhaar 1%
Water Supply 0%
Collection on with Meter Usage 6%
Collection on without Meter Usage 20%
Rent on Meters and Tankers 10%
Pratibhoot 1%
Others 10%
Interest 2%
Others collections 8%
House rent 10%
Najul Bhoomi se prapthi aye 1%
Income from selling lands 1%
Fees, Service charges & Penalties
Cycle stand fee 2%
Nikshep 3%
khadv aur peyi products ke vikray ke liye anugnayapith fees 8%
Colony vikash shulkh 1%
Dhalal Commission, agent nappayi tullayi vaalo se anugnayapith fees 1%
other fee 10%
Bhavano ka nirmaan anugna shulk 1%
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 97 of 99
City Development Plan for Barhi Town
Details Assumption
Vinidhan par vyaj 1%
General 1%
Education / others 1%
Capital Receipts
samany pryojana keliye moolbhoot sadak 10%
State finance commission 20%
Fundamental services 5%
Slum development Programmes 1%
Special Fund for economic help 2%
12 / 13 finance commission 1%
Mid day meal 10%
Other Works 15%
Revenue Expenditure
Salary & Establishments
a. Officers payment / salary 12%
b. Allowance / Emergency 20%
c. Emergency / provisional establishment 1%
d. Travel allowance 1%
e. Chiki / bhadri / dress 1%
Office Expenditure
Establishment of revenue department and officials payment 13%
Allowance 10%
Emergency computerized taxation 1%
Remuneration 9%
other expenditure / city management 10%
Extra charges 1%
pension and donation 1%
Administrative expenses 8%
Education
Primary schools and mid day meal 15%
Mid day meal programme 1%
Cook / chef 1%
poverty line, boy-girl student stipend 1%
Construction and maintainance of school buildings 8%
library, auditorium,museums 10%
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 98 of 99
City Development Plan for Barhi Town
Details Assumption
Water Works
Government water 1%
Bonfire 1%
construction of embankment 1%
Construction of Wells ,Lakes and pumps and maintenance 15%
Avashyan nidhi greshmkaleen jal sankat tanker 20%
others (extra charges, water tankers) 1%
- Establishment of Private Toilets 10%
- Establishment 15%
- Provisional establishment 12%
- various cleaning sanitation equipment 25%
road irrigation 10%
Communicable type 15%
Public health & Services
Establishment, construction workers 21%
Akasmikata 10%
equipment maintenance work 20%
Expenditure of work, equipment wealth expenditure 1%
Government , welfare works 1%
Improvements
Lok Nirman (Public Works) 1%
Establishment 1%
Construction workers 15%
- Construction 1%
New roads, lanes and drains construction 10%
Maintenance 8%
other works 10%
- Bhandar aur anya (others) 15%
Contribution for the service providing purpose 1%
Redemption at principal amount 1%
Interest 1%
Expenditure on diesel and oil 5%
Tractor maintenance 1%
Actual expenditure at work done for the private people 1%
Government exhibition fare 1%
legal chargers 1%
Future Nidhi me apradhan 1%
GIS – Geographical information system 1%
Doc: Final Report for Barhi Nagar Parishad Date: 26-12-2013
Page: Page 99 of 99
City Development Plan for Barhi Town
Details Assumption
ABF 1%
Telephone and trunk call 10%
Expenditure fee 15%
Extra 1%
Expenditure on stamp ticket and postages 10%
check book, bank kale, chagr 1%
expenditure on national festivals 15%
Expenditure on elections 3%
expenditure for organizing learning other programmes 1%
remuneration for census data collection 1%
Asaadhaaran thata run 1%
Samvadhi nisheph 20%
saving Bank / Dhak Ticket 15%
Others 15%
nikhshep amanth raasi 5%
Expenditure on policies / DPR and other grants 10%
Others
Establishment 8%
purchasing of samagri (Lamp, oil, bulb, repair tools 5%
electricity supply expenditure 5%
New works 1%
forest animals, snakes, stay dogs vinash 1%
Purchase of stationary 5%
expenditure in advertisement 3%
Computer / xerox 5%
vehicle rent 1%
Furniture 1%