CapitalProgramme2009/10 WorkDone Brinningtonand VictoriaPark West Area GreatMoorandHazelGrove BoroughWide BoroughWide BoroughWide BoroughWide BoroughWide BoroughWide BoroughWide BoroughWide East Area HeatonNorrisandEdgeley CheadleHeath,Edgeley CarecallUpgrade LiftReplacement BirchCourt Concierge SustainabilityWorks Rewires 2,801 1,019 812 242 400 132 N/A N/A N/A N/A N/A N/A N/A N/A Roofing PropertyConversion’s Offerton Hillgate

Citation preview

Capital Programme 2009/10

This leaflet contains information on the proposed Capitalworks to be carried out in the 2009/2010 financial year.This years programme will again concentrate mainly onworks that will help us to achieve the Decent HomesStandard by 2010.

The table below illustrates the number of properties planned foreach of the main elements of work in the two housing areas. Allthese works are subject to survey.

2 Capital Programme 2009/10

Introduction

Work Done

Kitchen and BathroomReplacements

HeatingReplacements

Roofing

Lift Replacement

Rewires

Sustainability Works

Concierge

Property Conversion’s

Overcladding androofing to NonTraditional Properties

DDA and FRAS Works

Fees and Additional/ Misc. Works

Carecall Upgrade

Non Decent Homeswork

PropertiesPlanned

2,801

812

242

400

1,019

N/A

N/A

132

N/A

N/A

N/A

N/A

EastArea

Brinnington, Marple,Mottram St. and Offerton

High Lane, Marple, MarpleBridge, Offerton and Romiley

Great Moor and Hazel Grove

Hillgate

High Lane, Marple, MarpleBridge, Offerton and Romiley

Borough Wide

Borough Wide

Birch Court

Offerton

Borough Wide

N/A

Borough Wide

Brinnington andVictoria Park

WestArea

Adswood, Cale Green, Gatley,Edgeley, Reddish andShaw Heath

Cale Green, Cheadle, CheadleHeath and Heaviley

Cheadle, Cheadle Hulme,Cheadle Heath and Davenport

Heaton Norris and Edgeley

Cheadle, Cheadle Heath,Edgeley and Lancashire Hill

Borough Wide

Borough Wide

Cheadle Heath, Edgeley

Borough Wide

N/A

Borough Wide

Edgeley, Heaton Norris andLancashire Hill

Area Locations Covered

East Brinnington, Marple,Mottram Street and Offerton

West Adswood, Cale Green, Gatley,Edgeley, Reddish and Shaw Heath

3Capital Programme 2009/10

Kitchen and bathroom replacements

The kitchen and bathroom installation programme is now into itsfourth year and will continue to be rolled out across the Borough in2009/10.

A survey of all the properties in this years programme will beundertaken to find out the condition of the existing kitchen andbathroom. Kitchens and bathrooms that already meet the DecentHomes standard will not be included in the replacementprogramme. Properties that are included in this years programmewill receive confirmation by letter.

Customers will be invited to attend a choice event at a locationclose to their homes, to see and choose from the kitchen andbathroom samples on display. It will also provide an opportunity tomeet staff from Stockport Homes and also the Contractor who willbe involved with the installations. Kitchen and bathroom surveysand replacements will take place in the following areas this year:

Seven contractors have been appointed through GM Procure tocarry out the kitchen and bathroom replacements this year. Thecontractors are as follows:

Casey’sEmanuel WhittakersFT Finley’sMears

Hughes BrothersJackson & JacksonPMS

In addition to the above schemes planned maintenance andsustainability works will also be undertaken. The plannedmaintenance works will include projects such as external painting,upgrade works to balconies, railings and gates and DisabilityDiscrimination Act (DDA) and fire safety works.

4 Capital Programme 2009/10

Heating Replacements

Following a concentration on this area, this year will see a smallprogramme of heating replacements, referred to as a ‘Mop-Up’which will aim to complete those properties that have not beendone in previous years.

These works will be carried out in the following areas:

Rewires

Rewires will be carried out across the Borough. A large proportionof this work will be undertaken in conjunction with the kitchen andbathroom replacements. The rewires will be carried out to therelevant properties in the areas identified below.

Area Locations Covered

East

West

High Lane, Marple, Marple Bridge, Offerton and Romiley.

Cheadle, Cheadle Heath, Edgeley and Lancashire Hill.

Area Locations covered

East

West

High Lane, Marple, Marple Bridge, Offerton and Romiley.

Cale Green, Cheadle, Cheadle Heath, and Heaviley.

The contractor that has been appointed for heating replacement isDodds.

5Capital Programme 2009/10

Overcladding and Roofing to non-traditional properties

The overcladding and roofing works to non-traditional propertiesimprove the aesthetics of the area as well as delivering aconsiderable saving on customers’ fuel bills.

Roofing

Area Locations Covered

East Great Moor and Hazel Grove

West Cheadle, Cheadle Hulme, CheadleHeath and Davenport.

Miscellaneous Projects

Pitched roofing works will be carried out in the following areas:

Various works will be done across the Borough including lift replacements, paintingworks, and health and safety works which we are required to carry out due toregulatory and legislative requirements.

6 Capital Programme 2009/10

Works in Progress

We understand that nobody likes upheaval in their home. However,some of the works to be carried out are extensive and it isinevitable that disruption will be encountered.

For our part we will do our best to keep any mess and generalinconvenience to a minimum.

For any further information, please telephone the InvestmentProgramme Advice line on 0161 474 4407 or visit StockportHomes’ website at www.stockporthomes.org

7Capital Programme 2009/10

Notes

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

.................................................................................................................

Accessing our services

This leaflet gives you information on the proposedCapital works to be carried out in 2009/10financial year. If you would like a copy in largeprint, Braille, on audio tape or CD, please contactthe Social Inclusion Team on 0161 474 2860 oremail: [email protected]