33
CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and Ground Networks Final Presentation ESTEC, Noordwijk 2 June 2005 Jolyon Reburn Remote-Sensing Group Earth Observation and Atmospheric Science Division, SSTD Rutherford Appleton Laboratory

CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

Embed Size (px)

Citation preview

Page 1: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

CAPACITYOperational Atmospheric Chemistry Monitoring Missions

ESA contract no. AO/1-4273/02/NL/GS

Assessment of Existing and Planned Space Missionsand Ground Networks

Final PresentationESTEC, Noordwijk

2 June 2005

Jolyon Reburn

Remote-Sensing GroupEarth Observation and Atmospheric Science Division, SSTD

Rutherford Appleton Laboratory

Page 2: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 2

Assessment of Existing and Planned Space Missions and Ground Networks

• Consortium• Outline and Context• Space Programmes for Atmospheric Sounding• Assessment of Instruments

– Observation Techniques– Instrument Data– Analysis Method

• Capabilities and Limitations of MetOp/NPOESS & other Planned Missions

• Summary and Conclusions

Content

Page 3: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 3

Co-ordinator J.Reburn, RAL

Ground-based Networkstrace gases M. de Maziere, BIRA

aerosol F-M. Breon, LSCE

Satellite Obervationsnadir-uv/vis/nir/swir H. Bovensmann, M. Weber, IUP

R. Jongma, I. Aben, A. Maurellis, SRON;R. Siddans, RAL

passive nadir aerosol F-M. Breon LSCE, C. Poulsen RAL

nadir-mir C. Clerbaux CNRS

lidar F-M. Breon LSCE

limb-mm/sub-mm N. Lautie, RSS; C. Verdes, IFE; V.Jay, RAL

limb-mir G. Stiller, IMK; J. Remedios, UL

limb-uv/vis/nir/swir H. Bovensmann, C v Savigny, IUP

occultation C. Clerbaux, CNRS; H. Bovensmann, IUP

Instrument Consortium

Page 4: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 4

The task was to examine and assess the capabilities of existing and planned :

– Space Missions

– Ground-based Networks

To set the context for the space-borne elements a review of future programmes, relevant to atmospheric sounding, by European and other national agencies was also carried out.

Outline and Context

Page 5: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 5

• The “Instrument Team” provided instrument performance data

• The capabilities of instruments were assessed quantitatively against requirements

Note: The data requirements in this study are defined for longer term “monitoring” purposes

In this context the operational satellite observing system, comprising the European MetOp and the American NPOESS missions, is the foundation, and therefore merits particular attention.

Outline and Context

Page 6: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 6

Space Programmes

Page 7: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 7

• Space agencies are continually developing new programmes including both

– research missions (e.g. ESA, NASA) – operational missions (e.g. EUMETSAT, NOAA)

• In the context of this study, the latter are more relevant, although research programmes will also contribute to atmospheric monitoring

Space Programmes

Page 8: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 8

• ESA/EU GMES Sentinel Programme– CAPACITY study directed to this

• EUMETSAT post-MSG and -EPS Programmes• ESA Explorer Programme

– 6 approved missions• NASA ESSP

– follow on from EOS Aqua, Terra, Aura• NPOESS (US)

– NPP + 6 operational systems• Other National Agencies e.g. JAXA (Japan)

Space Programmes

Page 9: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 9

Assessment of Instruments

Page 10: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 10

• Ground Networks

– trace gases (O3 sondes, photometers, chromatographs …)

– aerosol (spectral radiometers …)

• Satellite Observations– nadir-uv/vis/nir/swir– passive nadir-sounding of aerosol– nadir-mir– lidar– limb-mm/sub-mm– limb-mir– limb-uv/vis/nir/swir– occultation

Observation Techniques

Page 11: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 11

The “Instrument Team” provided– instrument descriptions– performance data (where available) and references

Performance data was collected for products that are or are likely to be produced routinely

The data included:• Horizontal resolution, horizontal sampling • Temporal sampling / revisit time• Profile of vertical resolution and uncertainty • Author and source reference

Instrument Data

Page 12: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 12

Approach:

• For the ground network and current satellite missions, standard demonstrated sensor performances were used

• For future satellite missions they were estimated from contemporary missions and retrieval simulations supplied to the study team from other projects

Instrument Data

Page 13: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 13

• Instrument capabilities analysed for all 9 user application areas in tables which directly mirror the Data Requirement Tables

• Analyses vs. requirements were carried out for

– Each instrument• By individual applications• By theme (Ozone, Air Quality, Climate)

– Satellite missions, comprising several instruments

• 9 application areas → ~130 product requirements → >35 instruments → 264 pages of tables

Analysis Method

Page 14: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 14

Analysis Method

Page 15: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 15

Analysis Method

Page 16: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 16

• Requirements met partially – capability matches the least demanding

requirement (also referred to as threshold)• Requirements met fully

– means that the most stringent requirement (or target) is met

(NOTE: requirements and capabilities given as ranges so different levels of agreement possible)

Analysis Method

Page 17: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 17

Analysis Method

Page 18: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 18

Capabilities & Limitations of MetOp/NPOESS

and other Planned Missions

Page 19: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 19

Capabilities of MetOp/NPOESS & other planned missions

Page 20: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 20

Water Vapour

• MetOp/NPOESS sounding adequate in lower trop.• Will not provide useful H2O data above tropopause and

vertical resolution in upper troposphere will not be sufficient for some applications

Aerosol & Cloud

• Imagers in polar and geo orbit will provide geographical coverage, aerosol optical thickness, size and other parameters.

• APS on NPOESS will deliver additional aerosol parameters (e.g. ref. index, single scatter alb.) along track

• Active instruments will provide tropospheric vertical profiles, although design lifetimes are relatively short

Capabilities of MetOp/NPOESS & other planned missions

Page 21: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 21

Ozone

• MetOp/NPOESS will provide observations to monitor stratospheric and total column O3

• Tropospheric O3 retrieval, demonstrated for GOME-1. Simulations indicate improvement possible from addition of IASI/CrIS (FTIR) to GOME-2/OMPS (uv)

• The operational system will provide uv/vis observations at 2 local times: ~09:30 (GOME-2), ~13:30 (OMPS)

Capabilities of MetOp/NPOESS & other planned missions

Page 22: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 22

Carbon Dioxide

• The FTIR spectrometers on MetOp, NPOESS and GOSAT will also observe CO2, and the near-IR grating spectrometer on OCO is designed specifically to do so

• Whether these observations will meet the stringent requirements defined in CAPACITY is TBD

Capabilities of MetOp/NPOESS & other planned missions

Page 23: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 23

Trace gases other than H2O, O3 and CO2

• MetOp and NPOESS uv/vis sensors: – trace gas total columns will be derived

i.e. NO2, SO2, H2CO and BrO

– stratospheric limb-observations by OMPS may also offer BrO and NO2 information

• The operational system will provide uv/vis observations at only two local times (9:30am for GOME-2 and 13:30 for OMPS)

Capabilities of MetOp/NPOESS & other planned missions

Page 24: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 24

• MetOp and NPOESS FTIR sensors:

– several trace gases in addition to H2O and O3 will be measured e.g. CH4 and CO

– height-assignment/resolution intrinsically limited

– sensitivity lowest in boundary-layer (except H2O), because T contrast with surface is lowest

• Sensors will operate concurrently in (at least) two orbits, so observations will be made at four local times per day (equator crossing times: 01:30, 09:30, 13:30 and 21:30)

– Given the photochemical lifetimes of CH4 and CO, non-compliance on temporal sampling less critical than for short-lived pollutants measured in uv/vis

Capabilities of MetOp/NPOESS & other planned missions

Page 25: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 25

Limitations of MetOp/NPOESS & other planned missions

Page 26: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 26

• The ground-based networks provide measurements of many of the required products and uncertainty and time-sampling/revisit requirements are met in most cases.

• The capabilities of these networks is likely to continue to play an important part in monitoring the atmosphere.

• It is, however, clear from the assessment that there is, in general, a lack of altitude attribution and that some height ranges are not well addressed.

• In many cases only surface, partial column or low-vertical-resolution profiles are provided, whereas high-vertical-resolution profiles are often specified in the requirements.

• It should be noted that aerosols, particulates, tracers and some organic compounds are not appropriately addressed for several applications.

Ground-based Networks

Page 27: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 27

Summary

&

Conclusions

Page 28: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 28

• The ground network, current satellite missions and new satellite missions planned for 2010-2020 were reviewed to evaluate their contributions to monitoring of atmospheric composition.

• The review confirmed that the ground networks and satellite missions planned for 2010-2020 would make valuable contributions to atmospheric composition monitoring in that period.

However, the review also identified a number of limitations which can be summarised as follows:

Summary & Conclusions

Page 29: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 29

• Spatio-temporal sampling of the boundary layer by MetOp and NPOESS is too sparse to comply with the stringent requirements for air quality applications.It is limited by two factors: 1. ground-pixel size

determines how frequently observations can be made between clouds

2. equator crossing times

observations of O3 and short-lived pollutants NO2, H2CO and SO2 will be made at ~9:30am (GOME-2 and ~1:30pm (OMPS), but not later in the day, which would be:

(a) necessary for attribution of afternoon pollution episodes and (b) closer to early morning air quality forecast time

Summary & Conclusions

Page 30: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 30

• Spectral coverage needed at swir wavelengths, i.e. longer than GOME-2 and OMPS, to:

(a) improve MetOp/NPOESS sensitivity to CH4

(and CO) in the boundary layer and (b) resolve tropospheric aerosol into several layers

– needed for climate and air quality applications

• To target tropospheric trace gases (e.g. non-methane hydrocarbons) additional to those measured by IASI and CrIS, a nadir mid-infrared (FTIR) instrument with higher spectral resolution would be needed, i.e. similar to TES.

Summary & Conclusions

Page 31: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 31

• Requirements for sounding trace gases and aerosol in the upper troposphere and stratosphere will not be addressed at all by MetOP or NPOESS, except for:

– stratospheric O3 (GOME-2 & OMPS)

– stratospheric aerosol (OMPS)

– (possibly) stratospheric NO2 and BrO (OMPS)

• These requirements are currently being addressed by the Odin, Envisat and Aura limb-sounders, but none of these are likely to still be functioning beyond 2010.

Summary & Conclusions

Page 32: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 32

• No UV-VIS or IR solar occultation sensors for long-term monitoring of stratospheric trace gas and aerosol profiles are currently planned after MAESTRO and ACE on SCISAT, which are unlikely to still be functioning beyond 2010.

• The vertical resolution of ground based sensors is not sufficient in a number of cases to meet requirements placed on them for profile measurements.(It should be noted that sensors on airborne platforms may meet the vertical resolution requirements in some height ranges, but these have not been examined quantitatively in this study.)

Summary & Conclusions

Page 33: CAPACITY Operational Atmospheric Chemistry Monitoring Missions ESA contract no. AO/1-4273/02/NL/GS Assessment of Existing and Planned Space Missions and

2 June 2005 CAPACITY Final Presentation 33

Thank you