16
1 AFCEA Belvoir Industry Days Mr. Joseph Bucci – April 4, 2018

AFCEA Belvoir Industry Days - fbcinc.com · integration onto combat platforms to meet and exceed system of systems requirements ... Mr. Mark O’Neill $600M to $950M ACC APG Kevin

  • Upload
    dangtu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

1

AFCEA Belvoir Industry Days

Mr. Joseph Bucci – April 4, 2018

2

MISSION: Deliver capability now through affordable and adaptable programs that pace the threat.

VISION: Outpace the threat with technical excellence, adaptability and rapid solutions that support a broad range of operating environments.

2

Threat Driven,Customer Focused,Decisive Innovation

3

Across the PEO IEW&S Portfolio

PM ASE Develop and field aircraft survivability systems to maximize survivability of Army aircraft without degrading combat mission effectiveness.

PM DCGS-A Support the Army’s ISR mission for processing, exploitation, and dissemination (PED) of information and intelligence data across echelons.

PM EW&CAcquire integrated Intelligence, Electronic and Cyber Warfare capabilities to provide Spectrum and Cyberspace Superiority and enable freedom of maneuver on the Battlefield.

PM SAIDevelop, acquire, field, and supply life cycle support to modernized, integrated, and tactically relevant aerial ISR sensor and sensor processing payloads.

PM DOD BiometricsDesign, engineer, acquire, deploy, and sustain enterprise biometric solutions in multiple operating environments enabling identity dominance on the battlefield and across the DOD.

PM TSProvide sensors for enhanced situational awareness and decisive action and Integrated Base Defense

Sensor and Sensor Processing Systems across the PEO portfolio enable ISR, Intelligence production, Integrated Base Defense, Force Protection

PM PNTPositioning, Navigation and Timing leads the Army in developing and integrating PNT technology and also collaborates with the other Department of Defense (DoD) Services to deliver interoperable, reliable products.

PD TENCAPEnable the Army to rapidly exploit and influence national capabilities and architectures and conduct advanced development and rapid prototyping to enhance and inform Army capabilities and CONOPS to pace the threat.

4

PEO IEW&S Focus

• Provide agility and flexibility into executing IEW&S programs

• Aggressively and effectively execute and control programs

• Deliver capabilities in a contested environment

• Better inform program decisions for Army leadership

• Inform Acquisition life-cycle with the latest intelligence

• Thank our organizational teams and cultivate our stakeholder partnerships

Enabling Readiness, Modernization, Future Force

Focus Areas

5

PEO IEW&S Acquisition Imperatives

Rapid Acquisition Enabled by Open, Adaptable Programs to Combat Complexity− PEO IEW&S Leading Threat Agile Solutions− Streamlined Acquisition Process Focused on Small, Frequent Releases of Capability− Early and Frequent Involvement with System Users and Small, Qualified, Dynamic Teams will be

critical components to rapid acquisitions of complex systems

JUONS/ONS EW & Offensive Cyber PNT/Space Aerial ISR Aircraft Survivability

• A shift toward Rapid Acquisition is required to keep pace with the threat and enable relevant technologies in complex systems.

6

Dismounted MfT

Dismounted MfT

Collection / SurveyDirection-Finding

Terrestrial Multi-Function Teams

Tactical QuestioningSite Exploitation

(Biometrics & Forensics)

Defensive Electronic Attack

Multi-Function EW (MFEW)Mounted

Aerial

Fixed Site

•Counter Fire•Counter UAS

•Precision Munitions•Kinetic & Non-Kinetic

Effects

FIRES

• Detect, identify, precision locate, and exploit enemy

communications• Process, collaborate, and

disseminate Intelligence

INTEL

•Corrupt or Usurp AdversaryDecision Making While

Protecting Our Own

IO

CYBERSPACE OPERATIONS

• Defensive Cyber Ops (DCO)• Offensive Cyber Ops (OCO)

• DoD Information Network Ops (DINO)ELECTRONIC

WARFARE (EW)• Electronic Attack (EA)• Electronic Protect (EP)

• Electronic Warfare Support (ES)

SIGNAL• EW Planning & Management

Tools (EWPMT)• Spectrum Management (SM)

• RF Interference Mitigation (RIM)•Spectrum Management

Ops (SMO)CEMA

Dismounted

Offensive Cyber

Offensive Electronic Attack

Nested Offensive Cyber

7

Challenges Across the Portfolio

AcquisitionAcquisition methodology

(Rapid Contracting, Adaptable Programs, etc.) should match

the mission need

Positioning, Navigation and Timing (PNT)

Rapid delivery of precise location and desired position while acquiring and maintain

accurate standard time

Intel CommunitySynchronize with National

space capabilities to support tactical operations

ModernizationModernize manned and unmanned Aerial and Terrestrial ISR sensor

capabilities

Electronic Warfare

IntegrationDevelop & enhance integrated electronic warfare capabilities

Intel ProcessingEnhance intelligence processing, Tasking-

Processing Exploitation & Dissemination (T-PED), and Intelligence Community (IC)

convergence capabilities

Offensive CyberImprove tactical offensive

cyber capabilities for communities of interest

Next Generation FLIR Imaging

3rd Generation FLIR integration onto combat

platforms to meet and exceed system of systems

requirements

Leverage Our Partnerships Today to Address Tomorrow’s Problems & Outpace the Threat

8

Industry Partnership

Open, continuous feedback, better industry day events, and smarter,

mission-focused contracts.

Need your help with timely,

qualified proposals.

Expect aggressively managed programs and contract performance

accountability (delinquency notices and CPARS). More use of

liquidated damages involving national security contracts and incentives.

Expect longer-term contracts (min 5 years) and leveraging COTS/NDI (see

new Department guidebook).

9

*The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid of request for proposal, and is not a commitment by the government to purchase the desired products and services.

PM - Product Effort Title PM Lead Estimated Value

Contracting Activity

Contracting Officer

Estimated Solicitation

Date

Estimated Award Date

DCGS-A-Fielding and

Training

Field Office Fort Hood Fielding and Training

LTC Shawanta Smart $200M to $260M ACC APG James Farnsworth

443-861-4754 2nd Qtr FY 18 4th Qtr FY 18

ASE Logistics Support Services Mr. Adam Kimbro $15M to $30M ACC Redstone TBD 3rd Qtr FY 18 2nd Qtr FY 19

DCGS-A-Capability Drop

DCGS-A Capability Drop 2 Data Warehouse Support

LTC Matthew Paul $50M to $100M ACC APG James Farnsworth

443-861-4754 3rd Qtr FY 18 1st Qtr FY 19

EW&C-EA MFEW Air Large OTA Mr. Chris Addison $60M to $110M TBD TBD 3rd Qtr FY 18 1st Qtr FY 19

PNT Mounted and Anti-Jam System (AJAS) OTA

MAJ Zachary Denton $30M to 60M ACC-NJ TBD 3rd Qtr FY 18 1st Qtr FY 19

PNT Dismounted A-PNT Prototypes OTA

MAJ Zachary Denton $25M to 50M ACC-NJ TBD 3rd Qtr FY 18 1st Qtr FY 19

PNT Pseudolite Prototypes OTA MAJ Zachary Denton $30M to 56M ACC-NJ TBD 3rd Qtr FY 18 1st Qtr FY 19

TS-AEROSTATSPSS-T Follow-On -

Engineering, Logistics and Operations Support

Mr. Matt Chellin $900M to $990M ACC APGJennifer

Mattessino443-861-4772

3rd Qtr FY 18 3rd Qtr FY 19

TS-FPS NIIS Tactical Sustainment LTC Beire Castro $90M to $130M ACC APG Belvoir

Sabin Joseph703-704-0826 3rd Qtr FY 18 1st Qtr FY 19

TS-FPS IBD-SS Sustainment Services LTC Beire Castro $800M to $1B ACC APG Belvoir

Undra Robinson703-704-0813 3rd Qtr FY 18 3rd Qtr FY 19

Industry Contracting Opportunities

10

*The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid of request for proposal, and is not a commitment by the government to purchase the desired products and services.

PM - Product Effort Title PM Lead Estimated Value

Contracting Activity

Contracting Officer

Estimated Solicitation

Date

Estimated Award Date

PEO HQ Systems Engineering and Technical Assistance Support Ms. Kailyn Bloom $10M to $30M ACC APG Carla D’Errico

443-861-5357 4th Qtr FY 18 3rd Qtr FY 19

TENCAPTENCAP RF Exploit, Enhance, Enable, and Influence Follow-

On

Mr. Timothy Roseberry

$230M to $480M GSA TBD 4th Qtr FY 18 1st Qtr FY 19

TS-FPS G-BOSS(E)

Component Heavy Mobile Trailer

LTC Beire Castro $60M to $80M ACC APG BelvoirRosetta Wisdom-

Russell 703-704-0826

4th Qtr FY 18 2nd Qtr FY 19

TS-FPS G-BOSS(E)

Component Payload - Radar (RF Sensor)

LTC Beire Castro $10M to $40M ACC APG BelvoirRosetta Wisdom-

Russell 703-704-0826

4th Qtr FY 18 3rd Qtr FY 19

TS-FPSG-BOSS(E)

Electro-Optic/Infrared Imager Component

LTC Beire Castro $40M to $90M ACC APG Belvoir Sabin Joseph703-704-0826 4th Qtr FY 18 3rd Qtr FY 19

Biometrics-BAT-A

Next Generation Biometrics Collection Capability

(NXGBCC)Mr. Brian Likens $100M to

$140M ACC APG Ercilia Del Orbe443-861-5389 1st Qtr FY 19 3rd Qtr FY 19

DCGS-A Systems Engineering and Technical Assistance Support Mr. Alvin Horhn $20M to $60M ACC APG Carla D’Errico

443-861-5357 1st Qtr FY 19 3rd Qtr FY 19

DCGS-A-JTT JTT-Next Generation Mr. Ned Rhianhard

$100M to $150M ACC APG James Farnsworth

443-861-4754 1st Qtr FY 19 3rd Qtr FY 19

Industry Contracting Opportunities

11

*The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid of request for proposal, and is not a commitment by the government to purchase the desired products and services.

PM - Product Effort Title PM Lead Estimated Value

Contracting Activity

Contracting Officer

Estimated Solicitation

Date

Estimated Award Date

SAI-MARSSSensors, Aerial Manned –

Intelligence, Surveillance and Reconnaissance (SAM-ISR)

LTC Sean Smith $800M to $1.2B ACC APG Abigail Jordan (443) 861-5373 1st Qtr FY 19 3rd Qtr FY 19

SAI-ARLAirborne Reconnaissance Low

Systems Support (PASS) Follow-On

Mr. Mark O’Neill $600M to $950M ACC APG Kevin Cook

(443) 861-5362 1st Qtr FY 19 3rd Qtr FY 19

ASE-Missile Warning

CIRCM Full Rate Production A-Kit

LTC Rodney Turner $90M to $150M ACC Redstone TBD 2nd Qtr FY 19 3rd Qtr FY 20

TS-CTISEmbedded SAASM Global Positioning System-Survey

(GPS-S)

Mr. George Ohanian $20M to $45M GSA Julie Anderson

703-428-6272 2nd Qtr FY 19 4th Qtr FY 19

TS-GS

Third Generation Forward Looking Infrared Long Range Advanced Scout Surveillance

System (3GEN LRAS3)

LTC Scott Madore $40M to $75M ACC APG Belvoir TBD 2nd Qtr FY 19 1st Qtr FY 20

SAI-MARSSSOCOM Tactical Airborne

Multi-Sensor Platforms (STAMP) Follow-On

LTC Sean Smith $350M to$650M ACC APG Abeer Ameer

(443) 861-5363 3rd Qtr FY 19 2nd Qtr FY 20

SAI SETA Follow-On Support Mr. Gregg Pisani $25M to $50M ACC APG Paul Kurzer 443-861-5368 3rd Qtr FY 19 2nd Qtr FY 20

Industry Contracting Opportunities

12

*The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid of request for proposal, and is not a commitment by the government to purchase the desired products and services.

PM - Product Effort Title PM Lead Estimated Value

Contracting Activity

Contracting Officer

Estimated Solicitation

Date

Estimated Award Date

TS-AEROSTATS RSLF FMS Mr. Matt Chellin $600M to $800M ACC APG

Jennifer Mattessino

443-861-47724th Qtr FY 19 3rd Qtr FY 20

EW&C-EARF Interference Mitigation

(RIM) Interference Canceller Heavy (IC Heavy)

Mr. Chris Addison $5M to $15M TBD TBD 2nd Qtr FY 20 4th Qtr FY 20

TS-CTIS Automated Integrated Survey Instrument (AISI)

Mr. George Ohanian $20M to $40M GSA Julie Anderson

703-428-6272 2nd Qtr FY 20 4th Qtr FY 20

TS-CTIS ENFIRE Upgrade/Tech Refresh

Mr. George Ohanian $40M to $75M GSA Julie Anderson

703-428-6272 4th Qtr FY 20 2nd Qtr FY 21

Industry Contracting Opportunities

13

Back Up

America’s Force of Decisive Action

14

PEO IEW&S Locations

Los Angeles, CA• PM PNT

Fort Belvoir & Surrounding VA Area• PM Biometrics• PM DCGS-A• PM Terrestrial Sensors• PD TENCAP

Fort Gordon, GA• LNO Cyber CoE

Huntsville &Surrounding AL Area• PM ASE• PM TS• PM EW&C

APG & Surrounding MD Area• PEO IEW&S HQ• PM DCGS-A• PM EW&C• PM Sensors – Aerial Intelligence• PM PNT • PM Terrestrial Sensor

IRAQ KUWAITAFGHANISTAN

Fort Bliss, Texas NIE

Fort Meade, MD• PdM IW

Fort Huachuca, AZ• LNO Intel CoE

15

24 Feb 2016

PM ASE PM BIOMETRICS

PEO IEW&S PortfolioPM DCGS-A PM EW&C

* Pre-Program Initiation† Quick Reaction Capability^ Project

DCGS‐A• DCGS‐A F&T• DCGS‐A CD’s 1‐7• DCGS‐A Lite †• Palantir † 

Machine Foreign Language Translation Systems (MFLTS)• MFLTS

Counterintelligence/ Human Intelligence Automated Reporting and Collection System (CHARCS)• CHARCS

Joint Tactical Terminal (JTT)• JTT

IR Countermeasures• Advanced Threat Infrared Countermeasure (ATIRCM)

• Advance Threat Warner & Common Infrared Countermeasure (ATW/CIRCM) †

• Common Infrared Countermeasure (CIRCM)

Missile Warning• Common Missile Warning System (CMWS)

• Limited Interim Missile Warning System (LIMWS) †

Threat Warning• APR‐39 Radar Warning Receiver (RWR)

• Laser Detection System (LDS) AN/AVR‐2B(V)

Quick Reaction Capability • ATW/DoN LAIRCM †

ACAT I (red)ACAT II (blue)ACAT III (green)ACAT IV (Purple)

Biometrics Enabling Capability (BEC)• Biometrics Enabling Capability (BEC) Inc0

• Biometrics Enabling Capability (BEC) Inc1 *

Biometrics Collection Capability (BCC)• Biometrics Automated Toolset ‐ Army (BAT‐A)

• Next Generation Biometric Collection Capability (NXGBCC)

Electronic Attack (EA)• Counter RCIED Electronic Warfare (CREW)/Duke

• Multi‐Function Electronic Warfare (MFEW‐Air Large)

• Thor III †• Baldr †• Universal Test Set (UTS) †• GATOR †

Electronic Warfare Integration (EWI)• Electronic Warfare Planning and Management Tool (EWPMT)

• RIM ^

Information Warfare (IW) 

Prophet• Prophet • EW Capabili es for USAREUR †• Terrestrial Layer Support*• Wol ound †

16

24 Feb 2016

PM PNT PM SAI

PEO IEW&S PortfolioPD TENCAP PM TS

* Pre-Program Initiation† Quick Reaction Capability^ Project

ACAT I (red)ACAT II (blue)ACAT III (green)ACAT IV (Purple)

Medium Altitude Reconnaissance and Surveillance System (MARSS)• Enhanced Medium Altitude  Reconnaissance and Surveillance System (EMARSS)

• Guardrail Common Sensor System (GRCS)

• Medium Altitude Reconnaissance and Surveillance System (MARSS) †

Aerial Reconnaissance Low (ARL)• Airborne ReconnaissanceLow‐Enhanced (ARL‐E)

• Airborne Reconnaissance Low‐MULTINT (ARL‐M)

• Saturn Arch † 

Sensors‐Unmanned & Rotary Wing (SURW)• Small Tactical Radar Lightweight (STARLite)

• Tactical Signals Intelligence Payload (TSP)

• Air Vigilance (AV)Aerostats• Joint Combat Identification Marking System (JCIMS)• Persistent Surveillance System – Tethered (PSS‐T)• Una ended Transient Acous c MASINT Sensor (UTAMS) †Counter Explosive Hazards (CEH)• Husky Mounted Detection System (HMDS)• HMDS Wire Detect †Combat Terrain Information System (CTIS)• Automated Integrated Survey Instrument (AISI)• Global Positioning System‐Survey (GPS‐S)• Instrument Set, Reconnaissance and Surveying (ENFIRE)Electro‐Optical/Infrared (EO/IR) Payloads• Common Sensor Payload (CSP)• MX Sensors ^• Shadow Payloads ^Force Protection Systems (FPS)• Automated Installation Entry (AIE) ^• Battlefield Anti‐Intrusion System (BAIS)• Combat Outpost Surveillance Force Protection System(COSFPS) †• Entry Control Point (ECP) †• Ground Based Operational Surveillance System – Expeditionary (G‐BOSS(E)

• Integrated Base Defense (IBD) Ki ng †• Integrated Commercial Intrusion Detection System (ICIDS)• Integrated Ground Security, Surveillance Response ‐ Capability (IGSSR‐C)

• Joint Defense Operations Center/Joint Situational Awareness System (JDOC/JSAS) †

• Lighting Kit Motion Detector (LKMD)• Non Intrusive Inspec on System (NIIS) †• Rapid Reac on Tunnel Detec on (R2TD) †• Rapid Deployment Integrated Surveillance System (RDISS) †• Counter Vehicle Borne Improvised Explosive Device (CVBIED) †• Base Expeditionary Targeting Surveillance System‐ Combined (BETSS‐C) †

• Bi‐static Surveillance System (BSS) †• Persistent Surveillance and Dissemination System of Systems (PSDS2) †

• Tactical Security System (TSS) Ground Sensors (GS)• 2nd Generation Forward Looking Infrared (FLIR)• 3rd Generation Forward Looking Infrared (3GEN FLIR)• Close Access Target Reconnaissance (CATR)• Driver’s Vision Enhancer (DVE)• Expendable Unattended Ground Sensors (E‐UGS) †• Fixed Site Sniper Detection System (FSSDS) †• Gunshot Detec on System (GDS) †• Long Range Advanced Scout Surveillance System (LRAS3) • Vehicle Optics Sensor System (VOSS)• Una ended Transient Acous c MASINT Sensor (UTAMS) †

Mounted PNT• Mounted*• Anti‐Jam Antenna*

Pseudolites• Pseudolite*• Dismounted*

Resiliency & Software Assurance Measures (RSAM)• Resiliency & Software 

Assurance Measures (RSAM)