Page 1: Building an Electric Vehicle Station Network

A Case Study – County of Sonoma

Source: Audi

David WorthingtonFleet Manager

Green Fleets RoundtableOakland, CA – October 22, 2014

Building an Electric Vehicle Charging Station Network

Page 2: Building an Electric Vehicle Station Network

Topics of Discussion

• EV Infrastructure Experience• Vehicle Designs• Electric Vehicle Supply Equipment

(EVSE)• Site Location Choices• Site Design• Costs• Maintenance and Repairs

Page 3: Building an Electric Vehicle Station Network

Transportation is a Major Source of GHG emissions

Page 4: Building an Electric Vehicle Station Network

EV Infrastructure Experience

• First Set of Charging Stations Installed in 2008

• Charging Stations Installed to Date– 74 Charging Ports– 37 Stations

• 17 Fleet Use Only• 20 Public• 16 Different Site Locations• 8   Different Cities and Towns

• Future Installations to be Completed by End of 2015– 38 Charging Ports– 19 Stations

• 12  Fleet Use Only• 9    Public• 11  Different Site Locations• 2    New Cities

Page 5: Building an Electric Vehicle Station Network

County Owned Charge Ports

Page 6: Building an Electric Vehicle Station Network

Publicly Available Charge Port Locations as of Today

Page 7: Building an Electric Vehicle Station Network

County Owned Charging PortsEnergy Supplied Over Time

Page 8: Building an Electric Vehicle Station Network

Vehicle Designs

No Standard for Charge 

Point Location on Vehicle Bodies

Page 9: Building an Electric Vehicle Station Network

Electric Vehicle Supply Equipment

Do You Need Vehicle Use Data?

“Dumb” Chargers “Smart” Chargers

Page 10: Building an Electric Vehicle Station Network

EVSE Costs

$30$450 30amps

Level 1 Level 2

$1,000 30amps

Level 2

$3,900 30amps

Level 2 DC Fast Charger

$19,000 125amps

DC Fast Charger

$40,000 550amps

Page 11: Building an Electric Vehicle Station Network

Site Location Choices

• Public or Fleet Use?• Location Needs Assessment• Voltage Availability• Accessibility• Infrastructure Costs• Vehicle Designs

Page 12: Building an Electric Vehicle Station Network

Site Location Choices Cont…

Fleet Use Only Public

•Accessibility•Fee Structure•Hours of Operation•Ease of Use•Vandalism•Customer Service

•Data Tracking•Driver Training•Sophistication of Equipment•Restricting Public Access

Page 13: Building an Electric Vehicle Station Network

Publicly Accessible

Fleet Use OnlyTypically Less Expensive on a Per Station Cost Average

Page 14: Building an Electric Vehicle Station Network

Site Design

• Will the cord reach the vehicle?

• Wall Mount versus Bollard Mount?

• Cellular Coverage or Hard Wired for Data Transmission?

Page 15: Building an Electric Vehicle Station Network

An Installation in 2009

Page 16: Building an Electric Vehicle Station Network

Lessons Learned Same Site in 2013 

Page 17: Building an Electric Vehicle Station Network

Public Accessibility Challenges

Is it a Fueling 

Station or a Parking Space?

Federal ‐‐ American with Disabilities Act (ADA)

State – Building Codes

Local – Permitting 

Page 18: Building an Electric Vehicle Station Network

Infrastructure Costs

 $‐

 $5,000.00

 $10,000.00

 $15,000.00

 $20,000.00

 $25,000.00

 $30,000.00

1 1 1 2 2 2 2 2 3 3 3 6 8

Number of Charging Stations Installed At Each Site

Average Charging Station Site Infrastructure Installation Costs Does Not Include EVSE Costs. 13 Sites, 36 Stations, and 72 Ports

Page 19: Building an Electric Vehicle Station Network

Infrastructure Costs Cont…

 $‐

 $10,000.00

 $20,000.00

 $30,000.00

 $40,000.00

 $50,000.00

 $60,000.00

 $70,000.00

1 1 1 2 2 2 2 2 3 3 3 6 8

Number of Charging Stations Installed At Each Site

Total Charging Station Site Infrastructure Installation Costs Does Not Include EVSE Costs

Page 20: Building an Electric Vehicle Station Network

Infrastructure Costs Vary Greatly

Low Cost Installation

Page 21: Building an Electric Vehicle Station Network

High Cost of Installation

Page 22: Building an Electric Vehicle Station Network

….300 Feet of Trenching….

Page 23: Building an Electric Vehicle Station Network

…..Through Two Parking Lots

Page 24: Building an Electric Vehicle Station Network

Maintenance and Repairs

Curling and Uncurling Electrical Cords Every Day Results in Wiring Failures 

and An Unexpected Maintenance Item to Budget 

For 

Page 25: Building an Electric Vehicle Station Network

Maintenance and Repairs Cont…

Has the Circuit Breaker Been Turned Off for Facility Maintenance and Forgot to be Flipped Back On……?

Page 26: Building an Electric Vehicle Station Network

Help?  You Are Not Alone in Figuring It Out

California Office of Planning and Research Electric Vehicle Infrastructure Guidelines

http://opr.ca.gov/docs/PEV_Access_Guidelines.pdf

Plug‐In Electric Vehicle Collaborativehttp://www.pevcollaborative.org

Bay Area Climate Collaborative http://www.baclimate.org

Page 27: Building an Electric Vehicle Station Network

Questions?

There is a fine line between the “cutting edge and the bleeding edge.”  

Sharing information can help minimize the bleeding.

Page 28: Building an Electric Vehicle Station Network

Contact Information

David WorthingtonFleet Manager

County of Sonoma, California(707) 565-2809