CAPITAL INFRASTRUCTURE PROGRAM
2020 - 2023
One Parkland: Powerfully Connected.
Presented as part of the 2020 Final Budget April 2020
ENGINEERING SERVICES
April 2020
Welcome to Parkland County’s Four Year Capital Infrastructure Program
Published annually as part of the budget process, this document outlines and maps the four year plan for major capital works across Parkland County. The Capital Infrastructure Program includes both new and rehabilitation projects in the following asset categories:
• Roads• Bridges• Water• Wastewater• Stormwater
The 2020 program was approved by Council in April 2020 as part of the 2020 final budget.
The subsequent years forecast upcoming capital projects in the Capital Infrastructure Program which are reviewed and re-prioritized annually as new information is collected and analyzed. The main prioritization criteria for major road re-construction projects is included in the back of this document.
If you would like more information about Parkland County's Capital Infrastructure Program, you can reach Engineering Services at 780-968-8445. We would be happy to hear from you!
Engineering Services
2020 Bridge Culvert Installation 2019
2020 Capital Infrastructure Program Project ListColumn6 Column7 Column8
A0 A. DESIGN & LAND ACQUISITION PROJECTS
20-A1 Bridge File 70280 (RR 64, 300m North of Twp 504) Design for Bridge Repair
20-A2 Acheson Roads (Not Mapped) Conceptual Design
B B. ROAD CONSTRUCTION PROJECTS
20-B1Gravel Road Reconstruction Program - County Wide (Locations mapped separately)
Reconstruction
20-B2 Twp 510, RR 45 - RR 50 Reconstruction + Drainage Repairs
C0 C. ASPHALT SURFACING PROJECTS20-C1 Parkland Drive, RR 15 to Hwy 16A ACP Resurfacing
20-C2 261 Street, 114 Ave to 115 Ave ACP Resurfacing
20-C3 Entwistle - 52 Street, 48 Ave to 50 Ave ASBC Resurfacing
20-C4 RR 10, Twp 512 to Twp 514 ASBC Resurfacing
20-C5 RR 20, Parkland Drive to Hwy 16 ASBC Resurfacing
20-C6 East Service Rd 263, Twp 513 to Twp 514 ASBC Resurfacing
20-C7 Twp 510, RR 55 to Hwy 759 Design + base/subgrade assessment
D. SEAL COAT SURFACING PROJECTS 20-D1 RR 41, Hwy 16 to Twp 534 Seal Coating
20-D2 RR 15 (Beach Corner Rd), from 200m North of Twp 533A to Twp 534 Seal Coating
20-D3 RR 275 (Boundary Rd), Twp 541 to Twp 542 Seal Coating
20-D4 RR 20, Hwy 16A to SRN 532 Seal Coating
20-D5 RR 262 (Willowdale Rd), Twp 513 to Twp 520 Seal Coating
20-D6 RR 274 (Campsite Rd), Twp 534 to Twp 540 Seal Coating
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION PRESERVATION PROJECTS20-F1 Blueberry Hills Estates Subdivision Preservation - ASBC
20-F2 Country Lane Estates - Christensen Dr Subdivision Preservation - ASBC
20-F3 Fleming Park - Fleming Dr, Fleming Cres Subdivision Preservation - ASBC
20-F4 Harris Acres - Harris Dr Subdivision Preservation - ASBC
20-F5 Lidin Acres - Meadow Dr Subdivision Preservation - ASBC
20-F6 Spring Hills - Leslie Lane, Lindsay Lane Subdivision Preservation - ASBC
20-F7 Spruce Bluff Estates - Ulmer Dr, Grouse Pt Subdivision Preservation - ASBC
20-F8 Valaspen Place South - Valaspen Dr, Aspen Cres Subdivision Preservation - ASBC
20-F9 Weekend Estates - Groleau Dr, Jackfish Cres Subdivision Preservation - ASBC
20-F10 Wesparkdale - Marion Cres Subdivision Preservation - ASBC
20-F11 Willow Park - Willow Park Drive Subdivision Preservation - ASBC
20-F12 Woodland Acres - Woodland Drive Subdivision Preservation - ASBC
G0 G. WATER20-G1 Acheson Zone 4 Reservoir Expansion Construction
20-G2 Walker Lake - Lakeshore Waterloop Design & Land Acquisition
H0 H. WASTEWATER20-H1 Acheson Zone 1 & 2 Wastewater Manhole and Main Rehabilitation Construction
20-H2 Tomahawk Lagoon Rehabilitation Concept Design
20-H3 Wastewater Rehabilitation - Entwistle 51A Street Concept Design
20-H4 Entwistle Lagoon Rehabilitation Design & Construction
J. STORMWATER
20-J1 Fallis Drainage Improvements Design
G1
G2
B2
C3C2C5
C4
C1
C7
C6
D2
D3
D4
D1
D5
D6
F8
F7
F6
F11
F1
F9
F12
F4
F2
F3
F5
F10
A1
J1
H2
H4
H3
H1
R.07
R.07
R.08
R.08
R.05
R.05R.06
R.06 R.02 R.01
R.01R.02
R.03
R.03R.04
R.04
R.25
R.25R.28 R.26
R.26
R.27
R.27R.28T.5
0T.5
1T.5
4T.5
5T.5
3T.5
2
T.51
T.52
T.54
T.50
T.55
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
RGE RD11
RGE RD11
RGE RD254
RGE RD254
TWP
RD53
0
TWP
RD53
0
TWP
RD53
5
TWP
RD53
5
TWP
RD53
4
TWP
RD53
4
TWP
RD53
3
TWP
RD53
3
TWP
RD52
3
TWP
RD52
3
TWP
RD53
1
TWP
RD53
1
TWP
RD52
2
TWP
RD52
2
TWP
RD52
1
TWP
RD52
1
TWP
RD52
0
TWP
RD52
0
TWP
RD51
3
TWP
RD51
3
TWP
RD51
5
TWP
RD51
5
TWP
RD51
4
TWP
RD51
4
TWP
RD54
0
TWP
RD54
0
TWP
RD52
5
TWP
RD52
5
TWP
RD52
4
TWP
RD52
4
TWP
RD54
2
TWP
RD54
2
TWP
RD51
1
TWP
RD51
1TWP
RD51
2
TWP
RD51
2
TWP
RD54
1
TWP
RD54
1
TWP
RD54
3
TWP
RD54
3TWP
RD54
4
TWP
RD54
4
TWP
RD55
0
TWP
RD55
0
TWP
RD54
5
TWP
RD54
5
TWP
RD51
0
TWP
RD51
0
TWP
RD50
3
TWP
RD50
3
TWP
RD50
5
TWP
RD50
5
TWP
RD50
4
TWP
RD50
4
TWP
RD53
2
TWP
RD53
2
TWP
RD50
2
TWP
RD50
2
LegendA. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. Water ProjectsH. Wastewater ProjectsJ. Stormwater Projects µ0 5 10 152.5
Kilometers Parkland CountyInfrastructure Program 2020
Updated: 2020-03-02
As presented as part of the 2020 Final Budget - April 2020
Gravel Road Reconstruction
Program
2020 Gravel Road Reconstruction Program Project List*Column6 Column7 Column8
B2. GRAVEL ROAD RECONSTRUCTION PROGRAM
B2 - 4 Twp 510, RR 14 - Everington Rd Approx. 300m Road Reconstruction and Ditching at 1 location
B2 - 5 RR 13, Twp 513 - Twp 514 Approx. 700m Road Reconstruction at 1 location
B2 - 7 RR 15, Twp 510 - Twp 512 Approx. 1280m Road Reconstruction at 7 locations
B4 - 8 RR 21, Twp 511 - Twp 512 Approx. 700m Road Reconstruction at 1 location
B4 - 9 RR 75, Twp 513 - Twp 511 Approx. 300m Intersection Reconstruction at 1 location
B4 - 13 RR 20, Twp 510 - 511 Approx. 140m Road Reconstruction at 2 locations
B2 - 14 RR 15, Twp 514 to Twp Hwy 627 Approx. 140m Road Reconstruction at 1 locations
B2 - 15 RR 13, Twp 512 - Twp 513 Approx. 340m Road Reconstruction at 1 location
* Locations which are planned for the 2020 gravel road reconstruction program - not in any prioritized order. *Will be constructed as schedule efficiencies and resources allow. *Locations subject to change and re-prioritized as other locations are identified with spring conditions.
B2-9B2-5
B2-15
B2-14
B2-8
B2-13
B2-4
B2-7
R.07
R.07
R.08
R.08
R.05
R.05R.06
R.06 R.02 R.01
R.01R.02
R.03
R.03R.04
R.02R.04
R.25
R.25R.27R.28 R.26
R.26
R.27
R.27R.28T.5
0T.5
1T.5
4T.5
5T.5
3T.5
2
T.51
T.52
T.54
T.50
T.55
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
RGE RD11
RGE RD11
RGE RD254
RGE RD254
TWP
RD53
0
TWP
RD53
0
TWP
RD53
5
TWP
RD53
5
TWP
RD53
4
TWP
RD53
4
TWP
RD53
3
TWP
RD53
3
TWP
RD52
3
TWP
RD52
3
TWP
RD53
1
TWP
RD53
1
TWP
RD52
2
TWP
RD52
2
TWP
RD52
1
TWP
RD52
1
TWP
RD52
0
TWP
RD52
0
TWP
RD51
3
TWP
RD51
3
TWP
RD51
5
TWP
RD51
5
TWP
RD51
4 TWP
RD51
4
TWP
RD54
0
TWP
RD54
0
TWP
RD52
5
TWP
RD52
5
TWP
RD52
4
TWP
RD52
4
TWP
RD54
2
TWP
RD54
2
TWP
RD51
1
TWP
RD51
1TWP
RD51
2 TWP
RD51
2
TWP
RD54
1
TWP
RD54
1
TWP
RD54
3
TWP
RD54
3TWP
RD54
4
TWP
RD54
4
TWP
RD55
0
TWP
RD55
0
TWP
RD54
5
TWP
RD54
5
TWP
RD51
0
TWP
RD51
0
TWP
RD50
3
TWP
RD50
3
TWP
RD50
5
TWP
RD50
5
TWP
RD50
4
TWP
RD50
4
TWP
RD53
2
TWP
RD53
2
TWP
RD50
2
TWP
RD50
2
B2. Gravel Road Reconstruction Program 2020 µ0 5 10 152.5
KilometersLegend
2020 Locations
Updated: 2020-02-25
Parkland County
As presented as part of the 2020 Final Budget - April 2020
2021 RR 55 Creek Erosion Control – 1 year after construction
2021 Capital Infrastructure Program Project ListColumn6 Column7 Column8
A0 A. DESIGN & LAND ACQUISITION PROJECTS21-A1 Bridge File 09046 (RR 25, 950m South of Twp 520) Design for Bridge Repair
21-A2 Acheson Roads (Not Mapped) Conceptual Design
21-A3 Twp 524, RR 12 (Stony Plain) to Hwy 770 Conceptual Design
21-A4 Twp 531A (114th Ave), 261st Street to 259th Street Collector Road Design
21-A5 Entwistle, 50A Ave, from Hwy 16A to 49th Street Hamlet Road Design
21-A6 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Road Rehabilitation Design
B B. ROAD CONSTRUCTION PROJECTS21-B1 Bridge File 09254 (RR70, 500m South of Hwy 16) Bridge Repair - Construction
C0 C. ASPHALT SURFACING PROJECTS21-C1 RR 273 (Golden Spike Rd), Hwy 627 to Twp 513 ACP Resurfacing
21-C2 Twp 510, RR 55 to Hwy 759 ASBC Resurfacing + base/subgrade repairs
21-C3 Twp 512, RR 60 to RR 62 (Tomahawk) ASBC Resurfacing
21-C4 Tomahawk - Multiple Locations ASBC Resurfacing
21-C5 RR 271, Twp 513 to Twp 514 ASBC Resurfacing
21-C6 Twp 514 (Millbank Rd), Hwy 22 to RR 70 Design + base/subgrade assessment
21-C7 Next Valid Petition (2) Local Improvements
D. SEAL COAT SURFACING PROJECTS 21-D1 Twp 511 (Graminia Rd), Hwy 60 to RR 271 Seal Coating
21-D2 Parkland Drive, RR15 to RR 21 Seal Coating
21-D3 Twp 514 (Woodbend Rd), RR 260 to RR 261 Seal Coating
21-D4 Wabamun Provincial Park Rd, Hwy 16 to Park Entrance Seal Coating
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION PRESERVATION PROJECTS21-F1 Clearwater Estates - Robinson Dr, Allan Dr, Beaver Ave Subdivision Preservation - ASBC
21-F2 Deer Park II - 1st & 2nd Ave, 1st & 2nd Street Subdivision Preservation - ASBC
21-F3 Hubbles Lake - Diamond Dr, Diamond Rd Subdivision Preservation - ASBC
21-F4 Lily Lake Estates - Michelle Dr, Michelle Cres, Michelle Close Subdivision Preservation - ASBC
21-F5 Maude-West Acres Subdivision Preservation - ASBC
21-F6 Pine Wood - Pine Wood Dr, West Rd Subdivision Preservation - ASBC
21-F7 Whispering Pines - Whispering Pine Dr, Pine St, Spruce St, Valley Dr Subdivision Preservation - ASBC
G0 G. WATER21-G1 Walker Lake - Lakeshore Waterloop Construction
21-G2 Zone 4 Fill Line - Booster Station Construction
H0 H. WASTEWATER21-H1 Tomahawk Lagoon Rehabilitation Design & Land Acquisition
21-H2 Wastewater Main Level of Service - Acheson Zone 1, RR 264 & Twp 531A Design
21-H3 Wastewater Rehabilitation - Entwistle 51Ast Street Design
21-H4 Wastewater Rehabiliation - Entwistle South Lift Station Inlet Design & Construction
A6
A4
A3
C4C3
C5
C2
C1C6
D1
D4
D3
D2F3
F4
F2
F7
F6
F1
F5
A1
G1
G2
B1
H1
H2
R.07
R.07
R.08
R.08
R.09
R.09
R.05
R.05R.06
R.06 R.01
R.01R.02
R.03
R.03R.04
R.02R.04 R.25
R.25
R.27 R.26
R.26R.27
R.28
R.28T.5
0T.5
1T.5
3T.5
5T.5
4T.5
2
T.51
T.52
T.54
T.50
T.55
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
RGE RD11
RGE RD11
RGE RD254
RGE RD254
TWP
RD53
0
TWP
RD53
0
TWP
RD53
5
TWP
RD53
5
TWP
RD53
4
TWP
RD53
4
TWP
RD53
3
TWP
RD53
3
TWP
RD52
3
TWP
RD52
3
TWP
RD53
1
TWP
RD53
1
TWP
RD52
2
TWP
RD52
2
TWP
RD52
1
TWP
RD52
1
TWP
RD52
0
TWP
RD52
0
TWP
RD51
3
TWP
RD51
3
TWP
RD51
5
TWP
RD51
5
TWP
RD51
4 TWP
RD51
4
TWP
RD54
0
TWP
RD54
0
TWP
RD52
5
TWP
RD52
5
TWP
RD52
4
TWP
RD52
4
TWP
RD54
2
TWP
RD54
2
TWP
RD51
1
TWP
RD51
1TWP
RD51
2 TWP
RD51
2
TWP
RD54
1
TWP
RD54
1
TWP
RD54
3
TWP
RD54
3TWP
RD54
4
TWP
RD54
4
TWP
RD55
0
TWP
RD55
0
TWP
RD54
5
TWP
RD54
5
TWP
RD51
0
TWP
RD51
0
TWP
RD50
3 TWP
RD50
3
TWP
RD50
5 TWP
RD50
5
TWP
RD50
4 TWP
RD50
4
TWP
RD53
2
TWP
RD53
2
TWP
RD50
2 TWP
RD50
2
0 5 10 152.5Kilometers
LegendA. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. Water ProjectsH. Wastewater Projects µParkland County
Infrastructure Program 2021Updated: 2020-02-28
As presented as part of the 2020 Final Budget - April 2020
A5
H4
H3
See Inset
Entwistle Inset
2022 Helenslea Water & Wastewater Service Lines Installation 2019
2022 Capital Infrastructure Program Project ListColumn6 Column7 Column8
A0 A. DESIGN & LAND ACQUISITION PROJECTS22-A1 Sundance Rd, RR 51 to RR 60 Conceptual Design
B B. ROAD CONSTRUCTION PROJECTS22-B1 Bridge File 70280 (RR64, 300m North of Twp 504) Bridge Repair - Construction
22-B2 Entwistle, 50A Ave, from Hwy 16A to 49th Street Hamlet Road Reconstruction
22-B3 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Road Rehabilitation Construction
C0 C. ASPHALT SURFACING PROJECTS22-C1 RR 273 (Calahoo Rd), Twp 534 to Twp 540 ACP Resurfacing
22-C2 Twp 514 (Millbank Rd), Hwy 22 to RR 70 ASBC Resurfacing + base/subgrade repairs
22-C3 RR 272 (Century Rd), Twp 520 to Twp 522 ASBC Resurfacing
22-C4 Twp 512A, Hwy 60 to RR 263A ASBC Resurfacing
22-C5 Duffield - Multiple Locations ASBC Resurfacing
22-C6 Next Valid Petition (2) Local Improvements
D. SEAL COAT SURFACING PROJECTS 22-D1 Twp 534, RR 41 to RR 43 Seal Coating
22-D2 RR 43, Twp 534 to Twp 535 Seal Coating
22-D3 Parkland Drive, Hwy 770 to RR 25 Seal Coating
22-D4 RR 261 (Fleming Road), Twp 512 to Twp 520 Seal Coating
22-D5 East Service Rd 263, from Twp 514 to Twp 515A Seal Coating
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION PRESERVATION PROJECTS22-F1 Birch-Hill Park - Birch Hill Dr Subdivision Preservation - ASBC
22-F2 Fernwood Estates - Fernwood Dr, Sudavian Cres Subdivision Preservation - ASBC
22-F3 Garden Grove Estates - Lakeshore Dr Subdivision Preservation - ASBC
22-F4 Grove Acres - Bruce Blvd Subdivision Preservation - ASBC
22-F5 Landmark Estates - Downey Cres Subdivision Preservation - ASBC
22-F6 Osborne Acres - Osborne Dr, Osborne Pl Subdivision Preservation - ASBC
22-F7 Pine Valley V - Pine Cres Subdivision Preservation - ASBC
22-F8 Sunset View Acres - Sunset Dr, Sunset Rd Subdivision Preservation - ASBC
G0 G. WATER22-G1 279th Street Water Loop & Hwy 16 Crossing Design & Land Acquisition
22-G2 Entwistle Water Reservoir and Pumphouse Design & Land Acquisition
H0 H. WASTEWATER22-H1 Tomahawk Lagoon Rehabilitation Construction
22-H2 Wastewater Rehabilitation - Entwistle 51Ast Street Construction
22-H3 Wastewater Main Level of Service - Acheson Zone 1, RR 264 & Twp 531A Construction
J. STORMWATER
22-J1 Stormwater Rehabilitation/Replacement - Acheson Zone 3 Design
J1A1
B2B3
C5
C4
C3
C2
C1
D5
D2D1
D4
D3
F4F3
F2
F7
F1
F8
F6
F5
B1
H1
H2
H3
G2
G1
R.07R.08 R.05R.06
R.07R.08 R.02
R.01R.02
R.03
R.03
R.04
R.04
R.05R.06 R.01
R.25
R.25R.28 R.26
R.26
R.27
R.27R.28T.5
0T.5
1T.5
4T.5
5T.5
3T.5
2
T.51
T.52
T.54
T.50
T.55
T.49
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
RGE RD11
RGE RD11
RGE RD254
RGE RD254
TWP
RD53
0
TWP
RD53
0
TWP
RD53
5
TWP
RD53
5
TWP
RD53
4
TWP
RD53
4
TWP
RD53
3
TWP
RD53
3
TWP
RD52
3
TWP
RD52
3
TWP
RD53
1
TWP
RD53
1
TWP
RD52
2
TWP
RD52
2
TWP
RD52
1
TWP
RD52
1
TWP
RD52
0
TWP
RD52
0
TWP
RD51
3
TWP
RD51
3
TWP
RD51
5
TWP
RD51
5
TWP
RD51
4
TWP
RD51
4
TWP
RD54
0
TWP
RD54
0
TWP
RD52
5
TWP
RD52
5
TWP
RD52
4
TWP
RD52
4
TWP
RD54
2
TWP
RD54
2
TWP
RD51
1
TWP
RD51
1TWP
RD51
2
TWP
RD51
2
TWP
RD54
1
TWP
RD54
1
TWP
RD54
3
TWP
RD54
3TWP
RD54
4
TWP
RD54
4
TWP
RD55
0
TWP
RD55
0
TWP
RD54
5
TWP
RD54
5
TWP
RD51
0
TWP
RD51
0
TWP
RD50
3
TWP
RD50
3
TWP
RD50
5
TWP
RD50
5
TWP
RD50
4
TWP
RD50
4
TWP
RD53
2
TWP
RD53
2
TWP
RD50
2
TWP
RD50
2
0 5 10 152.5Kilometers
LegendA. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. Water ProjectsH. Wastewater ProjectsJ. Stormwater Projects µParkland County
Infrastructure Program 2022Updated: 2020-03-02
As presented as part of the 2020 Final Budget - April 2020
Subdivision Surfacing Program 2023
2023 Capital Infrastructure Program Project ListColumn6 Column7 Column8
A0 A. DESIGN & LAND ACQUISITION PROJECTS23-A1 Bridge File 13614 (RR 33, 1.2km South of Twp 514) Design for Bridge Repair
23-A2 Next Road Concept Design Conceptual Design
B B. ROAD CONSTRUCTION PROJECTS23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair - Construction
23-B2 Twp 531A (114th Ave), 261st Street to 259th Street Reconstruction + Widen + ACP Surfacing
23-B3 231st Street, Hwy 16 to Hwy 16A (Phase 1) Reconstruction + Widen + ACP Surfacing
C0 C. ASPHALT SURFACING PROJECTS23-C1 RR 273 (Calahoo Rd), Hwy 16 to Twp 534 ACP Resurfacing
23-C2 Twp 524, RR 12 to RR 14 ASBC Resurfacing
23-C3 RR 13, Twp 524 to Meadow Run Estates ASBC Resurfacing
23-C4 RR 272 (Century Rd), Twp 522 to Twp 524 ASBC Resurfacing
23-C5 RR 12, Hwy 16 to Partridge Place ASBC Resurfacing
23-C6 Twp 512, RR 261 to Silver Bell Heights - To be done with SBH/White Tail ASBC Resurfacing
23-C7 RR 30 (Meso Rd), Hwy 16 to Cantebury Estates ASBC Resurfacing
23-C8 Next Valid Petition (2) Local Improvements
D. SEAL COAT SURFACING PROJECTS 23-D1 Parkland Drive, RR 25 to Hwy 16 Seal Coating
23-D2 RR 12 (Rosenthal Rd), Twp 520 to Twp 522 Seal Coating
23-D3 Twp 530, RR 265A to 270A Seal Coating
23-D4 Twp 532A, RR 270 to RR 272 Seal Coating
23-D5 Twp 540, RR 280 to RR 10 Seal Coating
23-D6 SRN 532, RR15 to RR 20 Seal Coating
23-D7 SRN 532, RR 261 to RR 263 Seal Coating
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION PRESERVATION PROJECTS23-F1 Chickakoo Estates - Mitchell Dr, Chickakoo Dr Subdivision Preservation - ASBC
23-F2 Grand River Valley Estates - Riverview Cres Subdivision Preservation - ASBC
23-F3 Harder Acres - Harder Dr Subdivision Preservation - ASBC
23-F4 Huntingdon Heights - Regency Cres Subdivision Preservation - ASBC
23-F5 Meadow Run Estates - Meadow Rd Cul-de-sac Subdivision Preservation - ASBC
23-F6 Prestige Heights - Prestige Dr, North Rd, South Rd Subdivision Preservation - ASBC
23-F7 Valaspen Place North - Lakeview Ave, Main St Subdivision Preservation - ASBC
23-F8 Westward Estates - Westward Dr Subdivision Preservation - ASBC
23-F9 White Tail Acres - White Tail Way Subdivision Preservation - ASBC
G0 G. WATER23-G1 279th Street Water Loop & Hwy 16 Crossing Construction
23-G2 Entwistle Hwy 16 X-ing Water Loop Design
23-G3 Entwistle Water Reservoir and Pumphouse Construction
H0 H. WASTEWATER23-H1 Wastewater Rehabilitation - CIPP Program (Not Mapped) Design & Construction
23-H2 Wastewater Rehabilitation - Entwistle Forcemain Design
23-H3 Wastewater Main Level of Service - Acheson Zone 4 to 3, Acheson Rd Design
J. STORMWATER
23-J1 Stormwater Rehabilitation/Replacement - Acheson Zone 3 Construction
J1 B2
C5
C3C4
C1C7
C2
C6
D6D4
D3
D5
D1
D2
D7
F2
F1
F9
F6
F7
F3F8
F5
F4
B1
B3
A1
H2
H3G3
G2
G1
R.07
R.07
R.08
R.08
R.05
R.05R.06
R.06 R.01
R.01R.02
R.03
R.03R.04
R.02R.04 R.25
R.25
R.27 R.26
R.26R.27
R.28
R.28T.5
0T.5
1T.5
4T.5
5T.5
3T.5
2
T.55
T.51
T.52
T.54
T.50
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
RGE RD11
RGE RD11
RGE RD254
RGE RD254
TWP
RD53
0
TWP
RD53
0
TWP
RD53
5
TWP
RD53
5
TWP
RD53
4
TWP
RD53
4
TWP
RD53
3
TWP
RD53
3
TWP
RD52
3
TWP
RD52
3
TWP
RD53
1
TWP
RD53
1
TWP
RD52
2
TWP
RD52
2
TWP
RD52
1
TWP
RD52
1
TWP
RD52
0
TWP
RD52
0
TWP
RD51
3
TWP
RD51
3
TWP
RD51
5
TWP
RD51
5
TWP
RD51
4
TWP
RD51
4
TWP
RD54
0
TWP
RD54
0
TWP
RD52
5
TWP
RD52
5
TWP
RD52
4
TWP
RD52
4
TWP
RD54
2
TWP
RD54
2
TWP
RD51
1
TWP
RD51
1TWP
RD51
2
TWP
RD51
2
TWP
RD54
1
TWP
RD54
1
TWP
RD54
3
TWP
RD54
3TWP
RD54
4
TWP
RD54
4
TWP
RD55
0
TWP
RD55
0
TWP
RD54
5
TWP
RD54
5
TWP
RD51
0
TWP
RD51
0
TWP
RD50
3
TWP
RD50
3
TWP
RD50
5
TWP
RD50
5
TWP
RD50
4
TWP
RD50
4
TWP
RD53
2
TWP
RD53
2
TWP
RD50
2
TWP
RD50
2
0 5 10 152.5Kilometers
LegendA. Design & Land Acquisition ProjectsB. Road Construction ProjectsC. Asphalt Surfacing ProjectsD. Seal Coat Surfacing ProjectsF. Subdivision Surfacing ProjectsG. Water ProjectsH. Wastewater ProjectsJ. Stormwater Projects µParkland County
Infrastructure Program 2023Updated: 2020-03-02
As presented as part of the 2020 Final Budget - April 2020
2020 -2023 Asphalt Surfacing Program
2020-2023 Capital Infrastructure Program Project ListColumn6 Column7 Column8 Column9
A0 A. DESIGN & LAND ACQUISITION PROJECTS
20-A1 Bridge File 70280 (RR 64, 300m North of Twp 504) Design for Bridge Repair 2020
20-A2 Acheson Roads (Not Mapped) Conceptual Design 2020
21-A1 Bridge File 09046 (RR 25, 950m South of Twp 520) Design for Bridge Repair 2021
21-A2 Acheson Roads (Not Mapped) Conceptual Design 2021
21-A3 Twp 524, RR 12 (Stony Plain) to Hwy 770 Conceptual Design 2021
21-A4 Twp 531A (114th Ave), 261st Street to 259th Street Collector Road Design 2021
21-A5 Entwistle, 50A Ave, from Hwy 16A to 49th Street Hamlet Road Design 2021
21-A6 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Road Rehabilitation Design 2021
22-A1 Sundance Rd, RR 51 to RR 60 Conceptual Design 2022
23-A1 Bridge File 13614 (RR 33, 1.2km South of Twp 514) Design for Bridge Repair 2023
23-A2 Next Road Concept Design Conceptual Design 2023
B B. ROAD CONSTRUCTION PROJECTS
20-B1 Gravel Road Reconstruction Program - County Wide (Locations mapped separately) Reconstruction 2020
20-B2 Twp 510, RR 45 - RR 50 Reconstruction + Drainage Repairs 2020
21-B1 Bridge File 09254 (RR 70, 500m South of Hwy 16) Bridge Repair - Construction 2021
22-B1 Bridge File 70280 (RR 64, 300m North of Twp 504) Bridge Repair - Construction 2022
22-B2 Entwistle, 50A Ave, from Hwy 16A to 49th Street Hamlet Road Reconstruction 2022
22-B3 Helenslea Heath, Helenslea Heath III, Helenslea Estates Subdivision Road Rehabilitation Construction 2022
23-B1 Bridge File 09046 (RR 25, 950m South Twp 520) Bridge Repair - Construction 2023
23-B2 Twp 531A (114th Ave), 261st Street to 259th Street Reconstruction + Widen + ACP Surfacing 2023
23-B3 231st Street, Hwy 16 to Hwy 16A (Phase 1) Reconstruction + Widen + ACP Surfacing 2023
C0 C. ASPHALT SURFACING PROJECTS20-C1 Parkland Drive, RR 15 to Hwy 16A ACP Resurfacing 2020
20-C2 261 Street, 114 Ave to 115 Ave ACP Resurfacing 2020
20-C3 Entwistle - 52 Street, 48 Ave to 50 Ave ASBC Resurfacing 2020
20-C4 RR 10, Twp 512 to Twp 514 ASBC Resurfacing 2020
20-C5 RR 20, Parkland Drive to Hwy 16 ASBC Resurfacing 2020
20-C6 East Service Rd 263, Twp 513 to Twp 514 ASBC Resurfacing 2020
20-C7 Twp 510, RR 55 to Hwy 759 Design + base/subgrade assessment 2020
21-C1 RR 273 (Golden Spike Rd), Hwy 627 to Twp 513 ACP Resurfacing 2021
21-C2 Twp 510, RR 55 to Hwy 759 ASBC Resurfacing + base/subgrade repairs 2021
21-C3 Twp 512, RR 60 to RR 62 (Tomahawk) ASBC Resurfacing 2021
21-C4 Tomahawk - Multiple Locations ASBC Resurfacing 2021
21-C5 RR 271, Twp 513 to Twp 514 ASBC Resurfacing 2021
21-C6 Twp 514 (Millbank Rd), Hwy 22 to RR 70 Design + base/subgrade assessment 2021
21-C7 Next Valid Petition (2) Local Improvements 2021
22-C1 RR 273 (Calahoo Rd), Twp 534 to Twp 540 ACP Resurfacing 2022
22-C2 Twp 514 (Millbank Rd), Hwy 22 to RR 70 ASBC Resurfacing + base/subgrade repairs 2022
22-C3 RR 272 (Century Rd), Twp 520 to Twp 522 ASBC Resurfacing 2022
22-C4 Twp 512A, Hwy 60 to RR 263A ASBC Resurfacing 2022
22-C5 Duffield - Multiple Locations ASBC Resurfacing 2022
22-C6 Next Valid Petition (2) Local Improvements 2022
23-C1 RR 273 (Calahoo Rd), Hwy 16 to Twp 534 ACP Resurfacing 2023
23-C2 Twp 524, RR12 to RR14 ASBC Resurfacing 2023
23-C3 RR 13, Twp 524 to Meadow Run Estates ASBC Resurfacing 2023
23-C4 RR 272 (Century Rd), Twp 522 to Twp 524 ASBC Resurfacing 2023
23-C5 RR 12, Hwy 16 to Partridge Place ASBC Resurfacing 2023
23-C6 Twp 512, RR 261 to Silver Bell Heights - To be done with SBH/White Tail ASBC Resurfacing 2023
23-C7 RR 30 (Meso Rd), Hwy 16 to Cantebury Estates ASBC Resurfacing 2023
23-C8 Next Valid Petition (2) Local Improvements 2023
D. SEAL COAT SURFACING PROJECTS 20-D1 RR 41, Hwy 16 to Twp 534 Seal Coating 2020
20-D2 RR 15 (Beach Corner Rd), from 200m North of Twp 533A to Twp 534 Seal Coating 2020
20-D3 RR 275 (Boundary Rd), Twp 541 to Twp 542 Seal Coating 2020
20-D4 RR 20, Hwy 16A to SRN 532 Seal Coating 2020
20-D5 RR 262 (Willowdale Rd), Twp 513 to Twp 520 Seal Coating 2020
20-D6 RR 274 (Campsite Rd), Twp 534 to Twp 540 Seal Coating 2020
21-D1 Twp 511 (Graminia Rd), Hwy 60 to RR 271 Seal Coating 2021
21-D2 Parkland Drive, RR15 to RR 21 Seal Coating 2021
21-D3 Twp 514 (Woodbend Rd), RR 260 to RR 261 Seal Coating 2021
21-D4 Wabamun Provincial Park Rd, Hwy 16 to Park Entrance Seal Coating 2021
22-D1 Twp 534, RR 41 to RR 43 Seal Coating 2022
22-D2 RR 43, Twp 534 to Twp 535 Seal Coating 2022
22-D3 Parkland Drive, Hwy 770 to RR 25 Seal Coating 2022
22-D4 RR 261 (Fleming Road), Twp 512 to Twp 520 Seal Coating 2022
22-D5 East Service Rd 263, from Twp 514 to Twp 515A Seal Coating 2022
23-D1 Parkland Drive, RR 25 to Hwy 16 Seal Coating 2023
23-D2 RR 12 (Rosenthal Rd), Twp 520 to Twp 522 Seal Coating 2023
23-D3 Twp 530, RR 265A to 270A Seal Coating 2023
23-D4 Twp 532A, RR 270 to RR 272 Seal Coating 2023
23-D5 Twp 540, RR 280 to RR 10 Seal Coating 2023
23-D6 SRN 532, RR15 to RR 20 Seal Coating 2023
23-D7 SRN 532, RR 261 to RR 263 Seal Coating 2023
E0 E. MISCELLANEOUS PROJECTS TO BE ADDED THROUGHOUT THE YEAR
F0 F. SUBDIVISION PRESERVATION PROJECTS20-F1 Blueberry Hills Estates Subdivision Preservation - ASBC 2020
20-F2 Country Lane Estates - Christensen Dr Subdivision Preservation - ASBC 2020
20-F3 Fleming Park - Fleming Dr, Fleming Cres Subdivision Preservation - ASBC 2020
20-F4 Harris Acres - Harris Dr Subdivision Preservation - ASBC 2020
20-F5 Lidin Acres - Meadow Dr Subdivision Preservation - ASBC 2020
20-F6 Spring Hills - Leslie Lane, Lindsay Lane Subdivision Preservation - ASBC 2020
20-F7 Spruce Bluff Estates - Ulmer Dr, Grouse Pt Subdivision Preservation - ASBC 2020
20-F8 Valaspen Place South - Valaspen Dr, Aspen Cres Subdivision Preservation - ASBC 2020
20-F9 Weekend Estates - Groleau Dr, Jackfish Cres Subdivision Preservation - ASBC 2020
20-F10 Wesparkdale - Marion Cres Subdivision Preservation - ASBC 2020
20-F11 Willow Park - Willow Park Drive Subdivision Preservation - ASBC 2020
20-F12 Woodland Acres - Woodland Drive Subdivision Preservation - ASBC 2020
21-F1 Clearwater Estates - Robinson Dr, Allan Dr, Beaver Ave Subdivision Preservation - ASBC 2021
21-F2 Deer Park II - 1st & 2nd Ave, 1st & 2nd Street Subdivision Preservation - ASBC 2021
21-F3 Hubbles Lake - Diamond Dr, Diamond Rd Subdivision Preservation - ASBC 2021
21-F4 Lily Lake Estates - Michelle Dr, Michelle Cres, Michelle Close Subdivision Preservation - ASBC 2021
21-F5 Maude-West Acres Subdivision Preservation - ASBC 2021
21-F6 Pine Wood - Pine Wood Dr, West Rd Subdivision Preservation - ASBC 2021
21-F7 Whispering Pines - Whispering Pine Dr, Pine St, Spruce St, Valley Dr Subdivision Preservation - ASBC 2021
22-F1 Birch-Hill Park - Birch Hill Dr Subdivision Preservation - ASBC 2022
22-F2 Fernwood Estates - Fernwood Dr, Sudavian Cres Subdivision Preservation - ASBC 2022
22-F3 Garden Grove Estates - Lakeshore Dr Subdivision Preservation - ASBC 2022
22-F4 Grove Acres - Bruce Blvd Subdivision Preservation - ASBC 2022
22-F5 Landmark Estates - Downey Cres Subdivision Preservation - ASBC 2022
22-F6 Osborne Acres - Osborne Dr, Osborne Pl Subdivision Preservation - ASBC 2022
22-F7 Pine Valley V - Pine Cres Subdivision Preservation - ASBC 2022
22-F8 Sunset View Acres - Sunset Dr, Sunset Rd Subdivision Preservation - ASBC 2022
23-F1 Chickakoo Estates - Mitchell Dr, Chickakoo Dr Subdivision Preservation - ASBC 2023
23-F2 Grand River Valley Estates - Riverview Cres Subdivision Preservation - ASBC 2023
23-F3 Harder Acres - Harder Dr Subdivision Preservation - ASBC 2023
23-F4 Huntingdon Heights - Regency Cres Subdivision Preservation - ASBC 2023
23-F5 Meadow Run Estates - Meadow Rd Cul-de-sac Subdivision Preservation - ASBC 2023
23-F6 Prestige Heights - Prestige Dr, North Rd, South Rd Subdivision Preservation - ASBC 2023
23-F7 Valaspen Place North - Lakeview Ave, Main St Subdivision Preservation - ASBC 2023
23-F8 Westward Estates - Westward Dr Subdivision Preservation - ASBC 2023
23-F9 White Tail Acres - White Tail Way Subdivision Preservation - ASBC 2023
G0 G. WATER20-G1 Acheson Zone 4 Reservoir Expansion Construction 2020
20-G2 Walker Lake - Lakeshore Waterloop Design & Land Acquisition 2020
21-G1 Walker Lake - Lakeshore Waterloop Construction 2021
21-G2 Zone 4 Fill Line - Booster Station Construction 2021
22-G1 279th Street Water Loop & Hwy 16 Crossing Design & Land Acquisition 2022
22-G2 Entwistle Water Reservoir and Pumphouse Design & Land Acquisition 2022
23-G1 279th Street Water Loop & Hwy 16 Crossing Construction 2023
23-G2 Entwistle Hwy 16 X-ing Water Loop Design 2023
23-G3 Entwistle Water Reservoir and Pumphouse Construction 2023
H0 H. WASTEWATER20-H1 Acheson Zone 1 & 2 Pipe Rehabiliation Construction 2020
20-H2 Tomahawk Lagoon Rehabilitation Concept Design 2020
20-H3 Wastewater Rehabilitation - Entwistle 51A Street Concept Design 2020
20-H4 Entwistle Lagoon Rehabilitation Design & Construction 2020
21-H1 Tomahawk Lagoon Rehabilitation Design & Land Acquisition 2021
21-H2 Wastewater Main Level of Service - Acheson Zone 1, RR 264 & Twp 531A Design 2021
21-H3 Wastewater Rehabilitation - Entwistle 51Ast Street Design 2021
21-H4 Wastewater Rehabiliation - Entwistle South Lift Station Inlet Design & Construction 2021
22-H1 Tomahawk Lagoon Rehabilitation Construction 2022
22-H2 Wastewater Rehabilitation - Entwistle 51Ast Street Construction 2022
22-H3 Wastewater Main Level of Service - Acheson Zone 1, RR 264 & Twp 531A Construction 2022
23-H1 Wastewater Rehabilitation - CIPP Program (Not Mapped) Design & Construction 2023
23-H2 Wastewater Rehabilitation - Entwistle Forcemain Design 2023
23-H3 Wastewater Main Level of Service - Acheson Zone 4 to 3, Acheson Rd Design 2023
J. STORMWATER
20-J1 Fallis Drainage Improvements Design 2020
22-J1 Stormwater Rehabilitation/Replacement - Acheson Zone 3 Design 2022
23-J1 Stormwater Rehabilitation/Replacement - Acheson Zone 3 Construction 2023
23-A1
23-B1
23-B3
22-H1
22-B1
21-H1
21-A1
21-B1
20-H2
20-J1
20-H4
20-A1
23-F8
23-D6
23-F2
23-C6
23-F1
23-F9
23-F6
23-F7
23-F3
23-F523-D3
23-D5
23-C3
23-D1
23-C1
23-C523-C7
23-C4
23-D2
23-D4
23-C2
23-F4
22-C5
22-B322-D2
22-C4
22-D5
22-F4
22-F3
22-F5
22-F2
22-D4
22-F1
22-F7
22-C1
22-C3
22-C2
22-F8
22-A1
22-D322-D1
21-C4
21-F6
21-A6
21-F1
21-F7
21-D4 21-F3
21-F221-F4
21-C5
21-F521-D2
21-C321-D1
21-C2
21-C1
21-D3
21-C6
21-A321-A3
20-F820-D2
20-D4
20-C6
20-F1
20-D3
20-C5
20-F9
20-F7
20-F12
20-F4
20-F6
20-B2
20-F2
20-D6
20-F3
20-F11
20-D5
20-F5
20-D1
20-C7
20-F10
20-C4
20-C1
R.07
R.07
R.08
R.08
R.05
R.05R.06
R.06 R.01
R.01R.02
R.03
R.03R.04
R.02R.04 R.25
R.25
R.27 R.26
R.26R.27
R.28
R.28T.5
0T.5
1T.5
4T.5
5T.5
3T.5
2
T.51
T.52
T.54
T.50
T.55
T.53
RGE RD281
RGE RD42
RGE RD42
RGE RD22
RGE RD22
RGE RD60
RGE RD60
RGE RD64
RGE RD64
RGE RD63
RGE RD63
RGE RD80
RGE RD80
RGE RD65
RGE RD65
RGE RD70
RGE RD70
RGE RD51
RGE RD51
RGE RD50
RGE RD50
RGE RD15
RGE RD15
RGE RD14
RGE RD14
RGE RD274
RGE RD274
RGE RD71
RGE RD71
RGE RD72
RGE RD72
RGE RD35
RGE RD35
RGE RD73
RGE RD73
RGE RD74
RGE RD74
RGE RD75
RGE RD75
RGE RD81
RGE RD81
RGE RD10
RGE RD10
RGE RD62
RGE RD62
RGE RD21
RGE RD21
RGE RD273
RGE RD273
RGE RD265
RGE RD271
RGE RD271
RGE RD82
RGE RD82
RGE RD83
RGE RD83
RGE RD44
RGE RD44
RGE RD255
RGE RD255
RGE RD260
RGE RD260
RGE RD261
RGE RD261
RGE RD262
RGE RD262
RGE RD263
RGE RD263
RGE RD264
RGE RD264
RGE RD34
RGE RD34
RGE RD33
RGE RD33
RGE RD31
RGE RD31
RGE RD30
RGE RD30
RGE RD24
RGE RD24
RGE RD32
RGE RD32
RGE RD25
RGE RD25
RGE RD61
RGE RD61
RGE RD55
RGE RD55
RGE RD54
RGE RD54
RGE RD53
RGE RD53
RGE RD52
RGE RD52
RGE RD45
RGE RD45
RGE RD43
RGE RD43
RGE RD41
RGE RD41
RGE RD40
RGE RD40
RGE RD23
RGE RD23
RGE RD20
RGE RD20
RGE RD13
RGE RD13
RGE RD12
RGE RD12
RGE RD280
RGE RD280
RGE RD275
RGE RD275
RGE RD270
RGE RD270
RGE RD272
RGE RD272
RGE RD11
RGE RD11
RGE RD254
RGE RD254
TWP
RD53
0
TWP
RD53
0
TWP
RD53
5
TWP
RD53
5
TWP
RD53
4
TWP
RD53
4
TWP
RD53
3
TWP
RD53
3
TWP
RD52
3
TWP
RD52
3
TWP
RD53
1
TWP
RD53
1
TWP
RD52
2
TWP
RD52
2
TWP
RD52
1
TWP
RD52
1
TWP
RD52
0
TWP
RD52
0
TWP
RD51
3
TWP
RD51
3
TWP
RD51
5
TWP
RD51
5
TWP
RD51
4
TWP
RD51
4
TWP
RD54
0
TWP
RD54
0
TWP
RD52
5
TWP
RD52
5
TWP
RD52
4
TWP
RD52
4
TWP
RD54
2
TWP
RD54
2
TWP
RD51
1
TWP
RD51
1TWP
RD51
2
TWP
RD51
2
TWP
RD54
1
TWP
RD54
1
TWP
RD54
3
TWP
RD54
3TWP
RD54
4
TWP
RD54
4
TWP
RD55
0
TWP
RD55
0
TWP
RD54
5
TWP
RD54
5
TWP
RD51
0
TWP
RD51
0
TWP
RD50
3
TWP
RD50
3
TWP
RD50
5
TWP
RD50
5
TWP
RD50
4
TWP
RD50
4
TWP
RD53
2
TWP
RD53
2
TWP
RD50
2
TWP
RD50
2
0 5 10 152.5Kilometers
Legend2020202120222023 µ
Parkland CountyInfrastructure Program
2020 - 2023 Updated: 2020-03-04
As presented as part of the 2020 Final Budget - April 2020
20-C3
21-A5
22-B2
20-H3
21-H4
21-H3
22-G2
22-H2
23-G3
23-G223-H2
Entwistle Inset
See Inset
20-C2
21-A422-F6
23-B2
23-D7
20-G1
20-G220-H1
21-G2
21-H2
21-G122-H3
22-J1
22-G1
23-J123-H3
23-G1
Acheson Inset
See Inset
1. SURFACED ROAD RECONSTRUCTION
Suggested Guidelines for Criteria RatingsRating
Criteria 1-2
Guideline 3-4
Guideline 5-6
Guideline 7-8
Guideline 9-10
Guideline
1) Do Safety Elements and Existing Geometric Road Standards Require Improvement?
No Deficiencies Minor Alignment Problems or Sight
Distance Concerns.
Significant Deficiencies Related to
Alignment or Sight Distance, etc.
Major Deficiencies
Major Multiple Deficiencies
2) Are Maintenance Costs High? <$1,000/mile $1,000 to $2,000/mile
$2,000 to $3,000/mile
$3,000 to $4,000/mile
+$4,000/mile
3) Are Traffic Volumes High? 0-250 251-500 501-750 751-1000 +1000
4) Is this Project of Network Importance to the County?
Access Local Minor Collector Major Collector Arterial
5) Is this Project Environmentally and Socially Friendly?
Major Multiple Impacts
Major Impact Significant Impact Minor Impact Negligible Impact
6) Is there Ratepayer Consensus in the Vicinity of this Project?
Unanimous Opposition
Majority Opposition
Mixed Support/
Opposition
Majority Support Unanimous Support
7) Is Construction Technically and Economically Feasible?
Major Problems Serious Problems Average Difficulty Minor Problems Negligible Problems
Division Type Between Length Roadway Criteria Ratings
ROAD PROGRAM WORKSHEETUpdated Mar 2020
Surfaced Road Reconstruction List With Ratings
Number Name (km)
Safe
ty &
Sta
ndar
ds
(20%
)Main
tena
nce C
osts
(20%
)Tr
affic
Vol
ume (
25%
)Ne
twor
k Im
porta
nce
(10%
)Fr
iendl
ines
s (10
%)
Conc
ensu
s (10
%)
Feas
abilit
y (5%
)To
tal (
100%
) Comments
5 Reconstruction & ASBC Surfacing TWP 524 Mink Lake Road HWY 770- RR25 3.0 7 10 10 6 5 8 5 8.05 Grant Funding Required2 Widening & ACP Surfacing RR 274 Campsite Road TWP524-SG 1.6 4 6 10 8 4 8 4 6.70 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR263-270 4.8 5 4 10 7 7 6 6 6.60 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR270-273 4.892 5 4 10 7 7 6 6 6.60 Grant Funding Required4 Widening & ASBC Surfacing TWP 524 79TH Avenue RR12-15 4.8 3 6 10 10 5 6 4 6.60 Grant Funding Required6 Widening & ASBC Surfacing TWP 530 Sundance Road RR51-53 3.5 4 10 5 8 6 7 5 6.40 Grant Funding Required6 Widening & ASBC Surfacing TWP 530 Sundance Road RR53-60 5.0 4 10 5 8 6 7 5 6.40 Grant Funding Required
2 & 3 Widening & ACP Surfacing TWP 534 RR 271A to RR 274 6 5 10 4 10 6 5 5 6.35 Grant Funding Required2 & 3 Widening & ACP Surfacing TWP 534 RR 274 to Hwy 779 2.8 6 10 2 10 6 5 4 6.00 Grant Funding Required2 & 3 Widening & ACP Surfacing TWP 534 Hwy 44 to RR 271A 3.5 4 10 2 10 6 5 5 5.65 Grant Funding Required
3 Reconstruction & ACP Surfacing TWP 540 Hwy 779 - RR14 8 7 2 10 6 5 7 4 6.30 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 RR274-275 1.8 3 5 10 6 6 7 5 6.25 Grant Funding Required5 Reconstruction & ASBC Surfacing RR 41 TWP532-534 3.2 6 4 7 6 8 7 7 6.20 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 RR275-280 1.7 6 2 8 6 6 7 5 5.75 Grant Funding Required5 Reconstruction & ASBC Surfacing RR 32 Duffield Road TWP520-CN 7.9 8 2 6 9 4 6 4 5.60 Grant Funding Required4 Reconstruction & ASBC Surfacing SRS TWP532 RR13-13A 0.8 10 4 2 4 8 7 6 5.50 Grant Funding Required1 Widening & ACP Overlay TWP 511 Graminia Road RR261-263 3.2 5 2 8 6 6 6 4 5.40 Grant Funding Required3 Reconstruction & ASBC Surfacing TWP 540 SH779-RR280 1.2 4 2 8 6 5 6 5 5.15 Grant Funding Required1 Reconstruction & ASBC Surfacing RR 261 Fleming Road TWP511-512A 2.3 4 3 7 6 4 5 5 4.90 Grant Funding Required1 Widening & ACP Overlay TWP 514 Woodbend Road RR260-263 4.8 4 2 6 6 5 5 4 4.50 Grant Funding Required4 Reconstruction & ASBC Surfacing RR 21 Sundown Road CN-Parkland Dr. 1.6 7 1 5 4 3 5 4 4.25 Grant Funding Required
2020 Road Program Project
2021 Road Program Project Within 10 Years
2022 Road Program Project
2023 Road Program Project
2024 Road Program Project
2. GRAVEL RECONSTRUCTION
Suggested Guidelines for Criteria Ratings
Rating Criteria 1-2
Guideline 3-4
Guideline 5-6
Guideline 7-8
Guideline 9-10
Guideline
1) Do Safety Elements and Existing Geometric Road Standards Require Improvement?
No Deficiencies Minor Alignment Problems or Sight
Distance Concerns.
Major Deficiencies
Major Multiple Deficiencies
2) Are Maintenance Costs High? <$1,000/mile $1,000 to $2,000/mile
Significant Deficiencies Related to
Alignment or Sight Distance, etc.
$2,000 to $3,000/mile
$3,000 to $4,000/mile
+$4,000/mile
3) Are Traffic Volumes High? 0-50 51-150 151-250 251-400 +401
4) Is this Project of Network Importance to the County?
Access Local Minor Collector Major Collector Arterial
5) Is this Project Environmentally and Socially Friendly?
Major Multiple Impacts
Major Impact Significant Impact Minor Impact Negligible Impact
6) Is there Ratepayer Consensus in the Vicinity of this Project?
Unanimous Opposition
Majority Opposition
Mixed Support/
Opposition
Majority Support Unanimous Support
7) Is Construction Technically and Economically Feasible?
Major Problems Serious Problems Average Difficulty Minor Problems Negligible Problems
Division Type Between Length Roadway
ROAD PROGRAM WORKSHEETUpdated Mar 2020
Gravel Road Reconstruction Project List With Ratings
Criteria Ratings
Number Name (km)
Safe
ty &
Sta
ndar
ds
(20%
)
Mainte
nanc
e Cos
ts
(20%
)
Traf
fic V
olum
e (25
%)
Networ
k Im
porta
nce
(10%
)
Frien
dlin
ess (
10%
)
Conse
nsus
(10%
)
Feas
abilit
y (5%
)
Tota
l (10
0%) Comments
Column1 Column2 Column3 Column4 Column6 Column7 Column175 Full Reconstruction RR 41 TWP534-535 1.6 5 7 8 4 7 7 4 6.4 Grant Funding Required5 Reconstruction 2 locations + Drainage Repairs TWP 510 Correction Road RR45-50 1.6 8 10 4 8 6 7 1 6.75 Grant Funding Required5 Full Reconstruction RR 30 Meso Rd Cantebury Estates North 1.3 7 9 6 8 8 8 6.25 Grant Funding Required5 Full Reconstruction RR 22 TWP510-511 0.8 9 8 4 3 5 5 5 5.95 Grant Funding Required5 Full Reconstruction RR 35 Hwy 16 - TWP 533A 2.3 4 5 8 4 5 7 4 5.6 Grant Funding Required5 Full Reconstruction RR 30 TWP524A-Mayatan 2.6 6 7 4 4 7 6 5 5.55 Grant Funding Required4 Gravel Road Reconstruction Program TWP 510 Correction Road RR14-Everington Rd 0.3 5 7 4 4 7 7 5 5.45 Grant Funding Required6 Gravel Road Reconstruction Program TWP 522 Hwy 22 to Hwy 759 14.8 5 7 5 8 3 4 5 5.40 Grant Funding Required4 Full Reconstruction RR 11 Hwy 627 North 500m 0.5 5 7 4 4 6 7 4 5.30 Grant Funding Required
4 & 5 Full Reconstruction TWP 514 Woodbend Rd RR 20 to Hwy 770 4.8 7 8 2 4 5 5 8 5.30 Grant Funding Required4 Gravel Road Reconstruction Program RR 13 TWP512-513 0.5 4 7 4 4 7 7 6 5.30 Grant Funding Required6 Full Reconstruction TWP 512 RR75-80 1.6 5 7 4 3 7 6 6 5.30 Grant Funding Required6 Full Reconstruction TWP 512 RR74-75 1.6 5 7 4 3 7 6 6 5.30 Grant Funding Required6 Full Reconstruction RR 73 South of TWP 534 0.4 9 6 2 4 6 5 4 5.20 Grant Funding Required5 Full Reconstruction RR 42 TWP534-535 1.6 7 4 3 6 7 6 5 5.10 Grant Funding Required5 Full Reconstruction RR 31 TWP531-532 1.9 7 4 4 3 5 8 5 5.05 Grant Funding Required5 Full Reconstruction RR 44 Lakeshore-HWY 16 2.2 5 5 4 4 7 7 5 5.05 Grant Funding Required4 Full Reconstruction TWP 514 RR274-275 1.8 7 6 2 4 6 7 4 5.00 Grant Funding Required5 Full Reconstruction RR 43 Lakeshore-HWY 16 1.8 4 3 7 3 7 6 5 5.00 Grant Funding Required3 Construction TWP 532 RR13-14 0.8 6 4 4 4 6 7 5 4.95 Grant Funding Required6 Full Reconstruction TWP 530 RR70-71 1.8 6 4 3 6 6 7 4 4.85 Grant Funding Required4 Gravel Road Reconstruction Program RR 15 Twp 510 - 512 1.3 2 7 4 4 7 7 5 4.85 Grant Funding Required3 Full Reconstruction TWP 535 Chickakoo Rd RR12 - RR 13 1.8 8 4 4 4 3 5 3 4.75 Grant Funding Required4 Full Reconstruction RR 14 TWP510-512 0.7 5 8 2 4 5 5 5 4.75 Grant Funding Required5 Full Reconstruction RR 24 TWP511-512 1.5 7 4 3 3 6 6 6 4.75 Grant Funding Required4 Full Reconstruction RR 21 TWP512A-513A 1.6 8 6 2 3 4 5 4 4.70 Grant Funding Required6 Full Reconstruction TWP 531A SH759-RR61 2.0 7 3 4 3 5 7 4 4.70 Grant Funding Required3 Gravel Road Reconstruction Program TWP 534 RR280 - RR275 0.3 2 7 3 9 5 5 5 4.70 Grant Funding Required
4 & 5 Gravel Road Reconstruction Program RR 21 TWP511-512 0.7 2 8 4 4 5 5 5 4.65 Grant Funding Required3 Gravel Road Reconstruction Program RR 275 Boundary Rd Westbrook Cres to Twp 534 1.1 5 5 4 4 5 5 5 4.65 Grant Funding Required5 Full Reconstruction RR 31A RR31-TWP520, includes 515A 031A to 2.0 8 4 3 3 4 6 4 4.65 Grant Funding Required5 Gravel Road Reconstruction Program Lakeside Park Subdivison RR 25 4.1 4 7 3 4 5 5 5 4.60 Grant Funding Required6 Gravel Road Reconstruction Program RR 75 RR513 to RR511 0.4 4 7 3 4 5 5 5 4.60 Grant Funding Required4 Gravel Road Reconstruction Program RR 275 Twp 512-511 4 8 2 4 5 5 5 4.55 Grant Funding Required6 Full Reconstruction TWP 514 RR81-82 1.6 5 3 4 3 7 6 6 4.50 Grant Funding Required6 Full Reconstruction TWP 524 RR72-73 1.6 4 3 4 5 7 6 6 4.50 Grant Funding Required
1 & 4 Gravel Road Reconstruction Program TWP 510 RR273 (N) - RR 275 (S) 1.1 5 5 3 5 5 5 5 4.50 Grant Funding Required3 Full Reconstruction RR 13 TWP535-540 1.8 8 4 4 3 3 3 3 4.45 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 Hwy 627 - Twp 514 3.2 4 5 4 4 5 5 5 4.45 Grant Funding Required4 Gravel Road Reconstruction Program RR 11 TWP 512 - 511 0.7 4 5 4 4 5 5 5 4.45 Grant Funding Required6 Full Reconstruction RR 73 TWP514-520 0.2 5 4 4 4 5 5 5 4.45 Grant Funding Required6 Gravel Road Reconstruction Program TWP 520 RR72-73 1.6 5 4 4 4 5 5 5 4.45 Grant Funding Required6 Gravel Road Reconstruction Program TWP 510 RR80-81 1.6 5 5 3 4 5 5 5 4.40 Grant Funding Required5 Full Reconstruction TWP 514 RR43-45 3.2 7 3 2 3 8 5 6 4.40 Grant Funding Required6 Full Reconstruction TWP 540 RR64A-SH757 0.8 6 4 2 3 7 6 6 4.40 Grant Funding Required6 Full Reconstruction RR 65 SH757-TWP545A 0.8 7 4 1 3 7 6 6 4.35 Grant Funding Required3 Full Reconstruction RR 11 TWP541-SH633 1.6 7 2 2 3 7 7 6 4.30 Grant Funding Required5 Full Reconstruction TWP 522 RR22-SH770 1.8 9 4 3 3 2 3 2 4.25 Grant Funding Required4 Full Reconstruction RR 14 TWP512-513A 2.4 7 4 1 4 8 3 5 4.20 Grant Funding Required2 Full Reconstruction RR 272 Century Road TWP514-520 3.2 4 3 3 4 7 6 7 4.20 Grant Funding Required1 Full Reconstruction RR 275 TWP504-510 3.0 3 3 4 4 7 7 4 4.20 Grant Funding Required4 Gravel Road Reconstruction Program RR 13 RR505 - 510 0.9 5 5 2 4 5 5 5 4.15 Grant Funding Required4 Gravel Road Reconstruction Program TWP 514 Woodbend Rd RR11-12 0.2 5 5 2 4 5 5 5 4.15 Grant Funding Required2 Full Reconstruction RR 271 Pioneer Road TWP524-530 3.2 3 3 4 3 7 6 5 4.05 Grant Funding Required4 Gravel Road Reconstruction Program RR 15 TWP514 to Hwy 627 0.8 2 5 4 4 5 5 5 4.05 Grant Funding Required4 Gravel Road Reconstruction Program RR 20 TWP510-511 0.8 2 5 4 4 5 5 5 4.05 Grant Funding Required5 Full Reconstruction RR 22 TWP522-523A 2.7 9 4 2 3 2 3 2 4.00 Grant Funding Required4 Gravel Road Reconstruction Program RR 13 TWP513-514 0.3 2 5 3 4 5 5 5 3.80 Grant Funding Required
2020 Gravel Road Reconstruction Program Candidates
2020 Road Program Project
2021 Road Program Project
2022 Road Program Project
2023 Road Program Project
within 10 years