62
CAPITAL PROGRAM COMMITTEE Friday, November 30, 2018 12:00 PM VTA Conference Room B-106 3331 North First Street San Jose, CA AGENDA CALL TO ORDER 1. ROLL CALL 2. PUBLIC PRESENTATIONS: This portion of the agenda is reserved for persons desiring to address the Committee on any matter not on the agenda. Speakers are limited to 2 minutes. The law does not permit Committee action or extended discussion on any item not on the agenda except under special circumstances. If Committee action is requested, the matter can be placed on a subsequent agenda. All statements that require a response will be referred to staff for reply in writing. 3. ORDERS OF THE DAY CONSENT AGENDA 4. ACTION ITEM - Approve the Regular Meeting Minutes of June 28, 2018. REGULAR AGENDA 5. INFORMATION ITEM - Receive a presentation on the current capital budget development process. (Verbal Report) 6. INFORMATION ITEM - Receive information on VTA Planning activities. 7. DISCUSSION ITEM - Receive a presentation and provide input on continued development of VTA's Enhanced Capital Program process.

CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

CAPITAL PROGRAM COMMITTEE

Friday, November 30, 2018

12:00 PM

VTA Conference Room B-106

3331 North First Street

San Jose, CA

AGENDA

CALL TO ORDER

1. ROLL CALL

2. PUBLIC PRESENTATIONS:

This portion of the agenda is reserved for persons desiring to address the Committee on any matter not on the agenda. Speakers are limited to 2 minutes. The law does not permit Committee action or extended discussion on any item not on the agenda except under special circumstances. If Committee action is requested, the matter can be placed on a subsequent agenda. All statements that require a response will be referred to staff for reply in writing.

3. ORDERS OF THE DAY

CONSENT AGENDA

4. ACTION ITEM - Approve the Regular Meeting Minutes of June 28, 2018.

REGULAR AGENDA

5. INFORMATION ITEM - Receive a presentation on the current capital budget development process. (Verbal Report)

6. INFORMATION ITEM - Receive information on VTA Planning activities.

7. DISCUSSION ITEM - Receive a presentation and provide input on continued development of VTA's Enhanced Capital Program process.

Page 2: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Santa Clara Valley Transportation Authority Capital Program Committee November 30, 2018

Page 2

OTHER ITEMS

8. Items of Concern and Referral to Administration.

Business Interruption Fund Study for BART Phase II

9. Review Committee Work Plan. (Flynn)

10. Committee Staff Report. (Flynn)

11. Chairperson's Report. (Carr)

12. Determine Consent Agenda for future Board of Directors Meeting.

13. ANNOUNCEMENTS

14. ADJOURN

In accordance with the Americans with Disabilities Act (ADA) and Title VI of the Civil Rights Act of 1964, VTA will make reasonable arrangements to ensure meaningful access to its meetings for persons who have disabilities and for persons with limited English proficiency who need translation and interpretation services. Individuals requiring ADA accommodations should notify the Board Secretary’s Office at least 48-hours prior to the meeting. Individuals requiring language assistance should notify the Board Secretary’s Office at least 72-hours prior to the meeting. The Board Secretary may be contacted at (408) 321-5680 or [email protected] or (408) 321-2330 (TTY only). VTA’s home page is www.vta.org or visit us on www.facebook.com/scvta. (408) 321-2300:    中文 / Español / 日本語 /  한국어 / tiếng Việt /  Tagalog.

Disclosure of Campaign Contributions to Board Members (Government Code Section 84308) In accordance with Government Code Section 84308, no VTA Board Member shall accept, solicit, or direct a contribution of more than $250 from any party, or his or her agent, or from any participant, or his or her agent, while a proceeding involving a license, permit, or other entitlement for use is pending before the agency. Any Board Member who has received a contribution within the preceding 12 months in an amount of more than $250 from a party or from any agent or participant shall disclose that fact on the record of the proceeding and shall not make, participate in making, or in any way attempt to use his or her official position to influence the decision. A party to a proceeding before VTA shall disclose on the record of the proceeding any contribution in an amount of more than $250 made within the preceding 12 months by the party, or his or her agent, to any Board Member. No party, or his or her agent, shall make a contribution of more than $250 to any Board Member during the proceeding and for three months following the date a final decision is rendered by the agency in the proceeding. The foregoing statements are limited in their entirety by the provisions of Section 84308 and parties are urged to consult with their own legal counsel regarding the requirements of the law.

All reports for items on the open meeting agenda are available for review in the Board Secretary’s Office, 3331 North First Street, San Jose, California, (408) 321-5680, the Monday, Tuesday, and Wednesday prior to the meeting. This information is available on VTA’s website at http://www.vta.org and also at the meeting.

NOTE: THE BOARD OF DIRECTORS MAY ACCEPT, REJECT OR MODIFY ANY ACTION RECOMMENDED ON THIS AGENDA.

Page 3: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Capital Program Committee

Thursday, June 28, 2018

MINUTES

CALL TO ORDER

The Regular Meeting of the Capital Program Committee (CPC) was called to order at

12:03 p.m. by Chairperson Carr in Conference Room B-106, 3331 North First Street, San

Jose, California.

1. ROLL CALL

Attendee Name Title Status

Larry Carr Chairperson Present

Cindy Chavez Member Present

David Cortese Alternate Member N/A

Dev Davis Alternate Member N/A

Daniel Harney Alternate Member N/A

Glenn Hendricks Alternate Member N/A

Chappie Jones Member Present

Bob Nuñez Member Present

Raul Peralez Member Present

Rob Rennie Alternate Member N/A

Savita Vaidhyanathan Member Present

A quorum was present.

2. Welcome remarks from the General Manager/CEO, Nuria I. Fernandez

Nuria I. Fernandez, General Manager and CEO, provided welcome remarks and an

overview of need, benefits, and opportunities of a Board-level committee to provide input

on VTA’s capital program. Ms. Fernandez noted the Committee’s vital role on matters

concerning State of Good Repair, transit asset management, and infrastructure

maintenance.

Chairperson Carr provided welcome remarks.

4

Page 4: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Capital Program Committee Minutes Page 2 of 5 June 28, 2018

3. PUBLIC PRESENTATIONS

Member Peralez arrived at the meeting and took his seat at 12:12 p.m.

Roland Lebrun, Interested Citizen, made the following comments: 1) referenced the

long-term recreational vehicle (RV) parking for VTA employees and suggested to

continue to offer parking for a fee; and 2) suggested VTA consider a microtransit pilot

program at the Kaiser Permanente in South San Jose, similar to the partnership between

the University of California San Francisco (UCSF) and Chariot, through a Metropolitan

Transportation Commission (MTC) grant program.

4. ORDERS OF THE DAY

Chairperson Carr noted a request from staff to hear Agenda Item #8. Overview of Short-

Range Transit Plan (SRTP) Process following Agenda Item #9. Overview of Transit

Asset Management, State of Good Repair, and Enterprise Asset Management System

Processes.

M/S/C (Chavez/Nuñez) to accept the Orders of the Day.

RESULT: ACCEPTED [UNANIMOUS] – Orders of the Day MOVER: Cindy Chavez, Member

SECONDER: Bob Nuñez, Member

AYES: Carr, Chavez, Jones, Nuñez, Peralez, Vaidhyanathan

NOES: None

ABSENT: None

5. Committee Vice Chairperson for 2018

Stephen Flynn, Senior Policy Analyst and Staff Liaison, provided a brief overview of the

election process.

M/S/C (Chavez/Jones) to close nominations and elect Member Nuñez as the

Committee’s Vice Chairperson for calendar year 2018.

RESULT: APPROVED [UNANIMOUS] – Agenda Item #5 MOVER: Cindy Chavez, Member

SECONDER: Chappie Jones, Member

AYES: Carr, Chavez, Jones, Nuñez, Peralez, Vaidhyanathan

NOES: None

ABSENT: None

CONSENT AGENDA

There were no items under the Consent Agenda.

4

Page 5: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Capital Program Committee Minutes Page 3 of 5 June 28, 2018

REGULAR AGENDA

6. Overview of Proposed Enhanced VTA Capital Program Planning Process

Ms. Fernandez introduced Joe Speaks, Senior Consultant, Jacobs (CH2M), and provided

a brief overview of the Committee’s purpose.

Chris Augenstein, Director of Planning and Programming, provided an overview of key

objectives of the enhanced capital program process and current key VTA planning

activities.

Mr. Speaks noted VTA's diverse responsibilities and provided an overview of the

comprehensive capital planning activities, as guided by the Strategic Plan. He outlined

the recommended capital program process enhancements, including the development of a

comprehensive, unconstrained 10-year Capital Needs List and a fiscally constrained

5-year Capital Plan (CAP5).

Mr. Augenstein noted recommended Committee responsibilities, including a brief

overview of the comprehensive capital program planning process leading up to the

biennial budget.

Members of the Committee made the following comments: 1) requested staff provide

additional information on cost implications of a capital program that includes operations

and maintenance, and to bring forward a formal definition of terms for Board adoption;

2) requested additional information on funding authority and source of funds as it

pertains to VTA’s capital planning activities; 3) asked about planning process to assess

opportunities in innovation or emerging technologies; and 4) operating and maintenance

needs should be factored into the capital needs.

Staff noted existing federal, state, and regional approaches are not aligned with the pace

of change in emerging technologies. Staff clarified VTA’s vision statement refers to

technological innovation as well as business model innovation.

Public Comment

Glenn Hendricks, Interested Citizen and City of Sunnyvale Mayor, highlighted the

importance of fully understanding the fiscal impact of capital projects including

operational and maintenance costs. He suggested a policy that future proposed capital

projects include an analysis on operational cost implications.

Mr. Lebrun noted the challenge of VTA’s diverse responsibilities and suggested VTA

consider separating its congestion management duties and bus and light rail operations,

similar to the County of San Francisco’s structure.

On order of Chairperson Carr, and there being no objection, the Committee received a

presentation and provided input on the proposed enhancement of VTA's Capital Program

planning process.

4

Page 6: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Capital Program Committee Minutes Page 4 of 5 June 28, 2018

7. Overview of VTA Strategic Plan

Scott Haywood, Transportation Planning Manager, provided an overview of the VTA

Strategic Plan, highlighting mission and vision statements, values, business lines, and the

relationship of the Strategic Plan with the Committee's purpose.

On order of Chairperson Carr, and there being no objection, the Committee received a

presentation on the VTA Strategic Plan and its relationship to the Capital Program

Planning process.

The Agenda was taken out of order.

9. Overview of Transit Asset Management, State of Good Repair, and Enterprise Asset

Management System Processes

Bruce Abanathie, Principal Transportation Planner, provided a brief overview of Transit

Asset Management (TAM) and State of Good Repair (SGR), highlighting: 1) overview of

VTA asset inventory; 2) condition assessments; 3) Transit Economic Requirements

Model (TERM) Lite projections; and 4) overview of Enterprise Asset Management

(EAM) software.

On order of Chairperson Carr, and there being no objection, the Committee received a

presentation on VTA's Transit Asset Management, State of Good Repair, and Enterprise

Asset Management System Processes.

8. Overview of Short-Range Transit Plan (SRTP) Process

Adam Burger, Senior Transportation Planner, provided an overview of the staff report,

highlighting: 1) SRTP purposes and the Metropolitan Transportation Commission’s

(MTC) interest in the SRTP; 2) projected transit service levels and declining bus speeds;

3) slowing routes require more buses; 4) summary of core capital program budget;

5) VTA bus purchase history and bus fleet usage; and 6) long-term expense projections.

On order of Chairperson Carr, and there being no objection, the Committee received a

presentation on VTA's Short-Range Transit Plan planning process.

OTHER ITEMS

10. Items of Concern or Referral to Administration

There were no items of concern or referral to Administration.

11. Committee Work Plan

On order of Chairperson Carr, and there being no objection, the Committee reviewed

the CPC Work Plan.

4

Page 7: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Capital Program Committee Minutes Page 5 of 5 June 28, 2018

12. Committee Staff Report

Discuss future meeting dates

Mr. Flynn noted staff recommendation to hold quarterly meetings and proposed

the next CPC meeting be held on October 25, 2018. The Board Secretary’s Office

will conduct polling to assess Committee Members’ availability.

13. Chairperson's Report

Chairperson Carr requested staff spell out or provide definitions of acronyms.

14. Determine Consent Agenda for the August 2, 2018, Board of Directors Meeting

CONSENT:

None.

REGULAR:

None.

15. ANNOUNCEMENTS

There were no Announcements.

16. ADJOURNMENT

On order of Chairperson Carr, and there being no objection, the meeting was

adjourned at 1:37 p.m.

Respectfully submitted,

Michelle Oblena, Board Assistant

VTA Office of the Board Secretary

4

Page 8: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Current Capital Budget Development Process

Capital Program Committee

November 30, 2018

Agenda Item #5

Page 9: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

FY20 & FY21 Capital Budget Development Schedule

2

Call For Projects

Budget & Grants Department Review

Project Scoring

Initial Ranking and Funding

Executive Review of Projects

GM Review of Projects

Proposed Capital Budget Finalized

CPC Review of Proposed Budget

CPC 2nd Review (if necessary)

Board Budget Workshop

Community/Advisory Comm Review

Budget Adoption

Page 10: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Project Evaluation Criteria

3

• Enhances Safety & Security

• Environmental Sustainability

• Improves Cost Efficiency/Effectiveness

• Improves Transit System

• Increases Ridership

• Preserves/Maintains Transit System

Page 11: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Additional Prioritization Parameters

4

• Mandated—legal or contractual obligations

• Grant or other “outside” funding source(s)

• Return on investment of less than 2 years

• Augmentations to existing projects

• “Recurring” maintenance programs—HVAC,

pavement, roofing, etc.

Page 12: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Current Prioritization Limitations

5

• Evaluation criteria and weighting may not

accurately reflect current agency priorities

• Focus limited to VTA Transit projects

• Qualities/characteristics of Technology and

Innovation projects not well represented

Page 13: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

QUESTIONS???

Page 14: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Date: November 26, 2018

Current Meeting: November 30, 2018

Board Meeting: N/A

BOARD MEMORANDUM

TO: Santa Clara Valley Transportation AuthorityCapital Program Committee

THROUGH: General Manager, Nuria I. Fernandez

FROM: Director - Planning & Programming, Chris Augenstein

SUBJECT: VTA Planning Activities

FOR INFORMATION ONLY

BACKGROUND:

The Capital Program Committee received information on key VTA planning activities as part of the Strategic, Comprehensive Program Process presentation at their June 28, 2018 meeting. As a result, the Committee requested more information on the resources that VTA dedicates to transportation planning. This memorandum is intended to respond to that request.

VTA’s planning activities fall into three main categories:

1. Countywide plans to fulfill VTA’s mission as the Congestion Management Agency (CMA) and Transportation Authority for Santa Clara County, manage mobility and provide transit service.

2. Targeted studies to address regional or sub-regional mobility issues3. Other studies requested by member agencies.

VTA receives ongoing planning funding through the Metropolitan Transportation Commission (MTC) and the State Transportation Improvement Program (STIP). MTC periodically provides grants for short-range transit plans and other regional priorities. Plans related to specific ballot-measure programs may be funded through those programs. VTA also seeks outside grants for specific planning efforts and to fund targeted studies for member agencies.

DISCUSSION:VTA’s transportation planning efforts are concentrated in two divisions: Planning and Programming and Engineering and Transportation Program Delivery. The specific sub-units are outlined below. Planning activities are carried out with a combination of VTA staff and consultant services.

6

Page 15: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Page 2 of 5

• Planning and Programming Division:o Transit Planningo Transportation Planning (non-transit)

• Engineering and Transportation Program Delivery Divisiono Mobility and Project Development Department

Below is a summary of the larger planning efforts that have been recently completed, are currently in process or are anticipated to begin in the very near future. This is not intended to be a comprehensive list of planning activities or studies. In addition, the planning activities outlined in this memo are those related to capital projects. VTA transit planning staff also plans and schedules all of VTA’s bus and rail services.

Transit Planning: Plans and Studies

Short Range Transit Plan (SRTP): The SRTP is VTA’s most comprehensive transit planning document. The SRTP documents VTA bus, light rail and paratransit services and provides a ten-year projection of operating and supporting capital strategies. In addition, the SRTP identifies many challenges to sustainability that VTA faces and frames these challenges within the overall goals of VTA.Updated every two to four years, staff is currently updating the SRTP, which will cover 2018 -2027. The planning efforts are primarily completed by VTA staff, with consultant support for graphics and publication. The current SRTP covers 2014 - 2023.

Next Network: The Next Network was a study of VTA’s bus network which resulted in a major redesign of the bus network that expanded VTA’s frequent network of transit service to more people. Once implemented, the redesigned network will provide “show up and go” frequent service to 150,000 more residents and 160,000 more jobs while maintaining a strong network of neighborhood services that are a lifeline for many residents.

Completed and adopted by the VTA Board of Directors in 2017, the plan was delivered by VTA staff, supported by $340,000 in consulting contracts, including a contract with Jarrett Walker for specialized planning services.

SR 85 Transit Guideway Study: The State Route (SR) 85 Transit Guideway Study is the first step towards potential transit improvements on SR 85, the 23.7-mile corridor that connects the cities of Mountain View and San Jose, from the SR 85/US 101 interchange in Mountain View to the SR 85/US 101 interchange in South San Jose. In 2018, staff completed work on a travel market and engineering constraints analysis to understand which types of transit services may be good fits for the corridor. The next steps are to identify and analyze multiple project alternatives for cost and feasibility. This study will continue in early 2019, with a loan from MTC. The current $1.6 million cost estimate is primarily for consultant costs.

Fast Transit Program: The Fast Transit Program is a comprehensive examination of the causes of VTA’s significantly declining transit speeds. This decline in transit speed increases travel times, affecting on-time reliability, which makes transit less appealing to riders. In addition, the

6

Page 16: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Page 3 of 5

slowing routes become increasingly more expensive to operate as additional buses or trains are need to maintain the same frequency of service. The goals of the Fast Transit Program are to provide VTA with cost-effective projects or solutions to address the declining speeds and policy decisions to prioritize speed improvements throughout the agency.

VTA staff is currently conducting the Fast Transit Program. Future consultant needs to complete the study are anticipated.

Strategic Plan for Advancing High Capacity Transit Corridors: This study will help guide future VTA investment decisions for the next phase of high capacity transit corridors. Evaluation criteria of a recently-released Request for Proposals for the study includes transit supportiveness in the corridor, capital and operating costs, and local support for high capacity transit. The study will also help VTA explore and evaluate the potential integration of autonomous vehicle technology into the next wave of high capacity transit corridor development. The corridors recommended for advancement will inform VTA’s long range transportation plan. Study kick-off is scheduled for early 2019. Consultant services are approximately $760,000.

Diridon Station Concept Plan: With the addition of BART and High Speed Rail, the San Jose Diridon Station is on target to become the largest inter-modal facility in Northern California. Recent development interest has prompted new urgency to analyze transportation facility needs, resolve short and long-term operational issues, and design world-class intermodal transportation facility that is seamlessly integrated within the urban fabric of downtown San Jose. To ensure its success VTA, Caltrain, and California High Speed Rail, as well as the City of San Jose, in whose jurisdiction the station resides, are partnering together to develop a San Jose Diridon Station Concept Plan. The partners have entered in to a Cooperative Agreement to plan and fund the Diridon Station Concept Plan. The partners have also hired the architectural and engineering team of Arcadis Benthem Crouwel to develop the concept plan. The current phase is approximately $3.5 million.

Transportation Planning (non-transit)

Envision Silicon Valley: The VTA launched Envision Silicon Valley, a dynamic visioning process to discuss current and future transportation needs of Santa Clara County, to identify solutions and to craft funding priorities. Through this extensive community-based process, VTA successfully placed a transportation sales tax measure (Measure B) on the November 2016 ballot. Measure B was approved by 72% of Santa Clara County voters to enhance transit, highways, expressways and active transportation in the County. Over the next 30 years, Measure B is anticipated to generate $6.3 billion in 2017 dollars. The Envision Silicon Valley planning effort was completed almost entirely by VTA staff, with minimal consultant support for community outreach.

VTA Strategic Plan (2017-2022): The Plan establishes VTA’s Mission, Vision, and Values, and guides the development and implementation of VTA’s Business Lines, which outline the strategies necessary to reach our goals. This Plan will also serve to guide our budgeting process and allocation of resources. The Plan was primarily completed in-house by VTA staff, with

6

Page 17: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Page 4 of 5

$52,000 in consultant support.

Valley Transportation Plan 2040 (Countywide Transportation Plan): The Valley Transportation Plan (VTP) is the countywide long-range transportation plan for Santa Clara County. As the Congestion Management Agency (CMA) for the county, the Santa Clara Valley Transportation Authority (VTA) periodically updates this 25-year plan. VTP provides a planning and policy framework for developing and delivering future transportation projects as well as location-specific improvements for all modes of travel. All work on the current VTP was completed in-house by VTA staff.

Congestion Management Plan (2017-2024): VTA serves as the Congestion Management Agency (CMA) for Santa Clara County. California State statute requires CMAs to develop, adopt and update a Congestion Management Program (CMP) every two years. This Program is summarized in a ‘Congestion Management Program document’ which is published every two years and completed in-house by VTA staff.

Community Design and Transportation Manual Update: VTA is updating the Community Design and Transportation Manual (2003) to incorporate new pedestrian and bicycle design best practices and to address innovations in transportation demand management and parking strategies, automated vehicles, on-demand shared ride, micro-mobility, and other changes in land use and transportation. VTA is in the process of procuring consultants for this update, and costs are anticipated to be approximately $200,000.

Countywide Bicycle Plan: VTA's comprehensive Bicycle Program is committed to improving the bicycle infrastructure throughout Santa Clara County and to enable and encourage people to bike to work, school, errands and for recreation. The recently updated Countywide Bicycle Plan establishes a network of Cross County Bikeway Corridors that will provide continuous, complete bike connections across the county. The plan also identifies locations where new and improved bicycle connections are needed across freeways, rail lines, and creeks. Lastly, the plan identifies ways to make it easier for people to use their bicycle with transit, including bicycle access to major transit stops, bicycle parking at stops, and bicycle accommodations on board. Under $500,000 was expended for consultant services for the most recently updated plan.

Pedestrian Access to Transit Plan: The VTA Pedestrian Access to Transit Plan is the first countywide plan to emphasize improving pedestrian access to transit on a regional scale. The plan identifies twelve Focus Areas in Santa Clara County-areas with high VTA bus ridership and high need for pedestrian infrastructure improvements-and 165 capital projects that can improve pedestrian access to transit in these Focus Areas. It complements local pedestrian planning documents, which cover specific geographic areas based on the communities’ needs. A total of $95,000 was expended on consultant services.

Complete Streets: Three Complete Streets Corridor studies were led by VTA planning staff in partnership with city staff. All of the studies evaluate transit travel times, signal coordination, signal-timing modifications, multimodal access, safety, and connectivity in the respective corridors. The three Complete Streets Studies are as follows:

• Bascom Complete Streets - Ongoing. Consultant services for this effort are

6

Page 18: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Page 5 of 5

approximately $1.1 million.• Tasman Complete Streets - Ongoing. Consultant services for this effort are

approximately $1.1 million.• Story/Keyes Complete Streets - Complete. Consultant services for this effort was

approximately $400,000.

Taking the Lead on the Senate Bill 743-Transition to Vehicle Miles Traveled (VMT): Senate Bill (SB) 743 calls for a major shift in the transportation analysis of projects such as land developments and plans, moving away from congestion-focused measures and towards Vehicle Miles Traveled (VMT). VTA has taken a leading role with the cities of Santa Clara County as well as the County to develop consistent countywide guidelines, tools and data to help implement SB 743. To date, VTA has established a multi-disciplinary working group, set up a dedicated website (www.vta.org/los-vmt <http://www.vta.org/los-vmt>), hosted an informational webinar, and produced a fact sheet on “Things Local Agencies Should Be Thinking About” with the SB 743 transition, among other efforts. VTA is also in the process of gathering funding to develop a countywide, web and Geographic Information Systems (GIS)-based tool to estimate VMT from land use projects and plans, which would be among the first countywide tools of its kind in the state and the nation.

Work on this endeavor is done in-house by VTA staff. Future consultant needs on the GIS-based tool described above is expected.

Mobility and Project Development

SR 87 Corridor Study: In partnership with the City of San Jose, this study seeks to address existing concerns for SR 87 in advance of anticipated growth and land-use in the area. VTA will identify technology-based improvements and innovative solutions that will maximize use of existing infrastructure, focus on less capital-intensive operational applications, and rely on real time information to find “hidden” capacities along SR 87. The cost of the study is approximately $225,000.

I-280 Corridor Study: The primary objective of the I-280 Corridor Study was to identify multi-modal improvement projects for Santa Clara County’s next iteration of its long range transportation plan, Valley Transportation Plan (VTP). The study area extends from the US 101/I-680/I-280 interchange in San Jose to the Santa Clara/San Mateo county line. The cost of the study was approximately $750,000.

Prepared By: Marcella RensiMemo No. 6771

6

Page 19: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

VTA Planning Activities

Capital Program CommitteeNovember 30, 2018

Agenda Item #6

Page 20: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

2

VTA Planning: One Purpose, Three Linked Efforts

Transit

Highways

Transportation (CMA) Best 

Practices

Contributing Support Functions:  ‐ Environmental‐ Sustainability

VTA Planning

Page 21: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

3

Transit Planning

Page 22: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

4

Transit Planning: Our Overall Charge

• Design and improve transit service

• Plan for the future

• Develop policies for efficient, equitable service

• Work with other agencies

Page 23: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

5

Transit Planning: Design and Improve Service

Next Network Plan and implementation

Transit Service Performance Analysis

Annual Transit Service Plan

FAST Program: faster, more reliable bus and light rail transit

Passenger focus: stops, shelters, benches, maps, schedules, signs

Manage: quarterly changes, events, agency coordination

Page 24: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

6

Transit Planning: Plan for the Future

Short Range Transit Plan: 10‐year projections & projects

Bus Improvements: Rapid 522 & 523, El Camino, King Road

Light Rail: Capitol & Vasona extensions, speed/safety

Corridors: High Capacity Corridor Study, SR 85 Study

Stations: Diridon, MTV & Great America Transit Centers

First/last mile innovative transit services – Measure B

Page 25: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

7

Transit Planning: Develop Policies

Transit Service Guidelines

Station Access Policy

Transit Passenger Environment Plan

Title VI Service Equity Policy & Standards

Page 26: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

8

Transit Planning: Work with Other Agencies

Caltrain: Business Plan, South County, Measure B projects

BART: Phase II planning, service coordination

Rail: High Speed Rail, ACE, Capitols, Dumbarton

Cities: Downtown San Jose Mobility Plan, St. James Park,

MV Transit Center, Great America Transit Center

San Fernando Street Bikeway

Page 27: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

9

Transportation Planning

(Congestion Management Agency)

Page 28: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

10

• Long-range Planning

• Required Planning Activities

• Countywide Lead

• Corridor-level Studies

• Support Member Agencies

Transportation Planning

Page 29: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

11

Long-range Planning

Strategic Plan (2017-2022)

Valley Transportation Plan (VTP)

Countywide Bicycle Plan

Transportation Planning (cont.)

Page 30: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

12

• Envision Silicon Valley

• Pedestrian Access to Transit

• Community Design & Transportation Update

• Congestion Management Plan

Recent Transportation Planning Activities

Page 31: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

13

• Complete Streets Studies

Story/Keys

Tasman

Bascom

• Lead for Implementation of SB 743

Recent Transportation Planning Activities (cont.)

Page 32: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

14

Highway Program Planning

Page 33: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

15

Highway Project Delivery Process

Corridor/Area Studies

CountywideTransportation

Plan(e.g., VTP 2040)

MTC RTP

VTA Board Implementation

PlanPSR

TransportationImprovement

Plan (TIP)

PA/ED(Environmental/ PE)

PS&E(Final

Design)

ProjectConstruction

Operations&

Monitoring(Caltrans)

STIP

PROJECTDEVELOPMENT

PLANNING &PROGRAMMING

ENGINEERING, CONSTRUCTION& OPERATIONS

MTC: MetropolitanTransportation Commission

RTP: Regional TransportationPlan

PSR: Project Study Report

STIP: State TransportationImprovement Program

PA: Project Approval

ED: Environmental Document

PE: Preliminary Engineering

PS&E: Plans, Specifications & Estimates

CMP: Congestion ManagementProgram

Page 34: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

16

Highway Program Activities

• Coordinate with Caltrans and Federal Highway Administration (FHWA)

• Develop cooperative and funding agreements with Caltrans and local

agencies

• Deliver highway projects from project initiation to final design

• Administer the construction contract for projects

• Deliver a variety of highway projects:

Express Lanes

Highway Interchanges

Highway Noise Abatement

Freeway Corridor Studies

Complete Streets Implementation

Page 35: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

17

Potential Fund Sources

• LocalCity/Developer funds, VTA (Vehicle Registration Fees, sales tax measure)

• StateSTIP (State Transportation Improvement Program), SB1 Programs, Planning

grants

• FederalGrants, Surface Transportation Program (STP)/(Congestion Management and

Air Quality (CMAQ)

• OthersFinancing; private contributions

Page 36: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Active Highway Projects

• Mathilda Avenue Improvements at US 101 and SR 237 – Construction phase

• SR 237 Express Lanes (Phase 2) – Construction phase

• US 101‐SR 85 Express Lanes (Phase 3) – Construction phase

• US 101‐SR 85 Express Lanes  (Phase 4) – Design phase

• US 101/Trimble Road‐De La Cruz Blvd. Interchange Improvements – Design phase

• US 101/SR 25 Interchange Improvements (Phase 1)  ‐ Design phase

• I‐680 Sound walls from Capitol Expwy. to Mueller Avenue – Environmental  

• I‐280/Wolfe Road Interchange Improvements – Environmental phase

• I‐280/Winchester Boulevard Interchange Improvements – Environmental phase

• US 101/ Zanker Road Interchange – Environmental phase

18

Page 37: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

19

Questions?

Page 38: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Date: November 21, 2018

Current Meeting: November 30, 2018

Board Meeting: N/A

BOARD MEMORANDUM

TO: Santa Clara Valley Transportation AuthorityCapital Program Committee

THROUGH: General Manager, Nuria I. Fernandez

FROM: Director - Planning & Programming, Chris Augenstein

SUBJECT: Proposed Enhanced VTA Capital Program Process

FOR DISCUSSION ONLY

BACKGROUND:

In December 2016, the Board established the Capital Program Committee (CPC). This action resulted from GM/CEO Nuria Fernandez’s recommendation, based on her extensive transportation industry experience, that having a board standing committee focused on the capital program is both best practice and good governance, and the lack thereof was hindering VTA’s ability to fully achieve its strategic goals. The CPC's primary responsibilities can be summarized as:

• Provide Board-level policy direction on the capital program

• Determine capital priorities

To maximize the CPC’s effectiveness and value to the Board and VTA, a process was initiated to:

(1) Further define and clarify the CPC’s mission and specific duties

(2) Identify potential adjustments to enhance VTA’s existing capital program

(3) Determine the tools and information needed by the committee to optimally fulfill its mission of determining capital priorities

A key objective of this process, mindful of VTA’s current economic challenges, was to enhance the existing capital program utilizing existing resources as much as possible. In short, to identify actions needed to efficiently adjust existing processes into a more unified capital program capable of providing the CPC and Board with the needed comprehensive view of VTA’s strategic capital needs. To aid this process and provide expertise on best practices, VTA engaged the services of transportation consulting firm Jacobs. The Jacobs team is led by Joe Speaks, Senior Consultant.

7

Page 39: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Page 2 of 2

At the initial CPC meeting, held in June 2018, the CPC reviewed information on the current VTA capital program and several key planning efforts. The Committee also reviewed and discussed several initial draft recommendations on the CPC’s overall role and responsibilities as well as some potential adjustments to the overall capital program and associated processes.

DISCUSSION:

Since the first CPC meeting, development has continued on potential ways to efficiently improve the capital program process. This work, combined with input provided by the Committee at the initial meeting, has yielded several new or revised recommendations for optimizing the current VTA Capital Program and planning processes into what will henceforth will be termed the “Enhanced Capital Program.”

The recommended Enhanced Capital Program includes the proposed integrated process and schedule that provides defined, recurring opportunities for Committee input, direction and approval, in fulfillment of its capital program stewardship responsibilities, while concurrently limiting CPC meetings to a small number.

Staff will present recommendations on the following topic areas:

• Refinement of CPC mission

• CPC Roles/Responsibilities

• Enhanced Capital Program

• Scope

• Process including key CPC points of input and approval

• Schedule

• VTA Capital Plan

• Items for future consideration

It should be noted that significant time will be needed to fully develop, refine and implement the Enhanced Capital Program process and products, full implementation is projected for mid-2020.

Given the breadth and complexity of VTA’s capital program, the enhancement process will most likely be an evolving process with refinements occurring during the first few years.

Prepared By: Stephen Flynn, Sr. Policy AnalystMemo No. 6797

7

Page 40: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Enhanced Capital Program

Designing VTA’s Future by Charting the Course

Capital Program CommitteeNovember 30, 2018

Agenda Item #7

Page 41: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

2

Key Topics for Today

1) Capital Program Committee (CPC) Mission

Recommended Roles/Responsibilities

2) Enhanced Capital Program Proposed Scope and Process

Process and Timetable

Next Steps

3) Potential Items for Future CPC Consideration

Page 42: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

3

Capital Program Committee (CPC)

Page 43: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

4

Capital Program Committee (CPC) Mission

Board established CPC to:

• Elevate focus on Capital Program

• Strengthen Board understanding of capital investment

needs and challenges

• Provide Board-level policy direction for Capital

Program

• Optimize strategic capital planning efforts

Page 44: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

5

Recommended CPC Roles/Responsibilities

Specific Key Duties

A. Policy stewardship and strategic direction for Capital Program

B. Provide input/direction and recommend Board approval of:

Project priorities and scoring criteria

Strategic capital plan (CAP5)

Major cost and/or scope changes to existing mega-projects

C. Review and evaluate:

Existing major projects for current need and operating impacts on system

Capital expansion plans for alternative service provision options

D. Monitor project progress at summary/exception level

Page 45: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

6

Proposed CPC Meeting Schedule

• Four recurring meetings on 4th Thursday of month @ noon:

February

May

August

October

• Potentially 1 - 2 supplemental meetings, if

needed, during CAP5 development (every other

year)

Page 46: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

7

Proposed 2019 Meeting Schedule

• February 28

• March 12 or 14 (if needed)

• May 23

• August 22

• October 24

Page 47: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

8

Proposed

Enhanced Capital Program

Page 48: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

9

Current VTA Capital Program

• Mature and effective planning activities Transit

CMP

Highways

Bike/Pedestrian

Other

• Overall Capital Program process

Opportunities to incorporate best practices

Modify/enhance to best align with/support CPC mission

Page 49: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

10

Enhanced Capital Program

Scope

• Projects VTA is responsible for delivering

• Where VTA provides capital funding to partner agency/agencies (for

example, Caltrain)

• Progress monitoring of 2016 Measure B projects

Page 50: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

11

Implementation

Completion is targeted to be ready for use in biennial budget process for FY22 &

FY23 budgets (starts Summer 2020)

• Significant time needed to:

Develop/refine process and products

Receive CPC input/guidance

Train staff

Complete Board-adopted Business Plan

• Exception (early application): In February 2019, CPC will review and be

asked to make a recommendation to the Board on capital portion for the

FY20 & FY21 budgets

Page 51: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

12

Resources for Enhanced Capital Program

• Given financial constraints, goal is to deliver with no/minimal

additional cost/burden

Use existing resources and staff

Adjust and align existing planning and reporting processes

Streamline process by integrating with existing biennial budget process

Simplify process to minimize additional time requirement for project managers

Page 52: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

13

Key Proposed Capital Program Enhancements

• Board-adopted fiscally-constrained 5-year strategic capital plan (CAP5)

• Capital priorities re-evaluated/adopted by Board every two years

Under CPC guidance, develop, enhance or promote:

• Comprehensive, strategic capital program capturing all

business lines

• Capital priorities, informed by Business Plan, adopted

by Board along with scoring criteria

Page 53: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

14

Proposed Capital Program Enhancements (cont.)

• Transparency of long-term operating impacts of capital

projects

• High-level summary status reporting by program (material

exceptions from plan highlighted)

• CPC points of input/policy direction/recommended approval

• Capital Program-related Board policies (as determined by CPC)

Page 54: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Proposed Enhanced Capital Program Workflow

15

Draft project priorities &

scoring criteriadeveloped

Board approvesBusiness Plan

CPC reviews/ revises/recommends priorities & scoring

criteria

CAP5 project requests scored /

ranked /then matched to funding

Board approvesproject priorities & scoring criteria

CPC reviews/ revises/ recommends

CAP5

Board approves CAP5; nearest 2 years become

capital element of biennial budget

Following Board adoption of biennial budget, CPC monitors

status of major projects (ongoing)

CPC input or action

Board action

Staff task

Page 55: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

16

10‐Year Capital Needs Projection

6 ‐ 15( p p g )

1 – 5(First 2 are capital portion of Biennial Budget)

VTA Capital Plan

CAP5

YEARS

Integrated Process/One Comprehensive Document with Two Elements

ELEMENTS

PRIORITIZED

FISCALLY CONSTRAINED

Yes

Yes

No

No

BOARD APPROVES Yes Information/Input

Page 56: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

17

Potential Items for CPC Consideration/Guidance

• Future of VTA Light Rail

• Evaluate current need/value and operating

impacts of specific previously-approved major

projects, as needed

• Should dedicated Innovation Program fund be established

• Consider establishing targeted allocation for VTA local share of capital

expenditures

• Long-term implications of ballot-defined expansion

projects

• Technology defining VTA workforce of the future

• Applied technology/autonomous vehicles

Page 57: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

18

Next Steps in Process (not inclusive)

• Complete Business Plan development

• Continue development of:

Capital Program process

Improved informational reporting tools for Board/CPC strategic decision-making

• Begin development of:

Framework for capital priorities and scoring process

Capital Plan/CAP5 process, schedule and tools

• Formalize CPC duties/responsibilities in Admin

Code and Board Rules of Procedure

Page 58: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

19

Questions?

Page 59: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

MEMORANDUM

TO: Santa Clara Valley Transportation Authority Capital Program Committee FROM: Director Raul Peralez Director Cindy Chavez DATE: November 26, 2018

SUBJECT: Referral to Administration - Business Interruption Fund Study for BART Phase II

We request staff to:

1. Undertake the process to procure an expert third-party consultant study of a Business Interruption Fund (BIF) for BART Phase II in which the scope should include but not be limited to: a. Funding structure and allocation, and, b. Comparative data of financial assistance models from comparable major transit

projects 2. With assistance from the third party consultant, create a baseline with which to be

able to gauge impacts once the project commences. 3. Following completion of a study, report back to the Board with recommendations for

consideration.

DISCUSSION:

While we are relieved that all parties have agreed to the less intrusive boring method of Single Bore, it does not necessarily mean there will be no impacts to the surrounding businesses along the BART Phase II corridor. In a major transit project that will introduce for the first time underground tunneling through San Jose and Santa Clara, there are always elements that are unpredictable. We have seen that firsthand with the Alum Rock Bus Rapid Transit project, in which was well-planned but encountered major construction problems that created substantial damages on adjacent businesses, many local and minority owned. The result was the creation of a Small Business Sustainability Program to respond and providing between $1,000 to $50,000 in

Young_T
Text Box
8
Page 60: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Page 2

financial assistance. There were many lessons learned from the project including the necessity to be proactive rather than reactive.

The concept of a BIF is not alien to major transit projects. The most prominent being Los Angeles Metro’s BIF which provides financial assistance to “small ‘mom and pop’ businesses located along the Crenshaw/LAX Transit Project, the Little Tokyo area and the 2nd/Broadway segment along the Regional Connector and Section 1 and Section 2 of the Purple Line Extension that are impacted by transit rail construction.” The purpose is to cover operating expenses that have been impacted due to potential lost revenue from construction. Whether VTA would like to adopt the same model or explore a different one, it would be prudent first to study and determine how a BIF would fit into the overall construction management strategy for BART Phase II. Regardless of the model, the creation of a baseline is especially important for the small businesses that may be operating on a mostly or all cash basis and do not have proper tax forms and/or books to back up their earnings. We would like to thank staff for their work up to this point in their Construction and Outreach Management Plan. We appreciate the efforts to proactively position activity in ways to minimize impacts. However, a project this monumental in scale should have all tools considered including how to make a business that may be severely impacted whole again. cc: Nuria I. Fernandez, VTA General Manager/CEO Capital Program Committee members

Page 61: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

Capital Program Committee (CPC)

Committee Work Plan

Doc ID Short TitleCPC

11/30

Board

12/6

CPC

2/28 (1)

CPC

3/12 (2)

Board

4/6

CPC

5/23 (1)

Items for

Future

Consideration6797 Recommended Enhanced Capital Program Process D

6771 VTA Planning Activities I

Current Capital Budget Development Process. V

6804 Capital Element of FY20 & FY 21 Biennial Budgets A A (2) A

6805 Policy on Expansion Projects Operating Costs Provision A A

Effects of Ad Hoc Financial Stability Recommendations on

Capital Program

D

Proposed 10-Year Capital Needs List Report Layout D

Preview of Potential Capital Project Scoring Criteria Matrix D

2000 Measure A Semi-Annual Report I

Update CPC Charter and Responsibilities In Admin Code and

Board Rules of Procedure

A

Recommended Evaluation Process and Criteria for Staff

Scoring of Proposed Projects

A

2016 Measure B Semi-Annual Report I *

VTP Highway Program Semi-Annual Report I

6622 Next Steps in Innovating the Way Silicon Valley Moves D

6623 Potential Value of Dedicated VTA Innovation Fund D

6624 What Does It Mean for VTA to be "Transportation Authority" D

LEGEND:

(1) Proposed, pending CPC approval.

(2) 3/12 & 3/14 are reserved to conduct one supplemental meeting, if needed

A = Action Item D = Discussion I = Information Item

P = Presentation V = Verbal Report * = Proposed

Revised: 11/21/2018

Young_T
Text Box
9
Page 62: CAPITAL PROGRAM COMMITTEE AGENDA CALL TO ORDERvtaorgcontent.s3-us-west-1.amazonaws.com/Site_Content/… · presentation and provided input on the proposed enhancement of VTA's Capital

2016 Measure B Update: November 2018 Local Streets and Roads 

  Draft Master Agreement 

o Sent to CIPWG/TAC members for second round of reviews – 11.19.18 

o Comments due 01.10.19  Complete Streets Checklist – finalizing layout  Program manual development 

o Initial stages  

BART Phase II   No action 

Bicycle/Pedestrian   Education/Encouragement 

o Draft Master Agreement development o VTA/SCCo developing countywide activities 

Capital Project Competitive Grant – 10 year program o Draft Criteria – Aug/Sept/Jan CIPWG & Feb 

BPAC o Program manual development – initial stage 

Planning Project Competitive Grant Program – early stage of development 

Caltrain Grade Separation   Finalizing draft Implementation Plan scope in 

conjunction with all three cities and Caltrain   

Caltrain Corridor Capacity Improvements   $4.3mil increase in budget approved at June 

BOD  Draft funding agreement – internal review 

Highway Interchanges   Noise mitigation program development – early fall 

2018 

County Expressways   Continue working with County staff as County 

is reconsidering priorities and action plan.  

SR 85 Corridor   Transit Guideway Study Task 2 

o MTC agreement executed; awaiting MTC process to enter into TIP – possibly Jan 2019 

Transit Operations   Innovative Mobility draft criteria 

o Currently scheduled for Jan TAC 

Upcoming BOD/Committee Items   MT #6692 – Bike/Ped Capital Grant Program Draft Criteria 

o Feb BPAC o March TAC/BPAC 

MT #6128 ‐ Innovative Transit Mobility Grant Program Draft Criteria –Discussion o Jan TAC 

 

Miscellaneous   FY20 & FY21 budget needs for 2016 Measure B in 

discussion 

 

Young_T
Text Box
10