C&D Waste Scenario Construction industry in India is growing at twice the world average. Total construction market in India (PWC Estimates) for FY 14 was over Rs. 900,000 crores. This creates sizable C&D waste. It is estimated on a conservative basis that over 25-30 million tons of C&D waste is generated annually that clogs rivers, blocks traffic and occupies dumping space Size graded aggregates, manufactured sand and cast products are the outputs which have great potential to replace natural materials and address shortage of building materials The first plant at Delhi (Burari) has shown that there is huge potential of recycling and value addition

C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

C&D Waste Scenario

Construction industry in India is growing at twice the world

average. Total construction market in India (PWC Estimates) for

FY 14 was over Rs. 900,000 crores. This creates sizable C&D

waste.

It is estimated on a conservative basis that over 25-30 million tons

of C&D waste is generated annually that clogs rivers, blocks

traffic and occupies dumping space

Size graded aggregates, manufactured sand and cast products are

the outputs which have great potential to replace natural

materials and address shortage of building materials

The first plant at Delhi (Burari) has shown that there is huge

potential of recycling and value addition

Page 2: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Swachh Delhi : Integrated Waste Processing

Collection & Transportation

Segregation of Waste

Combustible

Landfill

Recyclables

Compost Plant, Okhla

Bio-degradable

Rejects (inert)

Recyclables

Compost

Inert transferred To landfill as soilcover

C&D Products

Municipal Solid

Waste

Construction &

Demolition

Debris

C&D Processing Facility,

Burari/ShastriPark

RDF & WtE, Ghazipur

Page 3: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Tikri Kalan150 TPD

Sarai Kale Khan 150 TPD

Shastri Park 500 TPD

Libaspur150 TPD

Burari 2000 TPD

Ghazipur 2000 TPD MSW

Okhla 500 TPD

Waste to Energy

Construction & Demolition

Compost

Delhi Shows the WayDMRC 150 TPD

IL&FS Environment to process over 5600 TPD* of the total waste

(around 14000 TPD),

which is generated in the Delhi

IL&FS Environment to process about 3400 TPD of C&D waste generated

in Delhi & Gurgoan

Gurgoan

300 TPD

Page 4: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Construction and

Demolition (C&D) Waste

dumped at

Yamuna River Bank (prior to NGT order)

Page 5: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Pollution Levels : Construction Activities in Delhi

Page 6: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Over years of R&D in processing of C&D waste, we have nowmastered the technology and are able recycle/recover upto 95% ofincoming C&D waste.

EVO Wash

Thickener

Our Learning at Burari

Page 7: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Heterogeneous Nature of C&D waste

Generally C&D waste is mixture of many components hence makes its recycling more complex

Page 8: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

PROCESSING VIA ROCK BREAKING MACHINE

SEMI PROCESSEDCONCRETE

BLOCKS

PROCESSING OF PILES

Size of processed waste varies from gravel to Pile heads. For different category of waste different technique has to be adopted

Page 9: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

9

Process Line Flow

Page 10: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Processing C&D Waste : Value Addition

Input Outputs from Wet Processing

Useful Products

Rejects

Mixed Brick Base

35 23

Pre Cast Products

12 15 5100

Waste

Processing of C&D waste can reduce waste to landfill by 95% reducing pressure on scarce land

Loose Soil

Granular Sub Base

Manufactured Sand and

Others

10 Unit

Reinforced PFC Slabs

Other pre-cast Tiles &Paver block Kerb Stone RMC Manufactured Sand

C&D Waste :about 15% ofMSW generation

Rejects aredisposed indump site

Source: Internal Estimates

Page 11: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Burari in the News

Circular from

Ministry of

Urban

Development,

GoI

To establish

environment friendly

C&D recycling plant

in all cities with more

than 1 mn population

based on Burari model

Page 12: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

C&D Waste Management : Scientific Sustainability

Processed over 17 lakh tons of C&D waste since its inception in 2009, which would

otherwise have been dumped illegally in the river Yamuna and other environmentally

sensitive areas

Saving of about 11 hectares of land

costing app. 256 crores(as per circle rates)

Page 13: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

A unique large scale C&D recycling facility in the

Country, compliant with MSW, 2000 Rules

Engineered to process mixed Indian C&D waste

Reduces usage of natural resources and enhances

conservation

Reduces sand mining from river banks

Washing water recycled, only 10-15% makeup water

Reduces burden on the landfill sites, saving precious

urban land

Reduces air pollution

Able to recycle/recover about 95% of incoming waste

A replicable Public Private Partnership model

Burari : Salient Features

Page 14: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Recycled Concrete Aggregate (RCA)Recycled Aggregate (RA)

Material Recovered From C&D Waste

Mixed Waste Concrete Waste

Sand Substitute

Aggregate -3 mm

Aggregate

10-20 mm

Aggregate

3-10 mmAggregate

3-10 mm

Aggregate

10-20 mm

Page 15: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Recycled Green Products

Page 16: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Source :Aggregain.wrap.org.uk

Application where recycled and secondary aggregates

can be used in a variety of construction application

No Application

1 Concrete Road construction

2 Bituminous road construction

3 Hydraulically bond road construction

4 Ground Improvement

5 Earthwork embankments

6 Earthwork cuttings

7 Shallow Foundation

8 Deep Foundation

9 Utilities : New trenches

10 Utilities: reinstatements

11 Sub-Structure

12 Concrete Structures

13 Industrial Buildings

14 Residential Buildings

Applications : Recycled C&D Waste Products

Page 17: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

DEVELOPMENT OF ROAD SUBBASE IN GROUP

HOUSING AND INFRASTRUCTURE

PROJECTS

Recycled aggregates use in pavement construction

Recycled Soil, Brick Powder : Sub base Roads

Page 18: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Mandatory Usage of Recycled C&D Waste Products

Providing upto plinth level factory made precast cement

concrete solid blocks of Grade M10 made of C & D waste

from approved manufacturers.

New Supreme Court complex

Express Road in North Delhi

Providing, laying and compaction C&D waste material of

required grading passing through IS sieve 150 mm and

retaining on 26.5 mm sieve including carriage by

mechanical transport from processing unit to work site

including sporting and compacting the same to MoRTH

specifications in layers not exceeding 200 mm

Page 19: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Test Road by DDA

Unique Collaborative venture with DDA for Constructionof Pilot 100m wide Express road connecting NH-10 &Bakkarwala using processed C&D.

The 10 KM long road is being built as per specificationsand supervision of CRRI.

Size of C&D aggregates proposed to be used in this PilotRoad project is -150mm to +26.5mm. About 6 lakh tonsof processed C&D will be used in making of the PilotRoad.

Est. Revenue FY 16 Rs 80 million, Margin 50%

Page 20: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Advisory : Usage of Recycled Products

Page 21: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Regulatory Challenges

Lack of National Standards and regulations

Draft SWM Rules 2015 have incorporated detailed management of C&D

waste (expected to be notified soon)

Bureau of Indian Standards (BIS) is working on fast track mode but final

Standards yet to be notified

Market development is very important

Page 22: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Visit of

SMART Cities

Delegates,

June 2015

Page 23: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Lines from Visitor's Book, Burari Facility

Page 24: C&D Waste Scenariore.urban-industrial.in/live/hrdpmp/hrdpmaster/igep/... · 2015-12-01 · C&D Waste Scenario Construction industry in India is growing at twice the world average

Thank you.