378

Click here to load reader

CDP Amarpatan English

Embed Size (px)

DESCRIPTION

City Development Plan Madhya Pradesh

Citation preview

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - A -

    Acknowledgement Preparation of City Development Plan for Amarpatan has been one of the major milestones for I-Win Advisory Services Ltd. This accomplishment would not have been possible without the cordial and warm support of all the citizens of Amarpatan. Their ideas, suggestions and cooperation have been a major factor for successful preparation of the City Development Plan. We express our sincere gratitude to all the people of Amarpatan. We also express our gratitude to all district officials and municipal staff of Amarpatan who have been associated with the preparation of the City Development Plan. District Magistrate (Satna), Project Officer (District Urban Development Agency, Satna), Honourable Chairman and Chief Municipal Officer of Amarpatan Municipality deserve a special mention. Besides, we would also like to thank the Commissioner, Chief Engineer, Mr. Pravin Bhagwat, State Coordinator of UADD and all other staff of Urban Administration and Development Department, Bhopal, for their help and support.

    1

    Tarun Kanti Das

    Executive Director

    I-Win Advisory Services Ltd.

    Disclaimer: The information in this Report has been presented based on data collected from primary and secondary sources.

    Wherever information was not readily available, logical assumptions have been made, in good faith to draw meaningful inferences and these have been mentioned in the respective sections of the report. All such assumptions are subject to further corroboration based on availability of information. This Report includes certain statements, estimates, projections and forecasts based on the information provided by the concerned authorities and rational assumptions made by I-Win Advisory Services Ltd. All such projections are highly assumption specific & not common for all changing scenario. This report has been prepared I-Win Advisory Services Ltd. for its client, Urban Administrative Development Department, Govt. of Madhya Pradesh for its use for future development.

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    CITY USP

  • A M A R P A T A NAmarpatan with a population of 19409, is a small town in Satna district of Madhya Pradesh.National Highway 7 passes through the town.

    "LATE SHRI MANGAL CHAND JAIN JI" was the founder of New Amarpatan and he is very wellknown in the area and he built so many historical building at Amarpatan. There is an old Garhi intown which was built by the Lodhi community in ancient times

    O L D F O R T A T A M A R P A T A N

    K R I S H I U P A J M A N D I A T A M A R P A T A N

    Amarpatan is a Mandi town with a Krishi Upaj Mandi of Grade D, date of regulation : 5.2.1969. Functioning well at present and handles all transaction of produces of all the villages in and around. It covers whole of Amarpatan block.

    Amarpatan is a land of water bodies.

    L A K E S O F A M A R P A T A N

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    RESOLUTION OF MUNICIPAL COUNCIL

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    CHECKLIST

  • Latitude

    Longitude

    Average rainfall (annual) MM

    Height above mean sea level Mts

    Municipal area (1991) Sq kms

    Municipal area (2001) Sq kms

    Municipal area (2011) Sq kms

    Historic importance In one or two sentences

    Population Year 1981 (under Municipal

    boundary only)

    Population Year 1991 (under Municipal

    boundary only)

    Population Year 2001 (under Municipal

    boundary only)

    Population Year 2011 (under Municipal

    boundary only)

    Name of Population projection Method

    Projected population adopted Year 2016

    Projected population adopted Year 2026

    Projected population adopted Year 2036

    Land Use % Standard (as per UDPFI) Land use (Tentative in Sq kms ) Land use (Tentative in percentage)Agricultural 7.328 71.03

    Residential 1.712 16.60

    Mixed 0.039 0.38

    Unused Plots 0.004 0.04

    Commercial 3-4 0.027 0.26

    Transport 12-14 0.21 2.08

    Public-Semipublic 10-12 0.158 1.53

    Recreational 18-20 0.04 0.36

    Industrial 8-10 0.410 3.98

    Other Green 0.082 0.79

    Water body 0.287 2.79

    Heritage 0.018 0.18

    Total 10.32 100.000

    Name of the Town: Amarpatan

    City Profile

    23904

    28157

    I-Win Advisory Services Ltd.

    Amarpatan Nagar Palika Parishad

    Yes

    NA

    15030

    16371

    19409

    Exponential Method

    20881

    2419 N

    8058E

    average 846

    360 m

    Unknown

    10.32

    10.32

    Amarpatan is a Tehsil in Satna with the town being the Tehsil

    headquarter. Whole of Satna district comes within the

    Baghelkhand region.

    40-45

    Lan

    d U

    se

    Town level

    CompanyName

    ULB Name

    Whether the Sectoral Analysis report is as per UADD requisites

    Po

    pu

    lati

    on

    Tow

    n B

    rie

    fGeographical location (Town)

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    Name of wardMahatma

    Gandhi Ward

    Indira

    Gandhi Ward

    Pt. Jawahar

    Lal Nehru

    Ward

    Subhash

    Chandra

    Bose Ward

    Dr. Bhim Rao

    Ambedkar

    Ward

    Lal Bahadur

    Shashtri

    Ward

    Dr. Rajendra

    Prasad Ward

    Maharana

    Pratap Ward

    Sanjay

    Gandhi Ward

    Narsingh

    Ward

    Bhagat Singh

    Ward

    Rajeev

    Gandhi Ward

    Gouri

    Shankar

    Ward

    Bajrang

    WardShivaji Ward

    Ward Population (2011) 2111 1505 1803 1659 1285 1359 676 1311 847 678 1134 1218 1010 1622 1191 19409

    Area (sq kms) (2011) 1.11 1.26 1.99 1.82 0.92 0.83 0.37 1.30 0.16 0.03 0.18 0.04 0.12 0.11 0.09 10.32

    Density (PPSqkm) (2011) 1906 1190 905 909 1402 1645 1835 1009 5421 23765 6413 29659 8734 14917 13019 1881

    Male 1122 792 933 840 663 676 347 690 450 359 576 655 532 840 649 10124

    Female 989 713 870 819 622 683 329 621 397 319 558 563 478 782 542 9285

    SC (2001) 12 326 295 978 709 0 512 1 0 20 25 0 10 50 25 2963

    ST (2001) 19 447 112 0 145 0 82 5 8 109 57 6 140 6 9 1145

    BPL 2150 card holders

    Sex ratio 669 1106 850 864 902 1103 1220 923 1214 736 984 786 921 918 915 917

    Crude Literacy rate (%) 82.9 76.3 62.0 67.0 58.5 62.1 60.2 62.8 81.7 77.6 72.8 77.4 68.6 75.5 82.7 71.3

    Average Literacy rate (%) (excluding 0-6 years) 92.0 89.3 72.3 77.9 70.1 71.8 72.0 72.4 91.8 89.8 81.9 88.3 78.0 86.8 93.4 82.0

    No. of Primary schools (anganwari Kendras & School) 42

    No. of Primary Health Centre (Community Health

    Centre)0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1

    No. of Households 425 322 370 295 233 271 107 265 134 129 225 214 200 316 241 3747

    Primary occupation (Majority) Labours

    Seconday occupation

    Agricultural

    Labourers/ Household

    Industrial Workers

    Tertiary occupation Cultivators

    No. of SS/LS industrial units

    1 Saw Mill, 1

    Rice Mill, 1

    Saw Mill

    2 Stone

    Crusher, 1

    Milk

    Collection

    Centre

    6

    No. of Slum pockets 2 1 2 2 2 1 10

    Slum population 8000

    No. of Slum Households 1900

    No. of Households having water connections in the

    ward1479

    No. of Community water connections 6

    No. of Tubewells 1 1 1 3 6+3 outside town

    No. of Handpumps 147

    No. of OHTs 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1

    % Coverage of piped water supply 10% 10% 50% 40% 80% 60% 80% 100% 100% 100% 90% 100% 100% 100% 100% 74.67%No. of Individual Toilets (Source: City Sanitation

    Survey 2008-2009)425 125 87 14 40 12 26 76 27 6 136 93 98 58 187 1410

    No. of Individual Septic tanks (Source: Household

    Census 2011)1572

    No. of Community toilets

    1 (under

    construction

    )

    1 (under

    construction

    )

    2

    % of population - Open defecation 50%

    No. of Dust bins 14

    Wardwise Waste generated (Kgs) (2012) 6868

    Total no. of sanitary workers in the ward 31

    City Profile (Ward Wise)

    Name of the Town: Amarpatan

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    City Profile (Ward Wise)

    Name of the Town: Amarpatan

    Length of Pucca road (Mts) (includes Tar, WBM &

    Concrete Road)35084 m

    Length of Kuccha road (Mts) 3020 m

    Length of State Highway NA

    Length of National Highway 5.7 km

    Length of Road side drains Pucca (Mts) 21090 mLength of Natural drains (Nallah) Pucca/Channelized

    (Mts)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Length of Natural drains (Nallah) Kuttcha (Mts) 0 0 1683 1013 0 0 0 0 0 0 0 0 0 0 0 2696

    No. of household having Electricity connections 3262

    Name of Tourist site if any Garhi Garhi

    Name of Heritage site if any Garhi Garhi

    Bus stand(No.) 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1

    Parks (No.) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Playground(No.) 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1Total Property tax collection (in Rs.) (in July 12-13,

    for Current Year & Arrear)199899

    Property tax coverage(in %) 23.2% for Current Year

    Remarks

  • Source Tubewell Well River/Lake

    No. of Tubewell / River / Well 9 11 Talab within town Boundary

    Water Supplied by Tubewell / River / Well in MLD 1.2 0

    1.2

    40-50

    Rs 40 / month / household

    31.60%

    N

    Bargi Dam

    2.12 MLD

    No

    1572

    0

    0

    NA

    NA

    Jhinna nullah

    2.696 km

    No Particular Point

    21.09 km

    33%

    Jhinna Nullah

    No

    350 gm

    6.87 MT

    Yes, in ward 5

    Yes

    Padakka

    Yes

    4 acre land in ward 3

    2 km

    NA

    Frequency of Cleaning Community Septic tanks

    Name of natural nallah (Storm water drain)

    Length of natural nallah (Storm water drain) Kms

    Name of the Town: Amarpatan

    Sectoral Analysis

    Any initiative for DTDC (Yes /No)

    Any initiative for scientific disposal of waste

    Name of dumping/ landfill site

    Distance of the Dumping site/landfill site from main settlement area (Kms)

    Length of road side drain (Kms)

    Coverage of road side drainage w.r.t roads (%)

    Ultimate disposal point of Road side drains

    Any treatment plant/procedure adopted

    Per capita Solid waste generation (Considering Standards) (in gms)

    Total SW generation (in Tons)

    Total water supply in the town (MLD)

    Existing Supply rate (LPCD) considering distribution losses

    Water Charges per household per month (Rs.) Flat/Metered

    Whether any treatment plant exists (Y/N),If yes mention capacity (MLD)

    Proposed source (Surface)

    Frequency of Cleaning Individual Septic tanks

    Area of allotted landfill site for Scientific disposal

    Total sewage generation (MLD)

    Whether any treatment plant exists (Y/N),If yes mention capacity

    Total no. of individual septic tanks

    Existing Source

    SWM

    Ultimate disposal point of nallah

    If site for Scientific disposal is not allotted then whether formally requested by the ULB

    % Coverage under paid water supply

    Is the existing site Dumping site or allotted site for Scientific disposal

    Total no. of community septic tanks

    Total no. of Sewage/Mud pumps available with the ULB

    Wat

    er

    Sup

    ply

    Ph

    ysic

    al In

    fras

    tru

    ctu

    re

    Sew

    era

    geD

    rain

    age

  • Name of the Town: Amarpatan

    Sectoral AnalysisExisting Source

    NH 7 passing through the town

    NA

    NA

    NA

    Tar 11.571

    WBM 2.469

    Concrete 21.044

    Total (kms) 35.084

    (kms) 29.037

    Yes Currently in Ward 5

    No NA

    1 Satna Chowraha

    2 Ramnagar Chowraha

    3 All along Ramnagar Road in the market area

    NA

    Stre

    et

    Ligh

    tin

    g 526 electric poles

    132 KV Ward 3

    3262

    Kabir Math and Raj Mandir (Royal Temple) of Parihar Rajput

    Maharajas, and a Garhi (Fort) of Maharajas in ward no. 9

    Garhi maintained by PWD

    Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973

    Comhrehensive TCP legislation, heritage ammendment pending

    Kabir Math and Raj Mandir (Royal Temple) of Parihar Rajput

    Maharajas, and a Garhi (Fort) of Maharajas in ward no. 9

    Garhi maintained by PWD

    None

    Ownership/agency

    Total no. of Pilgrims/ Tourists visiting town per day

    Name of Possible Tourist site/s

    Name of Heritage site/s

    Ownership/agency

    Prevailing Heritage Act/s

    Name of the street beautified as per the instructions of UADD

    Bus stand (yes/No)

    Location of Substation

    Total no. of residential connections

    Total no. of street lights

    Ph

    ysic

    al In

    fras

    tru

    ctu

    re

    Traf

    fic

    &

    tran

    spo

    rtat

    ion

    Name of locations facing major traffic issues

    Any intracity mass transport mode (yes/no)

    Ro

    ads Distance of State Highway if nearby from the town (SH-XYZ) in Kms

    Total length of Pucca roads (Kms)

    Total length of Kuccha roads (kms)

    Name of National Highway passing from or nearby from the town (NH-XYZ)

    Distance of National Highway if nearby from the town (NH-XYZ) in Kms

    Name of State Highway passing from or nearby from the town (SH-XYZ)

    He

    rita

    ge &

    to

    uri

    smP

    ow

    er

    He

    rita

    ge &

    to

    uri

    sm

  • Name of the Town: Amarpatan

    Sectoral AnalysisExisting Source

    Jhinna Nullah, 12 major Talabs in & around the town

    Water (Prevention and Control of Madhya Pradesh Pollution) Rules,

    1975

    State Prevention and Control of Water Pollution Board Rules, 1975

    The Madhya Pradesh State Prevention and Control of Water

    Pollution Board and its Committees (Meetings) Rules, 1975

    Water (Prevention and Control of Pollution)(Consent) Madhya

    Pradesh Rules, 1975

    Garhi in ward 15, Ram talayia in ward 11

    CHC in ward 14

    Government NA

    Beds NA

    Private NA

    Beds NA

    No NA

    Yes Animal hospital in ward 4

    Name of town Satna and Maihar

    Distance (Kms) 25 km to Satna

    42 Available in each ward

    2+3 (private) Ward 14, 4, 1, 2

    1 Ward 1

    1 Ward 4

    0

    NA

    Name of River/Lake/Forest range/Any specific species

    Prevailing Environmental Act/s

    Edu

    cati

    on

    Other Health Facility if any

    He

    alth

    Areas facing threats

    No. of Primary Health centres/Dispensary

    No. of ITI

    No. of Hospitals

    Multispeciality hospital if any (Y/N)

    Name of Nearby town reffered for Treatment

    No. of Primary schools

    No. of Secondary/High schools

    No. of Colleges

    No. of Rain Basera/Night Shelter

    Ownership of Rain Basera (with ULB/Rental)So

    cial

    secu

    rity

    sch

    em

    es

    Soci

    al In

    fras

    tru

    ctu

    re

    Envi

    ron

    me

    nt

    He

    rita

    ge &

    to

    uri

    sm

  • Ward NoName of Slum pocket /

    reference nameNotified/ Un-notified

    Ward

    population

    Slum

    Household

    Individual

    water

    connection

    s

    No. of

    Communit

    y taps

    No. of

    Handpump

    s

    No. of

    Individual

    toilets

    No. of

    Communit

    y toilets

    No. of

    Pucca

    houses

    No. of

    Semi pucca

    houses

    No. of

    Kuccha

    houses

    No. of

    Permanent

    pattas

    distributed

    No. of

    Temporary

    pattas

    distributed

    No. of

    Primary

    school in

    the slum

    pocket

    No. of

    Primary

    Health

    centres in

    the slum

    pocket

    Beneficiari

    es under

    social

    security

    schemes

    Any

    interventio

    ns under

    IHSDP

    (Y/N)

    3 Umrahi Kolan Notified whole ward 1803 50 NA 3 2 NA 0 NA NA NA NA NA 0 0 NA NA3 Padakka Nadan Tola Notified whole ward 1803 60 NA 3 5 NA 0 NA NA NA NA NA 0 0 NA NA4 Kuchbandhiya Notified whole ward 1659 50 NA 1 3 NA 1 NA NA NA NA NA 0 0 NA NA5 Along Ramnagar Road Notified whole ward 1285 NA NA NA NA 0 NA NA NA NA NA 0 0 NA NA

    5 Southern part of Jigdhara Talab Notified whole ward 1285 NA NA NA NA 0 NA NA NA NA NA 0 0 NA NA

    6Along Ramnagar Road

    Northern ClusterNotified whole ward 1359 NA NA NA NA 0 NA NA NA NA NA 0 0 NA NA

    6 Nadan Tola Kolan Basti Notified whole ward 1359 NA NA NA NA 0 NA NA NA NA NA 0 0 NA NA8 Nadan Tola Kolan Basti Notified whole ward 1311 20 NA 2 2 NA 0 NA NA NA NA NA 1 0 NA NA8 Sua More Harijan Basti Notified whole ward 1311 50 4 3 6 NA 0 NA NA NA NA NA 1 0 NA NA

    11 Malsuri & Koriyan moholla Un-notified 1134 150 60 2 2 NA 0 NA NA NA NA NA 0 0 NA NATotal 14309 884 1 2 0

    271

    Slums & Urban Poor

    Sectoral Analysis

    233

    Name of the Town: Amarpatan

  • 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11

    Rates and Tax Revenue 6446947

    Assigned Revenues & Compensation 1915434

    Rental Income from Municipal Properties 1080182

    Rates and Tax Revenue

    Assigned Revenues & Compensation

    Rental Income from Municipal Properties

    Fees & User Charges 73451

    Sale & Hire Charges

    Revenue Grants, Contribution and Subsidies 2178050

    Income from Investments

    Interest Earned 23500

    Other Income 70345

    11787909

    Grants, Contribution for specific purposes 4235350

    Secured Loans

    Unsecured Loans

    Deposits

    Deposit works 1046280

    5281630

    Establishment Expenses 7788541

    Administrative Expenses 461847

    Operations & Maintenance 885213

    Interest & Finance Charges 0

    Programme Expenses 0

    Revenue Grants, Contribution and Subsidies

    Miscellaneous Expenses 1104920

    Transfer to Fund 0

    10240521

    Fixed Assets 259361

    Capital Work-in-Progress 0

    Investments -General Fund 310276

    Investments-Other Funds 0

    Stocks/Inventory 575540

    Loans, Advances and Deposits 615630

    Other Assets 2197700

    Miscellaneous Expenditure 116547

    4075054

    17069539

    14315575

    Name of the Town: Amarpatan

    Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.

    Year

    Municipal Finance

    Re

    ven

    ue

    Inco

    me

    Total - Revenue Income

    Total Income

    Total Expenditure

    Cap

    ital

    Re

    ceip

    ts

    Total Capital Receipts

    Re

    ven

    ue

    Exp

    en

    dit

    ure

    Total - Revenue Expenditure

    Cap

    ital

    Exp

    en

    dit

    ure

    s

    Total Capital Expenditure

  • Reforms Achieved (Y/N)

    Any City specific

    Strategies

    adopted

    Preliminary

    estimate (if any)

    for

    implementation

    Implementing agency

    2012-13 2013-14 2014-15 2015-16

    Full migration of double accounting System N to be introducedAmarpatan Nagar Palika

    ParishadProperty tax reforms, 85% coverage ratio and 90% collection

    ratioN to be introduced

    Amarpatan Nagar Palika

    ParishadLevy of user charges : full recovery of O & M charges for

    sewerage, water supply and SWMN to be introduced

    Amarpatan Nagar Palika

    Parishad

    Internal earmarking of basic services to urban poor N to be introducedAmarpatan Nagar Palika

    Parishad

    E-governance N to be introducedAmarpatan Nagar Palika

    ParishadProvision of basic services to urban poor including security

    of tenure at affordable prices, improved housing, water

    supply, sanitation

    N to be introducedAmarpatan Nagar Palika

    Parishad

    Reforms Action Plan

    Timeline to achieve reforms till 2015

    Name of the Town: Amarpatan

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - a -

    CONTENTS

    EXECUTIVE SUMMARY ....................................................................................................... i

    CHAPTER 1 ........................................................................................................................ 1.1

    1. Background .......................................................................................................... 1.1 1.1. Project Objective ............................................................................................................ 1.1 1.2. What is a City Development Plan ................................................................................... 1.1 1.3. Methodology for Preparation of CDP ............................................................................. 1.1

    CHAPTER 2 ........................................................................................................................ 2.1

    2. Regional Settings .................................................................................................. 2.1 2.1. A Unique Identity ............................................................................................................ 2.1 2.2. Location of Amarpatan ................................................................................................... 2.2 2.3. Regional Linkages ........................................................................................................... 2.2 2.4. Satna District ................................................................................................................... 2.4 2.5. Regional Settings ............................................................................................................ 2.7 2.6. Geomorphology .............................................................................................................. 2.7 2.7. Relief ............................................................................................................................... 2.8 2.8. Soil .................................................................................................................................. 2.8 2.9. Rivers .............................................................................................................................. 2.9 2.10. Regional Resources ....................................................................................................... 2.10 2.11. Climate .......................................................................................................................... 2.15 2.12. Fringe Areas of the Town .............................................................................................. 2.15

    CHAPTER 3 ........................................................................................................................ 3.1

    3. Demographic Profile ............................................................................................. 3.1 3.1. Population ....................................................................................................................... 3.1 3.2. Population Growth Rate ................................................................................................. 3.2 3.3. Area of the town ............................................................................................................. 3.3 3.4. Population Density.......................................................................................................... 3.3 3.5. Net Density ..................................................................................................................... 3.4 3.6. Sex Ratio ......................................................................................................................... 3.4 3.7. Literacy Rate ................................................................................................................... 3.6 3.8. Social Composition ......................................................................................................... 3.7 3.9. Population Projection ..................................................................................................... 3.8

    3.9.1. Process ................................................................................................................................ 3.8

    CHAPTER 4 ........................................................................................................................ 4.1

    4. Economic Profile ................................................................................................... 4.1 4.1. Resources ........................................................................................................................ 4.1 4.2. Existing Economic Scenario ............................................................................................ 4.4

    4.2.1. Workgroup Distribution ...................................................................................................... 4.4 4.2.2. Economic Profile.................................................................................................................. 4.6 4.2.3. Occupation Profile ............................................................................................................... 4.7 4.2.4. Household Affordability ...................................................................................................... 4.7

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - b -

    4.3. SWOT analysis for Economic Scenario .......................................................................... 4.12

    CHAPTER 5 ......................................................................................................................... 5.1

    5. Urban Environment .............................................................................................. 5.1 5.1. Geography of the Town .................................................................................................. 5.1 5.2. Land Use .......................................................................................................................... 5.1

    5.2.1. Existing Landuse .................................................................................................................. 5.1 5.2.2. Proposed Landuse ............................................................................................................... 5.5

    5.3. Housing ........................................................................................................................... 5.7

    5.3.1. Housing Typology ................................................................................................................ 5.7 5.3.2. Status of Ownership .......................................................................................................... 5.14

    5.4. Environmental Pollution ............................................................................................... 5.15

    5.4.1. Water ................................................................................................................................ 5.15 5.4.2. Air ...................................................................................................................................... 5.15 5.4.3. Noise ................................................................................................................................. 5.17 5.4.4. Land ................................................................................................................................... 5.17

    5.5. Seismic Zone .................................................................................................................. 5.18

    5.5.1. Previous experience in major disaster .............................................................................. 5.18

    5.6. SWOT analysis for Urban Environment ......................................................................... 5.19

    CHAPTER 6 ......................................................................................................................... 6.1

    6. Physical Infrastructure .......................................................................................... 6.1 6.1. Traffic & Transportation .................................................................................................. 6.1

    6.1.1. Existing Scenario ................................................................................................................. 6.1 6.1.2. Ongoing Proposals .............................................................................................................. 6.3 6.1.3. Issues ................................................................................................................................... 6.3 6.1.4. Recommendations .............................................................................................................. 6.4

    6.2. Water Supply ................................................................................................................... 6.5

    6.2.1. Water Source ...................................................................................................................... 6.5 6.2.2. Water Distribution .............................................................................................................. 6.5 6.2.3. Water tariff.......................................................................................................................... 6.8 6.2.4. Ongoing Proposals .............................................................................................................. 6.8 6.2.5. Water Demand .................................................................................................................... 6.8 6.2.6. Gap in Water Supply ........................................................................................................... 6.9 6.2.7. Issues ................................................................................................................................. 6.10 6.2.8. Recommendations ............................................................................................................ 6.10

    6.3. Sewerage and Sanitation .............................................................................................. 6.11

    6.3.1. Existing Scenario ............................................................................................................... 6.11 6.3.2. Ongoing Proposals ............................................................................................................ 6.15 6.3.3. Future Provision ................................................................................................................ 6.15 6.3.4. Gap in Sewerage and Sanitation ....................................................................................... 6.15 6.3.5. Issues ................................................................................................................................. 6.16 6.3.6. Recommendations ............................................................................................................ 6.16

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - c -

    6.4. Drainage ........................................................................................................................ 6.17

    6.4.1. Existing Scenario ................................................................................................................ 6.17 6.4.2. Gap in Existing Drainage Network ..................................................................................... 6.18 6.4.3. Issues ................................................................................................................................. 6.18 6.4.4. Recommendations ............................................................................................................ 6.19

    6.5. Solid Waste Management ............................................................................................ 6.20

    6.5.1. Waste Generation ............................................................................................................. 6.20 6.5.2. Waste Collection ............................................................................................................... 6.20 6.5.3. Waste Management .......................................................................................................... 6.20 6.5.4. Ongoing Proposals ............................................................................................................. 6.20 6.5.5. Future Provision ................................................................................................................ 6.20 6.5.6. Issues ................................................................................................................................. 6.20 6.5.7. Recommendations ............................................................................................................ 6.20

    6.6. Power ............................................................................................................................ 6.22

    6.6.1. Existing Scenario ................................................................................................................ 6.22 6.6.2. Future Provision ................................................................................................................ 6.23 6.6.3. Issues ................................................................................................................................. 6.23 6.6.4. Recommendations ............................................................................................................ 6.23

    6.7. SWOT analysis for Physical Infrastructure .................................................................... 6.24

    CHAPTER 7 ........................................................................................................................ 7.1

    7. Social Infrastructure ............................................................................................. 7.1 7.1. Health ............................................................................................................................. 7.1

    7.1.1. Existing Statistics ................................................................................................................. 7.1 7.1.2. Existing Health Facilities ...................................................................................................... 7.1 7.1.3. The Urban Development Plans Formulation and Implementation [UDPFI] Guidelines and

    GoMP Regulations .............................................................................................................. 7.1 7.1.4. Future Provisions ................................................................................................................. 7.2 7.1.5. Issues ................................................................................................................................... 7.2

    7.2. Education ........................................................................................................................ 7.3

    7.2.1. Existing Educational Facilities .............................................................................................. 7.3 7.2.2. The Urban Development Plans Formulation and Implementation [UDPFI] Guidelines and

    GoMP Regulations .............................................................................................................. 7.3 7.2.3. Future Provision .................................................................................................................. 7.4 7.2.4. Issues ................................................................................................................................... 7.4

    7.3. Other Social Infrastructure ............................................................................................. 7.5 7.4. SWOT analysis for Social Infrastructure ......................................................................... 7.8

    CHAPTER 8 ........................................................................................................................ 8.1

    8. Urban Poverty & Slums ......................................................................................... 8.1 8.1. Poverty Profile ................................................................................................................ 8.1 8.2. Slum Population .............................................................................................................. 8.1 8.3. General Characteristics of the Slums in Town ................................................................ 8.1 8.4. Availability of Basic Infrastructure in slums .................................................................... 8.2 8.5. Issues .............................................................................................................................. 8.3

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - d -

    CHAPTER 9 ......................................................................................................................... 9.1

    9. Heritage& Conservation ........................................................................................ 9.1 9.1. Historic Importance of the Town .................................................................................... 9.1 9.2. Heritage Resources ......................................................................................................... 9.1 9.3. Status of Conservation of the Resources ........................................................................ 9.1 9.4. Issues ............................................................................................................................... 9.1

    CHAPTER 10 ................................................................................................................... 10.1

    10. Municipal Structure & Municipal Finance ............................................................ 10.1 10.1. The Municipality ............................................................................................................ 10.1 10.2. Organisational Structure ............................................................................................... 10.1 10.3. Income........................................................................................................................... 10.1

    10.3.2. Capital Receipt .................................................................................................................. 10.3 10.3.3. Revenue Receipt ............................................................................................................... 10.3

    10.4. Expenditure ................................................................................................................... 10.5

    10.4.1. Capital Expenditure ........................................................................................................... 10.6 10.4.2. Revenue Expenditure ........................................................................................................ 10.6

    CHAPTER 11 ................................................................................................................... 11.1

    11. Stakeholders Participation ................................................................................. 11.1 11.1. Kick-off Workshop ......................................................................................................... 11.1

    11.1.1. Minutes of Meeting........................................................................................................... 11.1

    11.2. Second Stage Workshop ............................................................................................... 11.3

    11.2.1. Minutes of Meeting........................................................................................................... 11.3

    11.3. First District Level Presentation .................................................................................... 11.5 11.4. First State Level Review ................................................................................................ 11.6 11.5. Third Stage Workshop & Second District Level Presentation ....................................... 11.7

    11.5.1. Minutes of Meeting........................................................................................................... 11.7

    CHAPTER 12 ................................................................................................................... 12.1

    12. Sectoral Prioritization, City Vision & Strategies .................................................... 12.1 12.1. Issues ............................................................................................................................. 12.1 12.2. Sectoral Prioritization .................................................................................................... 12.1 12.3. The Vision ...................................................................................................................... 12.2 12.4. Strategy to Overcome ................................................................................................... 12.3

    CHAPTER 13 ................................................................................................................... 13.1

    13. Project Identification & Project Cost ................................................................... 13.1 13.1. Identification of Projects ............................................................................................... 13.1

    13.1.1. Water Supply Sector ......................................................................................................... 13.1 13.1.2. Sewerage & Sanitation Sector ........................................................................................... 13.3 13.1.3. Solid Waste Management Sector ...................................................................................... 13.6 13.1.4. Drainage Sector ................................................................................................................. 13.7

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - e -

    13.1.5. Slum Sector ....................................................................................................................... 13.8 13.1.6. Roads and Transport Sector .............................................................................................. 13.9 13.1.7. Environment Sector ......................................................................................................... 13.12 13.1.8. Economy Sector ............................................................................................................... 13.13 13.1.9. Land Use Sector ............................................................................................................... 13.15 13.1.10. Power Sector ................................................................................................................... 13.16 13.1.11. Street Light Sector ........................................................................................................... 13.17 13.1.12. Fire Fighting Sector .......................................................................................................... 13.17 13.1.13. Social Infrastructure Sector ............................................................................................. 13.16 13.1.14. Health Sector ................................................................................................................... 13.18 13.1.15. Education Sector ............................................................................................................. 13.19 13.1.16. Governance Sector .......................................................................................................... 13.20

    13.2. Capital Investment Plan .............................................................................................. 13.21

    CHAPTER 14 ................................................................................................................... 14.1

    14. Maps & Drawings ............................................................................................... 14.1 14.1. Location Map ................................................................................................................ 14.1 14.2. Regional Settings .......................................................................................................... 14.1 14.3. Local Settings ................................................................................................................ 14.1 14.4. Base Map ...................................................................................................................... 14.1 14.5. Ward Map ..................................................................................................................... 14.1 14.6. Existing Land use ........................................................................................................... 14.1 14.7. Existing Road Network .................................................................................................. 14.1 14.8. Existing Drainage Network ........................................................................................... 14.1 14.9. Existing Water Supply ................................................................................................... 14.1 14.10. Existing Social Infrastructure Network ......................................................................... 14.1 14.11. Existing Solid Waste Dumping Scenario ....................................................................... 14.1 14.12. Existing Slum Cluster Map ............................................................................................ 14.1 14.13. Existing Density Distribution (2011) ............................................................................. 14.1 14.14. Existing Literacy Rate Distribution (2001) .................................................................... 14.1 14.15. Existing Sex Ratio Distribution (2011)........................................................................... 14.1 14.16. Existing SC Population Distribution (2001) ................................................................... 14.1 14.17. Proposed Land Use Map ............................................................................................... 14.1 14.18. Proposed Road Network Map ...................................................................................... 14.1 14.19. Proposed Sanitation Network ...................................................................................... 14.1 14.20. Proposed Social Infrastructure Network ...................................................................... 14.1

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - f -

    LIST OF TABLES Table 2.3.1. Distances of Amarpatan from other major Towns ................................................................................. 2.3 Table 2.10.1. Agricultural production of Madhya Pradesh ...................................................................................... 2.10 Table 2.10.2. Mineral Production in Madhya Pradesh in the Year 2008-09 ............................................................ 2.11 Table 2.10.3. Breakup of the forests according to category - protected or reserved forests .................................. 2.14 Table 3.1.1. Demographic details of Amarpatan Town .............................................................................................. 3.1 Table 3.1.2. Ward wise population of Amarpatan ..................................................................................................... 3.1 Table 3.1.3. 0-6 year population of Amarpatan Town- Comparative Assessment ..................................................... 3.1 Table 3.2.1. Population Growth rate of Amarpatan Town- Comparative Assessment .............................................. 3.2 Table 3.4.1.Population Density of Amarpatan town- Comparative Assessment ....................................................... 3.3 Table 3.6.1. Sex Ratio of Amarpatan town- Comparative Assessment ...................................................................... 3.4 Table 3.6.2. 0-6 years Sex Ratio of Amarpatan town- Comparative Assessment ...................................................... 3.6 Table 3.7.1. Literacy Rate of Amarpatan town- Comparative Assessment ................................................................ 3.6 Table 3.8.1.SC & ST population of Amarpatan town- Comparative Assessment ....................................................... 3.7 Table 3.9.1. Density recommended as per UDPFI guidelines ..................................................................................... 3.8 Table 3.9.2. Trial Population Projection for up to year 2036 ..................................................................................... 3.8 Table 3.9.3. Corrected Population Projection for upto year 2036 ............................................................................. 3.9 Table 3.9.4. Summary of projected Population........................................................................................................ 3.10 Table 3.9.5. Projected Number of Households ........................................................................................................ 3.10 Table 4.2.1. Distribution of Population in working groups for Amarpatan town ....................................................... 4.5 Table 4.2.2. Workforce Participation Rate in Amarpatan town- Comparative Assessment ...................................... 4.5 Table 4.2.3. Number of Households with different Amenities: Amarpatan, 2011 ..................................................... 4.7 Table 4.2.4. Status of presence of Kitchen within households: Amarpatan, 2011 ................................................... 4.10 Table 4.2.5. Kitchen Fuel used by household: Amarpatan, 2011 ............................................................................. 4.11 Table 5.2.1. Existing Land Use, 2012: Amarpatan (NP) .............................................................................................. 5.4 Table 5.2.2. Ownership of talabs in Amarpatan ......................................................................................................... 5.5 Table 5.2.3. Proposed Land Use, Amarpatan (NP): 2036 ........................................................................................... 5.5 Table 5.2.4. Proposed Net Developed Area and Population density; Amarpatan (NP), 2036 ................................... 5.5 Table 5.3.1. Housing Typology (vide Structure): Amarpatan Town, 2001 .................................................................. 5.7 Table 5.3.2. Number of census Houses vide material of Floor in Amarpatan, 2001 .................................................. 5.8 Table 5.3.3. Number of census Houses vide material of Floor in Amarpatan, 2011 .................................................. 5.9 Table 5.3.4. Number of census Houses vide material of Roof in Amarpatan, 2001 ................................................. 5.10 Table 5.3.5. Number of census Houses vide material of Roof in Amarpatan, 2011 ................................................. 5.12 Table 5.3.6. Number of census Houses vide material of Wall in Amarpatan, 2001 ................................................. 5.13 Table 5.3.7. Number of census Houses vide material of Wall in Amarpatan, 2011 ................................................. 5.14 Table 5.4.1. Air Pollution Parameters & Standards .................................................................................................. 5.15 Table 5.4.2. Ambient Air Quality in Amarpatan ...................................................................................................... 5.17 Table 5.4.3. Ambient Noise Quality in Amarpatan .................................................................................................. 5.17 Table 6.1.1. Category of roads ................................................................................................................................... 6.1 Table 6.1.2. Categories of road present in the town as per previous reports ........................................................... 6.1 Table 6.1.3. Categories of road present in the town as per previous reports ........................................................... 6.2 Table 6.2.1. Piped water supply in wards in Amarpatan town................................................................................... 6.5 Table 6.2.2. Status of Access to Drinking water: Amarpatan- Comparative Assessment .......................................... 6.6 Table 6.2.3. Source of available water in Amarpatan, 2011 ...................................................................................... 6.6 Table 6.2.4. Water Supply Equipment in Amarpatan town ........................................................................................ 6.7 Table 6.2.5. Location of Over Head Tanks (OHT) in Amarpatan town ....................................................................... 6.7 Table 6.2.6. Location of Pumps and bore wells, Amarpatan town............................................................................. 6.7 Table 6.2.7. Projected water demand for up to year 2036 ........................................................................................ 6.9 Table 6.2.8. Gap considering current supply rate ...................................................................................................... 6.9 Table 6.2.9. Total available storage capacity ............................................................................................................. 6.9 Table 6.2.10. Number of storage tank required ......................................................................................................... 6.9 Table 6.2.11. Length of existing road without Water Supply pipeline ..................................................................... 6.10

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - g -

    Table 6.2.12. Length of existing pipe to be replaced................................................................................................ 6.10 Table 6.3.1. Households with bathrooms: Amarpatan, 2001 ................................................................................... 6.11 Table 6.3.2. Status of bathrooms: Amarpatan, 2011 ............................................................................................... 6.11 Table 6.3.3. Presence of Latrine in Households: Amarpatan, 2001 ......................................................................... 6.12 Table 6.3.4. Presence of Latrine in Households: Amarpatan, 2011 ......................................................................... 6.13 Table 6.3.5. . Type of Toilets: Amarpatan, 2011 ....................................................................................................... 6.14 Table 6.3.6. Projected Sewer demand for up to year 2036 ...................................................................................... 6.15 Table 6.3.7. Calculation for requirement of new toilets along with septic tanks ..................................................... 6.15 Table 6.3.8. Calculation for requirement of new septic tanks ................................................................................. 6.16 Table 6.4.1. Type of Connectivity for Waste Water Outlet: Amarpatan, 2001 ........................................................ 6.17 Table 6.4.2. Type of Connectivity for Waste Water Outlet: Amarpatan, 2011 ........................................................ 6.18 Table 6.4.3. Existing road without surface drains .................................................................................................... 6.18 Table 6.5.1. Projected MSW for year 2036 .............................................................................................................. 6.20 Table 6.6.1. Source of Power: Amarpatan, 2011 ...................................................................................................... 6.22 Table 6.6.2. Power requirement calculation ............................................................................................................ 6.23 Table 7.1.1. Guidelines for health facilities ................................................................................................................ 7.1 Table 7.1.2. GoMP Regulations for health facilities ................................................................................................... 7.1 Table 7.1.3. Projected requirements of Health Facilities ........................................................................................... 7.2 Table 7.2.1. UDPFI guidelines for educational facilities in a town ............................................................................. 7.3 Table 7.2.2. Projected Educational facilities for upto year 2036 ................................................................................ 7.4 Table 7.3.1. Households availing banking services, Amarpatan, 2011 ....................................................................... 7.6 Table 7.3.2. UDPFI Guidelines about community facilities in small town .................................................................. 7.7 Table 7.3.3. Requirement of Community facilities in the town.................................................................................. 7.7 Table 8.2.1. Identified Slum Clusters in Amarpatan ................................................................................................... 8.1 Table 8.4.1. Road, Water Supply & Drainage in Amarpatan ...................................................................................... 8.2 Table 8.4.2. Sanitation, Street Light & Household Electricity in Amarpatan .............................................................. 8.2 Table 10.1.1. Administrative setup of the town ....................................................................................................... 10.1 Table 10.2.1. Organisational Profile of Amarpatan Nagar Palika ............................................................................. 10.1 Table 10.3.1. Total Income of Amarpatan Municipality, 2008-09 ............................................................................ 10.1 Table 10.3.2. Collection of Tax for July, 2012-13: Amarpatan (NP) .......................................................................... 10.4 Table 10.3.3. Rate of Property tax per sq ft: Amarpatan (NP) ................................................................................. 10.4 Table 10.3.4. Different zones of Property Tax: Amarpatan (NP) .............................................................................. 10.4 Table 10.4.1. Expenditure, Amarpatan Municipality: 2008-09 ................................................................................ 10.5 Table 13.1.1. Projects Identified under water supply sector for Phase I: Amarpatan (NP) ...................................... 13.1 Table 13.1.2. Projects identified for Phase II: Amarpatan (NP) ................................................................................ 13.2 Table 13.1.3. Projects identified for Phase III: Amarpatan (NP) ............................................................................... 13.2 Table 13.1.4. Locations identified for Community Latrine and Public Conveniences in Amarpatan ....................... 13.3 Table 13.1.5. Projects Identified under Sewerage & Sanitation Sector for Phase I: Amarpatan (NP) ...................... 13.4 Table 13.1.6. Projects Identified for Sewerage & Sanitation Sector for Phase II: Amarpatan (NP).......................... 13.5 Table 13.1.7. Projects Identified for Sewerage & Sanitation Sector for Phase III: Amarpatan (NP)......................... 13.5 Table 13.1.8. Projects Identified for Solid Waste Management Sector for Phase I: Amarpatan (NP)...................... 13.6 Table 13.1.9. Projects Identified for Solid Waste Management Sector for Phase II: Amarpatan (NP)..................... 13.6 Table 13.1.10. Projects Identified for Solid Waste Management Sector for Phase III: Amarpatan (NP) ................. 13.6 Table 13.1.11. Project Identified for Drainage sector for Phase I: Amarpatan (NP) ................................................ 13.7 Table 13.1.12. Project Identified for Drainage sector for Phase II: Amarpatan (NP) ............................................... 13.7 Table 13.1.13. Project Identified for Drainage sector for Phase III: Amarpatan (NP) .............................................. 13.7 Table 13.1.14. Project Identified for Slum Development sector for Phase I: Amarpatan (NP) ................................ 13.8 Table 13.1.15. Project Identified for Slum Development sector for Phase I: Amarpatan (NP) ................................ 13.8 Table 13.1.16. Project Identified for Slum Development sector for Phase I: Amarpatan (NP) ................................ 13.8 Table 13.1.17. Locations identified for Community Latrine and Public Conveniences in Amarpatan ..................... 13.9 Table 13.1.18. Project Identified for Road & Transport sector for Phase I: Amarpatan (NP) ................................ 13.10 Table 13.1.19. Project Identified for Road & Transport sector for Phase II: Amarpatan (NP) ............................... 13.11 Table 13.1.20. Project Identified for Road & Transport sector for Phase I: Amarpatan (NP) ................................ 13.11

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - h -

    Table 13.1.21. Project Identified for Environment sector for Phase I: Amarpatan (NP) ........................................ 13.12 Table 13.1.22. Project Identified for Environment sector for Phase II: Amarpatan (NP) ....................................... 13.12 Table 13.1.23. Project Identified for Environment sector for Phase III: Amarpatan (NP) ...................................... 13.12 Table 13.1.24. Project Identified for Economic Development sector for Phase I: Amarpatan (NP) ...................... 13.13 Table 13.1.25. Project Identified for Economic Development sector for Phase II: Amarpatan (NP) ..................... 13.14 Table 13.1.26. Project Identified for Economic Development sector for Phase III: Amarpatan (NP) .................... 13.14 Table 13.1.27. Project Identified for Land Use sector for Phase I: Amarpatan (NP) ............................................. 13.15 Table 13.1.28. Project Identified for Land Use sector for Phase II: Amarpatan (NP) ............................................. 13.15 Table 13.1.29. Project Identified for Land Use sector for Phase III: Amarpatan (NP) ............................................ 13.15 Table 13.1.30. Project Identified for Power sector for Phase I: Amarpatan (NP) .................................................. 13.17 Table 13.1.31. Project Identified for Street Light sector for Phase I: Amarpatan (NP) ......................................... 13.17 Table 13.1.32. Project Identified for Fire Fighting sector for Phase I: Amarpatan (NP) ........................................ 13.17 Table 13.1.33. Project Identified for Social Infrastructure sector for Phase I: Amarpatan (NP) ............................ 13.16 Table 13.1.34. Project Identified for Social Infrastructure sector for Phase II: Amarpatan (NP) ........................... 13.16 Table 13.1.35. Project Identified for Social Infrastructure sector for Phase III: Amarpatan (NP) .......................... 13.16 Table 13.1.36. Project Identified for Health Sector for Phase I: Amarpatan (NP) .................................................. 13.18 Table 13.1.37. Project Identified for Health Sector for Phase II: Amarpatan (NP) ................................................. 13.18 Table 13.1.38. Project Identified for Health Sector for Phase III: Amarpatan (NP) ................................................ 13.18 Table 13.1.39. Project Identified for Education Sector for Phase I: Amarpatan (NP) ............................................ 13.19 Table 13.1.40. Project Identified for Education Sector for Phase II: Amarpatan (NP) ........................................... 13.19 Table 13.1.41. Project Identified for Education Sector for Phase III: Amarpatan (NP) .......................................... 13.19 Table 13.1.42. Projects Identified for Governance Sector for Phase I: Amarpatan (NP)........................................ 13.20 Table 13.1.43. Projects Identified for Governance Sector for Phase II: Amarpatan (NP)....................................... 13.20 Table 13.1.44. Projects Identified for Governance Sector for Phase III: Amarpatan (NP)...................................... 13.20 Table 13.2.1. Capital Investment Plan for Phase I: Amarpatan (NP) ...................................................................... 13.21 Table 13.2.2. Capital Investment Plan for Municipality projects only: Amarpatan (NP) ........................................ 13.31 Table 13.2.3 Proposed Phasing for Phase I project under NP ................................................................................ 13.38 Table 13.2.4. Proposed Financial operating Plan for Phase I projects under NP ................................................... 13.41 Table 13.2.5. Estimated Project Cost for Phase II: Amarpatan (NP) ....................................................................... 13.42 Table 13.2.6. Estimated Project Cost for Phase III: Amarpatan (NP) ...................................................................... 13.43

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - i -

    LIST OF FIGURES

    Figure 1.3.1. Methodology ......................................................................................................................................... 1.2 Figure 2.2.1. Location of Amarpatan town in Satna District of Madhya Pradesh ...................................................... 2.2 Figure 2.4.1. District map of Madhya Pradesh ........................................................................................................... 2.4 Figure 2.4.2. Tehsil wise Percentage Share of the District's Total Population ........................................................... 2.5 Figure 2.4.3. Percentage of Urban Population in all the Tehsils in Satna District: 2011 ............................................ 2.5 Figure 2.4.4. Tehsil wise Percentage Share of District's Urban Population, 2011 ...................................................... 2.6 Figure 2.4.5. Decadal Population Growth Rate of the Tehsils in Satna ...................................................................... 2.6 Figure 2.5.1. Regional Settings: Amarpatan ............................................................................................................... 2.7 Figure 2.7.1. Terrain around the town ....................................................................................................................... 2.8 Figure 2.9.1. River Basins in Madhya Pradesh ............................................................................................................ 2.9 Figure 2.10.1. Production in Satna District ............................................................................................................... 2.10 Figure 2.10.2. Mineral map of Madhya Pradesh ...................................................................................................... 2.11 Figure 2.10.3. Location of Cement Plants near Satna .............................................................................................. 2.12 Figure 2.10.4. Forest Map of Madhya Pradesh ........................................................................................................ 2.15 Figure 3.1.1. Proportion of 0-6 year population ......................................................................................................... 3.2 Figure 3.2.1. Decadal Growth ..................................................................................................................................... 3.2 Figure 3.4.1. Ward wise Population Density, Amarpatan, 2011................................................................................. 3.3 Figure 3.5.1. Ward wise Net Density, 2011 ................................................................................................................ 3.4 Figure 3.6.1. Distribution of Population according to sex .......................................................................................... 3.4 Figure 3.6.2. Trend of Sex Ratio of Amarpatan in the context of National and Regional Context ............................. 3.5 Figure 3.6.3. Ward Wise Male Female Population ..................................................................................................... 3.5 Figure 3.7.1. Ward wise Literacy Rate, Amarpatan Town, 2011 ................................................................................ 3.6 Figure 3.8.1. Percentage of SC population- Ward Wise, Amarpatan Town ............................................................... 3.7 Figure 3.8.2. Percentage of ST population- Ward Wise, Amarpatan town ................................................................ 3.7 Figure 4.1.1. Work Force Distribution: Amarpatan 2001- Comparative Assessment ................................................. 4.1 Figure 4.1.2. Area under Cultivation of Different Cereals in Satna District ................................................................ 4.2 Figure 4.1.3. Area under Cultivation of Different Pulses in Satna District.................................................................. 4.2 Figure 4.1.4. Area under Cultivation of Different Oil seed in Satna District ............................................................... 4.3 Figure 4.2.1. Percentage Distribution of workers, Amarpatan town, 2001 ............................................................... 4.4 Figure 4.2.2. Sectoral distribution of Workers: Amarpatan town .............................................................................. 4.5 Figure 4.2.3. Ward wise Work Force Participation Rate of Amarpatan Town............................................................ 4.6 Figure 4.2.4. Income Profile of Amarpatan town ....................................................................................................... 4.6 Figure 4.2.5. Occupation Profile of Amarpatan town ................................................................................................. 4.7 Figure 4.2.6. Percentage of Households with different Assets for Amarpatan- Comparative Assessment ............... 4.9 Figure 4.2.7. . Percentage of households having kitchen: Amarpatan, 2011- Comparative Assessment ................ 4.10 Figure 4.2.8. Type of Kitchen Fuel in Amarpatan, 2011 ........................................................................................... 4.11 Figure 5.2.1. Percentage of Developed Area: Amarpatan town, 2012 ....................................................................... 5.1 Figure 5.2.2. Existing Landuse Pattern in Amarpatan town ....................................................................................... 5.4 Figure 5.2.3. Proposed Land Use in Percentage: Amarpatan (NP), 2036 ................................................................... 5.6 Figure 5.3.1. Type of uses and their Percentage (of the Census Houses) in the region ............................................. 5.7 Figure 5.3.2. Housing Typology (vide Structure): Amarpatan Town, 2001- Comparative Assessment ...................... 5.8 Figure 5.3.3. Housing Typology (vide Material of Floor): Amarpatan town, 2001- Comparative Assessment .......... 5.9 Figure 5.3.4. . Housing Typology (vide Material of Floor): Amarpatan town, 2011- Comparative Assessment ...... 5.10 Figure 5.3.5. Housing Typology (vide Material of Roof): Amarpatan Town, 2001- Comparative Assessment......... 5.11 Figure 5.3.6. Housing Typology (vide Material of Roof): Amarpatan Town, 2011- Comparative Assessment ........ 5.12 Figure 5.3.7. Housing Typology (vide material of wall): Amarpatan Town, 2001- Comparative Assessment .......... 5.13 Figure 5.3.8. Housing Typology (vide material of wall): Amarpatan Town, 2011- Comparative Assessment ......... 5.14 Figure 5.5.1. Seismic Map of Madhya Pradesh ........................................................................................................ 5.18 Figure 5.5.2. Seismic Map of Madhya Pradesh ........................................................................................................ 5.18 Figure 6.1.1. Road length distribution in Amarpatan ................................................................................................. 6.2

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - j -

    Figure 6.1.2. Vehicles: Growth Trend, Satna District ................................................................................................. 6.3 Figure 6.2.1. Percentage of household having access to water, Amarpatan town, 2011- Comparative Assessment6.6 Figure 6.2.2. Percentage length of water supply line ................................................................................................. 6.8 Figure 6.3.1. Percentage of Households with bathrooms: Amarpatan, 2001-Comparative Assessment ................ 6.11 Figure 6.3.2. Percentage of Households with bathrooms: Amarpatan, 2011-Comparative Assessment ................ 6.12 Figure 6.3.3. Status of Presence of Latrine in Households: Amarpatan, 2001- Comparative Assessment .............. 6.13 Figure 6.3.4. Status of Presence of Latrine in Households: Amarpatan, 2011- Comparative Assessment ............. 6.13 Figure 6.3.5. Type of Toilets: Amarpatan, 2011- Comparative Assessment ............................................................ 6.14 Figure 6.3.6. Ward wise Status of Presence of Toilet in Households, Amarpatan town .......................................... 6.15 Figure 6.4.1. Type of Connectivity for Waste Water Outlet: Amarpatan, 2001- Comparative Assessment ............ 6.17 Figure 6.4.2.Type of Connectivity for Waste Water Outlet: Amarpatan, 2011- Comparative Assessment ............. 6.18 Figure 6.6.1. Source of Power: Amarpatan, 2011- Comparative Assessment .......................................................... 6.23 Figure 7.3.1. Households availing banking services ................................................................................................... 7.6 Figure 10.3.1. Income: Amarpatan Municipality ...................................................................................................... 10.2 Figure 10.3.2. Capital receipts: Amarpatan, 2008-09 ............................................................................................... 10.3 Figure 10.3.3. Revenue Income: Amarpatan 2008- .................................................................................................. 10.3 Figure 10.4.1. Expenditure: Amarpatan Municipality, 2008-09 ............................................................................... 10.5 Figure 10.4.2. Capital Expenditure: Amarpatan Municipality .................................................................................. 10.6 Figure 10.4.3. Revenue Expenditure: Amarpatan Municipality, 2008-09 ................................................................ 10.6 Figure 12.2.1. Assessment of existing Condition of Different Sectors based on Citizens opinion: Amarpatan 2012 .................................................................................................................................................................................. 12.1 Figure 12.2.2. Sectoral Prioritization for future demand based on Citizens opinion: Amarpatan, 2012 ................. 12.2

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - k -

    LIST OF PHOTOS

    Photo 2.3.1. National Highway 7 cutting across Amarpatan ...................................................................................... 2.3 Photo 2.3.2. Road to Rampur Baghelan from Amarpatan .......................................................................................... 2.3 Photo 2.10.1. Prism Cement Plant, Satna ................................................................................................................. 2.12 Photo 2.10.2. JP Bela Cement Plant, Rewa ............................................................................................................... 2.12 Photo 2.10.3. Maihar Cement Plant ......................................................................................................................... 2.13 Photo 4.1.1. Krishi Upaj Mandi at Amarpatan ............................................................................................................ 4.3 Photo 4.1.2. Rice Mill (left), Saw mill (centre), Oil Mill (right) in Amarpatan ............................................................. 4.3 Photo 4.2.1. Dairy unit, Crusher plant unit and vacant land in the Industrial Area .................................................. 4.4 Photo 5.2.1. Industrial Area in Amarpatan & Commercial Area along Streets.......................................................... 5.1 Photo 5.2.2. Centre of Amarpatan town, along NH 7 ................................................................................................ 5.2 Photo 5.2.3. Industrial Area, Padakka, in Amarpatan town ....................................................................................... 5.2 Photo 5.2.4. Development along Satna road towards NH 7 ...................................................................................... 5.3 Photo 5.2.5. Development along Ramnagar Road near Nadan Tola .......................................................................... 5.3 Photo 5.4.1. Water Bodies in Amarpatan ................................................................................................................ 5.15 Photo 5.4.2. Upkeep and Maintenance of Jhirna Nala is important ........................................................................ 5.15 Photo 6.1.1. National Highway 7 cutting across the town; Photo 6.1.2. Road to Satna .......................... 6.2 Photo 6.1.3. City Roads .............................................................................................................................................. 6.2 Photo 6.1.4. CC roads within the town; Photo 6.1.5. Amarpatan Bus Stand ........................................................... 6.3 Photo 6.2.1. A pump house; Photo 6.2.2. Water Tank; Photo 6.2.3. Water Tanker ............. 6.8 Photo 6.4.1. Jhirna Nullah ........................................................................................................................................ 6.17 Photo 6.6.1. MPEB Substation in the Industrial Area .............................................................................................. 6.22 Photo 7.1.1. Community Health Centre in Amarpatan .............................................................................................. 7.1 Photo 7.2.1. College (left) & Schools (centre & right) in Amarpatan ......................................................................... 7.3 Photo 7.2.2. SC Girls' School in Amarpatan ................................................................................................................ 7.3 Photo 7.3.1. Police Station; Photo 7.3.2. Stadium; Photo 7.3.3. Community Centre .............. 7.5 Photo 7.3.4. Site for Proposed Indoor Stadium ......................................................................................................... 7.5 Photo 7.3.5. Nagar Parishad Office in Amarpatan ...................................................................................................... 7.5 Photo 7.3.6. Banks & ATMs in Amarpatan ................................................................................................................. 7.6 Photo 7.3.7. Stadium in Amarpatan ........................................................................................................................... 7.7 Photo 8.3.1. A slum household in Amarpatan ........................................................................................................... 8.1 Photo 8.4.1. Few slum areas in the town .................................................................................................................. 8.3 Photo 9.2.1. The Garhi in Amarpatan ........................................................................................................................ 9.1 Photo 11.1.1. Proceedings of Kick off Workshop at Amarpatan ........................................................................... 11.1 Photo 11.2.1.Proceedings of Second Workshop at Amarpatan ............................................................................... 11.3 Photo 11.3.1. First District Level Presentation in Satna ........................................................................................... 11.5 Photo 11.4.1. Proceedings of the First District Level Presentation .......................................................................... 11.6 Photo 11.5.1. Proceedings of Third Workshop at Amarpatan.................................................................................. 11.8

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - i -

    EXECUTIVE SUMMARY

    Government of Madhya Pradesh, Urban Administration and Development Department, for the betterment of the local populace, has initiated the process of a planned and integrated development in the State. One of the major initiatives in this direction is formulation of a City Development Plan for all the Urban Local Bodies across the State. I-Win Advisory Services (Formerly known as ICICI-Winfra) has been assigned for the preparation of Amarpatan City Development Plan-2036. A City Development Plan [CDP] is to think systematically of the future and to determine how it wishes to shape that future. It sets a vision for the city to be achieved within a stipulated period of time, in sync with the character of the city and in consensus with its stakeholders. It charts out the course of action so that the city is enabled to reach the goal within the target period. A CDP helps in enhancing the livability, sustainability and manageability of the city.

    A CDP is essentially a strategy which focuses on

    The development of economic, physical and social infrastructure

    Strategies that deal specifically with issues affecting the urban poor

    Strengthening of Municipal Governments and their financial accounting and budgeting systems and procedures and

    Ensuring a better service delivery mechanism for all the citizens

    The preparation of the city development plan has been a multi-stage activity like Reconnaissance Survey, extensive Consultation with Stakeholders, Consultation with and validation from the Departmental Heads, Data Collection, Existing situation assessment or City Profiling, Identification of gaps in infrastructure and service, estimation for future demand of physical and social infrastructure, based on population projections, Identification of strategies, projects and programmes for services and infrastructure, Formulation of the Capital Investment Plan, Formulation of the Financial Operating Plan. Amarpatan Municipal Area of 10.32 sq km, is located in Satna district, in the north eastern part of Madhya Pradesh, at 36.8 km away from Satna town and 485 km away from the state Capital Bhopal. Amarpatan is a town and a nagar parishad & also a Tehsil in Satna district in the state of Madhya Pradesh, with the town being the Tehsil headquarter. Since the Whole of Satna district comes within the Baghelkhand region the town has a geographic & historic value. Bagelkhand or Baghelkhand is a region in central India, in northeastern Madhya Pradesh state formed of old landmass featuring undulating terrain with low outcrops, narrow valleys & plains. The Baghel Rajputs, who give their name to the region, are known as Baghels. In the beginning the administrative affairs of the region was coordinated by Baghelkhand Agency which was a collection of princely states in British India. The Municipal Area does not have any river flowing through but has several water bodies called Talabs to catch & store rainwater during rainy season. The Khajuraho airstrip is only 151 km from Amarpatan. Road is the major connectivity for Amarpatan. National Highway & cuts across the town with Maihar on the Eastern and Rewa on the western side of the Road. Satna road and Ramnagar road intersects the NH at the centre of the town. Nearest Railway Station is Maihar, which is 24 km and the other station close by is Satna, around 36.5 km from Amarpatan along major district road. The city has a population of 19409 (2011 Census) with a population density of 1881 per sq km which is much lower than the population density of Bhopal and Indore, two largest cities of Madhya Pradesh. Thus the scope of development is very high as the quantum of land developed into public amenities to support the residential development, is lower than the prescribed norms. The city also has a varying population growth rate due to the displacement of huge number of people during the construction of Bansagar dam.

    http://en.wikipedia.org/wiki/Nagar_panchayathttp://en.wikipedia.org/wiki/Satna_districthttp://en.wikipedia.org/wiki/Madhya_Pradeshhttp://en.wikipedia.org/wiki/Indiahttp://en.wikipedia.org/wiki/Madhya_Pradeshhttp://en.wikipedia.org/wiki/Rajputhttp://en.wikipedia.org/wiki/Princely_stateshttp://en.wikipedia.org/wiki/British_India

  • MP CDP PHASE II AMARPATAN CITY DEVELOPMENT PLAN

    REPORT NO.IWIN-SL/12-13/F/CDP/R0/014

    - ii -

    Since Amarpatan town is the only urban centre in the Tehsil it handles all transaction of produces of all the villages in and around. The local economy is primarily agro based and dependent on informal sectors. But the resources available are majorly regional & primary in nature. Large Industry is almost absent in the city. The household survey conducted by I-Win reveals that Amarpatan population mainly depends on the informal sector like labours & shops etc. Thus the employment situation of the area is grave with no commendable source of employment generation and a meagre income generation. The average income level is also low in the city. Survey reveals that the major share of the city falls in the Rs 3301 to Rs 5000 income slab. 50% of the population falls in BPL category. According to the local population, it is this scarcity of employment that acts as the catalyst for out-migration of