Business Process Workshop Course Assignment
Q
m
u
z
i
k
COPYRIGHT © 1997 BY PQ MUZIK AFRICA
All rights reserved. The contents, nor any part thereof, nor the format, the configuration or
any other aspect thereof may be copied, transformed, reworked, reverse engineered,
stored or transmitted, irrespective of the mode or method thereof, or in any other way be
dealt with other than only with the express prior written permission of PQ Muzik Africa.
BUSINESS PROCESS WORKSHOP Detail Course
Document Number: 850/00043/0200/v/09
Author: CJ Prinsloo Revision: 09 Date: November 1997
GENERAL OBJECTIVES OF THE COURSE
Rev 09: November 1997 Page 4
Business Process Workshop – Detail Course
On completion of the course, the student will be able to: 1. Understand the contents of Business Process Workshop database. 2. Understand the various hardware breakdown structures (HBS’s). 3. Apply knowledge gained in his/her job situation.
Rev 09: November 1997 Page 5
Business Process Workshop – Detail Course
TABLE OF CONTENTS 1. INTRODUCTION
1.1 Scope 1.1.1 Purpose of the manual 1.1.2 Target group 1.1.3 Modus Operandi 1.1.4 Overview of the Workshop and MRP
2. CREATING AN BUSINESS PROCESS WORKSHOP DATABASE
2.1 Definition and description: Business Process Workshop
2.2 Definition and description: Product Breakdown Structure (PBS)
2.3 Definition and description: Bill of Material (BOM)
2.4 A common accurate Integrated Product and Process Definition
2.5 Creating the Business Process Workshop Definition database 2.5.1 Design definition 2.5.2 Production definition 2.5.3 Assembly definition 2.5.4 Procurement definition 2.5.5 Product support definition
APPENDICES
1. APPENDIX 1
- BUSINESS PROCESS WORKSHOP COURSE ASSIGNMENT
2. APPENDIX 2
- WORKSHOP PROCESS FLOW CHART
REFERENCES
1. APICS DICTIONARY: 7TH EDITION
2. MRP II COURSE 1: CONCEPTS AND POLICIES
Rev 09: November 1997 Page 6
Business Process Workshop – Detail Course
1. INTRODUCTION
1.1 Scope
1.1.1 Purpose of the Course The purpose of the course is to teach students how to define an Business
Process Workshop within an Enterprise Resource Planning (ERP) system, that can be used for the purpose of Material Requirement Planning (MRP), Capacity Planning, Configuration and Quality Management, Maintenance Planning, Manufacturing, Procurement and Costing.
1.1.2 Target group The target group includes line- and project management as well as personnel
involved in the following functional areas in a manufacturing company: - DESIGN ENGINEERING - PRODUCTION - PROCUREMENT - FINAL ASSEMBLY - PRODUCT SUPPORT (LOGISTICS) - MARKETING AND PROGRAM MANAGEMENT - FINANCE - QUALITY Due to the nature and vast scope of the subject, people in certain functional
areas will have a greater interest in specific sections of the manual. Please study those sections directly applicable to your work situation thoroughly, and read through the remaining sections in order to relate to and gain a better understanding of those functions.
1.1.3 Modus Operandi Training will take place in the form of a workshop exercise. The workshop
process flow chart gives a schematic overview of the steps to be followed. Most ERP systems have an extensive HELP for on-line functions and data
fields. Use the help and the flow chart (Appendix 2) in conjunction when doing exercises.
1.1.4 Overview of the Workshop and MRP We start the course with a schematic overview of the Business Process
Workshop (so that the students know what they are in for) and also of Material Requirements Planning (MRP), to give those students who do not have any knowledge of MRP some background.
Rev 09: November 1997 Page 7
Business Process Workshop – Detail Course
BU
SIN
ES
S P
RO
CE
SS
W
OR
KS
HO
P
AD
D P
AR
TM
AS
TE
RS
CR
EA
TE
PR
OD
UC
TB
RE
AK
DO
WN
ST
RU
CT
UR
E(P
BS
)
AD
DC
US
TO
ME
RO
RD
ER
S
AD
D C
OS
TC
EN
TR
E
AD
D W
OR
KC
EN
TR
E
AD
DP
AR
TO
PE
RA
TIO
NS
FIR
M A
ND
RE
LE
AS
EP
UR
CH
AS
EO
RD
ER
S
RU
N M
RP
AN
D D
ET
ER
MIN
E
NE
TT
RE
QU
IRE
-M
EN
TS
CO
ST
PR
OD
UC
T(C
OS
T G
EN
.)
RE
LE
AS
EP
RO
DU
CT
ION
OR
DE
RS
RE
CE
IVE
PU
RC
HA
SE
DP
AR
TS
TO
ST
OR
E
SH
IPP
RO
DU
CT
CR
AT
EP
RO
DU
CT
ISS
UE
PA
RT
S T
OC
US
TO
ME
RO
RD
ER
S
ISS
UE
PA
RT
S T
OW
OR
KO
RD
ER
S
RE
CE
IVE
CO
MP
LE
TE
DA
SS
EM
BL
IES
/P
AR
TS
TO
ST
OR
E
Sp
ecif
ye
nd
ite
mC
RE
AT
EO
RD
ER
RE
QU
IRE
-M
EN
TS
Su
gg
est
Pla
nn
ed
Ord
ers
Su
gg
est
Pla
nn
ed
Ord
ers
C
A B
D
EG
H
I
J
KF
L
MN
OP
Q
Rev 09: November 1997 Page 8
Business Process Workshop – Detail Course
MRP LOGIC
WHAT ARE WE GOING TO MAKE?
WHAT DO WE NEED?
DO WE HAVE ENOUGH STOCK?
NEXT ITEM
TOO MUCH ON ORDER
SUGGEST EXCESS
ON ORDER
NEXT ITEM
SUFFICIENT ON ORDER?
PLAN AN ORDER
DUE DATE CORRECT?
SUGGEST
RESCHEDULE
YESNO
NOYES
YES
NO
NOYES
Rev 09: November 1997 Page 9
Business Process Workshop – Detail Course
THE MRP PROCESS
1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3
25 30 15 40 15 30 15 15Periods
Demand from X Demand from YIndependent
Demand for A
X
A B(1) (2)
Y
A C(1) (3)
PART A
On hand - 95Allocated - 20Lead Time - 3 PeriodsLot Size - 100
Gross requirements
Scheduled receipts
Projected on hand *
Net Requirements
Planned order receipts
Planned order releases
MRP worksheet for Item A
15
6075
40
20
40
100
80
30
50
100
15
35 35
45
10
100
90(-10)
90
1 2 3 4 5 6 7 8
* On hand - allocated
(95 - 20) = on hand balance
# Net Req = “negative”
projected on hand
Rev 09: November 1997 Page 10
Business Process Workshop – Detail Course
2. CREATING A BUSINESS PROCESS WORKSHOP DATABASE
2.1 Definition and Description: Integrated Product and Process Definition
(IPPD)
A Business Process Workshop can be defined as a comprehensive database
for a product family that includes all important data required by the following functions in a manufacturing company:
- DESIGN ENGINEERING - PRODUCTION - PROCUREMENT - FINAL ASSEMBLY - PRODUCT SUPPORT (LOGISTICS) - MARKETING AND PROGRAM MANAGEMENT - FINANCE - QUALITY The Business Process Workshop is defined in the following database files
within the MRP system. Part Master: Holds all data inherent to a part, regardless of where they are used.
Product Structure: Holds all data sensitive to the application of a part. The different structures are
also defined in this database. Routing Master: Holds all data regarding the assembling/manufacturing of a product, including
the assembly logic and sequence.
Rev 09: November 1997 Page 11
Business Process Workshop – Detail Course
BUSINESS PROCESS
WORKSHOP
DEFINITION
A comprehensive database for a product
family including all important data required
by:
* Design Engineering
* Production
* Procurement
* Final Assembly
* Product Support
* Marketing & Program Management
* Finance
* Quality
DATABASE FILES:
* Part Master
* Product Structure
* Routing Master
FIGURE 2.1A
2.2 Definition and Description: Product Breakdown Structure (PBS)
2.2.1 The Product Breakdown Structure (PBS) can be defined as a hierarchical
structure, which defines all configurations for a product family (including options) by means of parent-component links.
2.2.2 The PBS is one of the data elements in the Integrated Product and Process
Definition and different types of Product Breakdown Structures (PBS's) may exist for one product family, within the Integrated Product and Process Definition (IPPD). They are:
- Phantom PBS's - Modular PBS's - Pseudo PBS's - Functional Modular PBS's - Repaired PBS's These PBS’s are discussed in more detail in paragraph 4 of this chapter.
Rev 09: November 1997 Page 12
Business Process Workshop – Detail Course
PRODUCT BREAKDOWN
STRUCTURE
DEFINITION
A hierarchical structure which defines all
configurations for a product family (including
options) by means of parent-component links
DATA
Within IPD
DIFFERENT TYPES
* Phantom PBS’s
* Modular PBS’s
* Pseudo PBS’s
* Functional Modular PBS’s
FIGURE 2.2
2.3 Definition and Description: Bill of Material (BOM) A bill of material can be defined as a listing (or report) of subassemblies,
components, semi-finished parts, raw materials with the quantity required to build a subassembly, assembly or finished product, stipulated for each.
Depending on the type of manufacturing process or product, bills of material
can alternatively be known as formulas or recipes. A bill of material is derived from the Integrated Product and Process Definition
of a product family.
Rev 09: November 1997 Page 13
Business Process Workshop – Detail Course
BUSINESS PROCESS WORKSHOP
CREATEIntegratedProduct
Definition
HOW?
IntegratedDevelopment
(Team of 6Concept)
USEIntegratedProduct
Definition
FOR:• Manufacturing (MRP)• Support• Configuration Control• Procurement (MRP)• Costing• Configure to Order
SUPPORTDEFINITION• Failure Data• Resources• Change Control• Repair and Maintenance Procedures
PRODUCTSTRUCTURE• Configuration• Cost• Change Control
MANUFACTURING DEFINITION• Manufacturing Process• Resources• Change Control
FIGURE 2.1B
2.4 A common accurate Integrated Product and Process Definition
An Integrated Product and Process Definition (IPPD) includes data which affect
many functions because it basically defines how the product is designed, manufactured and supported, what the costs are involved and what quality is required.
BILL OF MATERIAL
DEFINITION
A structured list of drawings, specifications,
components, semi-finished parts, raw materials,
with the quantity required to build a sub-
assembly, assembly or finished product
stipulated for each.
FIGURE 2.3 The problems with multiple product definitions are obvious. They seldom
correspond, yet they are used for design engineering, planning, production, procurement, finance, and product support and configuration control. In
Rev 09: November 1997 Page 14
Business Process Workshop – Detail Course
essence configuration management means knowing exactly what you are supposed to build, what you are building and what you will be building. Consider the task of a producer of weapon systems, where the product is in a constant state of change. How do service people know which components are contained in which products? Configuration control is essential in these industries, but configuration control in a company with many different bills of material is certainly a challenge!
COMPANY USERS OF IPPD’S
PROGRAM MANAGEMENT
FINANCE
PRODUCTION MARKETING
PROCUREMENT PRODUCT SUPPORT
ENGINEERING FINAL ASSEMBLY CUSTOMER
QUALITY
FIGURE 2.4
2.5 Creating the Integrated Product and Process Definition database
Basically the IPPD contains five definitions, namely the design, assembly,
production, procurement and product support definitions. In the following paragraphs how to create and integrate these definitions is discussed.
2.5.1 Design Definition The following process has to be followed to create the "Design Definition":
Rev 09: November 1997 Page 15
Business Process Workshop – Detail Course
DESIGN DEFINITION
1. PRODUCT BREAKDOWN STRUCTURE (PBS)
* Parent/Component relationship
* Level
* Quantity per
* Modular, repair, planning (PBS)
2. IDENTIFY CONFIGURATION ITEMS
* Make / buy decision
* MRP planned
3. MASTER RECORD INDEX (MRI)
* Configuration item (CI) data pack
* Drawings, specifications, technical
instructions, documentation, etc.
4. OPTIONS
* Modular
5. QUALITY DATA
* Classification of characteristics
6. DESIGN STANDARDISATION DATA
* Commodity code
7. DESIGN RESPONSIBILITY
* Designer code
8. DESIGN HISTORY
* ECP number, implementation date
* Modification and revision status
9. PRODUCT SERIES AND BUSINESS UNIT
* Product definition and business unit code
10. NATIONAL STOCK CODIFICATION DATA (SIN SYSTEM)
* Standard number
* Approved item name
FIGURE 2.5
a. Define the Product Breakdown Structure (PBS) by means of parent-
component relationship levels and quantity required.
Rev 09: November 1997 Page 16
Business Process Workshop – Detail Course
PRODUCT BREAKDOWN STRUCTURE
LEVEL 1
LEVEL 2
LEVEL 3
PLUG
PLG00001
CCI
EARTH PIN ASSY
PLG00010
MCI
LINE PIN
PLG00009
MCI
EARTH PIN
PLG00005
PCI
PIN SCREW
PLG00006
PCI
LINE PIN
PLG00007
PCI
PIN SCREW
PLG00006
MCI
QTP = 1 QTP = 2
QTP = 1 QTP = 1 QTP = 1 QTP = 1
PBS defined by means of parent / component relationship and quantity required
FIGURE 2.6 b. Identify configuration items by means of the Source Code (Make/buy
decision) and MRP planned indicator.
HARDWARE BREAKDOWN STRUCTURE
SC = SOURCE CODE
MRP = MRP PLANNED
QTP = QUANTITY PER
PRODUCT Z
600/09000
SC = M MRP = Y
C
C
I
QTP = 1
QTP = 2 QTP = 1 QTP = 3 QTP = 4
SPECIFY THE MANUFACTURING AND PURCHASING LEVELS
SUB-ASSY A
600/00010
SC = M MRP = Y
M
C
I
SUB-ASSY B
600/00020
SC = M MRP = Y
M
C
I
QTP = 2
COMPONENT 1
600/00035
SC = P MRP = Y
P
C
I
COMPONENT 2
600/00036
SC = P MRP = Y
P
C
I
COMPONENT 3
600/00053
SC = P MRP = Y
P
C
I
COMPONENT 4
600/00054
SC = M MRP = Y
M
C
I
FIGURE 2.7
Rev 09: November 1997 Page 17
Business Process Workshop – Detail Course
Configuration Items (Cl’s) are those parts in a product which are either procured (purchase order), manufactured (production order) or supplied to the customer. The following types of Configuration Items (Cl’s) are usually included in a product definition:
- PCl’s (Procured Configuration Items) - MCl’s (Manufactured Configuration Items) - CCl's (Customer Configuration Items) NOTE: Configuration Items are all the "MRP Planned" “Procured” and
“Manufactured” parts in the product definition. They can also be defined as the stocked parts or the parts for which the MRP function will generate works or purchase orders. A printout of the product definition (BOM Print), showing only the Configuration items represents what is called a hardware breakdown of the product.
E.g. the make/buy decision for COMPONENT 4 in Figure 2.7 is specified
as manufactured by means of the SOURCE CODE = M and MRP PLANNED = Y.
Fig 2.8 c. Define the Master Record Index (MRI) for every CONFIGURATION ITEM
(Cl) data pack, by linking the drawings, specifications, interface drawings, technical instructions and documentation to the Cl. E.g. the drawings of COMPONENT 5 and COMPONENT 6 in Figure 2.8 are linked to COMPONENT 3, whereas a C-SPECIFICATION and TEST REPORT are linked to SUBASSEMBLY B.
NOTE: A MRI is an index of all drawings, specifications and other documents
required to manufacture or procure a configuration item.
Rev 09: November 1997 Page 18
Business Process Workshop – Detail Course
MASTER RECORD INDEX (MRI)
BY CONFIGURATION ITEM (CI)
COMPONENT 3
600/00053
SC = P MRP = Y
P
C
I
DRAWINGS OF COMPONENTS 5 AND 6 ADDED
(INCLUDED WITH DATAPACK FOR COMPONENT 3)
COMPONENT 4
600/00054
SC = M MRP = Y
C
C
I
COMPONENT 5
600/00055
SC = P MRP = N
D
R
G
COMPONENT 6
600/00056
SC = P MRP = N
D
R
G
C-SPEC
600/0086
SC = P MRP = N
SPEC
TEST REPORT
600/0126
SC = P MRP = N
D
O
C
SUB-ASSY B
600/00020
SC = M MRP = Y
M
C
I
QTP = 3
QTP = 2
QTP = 4 QTP = 1 QTP = 1
QTP = 1 QTP = 1
Specifications and documentation added
FIGURE 2.8 Fig 2.9 d. Define all the options/different configurations of a product family by means
of a "modular" Product Breakdown Structure (PBS). The modules act as generic baselines for the design, procurement, and assembly and product support definitions. It can also be used to quickly structure a specific end item configuration of the product for a client, by means of a "customer special order".
Rev 09: November 1997 Page 19
Business Process Workshop – Detail Course
OPTIONS FOR SAME PRODUCT
PRODUCT
A
POWER
SUPPLY
GROUP
POWER
UNIT
PETROL
COMMON
PARTS
PU PETROL
CYLINDER
HEAD
OPTIONS
TURBO
CHARGER
OPTION
POWER
UNIT
DIESEL
LUBRI-
CATION
SYSTEM
CYLINDER
HEAD
A
ENGINE
MOUNT-
INGS
CYLINDER
HEAD
B
CRANK
CASE
CRANK
SHAFT
FUEL
SYSTEM
SUSPEN-
SION
SYSTEM
TRANS-
MISSION
SYSTEM
ELEC-
TRICAL
SYSTEM
CARB
PETROL
COMMON
PARTS
SUSP.
COMMON
PARTS
TRANSM.
INSTRU-
MENTS
F / I
PETROL
SUSPEN-
SION
OPTION A
TRANSM.
FULLY
AUTOM.
STARTING
SYSTEM
DIESEL
SUSPEN-
SION
OPTION B
TRANSM.
SEMI
AUTOM.
ELECTRIC
CABLE
SYSTEM
FIGURE 2.9
e. Define quality control data by indicating the highest CLASSIFICATION OF CHARACTERISTICS for a configuration item (Cl).
f. Define design standardisation data by specifying the COMMODITY CODE
to which a configuration item (Cl) belongs. g. Identify the design responsibility by means of the DESIGNER CODE. h. Determine the design history by means of the ENGINEERING CHANGE
PROPOSAL (ECP) NUMBER, IMPLEMENTATION DATE, MODIFICA-TION STATUS and REVISION NUMBER.
i. Identify the product series and business unit responsible for the
manufacturing, by means of the PRODUCT DEFINITION, BUSINESS UNIT AND CONTROLLING DIVISION.
j. Establish a link to the Standard Item Numbering (SIN) system by means
of the STANDARD ITEM NUMBER (SIN). 2.5.2 The production definition The following process is required to create a "Production Definition":
Rev 09: November 1997 Page 20
Business Process Workshop – Detail Course
PRODUCT ION DEFINITION
1. MATERIAL
* Parent/component relationship
* Quantity per
2. SEMI-FINISHED PARTS
* Semi-finished in stock
3. SUB-CONTRACTED PARTS
* Sub-contracting (external) of operations
* Supply material
4. CONSUMABLES AND PROCESS SPECIFICATIONS
* Parent/component relationship
* Quantity per
5. MANUFACTURING LEAD TIME
* Lead time
6. PLANNING RESPONSIBILITY
* Planner code
7. MANUFACTURING LOT SIZE
* Order policy
8. SCRAP FACTOR
* Scrap percentage
9. FLOOR STOCK
* Floor stock indicator
FIGURE 2.10 a. Define the material and quantity required manufacturing a manufactured
component, by linking the material specification to the manufactured part. Fig 2.11 E.g. MATERIAL SPEC 4 (600/40054) is attached to COMPONENT 4
(600/00054) with a “quantity per” of 0.5.
Rev 09: November 1997 Page 21
Business Process Workshop – Detail Course
MATERIAL FOR MCI’S
SUB-ASSY B
600/00020
SC = M MRP = Y
M
C
I
QTP = 2
COMPONENT 3
600/00053
SC = P MRP = Y
P
C
I
QTP = 3
COMPONENT 4
600/00054
SC = M MRP = Y
M
C
I
QTP = 4
MATERIAL 4
600/40054
SC = p MRP = Y
P
C
I
QTP = 0.5
Material for 4 added
FIGURE 2.11 b. Identify and define parts that are manufactured up to a semi-finished
stage, and finalised later with a second works order. Fig 2.12 E.g. in its semi-finished stage the number for COMPONENT 4 is
600/00754/. When it is completed the number becomes 600/00054.
Rev 09: November 1997 Page 22
Business Process Workshop – Detail Course
SEMI-FINISHED ITEM
SUB-ASSY B
600/00020
SC = M MRP = Y
M
C
I
QTP = 2
COMPONENT 3
600/00053
SC = P MRP = Y
P
C
I
QTP = 3
COMPONENT 4
600/00054
SC = M MRP = Y
M
C
I
QTP = 4
COMP 4 - SEMI
600/00754
SC = M MRP = Y
M
C
I
QTP = 1
Semi-finished item
600/00754 being defined
MATERIAL 4
600/00554
SC = P MRP = Y
P
C
I
QTP = 0.5
M = MANUFACTURED
P = PROCURED
S = SUBCONTRACTED
FIGURE 2.12
c. Define subcontracted operations by means of a SUBCONTRACT part. Fig 2.13 E.g. suppose the manufacturing process for COMPONENT 4 (600/00754)
Figure 2.13, requires four machining operations namely 10, 20, 30 and 40. Operations 10, 20 and 40 can be done by your own company, but operation 30 has to be contracted out to an external supplier, since your company does not have the technology to do it. The definition for COMPONENT 4, before being contracted out to the supplier, is represented by COMPONENT 4 - SEMI-FINISHED (400/00754), for which operations 10 and 20 have been completed. The supplier does operation 30 and returns COMPONENT 4, SUBCONTRACT (600/07154), which is also in a half-completed stage, since operation 40 still has to be done by your company.
Rev 09: November 1997 Page 23
Business Process Workshop – Detail Course
d. Identify consumable material and process specifications that are required during the manufacturing process of manufactured parts.
SUB-CONTRACTED ITEMSUB-ASSY B
600/00020
SC = M MRP = Y
M
C
I
QTP = 2
COMPONENT 3
600/00053
SC = P MRP = Y
P
C
I
QTP = 3
COMPONENT 4
600/00054
SC = M MRP = Y
M
C
I
QTP = 4
COMP 4 - SEMI
600/00754
SC = M MRP = Y
M
C
I
QTP = 1
Sub-contracted item
(600/00054/7100) being defined
MATERIAL 4
600/00454
SC = P MRP = Y
P
C
I
QTP = 0.5
COMPONENT 4SUBCONTRACT
600/07154
SC = S MRP = Y
P
C
I
QTP = 1 OP 40
OP 30
OP 20
OP 10M = MANUFACTURED
P = PROCURED
S = SUBCONTRACTED
FIGURE 2.13 Fig 2.14 E.g. CONSUMABLE 1 in Figure 2.14 is a preservation lubricant, which is
required when COMPONENT 4 - SEMI-FINISHED (600/00754) is manufactured. Therefore CONSUMABLE 1 (061/00081) is linked to COMPONENT 4 - SEMI-FINISHED.
Rev 09: November 1997 Page 24
Business Process Workshop – Detail Course
CONSUMABLES
COMP 4 - SEMI
600/00754
SC = M MRP = Y
M
C
I
MATERIAL 4
600/00454
SC = P MRP = Y
P
C
I
QTP = 0.5
CONSUMABLE 1
061/00081
SC = P MRP = Y
P
C
I
QTP = 0.001
PROCESS SPEC 1
600/08754
SC = P MRP = N
SPEC
QTP = 1
QTP = 2
CONSUMABLE 1 (061/00081) AND
PROCESS SPECIFICATION 1 (600/08754) ARE LINKED
FIGURE 2.14
2.5.3 The assembly definition The following process is required to add the "Assembly Definition":
Rev 09: November 1997 Page 25
Business Process Workshop – Detail Course
ASSEMBLY DEFINITION
1. IDENTIFY SCHEDULED ASSEMBLIES
* Phantoms
* Number of works order
2. SEMI-FINISHED ASSEMBLIES
* Semi-finished in stock
3. SUB-CONTRACTED ASSEMBLIES
* Sub-contracting (external) (operations)
* Supply parts
4. ASSEMBLY LOGIC
* Deliver to operation
* Routing
* Stock pull list by operation/work station
5. CONSUMABLES
* Production
* Testing and qualification
6. ASSEMBLY LEAD TIME
* Lead time
7. PLANNING RESPONSIBILITY
* Planner code
8. ASSEMBLY LOT SIZE
* Order Policy
9. SCRAP FACTOR
* Scrap percentage
10. FLOOR STOCK
* Floor stock indicator
FIGURE 2.15
a. Identify scheduled assemblies by means of the SOURCE and MRP PLANNED codes. Scheduled assemblies are those assemblies for which work orders have to be generated. These assemblies must also be received to store, once completed. All assemblies are not necessarily scheduled assemblies, and therefore some are identified as "phantoms" (SOURCE CODE = N). No work orders will be generated for these "phantom" assemblies.
Fig 2.16 E.g. supposes the assembly department decides that they will be
decreasing the amount of assembly work orders for PRODUCT Z in Figure 2.16. To change SUBASSEMBLY A (600/00010) from a scheduled assembly (source code = M and MRP planned = Y) to an unscheduled assembly, they have to change the SOURCE CODE from M (manufactured) to "N " (phantom) and the MRP PLANNED CODE from "Y" to "N".
Rev 09: November 1997 Page 26
Business Process Workshop – Detail Course
SCHEDULED AND UNSCHEDULED ASSEMBLIES
SC = SOURCE CODE
MRP = MRP PLANNED
QTP = QUANTITY PER
M = MANUFACTURED
N = PHANTOM
P = PLANNED
PRODUCT Z
600/09000
SC = M MRP = Y
C
C
I
QTP = 1
QTP = 2 QTP = 1 QTP = 3 QTP = 4
SUB-ASSEMBLY A (600/00010), THE SC CHANGES FROM “M” TO “N”
SUB-ASSY A
600/00010
SC = N MRP = N
P
H
A
SUB-ASSY B
600/00020
SC = M MRP = Y
M
C
I
QTP = 2
COMPONENT 1
600/00035
SC = P MRP = Y
P
C
I
COMPONENT 2
600/00036
SC = P MRP = Y
P
C
I
COMPONENT 3
600/00053
SC = P MRP = Y
P
C
I
COMPONENT 4
600/00054
SC = M MRP = Y
M
C
I
FIGURE 2.16 Changing assemblies’ SOURCE CODES to PHANTOMS (SC = N) can
reduce the number of work orders on stock pull lists required to build the product.
Fig 2.17 E.g. while SUBASSEMBLY A was still a scheduled assembly, it would
have required three different assembly work orders to assemble one of PRODUCT Z. Each of these work orders would have had a stock pull list (see Figure 2.17).
Rev 09: November 1997 Page 27
Business Process Workshop – Detail Course
WORK ORDERS AND STOCK PULL LIST
FOR PRODUCT Z BEFORE MODIFICATION
STOCK PULL LIST
WO-01
SUB-ASSEMBLY A
600/00010
STOCK PULL LIST
WO-02
SUB-ASSEMBLY B
600/00020
STOCK PULL LIST
WO-03
PRODUCT Z
FINAL ASSEMBLY
600/00010
1. 600/00035
COMPONENT 1 (2 EA)
2. 600/00036
COMPONENT 2 (1 EA)
1. 600/00053
COMPONENT 3 (6 EA)
2. 600/00054
COMPONENT 4 (8 EA)
1. 600/00010
SUB-ASSY A (1 EA)
2. 600/00020
SUB-ASSY B (2 EA)
SUB-ASSEMBLY A, B AND PRODUCT Z ARE SCHEDULED ASSEMBLIES
FIGURE 2.17
Once SUBASSEMBLY A (600/00010) has been changed from a scheduled assembly to an unscheduled assembly, the number of assembly work orders will decrease from three to two, to assemble one of PRODUCT Z. (See Figure 2.18).
Rev 09: November 1997 Page 28
Business Process Workshop – Detail Course
WORK ORDERS AND STOCK PULL LIST
FOR PRODUCT Z AFTER MODIFICATION
STOCK PULL LIST
WO-02
SUB-ASSEMBLY B
600/00020
STOCK PULL LIST
WO-03
PRODUCT Z
FINAL ASSEMBLY
600/09000
1. 600/00053
COMPONENT 3 (6 EA)
2. 600/00054
COMPONENT 4 (8 EA)
1. 600/00020
SUB-ASSY B (2 EA)
2. 600/00035
COMPONENT 1 (2 EA)
3. 600/00036
COMPONENT 2 (1 EA)
ONLY SUB-ASSEMBLY B AND PRODUCT Z ARE SCHEDULED ASSEMBLIES
FIGURE 2.18 b. Identify semi-finished assemblies. These semi-finished assemblies are
those assemblies that have been manufactured up to a certain stage, and is completed later with a second work order.
E.g. suppose that SUBASSEMBLY B (600/00020) in Figure 2.19 requires
two identification plates, after painting has been completed. UNPAINTED SUBASSEMBLY B, without the identification plates, is a semi-finished assembly with a different number (600/00720) than the COMPLETED SUBASSEMBLY B (painted, with the identification plates attached).
Fig 2.19 c. Define subcontracted operations as subcontracted assemblies. E.g.
suppose SEMI-FINISHED SUBASSEMBLY B (600/00720) in Figure 2.19 cannot be assembled at your company, since you do not have the required technology or capacity. The assembly must then change from a MCI (manufactured configuration item) to a PCI (procured configuration item). This is achieved by changing the SOURCE CODE from "M" to "S". COMPONENT 3 and COMPONENT 4 now have to be pulled from the store and sent to the supplier, who will execute the assembly operations and return the assembly to your company as SEMI-FINISHED SUBASSEMBLY B (600/00720).
Rev 09: November 1997 Page 29
Business Process Workshop – Detail Course
SEMI-FINISHED ASSEMBLY
ID PLATE 1
600/00060
SC = P MRP = Y
P
C
I
SEMI SUB-ASSY B
600/00720
SC = S MRP = Y
M
C
I
ID PLATE 2
600/00061
SC = P MRP = Y
P
C
I
SUB-ASSY B
600/00020
SC = M MRP = Y
M
C
I
COMPONENT 3
600/00053
SC = P MRP = Y
P
C
I
COMPONENT 4
600/00054
SC = M MRP = Y
M
C
I
QTP = 2
QTP = 1 QTP = 1 QTP = 1
QTP = 4QTP = 3
SEMI-FINISHED SUB-ASSY B
(600/00020/7000) BEING IDENTIFIED ID PLATES ADDED
FIGURE 2.19
d. Incorporate the assembly logic by specifying the assembly operation and workstation for the various components.
Fig 2.20 E.g. PRODUCT Z requires three operations before it is completed, namely
operations 10, 20 and 30. A specific work centre station is linked to each operation in the database. Various components are required at each of these workstations, for example:
COMPONENT 1, COMPONENT 2 and ATTACHING ELEMENT 1 are
required at Workstation 1 for Operation 10. SUBASSEMBLY B and ATTACHING ELEMENT 2 are required at Workstation 2 for Operation 20. For the final operation, Operation 30, paint and thinners are required at Workstation 3.
By specifying the operation number for which a component is required, in
the DELIVER-TO-OPERATION field, the assembly logic gets defined in the Product Definition Database. It is now possible to divide the stock pull list for the final assembly of PRODUCT Z, in terms of operation and workstation.
Rev 09: November 1997 Page 30
Business Process Workshop – Detail Course
ASSEMBLY LOGIC
COMPONENT 1
061/00035
SC = P MRP = Y
P
C
I
COMPONENT 2
061/00036
SC = P MRP = Y
P
C
I
SUB-ASSY 1
600/00010
SC = N MRP = N
P
H
T
ATTACH ELEM 1
600/00070
SC = P MRP = Y
P
C
I
ATTACH ELEM 2
600/00071
SC = P MRP = Y
P
C
I
SUB-ASSY B
600/00020
SC = M MRP = Y
M
C
I
PRODUCT Z
600/09000
SC = M MRP = Y
CCI
THINNERS
061/00011
SC = P MRP = Y
P
C
I
PAINT
061/00019
SC = P MRP = Y
P
C
I
SC = SOURCE CODE
MRP = MRP PLANNED
QTP = QUANTITY PER
MDTO = MANUFACTURING DELIVER TO OPERATION
WS = WORK STATION
WC = WORK CENTRE
QTP = 1MDTO = 10
QTP = 5MDTO = 20
QTP = 10MDTO = 20
QTP = 2MDTO = 20
QTP = 2 QTP = 1.5MDTO = 30
QTP = 5.8MDTO = 30
QTP = 1
CONSUMABLES AND ATTACHING ELEMENTS BEING ADDED
OP NO
10
20
30
DESCRIPTION
ASSEMBLY SUB-ASSY A
INTEGRATE SUB-ASSY A
AND SUB ASSY BE
PAINT PRODUCT Z
STD HRS
15,0
20,0
5,0
WC
1
2
3ROUTING
FIGURE 2.20
E.g. instead of having a single stock pull list for PRODUCT Z, which will result in all components being issued to Work Station 1, and being moved from one station to the next, the stock pull list can be divided by operation and the components may be issued by operation.
Rev 09: November 1997 Page 31
Business Process Workshop – Detail Course
STOCK PULL LIST
FOR PRODUCT Z
STOCK PULL LIST
WO-03
PRODUCT Z
600/09000
1. 600/00020
SUB-ASSY B (2EA)
2. 600/00035
COMPONENT 1 (2EA)
3. 600/00036
COMPONENT 2 (1EA)
4. 600/00070
ATT ELEMENT 1 (5EA)
5. 600/00071
ATT ELEMENT 2 (10EA)
6. 061/00019
PAINT (6 L)
7. 061/00011
THINNERS (2 L)
STOCK PULL LIST
WO-03
PRODUCT Z
600/09000
1. 600/00035
COMPONENT 1 (2EA)
2. 600/00036
COMPONENT 2 (1EA)
3. 600/00070
ATT ELEMENT 1 (5EA)
OP : 10
WS : 1
STOCK PULL LIST
WO-03
PRODUCT Z
600/09000
1. 600/00020
SUB-ASSY B (2EA)
2. 600/00071
ATT ELEMENT 2 (10EA)
OP : 20
WS : 2
STOCK PULL LIST
WO-03
PRODUCT Z
600/09000
1. 061/00019
PAINT (6 L)
2. 061/00011
THINNERS (2 L)
OP : 30
WS : 3
WITHOUT DELIVER
TO OPERATION WITH DELIVER TO OPERATION
FIGURE 2.21 Fig 2.20 e. Identify consumable materials such as paint, thinners, welding rods,
cutting equipment and also materials used for testing and qualification, by linking each to the assembly where it is required.
f. Determine assembly lead times for MRP planned assemblies. g. Identify the planning responsibility of scheduled assemblies by means of
the PLANNER CODE. h. Specify the assembly LOT SIZE and ORDER POLICY based on the ABC
classification. i. Determine and specify the scrap factor by means of the SCRAP
PERCENTAGE. j. Identify “floor stock” components such as fasteners and consumable
materials, by means of the FLOOR STOCK INDICATOR. E.g. suppose ATTACHING ELEMENT 2 (600/00071) in Figure 2.22 is codified as a “floor stock” item, then the stock pull list for PRODUCT Z will no longer show ATTACHING ELEMENT 2.
Rev 09: November 1997 Page 32
Business Process Workshop – Detail Course
STOCK PULL LIST FOR PRODUCT Z
WITHOUT FLOOR STOCK ITEMS
STOCK PULL LIST
WO-03
PRODUCT Z
600/09000/5000
1. 600/00020/5000
SUB-ASSY B (2EA)
2. 600/00035/5000
COMPONENT 1 (2EA)
3. 600/00036/5000
COMPONENT 2 (1EA)
4. 061/00000/0010
PAINT (6 L)
5. 061/00000/0011
THINNERS (2 L)
STOCK PULL LIST
WO-03
PRODUCT Z
600/09000/5000
1. 600/00035/5000
COMPONENT 1 (2EA)
2. 600/00036/5000
COMPONENT 2 (1EA)
OP : 10
WS : 1
STOCK PULL LIST
WO-03
PRODUCT Z
600/09000/5000
1. 600/00020/5000
SUB-ASSY B (2EA)
OP : 20
WS : 2
STOCK PULL LIST
WO-03
PRODUCT Z
600/09000/5000
1. 061/00000/0010
PAINT (6 L)
2. 061/00000/0011
THINNERS (2 L)
OP : 30
WS : 3
WITHOUT DELIVER
TO OPERATION WITH DELIVER TO OPERATION
FLOOR STOCK ITEMS:
ATTACHING ELEMENT 1
600/00070/5000
AND
ATTACHING ELEMENT 2
600/00071/5000
NO LONGER APPEARS ON
THE STOCK PULL LIST
FIGURE 2.22 2.5.4 The procurement definition The following process is required to create the “Procurement Definition”. a. Identify the MRP planned procured items (PCI’s) by means of the
SOURCE and MRP PLANNED codes.
Rev 09: November 1997 Page 33
Business Process Workshop – Detail Course
PROCUREMENT DEFINITION
1. ID OF SCHEDULED PROCURED ITEMS
* Source code
* Schedule code (MRP planned = “Y”)
2. PROCUREMENT LOGIC
* MRP function
3. SUB-CONTRACTED PROCURED ITEMS
* Parts
* Assemblies
4. PROCUREMENT LEAD TIME
* Lead time
5. PLANNING RESPONSIBILITY
* Planner code
6. PROCUREMENT LOT SIZE
* Order policy
7. FLOOR STOCK
* Floor stock indicator
FIGURE 2.23
b. Incorporate the procurement logic into the Product Definition Database. This means that all Procured Configuration Items (PCI’s) must be at the correct level in the PBS, so that the MRP function can “see” it when the PBS is processed to create the plans.
Fig 2.24 E.g. suppose COMPONENT 6 (600/00056) in Figure 2.24, which is not
currently regarded as MRP PLANNED, is identified as a PCI, then it will have to move to the next level in the PBS because the MRP function does not explode below Procured Configuration Items (PCI’s). If this is not done, MRP will only process up to COMPONENT 3, because MRP logic accepts that everything connected to a PCI is part and parcel of that PCI, and has to be purchased as a unit.
c. Identify subcontracted parts and assemblies by means of the SOURCE
and MRP PLANNED CODES.
Rev 09: November 1997 Page 34
Business Process Workshop – Detail Course
DEFINE PROCUREMENT LOGIC
COMPONENT 3
600/00053
SC = P MRP = Y
P
C
I
COMPONENT 6
600/00056
SC = P MRP = Y
P
C
I
COMPONENT 4
600/00054
SC = M MRP = Y
M
C
I
COMPONENT 5
600/00055
SC = P MRP = N
D
R
G
QTP = 1 QTP = 4QTP = 3
QTP = 1
COMPONENT 6
600/00056
SC = P MRP = N
D
R
G
QTP = 1
COMPONENT 6 BEING IDENTIFIED AS A PCI AND MOVES TO THE NEXT HIGHER LEVEL
SO THAT IT CAN BE PLANNED BY MRP
FIGURE 2.24 Fig 2.25 E.g. SEMI-FINISHED SUBASSEMBLY B (600/00720) in Figure 2.25 is a
subcontracted assembly and COMPONENT 4; SUBCONTRACTED (600/07154) is a subcontracted part.
Rev 09: November 1997 Page 35
Business Process Workshop – Detail Course
DEFINE SUB-CONTRACTED PROCURED ITEMS
ID PLATE 1
600/00060
SC = P MRP = Y
P
C
I
SEMI SUB-ASSY B
600/00720
SC = S MRP = Y
P
C
I
ID PLATE 2
600/00061
SC = P MRP = Y
P
C
I
C-SPEC
600/00880
SC = P MRP = N
SPEC
SUB-ASSY B
600/00020
SC = M MRP = Y
M
C
I
TEST REPORT
600/00020
SC = P MRP = N
D
O
C
COMPONENT 3
600/00053
SC = P MRP = Y
P
C
I
COMPONENT 6
600/00056
SC = P MRP = Y
P
C
I
COMPONENT 4
600/00054
SC = M MRP = Y
M
C
I
COMPONENT 5
600/00055/5000
SC = P MRP = N
D
R
G
COMP 4 SUB-CON
600/07154
SC = S MRP = Y
P
C
I
QTP = 2
QTP = 1 QTP = 1 QTP = 1 QTP = 1 QTP = 1
QTP = 1 QTP = 4QTP = 3
QTP = 1
FIGURE 2.25 d. Determine and specify the procurement lead-time for each Procured
Configuration Item (PCI). e. Identify the planning responsibility for each Procured Configuration Item
(PCI) by means of the PLANNER CODE. f. Specify the size of the procurement LOT SIZE based on the ABC
classification by means of the ORDER POLICY. g. Define ORDER POLICY of the floor stock item and safety stock quantity
(re-order point).
Rev 09: November 1997 Page 36
Business Process Workshop – Detail Course
INT
EG
RA
TE
D P
RO
DU
CT
DE
FIN
ITIO
N D
AT
AB
AS
E
FO
R P
RO
DU
CT
Z
CO
MP
ON
EN
T 1
06
1/0
00
35
SC
= P
M
RP
= Y
P C I
CO
MP
ON
EN
T 2
06
1/0
00
36
SC
= P
M
RP
= Y
P C I
ID P
LA
TE
1
60
0/0
00
60
SC
= P
M
RP
= Y
P C I
SE
MI
SU
B-A
SS
Y B
60
0/0
07
20
SC
= S
M
RP
= Y
P C I
ID P
LA
TE
2
60
0/0
00
61
SC
= P
M
RP
= Y
P C I
C-S
PE
C
60
0/0
08
82
0
SC
= P
M
RP
= N
S P E C
SU
B-A
SS
Y 1
60
0/0
00
10
SC
= N
MR
P =
N
P H T
AT
TA
CH
EL
EM
1
60
0/0
00
70
SC
= P
M
RP
= Y
P C I
AT
TA
CH
EL
EM
2
60
0/0
00
71
SC
= P
M
RP
= Y
P C I
SU
B-A
SS
Y B
60
0/0
00
20
SC
= M
M
RP
= Y
M C I
PR
OD
UC
T Z
60
0/0
90
00
SC
= M
M
RP
= Y
C C I
TH
INN
ER
S
06
1/0
00
11
SC
= P
M
RP
= Y
P C I
PA
INT
06
1/0
00
10
SC
= P
M
RP
= Y
P C I
TE
ST
RE
PO
RT
60
0/2
01
26
SC
= P
M
RP
= N
D O C
CO
MP
ON
EN
T 3
60
0/0
00
53
SC
= P
M
RP
= Y
P C I
CO
MP
ON
EN
T 6
60
0/0
00
56
SC
= P
M
RP
= Y
P C I
CO
MP
ON
EN
T 4
60
0/0
00
54
SC
= M
M
RP
= Y
M C I
CO
MP
ON
EN
T 5
60
0/0
00
55
SC
= P
M
RP
= Y
P C I
CO
MP
4 S
UB
-CO
N
60
0/0
71
54
SC
= S
M
RP
= Y
P C I
CO
MP
4 S
EM
I
60
0/0
07
54
SC
= M
M
RP
= Y
M C I
PR
OC
ES
S S
PE
C
60
0/0
87
54
SC
= P
M
RP
= N
S P E C
MA
TE
RIA
L 4
60
0/0
04
54
SC
= P
M
RP
= Y
P C I
CO
NS
UM
AB
LE
S
06
1/0
00
81
SC
= P
M
RP
= Y
P C I
SC
=S
OU
RC
E C
OD
E
MR
P=
MR
P P
LA
NN
ED
QT
P=
QU
AN
TIT
Y P
ER
MD
TO
=M
AN
UF
AC
TU
RIN
G D
EL
IVE
R T
O O
PE
RA
TIO
N
LO
R=
LIN
E O
F R
EP
LA
CE
ME
NT
RD
TO
=R
EP
AIR
DE
LIV
ER
TO
OP
ER
AT
ION
CC
I=
CU
ST
OM
ER
CO
NF
IGU
RA
TIO
N IT
EM
PC
I=
PR
OC
UR
ED
CO
NF
IGU
RA
TIO
N I
TE
M
MC
I=
MA
NU
FA
CT
UR
ED
CO
NF
IGU
RA
TIO
N IT
EM
PH
T=
PH
AN
TO
M
IDE
NT
IFY
TH
E S
PA
RE
PA
RT
S B
Y R
EF
ER
RIN
G
TO
TH
E R
EP
AIR
TA
SK
SP
AR
E P
AR
TS
BE
ING
IDE
NT
IFIE
D B
Y
RE
FE
RR
ING
TO
TH
E R
EP
AIR
TA
SK
MR
P =
Y
BE
CA
US
E C
OM
PO
NE
NT
5
IS B
EIN
G I
DE
NT
IFIE
D
AS
A L
CI
ITE
M
DE
SIG
N D
EF
INIT
ION
+ P
RO
DU
CT
ION
DE
FIN
ITIO
N
+ A
SS
EM
BL
Y D
EF
INIT
ION
+ P
RO
DU
CT
SU
PP
OR
T D
EF
INIT
ION
+ P
RO
CU
RE
ME
NT
DE
FIN
ITIO
N
QT
P =
1M
DT
O =
10
QT
P =
5M
DT
O =
10
QT
P =
10
MD
TO
= 2
0Q
TP
= 2
MD
TO
= 2
0
QT
P =
2R
DT
O =
10
QT
P =
1.5
MD
TO
= 3
0Q
TP
= 5
.8M
DT
O =
30
QT
P =
1R
DT
O =
10
QT
P =
1Q
TP
= 1
QT
P =
1Q
TP
= 1
QT
P =
1
QT
P =
1R
DT
O =
20
QT
P =
4R
DT
O =
20
QT
P =
3
QT
P =
1R
DT
O =
20
QT
P =
1
QT
P =
1
QT
P =
0.5
QT
P =
0.0
01
QT
P =
1
FIGURE 2.26
Rev 09: November 1997 Page 37
Business Process Workshop – Detail Course
2.5.5 The product support definition The following process is required to create the “Product Support Definition”.
PRODUCT SUPPORT DEFINITION
1. IDENTIFY THE SPARE PARTS
* Per Maintenance Task
* Repairable / Discardable Items
2. PLANNING DATA FOR SPARE PARTS
* Manufacturing / purchasing decision (source code)
* MRP planned (Y / N)
3. PACKAGING DEFINITION FOR SPARE PARTS
* Packaging process
* Packaging material
* Packaging containers
4. PACKAGING DEFINITION FOR TOOLS AND EQUIPMENT
5. INTEGRATION WITH LOGISTIC SUPPORT ANALYSIS RECORD
* Maintenance Significant Items (MSI’s)
* MSI Funtions
* Failure Modes,Effects and Criticality Analysis Data
* Allocated Mean Time Between Failures (MTBF)
FIGURE 2.27 a. Identify spare parts. This is done by linking to the repair task for which the
component is required as a spare, and also by indicating whether the component is repairable or “discardable”.
b. Make sure that components, which have been identified as spare parts
are coded as MRP, planned by means of the SOURCE and MRP PLANNED codes.
Fig 2.26 E.g. COMPONENT 5 (600/00055) in Figure 2.26 is not MRP planned, but
because it has been identified as spare part, it must be codified as a PCI. The MRP PLANNED CODE therefore changes from “N” to “Y” and the SOURCE CODE TO “P”.
c. Define a PACKAGING DEFINITION for each spare part by building a
Product Breakdown Structure (PBS) for the packed parts. An interface to the PBS is achieved via the production part numbers, which are used in both Product Breakdown Structures (PBS’s).
Rev 09: November 1997 Page 38
Business Process Workshop – Detail Course
PR
OD
UC
T S
UP
PO
RT
PA
CK
ED
HB
S
PA
CK
MA
T 1
06
0/0
00
10
SC
= P
M
RP
= Y
P C I
PA
CK
MA
T 2
06
0/0
00
11
SC
= P
M
RP
= Y
P C I
PA
CK
MA
T 2
06
0/0
00
11
SC
= P
M
RP
= Y
P C I
PA
CK
MA
T 1
06
0/0
00
10
SC
= P
M
RP
= Y
P C I
PA
CK
MA
T 1
06
0/0
00
10
SC
= P
M
RP
= Y
P C I
PA
CK
MA
T 2
06
0/0
00
11
SC
= P
M
RP
= Y
P C I
ST
EE
L C
AB
A
60
0/0
05
52
SC
= P
M
RP
= Y
P C I
CA
RD
B B
OX
2
06
1/0
00
50
SC
= P
M
RP
= Y
P C I
WO
OD
CR
AT
E 1
60
0/0
05
50
SC
= P
M
RP
= Y
P C I
CA
RD
B B
OX
1
06
1/0
00
51
SC
= P
M
RP
= Y
P C I
CA
RD
B B
OX
1
06
1/0
00
51
SC
= P
M
RP
= Y
P C I
WO
OD
CR
AT
E 1
60
0/0
05
50
SC
= P
M
RP
= Y
P C I
CO
MP
ON
EN
T 1
60
0/0
00
35
SC
= P
M
RP
= Y
P C I
CO
MP
ON
EN
T 4
60
0/0
00
54
SC
= M
M
RP
= Y
M C I
CO
MP
ON
EN
T 2
60
0/0
00
36
SC
= P
M
RP
= Y
P C I
CO
MP
ON
EN
T 6
60
0/0
00
56
SC
= P
M
RP
= Y
P C I
CO
MP
4 S
UB
-C
60
0/0
71
54
SC
= P
M
RP
= Y
P C I
CO
MP
ON
EN
T 5
60
0/0
00
55
SC
= P
M
RP
= Y
P C I
CO
MP
1 P
AC
KE
D
60
0/5
70
35
SC
= N
M
RP
= N
P H T
CO
MP
4 P
AC
KE
D
60
0/5
70
54
SC
= N
M
RP
= N
P H T
CO
MP
2 P
AC
KE
D
60
0/5
70
36
SC
= N
M
RP
= N
P H T
CO
MP
6 P
AC
KE
D
60
0/5
70
56
SC
= N
M
RP
= N
P H T
CO
MP
4 S
/C P
AC
K
60
0/5
71
54
SC
= N
M
RP
= N
P H T
CO
MP
5 P
AC
KE
D
60
0/0
57
55
SC
= N
M
RP
= N
P H T
SP
AR
ES
LIS
T
60
0/0
05
01
SC
= N
M
RP
= N
P H T
SP
AR
ES
LIS
T 2
60
0/0
05
02
SC
= N
M
RP
= N
P H T
SP
AR
ES
LIS
T 3
60
0/0
05
03
SC
= N
M
RP
= N
P H T
PP
PM
A
60
0/0
05
00
SC
= M
M
RP
= Y
C C I
QT
P =
10
QT
P =
1
QT
P =
1
QT
P =
0.0
01
QT
P =
20
QT
P =
1
QT
P =
1
QT
P =
0.5
QT
P =
5
QT
P =
1
QT
P =
1
QT
P =
4.5
QT
P =
15
QT
P =
1
QT
P =
1
QT
P =
0.2
QT
P =
50
QT
P =
1
QT
P =
1
QT
P =
1.5
QT
P =
2
QT
P =
1
QT
P =
1
QT
P =
0.2
2
MD
TO
= 1
0M
DT
O =
20
MD
TO
= 1
0M
DT
O =
20
MD
TO
= 2
0M
DT
O =
10
RO
UT
ING
: S
PA
RE
PA
CK
A
OP
NO
10
20
WC
088
099
ST
D T
IME
0,5
1,5
WS 1 2
DE
SC
RIP
TIO
N
Pa
ck
ed
an
d P
res
erv
ed
A
Pa
ck
ed
an
d P
res
erv
ed
B
Define p
ackin
g m
ate
rial and c
onta
iners
FIGURE 2.28
Rev 09: November 1997 Page 39
Business Process Workshop – Detail Course
d. Define the packaging process by means of a ROUTING and specify the operation and workstation for the packed parts (which are usually phantoms).
E.g. PPPM A (600/00500) in Figure 2.28 requires 2 different packaging
processes (A and B) which are defined as operations 10 and 20 in the ROUTING for PPPM A. These operation numbers are entered into the “DELIVER TO OPERATION” data field, for the packed spares to which they apply. The stock pull list can now be divided by operation (packaging process).
STOCK PULL LIST FOR SPARE KIT A
STOCK PULL LIST OP 10
WO-03
SPARE KIT A
600/00500
1. 600/00035
COMPONENT 1
2. 600/00552
STEEL CABINET 1
3. 060/00010
PACKAGING MATERIAL 1
4. 600/00036
COMPONENT 2
5. 600/00550
WOODEN CRATE 1
6. 060/00011
PACKAGING MATERIAL 2
7. 600/00055
COMPONENT 5
OP : 10
WS : 1
STOCK PULL LIST OP 20
WO-07
SPARE KIT A
600/00500
1. 600/00054
COMPONENT 4
2. 600/00056
COMPONENT 6
3. 600/07154
COMPONENT 4
SUB-CONTRACT
4. 061/00050
CARBOARD BOX 2
5. 060/00011
PACKAGING MATERIAL 2
6. 061/00051
CARDBOARD BOX 1
7. 060/00010
PACKAGING MATERIAL 1
OP : 20
WS : 2
10 EA
10 EA
1 L
5 EA
7 EA
24 ME
2 EA
20 EA
15 EA
50 EA
20 EA
10 ME
65 EA
78 L
FIGURE 2.29
e. Define spare part and special equipment packaging material such as
plastic bags, plastic rolls, preservatives, and cardboard boxes, etc. Creating part masters for them and linking them to the packed spares does this.
f. Define specially designed containers by creating part masters and linking
them to the packed spare number. g. Define a Product Breakdown Structure (PBS) for packed special tools and
equipment.
Rev 09: November 1997 Page 40
Business Process Workshop – Detail Course
h. Create a direct link with the Logistic Support Analysis Record (LSAR) by means of the following:
- Identification of the Maintenance Significant Items (MSI’s) in the
product definition. MSI’s are systems, subsystems and functional groups in the product definition that require non-trivial product support in terms of preventative and corrective maintenance.
- Identify discardable spare parts. - Identify repairable spare parts. - Link spare parts to repair tasks by means of the REPAIR DELIVER
TO OPERATION, REPAIR OPERATION and OPERATION TYPE.
Rev 09: November 1997 Page 41
Business Process Workshop – Detail Course
APPENDIX 1
IPPD COURSE ASSIGNMENT
Detail Course
Rev 09: November 1997 Page 42
Business Process Workshop – Detail Course
LIST OF CONTENTS
BUSINESS SCENARIO
MODUS OPERANDI
EXERCISE 1: COMPILE A HARDWARE BREAKDOWN STRUCTURE (HBS)
EXERCISE 2: ENTER PART MASTERS AND PRODUCT STRUCTURE Assignment 1: Perform the make/buy decision and add Part Masters and Product
Structure Assignment 2: Enter the Customer Orders, perform ABC Classification and rectify order
policies for MRP Planned Parts
EXERCISE 3: EXECUTE PURCHASE AND WORK ORDERS Assignment 1: Execute Purchase Orders Assignment 2: Execute Work Orders Assignment 3: Modify Earth Pin and Process Change Proposal
EXERCISE 4: IMPLEMENT NEW DESIGN AND OPTIONS
Rev 09: November 1997 Page 43
Business Process Workshop – Detail Course
MODUS OPERANDI
1. Students are divided into teams of + six. 2. At least the following functions must be represented: - Production/Assembly - Engineering (Designer) - Procurement (Buyer) - Quality (Inspector) - Finances (BU Accountant) - Marketing (Program Manager) 3. The presenter will fulfill the roles of: - Suppliers - Clients - Storeman 4. Each team of six represents a company and they must decide on a name for
their company. 5. The workshop is divided into four exercises, namely: - Compiling a Hardware Breakdown Structure - Entering Part Masters, Product Structure and Client Orders - Executing Purchasing and Work Orders - Implementing a new Design and Options
Rev 09: November 1997 Page 44
Business Process Workshop – Detail Course
BUSINESS SCENARIO
1. Company XYZ manufactures three-point electrical plugs. 2. The company is responsible for the design and development of the product. 3. All components are purchased from approved suppliers, and are then
assembled internally. 4. The model manufactured at present is a “base screw model” type plug with a
white cover and white base. 5. The company is also responsible for product support (spares and repair).
Rev 09: November 1997 Page 45
Business Process Workshop – Detail Course
EXERCISE 1
COMPILE A HARDWARE BREAKDOWN STRUCTURE (HBS) Use the information supplied to specify a hardware breakdown for the plug.
INFORMATION The parts for the product are:
PART NUMBER DESCRIPTION COST 99900001 Plug Final Assy
99900002 Cover SM White 22c
99900003 Base SM White R1-00
99900004 Cord Grip 5c
99900005 Earth Pin Chromed 12c
99900006 Pin Screw 2c
99900007 Line Pin 10c
99900008 Base Screw 2c
99900009 Earth Pin Steel 10c
99900051 Bag Plastic 1c
NOTES - A product definition will be assigned to each team.
- The HBS must be prepared on a transparency.
- No manufacturing/purchasing decisions have been made at this stage.
- Allocate numbers for assemblies and subassemblies as required.
- Replace 999 with the first three characters of your name or surname.
- Ask the presenter for your own unique product code.
- Tools are issued to a cost centre as a non-fixed account part (i.e. screw driver R3-55).
OUTPUTS
- Hardware Breakdown Structure on transparency
EXERCISE 2
Rev 09: November 1997 Page 46
Business Process Workshop – Detail Course
ENTER PART MASTERS AND PRODUCT STRUCTURE (BOM) ASSIGNMENT 1: Add Part Masters and create a Product Structure (Bill of Material) for
your plug. (See Exercise 1). Make Earth Pin Chrome a sub-contracted part.
INFORMATION List of suppliers is:
NAME TECHNOLOGY GROUP Screwman Fasteners Elbree Precision Engineering Precision Engineering Electrical Moulded Components Injection Moulding Tool Centre Tools and Hardware Pack & Spice Plastic Bags SA Hardcrome Chrome Plating
ROUTING
Sequence Work Centre 1 “Assemble Line Pins” 01 “Assemble Earth Pin” 02
“Insert Pins into Base” 03 Work Centre 2 “Install Cord Grip” 04 “Install Cover” 05 External Operation “Chrome Earth Pin” - All items manufactured from brass must have a material specification. Material
specifications must be linked to the items manufactured from brass. - The Line Pins has a “Critical” and the Earth Pin a “Major A” characteristic.
Documents are purchased/not MRP and non-fixed account. - There is also a final acceptance specification for the finished product. - All fasteners are “floor stock”. - The customers supply Marking stickers. (Customer A = Blue and Customer B =
Red) - The Cord Grip, Cover, Line Pin and Base Screw are sold as a Spare Part Kit. (Spare
parts have to be packed as a kit in one plastic bag and marked according to client requirements (Customer A - Blue and Customer B - Red)).
- Part numbers and drawing numbers are the same. - Drawings and specifications must have a revision specified.
OUTPUTS
Rev 09: November 1997 Page 47
Business Process Workshop – Detail Course
- Cost Generation of Product (Online) - List of Parts by Designer (IPPD01) - List of Parts by Buyer (IPPD02) - List of Parts by Supplier (IPPD03) - List of Parts by Planner (IPPD04) - List of Items with Classification of Characteristics (IPPD05) - List of Specifications (IPPD06) - List of Customer Furnished Parts (CFI’s) (IPPD07) - List of Spare Parts (IPPD08) - BOM Report (IPPD09) - Routing Report (IPPD10) - List of Drawings (IPPD11)
EXERCISE 2
ENTER PART MASTERS AND PRODUCT STRUCTURE (BOM) ASSIGNMENT 2: Enter the Customer Orders, perform an ABC Classification and rectify
Order Policies for MRP Planned Parts (see flow chart for detail).
INFORMATION There are two customers - Customer A and Customer B. Customer A has ordered 8 plugs (2 per month, every 2
nd month from the end of this month). Customer B has ordered 6
plugs (2 per month every 2nd
month from the end of next month). The plugs are assembled in lot sizes of 2. One spares kit is to be delivered with every 4
th plug being
delivered.
OUTPUTS - ABC Classification (Online) - Order Policies (IPPD12) - MPS Orders Due (IPPD13)
Rev 09: November 1997 Page 48
Business Process Workshop – Detail Course
EXERCISE 3
EXECUTE PURCHASE AND PRODUCTION ORDERS ASSIGNMENT 1: Execute Purchase Orders (see flow chart for detail).
INFORMATION - Stock for presenters will take Purchase Items on hand. - Each “team of six” will have its own store.
OUTPUTS - Purchasing Plan (IPPD14) - Available Stock (IPPD15) ASSIGNMENT 2: Execute Work Orders (see flow chart for detail).
INFORMATION A stock pull instruction and stock pull list must be printed for every works order. NOTE: Receiving and issuing transactions will take two minutes depending on the availability of the printer.
OUTPUTS
- Stock Pull Instruction (Online) - Stock Pull List (Online) - Order to Store Instruction (Online) - Assembled Plugs ASSIGNMENT 3 (OPTIONAL): Modify Earth Pin and process Change Proposal.
INFORMATION Modify Earth Pin from Chrome Plated to Brass. Change Part Number and update Product Structure (see flow chart for detail).
OUTPUTS - Outstanding ECP’s for a Part (ECP01) - Purchase ECP Warning Report (ECP02) - List of Approved ECP’s for a Product (ECP03) - Unregistered Drawings for a Product (ECP04) - Drawing Completion Schedule (ECP05) - Registered Drawings for a Part (ECP06)
EXERCISE 3
Rev 09: November 1997 Page 49
Business Process Workshop – Detail Course
EXECUTE PURCHASE AND PRODUCTION ORDERS (Continued) - BOM Changes for a Product over a period (ECP07) - List of Completed ECP’s for a Product (ECP08) - Where used print (Online) - BOM Comparison (IPPD19) - Data Change History Inquiry (Online)
EXERCISE 4
IMPLEMENT NEW DESIGN AND OPTIONS ASSIGNMENT 1: A new design (snapper) is implemented, and additional colour options (ivory cover, transparent base) are added to the existing model. Build one modular BOM for the product range that will include all possible options and process customer order (see flow chart for detail).
INFORMATION - The snapper design is implemented. - Client an orders another 6 plugs at this point (2 per month starting from the end of
this month). The customer’s requirements are as follows: * 2 x Base Screw Model (Ivory Cover, White Base) * 2 x Base Screw Model (White Cover, Transparent Base) * 2 x Snapper Model (Ivory Cover, Transparent Base)
OUTPUTS - Item List for a Drawing (IPPD16) - Modular BOM Report (IPPD17) - Stock Pull Instruction and Stock Pull List (Online) - Assembled Plugs - Cost Roll-up for Client Order (Online)
IPPD WORKSHOP SCORE-CARD
COMPANY: ______________________________
Rev 09: November 1997 Page 50
Business Process Workshop – Detail Course
EXER-
CISE
ASSIGNMENT OUTPUT POSSIBLE
MARK
MINUS
ERROR
MARK
2 Enter Part Masters and
Product Structure
- List of Parts by Designer (IPPD01)
- List of Parts by Buyer (IPPD02)
- List of Parts by Supplier (IPPD03)
- List of Parts by Planner (IPPD04)
- List of Items with Classification of (IPPD05)
Characteristics
- List of Specifications (IPPD06)
- List of Customer Furnished Parts (CFI’s)(IPPD07)
- List of Spare Parts (IPPD08)
- BOM Report (IPPD09)
- Routing Report (IPPD10)
- List of Drawings (IPPD11)
TOTAL
10
10
10
10
10
10
10
10
10
10
10
10
120
2 Enter Client Order, ABC
Classification and Order
Policies
- ABC-Classification (Online)
- Order Policies (IPPD12)
- MPS’s still due (IPPD13)
- Purchasing Plan (IPPD14)
- Available Stock (IPPD15)
TOTAL
10
10
20
10
10
60
3 Execute Works Orders - Stock Pull Instruction (Online)
- Stock Pull List (Online)
- Assembled Plugs (Phase 1)
- Order to Store Instruction (Online)
- Assembled Plugs (Phase II)
TOTAL
10
10
60
10
40
130
4 Build a Modular BOM
and meet Client Order
- Item List for a Drawing (IPPD16)
- Modular BOM Report (IPPD17)
- Stock Pull Instruction and
Stock Pull List (Online)
- Assembled Plugs (x4)
- Cost Roll-up for Customer Order (Online)
TOTAL
10
40
10
40
10
420
Rev 09: November 1997 Page 51
Business Process Workshop – Detail Course
PLUG FINAL ASSEMBLY
PARTS LIST 1. Line Pin Assembly
2. Cover SM White or Ivory
3. Earth Pin Assembly
4. Cord Grip
5. Sticker (Red or Blue)
6. Base SM White
Rev 09: November 1997 Page 52
Business Process Workshop – Detail Course
MODULAR
BOM PLUG
MODULAR
ROUTING
PLUG FINALASSY GROUP
(COMMON PARTS)
SC = N MRP = Y
EARTH PIN ASSY 20
EARTH PIN
PIN SCREW
LINE PIN ASSY
LINE PIN 10
PIN SCREW 10
CORD GRIP 32
COVER GROUP
SC = N MRP = Y
SNAPPER GROUP
SC = N MRP = Y
COVER SNAP IVORY 31
COVER SNAP YELLOW 31
COVER SNAP RED 31
SM COVER GROUP
SC = N MRP = Y
COVER SM WHITE 30
COVER SM IVORY 30
BASE SCREW 30
SC = N
MRP = Y
Rev 09: November 1997 Page 53
Business Process Workshop – Detail Course
MARKING
SC = N MRP = Y
RED STICKER 40
BLUE STICKER 40SNAPPER BASE GROUP
SC = N MRP = Y
BASE SNAPPER
BASE GROUP
SC = N MRP = Y
SM BASE GROUP
SC = N MRP = Y
BASE SM WHITE 20
BASE SM TRANSPARENT 20
MODULAR ROUTING
10 Line Pin Assy
20 Base and Pin Assy
30 Cover Installation (Screw Model)
31 Cover Installation (Snapper)
32 Cord Grip Installation
40 Marking
Rev 09: November 1997 Page 54
Business Process Workshop – Detail Course
APPENDIX 2
WORKSHOP
PROCESS FLOW CHART
Rev 09: November 1997 Page 55
Business Process Workshop – Detail Course
IPD WORKSHOP
ADD PART
MASTERS
CREATE PRODUCT
BREAKDOWN
STRUCTURE
(PBS)
ADD
CUSTOMER
ORDERS
ADD COST
CENTRE
ADD WORK
CENTRE
ADD
PART
OPERATIONS
FIRM AND
RELEASE
PURCHASE
ORDERS
RUN MRP
AND DETERMINE
NETT REQUIRE-
MENTS
COST
PRODUCT
(COST GEN.)
RELEASE
PRODUCTION
ORDERS
RECEIVE
PURCHASED
PARTS TO
STORE
SHIP
PRODUCT
CRATE
PRODUCT
ISSUE
PARTS TO
CUSTOMER
ORDERS
ISSUE
PARTS TO
WORK
ORDERS
RECEIVE
COMPLETED
ASSEMBLIES /
PARTS TO STORE
Specify
end item CREATE
ORDER
REQUIRE-
MENTS
Suggest
Planned
Orders
Suggest
Planned
Orders
C
A
B
D
E G H
I
J
KF
L
M N O P Q
1.
ADD PART MASTERS
Part Master (Engineering) Part Master (Planning 1) Part Master (Planning 2) Part Master (Cost)
2. ADD ROUTING FOR
MANUFACTURED PARTS
Part operations
3. ADD PRODUCT STRUCTURE Product Structure
4. PERFORM A COST GENERATION Cost Generation
5. UPDATE COST FOR
MANUFACTURED PARTS
Cost Generation
6.
ID DRAWINGS IN BOM
Part Master (Revision) * Rev No = * For Non-drawings * Rev No = 00 for Drawings
Rev 09: November 1997 Page 56
Business Process Workshop – Detail Course
7.
PRINT INSPECTION REPORTS
Access Reports: - Parts by Designer - Parts by Buyer - Parts by Supplier - Parts by Planner - Classification of Characteristics - List of Specifications - Customer Furnished Items - List of Spares - BOM Report - List of Drawings
8.
ADD CUSTOMER ORDERS
Customer Orders (Header) Customer Orders (Line Mandatory) Access Reports: - MPS Orders Due
9. RUN MRP MRP Selective Run
10. PERFORM A ABC-
CLASSIFICATION
ABC Analysis/Reclassification
11. FIX ORDER POLICIES ACCORDING
TO ABC CLASSIFICATION
Part Master (Planning)
12. RUN INSPECTION REPORT FOR
ORDER POLICIES
Access Report: - Order Policies
13. RUN MRP AGAIN MRP Selective Run
14.
PRINT INSPECTION REPORTS
Access Reports: - Works Orders - Purchase Orders
15. GENERATE PURCHASE ORDER
REQUISITIONS TO BUILD SIX
PLUGS ONLY (NB: DO NOT
GENERATE MORE REQUISITIONS)
Stock Purchase Order Requisitions
16. RELEASE PURCHASE AND
SUBCONTRACT ORDERS
Released Purchase Order Generation
17. PRINT ISSUE INSTRUCTION FOR Stores to Order Requirements
Rev 09: November 1997 Page 57
Business Process Workshop – Detail Course
SUBCONTRACT PURCHASE
ORDER
(Send message to Storeman)
18. ISSUE PARTS TO SUBCONTRACT
PURCHASE ORDER
Stores to Order Requirements
19. PRINT PURCHASE ORDER FOR
SUBCONTRACT PART
20. RECEIVE ENOUGH PARTS FROM
SUPPLIER TO BUILD SIX PLUGS
Supplier to Store (Movements) Access Report: - Stock on Hand
21. RELEASE WORK ORDERS Order Master
22. PRINT ISSUE INSTRUCTION FOR
WORK ORDERS
Stores to Order Requirements (Movements) (Send message to Storeman)
23. ISSUE PARTS TO WORK ORDERS
BY “DELIVER TO OPERATION”
Stores to Order Requirements (Movements)
24. PRINT “RETURN TO STORE”
INSTRUCTION
Production to Store (Movements) (Send message to Storeman)
25. RECEIVE COMPLETED
ASSEMBLIES TO STORE
Production to Store (Movements)
26. ISSUE COMPONENTS AGAINST
CUSTOMER ORDERS
Stores to Order Requirements (Movements)
27. ADD A CRATE Crate (Movements)
28. CRATE PRODUCT Production to Crating (Movements)
29.
SHIP PRODUCT
Crating to Customer (Movements) Production to Customer (Movements) Access Report: - Outstanding Customer Order
(OPTIONAL)
PROCESS AN ECP FOR THE
EARTH PIN
See ECP Processing Flow Chart
30. Part Master (Engineering)
Rev 09: November 1997 Page 58
Business Process Workshop – Detail Course
STRUCTURE MODULAR BOM
Part Master (Planning 1) Part Master (Planning 2) Part Master (Cost) Product Structure
31.
LINK COMPONENTS TO
ASSEMBLY DRAWING
Product Structure Enter manufacturing Del-to-Op (manufacturing data) and balloon number (engineering data) Access Report: - Drawing Item List
32. ADD “MODULAR” ROUTING FOR
MODULAR BOM AND LINK PARTS
TO OPERATIONS
Part Operations (Operation Maintenance) Part Operations (Copy Ops from another part) Product Structure
33. ADD CUSTOMER ORDERS FOR
MODULAR BOM AND PRINT
REPORTS
Customer Orders (Header) Customer Orders (Line Mandatory) Access Report: - Outstanding Customer Orders
34. ADD ROUTING FOR “MODULAR”
CUSTOMER ORDER
Customer Orders (Order Operations)
35. PERFORM COST ROLL-UP FOR
“MODULAR” CUSTOMER ORDER
Order Operations
36. PERFORM SHORTAGE CHECKING
FOR CUSTOMER ORDER AND
RUN MRP
* Shortage Checking * MRP Selective Run
37. DO PURCHASING Repeat steps 15 to 22
38. ASSEMBLE PRODUCTS AND SHIP
TO CUSTOMER
Repeat steps 28 to 31