Case Studies - LNG Projects P G N L - s e i d u t S e s a C di es G P LNG s t c e j o o r o P P o ro

Case Studies - LNG ProjectsCase Studies - LNG … Plant 3 During the commissioning of an LNG plant the plant designer and the compressor supplier recognised the need for two `last

  • Upload
    doannga

  • View
    230

  • Download
    1

Embed Size (px)

Citation preview

Case Studies - LNG Projects PGNL-seidutSesaC dies G PLNG stcejoojrroPProro

1

Foreword

LNG Plant 1 LNG Plant 2 LNG Plant 3

Best Practice

P.04

P.07P.08P.11

P.12

Case Studies - LNG Projects

d eworFor

nt 1G PlaNLnt 2G PlaNLnt 3G PlaNL

iceactBest Pr

Case Studies - LNG Pr

ojectsLNG Prro

P.04

P.07P.08P.11

P.12

1

2

Best Practice: Welding of the internal element frame

ce: iactst PrBenterhe if tng oildeW amerl element fnanter

2

3

Best Practice: Perforated plates with continuous margins

ice: tst PracBeforated plates with contPer nsirgnuous maiforated plates with cont

3

4

Foreword

When Millions of US Dollars are tied up in the latest compressor technology you naturally want to be certain that you are protecting your investment in every way possible. Your aim should be to use equipment that offers you the lowest possible pressure drop based on your process design conditions, the best possible mechanically designed unit to accommodate any natural frequency / vortex shedding and mechanical strength issues whilst maintaining the highest levels of protection.

deworrdForre

ons of US DolillWhen Misor technolosecompr

ecte protryou ashould be to use equipment tmiaruoYYo

erusserpelbissopelbissoptsebeht

al frequencurnat

he latestied up in te trlars aons of US Doly want to be cerlluraty you nagsor technolo

y waing your investment in everhat ofshould be to use equipment t

ssecorpruoynodesabpordeottinudengisedyllacinahceme

ng and mechanical strengtitex sheddy / voral frequenc

he latesthattain ty want to be cer

ble.siy posy wahe lowest fers you that of

ions, ticondngiseds any etadommoccaoh ng and mechanical strengt

al frequenclst mais whsueis

ng and mechanical strengty / vorls of protvest leghehe hing tiniantilst ma

ng and mechanical strengtion.ectls of prot

4

5

Vee Bee can offer these solutions by providing bespoke designed equipment that meets all of the above requirements. We have, over the past 12 years, introduced CFD (Computational Fluid Dynamics) and FEA (Finite Element Analysis) to complement our 56 years of experience to provide these design solutions.

Before the introduction of CFD the only way to verify product pressure drops was to proof test in a laboratory which becomes impractical when you are sizing units up to 84� nominal bore. Our clients have become more exacting in the data they require and want to know the �actual� differential pressure as opposed to the industry standard statement �estimated differential pressure� the �actual� burst pressure of the element and the natural frequency of the element (which could be compromised by the compressor potentially ending in a costly failure).

Engineering the required design involves allowing suitable research and development design time, employing accurate ����� ��������� ���������� ����� ������� �� �� �������� ���and planned structured manufacturing. During these steps our Engineers employ 3D modelling techniques, CFD, FEA. We can rapidly customise our existing design frameworks to meet client specific application requirements or we can, where necessary, create an entirely new design. Our historical data, previously conducted laboratory tests and feedback from site allows us to accurately predict pressure loss through our products. In addition it allows us to determine the behaviour of the product when introduced to other upstream and downstream pipeline equipment. Vee Bee can review your actual pipe layouts to see what effect this has on your circuit hydraulics.

Vee Bee was established in 1957 by William V Bradley under the name of Filtration & Valves, becoming Vee Bee in 1980, providing commodity strainers to all process industries. However over the years we realised that our clients required more than just a commodity and so we set to work focusing our design team on a bespoke high-end solution looking at the application and assessing the potential pitfalls before they happen.

ehtreffefffonaceeBeeVVeeemtahttnempiuqe

� � � � � � � � �

psebgnidivorropybsnoituloseseemeriuqerevobaehtfollaste

� � � � � � � � �

d engisedekop, evaheW.stne

� � � � � � � � �

eemtahttnempiuqeey21tsapehtrevo(AEFdna)scimanyDceenierxpefosarey65

tcudortniehterofeBs was opdre surspre

n you aal whecitacimprs have become morentilOur c

htwonkottnawdnadnatsyrtsudniehtot

he �actual� burst pre t�erusserp

� � � � � � � � �

emeriuqerevobaehtfollastepmoC(DFCdecudortni,sraocto)sisylanAtnemelEeitinF(osnsigedesehtedviorptoce

votyawylnoehtDFCfonoiwhich y laboratora in t setproof o t

s up to 84� nomitng uniizre sin you ahe dan tng iictaxe es have become mor

usserplaitnereffid�lautca�ehddetamitse�tnemetatsdrad

he elemensure of tshe �actual� burst pre

� � � � � � � � �

, evaheW.stned iulFlanoitatup

ur otenmlepmo.snotiulo

t cudorpyfirevs comebewhich

e.l bornas up to 84� nomie riequy rhea tthe dad esopposareu

l aitnereffidhe t and the elemen

� � � � � � � � �

pthfoycneuqerflarutanprosserpmocehtyb

uqerehtgnireenignEoleveddnahcraeser� �������� ����utcurtsdennalpdna

y 3D modes emploneeriEngy customise our exilrapid

ion rcatiic applfispecenyleritnenaetaerc

� � � � � � � � �

he �actual� burst precebdluochhicw((wntemeleethyltsocanignidneyllaitnetop

niwollasevlovningisedderiuiyolpme,emitngisedtnempo�� � ������ ���� �������htgniruD.gnirutcafunamderu

D, FFs, Cqueng techniilly 3D modemeworks to meet cgn frasing deisty customise our exi

s or we can, wherrementequiion rtadlacirotsihruO.ngisedwe

� � � � � � � � �

d isemorpmoc. )eruliafy

e lbatiusgne taruccagni

�� ������� �r uospetseseh

e can A. WED, Ft enilmeworks to meet c

, rysase neces or we can, whery lsuoiverp,a

� � � � � � � � �

otarobaldetcudnocciderpyletarucc aot

lows us tlon it aitiddaroduced to otwhen int

BeeeeVVe.ntemuipqes on youas hiht tfecfwhat e

slitabsesawBeeeeVVe&noitartliFfoeman

ytidommocgnidivorperewsraeyehtrevo

tidtj

� � � � � � � � �

smorfkcabdeefdnatssetyrpruohguorhtssolerusserpt

our of tivhe behane tmiero detlows us ternd downstm areaher upstroduced to otaleippaltucauroywieevrcan

cs.iydrault hircuir cs on you

arBVilliamWyb7591nidehsieeBeeVgnimoceb,sevalVVa

udnissecorpllaotsreniartsyriuqerstneilcruotahtdesilaeifkttd

� � � � � � � � �

s uswollaetisn I.stcudorp

t oduche prour of tne ilpem piae

see otstuoya

he terr dnuydlea, 0891n

r evewoH.seirtsn ahteromder

id

� � � � � � � � �

naytidommocatsujhigokepesbanoamte

he potng tsissend asa

� � � � � � � � �

nisucofkrowottesewosdnthatngkioolnlutioosdne-hhig

y happen. ee ths beforllfaial pittnehe pot

� � � � � � � � �

n gisedruognn otilicappaeth

y happen.

� � � � � � � � �

� � � � � � � � �

� � � � � � � � �

5

6

54� Angled Tee Strainer 4� A5 rneiare Sted TTengle4� A

6

7

LNG Plant 1

Vee Bee were asked to provide filtration equipment for the second train being built at an existing LNG plant. The requirement was to supply identical units to the previous train which had been bought from another manufacturer. The design had to comply with the sizes and process conditions given in the data sheets while meeting strict differential pressure requirements

Vee Bee ran CFD simulations on each of the items. Over 60% of the items would not comply with the clients required differential pressures.

Vee Bee re-designed the elements to provide differential pressures as close to the clients requirements as possible, while maintaining ����������������������������� �����������������������������to analyse the several designs to see which would provide the lowest differential pressure. The element was then subjected to mechanical strength calculations and FEA to ensure that the design would comply with the burst pressure requirements specified.

LNG Plant 1

� � � � � � � � � � �

deksaereweeBeeVVeubgniebniartdnocescitnediylppusotsawrehtonamofrthguob

nd process condzes ahe sitenterffict ding stretime

miD sFn Cae ree BeVVeondluowsmeitethfo

s. ersusepr

� � � � � � � � � � �

mpiuqenoitartlifedivropotdT.tnalpGNLgnitsixenatatliuwniratsuoievrpehtotstniulacdahngisedehT.rr.erreutcfauanmtae dhn tn ivens gioitind process cond

ementsrquire ressul preaient

ms. Oete ihf th ocas on enoitlaumuqerstnclieethhitwylpmocto

� � � � � � � � � � �

e htroftnemment erreiuqereh

n eebdahhhicwh twilypmocotd

le hits wea shet

% 0r 6vems. Ol tianerrefefiddeiru

� � � � � � � � � � �

ff

tdengised-ereeBeeVVeresclientethtoeoscl���������������raveehe sse tylano atrplaitnereffidtsewol

nertslacinahcemotmocdluownsigedeth

d.ieficesp

� � � � � � � � � � �

nerreeffefidedivorpotstnemeleehtwhil,elsibospastsenuiremqre������������� ��������

h wouchie weo sns tgisl deraehtsawtnemeleehT.erusser

otAEFdnasnoitaluclachtgreursserptsurbethhtiwylpm

� � � � � � � � � � �

s aserreusserplaitgniinatinmaewhil��������������

ide thevd prolh woud etcejbusnet ahterusnes ementuirqer

� � � � � � � � � � �

� � � � � � � � � � �

� � � � � � � � � � �

� � � � � � � � � � �

� � � � � � � � � � �

7

8

LNG Plant 2

Vee Bee were asked to provide a solution to a problem that a client was experiencing with a conical strainer being used on cryogenic service. During operation the strainer was icing up and therefore restricting the flow through the line. The process of isolating the line and removing the strainer for cleaning and de-icing was time consuming and costly. The strainer had to be designed to accommodate for flow in both directions and capable of withstanding a 10 Bar burst pressure in the normal �������������������� ������������������������������!���direction. The strainer was also required to retain particles down to 0.25mm (250 micron) diameter.

To be able to accommodate the burst pressures Vee Bee determined a requirement for two perforated cones, one inside the other, with the mesh sandwiched between the two cones. In order for this design to be effective the perforated holes within the inner and outer cone would need to be perfectly ���������������������������������������������!���characteristics not compromised.

The high burst pressure required the perforated plate to be thicker than normal. This presented forming problems especially as the inner and outer cone had to be symmetrical. To overcome this problem Vee Bee designed a strainer that was manufactured �������������������!������������������������������������������������������������"���������������������������������of coarse mesh in-between the perforated panels. The panels were then welded together and each of the resulting eight segments were welded to a frame to produce an octagonal strainer. Vee Bee carried out extensive CFD to ensure that the design was ������������������������������������"�������������"���the construction by FEA.

LNG Plant 2

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

aereweeBeeVVxperiencing with a conis eant wielca

civrescinegoyrcereroefrehtdna

he lng tof isolatimitsawgnici-ed

otdengisedebhstible of wpaac������������the s. Tnoitcerid

o 0.25mm (250 micron) didown t

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

otnoitulosaedivorpotdeksaineratcal sxperiencing with a coniartsehtnoitarepogniruD.echthguorhtwolfehtgnitcirtseneirahe sting tmovne and reihT.yltsocdnagnimusnocemobniwolfrofetadommoccasusst prerr bu0 Banding a 1aths��������������� ���

o reed triqueso rls ar waneirat. rmeteao 0.25mm (250 micron) di

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

t ahtmelborpaod on seng uir beine

p ugnciisawrenias secorpehT.enile

ndng ainar cler foneo tdahreniartsehd nasnoitceridhtol mahe norn tre isu

��!���������icles train pato re

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

caotelbaeboTToeradenimretedhthtiw,rehtoeht

sihtrofredr onIrennieh tnihtiw����������

characteristics not compr

The high burst prmronnahtrekciht

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

o 0.25mm (250 micron) di

sserptsrubehtetadommoccdetarofrepowtroftnemeriuqeeewtebdehciwdnashsemehepehtevitceffffeebotngised

deendluowenocretuodna�������������������

omised.characteristics not compr

ed the perforated plate to beequire ressurThe high burst prborropgnimroffodetneserpsihT.lam

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

e eBeeVVeseruse disnieno,senocd

. senocowtehtnes elohdetarofrey ltcefrepebot��!������

ed the perforated plate to be especially as smelb

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

uodnarenniehteeVVemelborpsiht��������������������������hsemesraocfodedlewwenehterreew

otdedlewerewtuodeirraceeB�������������

the construction by FEA.

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

��

rtemmysebotdahenocretutahtreniartsadengisedeeBe��������������������!�����������������"��pdetarofrepehtneewteb-niuserreehtfohcaednarehteetgotdgatconaecudorpotemarfaahterusneotDFCevisnetxe���"�������������������

the construction by FEA.

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

e mocrevooTTo.lacird erutcafaunamsaw�����������������������������

s lenapehT.slenaps tnemgesthgiegnitlu

e eVVe.reniartslanogs awngisedehtta

��"��������

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � � � � �

� � � � � � � � �

� � � � � � � � �

8

9

High Pressure Conical Strainer Fine meshes sandwiched between two perforated platesInternal Frame

sure ConicseHigh Priched betandws shesne meFi

nal FrInter

rneiarl Stasure Conicated platesforwo peren tweiched bet

ated plates

amenal FrInter

9

10

72� Conical Strainers

01

� Con72 snerial Strica� Con

11

LNG Plant 3

During the commissioning of an LNG plant the plant designer and the compressor supplier recognised the need for two `last chance´ 72� conical strainers capable of withstanding 3.5 Bar to be installed directly in-front of the compressors. As the plant was already at the commissioning stage the strainers were required on a very tight schedule.

Vee Bee designed the strainers to meet the clients requirement ��������������� ���������������������������"����������������calculations and confirmed by FEA. Vee Bee designed and manufactured the strainers in less than four weeks.

During commissioning the client experienced problems with elements in strainers supplied by an alternative manufacturer. Vee Bee were subsequently asked to then design and manufacture replacement elements for these strainers to ensure the continued running of the plant.

t 3naG PlNL

� � � � � � � � � � �

ssimmocehtgniruDrosserpmocehtdnalacinoc�27´ecnahc

ctreid dellatto be inscommissionintheateadyalrwasghiy trn a vered oiqure

he ste designed tee BeVVe��� �����������

nd confions atlaculache stured tactfnuam

� � � � � � � � � � �

pehttnalpGNLnafogninoisenehtdesingocerreilppusratshtiwfoelbapacsreniarts

orssmpreohe cf tt oronf-ny ilctainstrethestaggcommissionin

le.udhect sgh

nteilhe ct teo mes trneiarhe st�"���������������������sie deee BeA. VVeEy Fmed brind conf

eks. han four wess ten lrs iinera

� � � � � � � � � � �

r engisedtnalpt sal`owtrofde

r aB5.3gnidnant alhe ps ts. Aor

eerwersain

t nmeequires rnt�������������

nd gned asieks.

� � � � � � � � � � �

inoissimmocgniruDsreniartsnistnemeleqesbuserreewweeeBeeVVetsnemeletnemacelper

t.nahe plf tng oirunn

� � � � � � � � � � �

rpdecneirepxetneilcehtgnevitanretlanaybdeilppussnangisednehtotdekkesayltneuqerusentosernairtseesthorfts

� � � � � � � � � � �

h tiwsmelbo. rerutcafuname rutcaffaunamdnd eunntiocethe

� � � � � � � � � � �

� � � � � � � � � � �

� � � � � � � � � � �

� � � � � � � � � � �

� � � � � � � � � � �

11

12

Best Practice

There is an increased level of concern in the industry that existing data used for sizing these large compressor strainers is incorrect. Clients and contractors are not receiving essential information about these potential problems until the plant starts its commissioning phase.

Vee Bee are passing on our experience to all of our clients regarding best practice when dealing with these types of strainers.

-

-

-

-

Internal elements. The internal element is often seen as more of an annoyance than a necessity as it can be expensive and it creates a pressure loss within a system. The element should be treated as an important and integral part of the system as it is placed directly in the flow preventing harm to more valuable equipment.

Differential pressure calculations using all of the equipment variables. Internal radii, seating rings, heavier wall ��������������������� �����������������������������������pressure through the strainer. Vee Bee uses actual manufacturers data when available or �worst case� data according to international standards to ensure the accuracy of data provided. Piping layouts. Valves, elbows and other pieces of equipment and fittings can have a detrimental effect on differential pressure through a strainer. Vee Bee are able to model piping layouts to give accurate data.

Element manufacture. Welding to ASME VIII Section 9 complete with NDT as required.

eictact PrBes

� � � � � � � � �

n increased level of ce is aherTng daixistt ehat

cnisisreniartsnessegniviecer

nt stahe plal tiunt

assinpearBeeeeVVet prsding beregar

s.rneiatrs

- lementl enaInter

� � � � � � � � �

n in teroncn increased level of chese large comprng tizd for sia usetng da

rtnocdnastneilC.tcerrocesehttuobanoitatmrofnilaitn

ng phase.ionissmmits its cornt sta

otnceiereexpuroongassing witnilan deee whicactt pr

lemennal eterhe ins. Tlement

� � � � � � � � �

y rthe indusn in tr essohese large compr

t onerasrotcas melborroplaitnetop

ng phase.

ts eniclouroflalof s opeyh these tg wit

en eten st is of

� � � � � � � � �

-

afoeros mavisnepxeebeTh.mestsy

al pantegrnd ialow preventhe ft

al preserentiffDinI.selbairav����������rhterusserperutcafunamdd

� � � � � � � � �

��

ecenanahtecnayonnanarusserpasetaerctidnaevdeeattrebdluohstnemeels plt is im aethe sysf tt oral pa

o more valum tring halow prevent

l olng aions usiatllcusure caal pres,sgnirgnitaes,iidarlanrten��������������� ��������eBeeV.reniartsehthguoroelbaliavanehwatadsredliiid

� � � � � � � � �

��

n actisaytissea nihtiwssoler

tant ropimanasdy in lectriaced ds pl

pment.ible equa

tpmenihe equf tl ol lawreivaeh

����������������l autcasesuee� esactsrow�r

d

� � � � � � � � �

-

-

droccaatadcaru acceht

youg lapinPipment aequi

al pressure thrientferfion do model pie tlba

anmntemelEte wicomple

� � � � � � � � �

dnatslanoitanretniotgnidided.a provty of da

her piend otbows alves, elats. VVayoutve a den hangs catiitnd fpment ainerough a straal pressure thrccurve ao gis ttyouping lao model pi

MSAotgnidleW.erutacfuanred.s requiT ah NDtte wi

� � � � � � � � �

e rusneotsdra

f ces oher piefect l efimentar

e re aee Be. VVenerr.a.tate daccur

9 noctieSIIIVE

� � � � � � � � �

� � � � � � � � �

� � � � � � � � �

� � � � � � � � �

� � � � � � � � �

21

13

-

-

-

-

��������������������� ����������������������������������is not acceptable. The units should be designed to reduce the risk of failure and to ensure the smooth operation of the plant. Allowing the client to know what pressure drop is going to be achieved and giving them the confidence to use this data to estimate much more accurately the level of productivity the plant can potentially achieve.

Element finish. Critical welds are ground back to reduce the risk of failure by fatigue.

Element mechanical design. Internal elements are the most important part of the unit and therefore should be designed to the same standards as a pressure vessel, utilising FEA and other analytical calculations to verify the element design.

Natural Frequency. The natural frequency of the pipeline or reciprocating equipment can have a major effect on the element. If the frequency of the element matches that of the pipe work then the element will eventually fail. Frequency analyses should be carried out where this may be an issue.

Standard designs. Where possible, especially on large plants, elements should be designed to be interchangeable reducing the risk of installing incorrect elements and reducing the requirements for multiple spare parts.

-

-

inish. CrElement fe by fatigue.risk of failur

nical desElement mechat of the unit ant paratimpor

� � � � � � � � � �

ck to reduce te ground barl welds aicatiinish. Cre by fatigue.

s al elementnaign. Internical desfore should be deherend tt of the unit a

� � � � � � � � � �

he ck to reduce t

he mostre ts asignedfore should be de

� � � � � � � � � �

-

-

dnatsemasehtotctiylaanrethodan

cneuqerFlarutaNng equipment caitiprocaor rec

equenche frelement. If thtnehtkrowepip

es should be cayslnaa

sngiseddradnatSments should be dents, elepla

krithind

� � � � � � � � � �

,lesseverusesrpasasdradeleethyrifevotsnotialucalcal

tfoycneuqerflarutanehT.ycjor ve a maajn hang equipment catches the element may of tequenc

liafyllautnevelliwtnemeleehhis may be ate ied out wherrres should be ca

yllaicepse,elbissoperehW.sgned to be intsiments should be de

tltiinlaltif

� � � � � � � � � �

A EFgnisilitu. ngiesdtneme

e nilepipehthefect on tjor efhe t of thatches ty cneuqerF.

n issue.his may be a

e gralnoyblengeacharegned to be intindd

� � � � � � � � � �

����������������T.elbatpeccatonsiotdnaeruliaffoksriottneilcehtgniwollA

ng tind givd aevechiae ate much mormaiesty alln potentiant capla

oksriethgincuderfstnemeriuqereht

� � � � � � � � � �

������������������� ���dengisedebdluohsstinuehoitarepohtoomsehterusne

porderusserptahwwonkoidence to use the confhem tng t

oductivhe level of pry ttelccurae aeve. chiy a

stnemeletcerrocniginlaltsnifo.strapearpselpitlumrof

� � � � � � � � � �

���������e htecuderotd. tnalpehtfono

e botgniogsita to his daidence to use the y ttioductiv

g incuderdnas

� � � � � � � � � �

� � � � � � � � � �

� � � � � � � � � �

13

14

Angled Tee Type Strainers ngled TA sneriarpe Stye TTyed TTe

41

15

Best Practice: High integrity framework

ce: iactst PrBe wormeary ftiHigh integr kwor

15

Vee Bee Filtration UK Ltd

Old Wharf RoadStourbridge, West Midlands, UK, DY8 4LSTel: +44 (0) 1384 378 884Fax: +44 (0) 1384 374 179

www.veebee.co.ukEmail: [email protected]

daf RoraOld Wh

ion UKtratlie Fee BeVVe

dtLK

eebeeles@val: siEmae.co.ukebee.vwww

Fax: +44 (0) 1384 37+44 (0) 1384 37el:TTe

SL8 4YDUK,st MeWidge, rbrStou

daf RoraOld Wh

e.co.uk

74 17978 884

nds, alMid