C2 SSA Pilot Briefing With Notes

Embed Size (px)

Citation preview

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    1/26

    C2 SSA COI Pilot:

    Building Netcentricity in theSpace C2 Weapon System

    January 2006

    Mrs. Roxanne GroenewoudMajor Mark Schmidt

    ESC CC2SG/NGDistribution C. Distribution authorized to US Governmentagencies and their contractors (administrative use, 12 Jan 2006).Refer other requests for this document to CC2SG/NGS.

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    2/26

    2

    Agenda

    Strategic Overview

    COI Scope

    COI Management

    Pilot Goals and Objectives Pilot Options

    Pilot Selection

    Pilot Acquisition

    Metrics Lessons Learned

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    3/26

    3

    C2 SSA COI Service = C2 SSA Data Model + NCES Security/Discovery/Adapter + NCES Messaging + DoD Metadata Registry

    Consumers

    Producers/Developers

    DDMSDiscovery

    Metadata Schemaw/ C2 SSA extensions(XML)

    Web Services Info Grid

    Advertise

    Post

    Info Request

    Info Delivery

    WS Ad

    WS P

    WS IR

    WS ID

    DSCS Status DBAuthoritative Source

    Web ServiceS D

    NCES

    Content

    Discovery

    S D

    ServiceAdapter

    ServiceAdapter S DS D

    UNCLAS

    NCES

    MessagingD

    DoD

    Metadata

    Registry

    NCESServices

    ACCESSIBLE

    VISIBLE

    C2 SSA

    UDOP UI

    Legacy

    SISPUDOP UIDOL Portal /Content

    Discovery UI

    MetadataRegistry UI

    C2 SSAData Model

    Schema(XML)

    C2 SSASubscription

    UI

    Developers

    UNDERSTANDABLE

    S

    D

    = data flow usesC2 SSA data modelschema

    = data flow uses

    DDMS Discoverymetadata schema

    = uses NCESSecurity forauthorization andPKI

    = uses NCESService Discoveryfor web serviceregistry

    S

    Service Registry

    Register & Discover

    DSCS

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    4/26

    4

    Outline

    2005 2006

    DetermineCOI Scope

    Create COI

    ManagementStructure

    EstablishPilot Goals &

    Objectives

    Evaluate

    PilotOptions

    AcquirePilot

    SelectPilot

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    5/26

    5

    C2 Space Situational Awareness Scope

    Space

    C2

    C2 SSA COI

    SSA

    SSA for C2

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    6/26

    6

    Outline

    2005 2006

    DetermineCOI Scope

    Create COI

    ManagementStructure

    EstablishPilot Goals &

    Objectives

    Evaluate

    PilotOptions

    AcquirePilot

    SelectPilot

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    7/267

    C2 SSA COI Structure

    Existing Planned

    DoD CIO

    Service CIOService CIO

    Services

    Working Group(USSTRATCOMChair)

    Service CIOC2 SSA COI Board (O-6)(Maj Gen Shackelford,

    AFSPC/DR chair)

    C2 SSA COI Forum (FO/GO)(Lt Gen Frank G. Klotz

    AFSPC/CV chair)

    C2 FCB

    Data Mgmt

    Working Group(AFSPC/LCO Chair)

    Pilot

    Working Group(ESC CC2SGChair)

    ImplementationWorking Group

    (AFSPC &USSTRATCOM

    Co-Chair)

    Service CIOs

    AdditionalWorking Groups

    (as required)Additional

    Working Groups(as required)

    AdditionalWorking Groups

    (as required)

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    8/268

    C2 SSA COI Management TeamOverall responsibility for groups efforts and COI progress

    Provide the action-officer-level administrative dutiesCoordinate issues across COI membership

    COI Management Team

    Data ManagementWorking Group

    Pilot WorkingGroup

    Develop COIVocabularies

    Identifyauthoritative datasources

    Adjudicate SSAdata andmetadatadecisions withstakeholders

    ServicesWorking Group

    Developprocesses anddemonstrateCOI products(data schema,enterprise

    services)

    Reduce risk toprogram ofrecord

    Facilitateserviceimplementationacross COIspirals

    Negotiate andmanageService LevelAgreements(SLAs)

    ImplementationWorking Group

    Define high level COICapability Roadmap(prioritize data & servicesto be made available)

    Define C2-SSA COI joint

    operational vision (targetarchitecture)

    Synchronize COIproducts with JCIDS,Acquisition, PPBE andMission Areas

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    9/269

    Outline

    2005 2006

    DetermineCOI Scope

    Create COI

    ManagementStructure

    EstablishPilot Goals &Objectives

    Evaluate

    PilotOptions

    AcquirePilot

    SelectPilot

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    10/2610

    Pilot Goals and Objectives

    Select and Design Pilot to:

    Provide Military Utility & Operational Leave-Behind

    Reduce Risk for COI (define & exercise processes)

    Intentionally tackle social / political issues

    Depend on DISAs Discovery & Security Services

    Derived Constraint Use SIPRNET

    Deliver Capability in 12 months

    Integrate existing tech rather than develop new tech

    Derived Constraint No new contracts

    Be Funded

    Derived Constraint Use/support program of record

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    11/2611

    Outline

    2005 2006

    DetermineCOI Scope

    Create COI

    ManagementStructure

    EstablishPilot Goals &Objectives

    Evaluate

    PilotOptions

    AcquirePilot

    SelectPilot

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    12/2612

    Pilot Evaluation Process

    Describe characteristics of good Pilot to the Community

    Solicit / Identify Pilot Candidates to be evaluated

    Reviewed Joint SSA Team recommendations

    Asked for Army, Navy, Marines & AF inputs

    Tailor Selection Process Evaluation Criteria

    Weighting of Criteria (Decision = Weigh Equally)

    Preliminary Scoping (costs; plans; schedule; COI

    commitments, manpower, funds)

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    13/2613

    Evaluation Criteria

    Operator

    Acquisition

    COI

    Perspectives: Evaluation Criteria:

    - WHAT IS OPS UTILITY (or VALUE) PROVIDED BY PILOT ?- JOINTNESS (ARMY, NAVY, MARINES, AF) ?- DOES PILOT BUILD ON JSSAT RECOMMENDATIONS ?- DOES PILOT BUILD ON AFSPCS HPT USE CASES ?- DOES PILOT PROVIDE FOUNDATION FOR REST OF THIS COI ?

    - WHAT ARE THE RISKS AND DEPENDANCIES ?- IS THERE A CONTRACT VEHICLE ALREADY AVAILABLE ?- ARE FUNDS ADEQUATE FOR 12 MONTH SCHEDULE ?- IS PILOT SCOPED TO BE SUCCESSFUL IN 12 MONTHS ?- IS THERE AN OPS DELIVERY THAT PILOT CAN MIGRATE WITH ?

    - DOES PILOT HELP ESTABLISH GOOD COI PROCESSES ?- DOES PILOT FOCUS ON EXTERNALLY SHARED DATA ?- DOES PILOT CREATE AN AUTHORITATIVE VOCABULARY FOR THE COI ?- DO AGREED UPON BUSINESS RULES EXIST ?- DOES PILOT ACTUALLY DEMONSTRATE NET-CENTRIC CAPABILITY ?

    Exercise processes across multiple boundaries

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    14/2614

    Outline

    2005 2006

    DetermineCOI Scope

    Create COI

    ManagementStructure

    EstablishPilot Goals &Objectives

    Evaluate

    PilotOptions

    AcquirePilot

    SelectPilot

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    15/2615

    Recommended Pilot to C2 SSA COI Forum & obtained finalapproval

    AFSPC/CV approved two operational threads during C2-SSA COIGeneral Officer Forum, 26 Jul 05

    Defense Satellite Communication System (DSCS) Thread (Joint

    with Army): Automate link status data exchange (M2M) Satellite communications status available near real-time to all

    Global Positioning System Thread: Create service to alert operators to satellite changes Improve target location and GPS weapon accuracy

    Provide Risk Reduction for Space C2 Weapon System Gain experience with use of Core Enterprise Services

    Security, discovery and messaging Exercise net-centric service oriented approach

    OSD/NII provided resources to assist the Pilot effort

    Pilot Selected

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    16/2616

    Outline

    2005 2006

    DetermineCOI Scope

    Create COI

    ManagementStructure

    EstablishPilot Goals &Objectives

    Evaluate

    PilotOptions

    AcquirePilot

    SelectPilot

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    17/2617

    COIs

    COI Pilot Acquisition Pathfinder

    GovernanceRqmts. System Engineering

    Security Service Level Agreements

    Metrics

    Risk ReductionPrototype Delivery Data Schema

    NCES interoperability

    HeadquartersPolicy andProcedures

    COI

    Space C2 WSProgram of

    Record

    DeliverOperationalCapability

    Acquire

    Pilot

    Data Schema

    Architecture

    Roadmap

    COIsCOIs

    OSD

    A i i i Ch ll S i C ifi i

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    18/2618

    Acquisition Challenge -- Security Certificationand Accreditation

    SystemDevelopment(continuous)

    SystemOperation

    (continuous)

    SSAADocument(periodic)

    SystemChange

    CertificationAnalysis(periodic)

    Mismatched processes

    Inherent bottleneck

    Risk

    How can IA be built-induring development?

    Process certification

    A i iti Ch ll S i L l

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    19/26

    19

    DataProducer

    SIPR

    SISPServer

    Acquisition Challenge -- Service LevelAgreements

    Acquisition:Ops. Requirements

    ResponsibilitiesInteroperabilityDevelopment

    OwnershipFundingTesting

    OperationalPerformance:

    FrequencyQuality

    Accuracy

    TimingAvailability

    DataFlow

    DataConsumer

    High Risk Government Responsibility

    A i iti Ch ll DISA d

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    20/26

    20

    Acquisition Challenge -- DISA andInteroperability

    Pilot is dependent on DISA NCES services

    Accessing services for development from .com

    Connecting non-operational with operational systems

    Balancing federated v. enterprise security solutions

    Interoperability standards / policy between: Data producers and consumers

    How to define the interface?

    Metadata schema

    Security Service

    Messaging

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    21/26

    21

    Metrics for OSD/NII

    Evaluate Initial and incremental costs of interfaces

    Rational: Provide a quantitative indicator of the cost of net-centricity Compare cost (time + $) of point-point v. net-centric interface development Assess variability in the development costs for future interfaces

    Changes / Impacts to Space C2 Weapon System Rational: How did the pilot influence and reduce the risk for future development Document changes to the SISP program. Including roadmap, costs, systems

    engineering process, security and test processes attributable to the COI pilot

    Service Usage Rational: Understand who is using what service and how often Create an automated log of users and activity Eventually measure unanticipated user activity

    Capability Assessment Rational: Assess if pilot provided capabilities are useful to the targeted users Assess the planned capability to be delivered. Did capability meets

    expectations? Was additional capability derived? Compare the planned v.actual capability.

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    22/26

    22

    Some Lessons Learned

    Net-Centric information sharing approach not wellunderstood

    High learning curve with NCES Core Enterprise Services

    Meetings with OSD/NII and DISA of great help

    Difficult to articulate & test Net-Centric requirements Performance requirements [SLAs]

    Combining operational systems with non-operationalcapabilities (e.g., NCES)

    Security requirements when combining systems atdifference mission assurance levels

    High level endorsement is key in joint environment

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    23/26

    23

    Synopsis

    Off and running building joint processes

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    24/26

    24

    Pilot Working Group Points of Contact

    Maj Mark Schmidt

    Pilot Working Group Chair ESC CC2SG/NG

    [email protected]

    719-556-9469

    Capt Neil Soliman

    Engineer and GPS Domain Expert

    ESC CC2SG/NG

    [email protected]

    719-556-2058

    Ms. Mary Pulvermacher

    Technical Lead

    MITRE

    [email protected]

    719-572-8241

    Pilot Working Group

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    25/26

    25

    C2 SSA COI Collaboration Portal

    1. To get an AF Knowledge Now Account

    Https://afkm.wpafb.af.mil/ASPs/Users/login.asp?filter=ct

    2. Direct link to C2 SSA Portal

    https://afkm.wpafb.af.mil/ASPs/COP/ClosedCoP.asp?filter=oo-ot-sp-03

  • 8/3/2019 C2 SSA Pilot Briefing With Notes

    26/26

    26

    Back- Up: C2 SSA COI Pilot Responsibilities

    DSCSClosed

    Network

    SATCOM Server Node

    Firewall

    Security LayerSecurity

    Layer

    AccessDSCS Data

    Get DSCSData

    SatelliteStatus Web

    Page

    SIPRNET

    GPS MissionControl Station

    2 SOPS

    SBMCS-MCSInterface

    NavAccData

    NavAccPrediction

    Web Service

    NavAcc AlertService

    SISP 1.0 Server

    DSCSData

    Other SIPRNETUsers

    Browser Only

    SIPRNET

    SIPRNET

    SISP Users

    SISPClient

    SIPRNETXML

    DMWG

    Army

    SISP 1.0

    Pilot Addition

    GPS StatusService

    SIPRNET

    PredictionRepository

    AlertProfiles

    GPS StatusWebsite (NANU)

    SIPRNETSIPRNET

    SBMCS-NANUInterface

    XML

    C2 SSA ServerSISP Prototype

    DSCS Thread

    GPS NavAcc Thread