31
parklandcounty.com CAPITAL INFRASTRUCTURE PROGRAM 20 20 - 202 3 One Parkland: Powerfully Connected. Presented as part of the 2020 Final Budget April 2020 ENGINEERING SERVICES

CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

parklandcounty.com

CAPITAL INFRASTRUCTURE PROGRAM

2020 - 2023

One Parkland: Powerfully Connected.

Presented as part of the 2020 Final Budget April 2020

ENGINEERING SERVICES

Page 2: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair
Page 3: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

April 2020

Welcome to Parkland County’s Four Year Capital Infrastructure Program

Published annually as part of the budget process, this document outlines and maps the four year plan for major capital works across Parkland County. The Capital Infrastructure Program includes both new and rehabilitation projects in the following asset categories:

• Roads• Bridges• Water• Wastewater• Stormwater

The 2020 program was approved by Council in April 2020 as part of the 2020 final budget.

The subsequent years forecast upcoming capital projects in the Capital Infrastructure Program which are reviewed and re-prioritized annually as new information is collected and analyzed. The main prioritization criteria for major road re-construction projects is included in the back of this document.

If you would like more information about Parkland County's Capital Infrastructure Program, you can reach Engineering Services at 780-968-8445. We would be happy to hear from you!

Engineering Services

Page 4: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair
Page 5: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2020 Bridge Culvert Installation 2019

Page 6: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2020 Capital Infrastructure Program Project ListColumn6 Column7 Column8

A0 A. DESIGN & LAND ACQUISITION PROJECTS

20-A1 Bridge File 70280 (RR 64, 300m North of Twp 504) Design for Bridge Repair

20-A2 Acheson Roads (Not Mapped) Conceptual Design

B B. ROAD CONSTRUCTION PROJECTS

20-B1Gravel Road Reconstruction Program - County Wide (Locations mapped separately)

Reconstruction

20-B2 Twp 510, RR 45 - RR 50 Reconstruction + Drainage Repairs

C0 C. ASPHALT SURFACING PROJECTS20-C1 Parkland Drive, RR 15 to Hwy 16A ACP Resurfacing

20-C2 261 Street, 114 Ave to 115 Ave ACP Resurfacing

20-C3 Entwistle - 52 Street, 48 Ave to 50 Ave ASBC Resurfacing

20-C4 RR 10, Twp 512 to Twp 514 ASBC Resurfacing

20-C5 RR 20, Parkland Drive to Hwy 16 ASBC Resurfacing

20-C6 East Service Rd 263, Twp 513 to Twp 514 ASBC Resurfacing

20-C7 Twp 510, RR 55 to Hwy 759 Design + base/subgrade assessment

D. SEAL COAT SURFACING PROJECTS 20-D1 RR 41, Hwy 16 to Twp 534 Seal Coating

20-D2 RR 15 (Beach Corner Rd), from 200m North of Twp 533A to Twp 534 Seal Coating

20-D3 RR 275 (Boundary Rd), Twp 541 to Twp 542 Seal Coating

20-D4 RR 20, Hwy 16A to SRN 532 Seal Coating

20-D5 RR 262 (Willowdale Rd), Twp 513 to Twp 520 Seal Coating

20-D6 RR 274 (Campsite Rd), Twp 534 to Twp 540 Seal Coating

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION PRESERVATION PROJECTS20-F1 Blueberry Hills Estates Subdivision Preservation - ASBC

20-F2 Country Lane Estates - Christensen Dr Subdivision Preservation - ASBC

20-F3 Fleming Park - Fleming Dr, Fleming Cres Subdivision Preservation - ASBC

20-F4 Harris Acres - Harris Dr Subdivision Preservation - ASBC

20-F5 Lidin Acres - Meadow Dr Subdivision Preservation - ASBC

20-F6 Spring Hills - Leslie Lane, Lindsay Lane Subdivision Preservation - ASBC

20-F7 Spruce Bluff Estates - Ulmer Dr, Grouse Pt Subdivision Preservation - ASBC

20-F8 Valaspen Place South - Valaspen Dr, Aspen Cres Subdivision Preservation - ASBC

20-F9 Weekend Estates - Groleau Dr, Jackfish Cres Subdivision Preservation - ASBC

20-F10 Wesparkdale - Marion Cres Subdivision Preservation - ASBC

20-F11 Willow Park - Willow Park Drive Subdivision Preservation - ASBC

20-F12 Woodland Acres - Woodland Drive Subdivision Preservation - ASBC

G0 G. WATER20-G1 Acheson Zone 4 Reservoir Expansion Construction

20-G2 Walker Lake - Lakeshore Waterloop Design & Land Acquisition

H0 H. WASTEWATER20-H1 Acheson Zone 1 & 2 Wastewater Manhole and Main Rehabilitation Construction

20-H2 Tomahawk Lagoon Rehabilitation Concept Design

20-H3 Wastewater Rehabilitation - Entwistle 51A Street Concept Design

20-H4 Entwistle Lagoon Rehabilitation Design & Construction

J. STORMWATER

20-J1 Fallis Drainage Improvements Design

Page 7: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

G1

G2

B2

C3C2C5

C4

C1

C7

C6

D2

D3

D4

D1

D5

D6

F8

F7

F6

F11

F1

F9

F12

F4

F2

F3

F5

F10

A1

J1

H2

H4

H3

H1

R.07

R.07

R.08

R.08

R.05

R.05R.06

R.06 R.02 R.01

R.01R.02

R.03

R.03R.04

R.04

R.25

R.25R.28 R.26

R.26

R.27

R.27R.28T.5

0T.5

1T.5

4T.5

5T.5

3T.5

2

T.51

T.52

T.54

T.50

T.55

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

RGE RD11

RGE RD11

RGE RD254

RGE RD254

TWP

RD53

0

TWP

RD53

0

TWP

RD53

5

TWP

RD53

5

TWP

RD53

4

TWP

RD53

4

TWP

RD53

3

TWP

RD53

3

TWP

RD52

3

TWP

RD52

3

TWP

RD53

1

TWP

RD53

1

TWP

RD52

2

TWP

RD52

2

TWP

RD52

1

TWP

RD52

1

TWP

RD52

0

TWP

RD52

0

TWP

RD51

3

TWP

RD51

3

TWP

RD51

5

TWP

RD51

5

TWP

RD51

4

TWP

RD51

4

TWP

RD54

0

TWP

RD54

0

TWP

RD52

5

TWP

RD52

5

TWP

RD52

4

TWP

RD52

4

TWP

RD54

2

TWP

RD54

2

TWP

RD51

1

TWP

RD51

1TWP

RD51

2

TWP

RD51

2

TWP

RD54

1

TWP

RD54

1

TWP

RD54

3

TWP

RD54

3TWP

RD54

4

TWP

RD54

4

TWP

RD55

0

TWP

RD55

0

TWP

RD54

5

TWP

RD54

5

TWP

RD51

0

TWP

RD51

0

TWP

RD50

3

TWP

RD50

3

TWP

RD50

5

TWP

RD50

5

TWP

RD50

4

TWP

RD50

4

TWP

RD53

2

TWP

RD53

2

TWP

RD50

2

TWP

RD50

2

LegendA. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. Water ProjectsH. Wastewater ProjectsJ. Stormwater Projects µ0 5 10 152.5

Kilometers Parkland CountyInfrastructure Program 2020

Updated: 2020-03-02

As presented as part of the 2020 Final Budget - April 2020

Page 8: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

Gravel Road Reconstruction

Program

Page 9: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2020 Gravel Road Reconstruction Program Project List*Column6 Column7 Column8

B2. GRAVEL ROAD RECONSTRUCTION PROGRAM

B2 - 4 Twp 510, RR 14 - Everington Rd Approx. 300m Road Reconstruction and Ditching at 1 location

B2 - 5 RR 13, Twp 513 - Twp 514 Approx. 700m Road Reconstruction at 1 location

B2 - 7 RR 15, Twp 510 - Twp 512 Approx. 1280m Road Reconstruction at 7 locations

B4 - 8 RR 21, Twp 511 - Twp 512 Approx. 700m Road Reconstruction at 1 location

B4 - 9 RR 75, Twp 513 - Twp 511 Approx. 300m Intersection Reconstruction at 1 location

B4 - 13 RR 20, Twp 510 - 511 Approx. 140m Road Reconstruction at 2 locations

B2 - 14 RR 15, Twp 514 to Twp Hwy 627 Approx. 140m Road Reconstruction at 1 locations

B2 - 15 RR 13, Twp 512 - Twp 513 Approx. 340m Road Reconstruction at 1 location

* Locations which are planned for the 2020 gravel road reconstruction program - not in any prioritized order. *Will be constructed as schedule efficiencies and resources allow. *Locations subject to change and re-prioritized as other locations are identified with spring conditions.

Page 10: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

B2-9B2-5

B2-15

B2-14

B2-8

B2-13

B2-4

B2-7

R.07

R.07

R.08

R.08

R.05

R.05R.06

R.06 R.02 R.01

R.01R.02

R.03

R.03R.04

R.02R.04

R.25

R.25R.27R.28 R.26

R.26

R.27

R.27R.28T.5

0T.5

1T.5

4T.5

5T.5

3T.5

2

T.51

T.52

T.54

T.50

T.55

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

RGE RD11

RGE RD11

RGE RD254

RGE RD254

TWP

RD53

0

TWP

RD53

0

TWP

RD53

5

TWP

RD53

5

TWP

RD53

4

TWP

RD53

4

TWP

RD53

3

TWP

RD53

3

TWP

RD52

3

TWP

RD52

3

TWP

RD53

1

TWP

RD53

1

TWP

RD52

2

TWP

RD52

2

TWP

RD52

1

TWP

RD52

1

TWP

RD52

0

TWP

RD52

0

TWP

RD51

3

TWP

RD51

3

TWP

RD51

5

TWP

RD51

5

TWP

RD51

4 TWP

RD51

4

TWP

RD54

0

TWP

RD54

0

TWP

RD52

5

TWP

RD52

5

TWP

RD52

4

TWP

RD52

4

TWP

RD54

2

TWP

RD54

2

TWP

RD51

1

TWP

RD51

1TWP

RD51

2 TWP

RD51

2

TWP

RD54

1

TWP

RD54

1

TWP

RD54

3

TWP

RD54

3TWP

RD54

4

TWP

RD54

4

TWP

RD55

0

TWP

RD55

0

TWP

RD54

5

TWP

RD54

5

TWP

RD51

0

TWP

RD51

0

TWP

RD50

3

TWP

RD50

3

TWP

RD50

5

TWP

RD50

5

TWP

RD50

4

TWP

RD50

4

TWP

RD53

2

TWP

RD53

2

TWP

RD50

2

TWP

RD50

2

B2. Gravel Road Reconstruction Program 2020 µ0 5 10 152.5

KilometersLegend

2020 Locations

Updated: 2020-02-25

Parkland County

As presented as part of the 2020 Final Budget - April 2020

Page 11: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2021 RR 55 Creek Erosion Control – 1 year after construction

Page 12: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2021 Capital Infrastructure Program Project ListColumn6 Column7 Column8

A0 A. DESIGN & LAND ACQUISITION PROJECTS21-A1 Bridge File 09046 (RR 25, 950m South of Twp 520) Design for Bridge Repair

21-A2 Acheson Roads (Not Mapped) Conceptual Design

21-A3 Twp 524, RR 12 (Stony Plain) to Hwy 770 Conceptual Design

21-A4 Twp 531A (114th Ave), 261st Street to 259th Street Collector Road Design

21-A5 Entwistle, 50A Ave, from Hwy 16A to 49th Street Hamlet Road Design

21-A6 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Road Rehabilitation Design

B B. ROAD CONSTRUCTION PROJECTS21-B1 Bridge File 09254 (RR70, 500m South of Hwy 16) Bridge Repair - Construction

C0 C. ASPHALT SURFACING PROJECTS21-C1 RR 273 (Golden Spike Rd), Hwy 627 to Twp 513 ACP Resurfacing

21-C2 Twp 510, RR 55 to Hwy 759 ASBC Resurfacing + base/subgrade repairs

21-C3 Twp 512, RR 60 to RR 62 (Tomahawk) ASBC Resurfacing

21-C4 Tomahawk - Multiple Locations ASBC Resurfacing

21-C5 RR 271, Twp 513 to Twp 514 ASBC Resurfacing

21-C6 Twp 514 (Millbank Rd), Hwy 22 to RR 70 Design + base/subgrade assessment

21-C7 Next Valid Petition (2) Local Improvements

D. SEAL COAT SURFACING PROJECTS 21-D1 Twp 511 (Graminia Rd), Hwy 60 to RR 271 Seal Coating

21-D2 Parkland Drive, RR15 to RR 21 Seal Coating

21-D3 Twp 514 (Woodbend Rd), RR 260 to RR 261 Seal Coating

21-D4 Wabamun Provincial Park Rd, Hwy 16 to Park Entrance Seal Coating

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION PRESERVATION PROJECTS21-F1 Clearwater Estates - Robinson Dr, Allan Dr, Beaver Ave Subdivision Preservation - ASBC

21-F2 Deer Park II - 1st & 2nd Ave, 1st & 2nd Street Subdivision Preservation - ASBC

21-F3 Hubbles Lake - Diamond Dr, Diamond Rd Subdivision Preservation - ASBC

21-F4 Lily Lake Estates - Michelle Dr, Michelle Cres, Michelle Close Subdivision Preservation - ASBC

21-F5 Maude-West Acres Subdivision Preservation - ASBC

21-F6 Pine Wood - Pine Wood Dr, West Rd Subdivision Preservation - ASBC

21-F7 Whispering Pines - Whispering Pine Dr, Pine St, Spruce St, Valley Dr Subdivision Preservation - ASBC

G0 G. WATER21-G1 Walker Lake - Lakeshore Waterloop Construction

21-G2 Zone 4 Fill Line - Booster Station Construction

H0 H. WASTEWATER21-H1 Tomahawk Lagoon Rehabilitation Design & Land Acquisition

21-H2 Wastewater Main Level of Service - Acheson Zone 1, RR 264 & Twp 531A Design

21-H3 Wastewater Rehabilitation - Entwistle 51Ast Street Design

21-H4 Wastewater Rehabiliation - Entwistle South Lift Station Inlet Design & Construction

Page 13: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

A6

A4

A3

C4C3

C5

C2

C1C6

D1

D4

D3

D2F3

F4

F2

F7

F6

F1

F5

A1

G1

G2

B1

H1

H2

R.07

R.07

R.08

R.08

R.09

R.09

R.05

R.05R.06

R.06 R.01

R.01R.02

R.03

R.03R.04

R.02R.04 R.25

R.25

R.27 R.26

R.26R.27

R.28

R.28T.5

0T.5

1T.5

3T.5

5T.5

4T.5

2

T.51

T.52

T.54

T.50

T.55

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

RGE RD11

RGE RD11

RGE RD254

RGE RD254

TWP

RD53

0

TWP

RD53

0

TWP

RD53

5

TWP

RD53

5

TWP

RD53

4

TWP

RD53

4

TWP

RD53

3

TWP

RD53

3

TWP

RD52

3

TWP

RD52

3

TWP

RD53

1

TWP

RD53

1

TWP

RD52

2

TWP

RD52

2

TWP

RD52

1

TWP

RD52

1

TWP

RD52

0

TWP

RD52

0

TWP

RD51

3

TWP

RD51

3

TWP

RD51

5

TWP

RD51

5

TWP

RD51

4 TWP

RD51

4

TWP

RD54

0

TWP

RD54

0

TWP

RD52

5

TWP

RD52

5

TWP

RD52

4

TWP

RD52

4

TWP

RD54

2

TWP

RD54

2

TWP

RD51

1

TWP

RD51

1TWP

RD51

2 TWP

RD51

2

TWP

RD54

1

TWP

RD54

1

TWP

RD54

3

TWP

RD54

3TWP

RD54

4

TWP

RD54

4

TWP

RD55

0

TWP

RD55

0

TWP

RD54

5

TWP

RD54

5

TWP

RD51

0

TWP

RD51

0

TWP

RD50

3 TWP

RD50

3

TWP

RD50

5 TWP

RD50

5

TWP

RD50

4 TWP

RD50

4

TWP

RD53

2

TWP

RD53

2

TWP

RD50

2 TWP

RD50

2

0 5 10 152.5Kilometers

LegendA. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. Water ProjectsH. Wastewater Projects µParkland County

Infrastructure Program 2021Updated: 2020-02-28

As presented as part of the 2020 Final Budget - April 2020

A5

H4

H3

See Inset

Entwistle Inset

Page 14: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2022 Helenslea Water & Wastewater Service Lines Installation 2019

Page 15: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2022 Capital Infrastructure Program Project ListColumn6 Column7 Column8

A0 A. DESIGN & LAND ACQUISITION PROJECTS22-A1 Sundance Rd, RR 51 to RR 60 Conceptual Design

B B. ROAD CONSTRUCTION PROJECTS22-B1 Bridge File 70280 (RR64, 300m North of Twp 504) Bridge Repair - Construction

22-B2 Entwistle, 50A Ave, from Hwy 16A to 49th Street Hamlet Road Reconstruction

22-B3 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Road Rehabilitation Construction

C0 C. ASPHALT SURFACING PROJECTS22-C1 RR 273 (Calahoo Rd), Twp 534 to Twp 540 ACP Resurfacing

22-C2 Twp 514 (Millbank Rd), Hwy 22 to RR 70 ASBC Resurfacing + base/subgrade repairs

22-C3 RR 272 (Century Rd), Twp 520 to Twp 522 ASBC Resurfacing

22-C4 Twp 512A, Hwy 60 to RR 263A ASBC Resurfacing

22-C5 Duffield - Multiple Locations ASBC Resurfacing

22-C6 Next Valid Petition (2) Local Improvements

D. SEAL COAT SURFACING PROJECTS 22-D1 Twp 534, RR 41 to RR 43 Seal Coating

22-D2 RR 43, Twp 534 to Twp 535 Seal Coating

22-D3 Parkland Drive, Hwy 770 to RR 25 Seal Coating

22-D4 RR 261 (Fleming Road), Twp 512 to Twp 520 Seal Coating

22-D5 East Service Rd 263, from Twp 514 to Twp 515A Seal Coating

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION PRESERVATION PROJECTS22-F1 Birch-Hill Park - Birch Hill Dr Subdivision Preservation - ASBC

22-F2 Fernwood Estates - Fernwood Dr, Sudavian Cres Subdivision Preservation - ASBC

22-F3 Garden Grove Estates - Lakeshore Dr Subdivision Preservation - ASBC

22-F4 Grove Acres - Bruce Blvd Subdivision Preservation - ASBC

22-F5 Landmark Estates - Downey Cres Subdivision Preservation - ASBC

22-F6 Osborne Acres - Osborne Dr, Osborne Pl Subdivision Preservation - ASBC

22-F7 Pine Valley V - Pine Cres Subdivision Preservation - ASBC

22-F8 Sunset View Acres - Sunset Dr, Sunset Rd Subdivision Preservation - ASBC

G0 G. WATER22-G1 279th Street Water Loop & Hwy 16 Crossing Design & Land Acquisition

22-G2 Entwistle Water Reservoir and Pumphouse Design & Land Acquisition

H0 H. WASTEWATER22-H1 Tomahawk Lagoon Rehabilitation Construction

22-H2 Wastewater Rehabilitation - Entwistle 51Ast Street Construction

22-H3 Wastewater Main Level of Service - Acheson Zone 1, RR 264 & Twp 531A Construction

J. STORMWATER

22-J1 Stormwater Rehabilitation/Replacement - Acheson Zone 3 Design

Page 16: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

J1A1

B2B3

C5

C4

C3

C2

C1

D5

D2D1

D4

D3

F4F3

F2

F7

F1

F8

F6

F5

B1

H1

H2

H3

G2

G1

R.07R.08 R.05R.06

R.07R.08 R.02

R.01R.02

R.03

R.03

R.04

R.04

R.05R.06 R.01

R.25

R.25R.28 R.26

R.26

R.27

R.27R.28T.5

0T.5

1T.5

4T.5

5T.5

3T.5

2

T.51

T.52

T.54

T.50

T.55

T.49

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

RGE RD11

RGE RD11

RGE RD254

RGE RD254

TWP

RD53

0

TWP

RD53

0

TWP

RD53

5

TWP

RD53

5

TWP

RD53

4

TWP

RD53

4

TWP

RD53

3

TWP

RD53

3

TWP

RD52

3

TWP

RD52

3

TWP

RD53

1

TWP

RD53

1

TWP

RD52

2

TWP

RD52

2

TWP

RD52

1

TWP

RD52

1

TWP

RD52

0

TWP

RD52

0

TWP

RD51

3

TWP

RD51

3

TWP

RD51

5

TWP

RD51

5

TWP

RD51

4

TWP

RD51

4

TWP

RD54

0

TWP

RD54

0

TWP

RD52

5

TWP

RD52

5

TWP

RD52

4

TWP

RD52

4

TWP

RD54

2

TWP

RD54

2

TWP

RD51

1

TWP

RD51

1TWP

RD51

2

TWP

RD51

2

TWP

RD54

1

TWP

RD54

1

TWP

RD54

3

TWP

RD54

3TWP

RD54

4

TWP

RD54

4

TWP

RD55

0

TWP

RD55

0

TWP

RD54

5

TWP

RD54

5

TWP

RD51

0

TWP

RD51

0

TWP

RD50

3

TWP

RD50

3

TWP

RD50

5

TWP

RD50

5

TWP

RD50

4

TWP

RD50

4

TWP

RD53

2

TWP

RD53

2

TWP

RD50

2

TWP

RD50

2

0 5 10 152.5Kilometers

LegendA. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. Water ProjectsH. Wastewater ProjectsJ. Stormwater Projects µParkland County

Infrastructure Program 2022Updated: 2020-03-02

As presented as part of the 2020 Final Budget - April 2020

Page 17: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

Subdivision Surfacing Program 2023

Page 18: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2023 Capital Infrastructure Program Project ListColumn6 Column7 Column8

A0 A. DESIGN & LAND ACQUISITION PROJECTS23-A1 Bridge File 13614 (RR 33, 1.2km South of Twp 514) Design for Bridge Repair

23-A2 Next Road Concept Design Conceptual Design

B B. ROAD CONSTRUCTION PROJECTS23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair - Construction

23-B2 Twp 531A (114th Ave), 261st Street to 259th Street Reconstruction + Widen + ACP Surfacing

23-B3 231st Street, Hwy 16 to Hwy 16A (Phase 1) Reconstruction + Widen + ACP Surfacing

C0 C. ASPHALT SURFACING PROJECTS23-C1 RR 273 (Calahoo Rd), Hwy 16 to Twp 534 ACP Resurfacing

23-C2 Twp 524, RR 12 to RR 14 ASBC Resurfacing

23-C3 RR 13, Twp 524 to Meadow Run Estates ASBC Resurfacing

23-C4 RR 272 (Century Rd), Twp 522 to Twp 524 ASBC Resurfacing

23-C5 RR 12, Hwy 16 to Partridge Place ASBC Resurfacing

23-C6 Twp 512, RR 261 to Silver Bell Heights - To be done with SBH/White Tail ASBC Resurfacing

23-C7 RR 30 (Meso Rd), Hwy 16 to Cantebury Estates ASBC Resurfacing

23-C8 Next Valid Petition (2) Local Improvements

D. SEAL COAT SURFACING PROJECTS 23-D1 Parkland Drive, RR 25 to Hwy 16 Seal Coating

23-D2 RR 12 (Rosenthal Rd), Twp 520 to Twp 522 Seal Coating

23-D3 Twp 530, RR 265A to 270A Seal Coating

23-D4 Twp 532A, RR 270 to RR 272 Seal Coating

23-D5 Twp 540, RR 280 to RR 10 Seal Coating

23-D6 SRN 532, RR15 to RR 20 Seal Coating

23-D7 SRN 532, RR 261 to RR 263 Seal Coating

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION PRESERVATION PROJECTS23-F1 Chickakoo Estates - Mitchell Dr, Chickakoo Dr Subdivision Preservation - ASBC

23-F2 Grand River Valley Estates - Riverview Cres Subdivision Preservation - ASBC

23-F3 Harder Acres - Harder Dr Subdivision Preservation - ASBC

23-F4 Huntingdon Heights - Regency Cres Subdivision Preservation - ASBC

23-F5 Meadow Run Estates - Meadow Rd Cul-de-sac Subdivision Preservation - ASBC

23-F6 Prestige Heights - Prestige Dr, North Rd, South Rd Subdivision Preservation - ASBC

23-F7 Valaspen Place North - Lakeview Ave, Main St Subdivision Preservation - ASBC

23-F8 Westward Estates - Westward Dr Subdivision Preservation - ASBC

23-F9 White Tail Acres - White Tail Way Subdivision Preservation - ASBC

G0 G. WATER23-G1 279th Street Water Loop & Hwy 16 Crossing Construction

23-G2 Entwistle Hwy 16 X-ing Water Loop Design

23-G3 Entwistle Water Reservoir and Pumphouse Construction

H0 H. WASTEWATER23-H1 Wastewater Rehabilitation - CIPP Program (Not Mapped) Design & Construction

23-H2 Wastewater Rehabilitation - Entwistle Forcemain Design

23-H3 Wastewater Main Level of Service - Acheson Zone 4 to 3, Acheson Rd Design

J. STORMWATER

23-J1 Stormwater Rehabilitation/Replacement - Acheson Zone 3 Construction

Page 19: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

J1 B2

C5

C3C4

C1C7

C2

C6

D6D4

D3

D5

D1

D2

D7

F2

F1

F9

F6

F7

F3F8

F5

F4

B1

B3

A1

H2

H3G3

G2

G1

R.07

R.07

R.08

R.08

R.05

R.05R.06

R.06 R.01

R.01R.02

R.03

R.03R.04

R.02R.04 R.25

R.25

R.27 R.26

R.26R.27

R.28

R.28T.5

0T.5

1T.5

4T.5

5T.5

3T.5

2

T.55

T.51

T.52

T.54

T.50

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

RGE RD11

RGE RD11

RGE RD254

RGE RD254

TWP

RD53

0

TWP

RD53

0

TWP

RD53

5

TWP

RD53

5

TWP

RD53

4

TWP

RD53

4

TWP

RD53

3

TWP

RD53

3

TWP

RD52

3

TWP

RD52

3

TWP

RD53

1

TWP

RD53

1

TWP

RD52

2

TWP

RD52

2

TWP

RD52

1

TWP

RD52

1

TWP

RD52

0

TWP

RD52

0

TWP

RD51

3

TWP

RD51

3

TWP

RD51

5

TWP

RD51

5

TWP

RD51

4

TWP

RD51

4

TWP

RD54

0

TWP

RD54

0

TWP

RD52

5

TWP

RD52

5

TWP

RD52

4

TWP

RD52

4

TWP

RD54

2

TWP

RD54

2

TWP

RD51

1

TWP

RD51

1TWP

RD51

2

TWP

RD51

2

TWP

RD54

1

TWP

RD54

1

TWP

RD54

3

TWP

RD54

3TWP

RD54

4

TWP

RD54

4

TWP

RD55

0

TWP

RD55

0

TWP

RD54

5

TWP

RD54

5

TWP

RD51

0

TWP

RD51

0

TWP

RD50

3

TWP

RD50

3

TWP

RD50

5

TWP

RD50

5

TWP

RD50

4

TWP

RD50

4

TWP

RD53

2

TWP

RD53

2

TWP

RD50

2

TWP

RD50

2

0 5 10 152.5Kilometers

LegendA. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. Water ProjectsH. Wastewater ProjectsJ. Stormwater Projects µParkland County

Infrastructure Program 2023Updated: 2020-03-02

As presented as part of the 2020 Final Budget - April 2020

Page 20: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2020 -2023 Asphalt Surfacing Program

Page 21: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2020-2023 Capital Infrastructure Program Project ListColumn6 Column7 Column8 Column9

A0 A. DESIGN & LAND ACQUISITION PROJECTS

20-A1 Bridge File 70280 (RR 64, 300m North of Twp 504) Design for Bridge Repair 2020

20-A2 Acheson Roads (Not Mapped) Conceptual Design 2020

21-A1 Bridge File 09046 (RR 25, 950m South of Twp 520) Design for Bridge Repair 2021

21-A2 Acheson Roads (Not Mapped) Conceptual Design 2021

21-A3 Twp 524, RR 12 (Stony Plain) to Hwy 770 Conceptual Design 2021

21-A4 Twp 531A (114th Ave), 261st Street to 259th Street Collector Road Design 2021

21-A5 Entwistle, 50A Ave, from Hwy 16A to 49th Street Hamlet Road Design 2021

21-A6 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Road Rehabilitation Design 2021

22-A1 Sundance Rd, RR 51 to RR 60 Conceptual Design 2022

23-A1 Bridge File 13614 (RR 33, 1.2km South of Twp 514) Design for Bridge Repair 2023

23-A2 Next Road Concept Design Conceptual Design 2023

B B. ROAD CONSTRUCTION PROJECTS

20-B1 Gravel Road Reconstruction Program - County Wide (Locations mapped separately) Reconstruction 2020

20-B2 Twp 510, RR 45 - RR 50 Reconstruction + Drainage Repairs 2020

21-B1 Bridge File 09254 (RR 70, 500m South of Hwy 16) Bridge Repair - Construction 2021

22-B1 Bridge File 70280 (RR 64, 300m North of Twp 504) Bridge Repair - Construction 2022

22-B2 Entwistle, 50A Ave, from Hwy 16A to 49th Street Hamlet Road Reconstruction 2022

22-B3 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Road Rehabilitation Construction 2022

23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair - Construction 2023

23-B2 Twp 531A (114th Ave), 261st Street to 259th Street Reconstruction + Widen + ACP Surfacing 2023

23-B3 231st Street, Hwy 16 to Hwy 16A (Phase 1) Reconstruction + Widen + ACP Surfacing 2023

C0 C. ASPHALT SURFACING PROJECTS20-C1 Parkland Drive, RR 15 to Hwy 16A ACP Resurfacing 2020

20-C2 261 Street, 114 Ave to 115 Ave ACP Resurfacing 2020

20-C3 Entwistle - 52 Street, 48 Ave to 50 Ave ASBC Resurfacing 2020

20-C4 RR 10, Twp 512 to Twp 514 ASBC Resurfacing 2020

20-C5 RR 20, Parkland Drive to Hwy 16 ASBC Resurfacing 2020

20-C6 East Service Rd 263, Twp 513 to Twp 514 ASBC Resurfacing 2020

20-C7 Twp 510, RR 55 to Hwy 759 Design + base/subgrade assessment 2020

21-C1 RR 273 (Golden Spike Rd), Hwy 627 to Twp 513 ACP Resurfacing 2021

21-C2 Twp 510, RR 55 to Hwy 759 ASBC Resurfacing + base/subgrade repairs 2021

21-C3 Twp 512, RR 60 to RR 62 (Tomahawk) ASBC Resurfacing 2021

21-C4 Tomahawk - Multiple Locations ASBC Resurfacing 2021

21-C5 RR 271, Twp 513 to Twp 514 ASBC Resurfacing 2021

21-C6 Twp 514 (Millbank Rd), Hwy 22 to RR 70 Design + base/subgrade assessment 2021

21-C7 Next Valid Petition (2) Local Improvements 2021

22-C1 RR 273 (Calahoo Rd), Twp 534 to Twp 540 ACP Resurfacing 2022

22-C2 Twp 514 (Millbank Rd), Hwy 22 to RR 70 ASBC Resurfacing + base/subgrade repairs 2022

22-C3 RR 272 (Century Rd), Twp 520 to Twp 522 ASBC Resurfacing 2022

22-C4 Twp 512A, Hwy 60 to RR 263A ASBC Resurfacing 2022

22-C5 Duffield - Multiple Locations ASBC Resurfacing 2022

22-C6 Next Valid Petition (2) Local Improvements 2022

23-C1 RR 273 (Calahoo Rd), Hwy 16 to Twp 534 ACP Resurfacing 2023

23-C2 Twp 524, RR12 to RR14 ASBC Resurfacing 2023

23-C3 RR 13, Twp 524 to Meadow Run Estates ASBC Resurfacing 2023

23-C4 RR 272 (Century Rd), Twp 522 to Twp 524 ASBC Resurfacing 2023

23-C5 RR 12, Hwy 16 to Partridge Place ASBC Resurfacing 2023

23-C6 Twp 512, RR 261 to Silver Bell Heights - To be done with SBH/White Tail ASBC Resurfacing 2023

23-C7 RR 30 (Meso Rd), Hwy 16 to Cantebury Estates ASBC Resurfacing 2023

23-C8 Next Valid Petition (2) Local Improvements 2023

Page 22: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

D. SEAL COAT SURFACING PROJECTS 20-D1 RR 41, Hwy 16 to Twp 534 Seal Coating 2020

20-D2 RR 15 (Beach Corner Rd), from 200m North of Twp 533A to Twp 534 Seal Coating 2020

20-D3 RR 275 (Boundary Rd), Twp 541 to Twp 542 Seal Coating 2020

20-D4 RR 20, Hwy 16A to SRN 532 Seal Coating 2020

20-D5 RR 262 (Willowdale Rd), Twp 513 to Twp 520 Seal Coating 2020

20-D6 RR 274 (Campsite Rd), Twp 534 to Twp 540 Seal Coating 2020

21-D1 Twp 511 (Graminia Rd), Hwy 60 to RR 271 Seal Coating 2021

21-D2 Parkland Drive, RR15 to RR 21 Seal Coating 2021

21-D3 Twp 514 (Woodbend Rd), RR 260 to RR 261 Seal Coating 2021

21-D4 Wabamun Provincial Park Rd, Hwy 16 to Park Entrance Seal Coating 2021

22-D1 Twp 534, RR 41 to RR 43 Seal Coating 2022

22-D2 RR 43, Twp 534 to Twp 535 Seal Coating 2022

22-D3 Parkland Drive, Hwy 770 to RR 25 Seal Coating 2022

22-D4 RR 261 (Fleming Road), Twp 512 to Twp 520 Seal Coating 2022

22-D5 East Service Rd 263, from Twp 514 to Twp 515A Seal Coating 2022

23-D1 Parkland Drive, RR 25 to Hwy 16 Seal Coating 2023

23-D2 RR 12 (Rosenthal Rd), Twp 520 to Twp 522 Seal Coating 2023

23-D3 Twp 530, RR 265A to 270A Seal Coating 2023

23-D4 Twp 532A, RR 270 to RR 272 Seal Coating 2023

23-D5 Twp 540, RR 280 to RR 10 Seal Coating 2023

23-D6 SRN 532, RR15 to RR 20 Seal Coating 2023

23-D7 SRN 532, RR 261 to RR 263 Seal Coating 2023

E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR

F0 F. SUBDIVISION PRESERVATION PROJECTS20-F1 Blueberry Hills Estates Subdivision Preservation - ASBC 2020

20-F2 Country Lane Estates - Christensen Dr Subdivision Preservation - ASBC 2020

20-F3 Fleming Park - Fleming Dr, Fleming Cres Subdivision Preservation - ASBC 2020

20-F4 Harris Acres - Harris Dr Subdivision Preservation - ASBC 2020

20-F5 Lidin Acres - Meadow Dr Subdivision Preservation - ASBC 2020

20-F6 Spring Hills - Leslie Lane, Lindsay Lane Subdivision Preservation - ASBC 2020

20-F7 Spruce Bluff Estates - Ulmer Dr, Grouse Pt Subdivision Preservation - ASBC 2020

20-F8 Valaspen Place South - Valaspen Dr, Aspen Cres Subdivision Preservation - ASBC 2020

20-F9 Weekend Estates - Groleau Dr, Jackfish Cres Subdivision Preservation - ASBC 2020

20-F10 Wesparkdale - Marion Cres Subdivision Preservation - ASBC 2020

20-F11 Willow Park - Willow Park Drive Subdivision Preservation - ASBC 2020

20-F12 Woodland Acres - Woodland Drive Subdivision Preservation - ASBC 2020

21-F1 Clearwater Estates - Robinson Dr, Allan Dr, Beaver Ave Subdivision Preservation - ASBC 2021

21-F2 Deer Park II - 1st & 2nd Ave, 1st & 2nd Street Subdivision Preservation - ASBC 2021

21-F3 Hubbles Lake - Diamond Dr, Diamond Rd Subdivision Preservation - ASBC 2021

21-F4 Lily Lake Estates - Michelle Dr, Michelle Cres, Michelle Close Subdivision Preservation - ASBC 2021

21-F5 Maude-West Acres Subdivision Preservation - ASBC 2021

21-F6 Pine Wood - Pine Wood Dr, West Rd Subdivision Preservation - ASBC 2021

21-F7 Whispering Pines - Whispering Pine Dr, Pine St, Spruce St, Valley Dr Subdivision Preservation - ASBC 2021

22-F1 Birch-Hill Park - Birch Hill Dr Subdivision Preservation - ASBC 2022

22-F2 Fernwood Estates - Fernwood Dr, Sudavian Cres Subdivision Preservation - ASBC 2022

22-F3 Garden Grove Estates - Lakeshore Dr Subdivision Preservation - ASBC 2022

22-F4 Grove Acres - Bruce Blvd Subdivision Preservation - ASBC 2022

22-F5 Landmark Estates - Downey Cres Subdivision Preservation - ASBC 2022

22-F6 Osborne Acres - Osborne Dr, Osborne Pl Subdivision Preservation - ASBC 2022

22-F7 Pine Valley V - Pine Cres Subdivision Preservation - ASBC 2022

22-F8 Sunset View Acres - Sunset Dr, Sunset Rd Subdivision Preservation - ASBC 2022

23-F1 Chickakoo Estates - Mitchell Dr, Chickakoo Dr Subdivision Preservation - ASBC 2023

23-F2 Grand River Valley Estates - Riverview Cres Subdivision Preservation - ASBC 2023

23-F3 Harder Acres - Harder Dr Subdivision Preservation - ASBC 2023

23-F4 Huntingdon Heights - Regency Cres Subdivision Preservation - ASBC 2023

23-F5 Meadow Run Estates - Meadow Rd Cul-de-sac Subdivision Preservation - ASBC 2023

23-F6 Prestige Heights - Prestige Dr, North Rd, South Rd Subdivision Preservation - ASBC 2023

23-F7 Valaspen Place North - Lakeview Ave, Main St Subdivision Preservation - ASBC 2023

23-F8 Westward Estates - Westward Dr Subdivision Preservation - ASBC 2023

23-F9 White Tail Acres - White Tail Way Subdivision Preservation - ASBC 2023

Page 23: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

G0 G. WATER20-G1 Acheson Zone 4 Reservoir Expansion Construction 2020

20-G2 Walker Lake - Lakeshore Waterloop Design & Land Acquisition 2020

21-G1 Walker Lake - Lakeshore Waterloop Construction 2021

21-G2 Zone 4 Fill Line - Booster Station Construction 2021

22-G1 279th Street Water Loop & Hwy 16 Crossing Design & Land Acquisition 2022

22-G2 Entwistle Water Reservoir and Pumphouse Design & Land Acquisition 2022

23-G1 279th Street Water Loop & Hwy 16 Crossing Construction 2023

23-G2 Entwistle Hwy 16 X-ing Water Loop Design 2023

23-G3 Entwistle Water Reservoir and Pumphouse Construction 2023

H0 H. WASTEWATER20-H1 Acheson Zone 1 & 2 Pipe Rehabiliation Construction 2020

20-H2 Tomahawk Lagoon Rehabilitation Concept Design 2020

20-H3 Wastewater Rehabilitation - Entwistle 51A Street Concept Design 2020

20-H4 Entwistle Lagoon Rehabilitation Design & Construction 2020

21-H1 Tomahawk Lagoon Rehabilitation Design & Land Acquisition 2021

21-H2 Wastewater Main Level of Service - Acheson Zone 1, RR 264 & Twp 531A Design 2021

21-H3 Wastewater Rehabilitation - Entwistle 51Ast Street Design 2021

21-H4 Wastewater Rehabiliation - Entwistle South Lift Station Inlet Design & Construction 2021

22-H1 Tomahawk Lagoon Rehabilitation Construction 2022

22-H2 Wastewater Rehabilitation - Entwistle 51Ast Street Construction 2022

22-H3 Wastewater Main Level of Service - Acheson Zone 1, RR 264 & Twp 531A Construction 2022

23-H1 Wastewater Rehabilitation - CIPP Program (Not Mapped) Design & Construction 2023

23-H2 Wastewater Rehabilitation - Entwistle Forcemain Design 2023

23-H3 Wastewater Main Level of Service - Acheson Zone 4 to 3, Acheson Rd Design 2023

J. STORMWATER

20-J1 Fallis Drainage Improvements Design 2020

22-J1 Stormwater Rehabilitation/Replacement - Acheson Zone 3 Design 2022

23-J1 Stormwater Rehabilitation/Replacement - Acheson Zone 3 Construction 2023

Page 24: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

23-A1

23-B1

23-B3

22-H1

22-B1

21-H1

21-A1

21-B1

20-H2

20-J1

20-H4

20-A1

23-F8

23-D6

23-F2

23-C6

23-F1

23-F9

23-F6

23-F7

23-F3

23-F523-D3

23-D5

23-C3

23-D1

23-C1

23-C523-C7

23-C4

23-D2

23-D4

23-C2

23-F4

22-C5

22-B322-D2

22-C4

22-D5

22-F4

22-F3

22-F5

22-F2

22-D4

22-F1

22-F7

22-C1

22-C3

22-C2

22-F8

22-A1

22-D322-D1

21-C4

21-F6

21-A6

21-F1

21-F7

21-D4 21-F3

21-F221-F4

21-C5

21-F521-D2

21-C321-D1

21-C2

21-C1

21-D3

21-C6

21-A321-A3

20-F820-D2

20-D4

20-C6

20-F1

20-D3

20-C5

20-F9

20-F7

20-F12

20-F4

20-F6

20-B2

20-F2

20-D6

20-F3

20-F11

20-D5

20-F5

20-D1

20-C7

20-F10

20-C4

20-C1

R.07

R.07

R.08

R.08

R.05

R.05R.06

R.06 R.01

R.01R.02

R.03

R.03R.04

R.02R.04 R.25

R.25

R.27 R.26

R.26R.27

R.28

R.28T.5

0T.5

1T.5

4T.5

5T.5

3T.5

2

T.51

T.52

T.54

T.50

T.55

T.53

RGE RD281

RGE RD42

RGE RD42

RGE RD22

RGE RD22

RGE RD60

RGE RD60

RGE RD64

RGE RD64

RGE RD63

RGE RD63

RGE RD80

RGE RD80

RGE RD65

RGE RD65

RGE RD70

RGE RD70

RGE RD51

RGE RD51

RGE RD50

RGE RD50

RGE RD15

RGE RD15

RGE RD14

RGE RD14

RGE RD274

RGE RD274

RGE RD71

RGE RD71

RGE RD72

RGE RD72

RGE RD35

RGE RD35

RGE RD73

RGE RD73

RGE RD74

RGE RD74

RGE RD75

RGE RD75

RGE RD81

RGE RD81

RGE RD10

RGE RD10

RGE RD62

RGE RD62

RGE RD21

RGE RD21

RGE RD273

RGE RD273

RGE RD265

RGE RD271

RGE RD271

RGE RD82

RGE RD82

RGE RD83

RGE RD83

RGE RD44

RGE RD44

RGE RD255

RGE RD255

RGE RD260

RGE RD260

RGE RD261

RGE RD261

RGE RD262

RGE RD262

RGE RD263

RGE RD263

RGE RD264

RGE RD264

RGE RD34

RGE RD34

RGE RD33

RGE RD33

RGE RD31

RGE RD31

RGE RD30

RGE RD30

RGE RD24

RGE RD24

RGE RD32

RGE RD32

RGE RD25

RGE RD25

RGE RD61

RGE RD61

RGE RD55

RGE RD55

RGE RD54

RGE RD54

RGE RD53

RGE RD53

RGE RD52

RGE RD52

RGE RD45

RGE RD45

RGE RD43

RGE RD43

RGE RD41

RGE RD41

RGE RD40

RGE RD40

RGE RD23

RGE RD23

RGE RD20

RGE RD20

RGE RD13

RGE RD13

RGE RD12

RGE RD12

RGE RD280

RGE RD280

RGE RD275

RGE RD275

RGE RD270

RGE RD270

RGE RD272

RGE RD272

RGE RD11

RGE RD11

RGE RD254

RGE RD254

TWP

RD53

0

TWP

RD53

0

TWP

RD53

5

TWP

RD53

5

TWP

RD53

4

TWP

RD53

4

TWP

RD53

3

TWP

RD53

3

TWP

RD52

3

TWP

RD52

3

TWP

RD53

1

TWP

RD53

1

TWP

RD52

2

TWP

RD52

2

TWP

RD52

1

TWP

RD52

1

TWP

RD52

0

TWP

RD52

0

TWP

RD51

3

TWP

RD51

3

TWP

RD51

5

TWP

RD51

5

TWP

RD51

4

TWP

RD51

4

TWP

RD54

0

TWP

RD54

0

TWP

RD52

5

TWP

RD52

5

TWP

RD52

4

TWP

RD52

4

TWP

RD54

2

TWP

RD54

2

TWP

RD51

1

TWP

RD51

1TWP

RD51

2

TWP

RD51

2

TWP

RD54

1

TWP

RD54

1

TWP

RD54

3

TWP

RD54

3TWP

RD54

4

TWP

RD54

4

TWP

RD55

0

TWP

RD55

0

TWP

RD54

5

TWP

RD54

5

TWP

RD51

0

TWP

RD51

0

TWP

RD50

3

TWP

RD50

3

TWP

RD50

5

TWP

RD50

5

TWP

RD50

4

TWP

RD50

4

TWP

RD53

2

TWP

RD53

2

TWP

RD50

2

TWP

RD50

2

0 5 10 152.5Kilometers

Legend2020202120222023 µ

Parkland CountyInfrastructure Program

2020 - 2023 Updated: 2020-03-04

As presented as part of the 2020 Final Budget - April 2020

20-C3

21-A5

22-B2

20-H3

21-H4

21-H3

22-G2

22-H2

23-G3

23-G223-H2

Entwistle Inset

See Inset

20-C2

21-A422-F6

23-B2

23-D7

20-G1

20-G220-H1

21-G2

21-H2

21-G122-H3

22-J1

22-G1

23-J123-H3

23-G1

Acheson Inset

See Inset

Page 25: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

1. SURFACED ROAD RECONSTRUCTION

Suggested Guidelines for Criteria RatingsRating

Criteria 1-2

Guideline 3-4

Guideline 5-6

Guideline 7-8

Guideline 9-10

Guideline

1) Do Safety Elements and Existing Geometric Road Standards Require Improvement?

No Deficiencies Minor Alignment Problems or Sight

Distance Concerns.

Significant Deficiencies Related to

Alignment or Sight Distance, etc.

Major Deficiencies

Major Multiple Deficiencies

2) Are Maintenance Costs High? <$1,000/mile $1,000 to $2,000/mile

$2,000 to $3,000/mile

$3,000 to $4,000/mile

+$4,000/mile

3) Are Traffic Volumes High? 0-250 251-500 501-750 751-1000 +1000

4) Is this Project of Network Importance to the County?

Access Local Minor Collector Major Collector Arterial

5) Is this Project Environmentally and Socially Friendly?

Major Multiple Impacts

Major Impact Significant Impact Minor Impact Negligible Impact

6) Is there Ratepayer Consensus in the Vicinity of this Project?

Unanimous Opposition

Majority Opposition

Mixed Support/

Opposition

Majority Support Unanimous Support

7) Is Construction Technically and Economically Feasible?

Major Problems Serious Problems Average Difficulty Minor Problems Negligible Problems

Page 26: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair
Page 27: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

Division Type Between Length Roadway Criteria Ratings

ROAD PROGRAM WORKSHEETUpdated Mar 2020

Surfaced Road Reconstruction List With Ratings

Number Name (km)

Safe

ty &

Sta

ndar

ds

(20%

)Main

tena

nce C

osts

(20%

)Tr

affic

Vol

ume (

25%

)Ne

twor

k Im

porta

nce

(10%

)Fr

iendl

ines

s (10

%)

Conc

ensu

s (10

%)

Feas

abilit

y (5%

)To

tal (

100%

) Comments

5 Reconstruction & ASBC Surfacing TWP 524 Mink Lake Road HWY 770- RR25 3.0 7 10 10 6 5 8 5 8.05 Grant Funding Required2 Widening & ACP Surfacing RR 274 Campsite Road TWP524-SG 1.6 4 6 10 8 4 8 4 6.70 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR263-270 4.8 5 4 10 7 7 6 6 6.60 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR270-273 4.892 5 4 10 7 7 6 6 6.60 Grant Funding Required4 Widening & ASBC Surfacing TWP 524 79TH Avenue RR12-15 4.8 3 6 10 10 5 6 4 6.60 Grant Funding Required6 Widening & ASBC Surfacing TWP 530 Sundance Road RR51-53 3.5 4 10 5 8 6 7 5 6.40 Grant Funding Required6 Widening & ASBC Surfacing TWP 530 Sundance Road RR53-60 5.0 4 10 5 8 6 7 5 6.40 Grant Funding Required

2 & 3 Widening & ACP Surfacing TWP 534 RR 271A to RR 274 6 5 10 4 10 6 5 5 6.35 Grant Funding Required2 & 3 Widening & ACP Surfacing TWP 534 RR 274 to Hwy 779 2.8 6 10 2 10 6 5 4 6.00 Grant Funding Required2 & 3 Widening & ACP Surfacing TWP 534 Hwy 44 to RR 271A 3.5 4 10 2 10 6 5 5 5.65 Grant Funding Required

3 Reconstruction & ACP Surfacing TWP 540 Hwy 779 - RR14 8 7 2 10 6 5 7 4 6.30 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 RR274-275 1.8 3 5 10 6 6 7 5 6.25 Grant Funding Required5 Reconstruction & ASBC Surfacing RR 41 TWP532-534 3.2 6 4 7 6 8 7 7 6.20 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 RR275-280 1.7 6 2 8 6 6 7 5 5.75 Grant Funding Required5 Reconstruction & ASBC Surfacing RR 32 Duffield Road TWP520-CN 7.9 8 2 6 9 4 6 4 5.60 Grant Funding Required4 Reconstruction & ASBC Surfacing SRS TWP532 RR13-13A 0.8 10 4 2 4 8 7 6 5.50 Grant Funding Required1 Widening & ACP Overlay TWP 511 Graminia Road RR261-263 3.2 5 2 8 6 6 6 4 5.40 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 SH779-RR280 1.2 4 2 8 6 5 6 5 5.15 Grant Funding Required1 Reconstruction & ASBC Surfacing RR 261 Fleming Road TWP511-512A 2.3 4 3 7 6 4 5 5 4.90 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR260-263 4.8 4 2 6 6 5 5 4 4.50 Grant Funding Required4 Reconstruction & ASBC Surfacing RR 21 Sundown Road CN-Parkland Dr. 1.6 7 1 5 4 3 5 4 4.25 Grant Funding Required

2020 Road Program Project

2021 Road Program Project Within 10 Years

2022 Road Program Project

2023 Road Program Project

2024 Road Program Project

Page 28: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair
Page 29: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

2. GRAVEL RECONSTRUCTION

Suggested Guidelines for Criteria Ratings

Rating Criteria 1-2

Guideline 3-4

Guideline 5-6

Guideline 7-8

Guideline 9-10

Guideline

1) Do Safety Elements and Existing Geometric Road Standards Require Improvement?

No Deficiencies Minor Alignment Problems or Sight

Distance Concerns.

Major Deficiencies

Major Multiple Deficiencies

2) Are Maintenance Costs High? <$1,000/mile $1,000 to $2,000/mile

Significant Deficiencies Related to

Alignment or Sight Distance, etc.

$2,000 to $3,000/mile

$3,000 to $4,000/mile

+$4,000/mile

3) Are Traffic Volumes High? 0-50 51-150 151-250 251-400 +401

4) Is this Project of Network Importance to the County?

Access Local Minor Collector Major Collector Arterial

5) Is this Project Environmentally and Socially Friendly?

Major Multiple Impacts

Major Impact Significant Impact Minor Impact Negligible Impact

6) Is there Ratepayer Consensus in the Vicinity of this Project?

Unanimous Opposition

Majority Opposition

Mixed Support/

Opposition

Majority Support Unanimous Support

7) Is Construction Technically and Economically Feasible?

Major Problems Serious Problems Average Difficulty Minor Problems Negligible Problems

Page 30: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair
Page 31: CAPITAL INFRASTRUCTURE PROGRAM · 23-A2 Next Road Concept Design Conceptual Design B B. ROAD CONSTRUCTION PROJECTS 23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair

Division Type Between Length Roadway

ROAD PROGRAM WORKSHEETUpdated Mar 2020

Gravel Road Reconstruction Project List With Ratings

Criteria Ratings

Number Name (km)

Safe

ty &

Sta

ndar

ds

(20%

)

Mainte

nanc

e Cos

ts

(20%

)

Traf

fic V

olum

e (25

%)

Networ

k Im

porta

nce

(10%

)

Frien

dlin

ess (

10%

)

Conse

nsus

(10%

)

Feas

abilit

y (5%

)

Tota

l (10

0%) Comments

Column1 Column2 Column3 Column4 Column6 Column7 Column175 Full Reconstruction RR 41 TWP534-535 1.6 5 7 8 4 7 7 4 6.4 Grant Funding Required5 Reconstruction 2 locations + Drainage Repairs TWP 510 Correction Road RR45-50 1.6 8 10 4 8 6 7 1 6.75 Grant Funding Required5 Full Reconstruction RR 30 Meso Rd Cantebury Estates North 1.3 7 9 6 8 8 8 6.25 Grant Funding Required5 Full Reconstruction RR 22 TWP510-511 0.8 9 8 4 3 5 5 5 5.95 Grant Funding Required5 Full Reconstruction RR 35 Hwy 16 - TWP 533A 2.3 4 5 8 4 5 7 4 5.6 Grant Funding Required5 Full Reconstruction RR 30 TWP524A-Mayatan 2.6 6 7 4 4 7 6 5 5.55 Grant Funding Required4 Gravel Road Reconstruction Program TWP 510 Correction Road RR14-Everington Rd 0.3 5 7 4 4 7 7 5 5.45 Grant Funding Required6 Gravel Road Reconstruction Program TWP 522 Hwy 22 to Hwy 759 14.8 5 7 5 8 3 4 5 5.40 Grant Funding Required4 Full Reconstruction RR 11 Hwy 627 North 500m 0.5 5 7 4 4 6 7 4 5.30 Grant Funding Required

4 & 5 Full Reconstruction TWP 514 Woodbend Rd RR 20 to Hwy 770 4.8 7 8 2 4 5 5 8 5.30 Grant Funding Required4 Gravel Road Reconstruction Program RR 13 TWP512-513 0.5 4 7 4 4 7 7 6 5.30 Grant Funding Required6 Full Reconstruction TWP 512 RR75-80 1.6 5 7 4 3 7 6 6 5.30 Grant Funding Required6 Full Reconstruction TWP 512 RR74-75 1.6 5 7 4 3 7 6 6 5.30 Grant Funding Required6 Full Reconstruction RR 73 South of TWP 534 0.4 9 6 2 4 6 5 4 5.20 Grant Funding Required5 Full Reconstruction RR 42 TWP534-535 1.6 7 4 3 6 7 6 5 5.10 Grant Funding Required5 Full Reconstruction RR 31 TWP531-532 1.9 7 4 4 3 5 8 5 5.05 Grant Funding Required5 Full Reconstruction RR 44 Lakeshore-HWY 16 2.2 5 5 4 4 7 7 5 5.05 Grant Funding Required4 Full Reconstruction TWP 514 RR274-275 1.8 7 6 2 4 6 7 4 5.00 Grant Funding Required5 Full Reconstruction RR 43 Lakeshore-HWY 16 1.8 4 3 7 3 7 6 5 5.00 Grant Funding Required3 Construction TWP 532 RR13-14 0.8 6 4 4 4 6 7 5 4.95 Grant Funding Required6 Full Reconstruction TWP 530 RR70-71 1.8 6 4 3 6 6 7 4 4.85 Grant Funding Required4 Gravel Road Reconstruction Program RR 15 Twp 510 - 512 1.3 2 7 4 4 7 7 5 4.85 Grant Funding Required3 Full Reconstruction TWP 535 Chickakoo Rd RR12 - RR 13 1.8 8 4 4 4 3 5 3 4.75 Grant Funding Required4 Full Reconstruction RR 14 TWP510-512 0.7 5 8 2 4 5 5 5 4.75 Grant Funding Required5 Full Reconstruction RR 24 TWP511-512 1.5 7 4 3 3 6 6 6 4.75 Grant Funding Required4 Full Reconstruction RR 21 TWP512A-513A 1.6 8 6 2 3 4 5 4 4.70 Grant Funding Required6 Full Reconstruction TWP 531A SH759-RR61 2.0 7 3 4 3 5 7 4 4.70 Grant Funding Required3 Gravel Road Reconstruction Program TWP 534 RR280 - RR275 0.3 2 7 3 9 5 5 5 4.70 Grant Funding Required

4 & 5 Gravel Road Reconstruction Program RR 21 TWP511-512 0.7 2 8 4 4 5 5 5 4.65 Grant Funding Required3 Gravel Road Reconstruction Program RR 275 Boundary Rd Westbrook Cres to Twp 534 1.1 5 5 4 4 5 5 5 4.65 Grant Funding Required5 Full Reconstruction RR 31A RR31-TWP520, includes 515A 031A to 2.0 8 4 3 3 4 6 4 4.65 Grant Funding Required5 Gravel Road Reconstruction Program Lakeside Park Subdivison RR 25 4.1 4 7 3 4 5 5 5 4.60 Grant Funding Required6 Gravel Road Reconstruction Program RR 75 RR513 to RR511 0.4 4 7 3 4 5 5 5 4.60 Grant Funding Required4 Gravel Road Reconstruction Program RR 275 Twp 512-511 4 8 2 4 5 5 5 4.55 Grant Funding Required6 Full Reconstruction TWP 514 RR81-82 1.6 5 3 4 3 7 6 6 4.50 Grant Funding Required6 Full Reconstruction TWP 524 RR72-73 1.6 4 3 4 5 7 6 6 4.50 Grant Funding Required

1 & 4 Gravel Road Reconstruction Program TWP 510 RR273 (N) - RR 275 (S) 1.1 5 5 3 5 5 5 5 4.50 Grant Funding Required3 Full Reconstruction RR 13 TWP535-540 1.8 8 4 4 3 3 3 3 4.45 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 Hwy 627 - Twp 514 3.2 4 5 4 4 5 5 5 4.45 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 TWP 512 - 511 0.7 4 5 4 4 5 5 5 4.45 Grant Funding Required6 Full Reconstruction RR 73 TWP514-520 0.2 5 4 4 4 5 5 5 4.45 Grant Funding Required6 Gravel Road Reconstruction Program TWP 520 RR72-73 1.6 5 4 4 4 5 5 5 4.45 Grant Funding Required6 Gravel Road Reconstruction Program TWP 510 RR80-81 1.6 5 5 3 4 5 5 5 4.40 Grant Funding Required5 Full Reconstruction TWP 514 RR43-45 3.2 7 3 2 3 8 5 6 4.40 Grant Funding Required6 Full Reconstruction TWP 540 RR64A-SH757 0.8 6 4 2 3 7 6 6 4.40 Grant Funding Required6 Full Reconstruction RR 65 SH757-TWP545A 0.8 7 4 1 3 7 6 6 4.35 Grant Funding Required3 Full Reconstruction RR 11 TWP541-SH633 1.6 7 2 2 3 7 7 6 4.30 Grant Funding Required5 Full Reconstruction TWP 522 RR22-SH770 1.8 9 4 3 3 2 3 2 4.25 Grant Funding Required4 Full Reconstruction RR 14 TWP512-513A 2.4 7 4 1 4 8 3 5 4.20 Grant Funding Required2 Full Reconstruction RR 272 Century Road TWP514-520 3.2 4 3 3 4 7 6 7 4.20 Grant Funding Required1 Full Reconstruction RR 275 TWP504-510 3.0 3 3 4 4 7 7 4 4.20 Grant Funding Required4 Gravel Road Reconstruction Program RR 13 RR505 - 510 0.9 5 5 2 4 5 5 5 4.15 Grant Funding Required4 Gravel Road Reconstruction Program TWP 514 Woodbend Rd RR11-12 0.2 5 5 2 4 5 5 5 4.15 Grant Funding Required2 Full Reconstruction RR 271 Pioneer Road TWP524-530 3.2 3 3 4 3 7 6 5 4.05 Grant Funding Required4 Gravel Road Reconstruction Program RR 15 TWP514 to Hwy 627 0.8 2 5 4 4 5 5 5 4.05 Grant Funding Required4 Gravel Road Reconstruction Program RR 20 TWP510-511 0.8 2 5 4 4 5 5 5 4.05 Grant Funding Required5 Full Reconstruction RR 22 TWP522-523A 2.7 9 4 2 3 2 3 2 4.00 Grant Funding Required4 Gravel Road Reconstruction Program RR 13 TWP513-514 0.3 2 5 3 4 5 5 5 3.80 Grant Funding Required

2020 Gravel Road Reconstruction Program Candidates

2020 Road Program Project

2021 Road Program Project

2022 Road Program Project

2023 Road Program Project

within 10 years