AEEE Presentation Armstrong July 2018 1

1

Canadian sales

June 15, 2017

Page 2: Canadian sales June 15, 2017

Armstrong Fluid Technology − Established 1934

Page 3: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 3

Armstrong Fluid Technology - Manufacturing Center

•An ISO 14001:2015 certified

•An ISO 9001 : 2015 certified

•Approved UL FM manufacturing

facility for fire packages

•Advanced performance testing

facility as per international

standards

• NPSH tests facility

• Also testing of Fluid Management

System packages

Page 4: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 4

Armstrong Fluid Technology - Foundry

• An ISO 14001:2015 certified

• An ISO 9001:2015 certified

• Bronze cast parts from 1lbs to 500 lbs

(0.5 to 250 Kg)

• Complies with ASTM, federal, military

and other engineering specifications

Page 5: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 5

Armstrong Fluid Technology - Capability Center

•70 plus qualified engineers

•Hydraulic Design

•Computational Fluid Dynamics (CFD)

•Finite Element Analysis (FEA)

•Mould Flow Analysis

•System/Package Design

•Controls Programming

•Design Assist Facility

Page 6: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 6

London Heathrow

Los Angeles

New Delhi India

Toronto Canada

Berlin Germany

HVAC is a part-load industry

90% of the time

10%-60% of design load

Page 7: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 7

Building load profile

Traditional pumps

are designed for

best efficiency

operation here.

Pumps should be

designed for

BEST

EFFICIENCY

operation here.

Page 8: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 8

INOX at Nariman Point, Mumbai, India

Page 9: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 9

Armstrong as Energy Service Company (ESCO)

Armstrong Fluid Technology has been empaneled as a

Energy Service Company by BEE (Bureau of Energy

Efficiency) in India. This empanelment represents

recognition of the energy impact of Armstrong

solutions, and our expertise designing and delivering

high efficiency fluid flow and HVAC systems for

commercial, industrial and residential applications.

Page 10: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 10

Armstrong’s participation for awards at ACREX 2018 exhibition

Armstrong represented by showing its capability in Energy Saving

category with a customer case study of INOX (Nariman point, Mumbai)

INOX (Nariman point, Mumbai) Runner up

Page 11: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 11

Customer Profile

• INOX Leisure Limited India is the diversification venture of the INOX

Group into entertainment. INOX Leisure’s mission is to be the leader in

the cinema exhibition industry. INOX has established a strong presence

in the cinema exhibition industry in a very short span.

• INOX currently operates 124 multiplexes and 496 screens in 61 cities

and will continue its expansion.

Page 12: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 12

Project Profile

Inline with India commitment to Paris Accord for global warming limiting and India

pledge to reduce emission intensity of GDP by 33%–35% by 2030 below 2005 levels :

• Inox commenced the journey for Energy Conservation and Carbon Foot Print

reduction in its multiplexes

•HVAC had major energy consumption in their Multiplexes and decided to target this

area to reduce energy consumption

•Energy Audit was carried out to find and implement advanced technology in this field

• INOX had an existing Multiplex theatre at Mumbai prime location – Nariman Point.

They wanted to convert this into India’s First 7-Star Experience multiplex with

LASERPLEX Technology

• Invited Armstrong to provide solution on pumping

Page 13: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 13

Project Details – INOX Nariman Point

• HVAC plant Details

✓ Peak Load : 240 TR

✓ Installed Chiller Tonnage : 360 TR

✓ Configuration : Air Cooled Chillers – 2 working and 1 standby

• Pumping System – 4 Pumps of 15 HP each at Constant Speed

✓ Configuration 2 working and 2 Standby – 240 GPM @ 98ft

✓ As per design one pump is supposed to cater to one chiller, but in actual operation

✓ During summer 3 pumps were operating with two chillers

✓ Rest of the year 2 pumps were operating for one chiller

•Air Handling Units(AHU)

✓ With 3 Way Modulating Valves

Page 14: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 14

Installation Before

Page 15: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 15

Installation Before

3way va lve

Constant Speed Horizontal Split Case Pump

3 x 120

Chiller

(WC)AHU

Page 16: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 16

Solution Applied

Change the current plant configuration from

constant primary system to variable primary flow system

Requirements:

•Replace existing 4 constant speed pumps with 3 Design

Envelope Pumps with built-in redundancy

•3-way valves at the AHU to be changed to 2-way

to allow variable flow.

• Introduce variable primary flow control system

•Add Bypass line in the plant room with modulating Valve.

Page 17: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 17

New Schematic and site installation photograph

Page 18: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 18

New Schematic and site installation photograph

2way valve

Motrised Valve

3w+1S

3 x 120

Chiller

(AirCooled)AHU

IPS 4501

Variable Primary flow

Controller

M

Page 19: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 19

Results

Chilled Water Primary Pump Energy Upgrade

– Inox Nariman

Total Annual Savings in INR Lacs 11

Total Investment from Inox INR Lacs 10

Total Payback period Years 1

Page 20: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 20

Results

Before After

Pumping system Before Pump-1 Pump-2 Pump-3 Pump-1 Pump-2 Pump-3

Chilled water

pump

Total pump installed on site 4 3

No of pump operation 3 2

Input Power (kW) 11 11 10 7 7

Net Pump Head in mtrs 28 29 27 28 29

Flow in GPM 200 190 252 249 241

Overall Efficiency (%) 32 31 42 59 60

Operating hours 5,840 5,840 1,952 5,840 1,952

Power cost in INR 11.3 11.3 11.3 11.3 11.3

Total cost of running- INR Lacs 7.72 7.86 2.41 7,674 2,530

Total pump running cost per annum

in Lacs 18 Lacs 7 Lacs

60% Saving in

pumping energy

cost

Page 21: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 21

Advantages of Design Envelope Solution

• Less shutdown time –to implement the new solution

• Easy installation – no DP Sensors, no flowmeters.

• Less controls complexity-Design envelope IPS 4501 Variable Primary flow controller

making use of senseless technology to control the pumps and bypass valve.

• Lower payback period.

Page 22: Canadian sales June 15, 2017

AEEE Presentation Armstrong July 2018 22

Thank you!